FORM 1 Riverbed Sand Mining Project
|
|
- Oscar Nelson
- 5 years ago
- Views:
Transcription
1 FORM 1 Riverbed Sand Mining Project At Gata. 117ध, 1306म ( Kuda River) Village: Gujarauliya, Beltikar, Tehsil: Naugarh, District: Siddharthnagar, Submitted by M/s Baburam Construction Address-1769 B-5 Gayatri Mandir Kisan Compound Pikaura, Shiv gulam Gandhi nagar Basti Proprietor Shri Srichandra Chaudhary S/o Sh.Matibar Chaudhary An ISO 9001:2015 Certified Organization QCI-NABET Accredited Organization, Certificate. NABET/ EIA/ 1619/IA eraenvcle@gmail.com Phone : , ,
2 Form 1 Basic Information. Item Details 1. Name of the Project Mining of Minor Mineral (Sand) 2.. in the Schedule 1(a) i 3. Project Proprietor Name/ Authorized Signatory/ Father Name/ Address Proposed Capacity/Area/Length/Tonnage to be handled / command and area/lease area/number of wells to be drilled. 4. New / Expansion / Modernization New 5. Existing Capacity / Area etc. 6. Category of Project i.e., A or B B2 Shri Srichandra Chaudhary S/o Shri Matibar Chaudhary. Address-1769, B-5 Gayatri Mandir Kisan Compound Pikaura, Shiv gulam Gandhi nagar Basti, (U.P.) Proposed Capacity in LOI : 1,42,000 m 3 / year Area: 7.89 Ha Project Duration: Five years Existing or Mineable Capacity: 48,400 m 3 / year Depth- 1.0 m Ground water table is 2-5 m bgl ( CGWB -2013) Mineable Area 4.84 Ha Forested Area NIL n-forested land 7.89 Ha Does it attract the general condition? If yes, please specify Does it attract the specific condition? If yes, please specify Location Plot / Survey / Khasra. Village Tehsil District State Nearest railway station / airport along with distance in kms. Nearest Town, City, District Headquarter along with distance in Kms. Gujarauliya, Beltikar /Naugarh/ Siddharthnagar/ Uttar pradesh Gata. 117ध, 1306म Gujarauliya, Beltikar Naugarh Siddharthnagar Uttar Pradesh Naugarh Railway Station is located 11.5 km from the site Nearest Town: Naugarh is located 11.5 km in South-West direction District Headquarter: Naugarh is located 11.5 km in South-West direction from the site Page 2
3 12. Village Panchayat, ZillaParishad, Municipal Corporation, Local Body (Complete address with telephone no. to be given) 13. Name of the applicant (Lessee) 14. Registered Address Address for Correspondence Name Designation Address Details of alternative sites examined, if any. Location of these sites should be shown on a toposheet. 17. Interlinked Project 18. Whether separate application of interlinked project has been submitted? Gram Panchayat: Gujarauliya, Zilla Panchayat: Siddharthnagar Municipal Corporation: t in Purview M/s Baburam Construction 1769 B-5 Gayatri Mandir Society: Kisan Compound Pikaura, Shiv gulam Gandhi nagar Tehsil: Basti District: State: Basti Uttar Pradesh Shri Srichandra Chaudhary Proprietor 1769 B-5 Gayatri Mandir Kisan Compound Society: Pikaura, Shiv gulam Gandhi nagar Tehsil: Basti District: State: Basti Uttar Pradesh Pin Code: Telephone. Fax. ne t Applicable 19. If yes, mention the date of Submission t Applicable 20. If no. specify the reason t Applicable 21. Whether the proposal involves approval / clearance from other departments: If yes, NA details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980 (b) The Wildlife (Protection) Act, (c) The C. R. Z. tification, ne ne ne 22. Whether there is any Government Order / Policy relevant / relating to the site? vide letter no. 630(1) / खनन सह यक / द न क 01/ May/ 2018 Page 3
4 Whether forest land involved? If yes (Specify the area in hectares) Whether there is any litigation pending against the project and / or land in which the project is proposed to be set up? (a) Name of the Court (b) Case. (c) Order(s) / directions of the Court, if any and its relevance with the proposed project. t Applicable Litigation is pending or exist as off today against the project site or land Activity 1.0 Construction, Operation or decommissioning of the project involving actions, which will cause physical changes in the locality (topography, land use, change in water bodies, etc.). Yes/ Details Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Clearance of existing land, vegetation and buildings? Proposed sand mining site is rugged and non-forested and non-arable land which is currently not in use. After the commissioning of the project, opencast, manual/semimechanized mine with the help of conventional hand tools sand mining will be executedin a careful manner to avoid any violation of the recommendations of MoEF. The topography of the site will remain unaffected. t Applicable 1.3 Creation of new land uses? t Applicable 1.4 Pre-construction investigations e.g., bore houses, soil testing? t Applicable 1.5 Construction works? t Applicable 1.6 Demolition works? t Applicable 1.7 Temporary sites used for construction works or housing of construction workers? Yes Temporary shed on the site will be provided for the workers Page 4
5 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations. Underground works including mining or tunneling? 1.10 Reclamation works? Yes t Applicable Open cast, manual/semi-mechanized mine. Sand shall be exploited with help of conventional hand tools. Sand mining will be done. The Sand mining is required to avoid the deposition which otherwise pose flooding threat to the nearby areas especially during rainy season Dredging? t Applicable 1.12 Offshore structures? t Applicable Production and manufacturing processes? Facilities for storage of goods or materials? Facilities for treatment or disposal of solid waste or liquid effluents? The project does not involve any production or manufacturing process. t Applicable or very little solid waste will be generated depending upon the man power, since the entire work. The Environmental Management Plan is proposed Facilities for long term housing of operational workers? Laborers from nearby areas will be hired hence no need of housing New road rail or sea traffic during construction or operation? Approach road already exists. (Kachha road about 450 m) New road, rail, air, waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc.? Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? New or diverted transmission lines or pipelines? Impoundment, damming, culverting, realignment or other changes to the hydrology of water courses or aquifers? t required for the proposed project The project shall not affect the existing traffic status. t Applicable t Applicable 1.22 Stream crossings? stream is crossing through the site. Page 5
6 1.23 Abstraction or transfers of water form ground or surface waters? Water for drinking purpose shall be brought from nearby places Changes in water bodies or the land surface affecting drainage or run-off? Transport of personnel or materials for construction, operation or decommissioning? Long-term dismantling or decommissioning or restoration works? Ongoing activity during decommissioning which could have an impact on the environment? Influx of people to an area in either temporarily or permanently? Yes The mining site will not affect natural drainage. The extracted sand will be transported by roads. Responsibility of laborers employed at site will rest with the proponent only. - - Few people from nearby locality will be temporarily employed Introduction of alien species? Loss of native species or genetic diversity? Rugged land, non-forested and nonarable hence no concern lies for biodiversity loss Any other actions? t even anticipated. 2.0 Use of Natural Resources for construction or operation of the project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):. Yes/ 2.1 Land especially undeveloped or agricultural land (ha) Land is rugged and non-arable and currently not in use. (Area: 7.89 Ha) 2.2 Water (expected source & competing users unit: KLD) Dust suppression: Irrigation: Drinking: 5.50 KLD 0.80 KLD 0.63 KLD Total: 6.93 KLD 2.3 Minerals (MT) Yes Minor Mineral (Sand) 2,13,00 TPA 2.4 Construction material stone, aggregates, sand / soil (expected source MT) -- Page 6
7 2.5 Forests and timber (Source MT) t Applicable Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) Any other natural resources (use appropriate standard units) t Applicable t Applicable 3.0 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) Changes in occurrence of disease or affect disease vectors (e.g., insect or water borne diseases) Yes/ t Applicable such impacts are anticipated 3.3 Affect the welfare of people e.g., by changing living conditions? Yes Short termed employment will be available to the local people 3.4 Vulnerable groups of people who could be affected by the project e.g., hospital patients, children, the elderly etc. any vulnerable group of people will be affected by the project. 3.5 Any other causes t Anticipated 4.0 Production of solid wastes during construction or operation or decommissioning (MT/months). Yes/ 4.1 Spoil, overburden or mine wastes 4.2 Municipal waste (domestic and or commercial wastes) Progressive mine closure plan is proposed. Since no temporary or permanent residence facility will be provided and 8 hrs. working does not anticipate any significant generation Page 7
8 of Municipal Waste on the sand mining site. 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) t Applicable 4.4 Other industrial process wastes t Applicable 4.5 Surplus product t Applicable 4.6 Sewage sludge or other sludge from effluent treatment t Applicable 4.7 Construction or demolition wastes t Applicable 4.8 Redundant machinery or equipment t Applicable 4.9 Contaminated soils or other materials t Applicable 4.10 Agricultural wastes t Applicable 4.11 Other solid wastes t Anticipated 5.0 Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr). 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes/ Yes 5.2 Emissions from production processes Yes There are only mobile sources of fossil fuel consumption i.e., in tippers and water tankers. Since maintained vehicles will be used and continuous maintenance of the vehicles is being ensured by the proponent however; the emission of obnoxious gasses cannot be ruled out completely. To control such emissions to the threshold limits proper green belt designing has been planned around the mining site and around the haulage roads. Particulate matter (Fugitive dust emission) will arise as a result of mining process further; it is being ensured that water sprinkling will be used as dust suppressor. Page 8
9 5.3 Emissions from materials handling including storage or transport Yes Trucks and trolleys will be used for transporting extracted sand covered with tarpaulin to minimize the fugitive dust emission. 5.4 Emissions from construction activities including plant and equipment t Applicable 5.5 Dust or odors from handling of materials including construction materials, sewage and waste t Applicable 5.6 Emissions from incineration of waste t Applicable 5.7 Emissions from burning of waste in open air (e.g., slash materials, construction debris) t Applicable 5.8 Emissions from any other sources t Applicable 6.0 Generation of ise and Vibration and Emissions of Light and Heat. Yes/ 6.1 From operation of equipment e.g., engines, ventilation plant, crushers t Applicable 6.2 From industrial or similar processes t Applicable 6.3 From construction or demolition t Applicable 6.4 From blasting or piling 6.5 From construction or operational traffic Yes blasting or piling will be used in the current sand mining project site. t Applicable 6.6 From lighting or cooling systems t Applicable 6.7 From any other sources t Applicable 7.0 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:. 7.1 From handling, storage, use or spillage of hazardous materials Yes/ t Applicable Page 9
10 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) t Applicable 7.3 By deposition of pollutants emitted to air into the land or into water t Applicable 7.4 From any other sources t Applicable 7.5 Is there a risk of long term buildup of pollutants in the environment from these sources? t Applicable 8.0 Risk of accidents during construction or operation of the project, which could affect human health or the environment. 8.1 From explosions, spillage, fires etc. from storage, handling, use or production of hazardous substances Yes/ t Applicable 8.2 From any other causes t Applicable 8.3 Could the project be affected by natural disasters causing environmental damage (e.g., floods, earthquakes, landslides, cloudburst etc.)? Mining site is in safe zone and no likely environmental damage is anticipated because of any natural disaster. 9.0 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality Leads to development of supporting utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment etc.) Yes/ t Anticipated Total of 53 man power working 8 hrs. on daily basis will require two temporary toilets and two temporary shelters. permanent development of any supporting infrastructure is proposed. Page 10
11 9.2 Housing development t Applicable Extractive industries t Applicable Supply industries t Applicable Other t Applicable Lead to after-use of the site, which could have an impact on the t Anticipated environment. 9.3 Set a precedent for later development 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects. any other project is existing in the near area Environmental Sensitivity. Area Name/Identity Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value. Areas which are important or sensitive for ecological reasons Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests. Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration. Inland, coastal, marine or underground waters. Aerial distance (within 15 km.) Proposed project location boundary - Kuda River 5. State, National boundaries. 6. Routes or facilities used by the public Flowing towards East direction of the site ne ne At km towards north direction NH-233/ SH-5 at 8.65km towards West direction 7. Defense installations t Applicable 8. Densely populated or built-up area Naugarh 11.5 km in South-West direction Page 11
12 Areas occupied by sensitive manmade land uses (hospitals, schools, places of worship, community facilities). Areas containing important, high quality or scare resources. (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded) Areas susceptible to natural hazard which could cause the project to present environmental problems. (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) Hospital Education Facility Places of Worship Community Facilities PHC at Naugarh, 11.5 Km towards South-West direction Primary School: at Naugarh, 11.5 Km towards South-West direction Temple at 3.60km towards West direction ne 2-5 m bgl ground water table is located in the mining lease area partially recharged by River Kuda in flowing through the region. any other mineral except sand/morrum is available in near 10 kms range. The mining area does not fall in any tourist or any pilgrimage site. ne The area under study falls in Zone-IV i.e. High intensity zone according to the Indian Standard Seismic Zoning. (IV) Proposed Terms of Reference for EIA studies t applicable Page 12
13 UNDERTAKING I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost. Date Place- te: Signature of Applicant SriChandra Chaudhary (Authorized Signatory) Resident of: Society: 1769 B-5 Gayatri Mandir Kisan Compound Pikaura, Shiv gulam Gandhi nagar Basti Tehsil: Basti District: Basti State: Uttar Pradesh 1. The projects involving clearance under coastal Regulation zone tification, 1991 shall submit with the application a C.R.Z map duly demarcated by one of the authorized agencies, showing the project activities, w.r.t. C.R.Z (at the stage of TOR) and the recommendations of the State coastal zone Management Authority (at the stage of EC). Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the C.R.Z. tification, 1991 for the activities to be located in the CRZ. 2. The projects to be located within 10 km of the National parks, sanctuaries, Biosphere Reserves, Migratory corridors of wild Animals, the project proponent shall submit the map duly authenticated by chief wildlife Warden showing these features vis-a-vis the project location and the recommendations or comments of the Chief Wildlife Warden thereon (at the stage of EC). 3. All correspondence with the Ministry of Environment & Forests including submission of application for TOR/Environmental Clearance, subsequent clarifications, as may be required from time to time, participation in the EAC Meeting on behalf of the project proponent shall be made by the authorized signatory only. The authorized signatory should also submit a document in support of his claim of being an authorized signatory for the specific project. Page 13
FORM 1 Riverbed Sand/Morrum / Mining Project
FORM 1 Riverbed Sand/Morrum / Mining Project At Khand. 19/3 (River Betwa) Village: Tikapur, Tehsil: Maudaha District:Hamirpur, Uttar Pradesh Submitted by Suresh Chandra Gupta S/o Narayan Das Gupta R/o-60
More informationAPPENDIX I. (See paragraph-6) FORM 1
(I) Serial Number Basic Information Item APPENDIX I (See paragraph-6) FORM 1 Details 1. Name of the project/s Soapstone Mining (ML. 15/95) 2. S.. in the schedule B1- Mining of Mineral 3. Proposed capacity/area/length/tonnage
More informationFORM 1 Riverbed Sand Mining Project
FORM 1 Riverbed Sand Mining Project At Gata. 1255 क Village: Bara Tehsil: Sewrai, District: Ghazipur, Uttar Pradesh. Submitted by M/s Vatsya Infrastructure Private Limited,Lucknow Sh. Rajeev Kumar Pandey
More informationAPPENDIX I. (See paragraph-6) FORM 1
(I) Serial Number Basic Information Item APPENDIX I (See paragraph-6) FORM 1 Details 1. Name of the project/s Soapstone, Red Ocher and China Clay (ML. 81/82) 2. S.. in the schedule 1 (a) - Mining of Mineral
More informationAnnex F Scoping Checklist
Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve
More informationAPPENDIX I (See paragraph 6) FORM 1
APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information: S.. Item Details 1 Name of the project/s: M/s. Sri Lakshmi Enterprises 2 S.. in the schedule 1 (a) 3. Proposed capacity/area/length/tonnage to
More informationFORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY. Asst.Director of Mines and Geology, Rajamahendravaram
FORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY Asst.Director of Mines and Geology, Rajamahendravaram Ordinary Sand Land Details : Govt Land Extent : 3.9634 Ha. VILLAGE
More informationFORM 1 BASIC INFORMATION S.NO.
FORM 1 BASIC INFORMATION S.NO. Item Details 1 Name of the Project M/s AVA Stones (P) Ltd, Director: Sri.Bimal Kumar Agarwal Colour Granite Mine. 2 S.. in the schedule 1(a) 3 Proposed capacity/ area/ length/
More informationFORM-I. 13. Name of Applicant District Collector Nasik 14. Registered Address Address : Collector Office, Nasik
FORM-I (I) Basic Information Item Details. 1. Name of the Project Proposal for Sand Quarry in Kas Village, Taluka Trimbakeshwar, District Nasik, State Maharashtra over an area of 1.5400 Ha at Damanganga
More informationA 'N 'E B 'N 'E C 'N 'E D 'N 'E
Gata. 12, Gata. 164, 352 & 1295/5 Basic Information FORM- 1 S.. Item Details 1. Name of the project/s Sand/Moram Mining 2. S.. in the schedule 1(a)i 3. Proposed capacity/area/length/tonnage to be handled
More informationAPPENDIX - I (See paragraph 6) FORM 1
APPENDIX - I (See paragraph 6) FORM 1 (I) Basic Information Item Details 1 Name of the project/s M/S Jashnani Constructions Pvt. Ltd. Proposed residential building project at Shahapur, Thane 2 S.. in the
More informationAPPENDIX I. (See paragraph 6) FORM 1
APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information Name of the Project Size of the project (in terms of total area) CRZ classification of the area Expected cost of the project Contact Information
More informationAPPENDIX I (See paragraph 6) FORM 1
APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. No Item Details 1 Name of the Project/s Sri A. Narasimulu 2 S. No in the Schedule 1(a) 3 Proposed capacity/area/length/tonnage to be handled/command
More informationApplication Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &
Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment tification dtd 14-09-2006 & 01-12-09 To be submitted By SHRI SANJAY SINGH S/O SHRI MAHENDRA SINGH RATHORE To Madhya
More informationAPPENDIX I (See paragraph - 6) FORM 1
APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information S. Item Details 1 Name of the project Sarpanch, Gram Panchayat chando chando Sand Mine 2 S.. in schedule Category B, Project or Activity 1(a)
More informationForm -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds-
Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for Form -1 [Vide tification dated 1 st December 2009] FOR PROPOSED COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI
More informationFORM-I for seeking clearance for project attracting CRZ notification
AnnexureIV FORM-I for seeking clearance for project attracting CRZ notification Basic information: SEA CLIFF RESORTS TOURISM PROJECT (.1682/A3/15/KCZMA/S&TD) Name of the Project: THE SEACLIFF Location
More informationM/s. Karthika Mines & Minerals Pvt.Ltd.-Colour Granite Quarry Ha. FORM - I
FORM - I (I) Basic Information S.. Item Details 1 Name of the project/s M/s.Karthika Mines & Minerals Pvt.Ltd. Colour Granite Quarry, 10.00 Ha. 2 S.. in the schedule 1 (B) 3 Proposed capacity Area-10.00
More informationMolvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No
Serial Number FORM 1 (Application for Environment Clearance Certificate) Item 1. Name of the project/s 2. S. No. in the schedule 3. Proposed capacity/ area/ length/ tonnage to be handled/ command area/lease
More informationAppendix I. Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN
Appendix I Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN AREA: 1.0 HECT (NON FOREST LAND) ML 219/1997 PRODUCTION CAPACITY: 50,000 TPA
More informationFORM 1 & 1 A. Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT. Palladium Grand II, S. No. 17/1A/2, Dhanori, Pune, Maharashtra
FORM 1 & 1 A Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT At Palladium Grand II, S. 17/1A/2, Dhanori, Pune, Maharashtra By M/s. Raojee Constructions FORM 1 Palladium Grand II RESIDENTIAL & COMMERCIAL
More informationFORM I TERMS OF REFERENCE. For. QUARRY OF ROAD METAL (6.265 Ha) Sri K Kasi Raju. PROP: K.Kasi Raju
FORM I TERMS OF REFERENCE For QUARRY OF ROAD METAL (6.265 Ha) Of Sri K Kasi Raju PROP: K.Kasi Raju Extent: 6.265 Ha of Budawada (V), Chimskurthy (M), Prakasam (Dt), Andhra Pradesh (I) BASIC INFORMATION
More informationAPPENDIX- I FORM- 1. (I) Basic Information:
(I) Basic Information: APPENDIX- I FORM- 1 Item Details 1. Name of Project Sand Stone Mining Project, M.L..-08/1987, Area 150.926 Ha., located n/v -Gubrenda, Tehsil -Karauli, District Karauli, (Rajasthan)
More informationFORM 1. APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006
FORM 1 APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006 (I) Basic Information: S. Item Details 1. Name of the Project/s : Expansion
More informationAPPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance)
(I) Basic Information APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance) Name of the Project: KRUTI ONELLA Sahyog Rekha Infraproject LLP Location / site alternatives Survey no.
More informationFORM 1. Basic Information Sr. No. 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD.
FORM 1 Basic Information Item Details 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD. located at Survey : 64 ne Lagu, Sabarmati Nadi Patt Village:
More informationProject: Bhidauni Khadar Ordinary Sand Mining Project on Yamuna River FORM 1 Applicant: M/s Satyug Foods Pvt. Ltd. FORM- I
FORM- I Page 0 of 14 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s Bhidauni Khadar Ordinary Sand Mining Project 2. S.. in the schedule 1(a) mining
More informationSand, Stone & Bajri Mining Project Applicant: Shri Ashish Kumar, M/s Ashish Stone Crusher. Form-1 FORM-1 SRUSHTI SEWA, NAGPUR 1
FORM-1 SRUSHTI SEWA, NAGPUR 1 FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s Sand, Stone and Bajri Mining Project 2. Serial. in the schedule 1(a) Mining of Mineral 3. Proposed capacity
More information(I) Basic Information:
(I) Basic Information: Item Details 1 Name of the project Proposed River Bed Ordinary Sand Mining At River Sharda, Village- Mudi, Gata - 443, Tehsil- Dhaurahra, District-Khiri, State-Uttar Pradesh. (Leased
More informationSri.T.N.Balasubramanya
Sri.T.N.Balasubramanya (Earlier: M/s.Global Golden Rocks) Extent: 5 Ha Colour Granite Quarry Sy.No.65 of Lattigam Village, Nandigam Mandal, Srikalulam District, Andhra Pradesh UPDATED FORM-I FORM 1 (As
More informationFORM min Village. Chowgund, Tehsil. Doru District. Anantnag State
Khasra.- 1273-min, Area: 4.459 Ha, Basic Information FORM- 1 S.. Item Details 1. Name of the project/s Limestone Mine 2. S.. in the schedule 1(a)i 3. Proposed capacity/area/length/tonnage to be/ handled
More informationApplication for Prior Environmental Clearance (EC)
Application for Prior Environmental Clearance (EC) (See Paragraph 6 tification dated14 th September 2006) as amended to EIA tification, 2006 issued vide S.O. 3067(E) on dt.01.12.2009. Basic Information
More informationFORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))
FORM 1 (As per new tification of MoEF dated 01-12-2009 vide S.O 3067 (E)) (I) BASIC INFORMATION S.. Item Details 1. Name of the project/s M/s. S.L.N.S. Granites Mining of Colour Granite 4.90 Ha 2. S..
More informationNo 1 Name of the Project/s M/s. Velchal Laterite Mine 2 S. No in the Schedule 1(a)
APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. Item Details No 1 Name of the Project/s 2 S. No in the Schedule 1(a) 3 Proposed capacity/area/length/tonnage to Mine lease area is 8.91 Ha,
More informationHaridarshan Residency ( Row Type House & School Building )
Survey.. 18, Moje: : Shekhpur, Tal: Kamrej, Dist.: Surat, Gujarat 394 130 FORM 1 AND BASIC INFORMATION FOR OBTAINING ENVIRONMENTAL CLEARANCE FOR NEW PROJECT OF Haridarshan Residency Block. 18, Village:
More informationREPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR
REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR Near Village Tehsil District State Capacity Lease Area Category of Project Project Cost KANTBARA BIJOLIYA Bhilwara Rajasthan 36561 TPA of
More informationUPDATED FORM I. SUBMISSION To Ministry of Environment & Forests & Climate Change, New Delhi. Prepared by. M/s. VIJAYNAGAR SUGAR PVT. LTD.
Annexure - III UPDATED FORM I For Amendment to Environmental Clearance (Environmental Clearance issued by MOEF vide. F.. J-11011/366/2007-IA-II (I) Dated, 15.04.2008.) SUBMISSION To Ministry of Environment
More informationAPPENDIX I (See paragraph 6) Form 1 (I) Basic Information
APPENDIX I (See paragraph 6) Form 1 (I) Basic Information Sr.. Item Details 1 Name of the Project/s Proposed expansion in Environment Clearance for Residential and Commercial project by Manikchand Kumar
More informationFOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR
FOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR MANUFACTURING MAN MADE FIBER (PARTIALLY ORIENTED YARN (POY), FULLY DRAWN YARM (FDY), TEXUTURISED YARN, TWISTED YARN - OTHER THAN RAYON THROUGH
More informationSubmitted To State Expert Appraisal Committee (SEAC), State Environmental Impact Assessment Authority, Andhra Pradesh.
Application for Prior Environmental Clearance (Form 1) For Proposed Colour Granite Mine over an Extent of 3.000 Hectares, in Sy. : 143 of Bharthupuram village, Nandigam Mandal, Srikakulam District, Andhra
More informationUPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana)
UPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana) Venkateswara Mines & Minerals (Earlier: Sri Bode Vijayasen Reddy), Kannaraopet Village, Nallabelli Mandal, JayashankarBhupalpally
More informationFORM-1. PROJECT: Sati & Garhi Sand Ghat,Ulai River (Area-22 Ha), Dist:-Jamui. APPLICANT: M/s Westlink Trading Pvt. Ltd. FORM- I.
FORM- I Page 0 of 15 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s Sati & Garhi Sand Ghat on Ulai River of District- Jamui. 2. S.. in the schedule
More informationProposed Ordinary Sand Mining Project at Gata No.- 8Ka/195, Village- Ratauli, Tehsil- Laharpur, District- Sitapur, U.P. FORM 1
Proposed Ordinary Sand Mining Project at Gata.- 8Ka/195, Village- Ratauli, (I) Basic Information: Sl. Item Details. 1 Name of the project Proposed Ordinary Sand Mining Project in Sharda River at Gata.-
More informationAPPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE
APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (AI) (viii) (ix) (x) Basic Information Name of the Mining Lease
More informationFORM 1. 8 Does it attract the specific condition? It yes, No Please specify 9 Location At Village Akurli, Akurli Road, Kandivali(E), Mumbai
FORM 1 (I) Basic Information Sr. Item Details. 1 Name of the Project WHITE CITY METAL 2 S.. in the Schedule 8 (b) 3 Proposed capacity/area /length/tonnage to Plot area: 45,800.00 sq.mt. be handled/command
More informationFORM 1. No condition? If yes, please specify. 8. Does it attract the specific. No condition? If yes, please specify. 9. Location Geo Coordinates
FORM 1 (I) Basic Information Sl.. Item Details 1. Name of the project/s 9.890 ha. of Proposed Colour Granite Mine of Sri S. Senthil Kumar 2. S.. in the schedule Item- 1(a) (Mining of Minerals) 3. Proposed
More informationUPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE. Sri Fakir Rohidas
UPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE At: Brahmanipali, Dustrict: Sambalpur, Odisha Sri Fakir Rohidas Prepared By Centre for Envotech and Management Consultancy Pvt. Ltd. Bhubaneswar
More informationProposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S. No. in the schedule 8(a)
FORM I (I) Basic Information S.. Item Details 1. Name of the project Proposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S.. in the schedule 8(a) 3. Proposed capacity/area/length/tonnage
More informationAPPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE
APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (II) (viii) (ix) (x) Basic Information Name of the Mining Lease
More informationSl. No. 1. Name of the Project/s : Chudeshwar Gravel Deposit (Narmada River) 2. Sl. No. of the Schedule : Category B-2 of Activity 1(A)
Form-I (APPENDIX-, PARAGRAPH-6) I. BASIC INFORMATION. Item Details. Name of the Project/s : Chudeshwar Gravel Deposit (Narmada River) 2.. of the Schedule : Category B-2 of Activity (A) 3. Proposed capacity
More informationAPPENDIX I (See paragraph 6) FORM 1
APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project Limestone Mine 2. S.. in the schedule S.. 1(a) mining of mineral is 3. Proposed capacity/area/length/tonnage
More informationM/S Overseas Min Tech Consultants, Jaipur 1
(I) Basic Information: APPENDIX I (See paragraph 6) FORM 1 S.. Item Details 1. Name of Project Proposed Soapstone Mining Project, Khasra 60, 61, 63, Area: 11.1830Hect., Production: 17508 TPA, Near Village:
More informationFORM 1. /area/length/tonnage. No condition? If yes, please specify. 8. Does it attract the specific
FORM 1 (I) Basic Information Sl.. Item Details 1. Name of the project/s 6.490 ha. of Proposed Colour Granite Mine of M/s. Alief Exports 2. S.. in the schedule Item- 1(a) (Mining of Minerals) 3. Proposed
More informationDetails required for submitting Fresh EC Application. (Category B2 Projects: Mining of Minor Minerals)
Details required for submitting Fresh EC Application (Category B2 Projects: Mining of Minor Minerals) 1. Project Sector (Non-Coal Mining) 2. Project Type (New, Expansion, Modernization) If Project Type
More informationFORM 1. Gownivaripalli Village, Tehsil. Gorantla Mandal, District. Anantapur District, State
FORM 1 (I) Basic Information Sl.. Item Details 1. Name of the project/s M/s. Squadm Mines & Minerals Pvt. Ltd - Road Metal & Building Stone 2. S.. in the schedule Item- 1(a) (Mining of Minerals) 3. Proposed
More information(Residential cum Commercial Project) APPENDIX I (See paragraph 6) FORM 1. Plot area: 37,039 m 2 Built up area: 1,11, m 2
(I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item 1 Name of the Project 2 S. number in schedule 8(a) 3 Proposed capacity/area/length/tonnage to be handled/command area/lease area/number
More informationApplication Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &
Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd 14-09-2006 & 01-12-09 To be submitted By Project Proponent To Madhya Pradesh State Environmental
More informationAppendix I. Form 1 BASIC INFORMATION MASONARY STONE MINING PROJECT VILLAGE KOLIYA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN
Appendix I Form 1 BASIC INFORMATION MASONARY STONE MINING PROJECT VILLAGE KOLIYA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN AREA: 1.0 HECT (NON FOREST LAND) ML: 27/1990 ( R ) 53/2009 PROPOSED PRODUCTION
More informationApplication Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA), Tamil Nadu
Form 1 as per EIA tification 2006 for Chockampatti Earth Quarry of Thiru.T.Poosai Durai, Chockampatti Village, Kadayanallur Taluk, Tirunelveli District, Tamil Nadu State. Application Form for Obtaining
More informationFORM 1 BASREHI SAND DEPOSIT ON BETWA RIVER
VILLAGE TEHSIL DISTRICT STATE FORM 1 BASREHI SAND DEPOSIT ON BETWA RIVER PRODUCTION CAPACITY PROJECT COST AREA BASREHI KALPI PLOT NO. / ZONE NO. 596 JALAUN UTTAR PRADESH 2,42,910 M 3 / YEAR 1.0 CRORE 16.194
More informationAPPENDIX I (See paragraph - 6) FORM 1
(I) Basic Information APPENDIX I (See paragraph - 6) FORM 1 SN Contents 1 Name of Project : Mining of Soapstone at Village-Kimoli, Tehsil & Dist -Bageshwar, Uttarakhand with an area 4.984 ha. 2 S. in Schedule
More informationFORM-I, PRE-FEASIBILITY REPORT FOR ENVIRONMENTAL CLEARANCE (EC) (Under Clause 6 of S.O.1533 of Environment Impact Assessment Notification, 2006)
FORM-I, PRE-FEASIBILITY REPORT FOR ENVIRONMENTAL CLEARANCE (EC) (Under Clause 6 of S.O.1533 of Environment Impact Assessment tification, 2006) BOULDER, GRAVEL AND SAND MINING PROJECT At Village Kiratpur
More informationFORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))
FORM 1 (As per new Notification of MoEF dated 01-12-2009 vide S.O 3067 (E)) I) BASIC INFORMATION Item Details 1 Name of the project/s Sri.Gandi Suryanarayana color Granite 2 S. No. in the schedule Item
More informationRenewal of Environmental Clearance for Commercial Complex City Square 2 S. No. in the Schedule 8 (a), Building & Construction project
1 SCOPING 1.1 FORM 1 The scoping for the project has been done based on Form-I, as per EIA tification, dated September 14, 2006 amended as on date. The scoping details are as follows: I. Basic Information
More informationAPPENDIX I. (See paragraph 6) FORM 1
APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information Sr. Item Details 1. Name of the project Mopar Limestone Mine 2. Sr. in the Schedule 1-A 3. Proposed capacity/area/length/tonnage to be handles/command
More informationAPPENDIX I (See paragraph 6) FORM 1
(I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item Details 1 Name of the Project WHITE LILLIES (Residential Project) 2 S. number in schedule 8(a) Proposed 3 capacity/area/length/tonnage
More informationAPPENDIX I. (See paragraph 6) FORM 1
Form-1 & Project Feasibility Report for Mopar Limestone Mine (13.25 hect) APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information Sr. No. Item Details 1. Name of the project Mopar Limestone Mine 2. Sr.
More informationFORM 1 (Application for Environment Clearance)
(I) Basic Information APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance) Name of the Project: Location / site alternatives under consideration: Size of the Project: Shreedhar Sparsh
More informationAPPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE FOR QUARRYING BRICK EARTH. Natham Group Village. Kamuthi Taluk, Ramanathapuram District
APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE FOR QUARRYING BRICK EARTH AT SURVEY NOS. 275/1A4, 275/1A6, 275/1A16, 275/1A26 and 275/1A11 Natham Group Village Kamuthi Taluk, Ramanathapuram District
More informationFORM-I. Environmental Clearance (EC)
FORM-I Environmental Clearance (EC) FOR M/S. Mahanth mica mines (MICA, QUARTZ & FELDSPAR MINES) Léase Area : 47.01 Acres/ 19.05 Ha Sy.. 140/P, 142, 143/P & 139/3 Kalichedu (V), Sydapuram (M), SPSR Nellore
More informationAPPENDIX I (See paragraph - 6) FORM 1
APPENDIX I (See paragraph - 6) FORM 1 (I)Basic Information S. Item Details 1 Name of the project 1.79Acr nakti Limestone Mines (Minor Mineral) 2 S.. in schedule Category B, Project or Activity 1(a) (As
More informationAPPENDIX I (See paragraph 6) FORM 1. Plot area: 13,114 m 2 Built up area: 81, m 2
(I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item 1 Name of the Project Residential Project 2 S. number in schedule 8(a) Proposed 3 capacity/area/length/tonnage to be handled/command area/lease
More informationForm I. for. Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens
Form I for Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens at T.P.S. 2, F.P.. 182/P, Sub Plot-A, OP. 43, R.S.. 85/P Vesu-Bhartana-Vesu, Tal: Choryasi Dist: Surat, Gujarat
More informationFORM 1. 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a)
FORM 1 (I) Basic Information Item Details 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a) 3 Proposed capacity/ area/ length/ tonnage to be handled/command area/lease area/number
More informationAPPENDIX I (See paragraph - 6) FORM 1
APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information S. Item Details 1 Name of the project 3.274 Ha Kapsada Limestone Mines (Minor Mineral) of M/s I.V.R.C.L Limited 2 S.. in schedule Category B,
More informationAPPENDIX I (See paragraph 6) FORM 1. Plot area: 10,439 m 2 Built up area: 50, m 2
(I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item 1 Name of the Project Commercial Project 2 S. number in schedule 8(a) Proposed 3 capacity/area/length/tonnage to be handled/command area/lease
More informationAPPENDIX I. (See Paragraph 6) FORM 1
APPENDIX I (See Paragraph 6) FORM 1 (I) Basic Information Item Details 1 Name of the Project Satva Shiva Gold 2 S. in the Schedule 8(a) 3 Proposed capacity/ area/ length/ tonnage to be handled/ command
More informationAPPENDIX I. (See paragraph -6) FORM- 1. S.No. Item Details 1 Name of the projects/s: Flag Stone Quarry
APPENDIX I (See paragraph -6) FORM- 1 (I)Basic information: S.. Item Details 1 Name of the projects/s: Flag Stone Quarry 2 S.. in the schedule Category B2;
More informationM/s. SURYA ENTERPRISES H.No: , Sri Paradise Apartments, New Andhra Bank Colony, Anantapuramu District
Application for Prior Environmental Clearance (Form 1) For Proposed Road Metal / Building Stone/ Robo/Manufacture Sand Mine Over An Extent Of 9.712 Hectares, in Sy.. 743 of Somandepalli Village, Somandepalli
More information.APPENDIX I (See paragraph 6) FORM 1. Sl. No. Item Details 1. Name of the project/s
.APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information. Item Details 1. Name of the project/s Peddayekkaluru White Shale Mine M/s. Swathi Mines 2.. in the schedule Proposed capacity/area/length/ tonnage
More informationFORM 1. Basic Information. Sl. No.
(I) Basic Information FORM 1 Sl.. Item Details 1. Name of the project/s Dimensional Stone Useful For Cubes & Kerbs Quarry Of M/s. R.R Stones Private Limited 2. S.. in the schedule Item- 1(a) Mining of
More informationFORM I. [Vide M.o.E.F & C.C Notification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE. M/s.
FORM I [Vide M.o.E.F & C.C tification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE At. 100/1, 100/2, 100/3, 100/4, 100/5, 100/6B, 101/1, 101/2, 101/3, 101/4, 101/5B,
More informationFORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT ( SQ. M) ANAMOL LIFE STYLE
FORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (22309.63 SQ. M) AT ANAMOL LIFE STYLE RESIDENTIAL CUM COMMERCIAL BUILDING S. No. 206, O.P. NO. 129, F.P. NO. 129 OF D.T.P.S. NO. 241, NANA CHILODA, GANDHINAGAR,
More informationRevised FORM - I & PRE-FEASIBILITY REPORT
Hind Energy & Coal Beneficiaton (India) Ltd. [Change in Technology from Dry to Wet Type of Coal Washery in EC issued by MoEF letter vide no. J-11015/364/2009-IA-II(M) dated 21st May 2014] at Hindadih Village,
More informationMs.Thriveni Earthmovers Private Limited HO.22/110,Greenways Roads,Fairlands,Salem,Tamilnadu
Application for Prior (Environmental Clearance) Transfer of EC- Form 1 For Transfer of EC from Ms.K.M.Altaf Kouser to Ms.Thriveni Earthmovers Private Limited Over an Extent of 4.838 Hectares of Road Metal
More informationSalai Godhani Stone Quarry of Mr. Arvind Janraoji Gajbhiye in Village Salai Godhani, Th Nagpur (Gra) & Dist Nagpur Form I APPENDIX-I FORM-1
APPENDIX-I FORM-1 (I) Basic Information Sr. Item Details. 1 Name of the project Salai Godhani Stone Quarry Project of Mr. Arvind Janraoji Gajbhiye 2 Sl.. in the schedule 1(a) as per MoEF notification dated
More informationFORM-I Basic Information
FORM-I Basic Information. Item Details 1. Name of the Project/s BHURI BERI Sandstone mine. 2. S.. in the schedule 1(a) 3. Proposed Proposed Capacity-1710 of Sandstone capacity/area/length/tonnage to Quarry
More informationAPPENDIX I (See paragraph - 6) FORM 1
APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information S. Item Details 1 Name of the project Ambey Mahila Swa Sahayata Samuh 2 S.. in schedule Category B, Project or Activity 1(a) (As per EIA tification
More informationFORM-I. Sector-16-B, GH Greater Noida, U.P.
ida, U.P. APPENDIX I (See paragraph-6) FORM 1 S.. Item Details 1. Name of the project/s Residential Complex entitled Ajnara Homes by M/s APV Reality Ltd. 2. S.. in the schedule 8 (b): Township and Area
More information30 TPH Fertilizer Blending unit for Customized NPK Production at Zuarinagar, Sancoale, Marmugao, SouthGoa, Goa
2012 Development of Viper Island as a high class tourist destination in A&N Islands with various recreational and entertainment activities Form 1 Form 1 & TOR 30 TPH Fertilizer Blending unit for Customized
More informationUPDATED FORM I 433 TPD CALCINED PETROLEUM COKE PLANT WITH 9 MW COGENERATION OF POWER PROPOSED AT
UPDATED FORM I Of 433 TPD CALCINED PETROLEUM COKE PLANT WITH 9 MW COGENERATION OF POWER PROPOSED AT APSEZ, Atchutapuram, Visakhapatnam district, Andhra Pradesh By RAIN CALCINER LIMITED Prepared By B.S.
More informationAnnexure-IV. Form-I for seeking clearance for project attracting CRZ notification. At Thengamputhur Village, Tamil Nadu by
Annexure-IV Form-I for seeking clearance for project attracting CRZ notification Basic Information: Name of the Project :- Location or site alternative under consideration: - Construction of Beach Resort
More informationFORM I (OPENCAST LATERITE MINE ha)
SHAIK IMAM SURVEY. 172, 173 & 174, SIDDLOOR VILLAGE, VIKARABAD MANDAL AND DISTRICT, TELANGANA STATE FORM I (OPENCAST LATERITE MINE- 6.176 ha) SUBMITTED BY Sri Shaik Imam R/o 8-2-579/B, Road No. 8, Banjara
More informationFORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects.
(I) Basic Information FORM-1 Item Details 1 Name of the Project Harbour Heights 2 S.. in the Schedule 8(b) Townships and Area Development projects. 3 Proposed capacity/area /length/tonnage to be Total
More informationJAI MAA SHARDA STONE CRUSHING
JAI MAA SHARDA STONE CRUSHING Prop. Hukum Singh (M.. 9425585252) Near-Pahunadukan Kedarpur Ambikapur, (C.G.) To, The Member Secretary, SLEIAA(State Level Environment Impact Assessment Authority), Ministry
More informationMANAKAWAS PLOT-1 TEHSIL-DADRI, DISTRICT-BHIWANI, HARYANA
FORM-I MINING OF STONE ALONG WITH ASSOCIATED MINOR MINERALS, PRODUCTION CAPACITY- 22,50,000 TPA, MINING LEASE AREA-20.34 HECTARE LEASE PERIOD: 10 YEARS PROJECT COST: 8.00 CRORES COST FOR EMP: 13.50 LAKHS
More informationFORM 1 BERI SAND DEPOSIT ON BETWA RIVER
VILLAGE TEHSIL DISTRICT STATE PRODUCTION CAPACITY PROJECT COST AREA FORM 1 BERI SAND DEPOSIT ON BETWA RIVER BERI PLOT NO. / ZONE NO. 10/20 HAMIRPUR HAMIRPUR UTTAR PRADESH 4,85,760 M 3 / YEAR 1.3 CRORE
More informationMOHIT PETROCHEMICALS (P) LTD, (NAGINA ROAD, BIJNOR)
UPDATED FORM 1 SUBMISSION TO MINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE, NEW DELHI MOHIT PETROCHEMICALS (P) LTD, (NAGINA ROAD, BIJNOR) [AMENDMENT IN ENVIRONMENTAL CLEARANCE] VILLAGE : FIROZPUR HAFIZ
More informationForm-1 FORM 1. Proposed salhan-bagda limestone mine ha( acres) M/s Jharkhand State Mineral Development Corporation Ltd.
i. Basic Information Sl. Item FORM 1 Details 1. Name of the project/s Proposed Limestone Mining at Village- Bagda, Chaingarha & Salhan, Thana- Ranchi & Budmu, District- Ranchi, State- Jharkhand. 2. S..
More informationNON FOREST LAND Ref. NO
NON FOREST LAND Ref. NO. 2019100004124 FORM I FOR ENVIRONMENTAL CLEARANCE (EC) (Under Clause 6 of S.O.1533 of Environment Impact Assessment tification, 2006) KHED BAJARI MINE LEASE AREA NEAR VILLAGE KHED,
More information