1 PRE FEASIBILITY REPORT TABLE OF CONTENTS S. No Particulars Page No. 1 Project Background 2 2 Project Description 4 3 Site Analysis 14 4 Rehabilitation & Resettlement 16 5 Proposed Infrastructure 16 6 Project Schedule & Cost Estimates 16 7 Analysis of proposal 16 1

2 1.0 PROJECT BACKGROUND Jharsuguda town is fast emerging as the economic hub of Odisha. Many small and medium scale steel units are being set up in the town vicinity. In recent years Jharsuguda district has witnessed a large scale industrialization, due to which there is a huge demand for air connectivity. Jharsuguda airport of Airports Authority of India (AAI) was constructed during Second World War period with low bearing strength suitable for General Aviation aircraft. This aerodrome is lying unused for more than three decades except for occasional use by general aviation aircraft of industrial houses situated at Jharsuguda and is presently unfit for commercial operations. In the year 2008, a feasibility study was carried out by AAI to revive Jharsuguda airport as one of the 32 Non-operational airports. As per the feasibility report by M/s RITES, it is technically feasible for development of Jharsuguda airport for operations of wide bodied aircraft with augmentation of facilities, additional land acquisition and obstruction elimination. A revised DPR along with feasibility study report, revised EFC memo traffic data of the airport as well as revenue data with a preliminary estimate of Rs Cr. was submitted to MOCA for considered proposal of Govt. Budgetary support (GBS) for development of Jharsuguda Airport from Planning Commission for in-principle approval. Govt. of Odisha has requested to operationalize the airport. AAI is considering to develop Jharsuguda Airport for A-320 type of aircraft operations. Jharsuguda airport can cater to the population of Jharsuguda, Brajarajnagar and Belpahar but also to the population of surrounding towns like Sambalpur and Burla which is 40 km away and Rourkela (about 100 km away) and Sundergarh (35 km away). 1.1 Project Proponent Airports Authority of India (AAI) was constituted by an Act of Parliament and came into being on 1st April Currently, it manages a total of 125 Airports, which include 11 International Airports, 08 Customs Airports, 81 Domestic Airports and 25 Civil Enclaves at Defence Airfields. AAI also provides Air Traffic Management Services (ATMS) over entire Indian Air Space and adjoining oceanic areas with ground installations at all Airports and 25 other locations to ensure safety of Aircraft operations. 1.3 Need for the Project Traffic study was conducted by Directorate CP & MS, which indicates the forecast the movement of aircrafts passengers and cargo from this airport as per Table-1. Traffic 2

3 potential of Jharsuguda Airport for the year and Traffic forecast for the next 22 years is given below: Year TABLE-1 TRAFFIC FORECAST Aircraft Movements (in Nos.) Passengers (in Lakhs) Cargo (in Tonnes) (BASE YEAR) GROWTH RATE 8.0% 10.0% 6.0% GROWTH RATE 8.0% 10.0% 6.0% GROWTH RATE 8.0% 12.0% 8.0%

4 2.0 PROJECT DESCRIPTION 2.1 Type of Project The proposed project is development of Jharsuguda aiport for A-320 operations which involves construction of Terminal building; Technical block and control tower; Fire station and work shop; Car park; and other aviation facilities. Further, strengthening of existing runway, apron and taxiway are also included. The airport is Non-Operational and under NOTAM. Presently only private / Non- Commercial flights are operating at Jharsuguda Airport. 2.2 Location Jharsuguda is the district headquarters of Jharsuguda district of Odisha located 515 km west of Kolkata. The airport is located at latitude N to N and longitude E to E. The proposed site falls in Survey of India Toposheet No. 73 B/4, 73 C/1, 64 NF/16 and 64 O/13. The 10 km radius study area map is given in Figure Details of Alternate Site Jharsuguda airport was constructed during second world war and was lying unused for more than three decades except for occasional use by General aviation aircraft of industrial uses. As per the feasibility study carried out by AAI, the airport is feasible for development for operations of wide bodied aircraft with augmentation of facilities, additional land acquisition and obstruction elimination. Hence, no alternative sites were examined. 4

5 FIGURE-1 STUDY AREA MAP 5

6 2.4 Existing Project Features Presently, the airport have following infrastructure for passenger facilitation: Runway - Orientation is 06/24 Size - (1882 m x 45 m) Surface - Flexible EXISTING RUNWAY Apron - (288 m x 180 m) Taxi - (144 m x 15 m) Turning Pad - Both end EXISTING APRON 6

7 RADAR (MSSR): Jharsuguda radar is the most latest technology used. It is Monopulse Secondary Surveillance Radar of range 250 Nm from Jharsuguda (radially). Presently this radar data is used by Nagpur and Varanasi. MSSR RADAR NDB: It is a Non-Directional Beacon which will be used for honing and locating the Jharuguda Airport for all the aircrafts coming to Jharsuguda Airport. NDB BUILDING 7

8 2.5 Proposed facilities Civil Works (a) Pavements (i) Strengthening and extension of existing runway 06/24 of length 1882 m (6173 ft) up to a width of 45 m with shoulder of 7.5 m width on both sides, to make the total dimensions of 2391 m (7844 ft) x 45 m (150 ft) for operation of A320/Q400 type of aircraft. ACN/PCN depending on sub-grade strength to be provided. The location of runway and other pavements is shown in Figure-2. Proper slope to be given for remaining area of original pavement to make it suitable for Runway Shoulder. (ii) Strengthening of portion of existing cement concrete Apron for dimension 115 m x 108 m with shoulder of width 7.5 m on all sides for parking of two A320 with power-in power-out configuration with appropriate fillets at junction points with Runway 06/24. (iii) (iv) (v) (vi) (vii) (viii) (ix) (x) Strengthening of Taxiway of length 375m and width 23m with Shoulders of 7.5m width along both sides of Taxiway. Fillets are to be provided at Taxiway and Runway / Apron junctions. Strengthening of portion of existing cement concrete Apron for GSE area of dimensions 50 m x 30 m as indicated in the Master Plan. The same may be strengthened as per site condition and a link road may be provided from GSE area to apron of dimension 7M wide. Minor Repairs to other area of the existing Apron, beyond the portion used for strengthening along minor repairs to existing Taxiway system for use of General Aviation aircraft to facilitate access to old apron and old hangars. Construction of Turn Pads at either end of Runway06/24 at the location Provision of Runway End Safety Area of dimensions, Length 150m x Width 90m for Runway06 and Length 240m x Width 90m for Runway24. Levelling, Grading and Development of Runway Basic strip (150m on either side of runway centre line). The soil of Runway strip should be flush with the edges of pavements and appropriate slope to facilitate draining of rain water into drainage system beyond the basic strips. Levelling of ground beyond Runway Strip upto Boundary Wall. Levelling & grading of Taxiway strip for taxiway (375mx23m) & apron taxi lanes. 8

9 FIGURE-2 MASTER PLAN 9

10 (xi) (xii) (xiii) (xiv) (xv) Provision of Isolation Bay of dimensions 64 m x 79 m along with link taxi track of 23 m width & shoulders of width 7.5 m, at a distance of 250 m from the centre line of Runway and construction of cooling Pit. Construction of drainage system for the runways, beyond Runway strip. Construction of Signal Square Area, provision of Turn Pads, landing T, and windsock etc Removal or reduction in height of identified manmade obstacles including trees, HT/LT power lines, water / gas pipelines and diversion of road, if passing through development area and approach funnel area Construction of building for housing DVOR/DME. (b) Passenger Terminal Building (i) Construction of new Passengers Terminal Building of area 5500 Sq.m as per IMG norms and features of Low Cost Terminal Building with modular design for handling 150 arriving and 150 departing passengers at a time with a scope for future expansion in west direction. The building should be provided with essential amenities for passengers, airlines such as check-in counters, conveyor belt for departing baggage, one number of oval shape conveyor belt in the arrival baggage collection area with provision/space for future installation of additional conveyor with minimum spacing of 11 m, space for storage of baggage trolleys (300 nos.), toilet facilities for passengers including those for physically challenged persons, adequate number of signage s, Fire Fighting/ alarm system, Drinking Water Coolers/Purifiers, adequate lighting inside & kerb side of the terminal building, provision of Renewable Energy System etc. (ii) Covered Kerb Area on city side with three lanes each for arriving and departing passengers, covered baggage make-up and break-up area on air side. (iii) Car park for 150 cars & 5 Buses, VIP car park (20 cars), AAI and Airlines staff car / scooter parking area at 100m away from any building as per BCAS norms (c) Construction of new Technical Block cum Control Tower (i) Construction of new Control Tower cum Technical Block as per the standard design implemented at Mysore, Rajahmundry and other smaller airports. (ii) Construction of Control Tower as per NOC for height clearance with minimum height of 25m AGL. (iii)provision of control tower table and other equipments, furniture, fixtures as per requirement of ATM, CNS & Met etc. 10

11 (d) Construction of Fire Station and MT Workshop Construction of Fire Station Cat. VII (as per Fire Order No. IV) along with MT Workshop etc. as per the standard design implemented at Mysore, Rajahmundry and other smaller airports. (e) Miscellaneous Civil Works (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) (x) (xi) (xii) Technical evaluation of strength of pavements before & after the completion of work and declaration of strength for commissioning of pavements. Provision of water storage and water supply, pump house for overhead water tanks and sump etc. for terminal building and residential colony, preferably by Pressurizing System and rain water harvesting system Construction of sewerage treatment plant of adequate capacity with facility for future expansion. Construction of regular boundary wall of height as per BCAS norms around newly acquired land as & when Govt of Orissa hands over along with existing airport land with Crash Gates at either end of Runway direction to provide for outside access to RFF vehicles in case of emergency. Provision of Watch Towers / Morcha as per requirements. Repair of existing quarters, which are in usable condition for operational staff with community center and medical dispensary etc. Construction of sub-station for housing DG sets, stepping down main power supply, transformers etc., storage facility for diesel, equipments, spare parts etc. Provision of gates to segregate air side and city side area with security guard posts at the entry gate and additional security posts inside the operational area at appropriate location in consultation with ATM and Security Dtes. Construction of perimeter road of 3.75m width all along the boundary wall inside operational area. Construction of approach road from fire station to runway and apron through shortest distance and runway end to boundary of airport in the approach path of runway, of sufficient strength to withstand twice the weight of the heaviest CFT or 60 tons, whichever is greater in accordance with Fire Order 4 of Construction of CCR room at appropriate location as per Master Plan. Procurement of furniture, chairs and baggage trolleys. Provision of culvert (pipe / box) at appropriate location in the operational / nonoperational area for crossing of electrical, communication cables, draining of storm water from runways, apron, terminal building and car park area. The 11

12 strength of culverts must be designed for highest category aircraft of Code E to facilitate long term usage without need for dismantling& reconstruction. (xiii) (xiv) (xv) (xvi) Horticulture and gardening works on city and airside. Construction of approach road from city main road upto the terminal building and internal circulation roads. Construction of electrical Sub station building. Construction of residential quarters, transit accommodation for AAI staff Electrical and Mechanical Works (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) High intensity Runway Lighting System (HIRL) comprising runway edge lights, runway end lights, threshold lights, simple approach lights at both ends, PAPI at both ends on Runway06/24, lighted landing T, lighted windsock, aerodrome rotating beacon, taxiway edge lights, apron edge lights and apron flood lights, Mandatory and informative signages etc. Internal and external electrification for all buildings and consideration of Energy Efficient solutions including renewable energy like Solar Power. Procurement and Installation of standby DG sets of adequate capacity, to augment the existing 2 nos of 125KW DG set, to provide essential 50% power supply to terminal building and 100% to control tower and equipment room and fire station and 100% for airfield lightings. Unitary AC/Packaged ACs etc. of adequate capacity for Terminal Building, Technical Block & Control Tower, centralized Fire Control System and Building Management System for Terminal Building. Provision of Apron Flood Lights at appropriate locations without infringing apron safety lines/clearance area for safety of aircraft operating on the apron with power-in/power-out parking stands. The locations of Apron Flood Light Masts shall be finalized with the concurrence of Dte of Planning. Lighting on car park, approach road, around terminal building area, Perimeter road and Watch Towers / Morcha. Procurement, installation and commissioning of conveyor belts behind the checkin counters and baggage collection area. Procurement, installation of additional split air-conditioners for reserved lounge, and Equipment Room, Control Tower, DVOR building etc. Installation of signages in the passenger Terminal Building. Necessary electricity supply to DVOR building and other operational buildings. 12

13 (x) Substation equipments, cabling, augmentation of power supply including deposits to State Electricity authorities etc C.N.S Works Provision of DVOR / DME, VHF and other associated communication and navigation aids including calibration and commissioning of DVOR/ DME, at the location indicated in the Master Plan IT & Airports Systems i) Public address system and car calling system. ii) Surveillance Close circuit TV system (SCCTV) and provision of adequate number of close circuit TV monitors, Security Surveillance System with monitoring facilities in the Terminal Manager Room, Security Control Room, APD Office etc. iii) Provision of Flight Information Display System (FIDS) with adequate number of plasma TV s in departure, arrival and security hold area for passenger facilitation/ entertainment iv) Provision of adequate no. of X-ray machines for scanning hand/checked-in baggage, including provision of required number of ETDs, DFMDs & HHMDs, as per BCAS norms. v) Computer cable data networking. vi) Provision of adequate no. of VHF FM Sets (Walkie Talkie, Base Stations & Mobile Stations). vii) Provision of Telephone Exchange / digital EPABX system for Terminal Building including telephone/ intercom instruments, wiring etc. 2.6 Water & Power Requirements Water Requirement It is estimated that about 200 KLD of water would be required for the entire airport including residential quarters. The total water requirement for the entire airport will be provided by Govt of Odisha at free of cost. Power Requirement Power required for the entire airport would be 1500 KW which will be provided by Govt. of Odisha at free of cost. Memorandum of Understanding (MoU) between AAI and Govt of Odisha is enclosed as Annexure-I. 13

14 2.7 Waste water Generation & management The wastewater generation mainly consists of sanitary waste, sewage from airport terminal, flight kitchen, effluent from the workshop etc. The sewage and sanitary waste from the buildings and airport terminal will be treated in Sewage Treatment Plant (STP) comprising primary, secondary and tertiary treatment facilities. The treated wastewater from the STP will be used for air conditioning, cooling water make-up and green belt development. It is estimated that about 80 KLD of wastewater will be generated from the proposed airport. The entire wastewater that is generated from the airport will be recycled and reused for non potable purposes. 2.8 Solid Waste Management Solid waste generated from the proposed airport mainly comprises of food waste and garbage waste. Further, small quantities of sludge from STP, medical waste and other waste will be generated. Collection and handling of domestic solid waste would be done in line with the provisions of the Municipal Solid Waste Rules 2000 (as amended). 3.0 SITE ANALYSIS 3.1 Connectivity The jharsuguda airport is located approximately at a distance of 5.4 km from Jharsuguda railway station and about 3.5 km from NH-200. The State Highway (SH- 10) is adjacent on the western side. Nearest airport is Ranchi, located at about 200 km in the NE side. 3.2 Land form, Land use & Land ownership The total land required for developing the airport is about acres, out of which about acres of land need to be acquired which will be transferred by the Govt of Odisha. The remaining 790 acres of land is already under possession of Airports Authority of India (AAI). Presently only the private or non commercial flights are operating at the airport. 3.3 Topography The airport facilities are already existing which need to be strengthened for the commercial operations. The topography of the proposed terminal building and other aeronautical facilities is flat. Presently, proposed site for terminal building consists of bamboo trees which need to be cut off. Further, the water pond at NE side, adjacent to the runway would require to be filled up. 14

15 The additional land required for the airport, needs acquisition by the State Govt. as per the existing provisions out of which an area of about 9.6 acres is forest land, which requires forest clearance. 3.4 Proposed Land use pattern The site proposed for airport development will be converted into commercial category which is Non-Operational and under NOTAM There is a proposal for city side development as part of the Phase II. A residential complex for the essential operational and other staff is also proposed within the airport boundary. 3.5 Existing Infrastructure Existing infrastructure details are given in section Social Infrastructure Available The existing social infrastructure in the Jharsuguda which is located at about 4.0 km from the site is: Hospital with ambulance; Banks; Post office; Bus station; Fire station; Secondary school; Police station; Shopping complex; Sports infrastructure (Stadium & Camps etc); Community halls; Cinema halls; and Primary health care centres. 4.0 REHABILITATION & RESETTLEMENT About 8 families would be affected due to the proposed project. The relocation of habitation will be taken up by the Govt of Odisha. 5.0 PROPOSED INFRASTRUCTURE The proposed project is development of Jharsuguda aiport for A-320 operations which involves construction of Terminal building; Technical block and control tower; Fire station and work shop; 15

16 Car park; and other aviation facilities. Further, strengthening of existing runway, apron and taxiway are also included. The details are discussed in Section PROJECT SCHEDULE & PRELIMINARY COST ESTIMATES Preliminary estimated cost of work for Development of Jharsuguda Airport is worked out as Rs. 200 Crores. State Government of Odisha is requested for funding Rs Crores towards this project. Balance shall be arranged by AAI internal resources 7.0 ANALYSIS OF PROPOSAL Jharsuguda town is fast emerging as the economic hub of Odisha. Many small and medium scale steel units are being set up in the town vicinity. In recent years Jharsuguda district has witnessed a large scale industrialization, due to which there is a huge demand for air connectivity. Being the economic hub of Odisha, it is essential to have an airport at Jharsuguda which helps in the development of this area. After completion of airport, Jharsuguda will be well connected to other cities and other states and will increase the tourist flow in this region. 16

17 ANNEXURE-I MEMORANDUM OF UNDESTANDING 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

PROPOSED TERMS OF REFERENCE FOR THE FOR EIA STUDIES

PROPOSED TERMS OF REFERENCE FOR THE FOR EIA STUDIES Project Category Project Proponent Location Expansion of Lucknow Airport in Respect of Construction of New Integrated Terminal Building at Amausi, Lucknow, Uttar Pradesh. A [7 (a): Development of an Airport]

More information

Parsoli Airport Gujarat

Parsoli Airport Gujarat Parsoli Airport Gujarat Airports Authority of India INDEX Page No 1. About The City.1-2 2. Technical Details..3-7 3. Village Map Parsoli, Land Record.8 4. Certificate Issued By GUJSAIL..9 5. Google Earth

More information

Pre-Feasibility Report (PFR)

Pre-Feasibility Report (PFR) Pre-Feasibility Report (PFR) For Development of New Civil Enclave at Kanpur Air Force Base, Uttar Pradesh Chapter - 1 Development of New Civil Enclave at Kanpur Air Force Base 1.1 Background Kanpur Air

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR PROPOSED EXTENSION OF RUNWAY AND ALLIED WORKS AT SHILLONG AIRPORT, BARAPANI, MEGHALAYA AIRPORTS AUTHORITY OF INDIA INDEX S. No Particulars Page no- 1. Executive summary 1-3 2.

More information

Check list for construction Project of EC [Category 8(a)]:

Check list for construction Project of EC [Category 8(a)]: Check list for construction Project of EC [Category 8(a)]: Provide authenticated (with stamp & Signature) hard copy of this check-list during submission of hard copy of ToR application. Sr. no. Checklist

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &

More information

Information Memorandum

Information Memorandum Integrated Development of No Frill Airstrip & Provision of Airline Connectivity at Chikkamagaluru on Design, Finance, Build, Operate and Transfer (DFBOT) Framework June 2018 Information CONTENTS CONTENTS...

More information

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS Annexure No - 13 SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS File No : Name of the Project: Proposed Commercial project called Bagmane Tech Park RIO Campus of M/s. Bagmane Developers

More information

Hong Kong International Airport Medium & Long Term Development Plans. The British Chamber of Commerce 18 July 2012

Hong Kong International Airport Medium & Long Term Development Plans. The British Chamber of Commerce 18 July 2012 Hong Kong International Airport Medium & Long Term Development Plans The British Chamber of Commerce 18 July 2012 Connecting HK with the World More than 100 airlines serving 160 destinations worldwide

More information

TABLE OF CONTENTS. Para No. Contents Page No

TABLE OF CONTENTS. Para No. Contents Page No TABLE OF CONTENTS Para No. Contents Page No Chapter-1 Introduction 1.0 Preamble 1 1.1 Location of the project 1 1.2 Objectives of the EIA study 3 1.3 Methodology of study 3 1.4 Structure of EIA report

More information

Pre-Feasibility Project Report

Pre-Feasibility Project Report Pre-Feasibility Project Report For Development of New Civil Enclave at Agra Airport (Near Air Force Base), Uttar Pradesh Chapter - 1 New Civil Enclave at Agra Airport (Near Air Force Base) 1.1 Background

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

BOB HOPE AIRPORT REPLACEMENT TERMINAL PROJECT LOCATION BOB HOPE AIRPORT REPLACEMENT TERMINAL PROJECT DESCRIPTION

BOB HOPE AIRPORT REPLACEMENT TERMINAL PROJECT LOCATION BOB HOPE AIRPORT REPLACEMENT TERMINAL PROJECT DESCRIPTION EXHIBIT A-1 BOB HOPE AIRPORT REPLACEMENT TERMINAL PROJECT LOCATION The Burbank-Glendale-Pasadena Airport Authority (Authority) seeks to develop a 14-gate replacement passenger terminal building and related

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted June 21, 2018

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted June 21, 2018 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted June 21, 2018 The City of Atlanta is providing an opportunity for public comment until July 23, 2018 related to the

More information

Table of Contents. Chapter Details Page Chapter 1 Existing Agartala Airport

Table of Contents. Chapter Details Page Chapter 1 Existing Agartala Airport Table of Contents Chapter Details Page Chapter 1 Existing Agartala Airport 1.1 Background 4 1.2 Location Details of Agartala Airport 4 1.3 Present Status & Facilities At Airport 4 1.3.1 Land Details 5

More information

State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests

State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests No.SEIAA/2009/ Dated. REGISTERED To M/s C & C Towers Ltd., Plot no.70, Institutional

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

Expansion of Calcutta Riverside (An Integrated Township)

Expansion of Calcutta Riverside (An Integrated Township) CONCEPTUAL PLAN Expansion of Calcutta Riverside (An Integrated Township) Project of Riverbank Developers Private Limited at Maheshtala, Batanagar, West Bengal. Project Proponent: Riverbank Developers Private

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For PRIOR ENVIRONMENTAL CLEARANCE STORAGE CAPACITY ENHANCEMENT OF HPCL, LPG BOTTLING PLANT Capacity: 3 X 500 MT At Plot No.499 Kota-Jhalawar Road (NH-12) Village- Mandana, Tehsil-

More information

The Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT

The Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT ABOUT PROJECT The Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In earlier project planning the total plot area

More information

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

MODIFIED QUARRYING PLAN FOR SHINGATALOOR SAND MINING BLOCK-2 EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY. MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT

More information

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative)

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative) Six Monthly Progress Report reg. Construction of Group Housing Colony at village Sarai Aurangabad in Sector 3-A, Bahadurgarh (Distt. Jhajjar), Haryana by M/s Prabhu Shanti Real Estate Pvt. Ltd., due in

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors 1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction

More information

Max. building height (m)

Max. building height (m) Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project

More information

EXECUTIVE SUMMARY. Project Proponent. Airport Authority of India. Pune International Airport, Lohgaon, Pune , Maharashtra

EXECUTIVE SUMMARY. Project Proponent. Airport Authority of India. Pune International Airport, Lohgaon, Pune , Maharashtra EXECUTIVE SUMMARY New Integrated Terminal Building, Reconstruction of Old Terminal Building, Modification of Existing Expanded Terminal Building, Associated City Side Facilities, Expansion of Apron and

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

Getting Around: Air Transportation in the 21 st Century

Getting Around: Air Transportation in the 21 st Century Getting Around: Air Transportation in the 21 st Century Edwin E. Herricks Lecture #6: The airport operations and University of Illinois Fall 2018 operational considerations Today we will consider what

More information

Details of the proposed project as presented before the committee are tabulated below:

Details of the proposed project as presented before the committee are tabulated below: Shrungal Homes Block No. 141, F.P.No.42, O.P.No.42, T.P.S.No.58 (Bamroli), Choryasi, Surat. Screening & scoping / appraisal. Details of the proposed project as presented before the committee are tabulated

More information

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KATIKELA RIVER SAND BED OVER 15.00 ACRES OR 6.070 HA IN VILLAGE KATIKELA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20)

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

GUIDELINES ON ENERGY CONSERVATION IN SEZs

GUIDELINES ON ENERGY CONSERVATION IN SEZs 1 GUIDELINES ON ENERGY CONSERVATION IN SEZs SEZs are special enclaves aimed at creating world class infrastructure. The guidelines and certification for SEZs is to be implemented as follows: Entire SEZ

More information

Pre-Feasibility Report. for. Educational Institute Allen Career Institute-Supath

Pre-Feasibility Report. for. Educational Institute Allen Career Institute-Supath Pre-Feasibility Report for Educational Institute Allen Career Institute-Supath at Plot No. 1, Educational Scheme, Naya Nohra & Hanuwantkhera, Kota, Rajasthan-324001 By M/s. Allen Career Institute Registered

More information

A-PDF Merger DEMO : Purchase from to remove the watermark

A-PDF Merger DEMO : Purchase from   to remove the watermark A-PDF Merger DEMO : Purchase from www.a-pdf.com to remove the watermark UTTARAKHAND STATE INFRASTRUCTURE DEVELOPMENT CORPORATION LTD. (USIDCL) EXPANSION AND STRENGTHENING OF RUNWAY AND UPGRADATION OF ASSOCIATED

More information

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND EXECUTIVE SUMMARY Kumhari Stone Mine is situated in Village - Kumhari, P.O. Basia, P.S. - Basia, District : Gumla, Jharkhand over an area of 2.02 Hectares or 5.00 Acres [ Plot no. 2085(P)]. Kumhari Stone

More information

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad 1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon

More information

Presentation to LSCM Logistics Summit An Update on the Developments of the Three-Runway System of Hong Kong International Airport

Presentation to LSCM Logistics Summit An Update on the Developments of the Three-Runway System of Hong Kong International Airport Presentation to LSCM Logistics Summit 2014 An Update on the Developments of the Three-Runway System of Hong Kong International Airport 18 September 2014 0 Overview of Hong Kong International Airport Open

More information

TABLE-1 PROJECT AT A GLANCE. Location S. F. Nos. 442/1, 442/3, 442/5, 443/1, 443/2, 443/3, 443/4, 443/5, 434/7, 434/8, 434/9 of Kolappalur Village

TABLE-1 PROJECT AT A GLANCE. Location S. F. Nos. 442/1, 442/3, 442/5, 443/1, 443/2, 443/3, 443/4, 443/5, 434/7, 434/8, 434/9 of Kolappalur Village TABLE-1 PROJECT AT A GLANCE Registered Address M/s. Pallavada Technical Textiles Park Private Limited, No. 78, Greams Road, Thousand Lights, Chennai-600006. Communication Address of M/s. Pallavada Technical

More information

CONSULTANT REGISTRATION SYSTEM (CRS) SPECIALISATION CATEGORY. CE - Civil Engineering Construction. - Building Construction

CONSULTANT REGISTRATION SYSTEM (CRS) SPECIALISATION CATEGORY. CE - Civil Engineering Construction. - Building Construction Capacity (RM) GRADE G1 not exceeding 100,000.00 G2 not exceeding 500,000.00 G3 not exceeding 1,000,000.00 G4 not exceeding 3,000,000.00 G5 not exceeding 5,000,000.00 G6 not exceeding 10,000,000.00 G7 not

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Six Monthly Compliance Report June-2015 M/s Mahagun Real Estate Pvt. Ltd SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex Mahagunpuram AT VILLAGE Mehrauli, Dasna, Ghaziabad, U.P. Being developed

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report Extension of Runway with Blast Pad, RESA, Taxiway, Apron, GSE Area, Isolation Bay, Construction of New Domestic Terminal Building, ATC tower cum Technical Block cum Fire Station

More information

SIA/PB/NCP/53462/2016)

SIA/PB/NCP/53462/2016) Item No.148.08: Application for environmental clearance under EIA notification dated 14.09.2006 for the development of group housing project namely SSL Highway Towers at Chandigarh-AmbalaHighway, Dera

More information

BRIEF SUMMARY OF THE PROJECT

BRIEF SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT Office Complex at Plot No. 5A & 5B, Shopping Mall, Vasant Kunj Phase - II, New Delhi Developed by M/s Oil and Natural Gas Corporation Limited BRIEF DESCRIPTION OF THE PROJECT

More information

State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests

State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests Vatavaran Bhawan, Nabha Road, Patiala-147001 Telefax:- 0175-2215802 No.SEIAA/2009/32235

More information

No.D.12/30/2009-SEZ Government of India Ministry of Commerce & Industry Department of Commerce

No.D.12/30/2009-SEZ Government of India Ministry of Commerce & Industry Department of Commerce No.D.12/30/2009-SEZ Government of India Ministry of Commerce & Industry Department of Commerce Udyog Bhawan, New Delhi Dated the 11 th December, 2009 To 1. All Development Commissioners 2. DG, EPCES Subject:

More information

City of St. Catharines Standard Drawings JULY Revised July 21, 2017 TES-ENG (SH)

City of St. Catharines Standard Drawings JULY Revised July 21, 2017 TES-ENG (SH) City of St. Catharines Standard Drawings JULY 2017 Revised July 21, 2017 TES-ENG (SH) Roads Dwg No. Revision Standard Sidewalk Detail 110-2001 1 Monolithic Curb-Faced Sidewalk for Concrete Road 110-2002

More information

22.1 ISSUES OBJECTIVES POLICIES RULES PERFORMANCE STANDARDS 10

22.1 ISSUES OBJECTIVES POLICIES RULES PERFORMANCE STANDARDS 10 22 NETWORK UTILITIES 22.1 ISSUES 3 22.2 OBJECTIVES 4 22.3 POLICIES 4 22.4 RULES 6 22.5 PERFORMANCE STANDARDS 10 Whanganui District Plan (15 January 2018) Chapter 22 Network Utilities 22-1 22 NETWORK UTILITIES

More information

7. Encumbrance certificate for 13 years issued not prior to 30 days from the date of submitting the application

7. Encumbrance certificate for 13 years issued not prior to 30 days from the date of submitting the application APPENDIX Check list Details to be given by the applicant (strike out the items whichever not applicable for the proposed development) 1. Copy of documents (sale deed/lease deed/power of attorney) self

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

CHAPTER 14. ROADWAYS AND MARINE TRANSPORTATION

CHAPTER 14. ROADWAYS AND MARINE TRANSPORTATION CHAPTER 14. ROADWAYS AND MARINE TRANSPORTATION 14.1 AFFECTED ENVIRONMENT 14.1.1 Definition of Resource This section describes the existing transportation facilities, specifically roads, the Tinian International,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

EXECUTIVE SUMMARY ES.1 BACKGROUND ES.2 PURPOSE AND NEED FOR THE PROPOSED PROJECT

EXECUTIVE SUMMARY ES.1 BACKGROUND ES.2 PURPOSE AND NEED FOR THE PROPOSED PROJECT EXECUTIVE SUMMARY ES.1 BACKGROUND The purpose of this Draft Environmental Report (DEIR) is the implementation of improvement projects at Charles M. Schulz Sonoma County Airport (the Airport). The improvement

More information

Advisory Circular. Grandfathering at Airports Pursuant to Canadian Aviation Regulation (CAR)

Advisory Circular. Grandfathering at Airports Pursuant to Canadian Aviation Regulation (CAR) Advisory Circular Subject: Grandfathering at Airports Pursuant to Canadian Aviation Regulation (CAR) 302.07 Issuing Office: Civil Aviation, Standards Document No.: AC 302-018 File Classification No.: Z-5000-34

More information

Kosovo s PPP Policy, Legal, & Institutional Framework

Kosovo s PPP Policy, Legal, & Institutional Framework MODULI 1 Kosovo s PPP Policy, Legal, & Institutional Framework Case study PIA concesssion 02, November 2016 Arton Ahmeti Central Public-Private Partnership Department Ministry of Finance 2 Overview Investment

More information

Appendix S10 - Airport Business Zone Structure Plan

Appendix S10 - Airport Business Zone Structure Plan S10.1 S10.1.1 S10.1.2 General The Airport Business Zone Structure Plan covers an area of some 157ha surrounding the airport operational area. It contains some existing industrial and service activities

More information

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell) ENVIRONMENT MANAGEMENT PLAN No. 1. Increase in water demand due to water usage for, dust suppression and for domestic purpose of workers 2. Sewage generation (9 KLD) and disposal 3. Solid waste generation

More information

b. Develop urban roads/states highways and National highways for the development of tourism, trade and commerce.

b. Develop urban roads/states highways and National highways for the development of tourism, trade and commerce. 4. INFRASTRUCTURE a. Improve rural roads and bridges vital for the marketing of agriculture products and transport of agriculture inputs. b. Develop urban roads/states highways and National highways for

More information

During the discussions, the Committee finalized the following additional TOR for further study:

During the discussions, the Committee finalized the following additional TOR for further study: Finalization of ToR for development of Visakhapatnam?Kakinada Corridor for the Establishment of Petroleum, Chemicals and Petrochemicals Investment Region (VK- PCPIR), Andhra Pradesh by M/s VK- PCPIR Special

More information

State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests

State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests Vatavaran Bhawan, Nabha Road, Patiala-147001 Telefax:- 0175-2215802 No.SEIAA/2009/ Dated.

More information

ISSUES, OBJECTIVES, POLICIES AND METHODS. See Part B5(a), 5(b), (8) and (9) and zone provisions in Part D.

ISSUES, OBJECTIVES, POLICIES AND METHODS. See Part B5(a), 5(b), (8) and (9) and zone provisions in Part D. 6 GENERAL RULE 6.11 PUBLIC WORKS 6.11.1 ISSUES, OBJECTIVES, POLICIES AND METHODS See Part B5, 5(b), (8) and (9) and zone provisions in Part D. 6.11.2 DESIGNATIONS FOR ROADS All road reserves shown in the

More information

STATE BANK OF INDIA. Inspection & Audit Department, Corporate Centre, Patna Zone, Sone Bhawan, 5 th Floor, Bir Chand Patel Marg, Patna

STATE BANK OF INDIA. Inspection & Audit Department, Corporate Centre, Patna Zone, Sone Bhawan, 5 th Floor, Bir Chand Patel Marg, Patna STATE BANK OF INDIA Inspection & Audit Department, Corporate Centre, Patna Zone, Sone Bhawan, 5 th Floor, Bir Chand Patel Marg, Patna -800001 PREMISES REQUIRED FOR GUEST HOUSE ON RENT The State bank of

More information

INDIAN INSTITUTE OF TECHNOLOGY HYDERABAD

INDIAN INSTITUTE OF TECHNOLOGY HYDERABAD INDIAN INSTITUTE OF TECHNOLOGY HYDERABAD SUSTAINABLE ARCOP LARGE ASSOCIATES DEVELOPMENT PRIVATE LIMITED SUSTAINABILITY AND THE CITY WHAT ARE WE TALKING ABOUT THE LINK KNOWN COMPONENTS OF AN URBAN FABRIC

More information

Sectors of operation. Capacity building & skill set development. Area development. Agri and food infrastructure. Industrial infrastructure

Sectors of operation. Capacity building & skill set development. Area development. Agri and food infrastructure. Industrial infrastructure Agri and food infrastructure Area development Capacity building & skill set development Industrial infrastructure Agribusiness policy & strategy Agri clusters & agri corridor Agribusiness investment regions

More information

Aviation Capital Construction Program Update

Aviation Capital Construction Program Update Aviation Capital Construction Program Update 2012 Completed Projects 2013 Active Projects Bern Seals Program Manager Parsons Management Consultants April 2013 0 Discussion Agenda Program Safety Performance

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

Bijwasan: A World Class Station

Bijwasan: A World Class Station Bijwasan: A World Class Station Presentation to Governing Body, UTTIPEC 19 th December, 2014 INDEX 1. AIMS & OBJECTIVE OF THE PROJECT 2. EXISTING CONDITIONS 3. MASTER PLAN - GENERAL LAYOUT 4. TRAFFIC STUDY

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

Hazardous Substances. 9. Hazardous Substances. Explanatory Statement

Hazardous Substances. 9. Hazardous Substances. Explanatory Statement Hazardous Substances 9. Hazardous Substances Explanatory Statement The Western Bay of Plenty District is predominantly rural land in farming and horticulture and has a number of small urban centres containing

More information

2018 PROPOSED AIRPORT CONSTRUCTION PROJECTS*

2018 PROPOSED AIRPORT CONSTRUCTION PROJECTS* Ted Stevens TAXIWAY R AIRCRAFT DESIGN GROUP VI IMPROVEMENTS Anchorage International Airport PUBLIC SAFTEY RADIO SYSTEM UPGRADES TAXIWAY V RECONSTRUCTION RUNWAY 15/33 REHABILITATION AND WIDENING 2019 RUNWAY

More information

TECHNICAL SPECIFICATIONS TABLE OF CONTENTS SUMMARY SERIES PRELIMINARIES & GENERAL REQUIREMENTS SPECIFICATIONS

TECHNICAL SPECIFICATIONS TABLE OF CONTENTS SUMMARY SERIES PRELIMINARIES & GENERAL REQUIREMENTS SPECIFICATIONS TECHNICAL SPECIFICATIONS TABLE OF CONTENTS SUMMARY PART 1 PART 2 PART 3 PART 4 PART 5 PART 6 PART 7 SERIES 100 - PRELIMINARIES & GENERAL REQUIREMENTS SPECIFICATIONS CIVIL WORKS SPECIFICATIONS BUILDING

More information

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL 2013 TO SEPTEMBER M/s. Subham Planners Ltd.

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL 2013 TO SEPTEMBER M/s. Subham Planners Ltd. COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL 2013 TO SEPTEMBER 2013 Name of The Company : M/s. Subham Planners Ltd. Project : Construction of group housing project at Village Betkuchi,

More information

State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests Telefax:

State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests Telefax: State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests Vatavaran Bhawan, Nabha Road, Patiala-147001 Telefax:- 0175-2215802 No.SEIAA/2009/19158

More information

KIX Early Recovery Plan. September 10, 2018

KIX Early Recovery Plan. September 10, 2018 KIX Early Recovery Plan September 10, 2018 Our Early Recovery Plan Recovery status (1) Emergency (2) Tentative (3) Full scale Time Sept 7, 2018 (3 days after the typhoon damage) After 1 week TBD Goal Operation

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

PLANNING & DEVELOPMENT AIRPORT INFRASTRUCTURE MANAGEMENT MICHAEL SHEEHAN SR DIRECTOR OF AIM DEVELOPMENT

PLANNING & DEVELOPMENT AIRPORT INFRASTRUCTURE MANAGEMENT MICHAEL SHEEHAN SR DIRECTOR OF AIM DEVELOPMENT PLANNING & DEVELOPMENT AIRPORT INFRASTRUCTURE MANAGEMENT MICHAEL SHEEHAN SR DIRECTOR OF AIM DEVELOPMENT AIRPORT INFRASTRUCTURE MANAGMENT 2 FACILITY SERVICES Facility Development Capital Projects Management

More information

Airport visit for HKIE Environmental Division 11 January 2014

Airport visit for HKIE Environmental Division 11 January 2014 Airport visit for HKIE Environmental Division 11 January 2014 1 Corporate Video 2 Agenda 1. HKIA Overview 2. Short-, medium- and long-term plan of HKIA 3. EIA for the Three-Runway System 4. Environmental

More information

Kadam Environmental Consultants w w w. k a d a m e n v i r o. c o m

Kadam Environmental Consultants w w w. k a d a m e n v i r o. c o m AHIR SALT AND ALLIED PRODUCTS PVT. LTD. Pre-feasibility report for Revival of Existing Jetty with Liquid Storage Terminal, Pipeline, road connectivity, Railway line and sidings at Mithirohar near (Kandla),

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT For ToR Application of Expansion Project For MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS (Dyes Intermediates) Proposed By: M/s. Plot No. C/1/B-145-3 Phase-II, GIDC Estate, Naroda,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR Conversion of Existing Product Storage Tanks TK-16(HSD) of 6000 KL to MS and TK-6(MS) of 1000 KL to Ethanol AT HPCL Bulk POL Depot, Mansa Road, Phoos Mandi, Bhatinda-151001.

More information

SECTION 15 - GENERAL INDUSTRIAL (MG) ZONE

SECTION 15 - GENERAL INDUSTRIAL (MG) ZONE SECTION 15 - GENERAL INDUSTRIAL (MG) ZONE No person shall within a General Industrial (MG) Zone use any land or erect, alter or use any building or structure except in accordance with the following provisions:

More information

CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT

CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT ABOUT PROJECT M/s. DAR Housing Ltd. Proposed Group Housing Project ATS Rhapsody, At Plot No. GH-12/1, Sector-01, Greater Noida (U.P.), having Plot

More information

Hazardous Substances Hazardous Substances Explanatory Statement Significant Issues Objective and Policies...

Hazardous Substances Hazardous Substances Explanatory Statement Significant Issues Objective and Policies... Section Contents Hazardous Substances... 2 9. Hazardous Substances... 2 Explanatory Statement... 2 9.1 Significant Issues... 3 9.2 Objective and Policies... 3 9.3 Activity Lists... 4 9.4 Quantity thresholds

More information

Adani M2K Projects LLP

Adani M2K Projects LLP Adani M2K Projects LLP Site Sector 102 / 102A, off Dwarka Expressway, Gurgaon. INDIA. Sales Office Adani House, Plot No. 83, Sector 32, Gurgaon 122001. INDIA. For enquiries call: +91 124 2555168. Email:

More information

LOCAL AUTHORITY AND SUBPROJECT SELECTION CRITERIA

LOCAL AUTHORITY AND SUBPROJECT SELECTION CRITERIA Additional Financing of Local Government Enhancement Sector Project (RRP SRI 42759) LOCAL AUTHORITY AND SUBPROJECT SELECTION CRITERIA A. Eligible Local Authority and Subprojects 1. Unless otherwise agreed

More information

Implemented by. Economic Aspects. Page 1 24/01/2017

Implemented by. Economic Aspects. Page 1 24/01/2017 Economic Aspects 24/01/2017 Page 1 Site development cost : 50 to 100 US $ per acre Investments realised per acre in China Industrial Zone Area Land and utilities costs Water cost per cu.m Land cost per

More information

Sustainable Construction Practices OMP Case Studies

Sustainable Construction Practices OMP Case Studies Sustainable Construction Practices OMP Case Studies Tenant Relocation Andres Garcia, O'Hare Modernization Program, Program Management Office Frank Grimaldi, Assistant Commissioner, Design and Construction,

More information

Department of Ecology and Environment Room No.709, 7 th Floor, IV-Gate, M.S. Building, Bangalore ,

Department of Ecology and Environment Room No.709, 7 th Floor, IV-Gate, M.S. Building, Bangalore , No. SEIAA: 7 : KAR: 2007 STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, KARNATAKA (Constituted by Ministry of Environment & Forests, Government of India) Department of Ecology and Environment Room

More information

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) 1) Executive Summary Project Name of Company / Mine Owner Location Village Taluka District State Girgita Limestone Mine M/s KJS

More information

CHAPTER 2 THE PROPOSED ACTION

CHAPTER 2 THE PROPOSED ACTION CHAPTER 2 THE PROPOSED ACTION 2.0 INTRODUCTION The proposed action(s) must ensure that the Afton Lincoln County Airport complies with minimum FAA and WYDOT design recommendations for a parallel taxiway

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

FROM THE CEO. Sameh Masry

FROM THE CEO. Sameh Masry An infrastructure utility Group of Companies specializing in the construction and operation & maintenance of water, power and transport systems. FROM THE CEO Sameh Masry Looking at the development and

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

Presentation for Business Opportunities & Entrepreneurial Training Summit

Presentation for Business Opportunities & Entrepreneurial Training Summit Welcome to the Presentation for Business Opportunities & Entrepreneurial Training Summit October 9, 2018 Ned Carey, C.M. Chief - Division of Administration & Performance Management Safety Management System

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information