ACQUISITION OF CROYDON COAL LTD
|
|
- Noreen Ray
- 5 years ago
- Views:
Transcription
1 Registered Office: Level 2, 395 Collins Street Melbourne, Victoria 3000 Telephone (03) th December 2013 ACQUISITION OF CROYDON COAL LTD 3D Resources Ltd. ( 3D Resources or the company ) is pleased to announce it has agreed to acquire Croydon Coal Ltd ( Croydon Coal ) a New Zealand company which owns a 100% interest in a Tangarakau Coalfield exploration project which the Company believes can potentially offer the company a commercial underground coal project in the short to medium term. The acquisition is subject to any regulatory approvals which may be required. Background 3D Resources has entered into an agreement to acquire 100% of Croydon Coal, a New Zealand company that holds 100% of Exploration Permit This permit covers a strategic part of the Tangarakau Coalfield, which is recognised as one of the largest continuous coal fields in the Taranaki and King Country coalfields of New Zealand. EP40752 (shaded Green)
2 EP40752 is located 40 kilometres south west from the farming town of Taumarunui, and 100km south west from the city of Hamilton. More importantly it is located within a few kilometres of the Okahukura to Stratford railway line that offers transport options for the coal into both the local market, as well as the export market through the port of New Plymouth. This port is uncongested and can accommodate panamax vessels. EP40752 surrounds Mining Permit MP41511 and shares the old underground workings of an old State coal mine, the Tatu State Mine in the southern boundary of the two permits. From 1940 to 1971, this mine produced over a million tonnes of thermal coal from underground mining, for local domestic consumption. EP40752 comprises 74.38km 2 and contains at least nine drill holes completed mainly by the Government. This drill hole data shows the continuity of the Maryville Coal Measures throughout much of the permit area which comprise at least 9 seams. The main commercial seam, that was the subject of historic mining at the Tatu State Mine, represents a convergence of two seams (Seams 7 & 8). These seams outcrop in the eastern part of the permit and dips to the west at around 3 to 5 degrees. Location of Drill holes and Coal Outcrops in and around EP40752
3 MP41511 (covering an area of just 3.1km 2 ) is reported to contain a JORC Indicated Resource of 7.3 million gross in-situ tonnes based on an average seam thickness of about 2.0metres. Government drill holes (7864, 7863 and 7860) located some 1.2km, 2.7km and 5.6km north of the mining permit contain coal seam thicknesses of 3.5metres, 2.6metres and 2.03metres of coal respectively for the same coal horizon. Around 3.6km to the south of the mining permit, a recent hole drilled by Solid Energy (9419) have geophysical down the hole logs that indicate there is 2.7metres of potential coal seams with some partings. Only a part of that seam was cored and so sample data is limited. These drill holes confirm that potentially, a mineable coal seam thickness exists over an extensive area both North and South of MP41511, including of course MP41511 itself. The down dip extension to the west remains largely unexplored and, based on the 3-5degree dips prevalent in this area, the main coal seams would be expected to be at around m below surface at the western boundary of EP It is 3D Resources view, therefore, that within the area surrounding the Mining Permit there is ample room for a target resource potential well in excess of the 20 million gross in-situ tonnes that may be required to give the project a +10year mine life. At this stage the resources in EP40752 are not defined sufficiently to generate a JORC compliant resource but the widely spaced drill hole data demonstrates continuity of potential mineable thicknesses of coal extending over large areas. Both permit areas are located on land owned by the Crown and administered by the Department of Conservation ( DOC ). MP41511 has a land access agreement in place with DOC to mine coal, and EP40752 has a land access agreement in place for defined exploration activities. So there appears to be government support for commercial development of coal in this area. Detailed map showing the locations of drill holes approved by the Government, some of which may be utilised by 3D Resources. The initial program by 3D Resources would aim to confirm continuity of mineable seam thicknesses over a wider area. (N.B. Grid shown on map = 1km x 1km)
4 Coal Quality Coal quality has been determined from several sources of coal sampling: Samples from six different outcrops from within, east and 1.6km southeast of MP41511; Samples from drill-hole 7864 which intersected 3.5m of coal 1.3km north of MP41511; Samples from the old Tatu State Mine including two run-of-mine analyses and results of analysis of 28 full face channel samples taken from the mine between 1941 and 1961; and Samples taken from the outcrop and exposed coal face at the proposed entrance point for the new underground mine within MP The proximate coal quality parameters, on an air dried basis (except for CV which is gross as received ) are summarised in the table below. CV (GAR) ASH VOL FC TM TS 5700 kcal 5% 40.5% 42.8% 14.5% 1.2% The coal is a high ranking sub-bituminous coal. New Zealand North Island coal, is typically high ranking sub-bituminous, high in vitrinite with reactive qualities, used primarily for feedstock to Huntly Power Station, and Glenbrook Steel Mill, which is a direct reduced iron steel plant, located south of Auckland and west of the Huntly coalfields. Infrastructure One of the attractions of the Croydon Coal project is that it is located close to infrastructure and so any mine development should involve fairly low capital costs.
5 A railroad passes the mine area, and a rail siding area has been identified 10km from mine mouth by tarred road. Alternatively, consideration can be given to installing a 3km overland conveyor from mine mouth to the rail siding if warranted. The freight railroad travels 110km southwest from the siding to the town of Stratford, and a further 40km northeast direct to the Port of New Plymouth. The same railroad joins the main trunk-line and travels 300km north to Huntly Power Station and then across to Glenbrook Steel. The railroad is currently moth-balled, but the Government railroad operator, Kiwirail, has indicated it will upgrade and re-commission the railroad at its cost, to be amortised in the haulage fee over the life of mine. The Port of New Plymouth has a 12 metre draft which was dredged in 2006 in anticipation of being the point of export for Pike River coal. The Company understands that Bathurst Resources Limited is also planning to utilise the Port for the export of its West Coast coal production by barging the coal from Westport in the South Island to New Plymouth for loading onto panamax vessels. 500KVA power can be supplied to the mine area at around $250,000, although supporting generator power would also be needed. Alternatively, at an estimated cost of $1 million, 1000KVA can be supplied which would be sufficient for an underground mine producing 1 million tonnes per annum. Target Markets The potential markets for the coal include both domestic supply in the North Island and export. Domestic demand in the North Island of New Zealand is driven by Huntly Power Station, a 1500MW Power Station designed for natural gas and coal consumption, and the Glenbrook Steel Mill, a direct reduced iron steel plant that sources its iron from nearby beach iron sands. Coal to the Power Station and the Steel Mill is supplied by Solid Energy New Zealand Limited s Huntly mines, as well as coal imported by the Power Station and the Steel Mill via the Port of Tauranga in the Eastern Bay of Plenty (typically imported from Indonesia and Australia). Apart from Fonterra, who supply their own milk factory, Solid Energy New Zealand Limited ( Solid Energy ) is the North Island s only significant coal producer and supplier. There are also several industrial users within the region of EP40752 who have a demand for coal, and who are supplied from quite a distance by Solid Energy. The financial and operational challenges of Solid Energy are well publicised. 3D Resources sees an opportunity to mitigate supplier risk for the Power Station and the Steel Mill, and to possibly be a cheaper source of supply to local industrial users in the North Island. With the availability of rail to the Port of New Plymouth, the export market provides Croydon Coal with good diversification of its coal and its customer base. About Croydon Coal Croydon Coal is a New Zealand company with 8million shares on issue. Croydon Coal s sole asset is a 100% interest in EP40752 which it acquired from Solid Energy New Zealand Ltd(Solid Energy)
6 by an agreement dated April EP40752 has been transferred to Croydon Coal with the payment to Solid Energy as follows: A cash payment ofnz$50,000 payable on the approval by the relevant Government authority to a two year extension of the permit from 7 November, 2013 to 6 November, 2015; and a cash payment of NZ$700,000 upon the Company being granted a mining permit; or If after 6 November, 2015 the Company does not apply for a mining permit but applies for and obtains an appraisal extension, a cash payment of NZ$200,000 on being granted that extension; and a cash payment of NZ$500,000 upon being granted a mining permit. If no mining permit is applied for and granted by 6 November, 2019, that is to say the Company has surrendered EP40752, there is a residual cash payment of NZ$200,000. At this stage the permit has been transferred to Croydon Coal in July 2013 but has yet to be granted a 2 year extension by Crown Minerals. This is expected to be processed in the next 1-2 months. Terms of the Acquisition 3D Resources has entered into an agreement to acquire all of the issued shares in Croydon Coal in consideration for $10,000 plus 40 million 3D Resources shares to be issued in four tranches: $10,000 plus 10million 3D Resources fully paid Ordinary shares to be issued when the Solid Energy terms of transfer are met and an extension to the license is granted by Crown Minerals(Tranche One); A further 10million 3D Resources fully paid Ordinary shares issued when a JORC Inferred Resource of more than 20million tonnes is identified on EP40752 and a positive Pre- Feasibility Study is completed.(tranche Two); A further 10million 3D Resources fully paid Ordinary shares issued when 3D acquires the rights to or ownership of MP41511 (Tranche Three); and A further 10million 3D Resources fully paid Ordinary shares when a Mining Permit is granted in respects of a part or all of EP40752(Tranche Four). The issue of 40million ordinary shares in 3D Resources represents a possible 14.2% of the current capital of 3D Resources. Conditions The acquisition is conditional upon: 3D Resources completing due diligence by 17 December 2013; Compliance with all necessary regulatory approvals including any ASX approvals that may be required as well as Crown Minerals approval to the transfer of control of Croydon Coal;
7 3D Resources completing a placement of at least $400,000 from the shortfall in the rights issue announced on 25 th October 2013 in order to assist fund the early stages of the project. A separate announcement will be made in respect to that placement in due course. For Further Information, Contact Andrew Draffin (Company Secretary) Telephone: Peter Mitchell (Managing Director) Telephone: info@3dresources.com.au Information in this ASX Announcement relating to Exploration Results and geological data has been compiled by Mr. Peter Mitchell who is a Member of the Australian Institute of Mining and Metallurgy and is Managing Director of 3D Resources Ltd. He has sufficient experience that is relevant to the types of deposits being explored for and qualifies as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2004 Edition). Peter Mitchell has consented to the release of the announcement.
MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA
311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8 9388 3701 ABN: 45 098 448 269 www.panasiacorp.com.au 11 May 2010 The Manager Company Announcements Platform Australian Securities Exchange
More informationOPTION TO PURCHASE BUENA VISTA IRON ORE DEPOSIT
ASX Release 19 February 2010 OPTION TO PURCHASE BUENA VISTA IRON ORE DEPOSIT HIGHLIGHTS Option to purchase 100% of USA based Buena Vista Iron ore deposit for total consideration of $US8 million over approximately
More informationShaw River Completes Acquisition of 75.5% Interest in Namibian Manganese Project
` ASX ANNOUNCEMENT 11 FEBRUARY 2011 Shaw River Completes Acquisition of 75.5% Interest in Namibian Manganese Project Highlights Acquisition of a 75.5% interest in the Otjozondu Manganese Project in Namibia
More informationDRILLING INTERSECTS SIGNIFICANT COAL SEAMS AT TCM COAL PROJECT, KALIMANTAN, INDONESIA
311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8 9388 3701 ABN: 45 098 448 269 www.panasiacorp.com.au 1 February 2010 The Manager Company Announcements Platform Australian Securities Exchange
More informationFor personal use only
a Level 14, 31 Queen Street Melbourne, Victoria 3000 t +61 3 8610 8633 f +61 3 8610 8666 e info@aruntaresources.com.au www.aruntaresources.com.au ABN 73 089 224 402 18 August 2015 ASX ANNOUNCEMENT (ASX:
More informationFor personal use only
9 August 2012 PRAIRIE DOWNS SECURES A LARGE COAL PROJECT IN POLAND Prairie Downs Metals Limited ( Prairie or Company ) is pleased to advise that the Company has secured a highly prospective and potentially
More informationFor personal use only
Friday, 2 November 2012 ASX release Cape Alumina sells Hey Point bauxite tenements and makes placement In a transaction valued at approximately $3.4 million, Cape Alumina Limited (ASX Code: CBX) has reached
More information15% Increase in JORC Inferred Coal Resource to 1.36 Billion Tonnes
ASX/Media Announcement 10 September 2012 Level 12, 301 Coronation Drive, Milton QLD 4064 Australia PO Box 2118, Toowong DC QLD 4066 Australia phone + 61 (0) 7 3337 9944 fax + 61 (0) 7 3337 9945 Carbon
More informationBAUXITE RESOURCES LIMITED ACN
BAUXITE RESOURCES LIMITED ACN 119 699 982 MARCH 2012 QUARTERLY REPORT HIGHLIGHTS: NEW FELICITAS BAUXITE PROSPECT MODELLING UNDERWAY First assay data suggests potential for significant bauxite resource.
More informationQUARTERLY REPORT March 2011
QUARTERLY REPORT March 2011 Australian energy company, Blackham Resources Ltd (Blackham) ( ASX: BLK ) continues to advance the development of the Scaddan and Zanthus Coal to Liquids ( CTL ) projects. The
More informationCompany Overview. August 2011
Company Overview August 2011 Capital Structure Market Capitalisation approx $130 million Undervalued against peers ASX Code: IDO 229.8m shares on issue 30.5m unlisted options Up to 35m performance shares
More informationASX Announcement / Media Release 8 June 2011
ASX Announcement / Media Release 8 June 2011 Fast Facts ASX Code: SCR SCRO Capital Structure Shares on issue: 66.37m Options on issue: 65.95m (ex 20c 75c) Market cap: $66m (Fully diluted) Board of Directors
More informationHaoma Mining NL A.B.N
Company Announcements Office Australian Stock Exchange Level 45, Rialto South Tower 525 Collins Street MELBOURNE. VIC. 3000 Haoma Mining NL A.B.N 12 008 676 177 Registered Office & Head Office: Level 1,
More informationMt Thirsty Cobalt-Nickel Joint Venture Infill Drilling Results
31 January 2007 ASX ANNOUNCEMENT. Mt Thirsty Cobalt-Nickel Joint Venture Infill Drilling Results The Company is pleased to announce results of infill drilling at the Mt Thirsty Cobalt Nickel Project, strategically
More informationFor personal use only
Mt Ruby DSO Project Acquired High Grade DSO Project in Queensland Mining planned to commence in Q4, 2013 Infrastructure accessible and ready ACN 146 455 576 ASX Release 8 February 2013 Suite 2, 12 Parliament
More informationWPG TO ENTER THE IRON ORE INDUSTRY
Western Plains Gold Ltd ABN 51 109 426 502 PO Box N239, Grosvenor Place NSW 1220, Australia Level 11, Kyle House, 27-31 Macquarie Place, Sydney, NSW Australia Telephone (+612) 9251 1044 Facsimile (+612)
More informationFor personal use only
For personal use only Welcome Over the past few months, AMMG has made some significant achievements: AMMG s team inspects the intersected lignite & coal from historical exploration in the Green Range area
More informationCOAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA
ASX/Media Release 18 January 2012 COAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA Highlights Phase 2 drilling work commenced and will continue through to mid February Inferred Resources estimate
More informationEstimating and Reporting of
AUSTRALIAN GUIDELINES FOR Estimating and Reporting of Inventory Coal, Coal Resources and Coal Reserves 2003 EDITION PREPARED BY THE COALFIELDS GEOLOGY COUNCIL OF NEW SOUTH WALES AND THE QUEENSLAND MINING
More informationAUSTRALIAN BAUXITE LIMITED
AUSTRALIAN BAUXITE LIMITED ASX: ABZ OPERATIONS REPORT Quarterly Activities Statement period ending 31 December 2009 29 January 2010 This quarterly operations report is dated 29 January 2010 and is for
More informationFor personal use only
ASX / MEDIA ANNOUNCEMENT 311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8 9388 3701 ABN: 45 098 448 269 5 September 2012 INVESTOR PRESENTATION SEPTEMBER 2012 Pan Asia Corporation Ltd (the
More informationBryah Secures Option over Historic Manganese Mine
ASX Announcement 7 May 2018 Bryah Secures Option over Historic Manganese Mine HIGHLIGHTS Bryah Resources secures exclusive 1 year option to purchase Mining Lease covering the historical Horseshoe South
More informationSUCCESSFUL INFILL DRILLING CAMPAIGN COMPLETED
31 Ord Street, West Perth WA 6005 PO Box 1941, West Perth WA 6872 +61 8 9322 1003 australianpotash.com.au @OzPotash ABN 58 149 390 394 13 November 2018 SUCCESSFUL INFILL DRILLING CAMPAIGN COMPLETED DEEP
More informationFor personal use only. Company Overview. 30 May 2011
Company Overview 30 May 2011 Capital Structure Market Capitalisation approx $145 million Undervalued against peers ASX Code: IDO 211.1m shares on issue (100% tradeable) 29.6m unlisted options (incl 28.6m
More informationFor personal use only
ASX RELEASE 16 February 2017 DRILL PROGRAMME AND TIMEFRAME CONFIRMED FOR OPUWO COBALT PROJECT HIGHLIGHTS Drill programme commencement scheduled for early March. First phase of drilling aims to systematically
More informationFor personal use only
16 September 2011 SULTAN ACCELERATES GROWTH WITH ACQUISITION OF HIGHLY STRATEGIC POLISH BASE METALS PROJECT Secures Bogdan Project Located Adjacent to Europe s Largest Copper Mine 42 sq km tenement sits
More informationSupplying Key Resources into Expanding Asian Markets COMPANY PRESENTATION
Supplying Key Resources into Expanding Asian Markets COMPANY PRESENTATION Thermal Coal: Indonesia - Kalimantan In Major Coal Provinces South and East Kalimantan Close to Asian Markets # 1 thermal coal
More informationFor personal use only
MEDIA/ASX RELEASE 13 JANUARY 2011 NEW EXPLORATION LICENCE GRANTED WITH JORC KAOLIN RESOURCE OF 65 MT AT AMMG'S MECKERING PROJECT (COMPRISING 16.77MT INDICATED 48.28MT INFERRED) HIGHLIGHTS AMMG granted
More informationASX Announcement 25 January 2017
ASX Announcement 25 January 2017 COMPANY DETAILS Davenport Resources Limited ABN: 64 153 414 852 ASX CODE: DAV PRINCIPAL AND REGISTERED OFFICE (& Postal Address) Davenport Resources Limited Level 14, 31
More informationPREFEASIBILITY STUDY COMPLETED FOR MMAMABULA WEST
For electronic distribution 12 th May 2014 Highlights PREFEASIBILITY STUDY COMPLETED FOR MMAMABULA WEST A Prefeasibility Study for an underground coal mine based on a 200Mt portion of the A Seam within
More informationDECEMBER 2010 QUARTERLY ACTIVITIES REPORT
21 January 2011 DECEMBER 2010 QUARTERLY ACTIVITIES REPORT HIGHLIGHTS Company s total JORC compliant resource inventory in south-east Brazil increased to 126.1 million tonnes at an average grade of 30.5%
More informationFor personal use only
Significant Increase in Resources and Potential of Talga s Swedish Iron Deposits ASX Code: TLG Talga Gold Ltd ABN 32 138 405 419 1st Floor, 2 Richardson St, West Perth, WA 6005 T: +61 8 9481 6667 F: +61
More informationFEASIBILITY STUDY COMPLETED CONFIRMING ROBUST CASH MARGINS FOR JOGJAKARTA IRON PROJECT
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE: 29 AUGUST 2011 FEASIBILITY STUDY COMPLETED CONFIRMING ROBUST CASH MARGINS FOR JOGJAKARTA IRON PROJECT Highlights: Feasibility Study completed on a 2
More informationFor personal use only
MEDIA/ASX RELEASE 4 MARCH 2013 147Mt INCREASE IN ALUMINOUS CLAY RESOURCES HIGHLIGHTS AMMG acquires new Gibson High Purity Alumina (HPA) Project with JORC inferred resource of 147 million tonnes (Mt) of
More informationASX Announcement 25 November 2010 MT BEVAN IRON ORE PROJECT EXPLORATION UPDATE. About Legacy Iron Ore. The Company Announcements Office ASX Limited
I R O N O R E L I M I T E D About Legacy Iron Ore Legacy Iron Ore Limited ( Legacy or the Company ) is a Western Australian based Exploration Company, focused on iron ore and gold exploration and discovery.
More informationUPDATE TO BROKEN HILL MINERAL RESOURCES AND ORE RESERVES
7 November 2008 UPDATE TO BROKEN HILL MINERAL RESOURCES AND ORE RESERVES Highlights Broken Hill Ore Reserves increase life of mine to 9 years at conservative price assumptions Substantial Resource base
More informationFor personal use only
NEWS RELEASE October 17, 2011 SIGNIFICANT INCREASE IN CLEAN COAL YIELD CONFIRMED BY COAL QUALITY TEST PROGRAM AT VISTA Highlights: Overall clean coal yield increases substantially to 56%, up from previous
More informationHaoma Mining NL. Dear Sir, ACTIVITIES REPORT FOR THE QUARTER ENDED MARCH 31, 2011 HIGHLIGHTS
Haoma Mining NL A.B.N 12 008 676 177 Registered Office & Head Office: Level 1, 401 Collins Street, Melbourne, Vic., 3000, GPO Box 2282U, Melbourne, Vic., 3001. Telephone (03) 9629 6888, Facsimile (03)
More informationFor personal use only
15 June 2016 ASX ANNOUNCEMENT Low cost highwall mining to commence at Isaac Plains Coking Coal Mine HIGHLIGHTS Highwall mining contract signed, targeting extraction of over 300,000 ROM tonnes of low cost
More informationFor personal use only
MetroCoal Limited (ASX:MTE) and Developing a Multi Commodity Company Presentation to Annual General Meeting 25 November 2014 1 METROCOAL AT YEAR END 2014 MetroCoal Holds >90% of Cape Alumina Commenced
More informationBUILDING AN EMERGING RESOURCE COMPANY UPDATE ON ACQUISITION OF COAL AND MANGANESE ASSETS IN INDONESIA
16 December 2009 The Manager Company Announcements Platform Australian Securities Exchange Exchange Plaza, 2 The Esplanade PERTH WA 6000 311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8
More informationJune 2009 quarterly report
June 2009 quarterly report HIGHLIGHTS Canning Basin Coal Projects, WA Resource at Duchess-Paradise upgraded to over 500Mt thermal coal Pre feasibility study on coal export project underway Myroodah Underground
More informationUpdate February Better Bauxite. Bauxite is the ore for aluminium and alumina
Update February 2010 Better Bauxite Bauxite is the ore for aluminium and alumina Australian Bauxite Limited ACN 139 494 885 Level 2 Hudson House 131 Macquarie Street Sydney NSW 2000 Australia Phone: +61
More informationInitial Coal Quality Testing Indicates Metallurgical Coal Potential
ASX RELEASE 31 October 2013 Initial Coal Quality Testing Indicates Metallurgical Coal Potential Highlights: Initial coal quality test results conducted on the recent drill cores from the Company s 100%
More informationFor personal use only
The largest non state-owned and second largest coal producer in Chongqing, China by coal reserves Blackgold International Holdings Limited ASX: BGG www.blackgoldglobal.net Mines and Money Hong Kong Presentation
More informationMine Infrastructure Construction begins at Nullagine JV First iron ore shipment by December 2010
ASX RELEASE 18 AUGUST 2010 Mine Infrastructure Construction begins at Nullagine JV First iron ore shipment by December 2010 Key Points: Mining approvals granted for Stage 1 of the Nullagine Iron Ore JV
More informationCockatoo Island Proposed Acquisition Update and Stage 4 Valuation
Cockatoo Island Proposed Acquisition Update and Stage 4 Valuation HIGHLIGHTS Stage 4 Probable Ore Reserve reported in accordance with the JORC Code 1 of 1.2 Mt @ 68.5% iron. First iron ore production expected
More informationHILLGROVE ACQUIRES OPTIONS ON INDONESIAN BAUXITE PROJECTS
Tuesday, 22 June 2010 Highlights HILLGROVE ACQUIRES OPTIONS ON INDONESIAN BAUXITE PROJECTS Options secured over 70% of companies controlling 1,400km² of granted bauxite exploration licenses in West Kalimantan
More informationFor personal use only
1 SCOPING STUDY CONFIRMS PROFITABLE POTENTIAL OF HASTINGS HEAVY RARE EARTH PROJECT The Manager Company Announcements Office Australian Securities Exchange 4th Floor, 20 Bridge Street SYDNEY NSW 2000 Hastings
More informationGrange Resources. Diggers & Dealers 4 August Russell Clark Managing Director & CEO
Grange Resources Australia s leading magnetite producer Grange Resources Limited (GRR) Level 11, 200 St Georges Terrace Perth, WA 6000, Australia Phone + 61 8 9321 1118 Fax + 61 8 9321 1523 www.grangeresources.com.au
More informationFIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET
May 30 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 FIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET First Gold poured from Dalgaranga
More informationFURTHER GROWTH FOR BALAMARA WITH AWARD OF SIGNIFICANT NEW COAL CONCESSION AT MARIOLA
288 Churchill Avenue Subiaco, WA 6008 ABN 84 061 219 985 P: +61 8 9380 9800 E:enquiries@balamara.com.au 27 July 2015 FURTHER GROWTH FOR BALAMARA WITH AWARD OF SIGNIFICANT NEW COAL CONCESSION AT MARIOLA
More informationFor personal use only
ASX ANNOUNCEMENT AUSTRALIAN BAUXITE LIMITED ASX: ABZ Binjour Bauxite Resource Increased 46% to 24.5 Million Tonnes Company resources grow to 106 million tonnes 1,2,3,4 24.5 million tonnes of thick, gibbsite-rich
More informationASX ANNOUNCEMENT 29 June 2012
ASX ANNOUNCEMENT AUSTRALIAN BAUXITE LIMITED ASX: ABZ Binjour Bauxite Resource Increased 46% to 24.5 Million Tonnes Company resources grow to 106 million tonnes 1,2,3,4 24.5 million tonnes of thick, gibbsite-rich
More informationFor personal use only
Nigerian Subsidiary Nigerian Subsidiary ASX ANNOUNCEMENT AND MEDIA RELEASE 22 January 2014 KOGI FURTHER OPTIMISES BARGING STUDY Highlights Optimisation of barging study reduces operating and capital cost
More informationFor personal use only
4 APRIL 2013 D Zone Mineral Resource Increases by 34% to 20.7 million tonnes with a significant increase in contained Cu and Fe Highlights Overall D Zone Mineral Resource tonnage has increased by 5.2 million
More informationTEMBANG PRE-FEASIBILITY STUDY DELIVERS POSITIVE OUTCOME
ASX ANNOUNCEMENT 23 February 2012 (8 pages by email) TEMBANG PRE-FEASIBILITY STUDY DELIVERS POSITIVE OUTCOME Sumatra Copper & Gold plc ( Sumatra or the Company ) is pleased to announce that the Prefeasibility
More informationINDONESIAN BAUXITE PROJECTS
Tuesday, 22 June 2010 INDONESIAN BAUXITE PROJECTS Highlights Hillgrove to assign to InterMet options over 70% of companies controlling 1,400km² of granted bauxite exploration licenses in West Kalimantan
More informationFor personal use only
Redmoor Presentation House of Commons, London ASX Release 30 November 2016 ASX Code NAE New Age Exploration Limited ( NAE or the Company ) is pleased to announce that the attached presentation on the Redmoor
More informationInvestor Presentation Jogjakarta Iron Sands Project
Investor Presentation Jogjakarta Iron Sands Project Overview of Iron Sands Project Large & well tested (to JORC Standard) Iron Sands Mineral Resource in Java, Indonesia, equivalent 65 Mt of Iron Project
More informationThalanga Operations Ore Reserve and Mineral Resource Statement
Thalanga Operations Ore Reserve and Mineral Resource Statement Ore Reserves Classification Tonnage (Kt) Cu (%) Pb (%) Zn (%) Au (g/t) Ag (g/t) Zn Eq. (%) West 45 (1) Proved 101 0.3 2.0 4.6 0.3 38 8.4 Probable
More informationBAUXITE RESOURCES LIMITED ABN
BAUXITE RESOURCES LIMITED ABN 72 119 699 982 1 April 2010 CLARIFICATION OF 16 January 2009 RELEASE ON JORC RESOURCES Bauxite Resources Ltd (BRL or the company ASX code BAU ) has been advised by ASX that
More informationGrange Resources Australia s leading magnetite producer
Grange Resources Australia s leading magnetite producer Grange Resources Limited (GRR) Level 11, 200 St Georges Terrace Perth, WA 6000, Australia Phone + 61 8 9321 1118 Fax + 61 8 9321 1523 www.grangeresources.com.au
More informationGarden Well Gold Deposit. Reserve Increases to 1.66 Million Ounces
ABN 28 009 174 761 31 March 2011 Manager Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 www.regisresources.com Level 1 1 Alvan
More informationAscot signs Heads of Agreement to acquire Urabá coal mining concession in Colombia
Perth Office: Ascot Resources Ltd 512 Hay Street Subiaco WA 6008 T: + 61 8 9381 4534 F: + 61 8 9380 6440 E: info@ascotresources.com W: www.ascotresourcs.com ASX ANNOUNCEMENT 22 July 2013 The Manager Company
More informationASX ANNOUNCEMENT 15 August 2011
ASX ANNOUNCEMENT AUSTRALIAN BAUXITE LIMITED ASX: ABZ 6 Million Tonnes Maiden Guyra Resource: High-Grade Bauxite Company resources grow to 68 million tonnes 1,2 Maiden Resource: 6 million tonnes of gibbsite-rich
More informationASX ANNOUNCEMENT 26 February 2013 ASX Code: BDR. MAIDEN DUCKHEAD HANGINGWALL LODE RESOURCE 584, g/t for 71,000 oz gold
ASX ANNOUNCEMENT 2 February 2013 ASX Code: BDR MAIDEN DUCKHEAD HANGINGWALL LODE RESOURCE 58,000 tonnes @ 3.8 g/t for 71,000 oz gold MAIDEN DUCKHEAD HANGINGWALL STARTER PIT RESERVE 272,000 tonnes @ 3.2
More informationFor personal use only
INVESTOR UPDATE May 2016 Disclaimer Statements & material contained in this presentation, particularly those regarding possible or assumed future performance, production levels or rates, metal prices,
More informationFor personal use only
24 August 2015 PROPOSED COAL SEAM ACCESS AT BUCK CREEK NO.2 MINE CONFIRMS LOW CAPITAL COST HIGHLIGHTS: Shallow depth of coal seam (100 to 125 feet / 30 to 38 metres) at proposed Buck Creek No. 2 Mine allows
More informationAustralian Tailings Group Pty Ltd Synergy (SNR) Investor Presentation
Australian Tailings Group Pty Ltd Synergy (SNR) Investor Presentation Disclaimer Forward-Looking Statements This presentation contains forward looking statements concerning the projects owned by Australian
More informationFor personal use only
ASX Release and Media Announcement 3 December 2012 IRON ROAD ANNOUNCES PROPOSED EXPORT SOLUTION New Port Option to Open South Australia to Capesize Bulk Carriers Iron Road Limited (Iron Road, ASX: IRD)
More informationGreat Western Scoping Study Update & Onsite Gold Processing
ASX RELEASE 10 August 2017 ABN: 45 116 153 514 ASX: TMX Great Western Scoping Study Update & Onsite Gold Processing Terrain Minerals Limited (ASX: TMX) is pleased to provide the following update on its
More informationFor personal use only
27 April 2017 ASX Announcement March 2017 Quarterly Activities Report Summary Chelkar - Assay High Grade Potash Mineralisation Present Bankable Feasibility Study Advances for Satimola Project JV with Chongqing
More informationFor personal use only
8 January 2016 Manager Companies Companies Announcements Office Australian Stock Exchange Limited LEIGH CREEK ENERGY LIMITED ASX ANNOUNCEMENT Initial PRMS ISG Gas Resources Certification Gas Sales discussions
More informationSTRONG PRE-FEASABILITY STUDY SUPPORTS 1.5 MTPA URQUHART BAUXITE DEVELOPMENT
ASX RELEASE 30 DECEMBER 2016 STRONG PRE-FEASABILITY STUDY SUPPORTS 1.5 MTPA URQUHART BAUXITE DEVELOPMENT HIGHLIGHTS Independent Pre-Feasibility Study (PFS) supports development of the Urquhart Bauxite
More informationFor personal use only
23 September 2015 ILLINOIS BASIN: EXPECTED FUTURE DEMAND GROWTH HIGHLIGHTS: Illinois Coal Basin ( ILB ) market fundamentals continue to show potential for strong future demand growth and a need for additional
More informationCARBON ENERGY. May Morné Engelbrecht Acting Chief Executive Officer
CARBON ENERGY May 2013 Morné Engelbrecht Acting Chief Executive Officer IMPORTANT STATEMENTS Disclaimer The information contained in this presentation is given without any liability whatsoever to Carbon
More informationFor personal use only
Tuesday, 11 December 2012 ASX release Cape Alumina completes Pre-Feasibility Study for Bauxite Hills Highlights Cape Alumina Limited (ASX Code: CBX) engaged GHD in April 2012 to carry out a pre-feasibility
More informationNew focus and new opportunities in Canadian graphite and coal
Ltd ACN: 110 884 252 New focus and new opportunities in Canadian graphite and coal Investor Presentation: December 2014 ASX: ADV 1 Disclaimer Competent Person Statement The information in this presentation
More informationKOGI REPORTS BARGING STUDY COMPLETED
ASX ANNOUCEMENT & MEDIA RELEASE 14 October 2013 KOGI REPORTS BARGING STUDY COMPLETED Highlights Niger River Barging Study Completed by Prestedge Retief Dresner Wijnberg (Pty) Ltd Five barging scenarios
More informationGum Flat Iron Ore. Potential to Export from Port Lincoln in 2 years. Dr A. John Parker. Managing Director. Port Lincoln Council 17 January 2011
Gum Flat Iron Ore Potential to Export from Port Lincoln in 2 years Dr A. John Parker Managing Director Port Lincoln Council 17 January 2011 Disclaimer & Competent Person s Statement This presentation has
More informationCarbon Energy UCG Projects update. UCG Association London March 2011
Carbon Energy UCG Projects update UCG Association London March 2011 Cliff Mallett Technical Director Important Statements Disclaimer The information contained in this presentation is given without any
More informationAustralia s largest Vanadium in magnetite deposit delivering the highest Vanadium grade in concentrate
Australia s largest Vanadium in magnetite deposit delivering the highest Vanadium grade in concentrate VANADIUM CONCEPT STUDY UNDERWAY High Purity Vanadium Pentoxide, Titanium Dioxide and Iron Oxide ASX:
More informationFor personal use only
Venture Upgrades DSO Resource Base and Delivers a 4mt Maiden Ore Reserve. ASX Announcement Thursday, 26/07/12 Ref: /VMS/606/VMS00287 Australian mineral exploration company, Venture Minerals Limited (ASX
More informationLynas Acquires New Rare Earths Resource in Malawi
Corporate Office Telephone: +61 2 8259 7100 Level 7 Facsimile: +61 2 8259 7199 56 Pitt Street Website: www.lynascorp.com Sydney NSW 2000 ACN: 009 066 648 AUSTRALIA 6 September 2007 Lynas Acquires New Rare
More informationFor personal use only
TALGA RESOURCES Talga Resources Ltd ABN 32 138 405 419 1st Floor, 2 Richardson St, West Perth, WA 6005 T: +61 8 9481 6667 F: +61 8 9322 1935 www.talgaresources.com Corporate Information ASX Code TLG Shares
More informationFor personal use only
ASX Code: MRP MacPhersons Resources Ltd ABN 98 139 357 967 ACN 139 357 967 Contact Details PO Box 10977 109 Maritana Street Kalgoorlie WA 6430 T +61 (0) 8 9091 7515 F +61 (0) 8 9091 7610 E info@mrpresources.com.au
More informationFor personal use only
June 2013 Quarterly Report 30 July 2013 Highlights Total gold production was 5,767 ounces for the quarter. Cash operating profit was A$628,000 for the quarter. Gold production at Lily was 4,641 ounces
More informationOn track to commence bauxite production in H1 2017
INVESTOR UPDATE July 2016 On track to commence bauxite production in H1 2017 Disclaimer Statements & material contained in this presentation, particularly those regarding possible or assumed future performance,
More informationMARILLANA MAIDEN HEMATITE ORE RESERVE OF 1.05 BILLION TONNES
ASX Release: 9 September 2010 MARILLANA MAIDEN HEMATITE ORE RESERVE OF 1.05 BILLION TONNES Definitive Mining Studies confirm continuity, quality and quantum of Ore body at MARILLANA Detrital Ore Reserves
More informationFor personal use only
High-grade gold intercepts from multiple holes in Borborema infill drilling program All 11 recent diamond and 35 RC holes hit ore-grade, in wide intersections Best intercepts include: - - Drilling at the
More informationWA s MT THIRSTY COBALT-NICKEL PROJECT POTENTIALLY WORLD S FOURTH LARGEST COBALT PRODUCER
WA s MT THIRSTY COBALT-NICKEL PROJECT POTENTIALLY WORLD S FOURTH LARGEST COBALT PRODUCER Highlights Project has potential to deliver 3,700 tonnes of cobalt, 10,300 tonnes of nickel and 27,000 tonnes of
More informationCarbon Energy Low cost, low emission energy has arrived
Carbon Energy Low cost, low emission energy has arrived Investor Presentation Andrew Dash Managing Director Australian Securities Exchange Spotlight Conference London 10th March 2011 Important Statements
More information5 th Asian Bauxite & Alumina Conference
5 th Asian Bauxite & Alumina Conference October 2015 Bauxite Hills Project Deliberate Focus ASX : MMI CORPORATE SNAPSHOT Shareholders 0.140 0.120 MMI Share Price (A$) Other 47% NetWealth Investments 5%
More informationFor personal use only
ACN 092 471 513 QUARTERLY REPORT FOR THE PERIOD ENDING 31 MARCH 2018 HIGHLIGHTS PENNY S FIND GOLD MINE KALGOORLIE (WA) 25,771 dry tonnes of ore processed at an average head grade of 6.55g/t Au 5,061 ounces
More informationASX ANNOUNCEMENT 28 July 2011 ASX Code: BDR EXCEPTIONAL GOLD AND IRON ORE RESULTS - TUCANO
ASX ANNOUNCEMENT 8 July 011 ASX Code: BDR EXCEPTIONAL GOLD AND IRON ORE RESULTS - TUCANO 10 m @ 0 g/t gold in RC grade control Tapereba AB1 m @ 14.0 g/t gold from Tapereba Sul 1. m @ 8. g/t gold from Tapereba
More informationCHINA MINING Conference Tianjin October 2014
CHINA MINING Conference Tianjin October 2014 Forward Looking Statements These materials include forward looking statements. Often, but not always, forward looking statements can generally be identified
More informationMINING COMMENCES AT KONONGO GOLD PROJECT
ASX Release Monday 28 th March 2011 MINING COMMENCES AT KONONGO GOLD PROJECT Signature Metals Limited is pleased to announce that it has commenced mining at the Konongo Gold Project. SIGNATURE METALS LIMITED
More information