STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS ENERGY FACILITY SITING BOARD

Size: px
Start display at page:

Download "STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS ENERGY FACILITY SITING BOARD"

Transcription

1

2 STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS ENERGY FACILITY SITING BOARD IN RE: Application of Invenergy Thermal Docket No. SB Development LLC s Proposal for Clear River Energy Center INVENERGY THERMAL DEVELOPMENT LLC S RESPONSES TO THE TOWN OF BURRILLVILLE S 36 th SET OF DATA REQUESTS Request 36-1 Response 36-1 RESPONDENT: Please provide the details of all testing that has been performed for the installation of an onsite drinking water well and related appurtenances and provide the results of all drilling, soil sampling, or other testing performed in connection with the same. No drilling, soil sampling, or testing has been performed to date in support of the installation of the proposed on-site drinking water well and related appurtenances. Given the limited potable water demand for the Clear River Energy Center ( CREC ), no advanced testing of the property is warranted. The installation of the CREC drinking water well will be similar to the installation of a typical private residential water supply well. Any water quality or yield testing of the CREC drinking water well will be performed concurrently with the drilling and installation of the well, which will be completed during facility construction. Jeffrey Hershberger, ESS Group, Inc. DATE: September 20, \003\ v1 Page 1 of 3

3 STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS ENERGY FACILITY SITING BOARD IN RE: Application of Invenergy Thermal Docket No. SB Development LLC s Proposal for Clear River Energy Center INVENERGY THERMAL DEVELOPMENT LLC S RESPONSES TO THE TOWN OF BURRILLVILLE S 36 th SET OF DATA REQUESTS Request 36-2 Response 36-2 Please provide the details of all testing that has been performed for the installation of an onsite septic system and related appurtenances and provide the results of all drilling, soil sampling, or other testing performed in connection with the same, including, but not limited to, percolation tests, if any. A program of test holes was performed in areas considered for the siting of the onsite wastewater treatment system ( OWTS ) leach field, with a number of locations selected for further evaluation. Soil evaluations were then conducted at the site and witnessed by the Rhode Island Department of Environmental Management ( RIDEM ). The RIDEM-witnessed test holes were first performed on February 7, 2017 and leach field siting and design was performed as part of an OWTS Application submission. Since then, design modifications required that the leach field be relocated; as such, additional test holes were performed and witnessed by RIDEM on August 2, 2017 and September 14, 2017 to evaluate subsurface conditions at potential alternative leach field locations. Site evaluation forms documenting the soil evaluations were submitted to RIDEM under OWTS Application No Copies of these forms are attached as Exhibit A. Note that in accordance with the RIDEM OWTS Regulations, dry weather soil evaluations were used to determine the seasonal high groundwater table and soil conditions for leach field sizing and design. Percolation testing was not performed, as allowed in the RIDEM OWTS Regulations. RESPONDENT: Brandon M. Blanchard, P.E., Pare Corporation DATE: September 20, \003\ v1 Page 2 of 3

4 INVENERGY THERMAL DEVELOPMENT LLC By its Attorneys, /s/ Alan M. Shoer Alan M. Shoer, Esq. (#3248) Richard R. Beretta, Jr. Esq. (#4313) Nicole M. Verdi, Esq. (#9370) ADLER POLLOCK & SHEEHAN, P.C. One Citizens Plaza, 8 th Floor Providence, RI Tel: Fax: Dated: September 20, 2017 CERTIFICATE OF SERVICE I hereby certify that on September 20, 2017, I delivered a true copy of the foregoing responses to the Town of Burrillville s 36 th Set of Data Requests via electronic mail to the parties on the attached service list. /s/ Alan M. Shoer \003\ v1 Page 3 of 3

5 EXHIBIT A

6

7

8

9

10

11

12

13

14

15 STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS Department of Environmental Management Office of Water Resources Onsite Wastewater Treatment System Program Site Evaluation Form Part A Soil Profile Description Application Number Property Owner: Invenergy Thermal Development, LLC Property Location: Route 100, Wallum Lake Road, Burrillville, RI AP 137 Parcel 002 Date of Test Hole: Soil Evaluator: DiOrio, Alfred W. License Number: D4004 Ptly. Cldy. X 11:00 Weather: Shaded: Yes No Time: 3 Horizon Boundaries Soil Colors Re-Dox TH Horizon Depth Dist Topo Matrix Re-Dox Features Ab. S. Contr. Texture Structure Consistence A 0-4" a s 2.5Y2.5/1 None None l gr fr 3 Soil Category E 4-10" g s 10YR4/1 None None ls gr fr 3 Bw 10-46" g s C 2 P sl 1 sbk fr 3 5YR4/4 CD " Y6/2 5YR4/4 C 2 P cb ls 0m fi 8 TH 4 Horizon Depth Horizon Boundaries Soil Colors Re-Dox Re-Dox Dist Topo Matrix Ab. S. Contr. Features Texture Structure Consistence Soil Category A 0-4" a s 10YR2/1 None None l gr fr 3 E 4-21" g s C 2 P ls gr fr 3 5YR4/4 Bw 21-72" g s 2.5Y6/4 5YR4/4 C 2 P ls gr fr 3 CD " Y6/2 5YR4/4 C 2 P cb ls 0m fi 8 03 A 120" None 29" 15" TH Soil Class Total Depth Impervious/Limiting Layer Depth (og) GW Seepage Depth SHWT (og) 03 A 120" None 29" 15" TH Soil Class Total Depth Impervious/Limiting Layer Depth (og) GW Seepage Depth SHWT (og) Designer recommends removal of A/E horizons for OWTS design. Additionally, OWTS Designer should strive to maximize/increase separation distance to SHWT for OWTS design. Reference Soil Evaluation on this site, dated , in same general area where SHWT=18" Comments: Revised 1/31/14

16 Part B Site Evaluation to be completed by Soil Evaluator or Class II or III Designer Please use the area below to locate: 1. Test holes and bedrock test holes, 2. Approximate direction of due north, 3. Offsets from all test holes to fixed points such as street, utility pole, or other permanent, marked object.* *OFFSETS MUST BE SHOWN Key: Approximate location of test holes Approximate location of bedrock test holes Estimated gradient and direction of slope Approximate direction of due north Bedrock THs TH Depth 1. Relief and Slope: 2. Presence of any watercourse, wetlands or surface water bodies, within 200 feet of test holes? If yes, locate on above sketch. NO YES X 3. Restrictive Layer or Bedrock within 4 below original ground within 25 feet of test hole? Provide all test hole locations & depths above. NO X YES 4. Presence of existing or proposed private drinking water wells within 200 feet of test holes? If yes, locate on above sketch. NO X YES 5. Public drinking water wells within 500 feet of test holes? If yes, locate on above sketch. NO X YES 6. Is site within the watershed of a public drinking water reservoir or other critical area defined in Rule 38? NO X YES 7. Has soil been excavated from or fill deposited on site? If yes, locate on above sketch. NO X YES 8. Site s potential for flooding or ponding: NONE SLIGHT X MODERATE SEVERE 9. Landscape position: Back slope 10. Vegetation: Specimen vegetation with moderate understory 11. Indicate approximate location of property lines and roadways. For use with OWTS Design only. 12. Additional comments, site constraints or additional information regarding site: Certification The undersigned hereby certifies that all information on this application and accompanying forms, submittals and sketches are true and accurate and that I have been authorized by the owner(s) to conduct these necessary field investigations and submit this request. Part A prepared by: Revised 1/31/14 Part B prepared by: Signature License # Signature License # DO NOT WRITE IN THIS SPACE Witnessed Soil Evaluation Decision: Concur Inconclusive Disclaim Unwitnessed Soil Evaluations Decision: Accept Inconclusive Disclaim Wet Season Determination required Additional Field Review Required Explanation: Signature Authorized Agent Elevation=560+/- NAVD88 (Google) Slope=0-8% Alfred W. DiOrio D4004 Alfred W. DiOrio D4004 Date

17

18

19

20

21

22

23

24