1 ` Larsen & Turbo Limited The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plans for which the industry, Government, Regulating agencies like Pollution Control Board working in the region and more importantly the population of the area need to extend their co-operation and contribution. Mitigation measures for each of the activities causing the environmental impact. Monitoring plans for checking activities and environmental parameters and monitoring responsibilities. Role responsibilities and resource allocation for monitoring. Following sections describes the environment management plan proposed for site clearing and Mining phases.

2 MITIGATION MEASURES:- Each of the activities during production phase is critically Reviewed for suggestion of mitigation measures. Based on This the Table 1 to 6 gives the mitigation measures for the Activities considered being causing significant Environmental impacts during production phase of every Year. Table: - 1 Environment Management Plan:- Activity Environmental Impacts Mining process Mitigation Air Water spraying by sprinkle to control micro particles of mineral and dust. Ensure uses of personal protective equipments. (PPE's) Water No waste water management. Install proper facilities to prevent rain / storm water. Land Ensure uses of personal protective equipments (PPE's). Manage proper storage of quarry solid wastes. Noise Ensure proper maintenance of machinery to reduce noise level Remarks Implementation responsibility: Project Proponent

3 Table: - 2 Environment Management Plan:- Activity Storage of all the Waste materials and products. Environmental Impacts Mitigation Air To be stored in Water accordance with Land the rules and regulation of the safety Department. Separate storage area for products. Install proper facilities to prevent rain / storm water contamination during the storage of solid prepared products. Trained / approved transports will be given work for the transportation of the products. Land Well maintained vehicles will be used. Metalled Road for vehicle movement. Top soil will be conserved and be utilized for greenbelt on area. Remarks Implementation responsibility: Project Proponent

4 Table: - 3 Environment Management Plan:-Other Facilities:- Activity Development and maintenance of green belt Environmental Impacts Mitigation Toilets Water Ensure proper sewage disposal. Air. Land Direct / Indirect Employment Socio- economic issue Ensure development and maintenance of proper green belt as proposed. Continue policy of local employment according to the skill and availability Remarks Implementation responsibility: Project Proponent Environmental Monitoring Plan:- Environment monitoring plan is given in table 5 as follows: Table No. 4 Sr.No. Activity Schedule Air Pollution Monitoring 1 Ambient air monitoring of parameters specified by GPCB in their air consents from time to time within the Proposed premises Water Pollution Monitoring Once every Calendar Year 1 No waste water Produced N.A. Solid Waste Generation Monitoring / Record Keeping 1 No Solid Waste Generation. N.A.

5 Expenditure on Environmental Matters:- The following table gives the expenditure to be incurred by Proponent on environmental matters. Table No. 5 Sr. No. Description Approximate Recurring cost per annum (Rs. In lacs) Approximate Capital Cost (Rs. In Lacs) 1 Air pollution control Water pollution control Environment monitoring and management 4 Solid and hazardous waste management Noise pollution control Occupational health Green belt Total

6 Table No. 6: vegetation Name of the trees Sensitive / tolerant to air pollution Height No. of Trees to be planted Amount to be Spent Neem Tolerant m 15 Vad Tolerant m 10 Peepal Tolerant m 15 Local species Tolerant 5-10 m 10 Total Lacs