1 EXECUTIVE SUMMARY This section is an executive summary of the Environmental Impact Report (EIR) for the proposed University of California, San Diego (UCSD) Health Sciences Graduate Student Housing project, prepared in compliance with the California Environmental Quality Act (CEQA). This section highlights the major areas of importance in the environmental analysis for the proposed project, as required by CEQA Guidelines Section It also provides a brief description of the proposed project, project objectives, alternatives to the proposed project, and areas of public interest known to the University of California. In addition, this section provides a table summarizing: (1) the potential environmental impacts that would occur as a result of construction of the proposed project; (2) the level of impact significance before mitigation; (3) the recommended mitigation measures that would avoid or reduce significant environmental impacts; and (4) the level of impact significance after mitigation measures are implemented. A cumulative impacts table is included as well, which summarizes: (1) cumulative environmental impacts; (2) the significance of each cumulative impact; (3) the projects contribution to each impact; (4) recommended mitigation measures; and (5) significance of project impact considering mitigation. A third table that compares the anticipated environmental impacts of the proposed project with each project alternative also is provided. Overview As required by CEQA, this EIR: (1) assesses the potentially significant direct, indirect, and cumulative environmental effects of the proposed Health Sciences Graduate Student Housing project; (2) identifies potential feasible means of avoiding or substantially lessening significant adverse impacts; and (3) evaluates a range of reasonable alternatives to the proposed project, including the required No Project Alternative. Pursuant to CEQA Guidelines, this EIR is a Tiered EIR that evaluates the effects of the proposed project as a part of all development previously analyzed under the 2004 Long Range Development Plan (LRDP) EIR. This Tiered EIR will be used by The Board of Regents of the University of California (The Regents) to evaluate the environmental implications of developing the proposed project in relation to that already considered under the 2004 LRDP EIR. ES-1

2 Project Description The proposed Health Sciences Graduate Student Housing project would construct 225, two-bedroom units, one three-bedroom staff apartment unit; administrative offices; vending, laundry and mail services; meeting rooms; a workout room; custodial/maintenance space; a 26-foot wide service and emergency access road; and internal open space on the site. The site is approximately 3.7 acres located within the south-central portion of the UCSD main campus, where the majority of the Health Sciences Graduate Student Housing project site is composed of an existing surface parking lot (P608) and associated roads, located approximately 300 feet northwest of the La Jolla Village Drive/Villa La Jolla Drive intersection. Extending along the eastern site perimeter is the non-motorized pathway that links the campus to the pedestrian bridge over La Jolla Village Drive; the bridge abuts the southeast corner of the site and provides a connection with the off-campus commercial and residential community to the south. Shrub- and tree-covered undeveloped land west and northwest of the parking lot comprises the remainder of the site. The western wing of the residential building would contain nine levels, and rise approximately 85 feet above the finished grade. The eastern wing would contain seven levels and rise approximately 67 feet above finished grade. Residential units would be located on every floor of each wing; nine of the units on the first level would include a patio. The student residential units would contain two bedrooms, one and one-half bathroom, a kitchen, and living room space. Twelve of the 225 two-bedroom student units would be Americans with Disabilities Act (ADA) accessible. One three-bedroom staff apartment would be included on the ninth level of the proposed building. The first level of the building would include a 68-space indoor bicycle storage room (to be accessible from both the building s exterior and the elevator lobby), and mechanical, electrical, janitorial and storage spaces (in addition to 15 residential units). The second level would house the building s reception area, administrative offices, mail room and a conference room, while the third level would house two additional small conference rooms off the lobby. A small fitness room, laundry room and meeting room (collectively, the amenity areas ) would be located on the fourth level of the western wing, adjacent to a green terrace off the third level. The conference and meeting rooms would provide centralized study/social spaces for the building s residents. The fifth through ninth levels of the building would house residential units and an occasional mechanical or electrical room. In total, the proposed residential building would encompass a total of approximately 250,000 gsf of building space. ES-2

3 Proposed site grading would be balanced on site and would involve approximately 7,500 cubic yards (cy) of both cut and fill. In an effort to bring sustainability into the construction and demolition process, a portion of project construction debris would be diverted from local landfills through recycling or appropriate reuse, as appropriate. All project staging areas, including contractor trailers, vehicle parking, erection/dismantle and equipment lay down, would occur within the boundaries of the project site. The proposed project would install connections to many of the existing utilities on campus or in the project area, including potable water, sewer, electrical power, storm drain, telecommunications and fiber optics. Open space on site primarily would be composed of a landscaped open space north and east of the building, with additional perimeter landscaping and trees. Additionally, the third-level terrace on the north end of the western wing would be landscaped and irrigated. A green roof, or terrace, is planned for this wing of the building, midway up the façade, below the interior amenity areas on the fourth level of the building. The proposed project would convert an impervious asphalt parking lot to a student housing site with extensive pervious, sustainable green space, providing both aesthetic and environmental enhancements. Hardscape elements associated with the project design guidelines and proposed site plan include architectural features (e.g., building materials and color schemes), circulation/access system amenities (e.g., pavement and pedestrian paths), and lighting/signage details, as well as site furnishings such as seating and benches, bicycle racks, trash enclosures and planters. Construction of the proposed project would extend over a period of approximately 23 months. All staging and lay-down areas for the proposed project would take place on the project site. An extensive commissioning process in which mechanical systems are tested and adjusted as necessary for maximum efficiency and optimization would be undertaken prior to project completion, to ensure the most sustainable operation of mechanical systems within the proposed project, thereby requiring less energy to operate the facility. The new housing units would be occupied by Summer ES-3

4 Project Objectives The fundamental project objectives for the proposed Health Sciences Graduate Student Housing project are to: Develop a 450-bed, quality, affordable on-campus graduate housing complex to increase the amount of on-campus housing opportunities for eligible UCSD graduate students without affecting existing housing supply. Develop graduate student housing and resident amenities in the School of Medicine neighborhood of campus where none currently exists. Advance the housing goals established in the 2004 LRDP, specifically the goal of housing 50 percent of the eligible student population in campus-owned facilities. Reduce traffic congestion within the community surrounding UCSD and promote alternative methods of transportation by providing increased on-campus housing. Incorporate sustainable design principles to achieve Leadership in Energy and Environmental Design (LEED) Silver certification, or higher, thereby reducing energy consumption and conserving natural resources and minimizing greenhouse gas production. Have an overall pedestrian orientation and augment the University s existing path system by providing good, clear pedestrian and bicycle connections to both on- and off-campus areas through existing campus circulation routes, thereby promoting increased use of alternative methods of transportation and less dependence on single-occupancy automotive transportation. Enhance UCSD s identity with the local community by creating an attractive residential community in the visually prominent location on the slope above La Jolla Village Drive, and taking advantage of existing landscape screening and the views offered from the site while arranging the buildings in a manner that blocks traffic noise generated by the local roads. Promote interaction among residents and other students through the provision of active exterior spaces, including a courtyard that is closed on three sides yet open to the north, making it private yet still open to the campus as a whole. ES-4

5 Impact Summary In accordance with Public Resources Code (PRC) Section , this Tiered EIR focuses on the environmental effects of the proposed project that were not analyzed as significant effects on the environment in the 2004 UCSD LRDP EIR or that can be mitigated at a project level. Five environmental issue areas, including aesthetics, hazards and hazardous materials, hydrology and water quality, noise and global climate change, are addressed at an in-depth project level in this Tiered EIR. As described in Section 4.0, Other CEQA Considerations, of this Tiered EIR, mitigation measures identified in the 2004 LRDP EIR for biological resources; and transportation, traffic and parking would be implemented as part of the proposed project to reduce impacts associated with these environmental issues to below a level of significance. This Tiered EIR relies on the analysis in the 2004 LRDP EIR for the remaining environmental issue topics, as the potential for impacts to these issue areas were determined to be consistent with analyses conducted in the 2004 LRDP EIR. For this reason, the remaining issue topics are not addressed in detail in this EIR but are presented in Section 4.0, Other CEQA Considerations, of this Tiered EIR. Table ES-1, presented at the end of this section, provides a summary of the environmental impacts that could result from development of the proposed project and feasible mitigation measures that could reduce or avoid environmental impacts. For each impact, Table ES-1 identifies the significance of the impact before mitigation, applicable mitigation measures, and the level of significance of the impact after implementation of the mitigation measures. Table ES-2 is a summary of cumulative impacts and mitigation. Table ES-3 provides a summary of the impacts that could result from development of each alternative, compared to the impacts that could result from the proposed project. Alternatives to the Proposed Project Four alternatives to the proposed project have been identified for further analysis in this Tiered EIR: No Project Alternative Reduced Massing Alternative Reduced Project Size Alternative Building Wing Position Swap Alternative ES-5

6 A summary description of these alternatives, their direct environmental impacts as compared to the proposed project and each alternative s ability to achieve the basic project objectives is provided. No Project Alternative Under the No Project Alternative, none of the residential, parking and residential service uses would be developed on site. The project site would remain in its current undeveloped condition as a surface parking lot. The project site would still be identified for future academic use in the 2004 LRDP and could be developed with an academic building at some point in the future under this alternative. Impacts to the existing visual character would be lessened by this alternative; however, they would not be avoided altogether. The No Project Alternative would not avoid significant hazards and hazardous materials impacts related to interruption of emergency response plans/routes. The No Project Alternative would either continue to contribute to existing drainage and water quality conditions if the site is not redeveloped or conditions would be improved in the future in a manner similar to the proposed project. Because of student housing would not be constructed under the No Project Alternative, it would avoid potentially significant impacts related to the permanent exposure of noise-sensitive receptors. All other impacts would be similar to the proposed project. The No Project Alternative would not achieve any of the project objectives identified in Section 2.0, Project Description, including advancing the 2004 LRDP goal of housing 50 percent of eligible students; reducing traffic congestion on and around UCSD by bringing students on campus; providing graduate student housing in the School of Medicine neighborhood and on UCSD s west campus, where none exists today; and incorporating architecture that evokes residential qualities through the use of human scale. In addition, the No Project Alternative would not eliminate the potential for future academic use on the project site (and associated environmental effects) pursuant to the 2004 LRDP. Reduced Massing Alternative The Reduced Massing Alternative would entail development of the proposed project but in a configuration that would reduce the height of the building, such that the building wings would conform to the lower-stature academic structures on campus (i.e., four to six stories) rather than the ES-6

7 taller housing buildings (i.e., seven to ten stories). This alternative would reduce the number of residential beds that could be built on site. Aesthetically, the Reduced Massing Alternative would reduce building heights and broaden their footprints and would change the visual character of the project site similar to that of the proposed project. The reduction in building wing heights would lessen the change in visual character experienced by motorists on public roads and residences near the campus by constructing a building that is lower in stature near the campus edge. The building would be screened more from public view by the trees that surround the project site on the eastern, western and southern sides of the site; however, the alternative would make the structures appear bulkier than the proposed project because the building footprint would cover more of the site and be set back less from the local roads and campus edge. Therefore, aesthetics impacts would not be significantly reduced or avoided by this alternative. The Reduced Massing Alternative would not avoid significant hazards and hazardous materials impacts related to interruption of emergency response plans/routes. Existing drainage and water quality conditions would be improved in the future under the Reduced Massing Alternative in a manner similar to the proposed project. Under the Reduced Massing Alternative, new sensitive receptors would be developed on site and people would be exposed to elevated transportation noise in excess of the campus standard, therefore, significant noise impacts would not be avoided. The Reduced Massing Alternative would achieve most of the basic project objectives related to the provision of housing on campus in the School of Medicine neighborhood, reducing traffic congestion within the local community, incorporating LEED design measures and enhancing UCSD s identity to off-campus areas. Unlike the proposed project, the broader building would not allow for clear pedestrian and bicycle connections to on- and off-campus areas, would not promote as much interaction among residents since the active exterior spaces, would reduce the number of proposed residential units (thus, would not meet UCSD s primary project objectives). Reduced Project Size Alternative Instead of constructing two wings, the Reduced Project Size Alternative would only involve the construction of one wing of the housing complex. If the 9-story, 150,000-square foot (sf) western wing is constructed, approximately 270 beds would be added to the campus. Alternatively, if the 7-story, 90,000-sf eastern wing is constructed, approximately 180 beds would be added to the ES-7

8 campus. Elimination of the western building wing under this alternative would not create as much of a change in visual character experienced by motorists on public roads and residences near the campus because the lower-stature eastern wing would be set back from La Jolla Village Drive and would not likely be visible to westbound motorists; conversely, if only the western wing were constructed under this alternative, the change in existing visual character would be similar to the proposed project. As such, no significant aesthetic impacts would be avoided by the Reduced Project Size Alternative. The Reduced Project Size Alternative would not avoid significant hazards and hazardous materials impacts related to interruption of emergency response plans/routes. Existing drainage and water quality conditions would be improved in the future under the Reduced Project Size Alternative in a manner similar to the proposed project. Under the Reduced Project Size Alternative, new sensitive receptors would be developed on site and people would be exposed to elevated transportation noise in excess of the campus standard. If only the eastern wing of the building were constructed under this alternative, the transportation noise impact would be less than for the western wing, but still greater than assumed for that wing under the proposed project as there would be no western wing to block the noise from La Jolla Village Drive. Therefore, significant noise impacts would not be avoided by this alternative. The Reduced Project Size Alternative would achieve some of the basic project objectives related to the provision of housing on campus in the School of Medicine neighborhood, reducing traffic congestion within the local community, incorporating LEED design measures, creating clear pedestrian and bicycle connections and enhancing UCSD s identity to off-campus areas. However, the smaller project size would not accomplish UCSD s goal of housing up to 50 percent of eligible students on campus and would force the campus to provide more beds elsewhere. It would also impact the project s ability to provide interior areas for the interaction of residents, by reducing space dedicated to meeting and conference rooms. Building Wing Position Swap Alternative Under this alternative, UCSD would swap the positions of the two proposed building wings, such that the taller 9-story western wing would be situated on the northern portion of the site, while the 7-story eastern wing would be placed along the southern edge of the site. The purpose of this alternative would be to mass the structure farther away from the campus edge and La Jolla Village Drive where ES-8

9 off-campus uses, such as the described residential and commercial development, occur. Aesthetically, the Building Wing Position Swap Alternative would shift the massing of the project building such that the taller of the wings is situated on the northern half of the site away from the edge of campus. Although the swap in building wing locations would place the taller wing of the building father from the off-campus community and La Jolla Village Drive, the 25-foot elevation difference between the building pads would nearly negate any aesthetic benefit gained from such a swap. A reduction in building height near the southern edge of campus would lessen the change in visual character experienced by motorists on public roads and residences near the campus by constructing the lowerstature wing closer to the road while stepping the massing of the taller wing away from the road; however, it would not be a substantial reduction in wing height since the eastern wing is only two floors less than the western wing and the building setback would be similar to the proposed project. Under the Building Wing Position Swap Alternative, both wings would be visible from eastbound La Jolla Village Drive and public areas south of the campus; accordingly, views of the project would not be substantially different under this alternative. The Building Wing Position Swap Alternative would not avoid significant hazards and hazardous materials impacts related to interruption of emergency response plans/routes. Existing drainage and water quality conditions would be improved in the future under the Building Wing Position Swap Alternative in a manner similar to the proposed project. Under the Building Wing Position Swap Alternative, new sensitive receptors would be developed on site and people would be exposed to elevated transportation noise in excess of the campus standard. The Building Wing Position Swap Alternative would achieve most of the basic project objectives related to the provision of housing on campus in the School of Medicine neighborhood, reducing traffic congestion within the local community, incorporating LEED design measures, providing pedestrian and bicycle linkages and creating a community for students. Repositioning of the building wings, however, would not enhance UCSD s identity with the local community because the alternative building arrangement would emphasize the visual prominence of the site and would not take full advantage of the landscape screening offered by the surrounding vegetated slopes. ES-9

10 Issues Raised During Project Scoping This EIR addresses issues associated with the proposed project that are known to the lead agency or were raised by agencies or interested parties during the Notice of Preparation (NOP) public/agency review period or public scoping meeting. Appendix A of this EIR includes comments received on the NOP and at the scoping meeting. These issues include: Project site is located in a portion of Camp Matthews. Concerns regarding unexploded ordnance and elevated levels of heavy metals and volatile organic compounds (VOCs) in the soil. Department of Toxic Substances Control (DTSC) recommends a Preliminary Endangerment Assessment (PEA) be conducted Consideration of Public Utilities Code (PUC) Section and Federal Aviation Regulation (FAR), Part 77 requirements Contact appropriate California Historic Resources Information Center (CHRIS) for possible recorded sites within the project site Consideration and evaluation of cultural resources Consideration of aesthetics, including lighting effects (shadow and glare), wind tunnel effects, and building height/layout on project site Consideration of potential air quality impacts Consideration of potential hazards, including: evacuation routes and alternative access routes for emergencies Consideration of potential hydrology/water quality impacts and inclusion of LEED-inspired specifications that are used Consideration of potential noise impacts, including: comparison of noise levels during construction versus non-construction, hours/time of day of construction, and mitigation if needed Consideration of potential traffic impacts, including: traffic circulation and parking studies Consideration of potential effects on market rates for local rentals Consideration of alternatives ES-10

11 Issue Impact ENVIRONMENTAL IMPACTS AND MITIGATION Aesthetics Scenic Vistas and Visual Character and Quality Lighting and Glare Hazards and Hazardous Materials Accidental Releases Public or Environmental Hazards from Activities in Listed Sites Hydrology and Water Quality Impairment or Interference with Emergency Plans Table ES-1 PROJECT-LEVEL ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES Proposed project would not have a substantial adverse effect on a scenic vista nor would it substantially degrade the existing visual character or quality of the project site and its surroundings. Proposed project would not create a substantial new source of lighting or glare that would degrade the existing visual character or quality of the project site and its surroundings. Project construction could encounter munitions and explosives of concern (MEC) associated with historic small arms training at Camp Matthews. Project site is listed on the Cortese list by the DTSC due to the potential for MEC associated with historic military training at Camp Matthews. Implementation of UCSD policies and procedures in accordance with Haz-4B would avoid impacts. Construction of the proposed project could require the temporary lane closure of Villa La Jolla Drive during utility connections. Significance Before S = Significant; LS = Less than Significant; PS = Potential Significant; SU = Significant/Unavoidable; N = No Impact Measure(s) Significance After LS No mitigation is required. LS PS 2004 LRDP EIR Measure Aes-2B LS LS No mitigation is required. LS LS No mitigation is required. LS PS 2004 LRDP EIR Measure Haz-6A. LS ES-11

12 Issue Hydrology and Water Quality (cont.) Site Drainage and Hydrology Water Quality Noise Exposure to Permanent Ambient Noise Temporary Increases in Ambient Noise Table ES-1 (cont.) PROJECT-LEVEL ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES Impact Proposed project would incorporate a number of design measures related to hydrology and drainage alteration, pursuant to analysis and requirements identified in the campus-wide Storm Water Management Plan (SWMP) and project-specific hydrology/water quality reports. Such measures would ensure that existing runoff volumes/velocities and overall drainage patterns are retained, and would avoid or effectively reduce associated potential impacts related to flooding, storm drain system capacity and erosion/sedimentation. Proposed project would incorporate a number of best management practices (BMPs) related to potential shortand long-term water quality impacts, pursuant to analyses and requirements identified in the campus-wide SWMP and project-specific hydrology/water quality reports. These measures would ensure project conformance with applicable water quality standards and discharge requirements, and would avoid or effectively reduce associated potential shortand long-term impacts related to water quality. Proposed project would not result in a substantial permanent increase in ambient noise levels but would construct new sensitive receptors that could expose persons to transportation noise in excess of campus standards. Construction activities associated with development of the proposed project would result in temporary increases in ambient noise levels above levels existing without the project. Significance Before S = Significant; LS = Less than Significant; PS = Potential Significant; SU = Significant/Unavoidable; N = No Impact Measure(s) Significance After LS No mitigation is required. LS LS No mitigation is required. LS PS 2004 LRDP EIR Measure Noi-1B. LS PS 2004 LRDP EIR Measure Noi-2A. LS ES-12

13 Table ES-1 (cont.) PROJECT-LEVEL ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES Issue Impact Significance Before EFFECTS FOUND NOT TO BE SIGNIFICANT WITH LRDP EIR MITIGATION Biological Resources Candidate, Sensitive, or Special Status Species Transportation, Traffic, and Parking Increases in Traffic Implementation of the Health Sciences Graduate Student Housing project could have direct and indirect impacts to nesting raptors, which are considered sensitive and are protected under the Migratory Bird treaty Act (MBTA). Construction traffic associated with proposed project could result in the temporary closure of vehicle lanes in the project vicinity. S = Significant; LS = Less than Significant; PS = Potential Significant; SU = Significant/Unavoidable; N = No Impact Measure(s) Significance After PS 2004 LRDP EIR Measure Bio-2D. LS PS 2004 LRDP EIR Measure Tra-1B. LS ES-13

14 Table ES-2 CUMULATIVE IMPACTS AND MITIGATION MEASURES Aesthetics Issue Degradation of views to scenic coastal areas Regional light pollution on astronomical viewing activities Air Quality Criteria pollutants Hazards and Hazardous Materials Regional exposure of people to contaminated sites Geographic Scope of Cumulative Impact Analysis Immediate vicinity of view corridor or view shed Significance of Cumulative Impact Project Contribution Measures Less than Significant Not cumulatively considerable because project is not located in a scenic coastal area Not applicable Project Significance Considering Not applicable San Diego region Potentially significant Not cumulatively considerable Not applicable Not applicable San Diego region or the airshed for reactive pollutants and surrounding vicinity for non-reactive or less reactive pollutants Immediately surrounding area Significant Cumulatively considerable Air-1 and 2004 LRDP EIR Measure Air-CB Cumulatively considerable and unavoidable Less than significant Not cumulatively considerable Not applicable Not applicable Hydrology and Water Quality Increases in storm water runoff within the watershed that could contribute to downstream erosion problems Drainage basin or watershed Less than significant Not cumulatively considerable with project design features that reduce the existing cumulative impact Not applicable Not applicable Development within watershed increases pollutant sources that could adversely affect receiving waters Drainage basin or watershed Less than significant Not cumulatively considerable with project compliance with NPDES and SWPPP requirements Not applicable Not applicable ES-14

15 Table ES-2 (cont.) CUMULATIVE IMPACTS AND MITIGATION MEASURES Noise Issue Transportation Noise Stationary Noise Construction Noise Global Climate Change Generation of greenhouse gas emissions from construction and operations that would contribute to global climate change Geographic Scope of Cumulative Impact Analysis UCSD and sensitive receptors in adjacent communities UCSD and sensitive receptors in adjacent communities Immediately surrounding area Significance of Cumulative Impact Project Contribution Measures Project Significance Considering Potentially significant Not cumulatively considerable Not applicable Not applicable Less than significant Not cumulatively considerable Not applicable Not applicable Less than significant Not cumulatively considerable Not applicable Not applicable Global Less than Significant Not cumulatively considerable Not applicable Not applicable ES-15

16 Issue Table ES-3 SUMMARY OF ANALYSIS FOR ALTERNATIVES TO THE PROPOSED PROJECT Proposed Project Without Proposed Project After No Project Reduced Massing Reduced Project Size Building Wing Position Swap Aesthetics Scenic Vistas and Visual Character and Quality LS LS LS LS LS LS Lighting and Glare PS LS PS PS PS PS Hazards and Hazardous Materials Accidental Releases LS LS LS LS LS LS Public and Environmental Hazards LS LS LS LS LS LS Impairment or Interference of Emergency Response PS LS PS PS PS PS Plans Hydrology and Water Quality Site Drainage and Hydrology LS LS LS LS LS LS Water Quality LS LS LS LS LS LS Noise Exposure to Permanent Ambient Noise PS LS PS PS PS PS Temporary Increases in Ambient Noise PS LS PS PS PS PS PS=Potentially significant; LS=Less than significant; N=No impact. ES-16

EXECUTIVE SUMMARY UNIVERSITY OF CALIFORNIA, SAN DIEGO REVELLE COLLEGE APARTMENTS AND COMMONS DINING RENOVATION PROJECT

EXECUTIVE SUMMARY UNIVERSITY OF CALIFORNIA, SAN DIEGO REVELLE COLLEGE APARTMENTS AND COMMONS DINING RENOVATION PROJECT EXECUTIVE SUMMARY UNIVERSITY OF CALIFORNIA, SAN DIEGO REVELLE COLLEGE APARTMENTS AND COMMONS DINING RENOVATION PROJECT FINAL INITIAL STUDY/MITIGATED NEGATIVE DECLARATION (STATE CLEARINGHOUSE NO. 2008101108)

More information

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE DESIGN OF THE MUSIC BUILDING PROJECT

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE DESIGN OF THE MUSIC BUILDING PROJECT CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE DESIGN OF THE MUSIC BUILDING PROJECT I. APPROVAL OF THE MITIGATED NEGATIVE DECLARATION Pursuant to Title 14, California

More information

The following findings are hereby adopted by The Regents in conjunction with the approval of the Project which is set forth in Section III, below.

The following findings are hereby adopted by The Regents in conjunction with the approval of the Project which is set forth in Section III, below. CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE EAST CAMPUS STUDENT HOUSING PHASE III DEVELOPMENT PROJECT UNIVERSITY OF CALIFORNIA, IRVINE I. ADOPTION OF THE MITIGATED

More information

UCSD HEALTH SCIENCES NEIGHBORHOOD GRADUATE AND PROFESSIONAL HOUSING

UCSD HEALTH SCIENCES NEIGHBORHOOD GRADUATE AND PROFESSIONAL HOUSING Regents Committee on Grounds and Buildings Preliminary Review of Design November 18, 2008 UCSD HEALTH SCIENCES NEIGHBORHOOD GRADUATE AND PROFESSIONAL HOUSING Project Background 225 (2 bedroom apartment

More information

CHAPTER 4.0 ENVIRONMENTAL SETTING, IMPACTS, AND MITIGATION

CHAPTER 4.0 ENVIRONMENTAL SETTING, IMPACTS, AND MITIGATION CHAPTER 4.0 ENVIRONMENTAL SETTING, IMPACTS, AND MITIGATION Sections 4.1 through 4.14 of Chapter 4.0 of this EIR contain a discussion of the potential environmental effects from implementation of the proposed

More information

PUBLIC HEARINGS June 6 & 7, 2018

PUBLIC HEARINGS June 6 & 7, 2018 PUBLIC HEARINGS June 6 & 7, 2018 STUDENT HOUSING WEST AGENDA & OUTLINE FOR THIS EVENING Agenda Present Student Housing West Project information. Present information specific to the Student Housing West

More information

PROJECT INFORMATION SESSION May 30 & 31, 2018

PROJECT INFORMATION SESSION May 30 & 31, 2018 PROJECT INFORMATION SESSION May 30 & 31, 2018 STUDENT HOUSING WEST ABOUT THE PROPOSED PROJECT Project Transaction Structure Key RFP Project Performance Goals Master plan, develop and operate approximately

More information

SECTION 6.0 Alternatives to the Proposed Project

SECTION 6.0 Alternatives to the Proposed Project SECTION 6.0 Alternatives to the Proposed Project 6.0 ALTERNATIVES TO THE PROPOSED PROJECT CEQA requires that an EIR include an analysis of a range of project alternatives that could feasibly attain most

More information

5.0 ALTERNATIVE VARIATIONS

5.0 ALTERNATIVE VARIATIONS 5.0 ALTERNATIVE VARIATIONS 5.1 INTRODUCTION The Draft EIR for the Beverly Hilton Revitalization Plan evaluated five alternatives to the project, pursuant to Section 15126.6 of the California Environmental

More information

1.0 INTRODUCTION 1.1 PROJECT OVERVIEW

1.0 INTRODUCTION 1.1 PROJECT OVERVIEW 1.0 INTRODUCTION This Environmental Impact Report (EIR) evaluates the potential for the San Joaquin Apartments and Precinct Improvements Project (the project or San Joaquin Apartments project to result

More information

6 ALTERNATIVES 6.1 INTRODUCTION

6 ALTERNATIVES 6.1 INTRODUCTION 6 ALTERNATIVES 6.1 INTRODUCTION Environmental impact reports (EIRs) are required to consider alternatives to the project that are capable of reducing or avoiding significant environmental impacts. Section

More information

65 East Project (P18-045) Addendum to an Environmental Impact Report

65 East Project (P18-045) Addendum to an Environmental Impact Report 65 East Project (P18-045) Addendum to an Environmental Impact Report File Number/Project Name: 65 East Project (P18-045) Project Location and Surrounding Land Uses: The proposed project site consists of

More information

B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT. Uses allowed in the B-2 Community Commercial Business District are subject to the following conditions:

B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT. Uses allowed in the B-2 Community Commercial Business District are subject to the following conditions: SECTION 46-53.1 B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT A. PURPOSE The B-2 Community Commercial Business District is oriented toward retail, service businesses and multi-family residential development.

More information

First and foremost, alternatives in an EIR must be potentially feasible. In the context of CEQA, feasible is defined as:

First and foremost, alternatives in an EIR must be potentially feasible. In the context of CEQA, feasible is defined as: ALTERNATIVES TO THE PROPOSED PROJECT 5.0 5.1 CEQA REQUIREMENTS CEQA requires that an EIR analyze a reasonable range of feasible alternatives that meet most or all project objectives while reducing or avoiding

More information

SUMMARY University of California San Francisco Institute for Regeneration Medicine

SUMMARY University of California San Francisco Institute for Regeneration Medicine SUMMARY University of California San Francisco Institute for Regeneration Medicine Final Initial Study and Mitigated Negative Declaration (State Clearinghouse No. 2008022027) March 2008 INSTITUTE FOR REGENERATION

More information

(DC2) SITE SPECIFIC DEVELOPMENT CONTROL PROVISION

(DC2) SITE SPECIFIC DEVELOPMENT CONTROL PROVISION (DC2) SITE SPECIFIC DEVELOPMENT CONTROL PROVISION 1. General Purpose To accommodate the development of a mid rise residential building that supports a broad mix of dwelling types and provides a commitment

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: MAY 1, 2013 TO: THRU: FROM: SUBJECT: Chair Fox and Members of the Design Review Committee Leslie Aranda Roseberry, Planning Manager Jennifer Le, Senior

More information

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT 5.1 - Introduction In accordance with CEQA Guidelines Section 15126.6, this Draft Subsequent Environmental Impact Report (DSEIR) contains a comparative impact

More information

The Village at Corte Madera Expansion Project

The Village at Corte Madera Expansion Project The Village at Corte Madera Expansion Environmental Report Addendum State Clearinghouse Number: 2016102061 Town of Corte Madera 300 Tamalpais Drive Corte Madera, CA 94925 April 2018 The Village at Corte

More information

G. HYDROLOGY Existing Conditions

G. HYDROLOGY Existing Conditions G. HYDROLOGY Existing Conditions Surface Water Runoff This section is based on the hydrology and drainage analysis for the proposed Project, which was prepared by KPFF Consulting Engineers and is attached

More information

6 ALTERNATIVES 6.1 INTRODUCTION

6 ALTERNATIVES 6.1 INTRODUCTION 6 ALTERNATIVES 6.1 INTRODUCTION Section 15126.6 of the California Environmental Quality Act (CEQA) Guidelines states that an EIR is to describe a range of reasonable alternatives to the proposed project,

More information

101 B. COMMITTEE ON GROUNDS AND BUILDINGS January 18, 2001

101 B. COMMITTEE ON GROUNDS AND BUILDINGS January 18, 2001 COMMITTEE ON 101 B B. CERTIFICATION OF ENVIRONMENTAL IMPACT REPORT AND APPROVAL OF DESIGN, SOUTHWEST CAMPUS HOUSING AND PARKING PHASE 1, LOS ANGELES CAMPUS The President recommends that upon review and

More information

CEQA FINDINGS IN CONNECTION WITH THE APPROVAL OF THE INTEGRATIVE GENOMICS BUILDING PROJECT, LAWRENCE BERKELEY NATIONAL LABORATORY

CEQA FINDINGS IN CONNECTION WITH THE APPROVAL OF THE INTEGRATIVE GENOMICS BUILDING PROJECT, LAWRENCE BERKELEY NATIONAL LABORATORY ATTACHMENT 4 CEQA FINDINGS IN CONNECTION WITH THE APPROVAL OF THE INTEGRATIVE GENOMICS BUILDING PROJECT, LAWRENCE BERKELEY NATIONAL LABORATORY I. CONSIDERATION OF THE 2006 LRDP EIR AND INTEGRATIVE GENOMICS

More information

SECTION 9.0 Effects Found Not To Be Significant

SECTION 9.0 Effects Found Not To Be Significant SECTION 9.0 Effects Found Not To Be Significant 9.0 EFFECTS FOUND NOT TO BE SIGNIFICANT The City of Santa Clarita conducted an Initial Study in April 2006 to determine significant effects of the proposed

More information

APPENDIX M CEQA Initial Study Checklist

APPENDIX M CEQA Initial Study Checklist APPENDIX M CEQA Initial Study Checklist Appendix G ENVIRONMENTAL CHECKLIST FORM (To be Completed by Applicant) 1. Project title: 2. Lead agency name and address: 3. Contact person and phone number: 4.

More information

3.10 Hydrology and Water Quality. Environmental Setting

3.10 Hydrology and Water Quality. Environmental Setting 3.10 Hydrology and Water Quality This section describes the potential hydrology and water quality impacts associated with the proposed changes to the approved project. Environmental Setting This section

More information

Environmental and Development Services Department Planning Division San Pablo Avenue, El Cerrito, CA (510) FAX: (510)

Environmental and Development Services Department Planning Division San Pablo Avenue, El Cerrito, CA (510) FAX: (510) Environmental and Development Services Department Planning Division 10890 San Pablo Avenue, El Cerrito, CA 94530 (510) 215-4330 - FAX: (510) 233-5401 N O T I C E O F P R E P A R A T I O N DATE: April 4,

More information

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN FOCUS OF INPUT NOP RESPONSES

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN FOCUS OF INPUT NOP RESPONSES NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN To: Responsible Agencies, Trustee Agencies, Organizations, and Interested Parties From: Erika

More information

Findings of Fact and Statement of Overriding Considerations

Findings of Fact and Statement of Overriding Considerations Findings of Fact and Statement of Overriding Considerations Pursuant to Sections 21081 and 21081.6 of the Public Resources Code and Sections 15091 and 15093 of the CEQA Guidelines Creative Arts & Holloway

More information

DESIGN GUIDELINES FOR MULTI FAMILY AND ATTACHED SINGLE FAMILY INFILL HOUSING

DESIGN GUIDELINES FOR MULTI FAMILY AND ATTACHED SINGLE FAMILY INFILL HOUSING DESIGN GUIDELINES FOR MULTI FAMILY AND ATTACHED SINGLE FAMILY INFILL HOUSING Multi family housing is an increasingly popular form of infill development in Shaker Heights because of the city s built out

More information

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE DESIGN OF THE SEGUNDO INFILL HOUSING PROJECT, DAVIS CAMPUS

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE DESIGN OF THE SEGUNDO INFILL HOUSING PROJECT, DAVIS CAMPUS CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE DESIGN OF THE SEGUNDO INFILL HOUSING PROJECT, DAVIS CAMPUS I. ADOPTION OF THE MITIGATED NEGATIVE DECLARATION In accordance

More information

I. CONSIDERATION OF 2020 LRDP FEIR (1/05) AND ADDENDUM #8 1

I. CONSIDERATION OF 2020 LRDP FEIR (1/05) AND ADDENDUM #8 1 ATTACHMENT 5 CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF AMENDMENT #2 TO THE 2020 LONG RANGE DEVELOPMENT PLAN -- CAMPUS SPACE AND INFRASTRUCTURE CHAPTER, AND APPROVAL

More information

Carpinteria Valley Water District Carpinteria Advanced Purification Project

Carpinteria Valley Water District Carpinteria Advanced Purification Project NOTICE OF PREPARATION AND SCOPING MEETING Carpinteria Valley Water District Carpinteria Advanced Purification Project TO: Agencies, Organizations, and Interested Parties DATE: January 7, 2019 SUBJECT:

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: AUGUST 21, 2013 TO: THRU: FROM: SUBJECT: Chair Fox and Members of the Design Review Committee Leslie Aranda Roseberry, Planning Manager Jennifer Le, Senior

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: MARCH 15, 2017 TO: THRU: FROM: SUBJECT: Chair Fox and Members of the Design Review Committee Anna Pehoushek, Assistant Community Development Director Monique

More information

The ~ommonwealth of Nassachusetts

The ~ommonwealth of Nassachusetts DEVAL L. PATRICK GOVERNOR The ~ommonwealth of Nassachusetts Executive Ofice of Energy adenvironmentafflffairs 100 cambridge Street, Suite 900 Boston, MA 02114 TIMOTHY P. MURRAY LIEUTENANT GOVERNOR July

More information

Boulder Ridge Fitness and Swim Center

Boulder Ridge Fitness and Swim Center Boulder Ridge Fitness and Swim Center First Amendment to Final Environmental Impact Report November 2014 County of Santa Clara Planning Office State Clearinghouse Number: 2013052012 INTRODUCTION The Draft

More information

APPENDIX N Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

APPENDIX N Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports APPENDIX N N.1 Guidance for Preparing and Reviewing CEQA Initial Studies Step 1: Consider the Project Characteristics as Provided by the Project Applicant Review the project application and draft plan

More information

The following Findings are hereby adopted by The Regents in conjunction with the approval of the project which is set forth in Section III below.

The following Findings are hereby adopted by The Regents in conjunction with the approval of the project which is set forth in Section III below. CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH CERTIFICATION OF THE FINAL EIR, FINDINGS, AND APPROVAL OF THE DESIGN OF THE SURGERY AND EMERGENCY SERVICES PAVILION, DAVIS MEDICAL CENTER

More information

RESOLUTION NO:

RESOLUTION NO: RESOLUTION NO: 11-031 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PASO ROBLES CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE 2011 CIRCULATION ELEMENT OF THE GENERAL PLAN AND ADOPTING FINDINGS,

More information

Corridor Commercial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Corridor Commercial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations 16.20.090 - Corridor Commercial Suburban District ( CCS ) CCS-1 CCS-2 Figure REFERENCE Typical Buildings in the CCS District INSERT DRAWING: SITE PLAN OF A TYPICAL SUBURBAN COMMERCIAL CORRIDOR DEVELOPMENT

More information

5.0 PRELIMINARY ENVIRONMENTAL REVIEW

5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.1 INTRODUCTION A preliminary environmental review was performed on the proposed freeway improvements that form Concept C, which encompasses the three freeway corridors

More information

2 Executive Summary 2.1 Project Location

2 Executive Summary 2.1 Project Location 2 Executive Summary 2.1 Project Location Draft Supplemental Environmental Impact Report page 11 2. Executive Summary 2.1 Project Location The proposed Project, known as the Outlets at San Clemente Sign

More information

Addendum to Mitigated Negative Declaration

Addendum to Mitigated Negative Declaration Background Addendum to Mitigated Negative Declaration Addendum Date: Case No.: 2011.0408E Project Title: Internet Services Exchange 2011.0408E, adopted July 24, 2014 Project Sponsor: John Wilson, The Cambay

More information

OTHER CEQA CONSIDERATIONS

OTHER CEQA CONSIDERATIONS Chapter 5 OTHER CEQA CONSIDERATIONS CEQA Guidelines Section 15128 requires that an EIR disclose the reasons why various possible environmental effects of a proposed project are found not to be significant

More information

Appendix D1 Screening Analysis

Appendix D1 Screening Analysis Appendix D Screening Analysis of Additional Resource Areas for Consideration in the CS SEIR due to Assumed Incremental Increase in Terminal Throughput under the Revised Project Appendix D1 Screening Analysis

More information

2700 Ninth Street East Bay Humane Society

2700 Ninth Street East Bay Humane Society Z O N I N G A D J U S T M E N T S B O A R D S t a f f R e p o r t FOR BOARD ACTION MAY 14, 2015 2700 Ninth Street East Bay Humane Society Use Permit #UP2013-0055 to allow the demolition of the existing

More information

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT City of American Canyon Broadway District Specific Plan Alternatives to the Proposed Project SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT 5.1 Introduction In accordance with CEQA Guidelines Section

More information

IMPACT ON LAND. 1. Will there be an effect as a result of a physical change to project site? Yes No

IMPACT ON LAND. 1. Will there be an effect as a result of a physical change to project site? Yes No Part 2 Project s Can Be IMPACT ON LAND 1. Will there be an effect as a result of a physical change to project site? Any construction on slopes of 15% or greater (15-foot rise per 100 feet of length) or

More information

DRAFT 9/28/09 ALLEY MAINTENANCE Q

DRAFT 9/28/09 ALLEY MAINTENANCE Q DRAFT 9/28/09 ALLEY MAINTENANCE Q [Q] QUALIFIED PERMANENT CONDITIONS OF APPROVAL Pursuant to Section 12.32.G of the Municipal Code, the following limitations are hereby imposed upon the use of the subject

More information

6.0 ALTERNATIVES. The alternatives that are evaluated in this section include the following:

6.0 ALTERNATIVES. The alternatives that are evaluated in this section include the following: 6.1 INTRODUCTION 6.0 ALTERNATIVES This chapter evaluates alternatives to the proposed project and examines the potential environmental impacts associated with each alternative. Through comparison of these

More information

5. OTHER CEQA CONSIDERATIONS

5. OTHER CEQA CONSIDERATIONS 5. OTHER CEQA CONSIDERATIONS Cumulative Impacts CEQA requires the analysis of impacts due to cumulative development that would occur independent of, but during the same timeframe as, the project under

More information

FINAL ADDENDUM #1 TO THE 2003 LONG RANGE DEVELOPMENT PLAN ENVIRONMENTAL IMPACT REPORT (State Clearinghouse No ) November 2006

FINAL ADDENDUM #1 TO THE 2003 LONG RANGE DEVELOPMENT PLAN ENVIRONMENTAL IMPACT REPORT (State Clearinghouse No ) November 2006 Page 1 FINAL ADDENDUM #1 TO THE 2003 LONG RANGE DEVELOPMENT PLAN ENVIRONMENTAL IMPACT REPORT (State Clearinghouse No. 2002102092) I. INTRODUCTION On November 20, 2003, The Regents of the University of

More information

APPENDIX A: NOTICE OF PREPARATION AND COMMENTS RECEIVED

APPENDIX A: NOTICE OF PREPARATION AND COMMENTS RECEIVED APPENDIX A: NOTICE OF PREPARATION AND COMMENTS RECEIVED Date: September 19, 2017 NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT To: Agencies and Interested Parties Lead Agency: Sacramento Municipal

More information

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT Date: September 19, 2017 NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT To: Agencies and Interested Parties Lead Agency: Sacramento Municipal Utility District 6201 S Street, MS B203 Sacramento,

More information

NIGHTTIME ILLUMINATION

NIGHTTIME ILLUMINATION IV.A.3 NIGHTTIME ILLUMINATION 1. INTRODUCTION This section analyzes and discusses the extent to which the proposed project s artificial lighting would affect the visual environment of the project site

More information

SANTA BARBARA COUNTY ZONING ADMINISTRATOR STAFF REPORT June 26, 2012

SANTA BARBARA COUNTY ZONING ADMINISTRATOR STAFF REPORT June 26, 2012 SANTA BARBARA COUNTY ZONING ADMINISTRATOR STAFF REPORT June 26, 2012 PROJECT: Winant-Sanders SFD Demo-Rebuild HEARING DATE: July 16, 2012 STAFF/PHONE: J. Ritterbeck, (805) 568-3509 GENERAL INFORMATION

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY

IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY ENVIRONMENTAL SETTING The project site is located in the Wilshire community of the City of Los Angeles and is bound by S. Wetherly Drive to

More information

Delaware Street

Delaware Street A t t a c h m e n t 1 F i n d i n g s a n d C o n d i t i o n s 2004-06 Delaware Street Use Permit #09-10000052 JULY 22, 2010 CEQA FINDINGS 1. The project is categorically exempt from the provisions of

More information

2.0 PIONEER HEIGHTS PHASE IV PROJECT

2.0 PIONEER HEIGHTS PHASE IV PROJECT 2.1 INTRODUCTION 2.0 PIONEER HEIGHTS PHASE IV PROJECT The California State University, East Bay (CSUEB) Hayward is proposing to construct the fourth phase of the Pioneer Heights student housing neighborhood

More information

Schwan Self-Storage. Addendum to Schwan Self-Storage Project Mitigated Negative Declaration Case No DP RV

Schwan Self-Storage. Addendum to Schwan Self-Storage Project Mitigated Negative Declaration Case No DP RV Schwan Self-Storage Addendum to Schwan Self-Storage Project Mitigated Negative Declaration Case No. 17-055-DP RV Prepared by: City of Goleta 130 Cremona Drive, Suite B Goleta, CA 93117 September 2017 Addendum

More information

Planning Commission Agenda Item

Planning Commission Agenda Item Planning Commission Agenda Item TO: THRU: FROM: Chair Gladson and Members of the Planning Commission Anna Pehoushek Assistant Community Development Director Monique Schwartz Assistant Planner SUBJECT PUBLIC

More information

The following presents a brief summary of Proposed Project effects found not to be significant, including reasons why they would not be significant.

The following presents a brief summary of Proposed Project effects found not to be significant, including reasons why they would not be significant. VII. EFFECTS FOUND NOT TO BE SIGNIFICANT 1. INTRODUCTION This section of the EIR provides information regarding impacts of the Proposed Project that were determined to be less than significant by the City

More information

NOTICE OF PREPARATION DRAFT ENVIRONMENTAL IMPACT REPORT

NOTICE OF PREPARATION DRAFT ENVIRONMENTAL IMPACT REPORT NOTICE OF PREPARATION DRAFT ENVIRONMENTAL IMPACT REPORT To: From: (Potential Responsible, City of Perris Trustee, Federal and Local Development Services Department Agencies and nearby property 135 North

More information

ADOPTION OF THE MITIGATED NEGATIVE DECLARATION

ADOPTION OF THE MITIGATED NEGATIVE DECLARATION CALIFORNIA ENVIRONMENTAL QUALITY ACT IN CONNECTION WITH THE APPROVAL OF THE TELECOMMUNICATIONS INFRASTRUCTURE IMPROVEMENTS PHASE A PROJECT UNIVERSITY OF CALIFORNIA, SANTA CRUZ CAMPUS I. ADOPTION OF THE

More information

ENVIRONMENTAL REVIEW PROCESS AND ADOPTION OF MITIGATED NEGATIVE DECLARATION

ENVIRONMENTAL REVIEW PROCESS AND ADOPTION OF MITIGATED NEGATIVE DECLARATION CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF LANDELS HILL-BIG CREEK NATURAL RESERVE AT THE UNIVERSITY OF CALIFORNIA, LANDELS HILL-BIG CREEK NATURAL RESERVE I. ENVIRONMENTAL

More information

6.13 Utilities and Service Systems

6.13 Utilities and Service Systems 6.13 6.13.1 Introduction This section describes impacts for utilities and service systems that would result from construction and operation of the CEQA Alternatives. 6.13.2 Regulatory Setting There are

More information

ENVIRONMENTAL APPLICATION (To be completed by Applicant) OFFICIAL USE ONLY. Planning Staff Name: Signature: Filing (CEQA and/or Coastal) No.

ENVIRONMENTAL APPLICATION (To be completed by Applicant) OFFICIAL USE ONLY. Planning Staff Name: Signature: Filing (CEQA and/or Coastal) No. ENVIRONMENTAL APPLICATION (To be completed by Applicant) Application Accepted as Complete? YES NO Date: OFFICIAL USE ONLY Planning Staff Name: Signature: Filing (CEQA and/or Coastal) No.: WORKING PROJECT

More information

Attachment 3 UC MERCED 2020 PROJECT

Attachment 3 UC MERCED 2020 PROJECT Attachment 3 UC MERCED 2020 PROJECT Addendum No. 6 to the 2009 UC Merced Long Range Development Plan Environmental Impact Statement / Environmental Impact Report The following Addendum has been prepared

More information

SUMMARY. Mitigated Negative Declaration for the Academic Building, Mission Bay Block 25A State Clearinghouse Number

SUMMARY. Mitigated Negative Declaration for the Academic Building, Mission Bay Block 25A State Clearinghouse Number ATTACHMENT 5 SUMMARY Mitigated Negative Declaration for the Academic Building, Mission Bay Block 25A State Clearinghouse Number 2012062042 Project Location and Description UCSF proposes the construction

More information

UC MERCED 2020 PROJECT. Addendum No. 7 to the 2009 UC Merced Long Range Development Plan Environmental Impact Statement / Environmental Impact Report

UC MERCED 2020 PROJECT. Addendum No. 7 to the 2009 UC Merced Long Range Development Plan Environmental Impact Statement / Environmental Impact Report ATTACHMENT 10 UC MERCED 2020 PROJECT Addendum No. 7 to the 2009 UC Merced Long Range Development Plan Environmental Impact Statement / Environmental Impact Report The following Addendum has been prepared

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: JANUARY 15, 2014 TO: Chair Fox and Members of the Design Review Committee THRU: FROM: SUBJECT: Leslie Aranda Roseberry, Planning Manager Robert Garcia,

More information

6.1 SIGNIFICANT IMPACTS OF THE PROJECT

6.1 SIGNIFICANT IMPACTS OF THE PROJECT SECTION 6.0 ALTERNATIVES CEQA requires that an EIR identify alternatives to a project as it is proposed. The CEQA Guidelines specify that the EIR should identify alternatives which would feasibly attain

More information

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac) Permit Application No.: 17-181 Rules: Erosion Control, Wetland Protection, and Waterbody Crossings & Structures Applicant: Hennepin County Received: 4/27/17 Project: CSAH 112 Phase II Complete: 9/5/17

More information

PROJECT: UC SANTA CRUZ SHW SUSTAINABILITY LUNCH AND LEARN

PROJECT: UC SANTA CRUZ SHW SUSTAINABILITY LUNCH AND LEARN PROJECT: SHW SUSTAINABILITY LUNCH AND LEARN TOPICS: STUDENT HOUSING WEST (SHW) INTRODUCTION SUSTAINABILITY POLICIES AND GOALS SHW NET-ZERO STRATEGIES Q&A LOCATION: SANTA, CA DATE: MAY 22, 2018 PAGE 1 PROJECT

More information

DRAFT SCOPE DRAFT ENVIRONMENTAL IMPACT STATEMENT

DRAFT SCOPE DRAFT ENVIRONMENTAL IMPACT STATEMENT DATE: November 7, 2017 DRAFT SCOPE DRAFT ENVIRONMENTAL IMPACT STATEMENT LIFELONG CYCLES, INC. PROPOSED HARLEY-DAVIDSON DEALERSHIP 1324 JERICHO TURNPIKE, INCORPORATED VILLAGE OF NEW HYDE PARK, NY Overview

More information

UC Merced and University Community Project Draft Environmental Impact Statement/ Environmental Impact Report

UC Merced and University Community Project Draft Environmental Impact Statement/ Environmental Impact Report UC Merced and University Community Project Draft Environmental Impact Statement/ Environmental Impact Report Volume 3 SCH # 2008041009 November 2008 Prepared for: U.S. Army Corps of Engineers, Sacramento

More information

UC Merced and University Community Project Draft Environmental Impact Statement/ Environmental Impact Report

UC Merced and University Community Project Draft Environmental Impact Statement/ Environmental Impact Report UC Merced and University Community Project Draft Environmental Impact Statement/ Environmental Impact Report Volume 3 SCH # 2008041009 November 2008 Prepared for: U.S. Army Corps of Engineers, Sacramento

More information

(1) The proposed commercial solar energy generation facility is either

(1) The proposed commercial solar energy generation facility is either (2) The design and siting of these facilities shall avoid the placement of turbines on or immediately adjacent to the upwind side of ridge crests; (3) The design may include other design features to minimize

More information

Administrative Office Building

Administrative Office Building EMP Museum Administrative Office Building SEATTLE, WA 52,520 GSF EMP is a leading-edge non-profit museum dedicated to contemporary popular culture. The client had special and unique requirements for the

More information

FIFTH ADDENDUM TO THE CIVIC CENTER SPECIFIC PLAN EIR APRIL 2015

FIFTH ADDENDUM TO THE CIVIC CENTER SPECIFIC PLAN EIR APRIL 2015 FIFTH ADDENDUM TO THE CIVIC CENTER SPECIFIC PLAN EIR APRIL 2015 CITY OF SANTA MONICA PLANNING AND COMMUNITY DEVELOPMENT 1685 MAIN STREET SANTA MONICA, CA 90401 INTRODUCTION This document is the Fifth Addendum

More information

914. "I-1", LIGHT INDUSTRIAL DISTRICT

914. I-1, LIGHT INDUSTRIAL DISTRICT 914. "I-1", LIGHT INDUSTRIAL DISTRICT 914.010. PURPOSE. The purpose of the "I-1", Light Industrial District is to provide for the establishment of warehousing and light or limited industrial development

More information

Environmental Setting, Impacts, and Mitigation Measures

Environmental Setting, Impacts, and Mitigation Measures First page header CHAPTER 4 Environmental Setting, Impacts, and Mitigation Measures 4.0 INTRODUCTION TO THE ENVIRONMENTAL ANALYSIS Sections 4.1 through 4.13 of Chapter 4 of this EIR contain a discussion

More information

FINDINGS OF FACT AND STATEMENT OF OVERRIDING CONSIDERATIONS

FINDINGS OF FACT AND STATEMENT OF OVERRIDING CONSIDERATIONS WEST SACRAMENTO AREA FLOOD CONTROL AGENCY SOUTHPORT SACRAMENTO RIVER EARLY IMPLEMENTATION PROJECT (BORROW ONE PROJECT) FINDINGS OF FACT AND STATEMENT OF OVERRIDING CONSIDERATIONS P R E P A R E D F O R

More information

CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT. Design Review Variance Categorically Exempt, Class 1

CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT. Design Review Variance Categorically Exempt, Class 1 CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT HEARING DATE: TO: CASE: APPLICANT: LOCATION: ENVIRONMENTAL STATUS: PREPARED BY: BOARD OF ADJUSTMENTIDESIGN REVIEW BOARD Design Review

More information

City of Palo Alto (ID # 7047) City Council Staff Report

City of Palo Alto (ID # 7047) City Council Staff Report City of Palo Alto (ID # 7047) City Council Staff Report Report Type: Consent Calendar Meeting Date: 6/13/2016 Summary Title: East Palo Alto Comment Letter Title: Approval and Authorization for the City

More information

1951 SHATTUCK AVENUE. D E S I G N R E V I E W C O M M I T T E E S t a f f R e p o r t. Continued Preliminary Design Review

1951 SHATTUCK AVENUE. D E S I G N R E V I E W C O M M I T T E E S t a f f R e p o r t. Continued Preliminary Design Review D E S I G N R E V I E W C O M M I T T E E S t a f f R e p o r t 1951 SHATTUCK AVENUE For Discussion / Majority Recommendations MARCH 21, 2019 Continued Preliminary Design Review Design Review #DRCP2018-0005

More information

LETTER G. City of San Diego

LETTER G. City of San Diego LETTER G City of San Diego G-1 The comment provides introductory statements and acknowledges collaboration between interested stakeholders and agency representatives in the development of the proposed

More information

U S E P E R M I T. CITY OF BERKELEY ZONING ORDINANCE Berkeley Municipal Code Title 23 USE PERMIT # MODUP c/o The Austin Group LLC

U S E P E R M I T. CITY OF BERKELEY ZONING ORDINANCE Berkeley Municipal Code Title 23 USE PERMIT # MODUP c/o The Austin Group LLC Planning and Development Department Land Use Planning U S E P E R M I T CITY OF BERKELEY ZONING ORDINANCE Berkeley Municipal Code Title 23 USE PERMIT # MODUP2014-0001 Property Address: Permittee Name:

More information

Environmental Setting, Impacts, Standard Conditions of Approval, and Mitigation Measures

Environmental Setting, Impacts, Standard Conditions of Approval, and Mitigation Measures CHAPTER 4 Environmental Setting, Impacts, Standard Conditions of Approval, and Mitigation Measures This Draft EIR has been prepared in accordance with CEQA, as amended (Public Resources Code Section 21000,

More information

ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM

ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM Each applicant needs to thoroughly review the conditions of development issued by the Planning Division in the format of a Resolution approving your project

More information

Sustainable Design Plan

Sustainable Design Plan Draft Jan 2012 4 Contents 4.1 Sustainable Approach to Design and Development 4.1.1 Understanding Sustainability 4.1.2 Response to Context and Location 4.2 Energy 4.2.1 Energy and Transportation 4.2.2 Local

More information

REPORT TO DESIGN REVIEW BOARD

REPORT TO DESIGN REVIEW BOARD CITY OF Community Development Department Planning Division Meeting Date: January 18, 2012 Case Numbers: CDR11-001 Project Planner: Sarjit Dhaliwal (415) 485-3397 REPORT TO DESIGN REVIEW BOARD SUBJECT:

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

Section 4.0 ALTERNATIVES

Section 4.0 ALTERNATIVES Section 4.0 ALTERNATIVES 4.1 Introduction Section 15126.6 of the State California Environmental Quality Act (CEQA) Guidelines requires an environmental impact report (EIR) to describe a range of reasonable

More information

ENVIRONMENTAL INFORMATION FORM

ENVIRONMENTAL INFORMATION FORM ENVIRONMENTAL INFORMATION FORM City of Fontana Planning Division The purpose of this form is to inform the city of the basic components of the proposed project so that the City may review the project pursuant

More information

5.0 LONG-TERM CEQA CONSIDERATIONS

5.0 LONG-TERM CEQA CONSIDERATIONS 5.0 LONG-TERM CEQA CONSIDERATIONS Section 15126 of the CEQA Guidelines requires that all phases of a project must be considered when evaluating its impact on the environment, including planning, acquisition,

More information

PRELIMINARY DRAINAGE STUDY

PRELIMINARY DRAINAGE STUDY PRELIMINARY DRAINAGE STUDY For 34 th & J Residences 3402 J St. San Diego, CA 92102 A.P.N 545-250-08 Prepared By: Kenneth J. Discenza, P.E. Site Design Associates, Inc. 1016 Broadway, Suite A El Cajon,

More information

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT Date: September 18, 2017 NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT To: Agencies and Interested Parties Lead Agency: Sacramento Municipal Utility District 6201 S Street, MS H201 Sacramento,

More information

CITY COUNCIL AGENDA REPORT

CITY COUNCIL AGENDA REPORT CITY COUNCIL AGENDA REPORT DATE: July 10, 2006 TO: FROM: SUBJECT: HONORABLE MAYOR AND COUNCILMEMBERS GEOFFREY STARNS, SENIOR PLANNER TALYN MIRZAKHANIAN, ASSOCIATE PLANNER ADOPTION OF RESOLUTION NO. 2006-1038,

More information