1 PROJECT PRE-FEASIBILITY REPORT For THE PROPOSED ORGANIC CHEMICALS MANUFACTURING IN EXISTING IN FORMULATION OF PESTICIDE, AGROCHEMICAL AND BIO FERTILIZERS MANUFACTURING UNIT AT M/S. SULPHUR MILLS LTD. PLOT NO. 2, GIDC PANOLI, TALUKA:ANKLESHWAR DIST: BHARUCH, GUJARAT Submitted by: M/S. SULPHUR MILLS LTD.

2 EXECUTIVE SUMMARY M/s. SULPHUR MILLS PVT.LTD. is planning to manufacture organic products in the existing formulation products manufacturing unit at Plot no. 2 GIDC Panoli, Taluka: Ankleshwar, Dist: Bharuch, Gujarat. Project Cost The total cost of the project after proposed expansion will be around Rs crores. Details of Products Details of existing and proposed products are given in following table. LIST OF PRODUCTS Sr No. Name Of Product Existing Quantity Propose Quantity Total Quantity (MT/M) (MT/M) (MT/M) 1 Pesticides, Agrochemicals, Fertilizers, Bio Fertilizers Formulation And Repacking (Own Manufacturing and job work) 2 Naphthalene based dispersing Agent 3. Phenol Based Dispersing Agent 4 Liquid Dispersing Agent (only Mixing) Since, the project is covered under the Category 5(f) of the new EIA notification-2006; we are applying for obtaining Environment Clearance for the same.

3 COST OF PROJECT The expected cost of proposed project is 7.00 crore. The plot has been purchased by M/s. Sulphur Mills ltd from GIDC. The total plot Area of the unit is sq. m. the green belt area will be 9000 Sq.m. FUEL & ELECTRICITY CONSUMPTION The proposed unit will use Natural gas as fuel for boiler while Diesel will be used as fuel in DG set. The connected electricity load will be 1000 KVA from DGVCL. WATER CONSUMPTION The unit will use 256 KL/Day water for industrial purpose and domestic purpose. WASTE WATER GENERATION The waste water generation from industrial activities will be 2 KL/Day. The sewage generation will be 16 KL/Day which will be goes to septic tank to soak pit. The industrial waste water will be treated in units own ETP having primary and tertiary treatment facilities. The treated water will be evaporate in Spray dryer and achieved the Zero liquid discharge for our unit. GASEOUS EMISSION There will be Two stack of Boiler (Capacity: 0.8 Tone/Hr), One thermic fluid heater (Capacity: 4 lacks K cal/hr).there is no process gas emission of proposed products. HAZARDOUS WASTE MANAGEMENT There will be generation of ETP Sludge (10 MT/Y). Waste /residue containing pesticide (10 MT/Y) Used Oil (1.08 MT/Y) HDPE Containers (395 MT/Y) Solid Waste (15 MT/Y) Date Expired materials (10 MT/Y).

4 INDEX Chapter No. Content 1 Introduction of The Project 2 Project Description 3 Site Analysis 4 Planning Brief 5 Proposed Infrastructure 6 Rehabilitation and Resettlement (R & R) Plan 7 Project Schedule & Cost estimates 8 Analysis of Proposal

5 CHAPTER - 1 Introduction of the Project 1.1 Identification of Project and Project Proponent M/s. Sulphur Mills ltd. is planning to manufacture organic products in the existing Formulation products manufacturing unit at plot no. 2, GIDC Panoli, Taluka: Ankleshwar, Dist: Bharuch,Gujarat. 1.2 Brief Description of Nature of the Project List of Products LIST OF EXISTING AND PROPOSED PRODUCT. Sr. No. Name of Product 1. Pesticide, Agrochemicals, Fertilizers, Bio Fertilizers Formulation & Repacking (Own manufacturing & Job work) Existing Quantity (MT/M) Proposed Quantity (MT/M) Total Quantity (MT/M) Naphthalene based dispersing agent Phenol Based Dispersing agent Liquid Dispersing Agent (only Mixing) Employment Generation: For the proposed expansion project, additional 15 nos. of personnel (existing 30 nos.) will be employed.

6 CHAPTER - 2 Project Description 2.1 Type of Project M/s. Sulphur Mills Ltd. is planning to manufacture organic products in the existing unit of Formulation products manufacturing unit at plot no. 2,GIDC Panoli, Taluka: Ankleshwar, Dist: Bharuch, Gujarat. 2.2 Location M/s. Sulphur Mills Ltd. located at plot no.2, GIDC Panoli, Taluka: Ankleshwar, Dist: Bharuch, Gujarat. Total Plot area of sq. mm is sufficient for proposed expansion. It is situated at North latitude and East longitude. A map showing project site is given in following figure-1 & a detailed map of the project site & surrounding is showing in following figure. Site Location Map

7 2.3 Size or Magnitude of Operation Details of production capacity is discussed in section Process Description Manufacturing process: PART A ] NAPHTHALENE BASE Take 1 mole of Naphthalene (M.W. = 128) mole of Sulphuric acid (M.W.=98) in a clean and dry reactor. Heat it to 155 to 160 deg Celcius. And maintain for 6 hrs. The product obtain is 1 mole of Naphthalene Sulphonate (M.W.= 208) + 1 mole of water (M.W.=18) Add 0.65 mole of formaldehyde (M.W.= 30) into it at deg c. The Product obtain is 1 mole of Naphthalene sulphonate formaldehyde condensate (M.W.= 222) + 1 mole of water (M.W.=18). The 1 mole of Naphthalene sulphonate formaldehyde condensate (M.W.= 222) is self polymerise to give one polymer of molecular weight Finally, the product is neutralised with 2 mole of Caustic soda. The product obtained is 1 mole of Sodium salt of Naphthalene sulphonate formaldehyde condensate + 1 mole water. Total molecular weight of product is approx PART B ] PHENOL BASE Take 1 mole of Phenol (M.W. = 94) mole of Sulphuric acid (M.W.=98) in a clean and dry reactor. Heat it to 102 to 105 deg Celcius. And maintain for 3 hrs. The product obtain is 1 mole of Phenol Sulphonate (M.W.= 174) + 1 mole of water (M.W.=18) Add 1.2 mole of Urea (M.W.=60) into it at deg c. Add 2.20 mole of formaldehyde (M.W.= 30) into it at deg c. The Product obtain is 1 mole of Phenol sulphonate formaldehyde condensate (M.W.= 204) + 1 mole of Urea formaldehyde condensate (M.W. = 89) + 1 mole of water (M.W.=18). The 1 mole of Phenol sulphonate formaldehyde condensate (M.W.=174 ) is self polymerise to give one polymer of molecular weight mole of Urea formaldehyde condensate (M.W. = 89) ) is self polymerise to give one polymer of molecular weight 312. Now, add 2 mole of Phenol + 2 mole of formaldehyde to obtain 1 mole of Phenol formaldehyde condensate (M.W.= 124), Which polymerise to give molecular weight 248. Finally, the product is neutralised with 3 mole of Caustic soda. The product obtained is 1 mole of Sodium salt of Phenol sulphonate formaldehyde condensate + 1 mole of Urea formaldehyde condensate + 1 mole of Phenol formaldehyde condensate + 1 mole of water. Total Molecular of product is Approx

8 LIQUID DISPERSING AGENT i) RAW MATERIALS : - ( in Kgs ) a) PART B (PHENOL BASE) = b) PART A (NAPHTHALENE BASE) = c) Water = ii) OPERATING INSTRUCTIONS :- Charge 2350 kgs of PART B liquid into a clean & dry reactor. Heat it to a temp o C. To this add 900 kgs of PART A kgs of water & stir well. Send sample to Q.C. to check for its ph & solids. If o.k. Cool & unload by filtering it through nylon cloth of 100 mesh.

9 2.5 Raw Materials requirement Details of Raw material consumption and Mode of transportation are given in following table. LIST OF RAW MATERIALS LIST OF PROPOSED PRODUCT WISE RAW MATERIAL Sr. Name Of Product No. 1 Naphthalene based dispersing agent 2 Phenol Based Dispersing agent 3 Liquid Dispersing Agent (only Mixing) Quantity MT/M Sr. No. Name Of Raw Material Quantity MT/M Naphthalene Formaldehyde Caustic Lye Phenol Formaldehyde Sulphuric Acid Urea Caustic Lye Naphthalene based dispersing agent 2 Phenol Based Dispersing agent

10 2.6 Availability of water its source, energy / power requirement and source Water The water requirement for the Formulation is 200 KLD and for the proposed organic products will be 56 KLD. This would be sourced from GIDC Panoli. Power Requirement Scenario Project HP Source Existing 1000 KVA Existing power requirement is/will source from Daxin Gujarat Vij Company Limited (DGVCL) Proposed 1500 KVA Additional power requirement is/will source from Daxin Gujarat Vij Company Limited (DGVCL) Fuel Requirement Sr. Fuel Daily Fuel Consumption Source & Mode of No. Existing Proposed Total Transportation 1 Natural Gas 1300 M 3 /hr 1500 M 3 /hr 2800 M 3 /hr From GGCL through direct pipe line 2.7 Air Pollution Emission from Combustion of Fossil fuels from stationary or Mobile Sources Sr. no. FLUE GAS EMISSION (EXISTING) Existing Details of Stacks and Air pollution Control equipments Flue Gas Emission: Stack attached to Stack Height in Mtr. From Ground Fuel used and rate of consumption Parameters Permissible Limits 1. Hot Air Generator at Spray drier-v Capacity K Cal/Hr 30 Natural Gas 100 NM 3 /Hr. Particulate Matter SO 2 2. Hot Air Generator at Spray drier-vi Capacity K Cal/Hr 30 Natural Gas 100 NM 3 /Hr. Particulate Matter SO 2 3. Hot Air Generator at Spray drier-vii Capacity K Cal/Hr 30 Natural Gas 100 NM 3 /Hr. Particulate Matter SO 2 4. Hot Air Generator at Spray drier-viii Capacity K Cal/Hr 30 Natural Gas 100 NM 3 /Hr. Particulate Matter SO 2 5. Hot Air Generator at Spray drier-ix Capacity K Cal/Hr 30 Natural Gas 100 NM 3 /Hr. Particulate Matter SO 2 6. Hot Air Generator at Spray 30 Natural Gas Particulate Matter

11 drier-x Capacity K Cal/Hr 7. Hot Air Generator at Spray drier-xi Capacity K Cal/Hr 8. Hot Air Generator at Spray drier-xii Capacity K Cal/Hr 9. Thermic Fluid Heater at Spray drier-v & VI Capacity K Cal/Hr 10. Thermic Fluid Heater at Spray drier-vii & VIII Capacity K Cal/Hr 11. Thermic Fluid Heater at Spray drier-ix & X Capacity K Cal/Hr 12. Thermic Fluid Heater at Spray drier-xi & XII Capacity K Cal/Hr 13 Diesel Generator 250 KVA X 2=500 KVA 100 NM 3 /Hr. SO 2 30 Natural Gas Particulate Matter 100 NM 3 /Hr. SO 2 30 Natural Gas Particulate Matter 100 NM 3 /Hr. SO 2 30 Natural Gas Particulate Matter 100 NM 3 /Hr. SO 2 30 Natural Gas Particulate Matter 100 NM 3 /Hr. SO 2 30 Natural Gas Particulate Matter 100 NM 3 /Hr. SO 2 30 Natural Gas Particulate Matter 100 NM 3 /Hr. SO 2 14 Diesel 100 ltr/hr. Particulate Matter SO 2 Proposed Details of Air pollution Control measures: Sr. No. Stack Attached to Type of Fuel and Consumption 1 Boiler 800 kg/hr Natural Gas: 500 NM 3 /Hr 2 Boiler 800 kg/hr Natural Gas: 500 NM 3 /Hr 3 Thermic Fluid Heater 4 lakh K.cal Natural Gas: 500 NM 3 /Hr Air Pollution control measures Flue gas Chimney 15 mtr. Flue gas Chimney 15 mtr. Flue gas Chimney 15 mtr. Parameters PM<150 mg/nm 3 SO x <40 mg/nm 3 <25 mg/nm 3 PM<150 mg/nm 3 SO x <40 mg/nm 3 <25 mg/nm 3 PM<150 mg/nm 3 SO x <40 mg/nm 3 <25 mg/nm 3

12 PROCESS GAS EMISSION Existing Process Gas Emission: Process Emission from Production Activities Stack No. Stack attached to 1. Spray Drier-V Capacity 1.2 Ton/Hr 2. Spray Drier-VI Capacity 1.2 Ton/Hr 3. Spray Drier-VII Capacity 1.2 Ton/Hr 4. Spray Drier-VIII Capacity 1.2 Ton/Hr 5. Spray Drier-IX Capacity 1.2 Ton/Hr 6. Spray Drier-X Capacity 1.2 Ton/Hr 7. Spray Drier-XI Capacity 1.2 Ton/Hr 8. Spray Drier-XII Capacity 1.2 Ton/Hr Stack Height in Mtr. From Ground Control Measures provided 30 Cyclone Separator Followed by Ventury Scrubber And then Drop let Separator 30 Cyclone Separator Followed by Ventury Scrubber And then Drop let Separator 30 Cyclone Separator Followed by Ventury Scrubber And then Drop let Separator 30 Cyclone Separator Followed by Ventury Scrubber And then Drop let Separator 30 Cyclone Separator Followed by Ventury Scrubber And then Drop let Separator 30 Cyclone Separator Followed by Ventury Scrubber And then Drop let Separator 30 Cyclone Separator Followed by Ventury Scrubber And then Drop let Separator 30 Cyclone Separator Followed by Ventury Scrubber And then Drop let Separator Parameters Permissible Limits SPM 150 mg/ NM 3 SPM 150mg/ NM 3 SPM 150 mg/ NM 3 SPM 150 mg/ NM 3 SPM 150 mg/ NM 3 SPM 150 mg/ NM 3 SPM 150 mg/ NM 3 SPM 150 mg/ NM 3

13 Waste Water Generation and it s Treatment: From the proposed expansion project, domestics waste water and process water will be generated. Domestic waste water will be disposed through the septic tank following by soak pit. Industrial waste water approximately 2 KLD will be treated as primary treatment and treated water will be Evaporated in Spray Dreyer, so our unit is Zero Liquid Discharge. Noise Pollution and Control Measures: From the existing and proposed expansion manufacturing unit noise pollution will generate which will be controlled by adopting different types of noise pollution control measures. Main sources of the noise pollution are machineries, Electric motors, dryers and heaters, etc. Encasement of noise generating equipment. Greenbelt will be developed all around the plant boundary to act as noise attenuator. In addition personnel, working near high noise level generating sources, will be provided with ear muffs. Proper and suitable acoustic barrier will also be provided around, areas generating high noise. Effective preventive maintenance and vibration measurement of all rotating equipment will help in the improvement of plant life and also noise reduction.

14 Solid and Hazardous Waste Generation and its Disposal Method The sources of solid wastes, generation and its management are as given in the following table. List of Existing And Proposed Hazardous Waste Generation and Management Type Of Waste Category As per Schedule II Existing Generation MT/Y Proposed Generatio n MT/Y Total Generation MT/M Source of generation Storage Facility Mode of Disposal Discarded Containers/ Empty bags & liners MT/Y 307 MT/Y 395 MT/Y Raw Material Covered Shed with RCC flooring Sale it to GPCB approved merchant/reuse Used Oil MT/Y MT/Y 1.08 MT/Y Machinery Store in separate Area Sale it to CPCB or MOEF approved recycler or reprocessor/reuse for machine lubrication Waste /residue containing pesticide MT/Y MT/Y Process Store in separate Area Reuse for next batch/send to BEIL Date Expired materials MT/Y MT/Y From Market/ Ware house/stoc k Store in separate Area Reuse after testing and modification Solid Waste MT/Y MT/Y From Laboratory water after spray Drying ETP MT/Y 10 MT/Y Waste water treatment Plant Covered Shed with RCC flooring Specified Storage Area Sent to BEIL Sent to BEIL Green Belt Development Company is having total 9000 m 2 land area is available. Around 33% out of total plot area will be developed as green belt.

15 CHAPTER - 3 SITE ANALYSIS 3.1 Connectivity Rail The nearest railway station is Sanjali Railway station, Which is around 1.5 km in North direction from the project site Road The site is well connected by road network to all the key places. The major highway passing near the project site is NH-8 which is around 1.0 kms east direction from the project site Air The nearest airport from the project site is Surat Airport. The distance of airport site is around 55.0 kms in South-west direction Communication Panoli GIDC is well connected with telephone, telefax etc. all communications facilities are well developed in the district. 3.2 Topography Topography of the land is plane. 3.3 Existing land use Pattern There is no Forest, National Park, and Wild life sanctuary within a radius of 10 km. Details of existing land use is given in the following table: DETAILS OF EXISTING LAND USE Sr. No. Particular Name & its Distance 1. Nearest National Highway NH- 8 at around 1.0 km in East 2. Nearest city Panoli at around 3.00 in south 3. Nearest River Narmada river at around km in north 4. Nearest Railway station Sanjali Railway Station 1.5 km in North 5. National park/reserve Forest, Biosphere, etc. None within 20 km 3.4 Existing Social Structure Project site is located at a distance of around km from Ankleshwar city. All the infrastructures are available within city like schools, Hospitals & community Facilities.

16 CHAPTER - 4 Planning Brief 4.1 Planning Concept Type of industries: M/s Sulphur Mills ltd. is planning to introduce new organics products in existing unit at Plot no. 2, GIDC Panoli, Taluka: Ankleshwar, Dist: Bharuch, Gujarat. 4.2 Land Use planning The Plant general Layout has been planned considering production facilities, auxiliary and ancillary facilities and plant utilities & services. The total plot area is sq.m. 4.3 Amanitas / facilities Adequate storage facilities for Chemicals, machinery spares and consumables shall be provided. A small mechanical and electrical/instrument workshop facilities for repairs and maintenance shall be provided. Time and security offices shall be provided in the plant. To avoid fire hazard, internal fire hydrants system in all major plant unit will be provided.

17 CHAPTER - 5 Proposed infrastructure 5.1 industrial Area The company already has land of m 2 in which Land Company will expand their production capacity. 5.2 Residential Area There is no provision of housing for the employees at site. 5.3 Green Belt The main objective of the green belt is to provide a barrier between the sources of pollution and the Surrounding areas. The green belt helps to capture the fugitive emission and to attenuate the noise Generated apart from improving the aesthetics. Development of green belt and other forms of greenery Shall also prevent soil erosion and washing away of topsoil besides helping in stabilizing the functional Ecosystem and further to make the climate more conducive and to restore water balance. The functional Ecosystem and further to make climate conducive and to restore water balance. The company has green belt area with lawn, plants and flowers spread across about 33 of the total area. Green belt shall be developed at plant boundary, road side, around office & buildings and stretch of open Land. The trees should be tolerant to air pollutants present in the area The trees should be able to grow and thrive on soil of the area, be evergreen, inhabitant, having minimum of leaf fall. The trees should be tall in peripheral curtain plantation and with large and spreading canopy in primary and secondary attenuation zone. The trees should posses extensive foliar area to provide maximum impinging surface for continued efficient adsorption and absorption of pollutants. The trees should be fast growing and indigenous and should maintain ecological, land and hydrological balance of the region. It is also recommended to plant few trees, which are sensitive to air pollution, as air pollution indicator. It is also recommended top carry out extensive plantation within premises. Keeping in view the climatic conditions, status of solid and vegetation types in and around the project area the species shall be selected for proposed green belt development. 5.4 SOCIAL INFRASTRUCTURE Drinking water facility, canteen, proper sanitation, etc will be provided to the working in plant. 5.5 CONNECTIVITY As discussed earlier, proposed location of the plant is already well be connected with the network of road & rail. So there is no need to construct any new road or rail for the transportation. 5.6 WASTE WATER MANAGEMENT From the proposed expansions project, domestic waste water and process waste will be generated. Domestic waste water will be disposed through the septic tank followed by soak pit. Industrial waste water approximately 2 KLD will be Treatment as primary and treated water will be evaporate in Spray dryer, so our unit is Zero Liquid Discharge.

18 5.8 INDUSTRIAL SOLID/HAZARDOUS WASTE MANAGEMENT The source of solid wastes, generation and its management are as given in the following table. Type Of Waste Category As per Schedule II Existing Generation MT/Y Proposed Generatio n MT/Y Total Generation MT/M Source of generation Storage Facility Mode of Disposal Discarded Containers/ Empty bags & liners MT/Y 307 MT/Y 395 MT/Y Raw Material Covered Shed with RCC flooring Sale it to GPCB approved merchant/reuse Used Oil MT/Y MT/Y 1.08 MT/Y Machinery Store in separate Area Sale it to CPCB or MOEF approved recycler or reprocessor/reuse for machine lubrication Waste /residue containing pesticide MT/Y MT/Y Process Store in separate Area Reuse for next batch/send to BEIL Date Expired materials MT/Y MT/Y From Market/ Ware house/stoc k Store in separate Area Reuse after testing and modification Solid Waste MT/Y MT/Y From Laboratory water after spray Drying ETP MT/Y 10 MT/Y Waste water treatment Plant Covered Shed with RCC flooring Specified Storage Area Sent to BEIL Sent to BEIL

19 CHAPTER - 6 Rehabilitation and Resettlement [R & R] Plan The project is in notified industrial area, which is already acquired and there is no habitat. So the project Proposal does not involve any Rehabilitation & Resettlement.

20 Project Schedule & Cost CHAPTER Time Schedule for the project The implementation of the project will involve major activities like preparation of specification / drawing, Issue of tenders, receipt of quotations, scrutiny of tenders, placing of orders, civil & structural Construction, delivery & erection of equipment, test trial runs of various items of equipment and Commissioning of the plant & equipment and completion of the project will take about 6 month after the necessary clearances are available, and the funding for the project has been tied up. 7.2 Estimated Project Cost The total cost of proposed expansion will be around Rs crores. 7.3 Budgetary Provisions for EMP Adequate budgetary provisions have been made by the management for execution of environmental Management plans. The details of capital and recurring [per annum] budget earmarked for pollution Control / monitoring equipment; operation and maintenance of pollution control facilities, for greenbelt development and maintenance. Cost of environmental Protection measures Sr. No. Particulates Rs. In Lacs 1. Capital Expenditure Recurring expenditure on environmental management cell and on pollution control system per annum 25

21 CHAPTER - 8 Analysis of proposal 8.1 Financial and Social Benefits The capital cost of the expansion synthetic organic chemicals manufacturing in existing premises is estimated at about Rs.7.00 crore for the installation of plant & machinery along with required auxiliary and balancing facilities for the production. The project is evaluated fully from the financial point of view and found to be viable in long run. By further expansion, it will help the country to accumulate foreign Currency and will contribute in reduction in fiscal deficit a bit. For the coming of this project surrounding area will get developed due to this project and through the corporate social Responsibility [CRS] activities, socio-economic status of the region will also get developed. It will also create employment helping the society at large.

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE FOR MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS OF M/s. MAYUR COLOUR AND CHEMICALS LOCATED AT Plot No. 5148, GIDC Industrial Estate, Ankleshwar

More information

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management ANNEXURES Annexure No. Description 1 Google image showing proposed project site 2 Plant Lay-Out 3 Manufacturing process details 4 Details of hazardous waste management 5 Details of Effluent Treatment Plant

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF BAKELITE POWDER MANUFACTURING UNIT of M/S. HINDUSTAN BAKELITE COMPANY PLOT NO. J-3436, GIDC ESTATE, ANKLESHWAR, DISTRICT: BHARUCH-393002, GUJARAT 0 CONTENTS

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For NEW PROJECT (PIGMENT MANUFACTURING PLANT) Of M/s. SHREY INDUSTRIES Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat) CONTENTS Sr.

More information

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad 1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For EXPANSION IN EXISTING MANUFACTURING PLANT Of M/s. SHIVA DYE STUFF PVT. LTD Plot no. A2-11/6104,G.I.D.C. Industrial Estate, Ankleshwar-393002, Gujarat. 1 CONTENTS Sr. No. Description

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANICCHEMICALS (RESINS) (5 f B IND II) By M/s M R INDUSTRIES SURVEY NO. 58/1 & 58/3 OPPOSITE WHOLESOME FOOD PVT. LTD.,

More information

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT PRE - FEASIBILITY REPORT For PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT Of M/s. SHREE RAM INDUSTRIES PLOT NO.5117, GIDC-ANKLESHWAR, PIN-393002 TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT

More information

M/S. Dain Colour Chem

M/S. Dain Colour Chem PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of M/S. Dain Colour Chem Plot No.: 5, Nilkanth Estate, Village: Dhanot, Ta.: Kalol, Dist.: Gandhinagar-382729, Gujarat 1 CONTENTS

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan Report on 1. PROJECT LOCATION & LAND USE The Ganesh Park 3 is a residential building project constructed on plot 608 to 613/5 Vil: GIDC Ankleshwar in Bharuch district of Gujarat state. The project land

More information

For TOR New Projects. Mo. no. : Contact no. and ID of the Applicant

For TOR New Projects. Mo. no. : Contact no. and  ID of the Applicant SEAC, Gujarat : Page 1 of 6 For TOR New Projects 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot /Survey, Landmark etc. ) M/s. Perstorp Industries

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT. M/s. BASF INDIA LTD. (UNIT-II)

PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT. M/s. BASF INDIA LTD. (UNIT-II) BRIEF SUMMARY OF THE PROJECT for PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT of M/s. BASF INDIA LTD. (UNIT-II) PLOT NO. 8001 & 8001A, PHASE-VI, G.I.D.C., ANKLESHWAR, DIST: BHARUCH-393002,

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report M/s. Veer Poly Chem 0 1. Introduction M/s. Veer Polychem is an existing unit located at Plot 119 & 120, Ranpur road, GIDC Dhandhuka, Dist: Ahmedabad, Gujarat. Currently, unit is

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 0.0 EXECUTIVE SUMMARY Shri Ashok Patel Partner of M/s. Patel Polymers is planning to manufacture organic chemical Different Types of Resins, for proposed expansion project at Plot

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR OBTAINING ENVIRONMENT CLEARANCE For Proposed Common Bio-Medical Waste Treatment and Disposal Facility At Survey -1186, Block - 3013/B, 3014/A, 3014/B Chhatral G.I.D.C, Taluka:

More information

PRE-FEASIBILITY REPORT. for

PRE-FEASIBILITY REPORT. for PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared

More information

RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD.

RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD. FOR THE PROPOSED EXPANSION PROJECT FOR THE MANUFACTURING OF KETONIC RESINS Category: 5(f) OF RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD. Located at: Plot No. C-1/46, 100 SHED AREA, GIDC, Vapi,

More information

Synthetic Organic Chemicals 5(f)

Synthetic Organic Chemicals 5(f) SEAC, Gujarat Page 1 of 14 Synthetic Organic Chemicals 5(f) For Terms of Reference [ToR] New Project 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot

More information

1.0 EXECUTIVE SUMMARY

1.0 EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY M/s Merino Industries Limited has proposed for manufacturing Phenol Formaldehyde Resin, Melamine Formaldehyde Resin at Plot No D2 CH 36, Dahej Phase II, Dist. Bharuch, Gujarat. The

More information

M/s. RAPID INTERMEDIATES

M/s. RAPID INTERMEDIATES BRIEF SUMMARY OF THE PROJECT for PROPOSED PESTICIDE SPECIFIC INTERMEDIATES AND SPECIALTY CHEMICALS PLANT of M/s. RAPID INTERMEDIATES PLOT NO. 2325, GIDC ESTATE-PANOLI, TALUKA: ANKLESHWAR, DIST: BHARUCH,

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT For ToR Application of Expansion Project For MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS (Dyes Intermediates) Proposed By: M/s. Plot No. C/1/B-145-3 Phase-II, GIDC Estate, Naroda,

More information

Pre - Feasibility Report. For. Modernization of Sugar Unit. Located at

Pre - Feasibility Report. For. Modernization of Sugar Unit. Located at Pre - Feasibility Report For Modernization of Sugar Unit Located at At & Post Village Sayan, Taluka Olpad, District Surat, Gujarat-394130 Of M/s. Shree Sayan Vibhag Sahakari Khand Udhyog Mandli Ltd. SUMMARY

More information

UNSATURATED POLYESTER RESIN

UNSATURATED POLYESTER RESIN PROJECT REPORT ON UNSATURATED POLYESTER RESIN BY AQUA CHEM INDUSTRIES Survey No. 50/2, Jodhpar (Nadi), Morbi - 363641, Gujarat. I N D E X Sr. No. Contents Page No. 1 Introduction 3 2 Project Description

More information

M/S PARAS INDUSTRIES E-67, RIICO, PHASE-II, MAVAL,ABU ROAD, DIST: SIROHI, RAJASTHAN FORM 1 ANNEXURES

M/S PARAS INDUSTRIES E-67, RIICO, PHASE-II, MAVAL,ABU ROAD, DIST: SIROHI, RAJASTHAN FORM 1 ANNEXURES M/S PARAS INDUSTRIES E-67, RIICO, PHASE-II, MAVAL,A FORM 1 ANNEXURES ANNEXURE NAME OF THE ANNEXURE PAGE NO. ANNEXURE I Detail of product 2 ANNEXURE II Detail of Raw Materials 3 ANNEXURE III ANNEXURE IV

More information

ANNEXURE A DETAILS OF PRODUCTS

ANNEXURE A DETAILS OF PRODUCTS Annexures to Form 1 & Pre Feasibility Report Proposed Project for manufacturing of Dyes Intermediates of M/s Jay Dyechem, Narol-Vatva Road,Ta : City, District : Ahmedabad, Gujarat. ANNEXURE A DETAILS OF

More information

For TOR New. 1. Basic Information of the Project:

For TOR New. 1. Basic Information of the Project: SEAC, Gujarat: Page 1 of 12 For TOR New. 1. Basic Information of the Project: i Name & Address of the Project site M/s. Shreenathji Dye Chem (Complete details with plot no./survey no., Landmark etc. )

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

PRE FEASIBILTY REPORT

PRE FEASIBILTY REPORT PRE FEASIBILTY REPORT FOR ENVIRONMENT CLEARANCE OF PROPOSED NEW PROJECT S. O. CHEMICALS (5 f Category) Proposed By: COREL PHARMA CHEM PVT. LTD. SURVEY NO. 473 & 481, BORISANA, KADI THOL ROAD, KADI, DIST

More information

Ramans Enviro Services Pvt. Ltd. Ahmedabad. Annexure A. Product Profile. Crude OBA AND/OR Crude OBA-CBS-X. Standardized OBA Solid AND/OR

Ramans Enviro Services Pvt. Ltd. Ahmedabad. Annexure A. Product Profile. Crude OBA AND/OR Crude OBA-CBS-X. Standardized OBA Solid AND/OR Annexure A Product Profile Sr. No. 1 2 Product Crude OBA AND/OR Crude OBA-CBS-X Standardized OBA Solid AND/OR Standardized OBA Liquid Proposed Qty (MT/ M) 400 400 1600 Note : For making Standardized OBA

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

PRE-FEASIBILITY REPORT PROPOSED PROJECT FOR MANUFACTURING OF DYES INTERMEDIATES. OF M/s. UMIYA CHEM INTERMEDIATES

PRE-FEASIBILITY REPORT PROPOSED PROJECT FOR MANUFACTURING OF DYES INTERMEDIATES. OF M/s. UMIYA CHEM INTERMEDIATES PRE-FEASIBILITY REPORT ON PROPOSED PROJECT FOR MANUFACTURING OF DYES INTERMEDIATES OF M/s. UMIYA CHEM INTERMEDIATES AT PLOT NO: 4705/1/1, GIDC ESTATE,ANKLESHWAR, DIST:BHARUCH STATE:-GUJARAT 1 1.0 EXECUTIVE

More information

PRE - FEASIBILITY REPORT PROPOSED CEMENT PLANT (CLINKER 200 TPD AND CEMENT GRINDING 600 TPD)

PRE - FEASIBILITY REPORT PROPOSED CEMENT PLANT (CLINKER 200 TPD AND CEMENT GRINDING 600 TPD) PRE - FEASIBILITY REPORT On PROPOSED CEMENT PLANT (CLINKER 200 TPD AND CEMENT GRINDING 600 TPD) AT DAG NO. 10 OF K.P. PATTA 1, VILLAGE: SARUTARI, P.O.- BYRNIHAT MOUZA: SONAPUR, DIST. KAMRUP (METRO) ASSAM

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &

More information

Accord Energy Corporation India Pvt. Ltd.

Accord Energy Corporation India Pvt. Ltd. Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Polyurethane Foam Manufacturing Facility Of M/s. KRISHNA MARUTI LTD. At Plot No-13, SMG JV Park, Block No- 334,335 Vill- Hansalpur, Tal - Mandal Dist.: Ahmedabad, Gujarat INDEX

More information

ENVIRONMENTAL IMPACT ASSESSMENT REPORT. M/s. VISHRUDH ORGANICS PVT LTD.

ENVIRONMENTAL IMPACT ASSESSMENT REPORT. M/s. VISHRUDH ORGANICS PVT LTD. ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT OF M/s. VISHRUDH ORGANICS PVT LTD. (Plot No.141/2/B, GIDC Estate, Ankleshwar, ) PREPARED BY BHAGWATI ENVIRO CARE PVT. LTD. [ISO 9001,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project Of MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS of 850 MT/Month By PASHUPATI INDUSTRIES 169/1/A2, Phase 1, Opposite Telephone Exchange, GIDC Naroda, Ahmedabad-382330

More information

PRE FEASIBILTY REPORT MANUFACTURING OF ORGANIC PIGMENT M/S PRINCE CHEMICALS

PRE FEASIBILTY REPORT MANUFACTURING OF ORGANIC PIGMENT M/S PRINCE CHEMICALS PRE FEASIBILTY REPORT ON PROPOSED PROJECT FOR MANUFACTURING OF ORGANIC PIGMENT OF M/S PRINCE CHEMICALS AT PLOT NO: 9111/3,9111/2/1 GIDC ESTATE, ANKLESHWAR, DIST: BHARUCH, STATE: GUJARAT 1 Index Sr no.

More information

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad Annexure Prefeasibility Report (PFR) File PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of Shri Hari Dyes & Chemicals Work & Regd. Office: CONTENTS Sr. No. Description 1.

More information

Kana Aroma Industries. Pre-Feasibility Report

Kana Aroma Industries. Pre-Feasibility Report Pre-Feasibility Report 1. INTRODUCTION M/s. is a proposed unit to be located at Shed no. C1-41/B/1 & 2, GIDC Industrial Estate, Nandesari, Vadodara, Gujarat and proposes to manufacture Allyl Iso Thiocynate,

More information

Product Profile. Annexure A. Annexures to Form - I & PFR. MT/ M Consented Ultimate. Crude OBA AND/ OR Standardized OBA liquid/ powder 190 AND/ OR 2600

Product Profile. Annexure A. Annexures to Form - I & PFR. MT/ M Consented Ultimate. Crude OBA AND/ OR Standardized OBA liquid/ powder 190 AND/ OR 2600 Annexure A Product Profile Sr. No. 1 Product Crude OBA AND/ OR Standardized OBA liquid/ powder MT/ M Consented Ultimate 525 190 AND/ OR 2600-23 - Annexure - B Details of Raw Materials Qty (Kg/ Kg) Qty/

More information

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25

More information

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant PRE FEASIBILITY REPORT FOR Silica Sand Beneficiation Plant BY Shree Silicaam Minerals LLP VILLAGE : CHOKI TALUKA : JAGADIA DIST : BHARUCH GUJARAT (INDIA) PRE-FEASIBILITY REPORT: SILICA SAND BENIFICIATION

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report Essentials Pharma 1 1. Introduction M/s. Essentials Pharma is an new unit to be located at Plot 19, Survey 10/1, Rajkot-Ahmedabad National Highway 8-B, Village: Hirasar, Tal: Rajkot,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,

More information

Check list for construction Project of EC [Category 8(a)]:

Check list for construction Project of EC [Category 8(a)]: Check list for construction Project of EC [Category 8(a)]: Provide authenticated (with stamp & Signature) hard copy of this check-list during submission of hard copy of ToR application. Sr. no. Checklist

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

vii Total cost of Proposed Project Existing : 0.16 Cr Proposed: 0.25 Cr Total : 0.41 Cr viii Total Plot area ( sq. meter)

vii Total cost of Proposed Project Existing : 0.16 Cr Proposed: 0.25 Cr Total : 0.41 Cr viii Total Plot area ( sq. meter) SEAC, Gujarat: Page 1 of 28 For TOR Expansion Case. 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot no./survey no., Landmark etc. ) M/s. Om Interchem

More information

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT LG Polymers India Pvt. Ltd. Sy. No.s

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT The Proposed Th Proposed Food Colours and Lake Colours Manufacturing Unit will be established on Plot 22/1 - B, Dhatav, MIDC

More information

Environment Consultant:

Environment Consultant: MODERNIZATION CUM EXPANSION OF INDUCTION FURNACE PRODUCTION(2,05,000 TPA TO 6,00,000 TPA) AND ROLLING MILL PRODUCTION (3, 69,000 TPA TO 6,00,000 TPA) at Sy. No. 158 (part) 159 (part), 166 170, village

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

Pre-feasibility Report

Pre-feasibility Report Pre-feasibility Report for expansion of production capacity of Fluoropolymers including Poly Tetrafluoro Ethylene (PTFE), manufacturing of new age refrigerant gas Difluoromethane (HFC 32) and related products,

More information

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is

More information

LIST OF ANNEXURE. Details of products and raw materials and storage facility for the same. Details of water consumption and wastewater generation

LIST OF ANNEXURE. Details of products and raw materials and storage facility for the same. Details of water consumption and wastewater generation LIST OF ANNEXURE Annexure-1 Location of the project site Annexure-2 Layout plan Annexure-3 Break up of land area requirement Annexure-4 Details of products and raw materials and storage facility for the

More information

INSPIRE INDUSTRIES PVT. LTD.

INSPIRE INDUSTRIES PVT. LTD. For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance]

Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Project Proposal: Expansion of Cement Plant capacity from 1.5 to 2.20 MTPA of Clinker and

More information

Sub: - An application for obtaining Environment Clearance for New Unit.

Sub: - An application for obtaining Environment Clearance for New Unit. Brief Note: Sub: - An application for obtaining Environment Clearance for New Unit. We M/s. Nemi Chem Industries Unit-2 are planning to manufacturing activity following products at Plot 1, Survey 316,

More information

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged

More information

Proposed Project for Manufacturing of Pigments

Proposed Project for Manufacturing of Pigments PREFEASIBILITY STUDY REPORT Of Proposed Project for Manufacturing of Pigments of M/s. Nirva Pigments Located at PLOT NO. DP-10, Saykha industrial Estate Ta: Vagra, Dist.: Bharuch P a g e 1 27 Contents

More information

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us

More information

(MT/Month) Total Consumption MT/Month

(MT/Month) Total Consumption MT/Month 1. INTRODUCTION M/s. Ambic Organic proposed to manufacture Aluminum Phosphide technical, Zinc Phosphide technical and its formulation at Survey No. 717/4, at Post: Kathlal, Taluka: Kathlal, Dist: Kheda.

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

Format for Appraisal-New:5

Format for Appraisal-New:5 SEAC Gujarat: Pageof5 Format for Appraisal-New:5. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot no./survey no., Landmark etc. ) M/S. DHARMANANDAN FINE

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar

To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar March 18, 2019 BY HAND DELIVERY/RPAD To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar 382 010 SUB.: APPLICATION FOR SUBMISSION OF ESSENTIAL DETAIL SOUGHT

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT ON PROPOSED PROJECT OF MANUFACTURING OF ORGANIC CHEMICALS OF AARTI INDUSTRIES LIMITED (UNIT-II) LOCATED AT Plot Z/103/D, Dahej SEZ-II, Dahej, Bharuch-392110 1.0 EXECUTIVE SUMMARY

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ASTRICA LABORATORIES PRIVATE LIMITED SY. NO. Part of 46,50,51,52,53, 54,55&56, ANANTHSAGAR VILLAGE, CHEGUNTA MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT ASTRICA LABORATORIES PRIVATE LIMITED

More information

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION Page 1 of 8 Environmental Statement for Clinker Grinding Unit of M/s Bihar Cement Plant (A Unit of Shree Cement Ltd.), situated at Jasoia Mor, BIADA, Industrial Growth Centre, Aurangabad, Tehsil & Dist.

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

COMPLIANCE STATUS REPORT

COMPLIANCE STATUS REPORT COMPLIANCE STATUS REPORT Sona Alloys Pvt. Ltd. Additional Director (IA) Ministry of Environment & Forests, Paryavaran Bhavan, CGO Complex, Lodhi Road, New Delhi 11003 Date: 08.02.2014 Sub: Compliance Status

More information

PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT

PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT Shri Dudhganga Vedganga Sahakari Sakhar Karkhana Limited, (SDVSSKL) located at Bidri (Mouninagar), Tal.: Kagal, Dist.: Kolhapur,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR Conversion of Existing Product Storage Tanks TK-16(HSD) of 6000 KL to MS and TK-6(MS) of 1000 KL to Ethanol AT HPCL Bulk POL Depot, Mansa Road, Phoos Mandi, Bhatinda-151001.

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT 01-07-2018/R3 PRE-FEASIBILITY REPORT FOR EXPANSION OF STEEL MANUFACTURING UNIT BY REPLACING EXISTING INDUCTION FURNACE CAPACITY Steel Billets/ Ingots- 28,800 TPA to 75,240 TPA By M/S TRISHALA ALLOYS PVT.

More information

Product Profile. Quantity in MT/Month CAS Solvent Dark Violet R Solvent Black

Product Profile. Quantity in MT/Month CAS Solvent Dark Violet R Solvent Black Annexure - A Product Profile Sr. No. Product Name Quantity in MT/Month CAS Existing Proposed Ultimate Number End Users 1 Acid Dyes 5.000-5.000 0.000 -- -- Solvent Yellow 82 12227-67-7 Solvent Dark Violet

More information

BALAJI AMINES LIMITED

BALAJI AMINES LIMITED FOR EXPANSION OF EXISTING SYNTHETIC ORGANIC CHEMICALS MANUFACTURING UNIT BALAJI AMINES LIMITED At Plot No: 4 & 5, Beside Sub-Station-II, I.D.A, Bollaram, Jinnaram (M), Medak District, Telangana State -

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT ON PROPOSED PROJECT OF MANUFACTURING OF ORGANIC CHEMICALS OF AARTI INDUSTRIES LIMITED (UNIT-V) LOCATED AT Plot 41/1, GIDC Estate, Jhagadia, Bharuch-393110 1.0 EXECUTIVE SUMMARY M/s.

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

ADDITIONAL ATTACHMENT LIST OF ANNEXURE

ADDITIONAL ATTACHMENT LIST OF ANNEXURE ANNEXURE ADDITIONAL ATTACHMENT LIST OF ANNEXURE TITLE I. Copy of Environment Clearance (EC) of unit for distillery II. III. IV. Valid consent Copy (CTO/CC&A) Details of Production & Raw Material Consumption

More information

Quantity as per CCA in MT/Month

Quantity as per CCA in MT/Month EXECUTIVE SUMMARY M/s. A-One Chemicalis engage for manufacturing of Dyes and Dye-Intermediatesat Plot No.A- 1/ 4701 & 202/B, Ankleshwar, Bharuch, Gujarat. As per EIA notification 2006 and its amendment,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For NEW MANUFCTURING PLANT Of BHIMANI DYE CHEM INDUSTRIES Plot No. 2, Survey No. 316, At: Dhanot, Ta: Kalol, Dist: Gandhinagar, Gujarat. CONTENTS Sr.No. Description 1. Executive

More information

Annexure-I List of Products

Annexure-I List of Products Annexure-I List of Products Sr. No. Name of Products Quantity (MT/Month) 1. Mono Chloro Acetic Acid (MCA) 300 2. Chloro Acetyl Chloride (CAC) 150 3. Tri Chloro Acetyl Chloride (TCAC) 150 4. Aluminum Chloroide

More information

The Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT

The Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT ABOUT PROJECT The Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In earlier project planning the total plot area

More information

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013. STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY & 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007-IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT Shivneri Sugars Ltd., A/p. - Ganesh tekadi, Nhavi (Bk.), Tal.: Koregaon, Dist.: Satara, Maharashtra State was registered vide

More information

M/S. HETERO INFRASTRUCTURE SEZ LIMITED

M/S. HETERO INFRASTRUCTURE SEZ LIMITED ENVIRONMENTAL STATEMENT (FORM - V) FOR THE FINANCIAL YEAR ENDING MARCH-2016. M/S. HETERO INFRASTRUCTURE SEZ LIMITED N.NARASAPURAM(V),NAKKAPALLI(M) VISAKHAPATNAM DISTRICT. SUBMITTED TO : ANDHRA PRADESH

More information

Date: M/S Desh Bhakt Ratnappa Kumbhar Panchaganga SSK Ltd, Inchalkaranji, Kolhapur.

Date: M/S Desh Bhakt Ratnappa Kumbhar Panchaganga SSK Ltd, Inchalkaranji, Kolhapur. Date: 04.06.2018 M/S Desh Bhakt Ratnappa Kumbhar Panchaganga SSK Ltd, Inchalkaraji, Kolhapur. Compliance to the Environmental Clearance for Co-generation Plant 30 MW. Ref: SEAC 2009/CR16/TC2, Dated: 18

More information

FORM-1. for. M/s. SHREE CHEMOPHARMA. ANKLESHWAR PVT. LTD. (Unit-1) Plot No. 313/13 & 313/14, GIDC Estate, Ankleshwar , Dist: Bharuch, Gujarat

FORM-1. for. M/s. SHREE CHEMOPHARMA. ANKLESHWAR PVT. LTD. (Unit-1) Plot No. 313/13 & 313/14, GIDC Estate, Ankleshwar , Dist: Bharuch, Gujarat FORM-1 for PROPOSED EXPANSION FOR PESTICIDE INTERMEDIATES AND SPECIALITY CHEMICALS IN EXISTING UNIT of M/s. SHREE CHEMOPHARMA ANKLESHWAR PVT. LTD. (Unit-1) Plot No. 313/13 & 313/14, GIDC Estate, Ankleshwar-393002,

More information

Mars Power & Steel Ltd.

Mars Power & Steel Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Mars Power & Steel Ltd. Village : Baihamura Tehsil : Ghargoda District : Raigarh Submitted to: Page 1 CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Executive

More information