1 SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT Guideline for Expedited Application Review (GEAR) 12d-Motor Vehicles and Mobile Equipment Coating Operations with Air Drying and Outside the Booth Priming Approved By: SIGNED David Warner Director of Permit Services Date: August 15, 2005 Purpose: To outline procedures for expedited processing of Authority to Construct (ATC) applications for motor vehicle and mobile equipment coating operations. These procedures will apply to processing of applications received over the counter or through the mail. I. Applicability This policy applies to processing of applications for Authority to Construct for new motor vehicle and mobile equipment coating operations that: emit up to 10 tons/year of VOCs, priming is performed outside the booth, and use air drying (no ovens or burners). II. Permit Application and Supplementary Forms The applicant must complete a regular application form and the Painting and Coating Operations Supplemental Form (see Attached Supplemental Application). III. Priority Processing The applications will be processed on an expedited basis if a complete application, complete supplemental form and correct filing fees for each permit unit are submitted. In order to meet the expedited time frame, the engineer assigned for preliminary review will deem the project complete (if appropriate) as of the date received. The project will then be automatically assigned for final review to the same engineer, who must then write the application review and finalize the project within seven days. The application review and final ATC will be submitted to the lead engineer for review. GEAR 12d-1

2 Final action on all projects will occur within thirty days after the submittal of the complete package. The priority processing will be preempted if: The application is subject to any public noticing requirements, including school notice per CH&SC (within 1000 feet of any K-12 school), or The application is part of a stationary source project where issuance of the permit will affect the outcome of the stationary source project. The application requires a site specific health risk assessment (HRA). IV. Application Review In order to standardize the application reviews for this source category, the application review will be used as a base document. The document is based on a new facility that is limited to 10 tons/year of VOC emissions. Minor revisions will be needed if higher or lower limits are requested/required. The following pages are a hard copy version of this standard review. This hard copy version for the GEAR Policy manual includes a copy of the required supplemental application form (see Attached Supplemental Application), the up-to-date Best Available Control Technology (BACT) analysis (see Attached BACT analysis), and the standard Authority to Construct (ATC) conditions (see Attached General Conditions). These attachments will be referred to, but will not be included in the actual application review done for a specific application. Of the attachments the application review will only include the draft ATC conditions. This will minimize the number of pages for the expedited application review. The use of this standard Application Review will ensure: A. That the proposed project complies with BACT requirements as specified in the District s current BACT Clearinghouse. B. That the proposed project is either exempt from offsets or the emissions from the project do not trigger offset requirements. C. That the permit has enforceable daily emission limitations (DELs) D. That the proposed project complies with all applicable prohibitory rules. Health Risk Assessment: A site-specific HRA must be conducted for all applications. GEAR 12d-2

3 V. Equipment Description To ensure uniformity, the following standard description will be used: MOTOR VEHICLE AND MOBILE EQUIPMENT COATING OPERATION WITH HVLP SPRAY GUN(S)(, A/AND A) PAINT SPRAY BOOTH WITH DRY EXHAUST FILTERS, AND AN ENCLOSED SPRAY GUN CLEANER It is not necessary to specify the manufacturer of the booth, spray gun(s), filter elements, spray gun cleaner, or oven burner on the ATC (PTO). The applicant has identified this information in his application if any question arises as to what he is authorized to install. VI. Authority to Construct Conditions To ensure uniformity, a standard set of conditions will be used as a base for all applications (see Attached ATC Conditions). Additional conditions may be necessary on a site-specific basis due to New Source Review requirements or health risk assessment. See PAS Category GEAR 12-D for general conditions. VII. Updates This GEAR will be updated as necessary to accommodate any changes in prohibitory rules, changes in the BACT Clearinghouse, or changes in cost information for the top-down BACT Analysis. The Permitting Handbook will also be updated whenever this GEAR document is updated. Each update will be submitted to the GEAR coordinator for review and the coordinator will forward the updates for Director approval. GEAR 12d-3

4 Facility Name: Facility s Name Authority to Construct Application Review Motor Vehicle and Mobile Equipment Coating (with air drying and outside the booth priming) Facility s Mailing Address Mailing Address: Facility s City, CA Zip Code Contact Person: Contact Person s Name Telephone: (XXX) XXX-XXXX, ext. XXXX Application # (# s): X-XXXX-X-X, -X-X, -X-X, and X-X (as necessary) Project #: X-XXXXXXX Deemed Complete: Project Complete Date Date: Completion Date Engineer: Engineer s Name Lead Engineer: Engineer s Name I. Proposal The primary business of facility name is the repairing and painting of motor vehicles and mobile equipment. Facility name is applying for an Authority to Construct (ATC) for a motor vehicle and mobile equipment painting operation with a paint spray booth. The facility will be air-drying the paint inside of the paint booth. The applicant has proposed that priming be allowed outside of the paint booth. In order to allow priming outside of the paint booth the applicant agrees to limit PM 10 emissions from priming to 2.0 lbs/day. This is required so that Best Available Control Technology (BACT) will not be required on the priming operation. II. Applicable Rules Rule 2010 Permits Required (12/17/92) Rule 2201 New and Modified Stationary Source Review Rule (12/19/02) Rule 2520 Federally Mandated Operating Permits (6/21/01) Rule 4101 Visible Emissions (11/15/01) Rule 4102 Nuisance (12/17/92) Rule 4201 Particulate Matter Concentration (12/17/92) Rule 4602 Motor Vehicle and Mobile Equipment Refinishing Operations (12/20/01) CH&SC CH&SC GEAR 12d-4

5 III. Project Location {If the painting operation is or is not located within 1,000 ft of the outermost boundary of a K-12 school, edit the following statement as necessary:} The project is located at N. Street Rd. in Any City, CA. The applicant states that the equipment is not located within 1,000 feet of a K-12 school. Therefore, the public notification requirement of California Health and Safety Code is/is not applicable to this project. IV. Process Description This paint spray booth will be used solely for automotive body repair and refinishing. The paint spray operation occurs in two stages, automotive body preparation (including application of primer and sanding) and application of topcoat. At this facility, auto body prep work, including the application of primer (which includes primer pretreatment, surfacer, and sealer) takes place outside of the paint spray booth. The application of the topcoat will take place inside of the paint spray booth. After the application of the topcoat the paint will be allowed to air-dry before the equipment is removed from the paint booth. V. Equipment Listing One XX' L X XX' W X XX' H paint spray booth XX hp exhaust fan Dry/Water/Oil-wash Filter System Approved HVLP Spray Gun(s) or Electrostatic Spray Gun(s) ## hp electric air compressor District approved gun cleaner {To ensure uniformity, the following standard equipment description will be used. Note: add the gun cleaner if applicant proposed.} X-XXXX-X-X: MOTOR VEHICLE AND MOBILE EQUIPMENT COATING OPERATION WITH HVLP SPRAY GUN(S)(, A/AND A) PAINT SPRAY BOOTH WITH DRY EXHAUST FILTERS, AND AN ENCLOSED SPRAY GUN CLEANER GEAR 12d-5

6 VI. Emission Control Technology Evaluation For the coating operation: Only PM 10 and VOC are emitted from the priming and topcoating operation. The applicant has proposed that priming take place outside of the paint booth so PM 10 emissions from the priming operation will be controlled only by the use of High Volume Low Pressure (HVLP) spray equipment. For the topcoating operation the applicant has proposed a paint spray booth with a dry exhaust filter system for PM 10 control, HVLP spray equipment for PM 10 and VOC control, and an approved gun cleaner for VOC control during spray equipment clean up. The paint spray booth with a dry exhaust filter system will control PM 10 emissions by filtering air from inside the paint booth before it is exhausted to the atmosphere. The HVLP spray equipment will control PM 10 and VOC emissions by having more paint transfer to the desired surfaces than traditional painting equipment. The approved gun cleaner will control VOC emissions by not allowing VOC containing liquids used during gun cleaning to evaporate into the atmosphere. VII. General Calculations A. Assumptions To avoid triggering offsets, VOC emissions are limited to 54.7 lb/day = 19,966 lb/yr (per Applicant). HVLP gun transfer efficiency (TE) is 75% (per STAPPA/ALAPCO Vol. 2, pg. 14-7, 5/30/91). Dry exhaust filter removal efficiency (RE) is 66% (STAAPPA/ALAPCO Vol. 2, pg. 14-7, 5/30/91). Exhaust fan for the paint booth is rated at 4,000 cfm (per Applicant). For emissions calculations purposes the facility is assumed to operate 24 hr/day and 365 days/yr (District assumption to conservatively estimate emissions). {If Applicant proposes otherwise, change this assumption, calculate emissions based on the proposed limit, and add conditions limiting the facilities operation along with recordkeeping of the hours of operation.} To avoid triggering BACT, daily PM 10 emissions from priming outside of the paint booth will be limited to 2.0 lb/day (per Applicant). B. Emission Factors For unit -X-X, the new motor vehicle coating operation: PM 10 emission factor (EF) for enamel paint (worst case) is 5.5 lb/gal, assuming all particulate matter (PM) emissions are PM 10 (STAPPA/ALAPCO Vol. 2, pg. 14-4, 5/30/91). Worst case enamel paint VOC content is 2.0 lb/gal as applied (District assumption to conservatively estimate PM 10 emissions). GEAR 12d-6

7 PM 10 EF for primer (worst case) is 3.0 lb/gal, assuming all PM emissions are PM 10 (STAPPA/ALAPCO Vol. 2, pg. 14-4, 5/30/91). Average primer VOC content is 5.0 lb/gal (STAPPA/ALAPCO Vol. 2, pg. 14-4, 5/30/91). {If the applicant has proposed a multi-stage coating insert the following calculation(s):} VOC Emission Factor for Multi-Stage Coatings: For the basecoat: {If available from the manufacturer use the VOC content of the basecoat, clearcoat, midcoat, or groundcoat.} The Material Safety Data Sheet (MSDS) for Brand XXX basecoat states that the VOC emission factor less water and exempt compounds is as follows: EF VOC bc = 2.01 lb-voc/gal {If not available from the manufacturer, do the following calculations to determine the as-applied VOC content of the basecoat, clearcoat, midcoat, or groundcoat.} This Brand XXX basecoat is mixed with additional components such as Brand YYY thinner and Brand ZZZ hardener. The MSDSs for these materials state that the VOC emissions factors less water and exempt compounds are as follows: EF VOC Thinner bc = 6.80 lb-voc/gal EF VOC Hardener bc = 6.75 lb-voc/gal For this basecoat mixture 5 parts of coating are mixed with 1 part thinner and 1 part hardener. Thus, the VOC emission factor for this basecoat as applied is calculated as follows: EF VOC bc as applied (lb-voc/gal) = {[VOC content of the basecoat (lb-voc/gal) x number of parts] + [VOC content of the thinner (lb-voc/gal x number of parts] + [VOC content of the hardener (lb-voc/gal x number of parts]} total number of parts EF VOC bc as applied lb-voc/gal = [(2.01 lb-voc/gal x 5 parts) + (6.80 lb-voc/gal x 1 part) + (6.75 lb-voc/gal x 1 part)] 7 parts EF VOC bc as applied = 3.37 lb-voc/gal GEAR 12d-7

8 For the clearcoat: The MSDS for Brand XXX clearcoat states that the VOC emission factor less water and exempt compounds is as follows: EF VOC cc = 4.01 lb-voc/gal This Brand XXX clearcoat is mixed with additional components such as Brand YYY thinner and Brand ZZZ hardener. The MSDSs for these materials state that the VOC emissions factors less water and exempt compounds are as follows: EF VOC Thinner cc = 4.80 lb-voc/gal EF VOC Hardener cc = 2.75 lb-voc/gal For this clearcoat mixture 4 parts of coating are mixed with 2 part thinner and 1 part hardener. Thus, the VOC emission factor for this clearcoat as applied is calculated as follows: EF VOC cc as applied (lb-voc/gal) = {[VOC content of the clearcoat (lb-voc/gal) x number of parts] + [VOC content of the thinner (lb-voc/gal x number of parts] + [VOC content of the hardener (lb-voc/gal x number of parts]} total number of parts EF VOC cc as applied lb-voc/gal = [(4.01 lb-voc/gal x 4 parts) + (4.80 lb-voc/gal x 2 parts) + (2.75 lb-voc/gal x 1 part)] 7 parts EF VOC cc as applied = 4.05 lb-voc/gal For the midcoat: {If applicable add the following calculation:} The MSDS for Brand XXX midcoat states that the VOC emission factor less water and exempt compounds is as follows: EF VOC mc = 2.50 lb-voc/gal This Brand XXX midcoat is mixed with additional components such as Brand YYY thinner and Brand ZZZ hardener. The MSDSs for these materials state that the VOC emissions factors less water and exempt compounds are as follows: EF VOC mc = 1.80 lb-voc/gal EF VOC mc = 3.75 lb-voc/gal For this midcoat mixture 6 parts of coating are mixed with 1 part thinner and 1 part hardener. Thus, the VOC emission factor for this midcoat as applied is calculated as follows: GEAR 12d-8

9 EF VOC mc as applied (lb-voc/gal) = {[VOC content of the midcoat (lb-voc/gal) x number of parts] + [VOC content of the thinner (lb-voc/gal x number of parts] + [VOC content of the hardener (lb-voc/gal x number of parts]} total number of parts EF VOC mc as applied lb-voc/gal = [(2.50 lb-voc/gal x 6 parts) + (1.80 lb-voc/gal x 1 parts) + (3.75 lb-voc/gal x 1 part)] 8 parts EF VOC mc as applied = 2.57 lb-voc/gal For the groundcoat: {If applicable add the following calculation:} The MSDS for Brand XXX groundcoat states that the VOC emission factor less water and exempt compounds is as follows: EF VOC gc = 1.00 lb-voc/gal This Brand XXX groundcoat is mixed with additional components such as Brand YYY thinner and Brand ZZZ hardener. The MSDSs for these materials states that the VOC emissions factors less water and exempt compounds are as follows: EF VOC Thinner gc = 5.50 lb-voc/gal EF VOC Hardener gc = 9.60 lb-voc/gal For this groundcoat mixture 4 parts of coating are mixed with 3 part thinner and 2 part hardener. Thus, the VOC emission factor for this groundcoat as applied is calculated as follows: EF VOC gc as applied (lb-voc/gal) = {[VOC content of the groundcoat (lb-voc/gal) x number of parts] + [VOC content of the thinner (lb-voc/gal x number of parts] + [VOC content of the hardener (lb-voc/gal x number of parts]} total number of parts EF VOC gc as applied lb-voc/gal = [(1.00 lb-voc/gal x 4 parts) + (5.50 lb-voc/gal x 3 parts) + (9.60 lb-voc/gal x 2 part)] 8 parts EF VOC gc as applied = 4.96 lb-voc/gal {For two stage multi-stage coating operations use the following calculation:} For the two stage multi-stage coating: EF VOC Two Stage MS (lb-voc/gal) = [EF VOC bc (lb-voc/gal) + 2 x EF VOC cc (lb- VOC/gal)] 3 EF VOC Two Stage MS lb-voc/gal = [3.37 lb-voc/gal + 2 x (4.05 lb-voc)] 3 GEAR 12d-9

10 EF VOC Two Stage MS = 3.82 lb-voc/gal {Note: If this is greater than 4.5 lb-voc/gal, then this coating does not meet the as applied VOC content limit for multi-stage top coatings of District Rule 4602.} {For three stage multi-stage coating operations use the following calculation:} For the three stage multi-stage coating: EF VOC Three Stage MS (lb-voc/gal) = [EF VOC bc (lb-voc/gal) + EF VOC mc (lb- VOC/gal) + 2 x EF VOC cc (lb-voc/gal)] 4 EF VOC Three Stage MS lb-voc/gal = [3.37 lb-voc/gal lb-voc + 2 x (4.05 lb- VOC)] 4 EF VOC Three Stage MS = 3.51 lb-voc/gal {Note: If this is greater than 4.5 lb-voc/gal, then this coating does not meet the as applied VOC content limit for multi-stage top coatings of District Rule 4602.} {For four stage multi-stage coating operations use the following calculation:} For the four stage multi-stage coating: EF VOC Four Stage MS (lb-voc/gal) = [EF VOC gc (lb-voc/gal) + EF VOC bc (lb- VOC/gal) + EF VOC mc (lb-voc/gal) + 2 x EF VOC cc (lb-voc/gal)] 5 EF VOC Four Stage MS lb-voc/gal = [4.96 lb-voc/gal lb-voc/gal lb- VOC + 2 x (4.05 lb-voc)] 5 EF VOC Four Stage MS = 3.80 lb-voc/gal {Note: If this is greater than 4.5 lb-voc/gal, then this coating does not meet the as applied VOC content limit for multi-stage top coatings of District Rule 4602.} C. Calculations 1. Pre-Project Potential to Emit (PE1) Pre-project emissions from unit -X-X, the new motor vehicle coating operation: Since this is a new unit at this facility the daily and annual pre-project emissions are zero for all criteria pollutants. PE1 = 0.0 lb/day = 0.0 lb/yr 2. Post-Project Potential to Emit (PE2) Post-project emissions from unit -X-X, the new motor vehicle coating operation: The post-project Potential to Emit (PE2) is determined by using the daily VOC emissions limit, the VOC and PM 10 content of the paint, the HVLP gun transfer GEAR 12d-10

11 efficiency, the dry exhaust filter removal efficiency, and the daily PM 10 emissions limit for priming. To make the VOC and PM 10 daily emissions limits enforceable and to simplify Permittee compliance, VOC emissions from the new permit unit have been set to 54.7 lb/day. Then VOC emissions from the all emissions units will be added together to reach the daily VOC limit. a. Daily PE2 (lb/day) Emissions from the outside priming operation (PE2 Priming ): First the daily PM 10 emissions for priming are determined based upon the PM 10 limit of 2.0 lb-pm 10 /day so that BACT is not triggered: PE2 Priming PM10 (lb/day) = PM 10 limit (lb-pm 10 /day) = 2.0 lb-pm 10 /day Then uncontrolled priming PM 10 emissions are determined: Uncontrolled PE2 Priming PM10 (lb/day) = PM 10 limit (lb-pm 10 /day) (1 - HVLP Transfer Efficiency) Uncontrolled PE2 Priming PM10 = 2.0 lb-pm 10 /day (1 0.75) Uncontrolled PE2 Priming PM10 = 8.0 lb-pm 10 /day Next the maximum daily primer usage is determined: Primer Usage (gal/day) = Uncontrolled PM 10 (lb-pm 10 /day) Primer PM 10 Content (lb-pm 10 /gal) Primer Usage = 8.0 lb-pm 10 /day 3.0 lb-pm 10 /gal = 2.7 gal/day Last the VOC emissions from the outside priming operation are determined: PE2 Priming VOC (lb/day) = Primer Usage (gal/day) x Primer VOC Content (lb- VOC/gal) PE2 Priming VOC = 2.7 gal/day x 5.0 lb-voc/gal = 13.5 lb-voc/day Emissions from the coating operation (PE2 Painting ): First the daily VOC emissions for painting are determined. In order to maintain the VOC emissions limit of 54.7 lb/day, the emissions from the priming operation will be subtracted from the daily limit and the balance applied to the painting done inside the booth. GEAR 12d-11

12 PE2 Painting VOC (lb/day) = VOC limit (lb/day) PE2 Priming VOC (lb/day) PE2 Painting VOC = 54.7 lb-voc/day 13.5 lb-voc/day = 41.2 lb-voc/day Daily Paint Usage (gal/day) = PE2 Painting (lb-voc/day) Enamel Paint VOC Content (lb-voc/gal) Daily Paint Usage = 41.2 lb-voc/day 2.0 lb-voc/gal = 20.6 gal/day Next the daily PM 10 emissions from painting are determined: PE2 Painting PM10 (lb/day) = Daily Paint Usage (gal/day) x Enamel Paint PM 10 Content (lb-pm 10 /gal) x (1 HVLP Transfer Efficiency) x (1 Dry Filter Control Efficiency) PE2 Painting PM10 = 20.6 gal/day x 5.5 lb-pm 10 /gal x (1 0.75) x (1 0.66) = 9.6 lb-pm 10 /day {Note: The following table adds columns 1 and 2 with the result presented in column 3. After entering the data in columns 1 and 2, highlight column 3 and press F9.} Table 1: Daily PE2 Pollutant PE2 Priming (lb/day) PE2 Painting (lb/day) PE2 Total (lb/day) NO x SO x PM CO VOC GEAR 12d-12

13 b. Annual PE2 (lb/yr) Annual post-project emissions from unit -X-X, the new motor vehicle coating operation: The annual post-project Potential to Emit (PE2) is determined by using the daily PE2 calculated previously in Section VII.C.2.a and operation of 365 day/year. PE2 Annual (lb/yr) = PE2 (lb-pollutant/day) x 365 day/yr PE2 Annual NOx PE2 Annual SOx = 0.0 lb-no x /day x 365 day/yr = 0 lb-no x /yr = 0.0 lb-so x /day x 365 day/yr = 0 lb-so x /yr PE2 Annual PM10 = 11.6 lb-pm 10 /day x 365 day/yr = 4,234 lb-pm 10 /yr PE2 Annual CO PE2 Annual VOC = 0.0 lb-co/day x 365 day/yr = 0 lb-co/yr = 54.7 lb-voc/day x 365 day/yr = 19,966 lb-voc/yr {Note: The following table multiplies column 1 by 365 with the result presented in column 2. After entering the data in column 1, highlight column 2 and press F9.} Table 2: Annual PE2 Pollutant PE2 (lb/day) PE2 (lb/yr) NO x 0 0 SO x 0 0 PM ,234 CO 0 0 VOC ,966 GEAR 12d-13

14 3. Pre-Project Stationary Source Potential to Emit (SSPE1) {Calculate the SSPE1 for the entire facility (See Rule 2201, Section 4.9). SSPE1 is used to determine if the offset threshold will be surpassed during this project, and to determine if public notice is required for a 20,000 lb/yr SSIPE.} Pursuant to Section 4.9 of District Rule 2201, the Pre-Project Stationary Source Potential to Emit (SSPE1) is the Potential to Emit (PE) from all units with valid ATCs or PTOs at the Stationary Source and the quantity of Emission Reduction Credits (ERCs) which have been banked since September 19, 1991 for Actual Emissions Reductions that have occurred at the source, and which have not been used on-site. {If this is a new facility use the following statement:} Since this is a new facility, there are no existing permit units or any ERCs banked at this facility. Thus: SSPE1 = 0.0 lb/yr {If this is an existing facility use the following statement:} Since this is an existing facility, SSPE1 is equal to the PE1 Total Pre-Project from all units for all criteria pollutants. {Note: Modify the following statement as necessary to meet the specifics of the facility.} There are two existing permit units, one unimplemented ATC, and no banked ERCs at this facility. In this situation the worst-case scenario for the facility will be used for the SSPE1. For this project the worst case is with the ATC for the boiler, permit unit -3-0, being implemented. From the PE calculations done for the facility (see Appendix D), the following annual emissions were calculated. Thus: {Note: The following table adds rows 1 thru X with the results presented in the SSPE1 row. After entering the data in rows 1 thru X, highlight the SSPE1 Total row and press F9:} GEAR 12d-14

15 Table 3: SSPE1 Permit Unit NO x (lb/yr) SO x (lb/yr) PM 10 (lb/yr) CO (lb/yr) VOC (lb/yr) -1-0, gas dispensing operation -2-0, emergency IC engine -3-0, 10.0 MMBtu/hr boiler , , , SSPE1 Total 0 0 3, Post-Project Stationary Source Potential to Emit (SSPE2) Pursuant to Section 4.10 of District Rule 2201, the Post-project Stationary Source Potential to Emit (SSPE2) is the Potential to Emit (PE) from all units with valid ATCs or PTOs, except for emissions units proposed to be shut down as part of the Stationary Project, at the Stationary Source and the quantity of Emission Reduction Credits (ERCs) which have been banked since September 19, 1991 for Actual Emissions Reductions that have occurred at the source, and which have not been used on-site. {If this is a new facility use the following statement. Enter the calculated PE2 from Section VII.C.2.b into the SSPE2 table below. After entering the data in rows 1 thru X, highlight the SSPE2 Total row and press F9:} Since this is a new facility, SSPE2 is equal to the change in emissions for the facility due to the installation of the new automotive coating operation, unit -X-X, as previously determined in Section VII.C.2.b. Thus: Table 4: SSPE2 Permit Unit NO x (lb/yr) SO x (lb/yr) PM 10 (lb/yr) CO (lb/yr) VOC (lb/yr) -X-X, new automotive coating operation 0 0 4, ,966 SSPE2 Total 0 0 4, ,966 GEAR 12d-15

16 {If this is an existing facility use the following statement:} Since this is a modification to an existing facility, SSPE2 is equal to the PE2 Total Post-Project from all units for all criteria pollutants. For this project the change in emissions for the facility is due to the installation of the new automotive coating operation, unit -X-X. Thus: {Note: The following table adds rows 1 thru X with the results presented in the SSPE1 row. After entering the data in rows 1 thru X, highlight the SSPE2 Total row and press F9.} Table 5: SSPE2 Permit Unit NO x (lb/yr) SO x (lb/yr) PM 10 (lb/yr) CO (lb/yr) VOC (lb/yr) -1-0, gas dispensing operation -2-0, emergency IC engine -3-0, 10.0 MMBtu/hr boiler -X-X, new automotive coating operation , , , , ,966 SSPE2 Total 2, ,744 5,939 25, Major Source Determination The following table compares the pre-project and post-project facility-wide annual emissions in order to determine if this facility is already an existing Major Source or if the facility is becoming a new Major Source as a result of this project. GEAR 12d-16

17 Table 6: Major Source Determination Pollutant SSPE1 (lb/yr) SSPE2 (lb/yr) Major Source Levels (lb/yr) Major Source? NO x ,000 No SO x ,000 No PM , ,000 No CO ,000 No VOC 0 19,966 50,000 No The preceding table shows that this facility is not a Major Source for any criteria pollutant. 6. Baseline Emissions (BE) a. Annual BE The BE is required, unit by unit, pollutant by pollutant, to determine the Net Emissions Change (NEC), which is reported quarterly in the PAS emissions profile, and to calculate the amount of offsets required, where necessary, when the SSPE1 is greater than the offset threshold. BE are determined for each emissions unit in this project in pounds/year as follows: BE = Pre-project Potential to Emit for: Any unit located at a non-major Source, Any Highly-Utilized Emissions Unit (80% of pre-project emissions), located at a Major Source, Any Fully-Offset Emissions Unit (a unit for which offsets have been provided), located at a Major Source, or Any Clean Emissions Unit (a unit that has a control efficiency of 95%, or 85% for a clean burn IC engine, or has met AIP BACT for the five years immediately prior to the submission of the complete application), located at a Major Source. Otherwise, BE = Historic Actual Emissions (HAE) GEAR 12d-17

18 {For a GEAR project, the following statement will be true. If not, please speak to your supervisor; this project is NOT a GEAR.} As shown previously in Section VII.C.5 this facility is not a Major Source for any criteria pollutant. Thus, BE = PE1 for all criteria pollutants. Since this unit is also a new unit at this facility PE1 = 0 lb/yr for all criteria pollutants. Thus: BE = 0.0 lb/yr for all criteria pollutants 7. Contemporaneous Increase in Permitted Emissions (CIPE) and Title I Modification Determination {For a GEAR project, the following statement will be true. If not, please speak to you supervisor, this project is NOT a GEAR.} This facility is not becoming a Major Source, as previously shown in Section VII.C.5, as a result of this project. Since, for non Major-Sources, the Title I Modification thresholds are equivalent to the Major Source Thresholds, this project is not a Title I Modification (Major Modification). Therefore the CIPE will not be calculated. 8. Quarterly Net Emissions Change (QNEC) The QNEC is calculated solely to establish emissions that are used to complete the District s PAS database emissions profile screen. Detailed QNEC calculations are included in Appendix B. VIII. Compliance Rule New and Modified Stationary Source Review Rule A. Best Available Control Technology (BACT) 1. BACT Applicability BACT requirements are triggered on a pollutant-by-pollutant basis and on an emissions unit-by-emissions unit basis for the following*: a) Any new emissions unit with a potential to emit exceeding two pounds per day, b) The relocation from one Stationary Source to another of an existing emissions unit with a potential to emit exceeding two pounds per day, c) Modifications to an existing emissions unit with a valid Permit to Operate resulting in an AIPE exceeding two pounds per day, and/or d) When a Title I Major Modification is triggered for a modification project at a facility that is a Major Source. GEAR 12d-18

19 *Except for CO emissions from a new or modified emissions unit at a Stationary Source with an SSPE2 of less than 200,000 pounds per year of CO. For this project there is the installation of a new permit unit. This permit unit consists of two emissions units, the priming operation and the painting operation. This will result in daily increases in VOC and PM 10 criteria pollutant emissions for permit unit -X-X, as calculated previously in Section VII.C.2.a and presented below. Table 7: BACT Applicability Pollutant PE2 Priming (lb/day) PE2 Painting (lb/day) BACT Trigger Levels (lb/day) BACT Required? NO x 0 0 > 2.0 No SO x 0 0 > 2.0 No PM > 2.0 Yes, for painting CO 0 0 > 2.0 and SSPE2 > 200,000 lb/yr No VOC > 2.0 Yes, for priming and painting Thus BACT will be triggered for VOC emissions from the priming operation and for PM 10 and VOC emissions from the painting operation for this project. 2. BACT Analysis Per District Policy APR 1305, Section IX, A top-down BACT analysis shall be performed as a part of the Application Review for each application subject to the BACT requirements pursuant to the District s NSR Rule for source categories or classes covered in the BACT Clearinghouse, relevant information under each of the following steps may be simply cited from the Clearinghouse without further analysis. Pursuant to the BACT guideline 4.2.1, (current quarter) (current year), and the Top-Down BACT analysis, both of which appear in Appendix A of this report, BACT is satisfied with: HVLP spray guns, coatings compliant with District rules, and enclosed paint gun cleaners GEAR 12d-19

20 Spray booth with exhaust filters used for the painting operation The applicant is proposing BACT by using HVLP spay guns, coatings compliant with District rules, enclosed paint gun cleaners, and a spray booth with exhaust filters used for the painting operation. Therefore, the following conditions will be listed on the proposed ATC to ensure compliance: {2934} Only HVLP, electrostatic, brush, dip, or roll coating application equipment, or other application equipment approved by the District in writing, shall be used. All application equipment shall be operated in accordance with the manufacturer's recommendations. [District Rule 4602] {1776} VOC content of coatings as applied, excluding water and exempt compounds, used for Group I vehicles or Group II vehicles (when a color match is required) shall not exceed any of the following limits: pretreatment wash primer 780 g/l (6.5 lb/gal), precoat: 600 g/l (5.0 lb/gal) primer/primer surfacer: 250 g/l (2.1 lb/gal), primer sealer: 420 g/l (3.5 lb/gal), topcoat: 420 g/l (3.5 lb/gal), metallic/iridescent topcoat: 520 g/l (4.3 lb/gal), and multi-stage topcoat system: 540 g/l (4.5 lb/gal). [District Rule 4602] {1777} VOC content of coatings as applied, excluding water and exempt compounds, used for Group II vehicles (when a color match is not required) shall not exceed any of the following limits: pretreatment wash primer 780 g/l (6.5 lb/gal), precoat: 600 g/l (5.0 lb/gal), primer/primer surfacer: 250 g/l (2.1 lb/gal), primer sealer: 340 g/l (2.8 lb/gal), topcoat: 420 g/l (3.5 lb/gal), metallic/iridescent topcoat: 420 g/l (3.5 lb/gal), and camouflage: 420 g/l (3.5 lb/gal). [District Rule 4602] {1779} VOC content of temporary protective coatings shall not exceed 60 g/l (0.5 lb/gal) of material. [District Rule 4602] {1778} VOC content of specialty coatings (as defined in Rule 4602) as applied, excluding water and exempt compounds, shall not exceed 840 g/l (7.0 lb/gallon). If specialty coating usage, except anti-glare/safety coatings, exceeds 1 gallon per day, such coatings shall not exceed 5% (by volume) of total coatings applied in any month. [District Rule 4602] {1882} The permittee shall not use materials with a VOC content greater than 50 g/l (0.42 lb/gallon) for spray equipment clean-up unless an enclosed system or equipment proven to be equally effective is used for cleaning. [District Rule 4602] GEAR 12d-20

21 B. Offsets {1535} All coating, except application of primer, shall be conducted in booth with filters in place, fan(s) operating, and doors closed. [District Rule 2201] 1. Offset Applicability Offset requirements shall be triggered on a pollutant-by-pollutant basis. Unless exempted pursuant to Section 4.6, offsets shall be required if the post-project SSPE2 equals or exceeds the following offset threshold levels. The following table compares the post-project facility-wide annual emissions in order to determine if offsets will be required for this project at this facility. Table 8: Offsets Applicability Pollutant SSPE2 (lb/yr) SSPE2 Offset Levels (lb/yr) Offsets Required? NO x 0 20,000 No SO x 0 54,750 No PM 10 4,234 29,200 No CO 0 200,000 No VOC 19,966 20,000 No Therefore, offsets will not be required for this project for any increases in criteria pollutant emissions since no criteria pollutants are above the offset threshold levels. C. Public Notification Public noticing is required for: a. A new facility, which is also a Major Source, b. Title I Modifications of an existing Major Source, c. Any new emissions unit with a PE of greater than 100 pounds during any one day for any pollutant, d. Any project, which results in the offset thresholds being reached or exceeded, and/or e. Any project with an SSIPE of greater than 20,000 lb/yr for any pollutant. GEAR 12d-21

22 1. Public Notice Applicability a. Major Source As shown previously in the Major Source Determination table in Section VII.C.5 this facility is not a new facility that is a new major source for any criteria pollutant emissions. Therefore, public noticing is not required for this project for new Major Source purposes because this facility is not becoming a new Major Source. b. Title I Modification As shown previously in Section VII.C.7, this project does not constitute a Title I Modification. Therefore, public noticing is not required for this project for exceeding the Title I Modification thresholds. c. PE > 100 lb/day There are two new emissions units at this facility. For new emissions units, public notification is required if the PE exceeds 100 lb/day for any criteria pollutant. The Daily PE for each emissions unit, as calculated previously in Section VII.C.2.a, is less than daily PE Public Notice threshold of 100 lb/day for all criteria pollutants. Therefore, public noticing is not required for this project for exceeding the PE Public Notice Thresholds. d. Offset Thresholds The following table compares the pre-project SSPE1 with the post-project SSPE2 in order to determine if any offset thresholds have been surpassed. Table 9: Offset Thresholds Pollutant SSPE1 (lb/yr) SSPE2 (lb/yr) SSPE2 Offset Levels (lb/yr) Public Notice Required? NO x ,000 No SO x ,750 No PM ,234 29,200 No CO ,000 No VOC 0 19,966 20,000 No GEAR 12d-22

23 Therefore, public noticing is not required for this project for reaching or surpassing the SSPE2 offset thresholds. e. SSIPE > 20,000 lb/yr The values for SSPE2 and SSPE1 are calculated according to Rule 2201, Sections 4.9 and 4.10, respectively, where SSIPE = SSPE2 - SSPE1. Public noticing is required if the SSIPE exceeds 20,000 lb/yr for any pollutant. The SSIPE is compared to the SSIPE Public Notice thresholds in the following table: {Note: The following table subtracts column 2 from 1 with the result presented in column 3. After entering the data in columns 1 and 2, highlight column 3 and press F9.} Table 10: SSIPE Thresholds Pollutant SSPE2 (lb/yr) SSPE1 (lb/yr) SSIPE (lb/yr) SSIPE Public Notice Levels (lb/yr) Public Notice Required? NO x ,000 No SO x ,000 No PM 10 4, ,234 20,000 No CO ,000 No VOC 19, ,966 20,000 No Therefore, public noticing is not required for this project for exceeding the SSIPE thresholds. 2. Public Notice Action As discussed above, public noticing pursuant to Section 5.4 of District Rule 2201 is not required for this project. D. Daily Emissions Limits (DEL) DELs are required by section The DELs are required to enforce the applicability of BACT. For this installation of a new automotive coating operation project the DELs are stated in the form of maximum daily emission rates for the painting operation. Therefore, the following conditions will be listed on the proposed ATC to ensure compliance: GEAR 12d-23

24 {1987} VOC emissions from the entire facility shall not exceed 54.7 pounds in any one day. [District Rule 2201] {2908} Particulate matter (PM10) emission rate (including painting and priming) shall not exceed 11.6 lb/day. [District Rule 2201] {1904} PM10 emissions from the use of the primer outside of the booth - including pretreatment, surfacer, and sealer - shall not exceed two pounds per day calculated based on 25% of the solids content of each coating. [District Rule 2201] E. Compliance Assurance The following measures shall be taken to ensure continued compliance with District Rules: 1. Source Testing Per District Source Testing Frequency policy APR-1705, dated 10/9/97, source testing is not required for coating operations. As such, source testing will not be required of this permit unit. 2. Monitoring There is no monitoring required of this permit unit. 3. Recordkeeping The permittee shall maintain records in accordance with Section 3.0 of District Rule 1070 as required by permit condition. Therefore, the following conditions will be listed on the proposed ATC to ensure compliance: {1792} Records shall be retained on-site for a minimum of five years and made available for District inspection upon request. [District Rule 4602] {1828} Permittee shall maintain daily records of the following: quantity and type (Group I, Group II vehicle with color match, or Group II vehicle without color match) of each vehicle coated; specific coatings used on each vehicle; mix ratios (by volume) of components added to each coating; volume of coatings applied; VOC content of each coating as applied; and purchase and usage of each specific solvent or reducer, showing the date, type and volume purchased or used. [District Rule 4602] GEAR 12d-24

25 {1885} Permittee shall keep the following records for solvent cleaning activities: manufacturers product data sheet or MSDS of solvents used, VOC content of solvents in g/l or lb/gal, and the type of cleaning activity for which each solvent is used. [District Rule 4602] 4. Reporting There is no reporting required of this permit unit. Rule Federally Mandated Operating Permits Since this facility s potential emissions do not exceed any major source thresholds of Rule 2201, as shown previously in the Major Source Determination table in Section VII.C.5, this facility is not a major source, and Rule 2520 does not apply. Rule Visible Emissions Rule 4101 states that no air contaminant shall be discharged into the atmosphere for a period or periods aggregating more than three minutes in any one hour which is as dark as, or darker than, Ringelmann 1 or 20% opacity. As long as the equipment is properly maintained and operated, compliance with visible emissions limits is expected under normal operating conditions. The following condition will be listed on the proposed ATC to ensure compliance: {15} No air contaminant shall be discharged into the atmosphere for a period or periods aggregating more than three minutes in any one hour which is as dark as, or darker than, Ringelmann 1 or 20% opacity. [District Rule 4101] Rule Public Nuisance Rule 4102 states that no air contaminant shall be released into the atmosphere that causes a public nuisance. The following condition will be listed on the proposed ATC to ensure compliance: {98} No air contaminant shall be released into the atmosphere which causes a public nuisance. [District Rule 4102] Therefore pursuant to the District s Risk Management Policy for Permitting New and Modified Sources (APR 1905, 3/2/01), a risk management review has been performed for this project to analyze the impact of toxic emissions. For projects where the increase in cancer risk is greater than one per million, Toxic Best Available Control Technology (T-BACT) is required. {If the total facility Prioritization score including this project is 1.0, use the following statement:} GEAR 12d-25

26 District policy APR 1905 specifies that for an increase in emissions associated with a proposed new source or modification, the District perform an analysis to determine the possible impact to the nearest resident or worksite. A Health Risk Assessment (HRA) is not required for a project with a total facility prioritization score of less than or equal to one. According to the Technical Services Memo for this project (see Appendix C), the total facility prioritization score including this project was less than or equal to one. Therefore, no further analysis is required to determine the impact from this project. {If the total facility Prioritization score including this project > 1.0, use the following statement:} District policy APR 1905 specifies that for an increase in emissions associated with a proposed new source or modification, the District perform an analysis to determine the possible impact to the nearest resident or worksite. A Health Risk Assessment (HRA) is not required for a project with a total facility prioritization score of less than or equal to one. According to the Technical Services Memo for this project (see Appendix C), the total facility prioritization score including this project was greater than one. Therefore, an HRA was required to determine the short-term and long-term chronic exposure from this project. The HRA results for this project are shown below: Unit Acute Hazard Index Table 11: HRA Results Chronic Hazard Index Cancer Risk T-BACT Required? X-XXXX-X-X 0.XX 0.XXX 0.XX per million? CH&SC California Health & Safety Code (Health Risk Analysis) {If the Cancer risk is < 1.0 x 10-6 and the Hazard indices risk for this project is < 1.0 use the following statement:} BACT is required if the acute or chronic exposure is greater than the District s significance level. BACT for toxic emission control (T-BACT) is not required for this project because the HRA (see Appendix C) indicates that the risk is not above the District s thresholds for triggering T-BACT requirements. {Scenario 1} The applicant has proposed that no paints containing {Note: Use applicable compounds as proposed by the applicant.} chromium compounds, lead compounds, and/or nickel compounds will be used at this facility. Because this was taken into account to determine this project s health risk, the ATC for this project will require that no paints containing {Note: Use applicable compounds as proposed by the applicant.} chromium compounds, lead compounds, and/or nickel compounds will be used at this facility. {Note: Use applicable general conditions depending on the compounds GEAR 12d-26

27 proposed by the applicant.} Therefore, the following conditions will be listed on the proposed ATC to ensure compliance: {369} No coatings, solvents, or additives containing chromium compounds shall be used. [District Rule 4102] {1984} No coatings, solvents, or additives containing lead compounds shall be used. [District Rule 4102] {1985} No coatings, solvents, or additives containing nickel compounds shall be used. [District Rule 4102] {Scenario 2} The applicant has proposed that paints containing {Note: List applicable compounds as proposed by the applicant. As of 2003, no automotive paints containing chromium or cadmium compounds can be used in California.} lead and/or nickel compounds, will be used at this facility. Because this was taken into account to determine this project s health risk, the ATC for this project will require that the use of paints containing {Note: Use applicable compounds as proposed by the applicant.} lead and/or nickel compounds be limited and that no paints containing chromium compounds be used at this facility. Therefore, the following conditions will be listed on the proposed ATC to ensure compliance: {1540} The as-applied use of coatings containing (list toxic compound) shall not exceed XX.X pint(s) per day and XX.X pint(s) per year. [District Rule 4102 and CH&SC 41700] {369} No coatings, solvents, or additives containing chromium compounds shall be used. [District Rule 4102] District policy APR 1905 also specifies that the increase in emissions associated with a proposed new source or modification not have acute or chronic indices, or a cancer risk greater than the District s significance levels (i.e. acute and/or chronic indices greater than 1 and a cancer risk greater than 10 in a million). As outlined by the HRA Summary in Appendix C of this report, the emissions increases for this project was determined to be less than significant. {If the Cancer risk is > 1.0 x 10-6 and the Hazard indices risk for this project is < 1.0 use the following statement:} BACT is required if the acute or chronic exposure is greater than the District s significance level. BACT for toxic emission control (T-BACT) is required for this project because the HRA (see Appendix C) indicates that the risk is above the District s thresholds for triggering T-BACT requirements. For this project T-BACT is triggered for PM 10 and VOC. T-BACT is satisfied with BACT for PM 10 and VOC (see Appendix A), which is the use of HVLP spay guns, coatings compliant with District rules, enclosed paint gun cleaners, and a spray booth with exhaust filters used for the painting operation. GEAR 12d-27

28 Therefore, the following conditions will be listed on the proposed ATC to ensure compliance: {2934} Only HVLP, electrostatic, brush, dip, or roll coating application equipment, or other application equipment approved by the District in writing, shall be used. All application equipment shall be operated in accordance with the manufacturer's recommendations. [District Rule 4602] {1776} VOC content of coatings as applied, excluding water and exempt compounds, used for Group I vehicles or Group II vehicles (when a color match is required) shall not exceed any of the following limits: pretreatment wash primer 780 g/l (6.5 lb/gal), precoat: 600 g/l (5.0 lb/gal) primer/primer surfacer: 250 g/l (2.1 lb/gal), primer sealer: 420 g/l (3.5 lb/gal), topcoat: 420 g/l (3.5 lb/gal), metallic/iridescent topcoat: 520 g/l (4.3 lb/gal), and multi-stage topcoat system: 540 g/l (4.5 lb/gal). [District Rule 4602] {1777} VOC content of coatings as applied, excluding water and exempt compounds, used for Group II vehicles (when a color match is not required) shall not exceed any of the following limits: pretreatment wash primer 780 g/l (6.5 lb/gal), precoat: 600 g/l (5.0 lb/gal), primer/primer surfacer: 250 g/l (2.1 lb/gal), primer sealer: 340 g/l (2.8 lb/gal), topcoat: 420 g/l (3.5 lb/gal), metallic/iridescent topcoat: 420 g/l (3.5 lb/gal), and camouflage: 420 g/l (3.5 lb/gal). [District Rule 4602] {1779} VOC content of temporary protective coatings shall not exceed 60 g/l (0.5 lb/gal) of material. [District Rule 4602] {1778} VOC content of specialty coatings (as defined in Rule 4602) as applied, excluding water and exempt compounds, shall not exceed 840 g/l (7.0 lb/gallon). If specialty coating usage, except anti-glare/safety coatings, exceeds 1 gallon per day, such coatings shall not exceed 5% (by volume) of total coatings applied in any month. [District Rule 4602] {1882} The permittee shall not use materials with a VOC content greater than 50 g/l (0.42 lb/gallon) for spray equipment clean-up unless an enclosed system or equipment proven to be equally effective is used for cleaning. [District Rule 4602] {1535} All coating, except application of primer, shall be conducted in booth with filters in place, fan(s) operating, and doors closed. [District Rule 2201] {Scenario 1} The applicant has proposed that no paints containing {Note: Use applicable compounds as proposed by the applicant.} chromium compounds, lead compounds, and/or nickel compounds will be used at this facility. Because this was taken into account to determine this project s health risk, the ATC for this project will require that no paints containing {Note: Use applicable compounds as proposed by the applicant.} GEAR 12d-28

29 chromium compounds, lead compounds, and/or nickel compounds will be used at this facility. {Note: Use applicable general conditions depending on the compounds proposed by the applicant.} Therefore, the following conditions will be listed on the proposed ATC to ensure compliance: {369} No coatings, solvents, or additives containing chromium compounds shall be used. [District Rule 4102] {1984} No coatings, solvents, or additives containing lead compounds shall be used. [District Rule 4102] {1985} No coatings, solvents, or additives containing nickel compounds shall be used. [District Rule 4102] {Scenario 2} The applicant has proposed that paints containing {Note: List applicable compounds as proposed by the applicant. As of 2003, no automotive paints containing chromium or cadmium compounds can be used in California.} lead and/or nickel compounds, will be used at this facility. Because this was taken into account to determine this project s health risk, the ATC for this project will require that the use of paints containing {Note: Use applicable compounds as proposed by the applicant.} lead and/or nickel compounds be limited and that no paints containing chromium compounds be used at this facility. Therefore, the following conditions will be listed on the proposed ATC to ensure compliance: {1540} The as-applied use of coatings containing (list toxic compound) shall not exceed XX.X pint(s) per day and XX.X pint(s) per year. [District Rule 4102 and CH&SC 41700] {369} No coatings, solvents, or additives containing chromium compounds shall be used. [District Rule 4102] District policy APR 1905 also specifies that the increase in emissions associated with a proposed new source or modification not have acute or chronic indices, or a cancer risk greater than the District s significance levels (i.e. acute and/or chronic indices greater than 1 and a cancer risk greater than 10 in a million). As outlined by the HRA Summary in Appendix C of this report, the emissions increases for this project was determined to be less than significant. Rule 4201 Particulate Matter Concentration The purpose of this rule is to protect the ambient air quality by establishing a particulate matter emission standard. This rule applies to any source operation, which emits or may emit dust, fumes, or total suspended particulate matter. This rule states that a person shall not release or discharge into the atmosphere from any single source operation, dust, fumes, or total suspended particulate matter emissions in excess of 0.1 grain/dscf, as determined by the test methods in section 4.0. GEAR 12d-29

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT Guideline for Expedited Application Review (GEAR) 12c-Motor Vehicles and Mobile Equipment Coating Operations with Air Drying and In-Booth Priming

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT Guideline for Expedited Application Review (GEAR) 12a-Motor Vehicles and Mobile Equipment Coating Operations with a Burner for Paint Drying and

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT Guideline for Expedited Application Review (GEAR) 12b-Motor Vehicles and Mobile Equipment Coating Operations with a Burner for Paint Drying and

More information

Authority to Construct Application Review Motor Vehicle and Mobile Equipment Coating (with unheated booth)

Authority to Construct Application Review Motor Vehicle and Mobile Equipment Coating (with unheated booth) : Facility s Name Mailing Address: Authority to Construct Application Review Motor Vehicle and Mobile Equipment Coating (with unheated booth) Facility s Mailing Address Facility s City, CA Zip Code Contact

More information

Authority to Construct Application Review Motor Vehicle and Mobile Equipment Coating (without paint booth)

Authority to Construct Application Review Motor Vehicle and Mobile Equipment Coating (without paint booth) : Facility s Name Mailing Address: Authority to Construct Application Review Motor Vehicle and Mobile Equipment Coating (without paint booth) Facility s Mailing Address Facility s City, CA Zip Code Contact

More information

Authority to Construct Application Review Motor Vehicle and Mobile Equipment Coating (with heated booth)

Authority to Construct Application Review Motor Vehicle and Mobile Equipment Coating (with heated booth) : Facility s Name Mailing Address: Authority to Construct Application Review Motor Vehicle and Mobile Equipment Coating (with heated booth) Facility s Mailing Address Facility s City, CA Zip Code Contact

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Existing Wood Coating Operations

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Existing Wood Coating Operations SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT Guideline for Expedited Application Review (GEAR) Existing Wood Coating Operations Approved By: Signed Seyed Sadredin Director of Permit Services

More information

San Joaquin Valley Unified Air Pollution Control District

San Joaquin Valley Unified Air Pollution Control District San Joaquin Valley Unified Air Pollution Control District Guideline for Expedited Application Review (GEAR) Ethylene Oxide (ETO) Sterilizers and Aerators Approved By: Signed Seyed Sadredin Director of

More information

Authority to Construct Application Review Woodworking Operation

Authority to Construct Application Review Woodworking Operation San Joaquin Valley Air Pollution Control District Authority to Construct Application Review Woodworking Operation Facility Name: Mailing Address: Contact Person: Telephone: Application # (# s): Project

More information

San Joaquin Valley Unified Air Pollution Control District

San Joaquin Valley Unified Air Pollution Control District San Joaquin Valley Unified Air Pollution Control District Guideline for Expedited Application Review (GEAR #27a) Fixed Roof Oil Field Production Tanks < 5000 BBLs Small Producer, Heavy Oil, Non-Major Source,

More information

San Joaquin Valley Unified Air Pollution Control District

San Joaquin Valley Unified Air Pollution Control District San Joaquin Valley Unified Air Pollution Control District Guideline for Expedited Application Review (GEAR #27b) Fixed Roof Oil Field Production Tank < 5000 BBLs Major Source, Heavy Oil, Connected to Vapor

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) #20 Existing Chain-Driven Charbroilers

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) #20 Existing Chain-Driven Charbroilers SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT Guideline for Expedited Application Review (GEAR) #20 Existing Chain-Driven Charbroilers Approved by: David Warner Director of Permit Services

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT Guideline for Expedited Application Review (GEAR) Motor Vehicles and Mobile Equipment Coating Operations Approved By: Signed Seyed Sadredin Director

More information

Approved By: Date Seyed Sadredin Director of Permit Services

Approved By: Date Seyed Sadredin Director of Permit Services San Joaquin Valley Unified Air Pollution Control District *****DRAFT***** Guideline for Expedited Application Review (GEAR) Dry-Batch Concrete Facility (> 700 yard 3 -Concrete/day) Approved By: Date Seyed

More information

San Joaquin Valley Air Pollution Control District

San Joaquin Valley Air Pollution Control District San Joaquin Valley Air Pollution Control District Authority to Construct Application Review Installation of Phase II of a New Electric Vehicle Manufacturing and Assembly Plant Facility Name: Faraday &

More information

Coating Processes. Internal Use Only App# APCD2015 APP

Coating Processes. Internal Use Only App# APCD2015 APP 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A. PROCESS DESCRIPTION Product(s)/Surface(s) Coated: Please identify all product coating operations that apply: Miscellaneous surfaces, not subject to other coating

More information

Authority to Construct Application Review Poultry Broiler Houses

Authority to Construct Application Review Poultry Broiler Houses San Joaquin Valley Air Pollution Control District Authority to Construct Application Review Poultry Broiler Houses Facility Name: Date: January 30, 2006 Mailing Address: P.O. Box 831 Attn: Environmental

More information

rai San Joaquin Valley AIR POLLUTION CONTROL DISTRICT

rai San Joaquin Valley AIR POLLUTION CONTROL DISTRICT rai San Joaquin Valley AIR POLLUTION CONTROL DISTRICT HEALTHY LIiR LIVING OCT 1 0 2013 Mr. Joey Barulich Vintage Production California, LLC 9300 Ming Avenue Bakersfield, CA 93311 Re: Proposed ATC / Certificate

More information

Authority to Construct Application Review Poultry Broiler Houses

Authority to Construct Application Review Poultry Broiler Houses San Joaquin Valley Air Pollution Control District Authority to Construct Application Review Poultry Broiler Houses Facility Name: Foster Farms, El Dorado Ranch Date: January 30, 2006 Mailing Address: P.O.

More information

BACT Determination Information

BACT Determination Information UNDER PUBLIC REVIEW SMAQMD BACT CLEARINGHOUSE CATEGORY: COATING - AUTO BODY BACT Size: Minor Source BACT PAINT SPRAY BOOTH BACT Determination Number: Permit Number: Equipment Description: Unit Size/Rating/Capacity:

More information

YOLO-SOLANO AIR QUALITY MANAGEMENT DISTRICT 1947 Galileo Court, Suite 103; Davis, CA Phone (530) ; Fax (530)

YOLO-SOLANO AIR QUALITY MANAGEMENT DISTRICT 1947 Galileo Court, Suite 103; Davis, CA Phone (530) ; Fax (530) YOLO-SOLANO AIR QUALITY MANAGEMENT DISTRICT 1947 Galileo Court, Suite 103; Davis, CA 95618 Phone (530)757-3650; Fax (530)757-3670 AUTHORITY TO CONSTRUCT (ATC) APPLICATION A separate application must be

More information

Adhesive Material Application Operation

Adhesive Material Application Operation 1 2 3 4 5 6 A. PROCESS DESCRIPTION Product(s)/Surface(s) Bonded: 1) Explanation of Process What is the product? What processes are being conducted? Where will volatile organic compound (VOC) and toxic

More information

"LIST AND CRITERIA" INDEX INTRODUCTION Section 1 - General Application Information... 5

LIST AND CRITERIA INDEX INTRODUCTION Section 1 - General Application Information... 5 "LIST AND CRITERIA" INFORMATION REQUIRED OF APPLICANTS SEEKING A PERMIT FROM THE SACRAMENTO AIR QUALITY MANAGEMENT DISTRICT Adopted March, 1985 (Amended 6-7-94, 01-11-96, 08-01-96) INDEX INTRODUCTION...

More information

San Joaquin Valley Unified Air Pollution Control District

San Joaquin Valley Unified Air Pollution Control District San Joaquin Valley Unified Air Pollution Control District Almond Hulling Permit Processing Approved By: (signed) Date: 8/22/02 Seyed Sadredin Director of Permit Services I. Purpose The purpose of this

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT COMPLIANCE DEPARTMENT COM 2180

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT COMPLIANCE DEPARTMENT COM 2180 SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT COMPLIANCE DEPARTMENT COM 2180 APPROVED: Signed DATE: December 28, 2006 Jon Adams Director of Compliance TITLE: RULE 4602 - MOTOR VEHICLE AND MOBILE

More information

CEQA Implementation Policy

CEQA Implementation Policy San Joaquin Valley Air Pollution Control District CEQA Implementation Policy Approved By: Date: June 10, 2008 David Warner, Director of Permit Services Purpose: The District has a statutory obligation

More information

RULE 410.4A Motor Vehicle and Mobile Equipment Refinishing Operations - Adopted 5/6/91, Amended 4/6/95, 3/7/96

RULE 410.4A Motor Vehicle and Mobile Equipment Refinishing Operations - Adopted 5/6/91, Amended 4/6/95, 3/7/96 RULE 410.4A Motor Vehicle and Mobile Equipment Refinishing Operations - Adopted 5/6/91, Amended 4/6/95, 3/7/96 I. Applicability Provisions of this Rule shall apply to coating and refinishing of Group I

More information

rali San Joaquin Valley sm AIR POLLUTION CONTROL DISTRICT

rali San Joaquin Valley sm AIR POLLUTION CONTROL DISTRICT rali San Joaquin Valley sm AIR POLLUTION CONTROL DISTRICT HEALTHY MR LIVING JUN 2 214 Mr. Wm. Douglas Shaffer Vintage Production California LLC 96 Ming Ave, Suite 3 Bakersfield, CA 93311 Re: Proposed ATC

More information

Re: Proposed ATC / Certificate of Conformity (Significant Mod) District Facility # N-3606 Project # N

Re: Proposed ATC / Certificate of Conformity (Significant Mod) District Facility # N-3606 Project # N N W San Joaquin Valley sm AIR POLLUTION CONTROL DISTRICT 4,1 HEALTHY AIR LIVING MAR 1 2 2014 Mr. Mac McCullough Pacific Southwest Container 4530 Leckron Rd Modesto, CA 95353 Re: Proposed ATC / Certificate

More information

k V San Joaquin Valley AIR POLLUTION CONTROL DISTRICT

k V San Joaquin Valley AIR POLLUTION CONTROL DISTRICT k V San Joaquin Valley AIR POLLUTION CONTROL DISTRICT 7:I or HEALTHY AIR LIVING - AUG 0 4 2014 Mr. Edward Burton 1500 W Main St Turlock, CA 95380 Re: Proposed ATC / Certificate of Conformity (Significant

More information

Table of Contents. (a) APPLICABILITY... 1 (b) EXEMPTIONS... 1 (c) DEFINITIONS... 1 (d) STANDARDS... 2

Table of Contents. (a) APPLICABILITY... 1 (b) EXEMPTIONS... 1 (c) DEFINITIONS... 1 (d) STANDARDS... 2 RULE 20.4 NEW SOURCE REVIEW PORTABLE EMISSION UNITS (ADOPTED AND EFFECTIVE 5/17/94) (REV. ADOPTED AND EFFECTIVE 12/17/97) (REV. ADOPTED 11/4/98; EFFECTIVE 12/17/98) (REV. ADOPTED AND EFFECTIVE 4/27/16)

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT COMPLIANCE DEPARTMENT COM 2200

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT COMPLIANCE DEPARTMENT COM 2200 SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT COMPLIANCE DEPARTMENT COM 2200 APPROVED: Signed DATE: December 28, 2006 Jon Adams Director of Compliance TITLE: RULE 4606 WOOD PRODUCTS COATING

More information

San Joaquin Valley Air Pollution Control District APR 1010 Application Review Format

San Joaquin Valley Air Pollution Control District APR 1010 Application Review Format San Joaquin Valley Air Pollution Control District APR 1010 Application Review Format Approved By: Signed Date: August 7, 2017 Arnaud Marjollet Director of Permit Services The purpose of this policy is

More information

Title V. Model General Permit Template SERIES 3 INTERAL COMBUSTION ENGINES. Template # SJV-IC-3-1

Title V. Model General Permit Template SERIES 3 INTERAL COMBUSTION ENGINES. Template # SJV-IC-3-1 Title V Model General Permit Template SERIES 3 INTERAL COMBUSTION ENGINES Template # SJV-IC-3-1 full-time, rich-burn, IC engines with NSCR fired on PUC quality natural gas with a sulfur content of less

More information

Re: Proposed ATC / Certificate of Conformity (Significant Mod) District Facility # S-1372 Project #

Re: Proposed ATC / Certificate of Conformity (Significant Mod) District Facility # S-1372 Project # San Joaquin Valley Ibm AIR POLLUTION CONTROL DISTRICT JUL 0 2 2014 &ZIT HEALTHY AIR LIVING' Mr. Kenneth Bork Freeport-McMoRan Oil and Gas, LLC 1200 Discovery Drive Suite 100 Bakersfield, CA 93309 Re: Proposed

More information

a San Joaquin Valley lam AIR POLLUTION CONTROL DISTRICT

a San Joaquin Valley lam AIR POLLUTION CONTROL DISTRICT a San Joaquin Valley lam AIR POLLUTION CONTROL DISTRICT HEALTHY Al DEC 3 1 213 Mr. Joey Barulich Vintage Production California, LLC 96 Ming Avenue, Suite 3 Bakersfield, CA 93311 Re: Proposed ATC / Certificate

More information

Controlling air pollution is a responsibility we all share. New York State Department of Environmental Conservation (DEC) has identified motor

Controlling air pollution is a responsibility we all share. New York State Department of Environmental Conservation (DEC) has identified motor Controlling air pollution is a responsibility we all share. New York State Department of Environmental Conservation (DEC) has identified motor vehicle refinishing as one of the many commercial businesses

More information

EMISSIONS ACTIVITY CATEGORY FORM SURFACE COATING OPERATIONS

EMISSIONS ACTIVITY CATEGORY FORM SURFACE COATING OPERATIONS FOR OHIO EPA USE FACILITY ID: EMISSIONS ACTIVITY CATEGORY FORM SURFACE COATING OPERATIONS This form is to be completed for each operation in which coatings are applied to parts, substrates, or other materials

More information

Table of Contents. (a) APPLICABILITY... 1 (b) EXEMPTIONS... 1 (c) DEFINITIONS... 1 (d) STANDARDS... 2

Table of Contents. (a) APPLICABILITY... 1 (b) EXEMPTIONS... 1 (c) DEFINITIONS... 1 (d) STANDARDS... 2 RULE 20.4 NEW SOURCE REVIEW PORTABLE EMISSION UNITS (ADOPTED AND EFFECTIVE 5/17/94) (REV. ADOPTED AND EFFECTIVE 12/17/97) (REV. ADOPTED 11/4/98; EFFECTIVE 12/17/98) (REV. ADOPTED AND EFFECTIVE 4/27/16)

More information

ARTICLE 3: MISCELLANEOUS VOLATILE ORGANIC COMPOUND EMISSION STANDARDS

ARTICLE 3: MISCELLANEOUS VOLATILE ORGANIC COMPOUND EMISSION STANDARDS ARTICLE 3: MISCELLANEOUS VOLATILE ORGANIC COMPOUND EMISSION STANDARDS SECTION 3.01 CUTBACK ASPHALT PAVING Adopted 03/13/80 (462) Revised/Renumbered 06/13/91 (700) (a) It shall be unlawful for any person

More information

Note: The definition of "photochemically reactive material" is based upon OAC rule (C)(5).

Note: The definition of photochemically reactive material is based upon OAC rule (C)(5). ADDITIONAL TERMS AND CONDITIONS 1. VISIBLE EMISSION LIMIT Visible particulate emissions from any stack shall not exceed 20 per cent opacity, as a 6-minute average, except for a period of 6 consecutive

More information

am AIR POLLUTION CONTROL DISTRICT

am AIR POLLUTION CONTROL DISTRICT a San Joaquin Valley am AIR POLLUTION CONTROL DISTRICT 11 VI.,.-11? I a HEALTHY AIR LIVING- FEB 0 3 2014 John Haley Aera Energy LLC PO Box 11164 Bakersfield, CA 93389-1164 Re: Notice of Preliminary Decision

More information

State of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit

State of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit State of New Hampshire Department of Environmental Services Air Resources Division Temporary Permit Permit No: TP-0120 Date Issued: December 26, 2012 This certifies that: Northeast Utilities Public Service

More information

DRAFT AUTHORITY TO CONSTRUCT

DRAFT AUTHORITY TO CONSTRUCT A/C NO.: 25399 ISSUED BY: DATE ISSUED: TO BE DETERMINED DAVID R. GROSE DATE EXPIRES: ISSUED TO: TO BE DETERMINED MITSUBISHI CHEMICAL CARBON FIBER AND COMPOSITES, INC. LOCATION: 5900 88 TH STREET, SACRAMENTO,

More information

rali San Joaquin Valley am AIR POLLUTION CONTROL DISTRICT

rali San Joaquin Valley am AIR POLLUTION CONTROL DISTRICT rali San Joaquin Valley am AIR POLLUTION CONTROL DISTRICT JAN 3 0 2014 Ed, HEALTHY AIR LIVING - Shams Hasan E&B Natural Resources 34740 Merced Avenue Bakersfield, CA 93908 Re: Notice of Preliminary Decision

More information

Table of Contents. (a) APPLICABILITY (b) EXEMPTIONS (c) DEFINITIONS... 2

Table of Contents. (a) APPLICABILITY (b) EXEMPTIONS (c) DEFINITIONS... 2 RULE 20.2 NEW SOURCE REVIEW NON - MAJOR STATIONARY SOURCES (ADOPTED AND EFFECTIVE 5/17/94) (REV. ADOPTED AND EFFECTIVE 12/17/97) (REV. ADOPTED 11/4/98; EFFECTIVE 12/17/98) (REV. ADOPTED (date of adoption);

More information

San Joaquin Valley AIR POLLUTION CONTROL DISTRICT

San Joaquin Valley AIR POLLUTION CONTROL DISTRICT San Joaquin Valley AIR POLLUTION CONTROL DISTRICT HEALTHY A 1 Pi LIVING' APR 2 9 2014 Mr. Mathew Tower O'Neill Beverages Comapany, LLC 8418 S. Lac Jac Parlier, Ca 93654 Re: Proposed ATC / Certificate of

More information

BEST AVAILABLE CONTROL TECHNOLOGY DETERMINATION

BEST AVAILABLE CONTROL TECHNOLOGY DETERMINATION B 777 12 th Street, Third Floor Sacramento, CA 95814 BEST AVAILABLE CONTROL TECHNOLOGY DETERMINATION DETERMINATION NO.: 149 & 176 DATE: 11/20/17 ENGINEER: Felix Trujillo, Jr. Category/General Equip Description:

More information

INSTRUCTIONS FOR FORM COATINGFORM001 SURFACE COATING OPERATIONS

INSTRUCTIONS FOR FORM COATINGFORM001 SURFACE COATING OPERATIONS VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT 669 County Square Drive, Ventura CA 93003 805/ 645-1401 FAX 805/ 645-1444 www.vcapcd.org INSTRUCTIONS FOR FORM COATINGFORM001 SURFACE COATING OPERATIONS Following

More information

"VI San Joaquin Valley am AIR POLLUTION CONTROL DISTRICT

VI San Joaquin Valley am AIR POLLUTION CONTROL DISTRICT "VI San Joaquin Valley am AIR POLLUTION CONTROL DISTRICT Lvg HEALTHY MR LIVING FEB 0 3 2014 Ms. Christine Ryan E & J Gallo Winery - Brandy 600 Yosemite Blvd., Modesto, CA 95354 Re: Proposed ATC / Certificate

More information

State of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit

State of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit State of New Hampshire Department of Environmental Services Air Resources Division Temporary Permit Permit No: FP-T-0152 Date Issued: July 18, 2007 Administrative Permit Amendment: June 11, 2008 This certifies

More information

San Joaquin Valley Unified Air Pollution Control District. Guideline for Expedited Application Review (GEAR) #24 Dry-Batch Concrete Facility

San Joaquin Valley Unified Air Pollution Control District. Guideline for Expedited Application Review (GEAR) #24 Dry-Batch Concrete Facility San Joaquin Valley Unified Air Pollution Control District Guideline for Expedited Application Review (GEAR) #24 Dry-Batch Concrete Facility Approved By: Date April 28, 2008 _ David Warner Director of Permit

More information

Introduction. Motor Vehicle Assembly Plant (001) (Plant No. 1) Motor Vehicle Assembly Plant (010) (Plant No. 2)

Introduction. Motor Vehicle Assembly Plant (001) (Plant No. 1) Motor Vehicle Assembly Plant (010) (Plant No. 2) Introduction Statement of Basis Honda Manufacturing of Alabama, LLC Lincoln, AL (Motor Vehicle Manufacturing) 309-0050 Major Source of VOCs & Hazardous Air Pollutant Emissions On September 1, 2017, Honda

More information

Engineering Guide #87: Guidance Concerning Rule Citations for the <10 tons/yr BAT Exemption

Engineering Guide #87: Guidance Concerning Rule Citations for the <10 tons/yr BAT Exemption GUIDANCE DOCUMENT Division of Air Pollution Control June 5, 2015 Engineering Guide #87: Guidance Concerning Rule Citations for the

More information

W N San Joaquin Valley AIR POLLUTION CONTROL DISTRICT

W N San Joaquin Valley AIR POLLUTION CONTROL DISTRICT W N San Joaquin Valley AIR POLLUTION CONTROL DISTRICT HEALTHY AIR LIVING OCT 14 2014 Richard Gilton Gilton Resource Recovery 818 McCloy Rd Stockton, CA 95351 Re: Notice of Preliminary Decision - Authority

More information

San Joaquin Valley AIR POLLUTION CONTROL DISTRICT

San Joaquin Valley AIR POLLUTION CONTROL DISTRICT San Joaquin Valley AIR POLLUTION CONTROL DISTRICT FEB 1 J 2013 Mr. Daniel Lee Paramount Farms, Inc. 13646 Highway 33 Lost Hills, CA 93249-9719 Re: Proposed ATC I Certificate of Conformity (Significant

More information

TITLE V OPERATING PERMIT STATEMENT OF BASIS

TITLE V OPERATING PERMIT STATEMENT OF BASIS Facility Name: Title V Permit No.: Permit Application Nos.: Site ID: Equipment Address: Goal Line, L.P. APCD2016-TVP-00043 APCD2016-APP-004597 APCD1992-SITE-08447 555 North Tulip Street Escondido, CA 92025

More information

TITLE V OPERATING PERMIT STATEMENT OF BASIS

TITLE V OPERATING PERMIT STATEMENT OF BASIS TITLE V OPERATING PERMIT STATEMENT OF BASIS Facility Name: Fleet Readiness Center Southwest (FRCSW) Title V Application Number: APCD2015-APP-004084 Title V Permit Number: Facility ID: Equipment Address:

More information

San Joaquin Valley Air Pollution Control District. Procedures for Quantifying Fugitive VOC Emissions At Petroleum and SOCMI Facilities

San Joaquin Valley Air Pollution Control District. Procedures for Quantifying Fugitive VOC Emissions At Petroleum and SOCMI Facilities San Joaquin Valley Air Pollution Control District Procedures for Quantifying Fugitive VOC Emissions At Petroleum and SOCMI Facilities Approved By: _(Signed) Date: _September 15, 2005_ David Warner Director

More information

1.0 Purpose. The purpose of this rule is to provide for the following:

1.0 Purpose. The purpose of this rule is to provide for the following: RULE 2201 NEW AND MODIFIED STATIONARY SOURCE REVIEW RULE (Adopted September 19, 1991; Amended March 11, 1992; Amended October 29, 1992; Amended December 17, 1992; Amended October 21, 1993; Amended June

More information

BACT Determination Information

BACT Determination Information ACTIVE SMAQMD BACT CLEARINGHOUSE CATEGORY: COATING - WOOD BACT Size: Minor Source BACT PAINT SPRAY BOOTH BACT Determination Number: 190 BACT Determination Date: 8/29/2018 Equipment Information Permit Number:

More information

TITLE V OPERATING PERMIT STATEMENT OF BASIS

TITLE V OPERATING PERMIT STATEMENT OF BASIS TITLE V OPERATING PERMIT STATEMENT OF BASIS Facility Name: El Cajon Energy, LLC Title V Application Number: APCD2011-APP-001657 Facility ID: Equipment Address: APCD2009-SITE-06554 222 N. Johnson Ave. Facility

More information

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION Page 1 of 5 Date Application Received: September 30, 2002 Application #: FY03-0057 PROJECT DESCRIPTION: FY03-0057 is for a renewal application for 6 spray booths (FP-T-0060 expired on July 31, 2002). FACILITY

More information

Re: Proposed ATC / Certificate of Conformity (Significant Mod) District Facility # S-2033 Project #

Re: Proposed ATC / Certificate of Conformity (Significant Mod) District Facility # S-2033 Project # San Joaquin Valley am AIR POLLUTION CONTROL DISTRICT HEALTHY AIR LIVING' DEC 2 3 2014 Mr. Larry Wanamaker GAF, Elk Corporation of Texas 6200 Zerker Road Shafter, CA 93263 Re: Proposed ATC / Certificate

More information

New Source Review Staff Presentation Community Advisory Council

New Source Review Staff Presentation Community Advisory Council New Source Review Staff Presentation Community Advisory Council DECEMBER 9, 2015 BUELLTON. SANTA YNEZ VALLEY MARRIOT T Staff Introductions Michael Goldman Engineering Manager Timothy Mitro Air Quality

More information

MI San Joaquin Valley AIR POLLUTION CONTROL DISTRICT HEALTHY A IR LIVING

MI San Joaquin Valley AIR POLLUTION CONTROL DISTRICT HEALTHY A IR LIVING MI San Joaquin Valley AIR POLLUTION CONTROL DISTRICT HEALTHY A IR LIVING MAR 1 4 2014 Ken Gagon Tessenderlg Kerley, Inc. 2255 N. 44b1 St., Suite 300 Phoenix, AZ 85008 Re: Notice of Preliminary Decision

More information

iraki San Joaquin Valley AIR POLLUTION CONTROL DISTRICT HEALTHY AIR LIVING

iraki San Joaquin Valley AIR POLLUTION CONTROL DISTRICT HEALTHY AIR LIVING iraki San Joaquin Valley AIR POLLUTION CONTROL DISTRICT HEALTHY AIR LIVING JUN 02 2014 Bill Donadio Hathaway, LLC PO Box 31385 Bakersfield, CA 93380 Re: Notice of Preliminary Decision - Authority to Construct

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT. Annual Offset Equivalency Demonstration.

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT. Annual Offset Equivalency Demonstration. DRAFT STAFF REPORT Annual Offset Equivalency Demonstration April 19, 2016 Prepared by: Derek Fukuda, Senior Air Quality Engineer Reviewed by: Errol Villegas, Permit Services Manager Arnaud Marjollet, Director

More information

SUPPLEMENT TO PERMIT NO Connolly North America, Inc Oakland Park Boulevard Highland Park, Michigan August 10, 2000

SUPPLEMENT TO PERMIT NO Connolly North America, Inc Oakland Park Boulevard Highland Park, Michigan August 10, 2000 SUPPLEMENT TO PERMIT NO. 309-99 Connolly North America, Inc. 12225 Oakland Park Boulevard Highland Park, Michigan 48203 GENERAL CONDITIONS 1. Rule 201(1) - The process or process equipment covered by this

More information

DRAFT AUTHORITY TO CONSTRUCT

DRAFT AUTHORITY TO CONSTRUCT A/C NO.: 25596 ISSUED BY: DATE ISSUED: DRAFT JORGE DEGUZMAN DATE EXPIRES: ISSUED TO: DRAFT 28 TH STREET LANDFILL, SOLID WASTE DIVISION, CITY OF SACRAMENTO LOCATION: 20 28 TH STREET, SACRAMENTO, CA 95816

More information

THESE SUGGESTED FORMS MAY BE USED TO COMPLY WITH THE RECORDKEEPING REQUIREMENTS OF RULE 463 (Wood Coatings)

THESE SUGGESTED FORMS MAY BE USED TO COMPLY WITH THE RECORDKEEPING REQUIREMENTS OF RULE 463 (Wood Coatings) 777 12 th Street, Suite 300 SACRAMENTO METROLITAN Sacramento, CA 95814 AIR QUALITY MANAGEMENT DISTRICT THESE SUGGESTED FORMS MAY BE USED TO COMPLY WITH THE RECORDKEEPING REQUIREMENTS OF RULE 463 (Wood

More information

SCAQMD Permit Streamlining Initiative

SCAQMD Permit Streamlining Initiative SCAQMD Permit Streamlining Initiative NACAA Joint Permitting & Enforcement Workshop December 9-11, 2014 Chicago, Illinois Mohsen Nazemi P.E. Deputy Executive Officer South Coast Air Quality Management

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT Permit #: 1349-AR-2 IS ISSUED TO: FM Structural Plastic Technology, Inc. dba FM Corporation 3535 Hudson Road Rogers, AR 72757 Benton County THIS PERMIT IS FM CORPORATION s

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT IS ISSUED TO: 1910 Baldor Drive Ozark, AR 72949 Franklin County THIS PERMIT IS BALDOR ELECTRIC COMPANY S AUTHORITY TO CONSTRUCT, MODIFY, OPERATE, AND/OR MAINTAIN THE EQUIPMENT

More information

August 31, Will Filbeck Instafab Company, Inc E 2nd Street Vancouver, WA Final Approval for Metal Fabrication Facility.

August 31, Will Filbeck Instafab Company, Inc E 2nd Street Vancouver, WA Final Approval for Metal Fabrication Facility. 85 NE 99th Street, Suite 294 Vancouver, WA 98682 (360) 574-3058 www.swcleanair.org August 3, 207 Will Filbeck Instafab Company, Inc. 2424 E 2nd Street Vancouver, WA 9866 Subject: Final Approval for Metal

More information

BACT Determination Information

BACT Determination Information ACTIVE CATEGORY: BACT Size: SMAQMD BACT CLEARINGHOUSE Solvent Cleaning Vactube MFG BACT Determination Number: Permit Number: Equipment Description: Unit Size/Rating/Capacity: Equipment Location: ROCs NOx

More information

BACT Determination Information

BACT Determination Information UNDER PUBLIC REVIEW SMAQMD BACT CLEARINGHOUSE CATEGORY: COATING - AEROSPACE BACT Size: Minor Source BACT PAINT SPRAY BOOTH BACT Determination Number: Permit Number: Equipment Description: Unit Size/Rating/Capacity:

More information

STATEMENT OF BASIS MASTERBRAND CABINETS INC. Auburn, Alabama Facility No

STATEMENT OF BASIS MASTERBRAND CABINETS INC. Auburn, Alabama Facility No STATEMENT OF BASIS MASTERBRAND CABINETS INC. Auburn, Alabama Facility No. 206-0032 On August 2, 2016, the Department received a renewal Major Source Operating Permit (MSOP) application from MasterBrand

More information

Southwest Clean Air Agency Page 1 of NE 99 th Street, Suite 1294, Vancouver, WA Voice: (360) Fax: (360)

Southwest Clean Air Agency Page 1 of NE 99 th Street, Suite 1294, Vancouver, WA Voice: (360) Fax: (360) Southwest Clean Air Agency Page 1 of 11815 NE 99 th Street, Suite 1294, Vancouver, WA 98682-2322 Voice: (360) 574-3058 Fax: (360) 576-0925 PAINT / SPRAY BOOTH INFORMATION FACILITY NAME: DATE: HOURS OF

More information

PRELIMINARY AUTHORITY TO CONSTRUCT

PRELIMINARY AUTHORITY TO CONSTRUCT PRELIMINARY ISSUED BY: DATE ISSUED: SEPTEMBER XX, 2018 JORGE DeGUZMAN DATE EXPIRES: SEPTEMBER XX, 2020 ISSUED TO: SACRAMENTO MUNICIPAL UTILITY DISTRICT FINANCING AUTHORITY (SFA) COSUMNES POWER PLANT LOCATION:

More information

Discussion Paper. Potential Amendments to the Metro Vancouver Automotive Refinishing Emission Regulation Bylaw

Discussion Paper. Potential Amendments to the Metro Vancouver Automotive Refinishing Emission Regulation Bylaw Discussion Paper Potential Amendments to the Metro Vancouver Automotive Refinishing Emission Regulation Bylaw Introduction Metro Vancouver Regional District (MVRD, operating as Metro Vancouver) is responsible

More information

DRAFT Procedures for Quantifying Fugitive VOC Emission Sources at Petroleum Facilities

DRAFT Procedures for Quantifying Fugitive VOC Emission Sources at Petroleum Facilities San Joaquin Valley Unified Air Pollution Control District DRAFT Procedures for Quantifying Fugitive VOC Emission Sources at Petroleum Facilities Approved By: Seyed Sadredin Director of Permit Services

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. October 6, NEW SOURCE REVIEW PERMIT TO INSTALL No

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. October 6, NEW SOURCE REVIEW PERMIT TO INSTALL No MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION October 6, 2004 NEW SOURCE REVIEW PERMIT TO INSTALL No. 206-04 ISSUED TO Excel Decorating & Finishing LOCATED AT 480 East Second Street

More information

qnlc d AIR POLLUTION CONTROL DISTRICT San Joaquin Valley HEALTHY AI R-LIVING" OCT

qnlc d AIR POLLUTION CONTROL DISTRICT San Joaquin Valley HEALTHY AI R-LIVING OCT San Joaquin Valley d AIR POLLUTION CONTROL DISTRICT qnlc HEALTHY AI R-LIVING" OCT 2 0 2010 Bill Misaki Vie-Del Winery #1 P.O. Box 2908 Fresno, CA 93745-2908 Re: Notice of Preliminary Decision - Authority

More information

2010, 21, 2012 ARD

2010, 21, 2012 ARD ]. ] Proposed RACT ORDER 411 Sunapee Street ] October 13, 2003, Amended Newport, NH. 03773 ] December 1, 2003, Amended ] March 2, 2010, Amended March 21, 2012 ARD-03-001 A. Introduction This RACT Order

More information

Technical Contact. Conrad Carter, Jr., P.E. President (704) PO Box 1760 Albemarle, NC

Technical Contact. Conrad Carter, Jr., P.E. President (704) PO Box 1760 Albemarle, NC NORTH CAROLINA DIVISION OF AIR QUALITY Application Review Issue Date: XXXX XX, 2017 Facility Data Applicant (Facility s Name): H. W. Culp Lumber Co, Inc. Facility Address: H. W. Culp Lumber Co, Inc. 491

More information

The provisions of this rule apply to any person who manufactures, supplies, uses, or specifies the use of wood products coatings for commercial use.

The provisions of this rule apply to any person who manufactures, supplies, uses, or specifies the use of wood products coatings for commercial use. VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 74.30 - WOOD PRODUCTS COATINGS (Adopted 5/17/94, Revised 9/10/96, 11/11/03, 6/27/06) A. Applicability The provisions of this rule apply to any person

More information

Painter Training Module for Environmental Compliance with

Painter Training Module for Environmental Compliance with Georgia Small Business Environmental Assistance Program Painter Training Module for Environmental Compliance with National Emissions Standards for Hazardous Air Pollutants: Area Source Rule for Paint Stripping

More information

Section 1 Facility Information

Section 1 Facility Information AIR QUALITY BUREAU 7900 Hickman Rd Ste 1 Windsor Heights, IA 50324 NOTIFICATION LETTER FOR PERMIT BY RULE FOR SPRAY BOOTHS Initials: Facility ID: DNR USE ONLY Date: FO#: Check/Money Order Credit Card Cash

More information

STATIONARY SOURCE APPLICATION INSTRUCTIONS

STATIONARY SOURCE APPLICATION INSTRUCTIONS 110 Maple Street, Auburn, CA 95603 (530) 745-2330 Fax (530) 745-2373 www.placerair.org STATIONARY SOURCE APPLICATION INSTRUCTIONS FEES: General Applications - Filing Fee: See Filing Fees Checklist. Note:

More information

AIR QUALITY MANAGEMENT DISTRICT

AIR QUALITY MANAGEMENT DISTRICT 777 12th Street, 3rd Floor SACRAMENTO METROPOLITAN Sacramento, CA 95814 AIR QUALITY MANAGEMENT DISTRICT AUTHORITY TO CONSTRUCT EVALUATION APPLICATION NO.: REVIEW STARTING DATE: 01/13/17 ISSUING ENGINEER:

More information

Re: Proposed ATC / Certificate of Conformity (Significant Mod) District Facility # N-1976 Project # N

Re: Proposed ATC / Certificate of Conformity (Significant Mod) District Facility # N-1976 Project # N VA San Joaquin Valley a. AIR POLLUTION CONTROL DISTRICT IZT HEALTHY MR LIVING JAN 24 2014 Mr. Jeff Schultz ConAgra Foods 544 S Yosemite Ave Oakdale, CA 95361 Re: Proposed ATC / Certificate of Conformity

More information

PERMIT APPLICATION REVIEW SUMMARY

PERMIT APPLICATION REVIEW SUMMARY PERMIT APPLICATION REVIEW SUMMARY New Hampshire Department of Environmental Services Air Resources Division P.O. Box 95, 29 Hazen Drive Concord, NH 03302-0095 Phone: 603-271-1370 Fax: 603-271-7053 AFS

More information

rai San Joaquin Valley a. AIR POLLUTION CONTROL DISTRICT

rai San Joaquin Valley a. AIR POLLUTION CONTROL DISTRICT rai San Joaquin Valley a. AIR POLLUTION CONTROL DISTRICT ' JZfr HEALTHY. I LIVING MAR 3 9 2015 Candice Longnecker Granite Construction, Coalinga P0 Box 15287 Sacramento, CA 95851 Re Notice of Preliminary

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT Proposed Revision to State Implementation Plan (SIP) to Address Federal Clean Air Act Requirements for Reasonably Available

More information

One-coat application 5 LV650 Clear 2 LV650 Hardener 1 LV650 Reducer Anti-Graffiti (#484165)

One-coat application 5 LV650 Clear 2 LV650 Hardener 1 LV650 Reducer Anti-Graffiti (#484165) Description Autocoat BT is a two component VOC compliant clear coat that provides excellent chemical resistance and stain repellent properties. is designed for original equipment and repairs of commercial

More information

Pierce Fittings, Inc. Page 1 of 7. Lane Regional Air Protection Agency Simple Low Air Contaminant Discharge Permit REVIEW REPORT

Pierce Fittings, Inc. Page 1 of 7. Lane Regional Air Protection Agency Simple Low Air Contaminant Discharge Permit REVIEW REPORT Pierce Fittings, Inc. Page 1 of 7 Lane Regional Air Protection Agency Simple Low Air Contaminant Discharge Permit REVIEW REPORT Pierce Fittings, Inc. 10 North Garfield Street Eugene, Oregon 97402 fresnovalves.com/

More information

COATING - PLEASURE CRAFT BACT Size: Minor Source BACT COATING OPERATION. BACT Determination Information

COATING - PLEASURE CRAFT BACT Size: Minor Source BACT COATING OPERATION. BACT Determination Information UNDER PUBLIC REVIEW SMAQMD BACT CLEARINGHOUSE CATEGORY: COATING - PLEASURE CRAFT BACT Size: Minor Source BACT COATING OPERATION BACT Determination Number: Permit Number: Equipment Description: Unit Size/Rating/Capacity:

More information

U500 Single Stage. Check gun manufacture specification HVLP Pressure

U500 Single Stage. Check gun manufacture specification HVLP Pressure Description is two-component, acrylic urethane designed for original equipment and repairs for commercial vehicles. is a cost-effective durable finish with good color capability that is simple to mix and

More information