1 ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Pathari Basouda : Basouda : Vidisha (M.P.) : 2.00 Hectare : Stone KHASRA No : 177/1/2 PRODUCTION CAP : Cu.mt/year Stone APPLICANT Shri Rashid Khan S/o Shri Munshi Khan A-54, Bhawani Dham, Phase -1, Narela Shankar, Ayodhya Bypass, Bhopal (MP) Prepared by Amit Saxena RQP/DGMMP/032/ , Vinayak Nagar,Bohra Ganeshji, Udaipur, Rajasthan

2 CONTENTS Sr No PARTICULARS Page No INTRODUCTION NAME OF THE LESSEE DETAILS OF THE AREA DETAILS OF THE MACHINES TO BE USED IN MINING OPERATION DETAILS OF MEASUREMENT OF QUARRY PIT EARLIER EXCAVATED IN THE AREA TO BE SANCTIONED AND DETAILS OF MINERAL CONCESSIONS SITUATED WITHIN 100 METERS PERIPHERY OF THIS AREA SCHEME OF THE PLANTATION DETAILS OF APPROXIMATE DISTANCE OF NATIONAL PARK, SANCTUARY, BIODIVERSITY AREA, INTERSTATE BOUNDARY SITUATED WITHIN PERIPHERY OF 10 KM FROM THE AREA TO BE SANCTIONED PROPOSED ANNUAL PRODUCTION OF MINERAL EFFECT ON GROUND WATER LEVEL DUE TO MINING OPERATION AND ITS PREVENTIVE MEASURES: DETAILS OF SCHEME OF CONTINUOUS RECLAMATION AND REHABILITATION OF THE LAND DEGRADATION DUE TO MINING OPERATION: DETAILS OF PREVENTIVE AND CONTROL SCHEME OF AIR AND WATER POLLUTION: PROVISIONS FOR SEPARATE STACKING OF SURFACE SOIL EXCAVATED FROM MINING OPERATION AND IT S UTILITY: DETAILS OF SOCIAL AND ECONOMIC UP GRADATION OF MINING EFFECTED AREA DUE TO PROPOSED PROJECT DETAILS OF BUDGETARY ARRANGEMENT FOR ENVIRONMENTAL MANAGEMENT ANY OTHER DETAILS DESIRED TO BE SUBMITTED BY MINERAL CONCESSION HOLDER Page 2 of 14

3 SCHEME FOR ENVIRONMENTAL MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Pathari Basouda : Basouda : Vidisha (M.P.) : 2.00 Hectare : Stone KHASRA No : 177/1/2 PRODUCTION CAP : Cu.mt/year Stone INTRODUCTION Nature is very kind on the human to provide all kind of materials on earth. All kinds of minerals are available in their raw form in the earth. Mining operations disturb the terrestrial configuration and natural beauty of the area. The magnitude of disturbance depends upon how the minerals are extracted from the mining area and the environmental impact depends upon the location and size of deposits and the methods adopted for its exploration. By adopting good mining practices it is moving towards harmonious development where both the operational and environmental aspects are accorded due weightage. Every quarry lease holder shall take all possible precautions for the protection of environment and control of pollution while conducting quarry operation. Under the mining operation the this management plan is required. The mining plan has been approved by Directorate of Geology & Mining Madhya Pradesh vide letter no on dtd. 24/11/2014. The Collector office (Khanij Shakha) Katni vide letter No. 1999/Khanij/2010, dated-36/06/2010. Page 3 of 14

4 NAME & ADDRESS OF LESSEE: Shri Rashid Khan S/o Shri Munshi Khan A-54, Bhawani Dham, Phase -1, Narela Shankar, Ayodhya Bypass, Bhopal (MP) Individual Owner SALIENT FEATURES OF THE PROJECT: Particulars Name of the project Land use pattern Mineral Mining Lease area Details Individual Owner Stone 2.00 Hect. Khasra No. 177/1/2 Land Use Private Land Lease Validity Production Capacity Village Tehsil District Latitude& Longitude 10 Years StoneProduction: Cu.mt/year Pathari Basouda Basouda Vidisha (A) 77 53'56.81"E 23 50'08.55"N (B) 77 54'02.02"E 23 50'08.82"N (C) 77 53'56.31"E 23 50'17.42"N (D) 77 54'01.74"E 23 50'17.46"N Estimated project cost 22 Lacs EMP Cost /- Man Power 10 Water demand and supply 4 KLD Nearest habitation/town The nearest village is Pathari Basouda which is about 2.0 KMS from mine site. Nearest Airport The nearest Airport is Bhopal which is about 117 KMS from mine site. Nearest Connectivity Village Road, which is about 420 mtr from mine site. Nearest Railway Station The nearest Railway Station is Ganj Basouda which is about 8 KMS from mine site. Power Supply No electricity is required. Page 4 of 14

5 1. DETAILS OF THE AREA VILLAGE TEHSIL DISTRICT AREA MINERAL : Pathari Basouda : Basouda : Vidisha (M.P.) : 2.00 Hectare : Stone KHASRA No : 177/1/2 PRODUCTION CAP Period : Cu.mt/year Stone : 10 Years The details of the lease area to be grant, ownership etc. is as below: District & State Tehsil Village Area in Khasra Mineral Lease hect. No. Name Period Vidisha, Madhya Basouda Pathari /1/2 Stone 10 Years Pradesh Basouda Whether area is recorded in forests Existance of Public road TOPO SHEET : No : No public road passes : Area falls in survey of India Page 5 of 14

6 EMP: Khasra Map: Page 6 of 14

7 Satellite Image of the mining area: 2. DETAILS OF MACHINE TO BE USED IN MINING OPERATION: Proposed Mining/excavation will be done according to the proposed manner of Manual & Semi Mechanized workings and some machineries i.e. Hydraulic Excavator, Dumpers, Tractor & Water Tank, Jack, Hammer, Wagon Drill will be required to deploy on hire basis for transport purpose. Details given in Mining Plan. 4. DETAILS OF MEASUREMENT OF QUARRY PIT EARLIER EXCAVATION IN THE AREA TO BE SANCTIONED AND DETAILS OF MINERAL CONCESSIONS SITUATED WITHIN 100 METER PERIPHERY OF THIS AREA No seasonal perennial drainage exists within the lease area One pit was excavated in the past. Page 7 of 14

8 The area in surroundings up to 100 meters forms a plain topography with miner undulations of waste land form. 5. SCHEME OF TREE PLANTATION: Main objective of green belt is to provide a barrier between the source of pollution and the surrounding areas. Green belt helps to capture the fugitive emission and to attenuate the noise generated apart from improving the aesthetics. While making choice of plant species for cultivation in green belts priority is to be given to create bio climate. The authorities responsible for making green belt must ensure proper selection of plant species and adequate provision of watering and protection of saplings exist at site. Healthy tree species will be recommends for plantation. Each plant must cover 2.5 x 2.5 meter and its 100 % survival should be achieved Suitable Mali will take care of survival conditions. During the plan period about 0.2Ha area will be used for plantation purposes with in 7.5m barrier zone & plantation will be undertaken towards the southwest slope. The lease area is marked by large exposure of barren land. The lease area is rocky terrain so it is only feasible to undertake the plantation with in lease hold area under 7.5 m barrier after spreading top soil over the strip plantation shall also be undertaken over complete benches. 30 no. trees will be planted per year. The tree species recommended are Tactonagrandis (Teak), Azadirachtaindica (Neem),Mangiferaindica (Aam), Acacia Catechu (Khair), Emblicaofficinalis (Amla), MahuncaLatitolia (Mahua), Planting should be done in large sized 90 cm x 90 cm.pits dug in advance and filled with manure about 50 days before planting. The plantation raised earlier should be carefully maintained. Mortalities should be replaced by fresh saplings. Post Plantation Care: Green belt area must be guarded by suitable fencing to avoid damage by cattle grazing. Page 8 of 14

9 PROPOSED PLANTATION DURING FIRST FIVE YEARS YEAR NO OF TREES AREA COVERED SURVIVAL RATE 1ST 2ND 3RD 4TH 5TH PER HECTARE PER HECTARE PER HECTARE PER HECTARE PER HECTARE (ANTICIPATED) 100 % 100 % 100 % 100 % 100 % SPECIES OF PLANTS MANGO, SUBABOOL KARANJ, TEAK, NEEM, KHAIR OR AS SUGGESTED BY FOREST DEPARTMENT 6. DETAILS AND APPROXIMATE DISTANCE OF NATIONAL PARK, SANCTUARY, BIODIVERSITY AREA, INTERSTATE BOUNDARY SITUATED WITHIN PERIPHERY OF 10 KM FROM THE AREA TO BE SANCTIONED Sr No Proposed project is located in whole or in part within 10 km. from the boundary of YES/NO 1 Protected areas notified under the Wild Life (Protection) - Act, NO National Park NO 3 Critically polluted areas as notified by the Central Pollution NO Control Board from time to time 4 Notified Eco-sensitive areas NO 5 Inter-state boundaries and international boundaries NO 7. PROPOSED ANNUAL PRODUCTION OF MINERAL The yearly production from the quarry is proposed Stone is Cu.mt/year with Semi Mechanized opencast mining system. Entire details are given in the mining plan. Page 9 of 14

10 8. EFFECT ON GROUND WATER LEVEL DUE TO MINING OPERATION AND ITS PREVENTIVE MEASURES: Mining will not be done below the water table. Mining will be done in non- monsoon period. There is no perennial water body in the area. Therefore mining activities will not cause adverse impacts as the mineral is non toxic in nature. Lease area is fairly flat reducing the possibility of soil erosion. Garland drains and check dams shall be constructed with appropriate settling tanks to prevent any run-offs from mine. As the manpower likely to be deployed from nearby village, therefore discharge of domestic waste water is not much and will be easily controlled with the provision of septic tank and soak pit. The stored water will be used for dust suppression and greenbelt development, etc. The pit exposed due to mining will become a source for catchment of rain water and in future it will be helpful to improve the water table of the area. 9. DETAILS OF SCHEME OF CONTINUOUS RECLAMATION AND REHABILITATION OF THE LAND DEGRADATION DUE TO MINING OPERATION: Land degradation is one of the major adverse impacts of open cast mining activities and any effort to control adverse impacts would be incomplete without appropriate land reclamation strategy. It is a mining below five hectares lease area, which is very small in nature therefore no damage of the land is anticipated. The area is likely to be degraded due to quarrying, pitting & roads. The impact on the land form or Physiography will be limited to the modification of the slope. The landscape and land use will undergo a radical change due to open cast mining. The impact during plan period is limited as benches will be formed on the already degraded land. Besides these benches, roads will also modify the Physiography. By the completion of project period plantation will grow up and will form green belt around the Quarry Land area. During the plan period, benches will reach the ultimate pit limit. The total exploited Stone shall be transported to plant of making aggregates therefore no waste shall be generated. Page 10 of 14

11 Reclamation and rehabilitation will be started at the end of mine life which required sufficient quantity of waste etc. for back filling. Availability of waste at the closing time of mine will be very less to meet requirement; hence the mined out pit will be developed as water reservoir in future. Experience of scientific mining work will be achieved by the applicant and workers which can be utilized for further achievements related to mining. 10. DETAILS OF PREVENTIVE AND CONTROL SCHEME OF AIR AND WATER POLLUTION: Air Pollution Control: The proposed site is located in the remote area having a clean atmosphere. Therefore the quality of ambient air will be as good as heaven. As the mining is of small scale, the potential sources of air pollution arising from mining operations would be Drilling, haul roads, exhaust fumes of internal combustion machines, combusting of fuel oil and transportation of Gitti. Due to this mining activities air quality will undergo certain significant change. The present level of mining is not anticipated to raise the concentration of the pollutants beyond the prescribed limits. However, the following measures are being adopted in the proposed mining activity to mitigate the PM levels in ambient air. Mitigation Measure: Mining activities will generate certain quantities of dust during drilling, blasting, loading and transportation operations. The following measures willbe taken to mitigate the fugitive dust from different operations: To avoid the dust generation from the drilling operations, wet drilling method will be adopted. Proper mitigation measures like water sprinkling will be adopted to control dust emissions. Drill machines will be equipped with dust collectors. Dust mask will be provided to all workers. Provision of dust filters/ mask to workers working at highly dust prone and affected areas. Page 11 of 14

12 Provision of green belt all along the periphery of the lease area. Periodical monitoring of ambient air quality in and around the lease area. Lying of haul road as per the standards Regular maintenance of haul road and service road to reduce air borne dust. Watering of haul road and other road at regular intervals. Dense plantation being carried in and around the proposed mines will help in combating air pollution. In case of long transportation the trucks after loading will be covered with tarpaulin sheets. Speed of the vehicles will be maintained within the prescribed limits. Trucks will not be over loaded and will be maintained to the optimum body level. Water Management and Water Pollution Control: Mining activities will not cause adverse impacts as the mineral is non toxic in nature. Lease area is fairly flat reducing the possibility of soil erosion. Garland drains and check dams shall be constructed with appropriate settling tanks to prevent any run-offs from mine. As the manpower is likely to be deployed from nearby village, therefore the discharge of domestic waste water will not be much and will be easily controlled with the provision of septic tank and soak pit. The stored water will be used for reduction of Particular Matter of Ambient Air, and for the development of greenbelt etc. Following control measures will be taken to minimize water Pollution due to mining activity; The stored water will be used for reduction of Particular Matter of Ambient Air, and for the development of greenbelt etc. A drain should be created around the quarry land and proposed water body. connected to the Water Consumption (Avg.) Waste Water Generation Source of water 4.0 KLD Only from domestic section, taken care by Soak pit/ Septic tank arrangement Nearby Village Page 12 of 14

13 Noise Environment: Movement of truck/ dumper will create the transitional noise level. However noise generated by these will be of low level and will be within the prescribed desired limit. Following control measures will be taken to minimize negative impact due to mining activity. Machinery and equipments of improved designs Proper maintenance of all machines will be carried out which will reduce noise generation during operations. Use of PPE,s personal protective devices i.e. earmuffs and earplugs by workers, working in high noise areas. Provision of green belt all along the periphery of the lease area. Conducting periodical medical checkup of all workers for any noise related health problems Proper training to personnel to create awareness about adverse noise level effects. Noise barriers, silencers and enclosures shall be incorporated in the equipments, which emit noise levels. Unnecessary use of horns by the drivers of the vehicles shall be avoided. 11. PROVISIONS FOR SEPARATE STACKING OF SURFACE SOIL EXCAVATED FROM MINING OPERATION AND IT S UTILITY: Top soil in the lease area is very scanty. Available soil will be removed and kept stacked for utilizing for plantation in the backfilled area, when the mine reaches the ultimate limits. Grasses will be planted on the soil along the slopes to prevent wash offs during monsoon and prevent landslides. Page 13 of 14

14 12. DETAILS OF SOCIAL AND ECONOMIC UP GRADATION OF MINING EFFECTED AREA DUE TO PROPOSED PROJECT: 2.00 Hectares of Shri Rashid Khan S/o Shri Munshi Khan Mine has undertaken community development works in order to improve the amenities in nearby villages as a part of commitment towards social and economic up liftment of the area. Mining is expected to have positive impact on socio-economic life of people living in nearby villages. No impact on agricultural lands has been reported due to mining, nor has mining affected the climate of the area. There has been rather an improvement in the status of the people because of increase in income due to direct or indirect employment Mining has created awareness amongst the people for education and general upliftment particularly in the womenfolk. 13. ENVIRONMENTAL MANAGEMENT IMPLEMENTATION BUDGET: Pollution control and monitoring Rs /- Occupational health Rs /- Green belt Rs /- Other: CSR Activity like separate toilets for girls in school, potable water tank in school, medical/first aid facility in the school Rs /- Miscellaneous (Fencing etc.) Rs /- Total Rs 1,20,000/- 14. ANY OTHER DETAILS DESIRED TO BE SUBMITTED BY MINERAL CONCESSION HOLDER: All information regarding EMP has been mentioned above point. Other information is given in Form-1, PFR & Mining plan. Page 14 of 14

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Parsen : Gwalior : Gwalior (M.P.) : 3.345 Hectare : Stone KHASRA No : 4154 PRODUCTION CAP : 50,000 Cu.mt/year (avg.) Stone APPLICANT

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Krishna Construction Company AT Khasra No.1046 Vill.-Pipalya Hamir, Tehsil-Barod, District-Agar Malwa (M.P.) Production Capacity: 40000 Cu.mt Crusher Stone for 18 Months

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN At Narmada River Mining Project:-Category B2 Lease Area: 20.000 Hect. Khasra No. 735 Vill.-Boras, Tehsil- Udaipura District- Raisen (M.P) Project Proponent M/s Shiva Corporation

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF ALAMPUR THIKARIYA SAND DEPOSIT QUARRY KHASRA NO. 149, TOTAL AREA- 8.0 Hect. (MALENI RIVER) AT VILLAGE- ALAMPUR THIKARIYA, TEHSIL-JAORA, DISTRICT- RATLAM, STATE-MADHYA PRADESH

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN VILLAGE - KUNDLA TEHSIL - NAGDA DISTRICT - UJJAIN STATE - MADHYA PRADESH KHASRA NO. - 574 AREA - 8.00 Hectare PRODUCTION - 98800 cu.m/ Year PREPARED UNDER RULE 42 C OF MP MINOR

More information

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0. ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

DHANWADA CRUSHER STONE QUARRY

DHANWADA CRUSHER STONE QUARRY ENVIRONMENT MANAGEMENT PLAN FOR Mining of Crusher Stone Area 1.910 Hect, Kh. No. 95 AT Village: Dhanwada, Tehsil: Khirkiya, Dist: Harda (MP) Proponent Shri Atul Kumar Agrawal S/o- Shri Ashok Agrawal Resi-

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT BANDOL CRUSHER STONE QUARRY OF SHRI TULSIRAM SAHU AT Khasra No. 15/2,23/2 Village Bandol Tehsil District State Madhya Pradesh Production Capacity 45030 M3/Year Area 3.150 Hectare

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Metal Stone Area 2.000 Hectare, Khasra No. 1127/1 Village Tehsil District State AT KHILCHIPUR KHILCHIPUR RAJGARH MADHYA PRADESH Proponent SHRI ALTAF KHA S/O SHRI

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING 1. Name and Address of Quarry Lease Holder: a. Name of applicant Priyesh Singh Thakur S/o Shri Karan Singh Thakur b. Designation of applicant Owner c. Name

More information

Piplyakamil Murrum Quarry located at Khasra No 90/2, near Village Piplyakamil, Tehsil- Dharampuri, District Dhar M.P

Piplyakamil Murrum Quarry located at Khasra No 90/2, near Village Piplyakamil, Tehsil- Dharampuri, District Dhar M.P 1. INTRODUCTION The project namely Piplyakamil Murrum Quarry having an area of 2.0 ha at Khasra No.- 90/2 near Village- Piplyakamil Tehsil- Dharampuri, District-Dhar, State-Madhya Pradesh belongs to Shree

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION An Environmental Management Plan (EMP) is a site-specific plan developed to ensure that all necessary measures are identified and implemented in order to protect

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

ENVIRONMENT MANAGMENT PLAN

ENVIRONMENT MANAGMENT PLAN ENVIRONMENT MANAGMENT PLAN DETAIL OF MINE- NAME OF MINERAL SANDSTONE (FURSHI PATTHAR) MINING LEASE FOR FINISHED SANDSTONE VILLAGE PARASWAHA, TEHSEEL JABERA DISTRICT - DAMOH KHASRA NO. 22/1, AREA 1.0 HECTARE

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) 1) Executive Summary Project Name of Company / Mine Owner Location Village Taluka District State Girgita Limestone Mine M/s KJS

More information

GRAVEL & ROUGH STONE QUARRY

GRAVEL & ROUGH STONE QUARRY ENVIRONMENTAL MANAGEMENT REPORT Of GRAVEL & ROUGH STONE QUARRY Sy. No. 211 (Carved out of Sy.No.1) Tarluwada Village & Anandapuram Mandal, Visakhapatnam District, Andhra Pradesh. AREA OF MINING LEASE 23.760

More information

Chapter- V MANAGEMENT PLAN (EMP)

Chapter- V MANAGEMENT PLAN (EMP) Chapter- V MANAGEMENT PLAN (EMP) The Environment Management Plan (EMP) for a development project prescribes the mitigation measures to be adopted to nullify or to minimize various anticipated environment

More information

Environmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village,

Environmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village, Environmental Management Plan For Mining of Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village, Palakurthy Mandal, Peddapally District, Telangana State Applicant Sri

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Sri D. Ujjinappa has applied for quarry lease for extracting of Building stone in Sy No. 19/2, Chatnihalli Village, Harpanahalli Taluk, Davangere District,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN EMP 1 INTRODUCTION In each of the areas of impact, measures have to be taken to reduce potentially significant adverse impacts and where these are beneficial in nature, such impacts are to be enhanced/

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF 3.45 HECTARES, MIDASAN STONE QUARRY AT VILL-MIDASAN, TEH SIHORA, DISTT JABALPUR, MADHYA PRADESH PROJCT PROPONENT SHRI RAJA MOR S/o SHRI VISHNU PRASAD MOR BUS STAND, TEHSIL

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT EXECUTIVE SUMMARY 1.0 Executive Summary The Mining lease was granted in favour of Shri Mukesh Kumar S/o Shri Harish Chandra, R/o Tatol vaya Bagra, Tehsil - Bhinmal, Dist.-Jalore

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

M/s.NEERAJ KUMAR JAIN

M/s.NEERAJ KUMAR JAIN EXECUTIVE SUMMARY OF DARSHANI LATERITE AND RED OCHRE DEPOSIT Area : 15.00 Ha. Village Budhanwara, Tahsil Bohriband, Dist. Katni MADHYA PRADESH For M/s.NEERAJ KUMAR JAIN KATNI 1 BUDHANWARA LATERITE AND

More information

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Smt. J N Rukmini, has applied for extracting of Building stone in Sy No. 40, Kuroda Bore Kavala village, Hassan Taluk & District, Karnataka over an extent

More information

1. PRE-FEASIBILITY REPORT

1. PRE-FEASIBILITY REPORT 1. PRE-FEASIBILITY REPORT 1.1 Executive Summary Sri. T. Thimmegowda, has applies quarry lisence for extracting of Building Stone Quarry in Sy No. 33/2, Kurodbore Kaval village, Hassan Taluk, Hassan District,

More information

Environment Management Plan

Environment Management Plan Environment Management Plan Environmental Impact Assessment Statement describing the impact of mining and beneficiation on environment on the following: i) Land area indicating the area likely to be degraded

More information

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR AT VILLAGE:- BRAHMPURI, TALUKA:- Sayla, DIST.:-Surendranagar 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN BANKUCHIA STONE DEPOSIT VILLAGE POLICE STATION DISTRICT STATE AREA PRODUCTION RATE BANKUCHIA PATAMDA EAST SINGHBHUM JHARKHAND 29.00 ACRES (11.74 HA) 854755 TPA PROJECT PROPONENT

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

ENVIRONMENTAL MANAGEMENT

ENVIRONMENTAL MANAGEMENT ENVIRONMENTAL MANAGEMENT PLAN RAJBANDH STONE DEPOSIT VILLAGE Rajbandh POLICE STATION MALPAHARI DISTRICT PAKUR STATE JHARKHAND AREA 9.00 ACRES (3.64 HA) PRODUCTION RATE 338850 TPA PROJECT PROPONENT M/S

More information

Environmental Management Plan. For Mining of. Building Stone & Road Metal

Environmental Management Plan. For Mining of. Building Stone & Road Metal Environmental Management Plan For Mining of Building Stone & Road Metal Over an extent of 5.65 Ha at Survey No. 427,428 & 429 Alladurg Village, Alladurg Mandal, Medak District, Telangana State Lessee M/s

More information

SHRI.LAKSHMAN NAMDEV KOLI

SHRI.LAKSHMAN NAMDEV KOLI PRE-FEASIBILITY REPORT (PFR) FOR PROPOSED STONE QUARRY BY SHRI.LAKSHMAN NAMDEV KOLI AREA. 1.00 HA., GAT. NO. 811/2 PART, VILLAGE BASTAWADE, TAL.: TASGAON, DIST.: SANGLI PREPARED BY EQUINOX ENVIRONMENTS

More information

ENVIRONMENTAL MANAGEMENT REPORT COLOUR GRANITE MINE

ENVIRONMENTAL MANAGEMENT REPORT COLOUR GRANITE MINE ENVIRONMENTAL MANAGEMENT REPORT Of COLOUR GRANITE MINE Sy. No.Old: 52/2B1 (New 52/2B1) of Peddavelagatur Village, Peddapanjani Mandal,Chittor District, Andhra Pradesh AREA OF MINING LEASE 5.70 Ha. For

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT GRANITE BUILDING STONE QUARRY MINING PROJECT STATE : KERALA DISTRICT : KANNUR THALUK : THALASSERY VILLAGE : THRIPPANGOTTUR BLOCK NO. : NIL SURVEY NO. : 275/1A MINERAL : GRANITE BUILDING

More information

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R. WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.Global Granites Production Granite Black Granits At Survey

More information

Pramod S. Kambli. Page 1

Pramod S. Kambli. Page 1 PREFEASIBILITY STUDY FOR SHREE. PRAMOD S. KAMBLI Page 1 Executive summary Shree.., has laterite stone quarry in an area 2.61 Ha in the survey No. 1091 With quarrying capacity of 10259.31 TPA. The major

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area. ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0. INTRODUCTION: The proposed M/s. Ordinary sand Mine of Shree Ramjibhai samjibhai Gujarati Area at near village Survey No.Bhadar River Bed, Vill.

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent Shri Alihusen Haji Mohammadali Alirajpurwala Address - N/V Kanawant, Taluka & District - Chhotaudepur Near Taluka District Area Survey

More information

PREFEASIBILITY REPORT FOR BRICK EARTH MINE

PREFEASIBILITY REPORT FOR BRICK EARTH MINE Page 1 PREFEASIBILITY REPORT FOR BRICK EARTH MINE Developed By- Village-Chandauhan, Tehsil-Phulpur, District-Allhabaad, Uttar Pradesh. RAI ENVIROMENTAL SERVICES PVT. LTD. Website: www.raienviro.com Email

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent - Kirtikumar Nathubhai Shah Address - N/V Damlai, Taluka- Jhagadia District - Bharuch Near Village Taluka District Area Survey No.

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan Building Stone (Granite), Khandas & Gitti, Boulder Mining Project Gata No. 989, Khand No. 10 Area 1.61 Ha.(4.0 Acre) Village Makrbai, Tehsil Mahoba, District Mahoba, Uttar

More information

EXECUTIVE SUMMARY. 1.1 Executive Summary

EXECUTIVE SUMMARY. 1.1 Executive Summary 1.1 Executive Summary EXECUTIVE SUMMARY Chobe ki Guwari Sand Stone Mining Project (M.L. No- 26-R-01/2001) is situated near village Chobe ki Guwari, Tehsil Sapotra, District Karoli, State Rajasthan over

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

EnvironmEntal management Plan

EnvironmEntal management Plan EnvironmEntal management Plan FOR BORAGAM SAND QUARRY Lease Area: 5.018 Ha. / 12.40 Acres of Sri Padman Kumar Bisoi S/o- Motising Bisoi At/ Po- Kerla, Tahasil Kodinga, Dist. Nabarangpur, Odisha Prepared

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area. PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.

More information

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 PRE-FEASIBILITY REPORT 1. SUMMARY Project Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 Village Kudeli Taluka Baikunthpur District Koriya

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the

More information

ENVIRONMENT MANAGEMENT PLAN. For Excavation of Brick Earth (Total Mining Area Ha.) (for Manufacturing of Bricks)

ENVIRONMENT MANAGEMENT PLAN. For Excavation of Brick Earth (Total Mining Area Ha.) (for Manufacturing of Bricks) ENVIRONMENT MANAGEMENT PLAN For Excavation of Brick Earth (Total Mining Area 2.121 Ha.) (for Manufacturing of Bricks) By M/s Bhagwati Eth (bzv) Udyog Village Shokanangla, Pargana & Tehsil Bazpur, District-

More information

ENVIRONMENTAL MANAGEMENT PLAN PHASIGUDA SAND QUARRY. For Sri Kalu Charan Behera. Prepared By AMARESH RATH RQP/OD/076/2017

ENVIRONMENTAL MANAGEMENT PLAN PHASIGUDA SAND QUARRY. For Sri Kalu Charan Behera. Prepared By AMARESH RATH RQP/OD/076/2017 ENVIRONMENTAL MANAGEMENT PLAN OF PHASIGUDA SAND QUARRY OVER AN AREA OF 12.842 ACRE / 5.196 HA IN VILLAGE PHASIGUDA OF DIGAPAHANDI TAHASIL OF GANJAM DISTRICT OF ODISHA. For Sri Kalu Charan Behera Village

More information

Masonry Stone Mining Project, M. L. No. 27/09, M. L. Area 1.0 ha. Near Village: Velangri, Tehsil & District-Sirohi (Rajasthan) PRE FEASIBILITY REPORT

Masonry Stone Mining Project, M. L. No. 27/09, M. L. Area 1.0 ha. Near Village: Velangri, Tehsil & District-Sirohi (Rajasthan) PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY PRE FEASIBILITY REPORT This is an existing mine, proposal for obtaining Environmental Clearance for Masonry Stone with production capacity 37,300 TPA Near Village: Velangri, Tehsil-Sirohi,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Excavation of Brick Earth (Total Mining Area 1.112Ha.) (For Manufacturing of Bricks) Submitted By M/s New Kaptan Brick Field Shri Krishna Kr. Singh S/o Shri Brahma DevSingh Pure

More information

State Environment Impact Assessment Authority, M.P. (Government of India, Ministry of Environment & Forests)

State Environment Impact Assessment Authority, M.P. (Government of India, Ministry of Environment & Forests) State Environment Impact Assessment Authority, M.P. (Government of India, Ministry of Environment & Forests) To, Shri Pradeep Jain C/o Jain Medical store, Main Market,Tendukheda, District Narsingpur M.P.

More information

EXECUTIVE summary. Khasra No. Area Ownership/Occupancy Hects. Govt. Land

EXECUTIVE summary. Khasra No. Area Ownership/Occupancy Hects. Govt. Land EXECUTIVE summary 11.1 PROJECT DESCRIPTION has been granted Mining lease over an extent of 8.09 Ha in village Tihai, District Satna, Madhya Pradesh for a period of 20 years with effect from 22.11.1995

More information

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha 1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted

More information

Environmental Management Plan Report

Environmental Management Plan Report Environmental Management Plan Report DUMERDIHI SAND QUARRY Over an area of 12.547 Ac/5.078 Ha in Village Dumerdihi, Nuapada Tahasil, Nuapada District. Odisha 2015-16 To 2019-20 CHAPTER 1 1. ENVIRONMENTAL

More information

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us

More information

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

MODIFIED QUARRYING PLAN FOR SHINGATALOOR SAND MINING BLOCK-2 EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY. MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

PRE-FEASIBILTY REPORT

PRE-FEASIBILTY REPORT Aug 2018 PRE-FEASIBILTY REPORT OF M/S. J.M.R.MINES (MINING OF FELDSPAR, QUARTZ & MICA MINE) Lease Area : 5.78 Hectares(14.29 Acres) Sy.No.941,942,943 &947 Giddalur (V), Sydapuram (M), SPSR Nellore District

More information

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005 Name of the Project: Naubasta Limestone Mine ( A Unit of M/s Jaiprakash Associates Limited ) for Expansion of Mining Capacity from 3.3 MTPA to 4.0 MTPA at villages Atrauli, Gadhwa, Kachoor, Naubasta, Kauadhan,

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

GREENCINDIA Consulting Pvt. Limited

GREENCINDIA Consulting Pvt. Limited Expansion of Tamar Bauxite Mine from 10,000 TPA to 40,000 TPA in Tamar & Kirkiran Villages, Majhgawan Tehsil, Satna District, Madhya Pradesh : The M.P. State Mining : GREENCINDIA Consulting Pvt. Limited

More information

Scanned by CamScanner

Scanned by CamScanner Scanned by CamScanner ENVIRONMENT STATEMENT (FORM V) Udaipur Cement Works Limited Daroli Limestone Mine-1 YEAR 2017-18 Udaipur Cement Works Limited SHRIPATINAGAR, P.O. CFA: DABOK, DISTRICT UDAIPUR (RAJASTHAN)-313021

More information

(A govt. of Kerala Undertaking)

(A govt. of Kerala Undertaking) Annexure - 1 Basic Information Important Note: Please send the information by e-mail in word format and a signed & scanned copy to the Member Secretary prior to the EAC meeting. Please also provide a copy

More information

EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD

EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD Madhya Pradesh State Mining Corporation Ltd (MPSMCL), a company of Government of Madhya Pradesh has been allotted Amelia (North) Coal Mining

More information

Gurha PF - NNE - 7.0km 11. Nearest major city with Nil population within 10km radius 12. Nearest Town / City within 10km radius

Gurha PF - NNE - 7.0km 11. Nearest major city with Nil population within 10km radius 12. Nearest Town / City within 10km radius EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 Introductions Capacity expansion of existing granite quarry (6.0 ha) is proposed, which is operational at village- Kathara, Tehsil- Lovekush Nagar & Dist.

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION. 1.1 Introduction

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION. 1.1 Introduction EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 Introduction M/s. Lafarge India Pvt. Ltd. (LIPL) is a subsidiary of French building materials, major Lafarge. The Lafarge is world leader in building materials

More information

EIA Report for ha Bhatia Limestone Mine EXECUTIVE SUMMARY

EIA Report for ha Bhatia Limestone Mine EXECUTIVE SUMMARY EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 Introductions The lease area is being hold by M/s KJS Cement Ltd, and Pawan Kumar Ahluwalia is the Managing Director and correspondence address is M/s KJS

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION BY MoEF (PERIOD FROM OCTOBER 13 TO MARCH 14) HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED SIX MONTHLY

More information

Environmental Management Plan. For Mining of. Rough Stone & Road Metal

Environmental Management Plan. For Mining of. Rough Stone & Road Metal Environmental Management Plan For Mining of Rough Stone & Road Metal Over an extent of 6.53 Ha at Survey No.312/1 of Ramalingampalli (V), Bommalaramaram (M), Yadadri Bhuvangairi (D), Telangana State. Lessee

More information

M/s Budwa Minerals, Village-Budwa, Tehsil-Beohari Dist. Shahdol (MP) Executive Summary ha Sathni Laterite, Ochre & White Clay Mine

M/s Budwa Minerals, Village-Budwa, Tehsil-Beohari Dist. Shahdol (MP) Executive Summary ha Sathni Laterite, Ochre & White Clay Mine EXECUTIVE SUMMARY 1. PREAMBLE Minerals are the chief source of present phase of industrialization, and play an important role in the present phase of the national economy and overall development of the

More information

PRE FEASIBILITY REPORT For SILICA SAND MINE. At Village- Karlapudi, Tehsil- Kota, Nellore, Andhra Pradesh ha.

PRE FEASIBILITY REPORT For SILICA SAND MINE. At Village- Karlapudi, Tehsil- Kota, Nellore, Andhra Pradesh ha. PRE FEASIBILITY REPORT For SILICA SAND MINE At Village- Karlapudi, Tehsil- Kota, Nellore, Andhra Pradesh 11.797 ha. Project Proponent Sri Yashpal Mendon 1 st Floor Mineral House, Hampankatta, Mangalore

More information

EXECUTIVE SUMMARY TABLE 1.2 PROJECT SITE DETAILS

EXECUTIVE SUMMARY TABLE 1.2 PROJECT SITE DETAILS EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION M/s Gangotri Limes Pvt. Ltd. is a private organization engaged in lime making and Shri Gangaram Sharma (MD) having sufficient experience in mining

More information

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND EXECUTIVE SUMMARY Kumhari Stone Mine is situated in Village - Kumhari, P.O. Basia, P.S. - Basia, District : Gumla, Jharkhand over an area of 2.02 Hectares or 5.00 Acres [ Plot no. 2085(P)]. Kumhari Stone

More information

Larsen & Turbo Limited ENVIRONMENTAL MANAGEMENT PLAN

Larsen & Turbo Limited ENVIRONMENTAL MANAGEMENT PLAN ` Larsen & Turbo Limited The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plans for which the

More information

M/s. Bharat Clays Private Limited Pre-Feasibility Report

M/s. Bharat Clays Private Limited Pre-Feasibility Report 1. EXECUTIVE SUMMARY 1.1 Introduction is a private partnership firm. They applied for a mining lease for China Clay over an extent of 2.023 Hectares in Sy. No: 102/3 & 102/4P of Jaggampeta Village, Jaggampeta

More information

PRE FEASIBILITY REPORT OF KANIYAKULAM EARTH QUARRY

PRE FEASIBILITY REPORT OF KANIYAKULAM EARTH QUARRY PRE FEASIBILITY REPORT OF AZHAGAPPAPURAM EARTH FOR OVER AN EXTENT OF 0.61.0HA IN AZHAGAPPAPURAM VILLAGE, AGASTEESWARAM TALUK, KANNIYAKUMARI DISTRICT, TAMIL NADU OF, (Under the Guidelines of Ministry of

More information

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara PROJECT PARTICULARS Name of the project - Sand mining Lease address - Village panchayat - Nara, Tahsil -Kanker, Dist Kanker (C.G.) Khasra No. - 1025 Sand mining area - 5.00 Hectares Name of the mineral

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN Table of Contents 1 INTRODUCTION... 1 1.1 ENVIRONMENTAL MANAGEMENT PLAN (EMP)... 1 1.2 Impacts on Land Environment... 1 1.2.1 Mitigation Measures... 1 1.3 WATER ENVIRONMENT... 2 1.3.1 Impacts on Water

More information

PRE-FEASIBILIY REPORT

PRE-FEASIBILIY REPORT BENDRI LIMESTONE QUARRY NO. - 4 3 (Quarry No. 1) (Quarry No. 1)MINERALS - DOLOMITE (LEASE PERIOD 20.05.2002 TO 19. 05.2022) LEASE AREA - 42.754 HECTARES MINING PROJECT - CATEGORY- B PRE-FEASIBILIY REPORT

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR AMJHAR LATERITE DEPOSIT M. L. Area 4.897 ha. In Village - Amjhar Tehsil - Amarpatan, District- Satna State - Madhya Pradesh Proposed Capacity 32256 TPA Lessee - Shri Vikram Singh

More information

TOR (564/PS-MS/MPPCB/SEAC/TOR

TOR (564/PS-MS/MPPCB/SEAC/TOR Executive Summary 1.0 Introduction Bijaiyan Laterite & Quartz Mining Project is located at village Bijaiyan, Tehsil Sihora, District Jabalpur (M.P.). The total lease area of the mine is 16.87 ha. M/s Sohani

More information

INDEX S.NO ITEM PAGE NO 1. INTRODUCTION 3 2. DETAILS ABOUT THE MINE LEASE AREA 4 3. MINING ACTIVITY 5 4. ENVIRONMENTAL MANAGEMENT PLAN 8

INDEX S.NO ITEM PAGE NO 1. INTRODUCTION 3 2. DETAILS ABOUT THE MINE LEASE AREA 4 3. MINING ACTIVITY 5 4. ENVIRONMENTAL MANAGEMENT PLAN 8 M/s. Nandini Mineral Industries (Mine Lease Area 4.120 Ha.) Sy. Nos. 105, 105/1, 2 & 113/1A Kolumulapali Village, Bethamcherla Mandal, Kurnool District, ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY ISO 9001:

More information