MAJHGAON MEDIUM PROJECT

Size: px
Start display at page:

Download "MAJHGAON MEDIUM PROJECT"

Transcription

1 GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT MAJHGAON MEDIUM PROJECT C.C.A 9900 Ha ESTIMATED COST Crores BLOCK:- AJAIGARH DISTRICT:- PANNA CHIEF ENGINEER DHASAN KEN BASIN WATER RESOURCES DEPARTMENT SAGAR(M.P)

2 GENERAL REPORT 1. Project envisages construction of composite dam named as Majhgaon Dam on Bada Nala a tributary to River Ken. The self catchment at the proposed site is Sqkm. Having 75% dependable yield of Mcm. The dam is proposed to have storage of the tune of Mcm and out of which diverted quantum of water it is Mcm from Bariyarpur Pick up weir at monsoon period from the share of Madhya Pradesh and Mcm from the self catchment of Bada Nala. In present scenario when there is no Daudhan Dam, there is ample water to divert. But the project in planned to sufficient yield from the independent catchment of Sqkm in between proposed Daudhan dam and Bariyarpur Pick up weir, even after construction of Daudhan Dam. Care has been taken to have availability of sufficient water for LBC of GOMP and RBC of Government of UP. Various studies have been conducted to finalise the yield, the study in appended Hydrology chapter, which is on the basis of recent 20 years data of G&D Mandla site of CWC and accordingly 75% success has been ensured. This yield is proposed to Transfer from Bariyarpur Pickup weir having crest at RL m to Majhgaon dam through a water conductor system having three components as detailed here below 2. Water Conductor System : I) Approach Channel: A 20 m wide approach channel at RL m from RD m to R.D 2800 m is provided to divert 38 cumecs water from Bariyarpur PUW to tunnel. A very gentle slope of 1 in 9500 is provided in the channel. The Basic idea of providing approach channel is to create a water pool at the entry of tunnel. The velocity of water in 0.81 m/sec & hence a silt pocket has been proposed at upstream of the tunnel. II) Tunnel : A 5.00 m diameter lined tunnel has been provided from RD 2800 m to 4600 m with a gradient of 1 in 2000 to generate velocity of 1.92 m/sec. III) Exit Channel : An exit channel in provided from RD 4600 m to 6288 m with a gradient of 1 in 5000 to join the Maghgaon reservoir at RL m i.e m below of RL m FRL of the dam.

3 3. Composite Dam:- A 4.4 km Long and m maximum height composite dam having FRL & MWL m, TBL m has been provided to storage MCM of water. The Left Earthen Main Dam is provided from RD 0.00 m to RD m. Then a m long spillway including non overflow portion of 10 m, having 11 nos. of radial gates of size 8.80 m x 3.50 m at crest RL m to pass SPF of 1170 Cumecs. Properties of five villages are situated at RL m of hence no floods lift in provided in the dam and flood in basin at FRL only. Right earthen main dam has been provided from RD m to RD m and two saddle dams are provided of length 1655 m and 1425 m Saddle Dam No.1 and Saddle Dam No.2 respectively on right bank. Previously the earth dam proposed with FRL 184.0m MWL as But it was apprehended that the crest of Bariyarpur PUW in at m and hence only 1.0 m drop with 2.6 kmlong approach channel may not be suitable for the hydraulic function of the water conductor system and hence the second alternate site was investigated by shifting the alignment at downstream, keeping the storage capacity same. This has resulted in better hydraulic performance of the under conductor system, reduced submergence area and property of 04 villages coming under submergence have been saved. A line diagram showing water conductor system and dam is enclosed here with as Fig Utilization of Yield:- Working table for 20 years has been prepared, which includes the Mcm water for irrigation 40 Mcm water for Industrial use 2 Mcm water to domestic supply. 5. Canal :- A 23 Km long main lined canal at right bank has been provided to irrigate 9900 Ha CCA. In addition there will be Kharif irrigation in 2700 Ha.

4 MAJHGAON MEDIUM IRRIGATION PROJECT Tehsil-Ajaigarh District- Panna BRIEF DESCRIPTION S. No. Description Detail 1 Name of Project : MAJHGAON MEDIUM IRRIGATIONP ROJECT 2 Estimated Total Cost : Lakhs 3 Annual Irrigation : Ha. Kharif : 2700 Ha. Rabi (by Flow irrigation) : 9900 Ha. 4 Benefit Cost 10% : Cost per Ha.on Rabi irrigation : 3.62 Lakhs 6 Cost per Ha. on annual irrigation : 2.85 Lakhs 8

5 Majhgaon Medium Irrigation Project Tehsil-Ajaigarh District- Panna CONSTITUENCY DETAILS S.No Description Detail. 1 Nearest Village : Majhgaon 2 Constituency No. : 60, Panna 3 Name of M.L.A. : Shri Shrikant Dubey 4 Name of M.P. : Shri Jitendra Singh Bundela

6 SALIENT FEATURES OF MAJHGAON MEDIUM PROJECT Sl. No. LOCATION Description. Maj hgaon Dam 1 State Madhya Pradesh 2 District Panna 3 Topo Sheet No. 63 D/1 4 Lattitude 24 54' 13.66" N 5 Longitude 80 10' 1.0" E 6 River Bada Nala 7 Situation At a distance of 1.30 K m East side of Narayanchua HYDROLOGY 1 Catchment Area Sq Km 2 Net Catchement Area Sq.km 3 Maximum Annual Rain fall mm (Year 1971) 4 Minimum Annual Rain fall mm (Year 2007) 5 Average Annual Rain fall mm 6 Design flood (PMF)as per Flood 1400 Cumecs Hydrograph 7 75% Dependable Yield from net Mcm catchment area RESERVOIR DATA 1 T.B.L m 2 M.W.L m 3 F.R.L m 4 Dead Storge Level m 5 River Bed Level m 6 Gross Storage at FRL Mcm 7 Live Storage Mcm 8 Dead Storage 7.39 Mcm 9 Tehsils in which Submergence area Ajaigarh 7 Partially ( Majhgaon, 10 No. of villages affected Banhari Kala, Dugraho, Hanumathpur Toria,sabdua,bariyarpur & Kunwarpur 11 No.of families affected No.of persons affected Water Spread Area at FRL Ha 14 Government Land submergence Ha 15 Private Land submergence area Ha 16 Forest submergence area ha. DAM Total Lenth of Dam Main Dam (Composite Dam) m Saddle Dam No m Saddle Dam No m (a) Ov er flow Section 1 Crest level of Spillway m

7 Sl. No. Description. Maj hgaon Dam 2 Length of spill way m 3 No. of Gates 1 gates of size(8.8m x 3.5m 4 Top width of dam 6.00m 5 Top of Dam (R.L) m 6 Deepest Foundation level m 7 Maximum height above foundation 12 m (b) Non ov er flow section 1 Top of Dam (R.L) 187 m 2 Maximum height above foundation 12 m 3 Length of NoF (5m on either side) 10 m (c) Earth Dam (i) Main Dam m a) Left Flank m b) Right Flank m Maximum height above G.L m (ii) Saddle Dam No m Maximum height above G.L m (ii) Saddle Dam No m Maximum height above G.L 5.6m Canal System (Irrigation) 1 Type of canal Flow canal with CC lining 2 G.C.A available Ha 3 C.C.A available 9900 Ha a) Kharif Paddy (7.17%) 350 Ha Jowar (7.77%) 350 Ha Soyabean (11.95%) 1000 Ha Maize (11.95%) 1000 Ha Total= 2700Ha b) Rabi By flow Wheat (3 MV) (44.62%) 3935 Ha Wheat (2 MV) (27.78%) 2925 Ha Gram (20.79%) 1940 Ha Oil Seeds (5.97%) 1100 Ha Total= 9900 Ha

8 Sl. No. Description. Maj hgaon Dam 4 Annual Irrigation Ha. 5 Intensity of Irrigation % 6 Project Intensity % Cost Estimates 1 Unit -I Headw orks Unit -II Canal Total Estimated Cost of Proj ect = Cost Per Ha. of Project 3.62 Lakhs Per Ha. B.C. Ratio 2.15 Sub Divisional Officer Singpur Barrage, Sub Division No.2 Ajagarh,District- Panna (M.P) Executive Engineer Water Resources Division District- Panna (M.P) Superintending Engineer Water Resources Circle Chhatarpur (M.P)

9 MAJHGAON MEDIUM IRRIGATION PROJECT BLOCK : AJAYGARH DISTRICT: PANNA 2.4 CHECK STATEMENT FOR MEDIUM IRRIGATION PROJECT (TO ACCOMAPNY T.C. 70) 1 Name of scheme : Majhgaon Medium Irrigation Project 2 Location of near village : Majhgaon 3 Constituency No & Name : 60, Panna 4 Name of (a) M.P. : Shri Jitendra Singh Bundela (b) M.L.A. : Shri Shrikant Dubey 5 Block : Ajaigarh Tehsil : Ajaigarh District : Panna 6 Cost (Rs.lakhs) : Rs lakhs 7 Culturable command area : 9900 Ha. 8 Cost per Hact. : Rs Lakhs /- per Ha. 9 B.C. Ratio Storage & Utilization : Live Storage (a) Required : Mcum (b) Provided : Mcum (c) Reason for not : Required capacity is provided Providing the Required capacity. : 11 Dead Storage Dead Storage Capacity is 7.39 Mcum out of the Gross Storage Capacity Mcm Irrigation 13 Submergence 1) Gross : ) Govt. Land : ) Private Land : ) Forest Land :

10 15 C.S.R.on which the estimate is based. 16 Provision of higher percentage if any : 17 General tendered percentage in the area: U.S.R. of M.P.W.R.D. in force From No Provision has been made. At U.C.S.R. 18 Land compensation per i) Culturable private land. : ii) Un Culturable private land. : 6,20,000/- Ha. 3,10,000/- Ha.

11 1.0 INTRODUCTION CHAPTER-1 Government of Madhya Pradesh proposed to construct Majhgaon Medium Project on local nala (Bada Nala), which is direct tributary of Ken River. The storage will be created by the self catchment of Majhgaon dam and will also be supplemented by releases from bariyarpur PUW. This medium Project will irrigate area in Ajaigarh Tehsil of Panna Distt. Proposed Reservoir will have a storage capcity of MCM, out of which MCM will be made available from Bariyapur PUW. A km long diversion channel is proposed to draw water from Bariyarpur PUW during monsoon period (i.e from July to September. Looking to the topography of the command area, a Right Bank Main canal having LSL at 172.0m is proposed and it is run for a length of Km. 1.1 Location Particulars Bariyarpur P.U.W Majhgaon Dam State Madhya Pradesh Madhya Pradesh District Panna Panna Taluk Ajaigarh Ajaigarh Latitude N 24 54' 13.66"N Longitude ' 1.0" E River Ken Bada Nalla 1.2 Accessibility: Distance and accessibility of Bariyarpur PUW and Majhgaon Dam from Panna District Head quarter is tabulated below:- Bariyarpur PUW can be approached from Panna via Ajaigarh. The total distance is about 60 Km. The Majhgaon dam site is about 12 Km from Ajaigarh via Amaha, Sinhai.

12 Particular Distance of Panna Accessibility District H.Q Bhopal (Capital City of M.P.) 390 Km Distances of Panna District Head Quarter from important places is tabulated below:- Bhopal-Sagar-Chhatarpur- Panna road Khajuraho ( Nearest Rail Head) 47 Km Khajuraho-Madla-Panna road Khajuraho (Nearest Air Khajuraho-Madla-Panna 47 Km Port) road

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT TEM MEDIUM IRRIGATION PROJECT EXECUTIVE SUMMARY 2016 CHIEF ENGINEER CHAMBAL BETWA BASIN WATER RESOURCES DEPARTMENT BHOPAL (M.P) TEM MEDIUM IRRIGATION

More information

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT SUTHALIYA PROJECT PRE FEASIBILITY REPORT ( PFR ) 2018 CHIEF ENGINEER CHAMBAL BETWA BASIN WATER RESOURCES DEPARTMENT BHOPAL (M.P) SUTHALIYA PROJECT

More information

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT PARBATI(RINSI)MAJOR IRRIGATION PROJECT PROJECT FEASIBILITY REPORT (PFR) 2017 CHIEF ENGINEER CHAMBAL BETWA BASIN WATER RESOURCES DEPARTMENT BHOPAL

More information

Head N E Ha

Head N E Ha Sr. No. PARTICULARS DETAILS A PREAMBLE 1. Project Name Ajansara Barrage Project 2. Project Proponent M/s. Vidharbha Irrigation Development Corporation 3. Screening Category Item 1 (C) in EIA Notification,

More information

Executive Summary of Bistan Lift IrrigationProject

Executive Summary of Bistan Lift IrrigationProject Executive Summary of Bistan Lift IrrigationProject INTRODUCTION:- 1.1 (i) AIM(S) OF THE PROJECT WORK : The main objective of Bistan Lift Irrigation Scheme is to provide irrigation facilities to the water-scare

More information

BERKHEDA MEDIUM IRRIGATION PROJECT. Techno-Economic Feasibility Report

BERKHEDA MEDIUM IRRIGATION PROJECT. Techno-Economic Feasibility Report GOVERNMENT OF MADHYA PRADESH NARMADA VALLEY DEVELOPMENT AUTHORITY CHIEF ENGINEER Indira Sagar Project (Canals) Sanawad District West Nimar, Madhya Pradesh BALANCE MEDIUM AND MINOR PROJECTS IN NARMADA BASIN

More information

State. 2. Location: Madhya Pradesh. Total period for which the forest land is proposed to be diverted (in year). 3. Detail of user agency

State. 2. Location: Madhya Pradesh. Total period for which the forest land is proposed to be diverted (in year). 3. Detail of user agency F. No. 8-39/2018-FC Sub: Proposal for diversion of 55.3 ha. of forest land for construction of Parna Minor Irrigation Project, in favour of Water Resources Department, Damoh District Madhya Pradesh State.-regarding.

More information

Sl.No DETAILS HULICAL FOREBAY DAM A. GENERAL:

Sl.No DETAILS HULICAL FOREBAY DAM A. GENERAL: KARNATAKA POWER CORPORATION LIMITED VARAHI HYDRO ELECTRIC PROJECT INFORMATION FOR ENGINEERING DATA Sl.No DETAILS HULICAL FOREBAY DAM A. GENERAL: 1. Name of the dam/project. 2. Location. Hulical fore bay

More information

ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA

ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA S. Masood Husain Nitya Nand Rai Director Assistant Director Foundation Engineering & Special Analysis Directorate Central

More information

Fig: Alignment of a ridge or watershed canal (Head reach of a main canal in plains)

Fig: Alignment of a ridge or watershed canal (Head reach of a main canal in plains) SYSTEM OF IRRIGATION CANAL CHAPTER 6 Alluvial Soil and Non-Alluvial Soil The soil which is formed by transportation and deposition of silt through the agency of water, over a course of time, is called

More information

6) Penstocks 3.25m dia and 965m long to lead a design discharge of cumecs

6) Penstocks 3.25m dia and 965m long to lead a design discharge of cumecs Project: Sorang Hydro Electric Project - 100 MW Overview: M/s.Himachal Sorang Pvt.Ltd., Hyderabad, is developing the Run of the River Sorang Hydro Electric Project (100MW) in Kinnaur District of Himachal

More information

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Created by Simpo PDF Creator Pro (unregistered version)  Asst.Prof.Dr. Jaafar S. Maatooq Lect.No.9 2 nd Semester Barrages, Regulators, Dams 1 of 15 In order to harness the water potential of a river optimally, it is necessary to construct two types of hydraulic structures, as shown in Figure

More information

Using SWAT Module in the Design of Submerged Weir on narrow rivers having high flood discharge

Using SWAT Module in the Design of Submerged Weir on narrow rivers having high flood discharge Using SWAT Module in the Design of Submerged Weir on narrow rivers having high flood discharge Presented by Er. Narendra Kumar Tiwary, B.Tech IIT Delhi, M.Tech NIT(Pat), Ph.D Scholar IIT Delhi Professor,

More information

POWER POTENTIAL STUDIES A CASE STUDY OF KULSI MUTLTIPURPOSE PROJECT

POWER POTENTIAL STUDIES A CASE STUDY OF KULSI MUTLTIPURPOSE PROJECT POWER POTENTIAL STUDIES A CASE STUDY OF KULSI MUTLTIPURPOSE PROJECT G.k.Hazarika B.E (civil) Asstt Executive Engineer Brahmaputra Board Dilip Goswami B.E (civil) Executive Engineer Brahmaputra Board The

More information

Intra and Inter Basin Linking of Rivers in Water Resources Management

Intra and Inter Basin Linking of Rivers in Water Resources Management Journal of Scientific & Industrial Research Vol. 75, March 2016, pp. 150-155 Intra and Inter Basin Linking of Rivers in Water Resources Management A Verdhen Dronacharya College of Engineering, Gurgaon-

More information

The Chairman welcomed all the members of the Committee and thereafter agenda items were taken up for deliberations.

The Chairman welcomed all the members of the Committee and thereafter agenda items were taken up for deliberations. The 292 nd meeting of the State Expert Appraisal Committee (SEAC) was held on 16 th June, 2017 under the Chairmanship of Dr. R.B. Lal for the projects / issues received from SEIAA. The following members

More information

ARHAM VEERAYATAN INSTITUTE OF ENGINEERING, TECHNOLOGY & RESEARCH Haripar (Mota Asambia), Bhuj Mandvi road, Mandvi Tal.

ARHAM VEERAYATAN INSTITUTE OF ENGINEERING, TECHNOLOGY & RESEARCH Haripar (Mota Asambia), Bhuj Mandvi road, Mandvi Tal. ARHAM VEERAYATAN INSTITUTE OF ENGINEERING, TECHNOLOGY & RESEARCH Haripar (Mota Asambia), Bhuj Mandvi road, Mandvi Tal. Kutch (Gujarat) Date: 19/10/2016, Wednesday Duration: 1 Day A FEEDBACK REPORT ON VISIT

More information

Impact of Bundelkhand Special Package for Drought Mitigation. National Rainfed Area Authority, Planning Commission, Government of India, New Delhi

Impact of Bundelkhand Special Package for Drought Mitigation. National Rainfed Area Authority, Planning Commission, Government of India, New Delhi Impact of Bundelkhand Special Package for Drought Mitigation National Rainfed Area Authority, Planning Commission, Government of India, New Delhi 1 Background of the Package The Package was initiated by

More information

WAPCOS LIMITED (A Government of India Undertaking) 76 C, Sector 18, Gurgaon , Haryana, INDIA

WAPCOS LIMITED (A Government of India Undertaking) 76 C, Sector 18, Gurgaon , Haryana, INDIA WATER RESOURCES DEPARTMENT GOVERNMENT OF MADHYA PRADESH EIA STUDY FOR BINA COMPLEX MULTIPURPOSE IRRIGATION PROJECT Volume-I : Final EIA Report WAPCOS LIMITED (A Government of India Undertaking) 76 C, Sector

More information

Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION. 1.1 General. 1.2 Establishment of the Company. 1.3 Special Features of the Project

Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION. 1.1 General. 1.2 Establishment of the Company. 1.3 Special Features of the Project Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION 1.1 General The Lower Erkhuwa hydropower Project is located in Kulung and Chauki Danda VDCs of Bhojpur District, in East Nepal. It is located

More information

A REPORT ON ACADEMIC VISIT TO UKAI DAM (Date: 27 th February 2017)

A REPORT ON ACADEMIC VISIT TO UKAI DAM (Date: 27 th February 2017) A REPORT ON ACADEMIC VISIT TO UKAI DAM (Date: 27 th February 2017) CONCERNED FACULTY : Dr. JIGAR SEVALIYA Prof. HIMANSHU PADHYA Prof. MEHALI MEHTA Prof. MITALI SHAH Dr. MINAKSHI VAGHANI Prof.PAYAL ZAVERI

More information

GOVERNMENT OF ANDHRA PRADESH WATER RESOURES DEPARTMENT CHINTHALAPUDI LIFT IRRIGATION SCHEME FEASIBILITY REPORT

GOVERNMENT OF ANDHRA PRADESH WATER RESOURES DEPARTMENT CHINTHALAPUDI LIFT IRRIGATION SCHEME FEASIBILITY REPORT GOVERNMENT OF ANDHRA PRADESH WATER RESOURES DEPARTMENT CHINTHALAPUDI LIFT IRRIGATION SCHEME FEASIBILITY REPORT SUBMITTED TO EXECUTIVE ENGINEER Indira Sagar Project, JANGAREDDYGUDEM West Godavari District.

More information

R.T.Thokal Head, Dept. of Irrigation and Drainage Engineering College of Agril Engg. And Tech., Dr.BSKKV, Dapoli Maharashtra State, INDIA

R.T.Thokal Head, Dept. of Irrigation and Drainage Engineering College of Agril Engg. And Tech., Dr.BSKKV, Dapoli Maharashtra State, INDIA Application of GIS-based SWAT framework for water management of irrigation project under rotational water supply S.D. Gorantiwar Head, Dept. of Irrigation and Drainage Engineering Dr. A. S. College of

More information

Solution for Irrigation Engineering

Solution for Irrigation Engineering Solution for Irrigation Engineering December 2015 Index Q.1) a). 2-3 b).3-5 c).5-6 d).6-8 e).9-10 Q.2) a).10-11 b). 12-14 c). 14-15 Q.3) a). 15-16 b). 17 c). 18 Q.4) a). N.A b). N.A c). N.A Q.5) a).20-22

More information

INVITATION OF BID (INTERNATIONAL COMPETITIVE BIDDING)

INVITATION OF BID (INTERNATIONAL COMPETITIVE BIDDING) INVITATION OF BID (INTERNATIONAL COMPETITIVE BIDDING) Bid Title : EPC Bid for Planning, detailed design& engineering, construction/manufacturing of civil, electro-mechanical, hydro- mechanical and switch

More information

A VISIT REPORT ON SARDAR SAROVAR DAM. CIVIL 4 th SEM PREPARED BY: MISS. D.A.DAVE MR. H.A.MAULVI CIVIL ENGINEERING DEPARTMENT

A VISIT REPORT ON SARDAR SAROVAR DAM. CIVIL 4 th SEM PREPARED BY: MISS. D.A.DAVE MR. H.A.MAULVI CIVIL ENGINEERING DEPARTMENT A VISIT REPORT ON SARDAR SAROVAR DAM CIVIL 4 th SEM PREPARED BY: MISS. D.A.DAVE MR. H.A.MAULVI CIVIL ENGINEERING DEPARTMENT A.Y.DADABHAI TECHNICAL INSTITUTE-KOSAMBA 1 The Narmada River Narmada means ever-delightful,

More information

Sub. Code:

Sub. Code: Important Instructions to examiners: ) The answers should be examined by key words and not as word-to-word as given in the model answer scheme. ) The model answer and the answer written by candidate may

More information

A Report on Industrial Visit at

A Report on Industrial Visit at Department of Civil Engineering A Report on Industrial Visit at Sardar Sarovar Dam Site & Dhanki Pumping Station (Dt.13-10-2015 & 14-10-2015) Prepared by: Jignesh Shah Details of Visit: Date: 13/10/2015

More information

Enhancement of System performance through Benchmarking: Case Study of Samrat Ashok Sagar Irrigation Project, MP, India

Enhancement of System performance through Benchmarking: Case Study of Samrat Ashok Sagar Irrigation Project, MP, India Volume 1, No 2, 21 Copyright 21 All rights reserved Integrated Publishing services Research article ISSN 976 4399 Enhancement of System performance through Benchmarking: Case Study of Samrat Ashok Sagar

More information

Figure 1: Interlinking Projects in IndiaSource: (Jolly, 2016)

Figure 1: Interlinking Projects in IndiaSource: (Jolly, 2016) Submergence Region of Daudhan Dam Ken-Betwa Interlinking Project Ar. Rakesh Kumar 1, Ar. Himanshu Saluja 2 1 Assistant Professor, Amity School of Architecture and Planning, Amity University Gurgaon, Haryana,

More information

SITE VISITED AT SARDAR SAROVAR DAM AT 24/08/2017 (3 RD, 5 TH AND 7 TH SEMESTER)

SITE VISITED AT SARDAR SAROVAR DAM AT 24/08/2017 (3 RD, 5 TH AND 7 TH SEMESTER) SITE VISITED AT SARDAR SAROVAR DAM AT 24/08/2017 (3 RD, 5 TH AND 7 TH SEMESTER) PREPARED BY: ASSISTANT PROFESSOR NILESH PRAJAPATI CIVIL ENGG. DEPARTMENT DJMIT MOGAR River Bed Power House (RBPH) RIVER BED

More information

Irrigation Crossing Structures

Irrigation Crossing Structures Irrigation Crossing Structures Road Open channel H.R. Open Irrigation Canal Tail escape Water way + Road way Culvert Bridge Water way + Water way Syphon Aqueduct Retaining walls Lining ١ 1- FUNCTION AND

More information

41.5 Case Study: Dam Break Analysis for Kali River Basin

41.5 Case Study: Dam Break Analysis for Kali River Basin 41.5 Case Study: Dam Break Analysis for Kali River Basin Kali River is a small River originates in Western Ghats at an elevation of about 9 m and flows down for about 16 Km before joining Arabian sea.

More information

Irrigation Structures 1

Irrigation Structures 1 CHAPTER 8 Irrigation Structures 1 Dr. M. R. Kabir Professor and Head, Department of Civil Engineering University of Asia Pacific (UAP), Dhaka LECTURE 20 Diversion Head Works Definition: The works, which

More information

Client: Budhi Gandaki Hydroelectric Project Development Committee. General Presentation

Client: Budhi Gandaki Hydroelectric Project Development Committee. General Presentation Client: Budhi Gandaki Hydroelectric Project Development Committee General Presentation 1. Background and objectives 2. Project location 3. Project information/features 4. Project performances 5. Environmental

More information

Draft EIA for Panchamnagar Medium Irrigation Project, Sagar, Madhya Pradesh

Draft EIA for Panchamnagar Medium Irrigation Project, Sagar, Madhya Pradesh 11.0 SUMMARY & CONCLUSION Panchamnagar Medium Project is a Medium Project of Department of Water Resources in Bundelkhand Region of Madhya Pradesh with annual irrigation of 9900 Ha. It comprises two construction

More information

Available online at ScienceDirect. Procedia Engineering 154 (2016 )

Available online at   ScienceDirect. Procedia Engineering 154 (2016 ) Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 154 (2016 ) 1319 1323 12th International Conference on Hydroinformatics, HIC 2016 Modeling of floods and flood control water

More information

WATER RESOURCES MANAGEMENT IN URBAN AREAS A SUSTAINABLE SOLUTION THROUGH IBWT

WATER RESOURCES MANAGEMENT IN URBAN AREAS A SUSTAINABLE SOLUTION THROUGH IBWT WATER RESOURCES MANAGEMENT IN URBAN AREAS A SUSTAINABLE SOLUTION THROUGH IBWT G A Rajkumar 1, M K Srinivas 2, L R Ranganath 3, M D Kudale 4 1 Assistant Research Officer, Central Water & Power Research

More information

ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma Resident Engineer ASEB, E-8, Lajpat Nagar-II, New Delhi

ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma Resident Engineer ASEB, E-8, Lajpat Nagar-II, New Delhi ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma Resident Engineer ASEB, E-8, Lajpat Nagar-II, New Delhi-110024. No: APGCL/CGM(H)/W/140/Pt-III/65 Dated : 01/11/2013. To Director (IA), Ministry of

More information

D.A.DEGREE.ENGINEERING & TECHNOLOGY MAHEMADABAD

D.A.DEGREE.ENGINEERING & TECHNOLOGY MAHEMADABAD D.A.DEGREE.ENGINEERING & TECHNOLOGY MAHEMADABAD INDUSTRIAL VISIT REPORT 1 Name of the industry Sardar Sarovar Dam 2 Location Kevadiya Colony Bharuch, Gujarat 3 Date 18-7-2017 4 Time 11:00AM 5 Semester

More information

UJH MULTIPURPOSE PROJECT JAMMU & KASHMIR

UJH MULTIPURPOSE PROJECT JAMMU & KASHMIR Annexure-V Annexure-V UJH MULTIPURPOSE PROJECT JAMMU & KASHMIR PRE FEASIBILITY REPORT 1 J&K State Power Development Corporation, Sector-3 Extension, 2 Table of Content EXECUTIVE SUMMARY...5 Chapter 1:

More information

EXECUTIVE SUMMARY Need for the Project

EXECUTIVE SUMMARY Need for the Project EXECUTIVE SUMMARY 1.0 1.1 Need for the Project Madhya Pradesh Government proposes to implement a number of Medium and Minor Irrigation Projects in Narmada Basin to provide irrigation water to semi and

More information

Delhi Noida Bhopal Hyderabad Jaipur Lucknow Indore Pune Bhubaneswar Kolkata Patna Web: Ph:

Delhi Noida Bhopal Hyderabad Jaipur Lucknow Indore Pune Bhubaneswar Kolkata Patna Web:     Ph: Serial : 01. SK_J+B_CE_Irrigation_090918 CLASS TEST (GATE) Delhi Noida Bhopal Hyderabad Jaipur Lucknow Indore Pune Bhubaneswar Kolkata Patna Web: E-mail: info@madeeasy.in Ph: 011-451461 CLASS TEST 018-19

More information

Sustainable Groundwater Management

Sustainable Groundwater Management Sustainable Groundwater Management Developing and promoting a more accurate understanding of the socio-ecological value of groundwater, and the nature and scale of the consequences of its unsustainable

More information

Civil Engineering Department. 2 Marks Question and Answer. CE:2301:Irrigation Engineering

Civil Engineering Department. 2 Marks Question and Answer. CE:2301:Irrigation Engineering Civil Engineering Department 2 Marks Question and Answer CE:2301:Irrigation Engineering 1 UNIT 1 INTRODUCTION 1) Define irrigation? Irrigation is defined as the science of artificial application of water

More information

FLOOD MODELING OF RIVER GODAVARI USING HEC-RAS

FLOOD MODELING OF RIVER GODAVARI USING HEC-RAS FLOOD MODELING OF RIVER GODAVARI USING HEC-RAS Sunil Kute 1, Sayali Kakad 2, Vrushali Bhoye 3, Akshada Walunj 4 1 Professor, Department of Civil Engineering, K.K.Wagh Institute of Engineering Education

More information

Prepared by Ministry of Mahaweli Development and Environment for the Asian Development Bank.

Prepared by Ministry of Mahaweli Development and Environment for the Asian Development Bank. Initial Environmental Examination April 2016 Project Number: 47381-002 SRI: Proposed Raising of the Minipe Anicut and Rehabilitation of the Minipe Left Bank Canal Project in Kandy District Addendum to

More information

Strategy and Methodology for Improved IWRM

Strategy and Methodology for Improved IWRM Strategy and Methodology for Improved IWRM A Case Study of Tungabhadra River Basin in India S. Puttaswamaiah H. L. Shashidhara K. V. Raju Centre for Ecological Economics and Natural Resources Institute

More information

REPORT ON INDUSTRIAL VISIT OF SARDAR SAROVAR PROJECT

REPORT ON INDUSTRIAL VISIT OF SARDAR SAROVAR PROJECT REPORT ON INDUSTRIAL VISIT OF SARDAR SAROVAR PROJECT ACADEMIC YEAR: - 2015-16 On 28 th Sept 2015 ORGANISED BY LAXMI INSTITUTE OF TECHNOLOGY, SARIGAM. DEPARTMENT OF CIVIL ENGINEERING (DEGREE/ DIPLOMA).

More information

1.1 Name of the Project : 1.2 Proposed Installed Capacity of the Project : MW

1.1 Name of the Project : 1.2 Proposed Installed Capacity of the Project : MW 1.0 GENERAL FORM NO.APP/P/PTB-2/1 PART B SECTOR SPECIFIC INFORMATION SMALL HYDRO POWER PROJECT 1.1 Name of the Project _ 1.2 Proposed Installed Capacity of the Project MW 1.3 Proposed location of the Project

More information

MANGLA DAM KEY FACTS. 380 ft. (above riverbed) Gross Storage Capacity: Live Storage Capacity: Year of Completion: 1967

MANGLA DAM KEY FACTS. 380 ft. (above riverbed) Gross Storage Capacity: Live Storage Capacity: Year of Completion: 1967 MANGLA DAM KEY FACTS Dam Type: Height: Length: Lake Area: Catchment Area: Gross Storage Capacity: Live Storage Capacity: Main Spillway Capacity: Earthfill 380 ft. (above riverbed) 10,300 feet 97.7 sq.

More information

Abstract. 1. Main features of the Cua Dat scheme. Hong Giang VNCOLD. Hanoi Vietnam. the Northern Central The reservoir storage purposes: - water

Abstract. 1. Main features of the Cua Dat scheme. Hong Giang VNCOLD. Hanoi Vietnam. the Northern Central The reservoir storage purposes: - water The diversion works for the Cua Dat CFRD in Vietnam Michel Ho Ta Khanh, Dinh Sy Quat, Prof Pham Hong Giang VNCOLD No 95/10 Chua Boc Street Dong Da District Hanoi Vietnam Abstract The Cua Dat CFRD is constructed

More information

Technical Manual. Determining, Regulating, and Enforcing Water Entitlements in Irrigation Projects of Maharashtra

Technical Manual. Determining, Regulating, and Enforcing Water Entitlements in Irrigation Projects of Maharashtra Technical Manual Determining, Regulating, and Enforcing Water Entitlements in Irrigation Projects of Maharashtra Maharashtra Water Resources Regulatory Authority Mumbai May 2015 About MWRRA Maharashtra

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

Delhi Noida Bhopal Hyderabad Jaipur Lucknow Indore Pune Bhubaneswar Kolkata Patna Web: Ph:

Delhi Noida Bhopal Hyderabad Jaipur Lucknow Indore Pune Bhubaneswar Kolkata Patna Web:     Ph: Serial : SK1_CE_U+I_Irrigation_091018 CLASS TEST Delhi Noida Bhopal Hyderabad Jaipur Lucknow Indore Pune Bhubaneswar Kolkata Patna Web: E-mail: info@madeeasy.in Ph: 011-451461 CLASS TEST 018-19 CIVIL ENGINEERING

More information

Systematic and Early Development of Hydro Projects in Nepal. Development of Projects in Bheri Basin A Case Study

Systematic and Early Development of Hydro Projects in Nepal. Development of Projects in Bheri Basin A Case Study Systematic and Early Development of Hydro Projects in Nepal Development of Projects in Bheri Basin A Case Study 1 RIVER MAP: ORIGIN AND ITS CONFLUENCES Tallo Bheri HEP Thuli Bheri-1HEP NEPAL Bheri-III

More information

Flood Control by Reservoir Operation for Ukai Reservoir

Flood Control by Reservoir Operation for Ukai Reservoir GRD Journals Global Research and Development Journal for Engineering Recent Advances in Civil Engineering for Global Sustainability March 2016 e-issn: 2455-5703 Flood Control by Reservoir Operation for

More information

HYDRAULIC DESIGN OF PIPE DISTRIBUTION NETWORK FOR IRRIGATION PROJECT

HYDRAULIC DESIGN OF PIPE DISTRIBUTION NETWORK FOR IRRIGATION PROJECT International Journal of Civil Engineering and Technology (IJCIET) Volume 9, Issue 7, July 2018, pp. 1109 1116, Article ID: IJCIET_09_07_116 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=9&itype=7

More information

DAM BREAK ANALYSIS & DISASTER MANAGEMENT PLAN

DAM BREAK ANALYSIS & DISASTER MANAGEMENT PLAN 11 DAM BREAK ANALYSIS & DISASTER MANAGEMENT PLAN 11.1 INTRODUCTION 11.1.1 Dam Break Phenomenon The construction of dams in rivers can provide considerable benefits such as the supply of drinking and irrigation

More information

Confirmation of minutes of 7 th EAC meeting.

Confirmation of minutes of 7 th EAC meeting. Draft minutes of the 8 th Meeting of the Expert Appraisal Committee for River Valley and Hydroelectric Projects held on 22.09.2017 at Teesta Meeting Hall, Indira Paryavaran Bhawan, Jor Bagh Road, New Delhi

More information

Additional Agenda Item No. 2

Additional Agenda Item No. 2 39 Additional Agenda Item No. 2 Sub: Diversion of 1835.14 ha of forest land for Parban Major Irrigation Project in favour of Water Resources Department, Rajast han in Baran and Jhalawar Forest Divisions

More information

AFC INDIA LIMITED NATIONAL WATER DEVELOPMENT AGENCY EXECUTIVE SUMMARY COMPREHENSIVE ENVIRONMENTAL IMPACT ASSESSMENT STUDY

AFC INDIA LIMITED NATIONAL WATER DEVELOPMENT AGENCY EXECUTIVE SUMMARY COMPREHENSIVE ENVIRONMENTAL IMPACT ASSESSMENT STUDY NATIONAL WATER DEVELOPMENT AGENCY (A Government of India Society under Ministry of Water Resources) COMPREHENSIVE ENVIRONMENTAL IMPACT ASSESSMENT STUDY KENKEN-BETWA LINK PROJECT: PHASEPHASE-I EXECUTIVE

More information

SCHEDULE A ASSESSMENT OF RIVER BASINS (RBs) IN SOUTH ASIA

SCHEDULE A ASSESSMENT OF RIVER BASINS (RBs) IN SOUTH ASIA SCHEDULE A ASSESSMENT OF RIVER BASINS (RBs) IN SOUTH ASIA Sr. No. Details 1 Physical Features - General Information 1.1 Name of River basin (also indicate regional names used in different countries, states

More information

DPR GUIDELINES FOR ERM OF IRRIGATION PROJECTS

DPR GUIDELINES FOR ERM OF IRRIGATION PROJECTS DPR GUIDELINES FOR ERM OF IRRIGATION PROJECTS 1.0 INTRODUCTION RAJEEV SINGHAL Director NWA, CWC, Pune Modernisation of Irrigation Project includes extension, renovation & modernisation components of existing

More information

Use of a distributed catchment model to assess hydrologic modifications in the Upper Ganges Basin

Use of a distributed catchment model to assess hydrologic modifications in the Upper Ganges Basin River Basin Management VI 177 Use of a distributed catchment model to assess hydrologic modifications in the Upper Ganges Basin L. Bharati 1, V. Smakhtin 2, P. Jayakody 2, N. Kaushal 3 & P. Gurung 1 1

More information

Flood Control by Reservoir Operation for Ukai Reservoir Kalariya Kishankumar B. 1 Dr.R.B.Khasiya 2 Mr.B.J.Batliwala 3 Dr.J.N.

Flood Control by Reservoir Operation for Ukai Reservoir Kalariya Kishankumar B. 1 Dr.R.B.Khasiya 2 Mr.B.J.Batliwala 3 Dr.J.N. IJSRD - International Journal for Scientific Research & Development Vol. 3, Issue 02, 2015 ISSN (online): 2321-0613 Flood Control by Reservoir Operation for Ukai Reservoir Kalariya Kishankumar B. 1 Dr.R.B.Khasiya

More information

CHAPTER-4 WATER RESOURCES

CHAPTER-4 WATER RESOURCES CHAPTER-4 WATER RESOURCES 4.1 GENERAL Dibang Multipurpose project is proposed across river Dibang, a major tributary of river Brahmaputra, near Munli village in Lower Dibang Valley District of Arunachal

More information

Alpha College of Engineering. Fifth Semester B.E. Question Bank. Hydrology and irrigation engineering

Alpha College of Engineering. Fifth Semester B.E. Question Bank. Hydrology and irrigation engineering Alpha College of Engineering Fifth Semester B.E. Question Bank Hydrology and irrigation engineering UNIT 1: INTRODUCTION & PRECIPITATION 1.Explain in brief the different types of precipitation. 2.How do

More information

STUDY OF FLOOD AT SURAT CITY AND ITS REMSDIAL MEASURES

STUDY OF FLOOD AT SURAT CITY AND ITS REMSDIAL MEASURES STUDY OF FLOOD AT SURAT CITY AND ITS REMSDIAL MEASURES PRASIT G. AGNIHOTRI, LECTURER AND PH. D. SCHOLAR DR. JAYANTILAL N. PATEL, PROFESSOR Civil Engineering Department S.V. National Institute of Technology

More information

Benefit of Irrigation Water Transfers in the National River Linking Project: A Case Study of the Ken-Betwa Link

Benefit of Irrigation Water Transfers in the National River Linking Project: A Case Study of the Ken-Betwa Link Benefit of Irrigation Water Transfers in the National River Linking Project: A Case Study of the Ken-Betwa Link Upali A. Amarasinghe 1, Om Prakash Singh 2, Tushaar Shah 1 and Ravindra Singh Chauhan 3 1

More information

Pawana Dam Energy Dissipation A Case Study

Pawana Dam Energy Dissipation A Case Study Australian Journal of Basic and Applied Sciences, 4(8): 36-367, 00 ISSN 99-878 Pawana Dam Energy Dissipation A Case Study Hinge G.A. Balkrishna S. 3 Khare K.C Research Scholar and Assistant Professor,

More information

Incidentally, here it should be noted that in response to RTI application, the dates of original commissioning. SSP: Mounting Costs, Minimal Benefits

Incidentally, here it should be noted that in response to RTI application, the dates of original commissioning. SSP: Mounting Costs, Minimal Benefits SSP: Mounting Costs, Minimal Benefits 1 Mounting Financial Costs According to the working group report on Water Resources for the 11 th Five Year Plan, the total cost of the Sardar Sarovar Project (SSP)

More information

GEOMORPHIC EFECTIVENESS OF FLOODS ON LOWER TAPI RIVER BASIN USING 1-D HYDRODYNAMIC MODEL,HEC-RAS

GEOMORPHIC EFECTIVENESS OF FLOODS ON LOWER TAPI RIVER BASIN USING 1-D HYDRODYNAMIC MODEL,HEC-RAS GEOMORPHIC EFECTIVENESS OF FLOODS ON LOWER TAPI RIVER BASIN USING 1-D HYDRODYNAMIC MODEL,HEC-RAS Darshan Mehta 1, Raju Karkar 2, Lalji Ahir 3 Assistant Professor, CED, S.S.A.S.I.T, Surat, Gujarat, India

More information

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION (ISO/IEC - 700-005 Certified) Model Solution: Summer 05 SUMMER 05 EXAMINATION MODEL ANSWER Subject & Code: Irrigation Engineering (750) Page No: 0 / ----------------------------- Important Instructions

More information

ARTIFICIAL RECHARGE PROJECT & AUGMENTATION OF SURFACE IRRIGATION IN THE COASTAL AREA OF VANUR TALUK, VILLUPURAM DISTRICT, TAMIL NADU, INDIA

ARTIFICIAL RECHARGE PROJECT & AUGMENTATION OF SURFACE IRRIGATION IN THE COASTAL AREA OF VANUR TALUK, VILLUPURAM DISTRICT, TAMIL NADU, INDIA ARTIFICIAL RECHARGE PROJECT & AUGMENTATION OF SURFACE IRRIGATION IN THE COASTAL AREA OF VANUR TALUK, VILLUPURAM DISTRICT, TAMIL NADU, INDIA by Auroville Water Harvest Phases of Hilden First Phase 2006-2007

More information

1 Sawalkote HEP Kirthai Stage-II Baglihar Stage-II Kirthai Stage-I 390

1 Sawalkote HEP Kirthai Stage-II Baglihar Stage-II Kirthai Stage-I 390 POWER SCENARIO IN J&K The J & K State is endowed with huge and vast water resources in the form of permanent glaciers & ice bodies, inland water bodies viz. lakes & river systems. These are being utilized

More information

Design of Small Hydro Power Project on Main Tirhut Canal, Champaran, Bihar, India

Design of Small Hydro Power Project on Main Tirhut Canal, Champaran, Bihar, India OPEN ACCESS Int. Res. J. of Science & Engineering, 2015; Vol. 3 (3): 125-130 ISSN: 2322-0015 RESEARCH REPORT Design of Small Hydro Power Project on Main Tirhut Canal, Champaran, Bihar, India Kumar Manish

More information

Madhya Pradesh. Chhatarpur, Panna & Tikamgarh

Madhya Pradesh. Chhatarpur, Panna & Tikamgarh F. No. 8-49/2016-FC Sub: Diversion of 6017.00 ha. of forest land in favour of Rashtriya Jal Vikas Abhikaran for development of Ken-Betwa Link Project from Dist. Chhatarpur, Panna and Tikamgarh, Madhya

More information

RIVER BASIN PENNAR [ INDIA

RIVER BASIN PENNAR [ INDIA RIVER BASIN PENNAR [ INDIA ] SCHEDULE A ASSESSMENT OF RIVER BASINS ORGANISATIONS (RBOs) IN SOUTH ASIA Sr. Details No. 1 Physical Features - General Information 1.1 Name of River basin (also indicate regional

More information

Distributed Hydrological Model For An Ungauged Subcatchment

Distributed Hydrological Model For An Ungauged Subcatchment Distributed Hydrological Model For An Ungauged Subcatchment Dr. Krishna Mohan M Professor of Civil Engineering, Malla Reddy Engg College (Autonomous under JNTUH), Secunderabad Abstract Rainfall and runoff

More information

Module 4. Hydraulic structures for flow diversion and storage. Version 2 CE IIT, Kharagpur

Module 4. Hydraulic structures for flow diversion and storage. Version 2 CE IIT, Kharagpur Module 4 Hydraulic structures for flow diversion and storage Lesson 1 Structures for Flow Diversion Investigation Planning and Layout Instructional objectives On completion of this lesson, the student

More information

Water Availability Assessment in a River with Complex Water Transfer System

Water Availability Assessment in a River with Complex Water Transfer System 2015 IJSRSET Volume 1 Issue 4 Print ISSN : 2395-1990 Online ISSN : 2394-4099 Themed Section: Engineering and Technology Water Availability Assessment in a River with Complex Water Transfer System R. V.

More information

Convergence of NREGS with Water Resource Department in the State of M.P. Date

Convergence of NREGS with Water Resource Department in the State of M.P. Date Convergence of NREGS with Water Resource Department in the State of M.P. Date 22.04.2009 OVER VIEW OF N.R.E.G.S. in MP State 1. Total District Notified 50 2. Total Janpad Panchayat 313 3. Total Gram Panchayats

More information

Medium and Minor Irrigation Works

Medium and Minor Irrigation Works Medium and Minor Irrigation Works Abstract: Sandela Haripriya, M.Tech Assistant Professor, Department of Civil Engineering, Balaji Institute of Technology & Sciences, Narsampet, Warangal, Telangana. As

More information

Modeling and Simulation of Irrigation Canals with Hydro Turbines

Modeling and Simulation of Irrigation Canals with Hydro Turbines Modeling and Simulation of Irrigation Canals with Hydro Turbines S Mohan Kumar Scientist, Department of Research, ABB Global Industries and Services Ltd Bangalore, India * mohan.s.kumar@in.abb.com (corresponding

More information

Address for Correspondence

Address for Correspondence Research Paper DYNAMIC FLOOD ROUTING AND UNSTEADY FLOW MODELLING: A CASE STUDY OF UPPER KRISHNA RIVER 1 Doiphode Sanjay L* 2 Oak Ravindra A. Address for Correspondence 1 M tech Student, Bharati Vidyapeeth

More information

Country proposal - SRI LANKA

Country proposal - SRI LANKA Country proposal - SRI LANKA P. M. Jayatilaka Banda Department of Meteorology, Nihal Rupasinghe Central Engineering Consultancy Bureau and S. B. Weerakoon University of Peradeniya, Sri Lanka Asia Water

More information

WATER RESOURCE ENNG.(NCE-702)

WATER RESOURCE ENNG.(NCE-702) Assignment: I (Unit 1) 1. Describe the concept of hydrologic cycle with the help of a neat sketch. What are the different components ofthe hydrologic cycle? What do you mean by hydrologic system? 2. A

More information

FEASIBILITY OF TAPTI BASIN FLOODS MODERATION WITH UPDATED TECHNOLOGY AND MANAGEMENT

FEASIBILITY OF TAPTI BASIN FLOODS MODERATION WITH UPDATED TECHNOLOGY AND MANAGEMENT FEASIBILITY OF TAPTI BASIN FLOODS MODERATION WITH UPDATED TECHNOLOGY AND MANAGEMENT By Dr. Mahesh D. Desai (Ph.D.) Visiting Professor, SVNIT, Consulting Engineer, EFGE Consultant, Surat. Shri Ravin M.

More information

Sub. Code:

Sub. Code: (ISO/IEC - 700-005 Certified) Model Answer: Summer 07 Sub. Code: 750 Important Instructions to examiners: ) The answers should be examined by key words and not as word-to-word as given in the model answer

More information

A Study on Physical Model Test for Cheongpyeong Dam Discharge Recalculation

A Study on Physical Model Test for Cheongpyeong Dam Discharge Recalculation Engineering, 014, 6, 731-74 Published Online October 014 in SciRes. http://www.scirp.org/journal/eng http://dx.doi.org/10.436/eng.014.611071 A Study on Physical Model Test for Cheongpyeong Dam Discharge

More information

Report on. Industrial Visit to. Reliance Thermal Power Plant, Dahanu

Report on. Industrial Visit to. Reliance Thermal Power Plant, Dahanu Report on Industrial Visit to Reliance Thermal Power Plant, Dahanu Submitted by: Dr.Ajoy Kumar(Principal) Bhavesh Kumar Pasi(HOD) Mayuri Chawan Neeta Gawde B.E. Mechanical Abstract: After being briefed

More information

THE PAMPA IRRIGATION PROJECT

THE PAMPA IRRIGATION PROJECT Chapter - 4 THE PAMPA IRRIGATION PROJECT 4.1 Introduction 4.1 Introduction 4.2 Description of the study area 4.3 Salient Features of the PIP 4.4 Context 4.5 Objectives of the Pampa Irrigation Project:

More information

ANNEXURE-III SALIENT FEATURES OF DUGAR HYDRO ELECTRIC PROJECT. Himachal Pradesh. Latitude. Longitude Nearest Railhead; Udhampur (J&K)

ANNEXURE-III SALIENT FEATURES OF DUGAR HYDRO ELECTRIC PROJECT. Himachal Pradesh. Latitude. Longitude Nearest Railhead; Udhampur (J&K) ANNEXURE-III SALIENT FEATURES OF DUGAR HYDRO ELECTRIC PROJECT Project Location State District River Vicinity Latitude Longitude Nearest Railhead; Udhapur (J&K) Hiachal Pradesh Chaba Chenab River Luj village

More information

FORM B: DAMMING AND DIVERSION OF WATER

FORM B: DAMMING AND DIVERSION OF WATER APPLICATION FOR RESOURCE CONSENT FORM B: DAMMING AND DIVERSION OF WATER NOTES Resource use activities must meet all the conditions of any relevant Permitted Activity Rules in the Waikato Regional Plan

More information

Water distribution within the canal network

Water distribution within the canal network Structures for water control and distribution 15 Chapter 4 Water flowing in a secondary irrigation canal can be divided over the tertiary canal network in several ways. One way is to divide the flow proportionally

More information

Conflict resolution and institutional arrangements for flood disaster management on Indo Nepal fringe: Focus on Kosi basin

Conflict resolution and institutional arrangements for flood disaster management on Indo Nepal fringe: Focus on Kosi basin Conflict resolution and institutional arrangements for flood disaster management on Indo Nepal fringe: Focus on Kosi basin N.M.P. Verma 15 Ambedkar University Introduction Trans-boundary conflict is one

More information

STANDARDS/MANUALS/ GUIDELINES FOR SMALL HYDRO DEVELOPMENT

STANDARDS/MANUALS/ GUIDELINES FOR SMALL HYDRO DEVELOPMENT STANDARDS/MANUALS/ GUIDELINES FOR SMALL HYDRO DEVELOPMENT General Works Guidelines for Investigation of SHP Projects Sponsor: Ministry of New and Renewable Energy Govt. of India Lead Organization: Alternate

More information

Dams are generally constructed in the mountainous reach of the river where the valley is narrow and the foundation is good.

Dams are generally constructed in the mountainous reach of the river where the valley is narrow and the foundation is good. [ DAMS ] 1 of 26 1-Definition : A dam is a hydraulic structure of fairly impervious material built across a river to create a reservoir on its upstream side for impounding water for various purposes. A

More information

A REPORT ON VISIT AT SARDAR SROVAR DAM. Faculty : Asst. Prof. Bhargav V. Vadalia MECHANICAL ENGINEERING DEPARTMENT OM ENGINEERING COLLEGE, JUNAGADH.

A REPORT ON VISIT AT SARDAR SROVAR DAM. Faculty : Asst. Prof. Bhargav V. Vadalia MECHANICAL ENGINEERING DEPARTMENT OM ENGINEERING COLLEGE, JUNAGADH. A REPORT ON VISIT AT SARDAR SROVAR DAM Date of Visit : 11th Sept., 2015 Branch : MECHANICAL Time : 08:00 am 03:30 pm Semester : 5th Faculty : Asst. Prof. Bhargav V. Vadalia MECHANICAL ENGINEERING DEPARTMENT

More information