1 FORM-1, 1A & CONCEPTUAL PLAN FOR ENVIRONMENT CLEARANCE FOR PROPOSED EXPANSION OF SARVODAYA HOSPITAL & RESEARCH CENTRE (A UNIT OF ANSHU HOSPITALS LTD) AT SITE NO.1, SECTOR-088 AT FARIDABAD, HARYANA Project Proponent: M/S ANSHU HOSPITALS LTD EIA Consultant: Ind Tech House Consult (An ISO 9001:2008 Certified Organization) G-8/6, Ground Floor, Sector 11, Rohini Delhi Tel: , Fax: January 2017

2 ENVIRONMENT CLEARANCE FOR PROPOSED EXPANSION OF SARVODAYA HOSPITAL & RESEARCH CENTRE (A UNIT OF ANSHU HOSPITALS LTD) AT SITE NO.1, SECTOR-08 AT FARIDABAD, HARYANA Project Proponent: M/S ANSHU HOSPITALS LTD For and on behalf of: Ind Tech House Consult Approved by: Mr. Arvind N. Devikar Signed: Position: EIA Coordinator Date: January, 2017 This report has been prepared by Ind Tech House Consult with all reasonable skill, care and diligence within the terms of the contract with the client, incorporating our general terms and conditions of business and taking account of the resources devoted to it by agreement with the client. We disclaim any responsibility to the client and others in respect of any matters outside the scope of the above. The document has been prepared for the titled project or named part thereof and should not be relied upon or used for any other project without an independent check being carried out as to its suitability and prior written authority of Ind Tech House Consult being obtained. Ind Tech House Consult accepts no responsibility or liability for the consequences of this document being used for a purpose other than the purpose for which it was commissioned. Any person using or relying on the document for such other purpose agrees, and will by such use or reliance be taken to confirm his agreement to indemnify Ind Tech House Consult for all loss or damage resulting there from. Ind Tech House Consult accepts no responsibility or liability for this document to any party other than the person by whom it was commissioned.

3 Team of Experts associated for the Project Declaration By Experts Contributing to the EIA Of Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) at Site No.1, Sector-08 at Faridabad, Haryana I, hereby, certify that I was a part of the EIA team in the following capacity that developed the above EIA. EIA coordinator: Mr. Arvind Narayan Devikar Associate Coordinator: Mr. Soumya Dwivedi Name: Mr. Arvind Narayan Devikar Signature and Date: S. NO. Functional Name of the expert/s areas 1 WP Mrs. Supriti Guha (FAE) Mr. Soumya Dwivedi (Team Member) Signature and date 2 MSW Mrs. Supriti Guha (FAE) Mr. Soumya Dwivedi (Team Member) 3 LU Mr. Rajveer Singh (FAE) Mr. Manish Shukla (AFAE) 4 AP Mr. Suman Banerjee (FAE) Mr. Soumya Dwivedi (Team Member) 5 NV Dr. Manoj Kr. Mishra (FAE) Mr. Suman Banerjee (AFAE) 6 EB Dr. Sameer DeshPande(FAE) Dr. Bideh Shukla (Team Member) 7 SE Dr. Debashish Bhttacharya (FAE) 8 HG Mr. Manish Shukla (AFAE) 9 SC Mr. Shrikant Mishra (FAE) Dr. Bideh Shukla (Team Member)

4 Associate Staff 1. Mr. Anand Kumar Dubey 2. Mr. Indra Sharma 3. Ms Monika Singh 4. Mr. Saurabh Bhardwaj Monitoring Laboratory Involved Ind Research and Development House ( NABL Approved Lab) Signature For Ind Tech House Consult

5 TABLE OF CONTENTS S. No. Contents Page No. I Form II Form 1 A III Conceptual Plan IV Annexure A DESCRIPTIVE Site Location Map (on Google) Annexure-A1 500 Mt Radius Map Annexure-A2 10 km Radius Map Annexure-A3 Water balance Diagram Annexure-A4 Rain Water Harvesting Calculation Annexure-A5 Site Photographs Annexure-A6 Electricity Bill Annexure-A7 Water Bill Annexure-A8 Bio Medical Agreement Annexure-A9 Board Of Resolution for authorized Signatory Annexure-A10 B LAND DOCUMENTS Allotment Letter & Registry Annexure-B1 Approved Zoning Plan Annexure-B2 Forest Noc Annexure-B3 Fire & Aravali Noc Annexure-B4 C D E CONSULTANT DISCLOUSURE Consultant Disclosure NABET Accreditation letter DRAWINGS Site Layout Plan Landscape Plan Section and Elevation Plan Fire Fighting Schematic Plan Services Plan Additional Documents/Affidavits Monitoring Report Electrical Hazards Plan Noise and Vibration plan Health safety and welfare plans Affidavit for use of RMC & Fly ash during construction Affidavit for use of ultra low sulphur diesel Affidavit for No Construction & No use of ground water Affidavit for providing fire fighting system Affidavit for Not diverting natural flow of water Annexure-C1 Annexure-C2 Annexure-D1 Annexure-D2 Annexure-D3 Annexure-D4 Annexure-D5 Annexure-E1 Annexure-E2 Annexure-E3 Annexure-E4 Annexure-E5 Annexure-E6 Annexure-E7 Annexure-E8 Annexure-E9

6 Affidavit for No encroachment of revenue Rasta Undertaking for Adequate safety measure during construction Undertaking for Safety and welfare of workers & residents from electrical Hazards Affidavit for use of solar energy as per HAREDA Norms Annexure-E10 Annexure-E11 Annexure-E12 Annexure-E13

7 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1 Application for Prior Environmental Clearance (EC) FORM 1 (See Paragraph 6 Notification dated14 th September 2006) as amended to EIA Notification, 2006 issued vide S.O. 3067(E) on dt Basic Information SN Item Details 1. Name of the project/s Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad. 2. S. No. in the schedule 8(a) 3. Proposed capacity/area/length /tonnage to be handled/ command area/lease area/ number of wells to be drilled Particulars Area in sqm Total plot area Proposed Built Up Area Total No. of Building Blocks 3 4. New/Expansion/Modernization Expansion- Additions of 150 Bed & Nursing Institute 5. Existing capacity/area etc. 150 beded Hospital + Nursing Institute Hosp Details Existing NO OF BEDS 150 OPD 500 PATIENTS 500 NURSING INSTITUTE-STUDENTS Category of the project i.e. A or B B 7. Does it attract the general condition? If yes, please specify. 8. Does it attract the specific condition? If yes, please specify. 9. Location Faridabad No No Plot/Survey/Khasra No. Site No. 1, Sector-08 Village - Tehsil District State 10. Nearest railway station/airport along with distance in kms. 11. Nearest town, city, district Headquarters along with distance in Km 12. Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal address with telephone nos. to be given) Faridabad Faridabad Haryana Faridabad Rly. Station, 2.70 km NW IGI Airport, Delhi, km. NW Faridabad - ITHC/PRJ/16-17/EIA/70 1 IND TECH HOUSE CONSULT

8 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form Name of the applicant Sarvodaya Hospital & Research Centre 14. Registered Address Site No.1, Sector-08, Faridabad 15. Address for correspondence: Name Designation (Owner/Partner/CEO) Address Dr. Rakesh Gupta Director YMCA Road, Sector-08, Faridabad Pin Code Telephone No , Fax No , Details of Alternative Sites examined, if any. Location of these sites should be shown on a topo-sheet. 17. Interlinked Projects Nil 18. Whether separate application of interlinked project has been submitted? Not applicable. Not Applicable 19. If yes, date of submission Not Applicable 20. If no, reason. Not Applicable 21. Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given. (a) The forest (Conservation) Act, 1980? (b) The wildlife (Protection) Act, 1972? (c) The C.R.Z. Notification, 1991? 22. Whether there is any government order/policy relevant/ relating to the site? No, project proposal does not involves approval / clearance under subhead a, b & c. No 23. Forest land involved (hectares) No 24. Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project. No ITHC/PRJ/16-17/EIA/70 2 IND TECH HOUSE CONSULT

9 Anshu Hospitals Ltd (I) Activity Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) SN Information/Checklist confirmation Yes/ No Details thereof (with approximate quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation and buildings? No No No change of Land use as the this is an expansion of the Existing hospital There was no existing vegetation at the project site. 1.3 Creation of new land uses? No. There was no creation / change of new land use. The land has been approved for the proposed project by Municipal Corporation of Faridabad (MCF). 1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Geotechnical Soil investigation has been carried out. 1.5 Construction works? Yes The major construction works are given below: Site Development Road Development Internal roads Utilities/Services Water Supply Sewerage Drainage Rain Water Harvesting Structures and Pits Power supply and back up facility, Buildings Hospital Nursing Institute 1.6 Demolition works? No Demolition work is not involved in the project. 1.7 Temporary sites used for construction works or housing of construction workers? 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations Yes Yes Local labors will be employed. So there will be no labour camps proposed at the site. Above ground building structure includes 03 block with B+ST+7. The earthwork is involved for foundation and laying of underground services etc. Excavated soil will be used for site leveling, back filling/filling and road construction. Top 200 mm layer of soil will be separately stored and used for landscaping / horticulture development work. ITHC/PRJ/16-17/EIA/70 3 IND TECH HOUSE CONSULT

10 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1 SN Information/Checklist confirmation 1.9 Underground works including mining or tunneling? Yes/ No Yes 1.10 Reclamation works? No Not involved Dredging? No Not involved Offshore structures? No Not involved Production and manufacturing processes? No Details thereof (with approximate quantities /rates, wherever possible) with source of information data Underground works includes excavation of earth for construction of foundation, water storage tank and STP This is a Hospital, hence, no production or manufacturing activities will be involved Facilities for storage of goods or materials? 1.15 Facilities for treatment or disposal of solid or liquid effluents? Yes Yes Temporary storage facilities will be created during construction phase for storage of construction materials. Solid Waste Construction Stage : During construction stage generated solid waste will comprise mainly of construction waste. The construction waste will be reused within the site for various constructions filling work. Operation Stage: Solid Waste Solid waste generation from the facility will be approximately 0.91 TPD including 0.55 TPD biodegradable. Solid waste generated from the hospital block and other areas will be collected daily by the dedicated and trained housekeeping staff. Twin bin systems will also be provided for segregation at sources. Recyclable wastes will be sold to vendors and nonrecyclable wastes will be disposed through authorized agency to municipal waste disposal site. Biodegradable waste will be treated in organic waste converter and used as manure for horticulture development. MSW including horticulture waste will be handled as per the Municipal Solid Waste Management & Handling Rules, Bio-medical Waste Bio-medical waste generation from the facility will be approximately 0.09 TPD. Waste water will also generate from construction activities, cleaning, curing washing etc. which contain suspended materials. ITHC/PRJ/16-17/EIA/70 4 IND TECH HOUSE CONSULT

11 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1 SN Information/Checklist confirmation Yes/ No Details thereof (with approximate quantities /rates, wherever possible) with source of information data Hazardous waste: 4.13 liters /day waste oil from DG sets will be generated and sold to authorized recyclers. E Waste : The e-waste, generated from the proposed project shall be stored at a designated place. Waste will be disposed as per E-waste Management and Handling Rules, Liquid Effluent Construction Stage: During the construction stage domestic liquid effluent generation will be Zero as there will be no labour camps proposed at site. Wastewater generated from construction site contains suspended materials, and washings from various areas. Construction wastewater shall be collected in a separate basin and shall be reused after primary treatment for sprinkling on roads. Mobile toilets and potable water facilities will be provided at site during construction phase for labour and staff. Operation Stage: Approximately 144 KLD of domestic waste water & 38 KLD Trade effluent will be generated from the proposed facility. This effluent will be treated in Sewage Treatment Plant & Effluent Treatment Plant having capacity of 170 KLD & 45 KLD respectively. The treated water from STP and ETP will be reused for horticulture, DG cooling & HVAC Facilities for long term housing of operational workers? 1.17 New road, rail or sea traffic during construction or operation? 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? No No No No No Not applicable Not applicable Not applicable Not applicable Not applicable ITHC/PRJ/16-17/EIA/70 5 IND TECH HOUSE CONSULT

12 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1 SN Information/Checklist confirmation 1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? Yes/ No No Details thereof (with approximate quantities /rates, wherever possible) with source of information data Not applicable Stream crossings? No Not applicable 1.23 Abstraction or transfers of water form ground or surface waters? 1.24 Changes in water bodies or the land surface affecting drainage or run-off Transport of personnel or materials for construction, operation or decommissioning Long-term dismantling or decommissioning or restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? No Yes Yes No No Yes There is no ground water extraction for the construction of project. Treated water from nearby STP will be arranged through tankers and will be used after testing and confirmation of fitness for construction. During operation phase, water requirement shall be met through MCF. Surface drainage may affect due to construction of the project. By considering run off prior to development & run off after development there is some increment in storm water runoff. However runoff generated from the project site during monsoon season will be used to recharge ground aquifer. Network of drainage system developed in the site will be used to collect roof as well as surface runoff. Potential Quantity of runoff will be CUM on annual basis, which will be recharged to ground. During construction phase transport of personnel as well as construction materials would be required. The personnel would preferably be engaged from nearby areas. Precaution will be taken to reduce the impact of vehicular movement by trying to avoid the vehicular trips during peak hours. Operation phase parking will be provided on surface and in basement. Not applicable Not applicable Construction phase Temporary influx of people from the nearby areas is expected. Operation phase 2408 (648 Fix Floating) Introduction of alien species? No Not applicable 1.30 Loss of native species or genetic diversity? 1.31 Any other actions? No None No Not applicable ITHC/PRJ/16-17/EIA/70 6 IND TECH HOUSE CONSULT

13 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are nonrenewable or in short supply): SN Information/checklist confirmation 2.1 Land especially undeveloped or agricultural land (ha) 2.2 Water (expected source & competing users) unit: Yes/ No Yes Yes Details thereof (with approximate quantities /rates, wherever possible) with source of information data The proposed project site and its surrounding areas are as per the Faridabad Master Plan development. Water requirement during construction phase will be met through treated tanker water supply. During operation phase fresh water demand will be met from MCF. Treated water demand for HVAC, gardening and DG Set cooling shall be met from treated water from ETP/STP installed at Site. 163 KLD from treated water will be used within site premises from STP and ETP installed at site. 2.3 Minerals (MT) No Not applicable 2.4 Construction material stone, Construction materials such as Cement, Steel, aggregates, sand / soil (expected source MT) Yes Bricks, Stone aggregates, and Sand would be required for construction of the project. These will be preferably procured from local reputed licensed vendors. 2.5 Forests and timber (source MT) No Limited use of timber will be done and it will be restricted to selected locations. 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) 2.7 Any other natural resources (use appropriate standard units) Yes No Power for the proposed project will be supplied by Dakshin Haryana Bijli Vitran Nigam. Maximum power demand for the proposed project is 2004 KW. DG sets of 3000 KVA will be used as power backup during power failure. HSD (low sulphur variety as per availability) fuel will be used for DG sets. _ 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. SN Information/Checklist confirmation 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) Yes/ No No Details thereof (with approximate quantities/rates, wherever possible) with source of information data Not applicable. ITHC/PRJ/16-17/EIA/70 7 IND TECH HOUSE CONSULT

14 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing living conditions? No No Not applicable. Not Applicable. 3.4 Vulnerable groups of people who No Not applicable. could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No Not applicable 4. Production of solid wastes during construction or operation or decommissioning (MT/month) SN Information/Checklist confirmation 4.1 Spoil, overburden or mine wastes 4.2 Municipal wastes (domestic and or commercial wastes) 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes/ No No Yes Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data Top soil generated during earth excavation will be stacked, covered, preserved for reuse as top layer for horticulture development. Remaining soil will be used for site leveling, back filling/filling in raft and road construction. Construction Phase: Municipal solid waste- Nil as there will be no Labour camps proposed. Operation Phase: Total solid wastes 0.91 TPD. The solid waste includes paper, card board, plastic cans etc. and kitchen wastes from houses. Recyclable wastes like card boards and plastic cans will be sold to vendors. Bio-medical Waste 0.09 TPD Waste oil 4.13 Lts/Day from DG sets will be the only hazardous waste generated from the project. This waste oil will be carefully stored in HDPE drums in isolated covered space and sold to recyclers authorized by CPCB/SPCB. Suitable care will be taken so as to prevent spills/ leaks of used oil from storage. 4.4 Other industrial process wastes No Not applicable 4.5 Surplus product No Not applicable 4.6 Sewage sludge or other sludge from effluent treatment Yes Dried sludge from the STP will be used as manure for horticulture development. Surplus manure will be sold to end users: farmers/nursery. ITHC/PRJ/16-17/EIA/70 8 IND TECH HOUSE CONSULT

15 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1 SN Information/Checklist confirmation 4.7 Construction or demolition wastes Yes/ No Yes 4.8 Redundant machinery or No equipment 4.9 Contaminated soils or other No Not applicable materials 4.10 Agricultural wastes No Not applicable 4.11 Other solid wastes No Not applicable Details thereof (with approximate quantities/rates, wherever possible) with source of information data Demolition work is not involved. Construction Work: Excavated soil will be used for landscaping and back filling. Other construction waste like bricks, concrete etc will be used in sundary / road works / manholes etc. Gunny bags, cardboards will be sent to authorize recycler. The inert waste will be sent to land fill site. Not applicable 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) SN Information/Checklist confirmation 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources 5.2 Emissions from production processes 5.3 Emissions from materials handling including storage or transport 5.4 Emissions from construction activities including plant and equipment 5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes/ No Yes No No Yes Margi nal Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data Emission will be from Stationary Sources: DG sets 3000 KVA. Mobile Sources: Vehicular emissions CPCB approved DG sets with acoustic canopy will be used only during power failure. Not applicable Fugitive dust emission due to handling and loading-unloading activities is envisaged during construction. Frequent water sprinkling will be done to minimize the fugitive emissions. During the construction phase, major emission will be in the form of fugitive dust, use of DG sets and transportation of construction material. The project may cause rise in dust levels during construction phase. Precautions would be taken to reduce dust generation during construction phase: RMC use will reduce the handling of cement, sand and concrete thus dust emission will be minimized. Tarpaulins will be used to cover trucks carrying debris. Water sprinkling will be practiced at regular intervals to reduce dust emissions. Dust is likely to be generated during operation phase due to movement of vehicles and blowing of air. But the impact is negligible. Sewage generated from proposed project will be treated in onsite ETP & STP. ITHC/PRJ/16-17/EIA/70 9 IND TECH HOUSE CONSULT

16 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1 SN Information/Checklist confirmation 5.6 Emissions from incineration of waste 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources Yes/ No No No No Details thereof (with approximate quantities/rates, wherever possible) with source of information data Not applicable Burning of any substances including biomass, slash materials and/ or construction debris will be prohibited. Nil 6. Generation of Noise and Vibration, and Emissions of Light and Heat: SN Information/Checklist confirmation 6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes/ No Details thereof (with approximate quantities/rates, wherever possible) with source of information data Yes Noise is expected to be generated during construction phase mainly from operation of heavy machinery, DG sets, and traffic. The indicated noise levels from certain construction plants/equipment are indicated below: Concrete Mixer - 85 dba Generator Pumps Trucks - 95 dba dba dba For control of noise adopted: following measures shall be 6.2 From industrial or similar processes 6.3 From construction or demolition No Yes Properly maintained equipment with mufflers will be used. High noise generating construction activities would be carried out only during day time. Workers working near high noise construction machinery would be supplied with ear muffs/ear plugs. During operation noise from operation of DG sets is envisaged. However, the generator sets, installed at site, shall be operated at noise level less than 75 db(a) as the generators will be placed either in acoustic chambers or equipped canopy. Not applicable Noise Pollution Control: Noise pollution will be due to operation of machinery as well as transportation vehicles. Following precautions shall be taken to control noise pollution: High noise generating construction activities would be carried out only during day time. Installation, use and maintenance of mufflers on equipment. ITHC/PRJ/16-17/EIA/70 10 IND TECH HOUSE CONSULT

17 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1 SN Information/Checklist confirmation Yes/ No Details thereof (with approximate quantities/rates, wherever possible) with source of information data Workers working near high noise construction machinery would be supplied with ear muffs/ear plugs. 6.4 From blasting or piling No Blasting & piling work is not involved in the project. 6.5 From construction or operational traffic Yes Construction Phase: Welding is light and heat generating activity during construction. Appropriate safety measures will be taken as per I.S. code and CPWD work manual. Materials for construction work. Precautions will be taken to reduce the impact of the vehicular movement such as vehicular trips will not be at peak traffic hours. Operation Phase: Car parking is provided on surface, Stilt and in basement. Vehicular movement is restricted to roads and parking areas. Provision of soft green peripheral and road side plantation will help in reduction of noise level. 6.6 From lighting or cooling No Nil systems 6.7 From any other sources No Nil 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: SN Information/Checklist confirmation 7.1 From handling, storage, use or spillage of hazardous materials 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) 7.3 By deposition of pollutants emitted to air into the land or into water Yes/ No Yes No No Details thereof (with approximate quantities/rates, wherever possible) with source of information data The waste oil generated during operation phase from the DG sets will be collected and separately stored in HDPE drums over concrete floor within the premises before final disposal. All precautionary steps will be taken to avoid spillage. It will be directly transferred to authorized recyclers. Generated waste water from the project will be treated in the ETP and STP proposed onsite, and recycled within the proposed project facility for gardening, DG cooling and air conditioning. Dust generation during construction phase from earthworks and movement of vehicles is a temporary phenomenon and will have short term impact during construction phase. Appropriate fugitive dust control measures, including water sprinkling of exposed areas and dust covers for trucks, will be provided to minimize any impacts. ITHC/PRJ/16-17/EIA/70 11 IND TECH HOUSE CONSULT

18 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1 SN Information/Checklist confirmation Yes/ No 7.4 From any other sources No Nil 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Details thereof (with approximate quantities/rates, wherever possible) with source of information data DG exhaust will be discharged at the sufficient height, stipulated by CPCB. 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment No. SN Information/Checklist confirmation 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes/ No No Details thereof (with approximate quantities/rates, wherever possible) with source of information data During construction phase, no such risk is anticipated. However, the contractors shall comply with the safety procedures, norms and guidelines as per applicability and mentioned in the National Building Code of India and Bureau of Indian Standards. During Operation Phase, all precautionary and safety measures will be taken to minimize any accident hazard. 8.2 From any other causes No Nil 8.3 Could the project be affected by natural disasters causing environmental damage (e.g. Floods, earthquakes, landslides, cloudburst etc)? Yes The proposed project site has no history of natural disasters such as floods, landslides, cloudburst etc. The site lies in Seismic Zone-IV. The construction will be carried out as per the guidelines prescribed for Seismic Zone-IV. All the civil structures will be seismically resistant and designed in accordance with provisions recommended related IS codes: IS 4326: 1993 IS 1893 (Part I), Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality SN Information/Checklist confirmation 9.1 Lead to development of supporting. facilities, ancillary development or development stimulated by the project, which could have impact on the environment e.g.: Yes/ No Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data The project will be equipped with dedicated internal road, parking, internal water distribution system, fire fighting system, internal sewage collection network, lighting facilities, solar lighting, and power backup facility. Increase in water and power demand ITHC/PRJ/16-17/EIA/70 12 IND TECH HOUSE CONSULT

19 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1 SN Information/Checklist confirmation Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) Yes/ No Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data Appropriate infrastructure like, roads, power supply and waste management facility will be developed within the site so that chances of occurrence of any adverse impacts are minimized. extractive industries No No supply industries Yes Construction materials other No No 9.2 Lead to after-use of the site, which could have an impact on the environment 9.3 Set a precedent for later developments 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Yes Yes No Since, this is a construction of hospital project; there will be generation of employment during construction & operation phase. Impacts on water availability, storm water drainage, availability of electricity, traffic congestion etc. (II) Environmental Sensitivity SN Areas Name/ Identity 1 Areas protected under No international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or Yes sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests. Aerial distance (within 15 km) of proposed project location boundary Not applicable Yamuna River, KM, NE Agra Canal, 0.35 km/e Canal, 0.29 km/e 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground waters Yes No Okhla Bird Sanctuary, km, North Asola Wild Life Sanctuary, Km Nw Not located within 15 km 5 State, National boundaries Yes Haryana -UP State Border, km, NE 6 Routes or facilities used by the No Not applicable public for access to recreation or other tourist, pilgrim areas 7 Defense installations Yes 56 ASP Air Force Station, Faridabad, 5.77 km/e ITHC/PRJ/16-17/EIA/70 13 IND TECH HOUSE CONSULT

20 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1 SN Areas Name/ Identity 8 Densely populated or built-up Yes area 9 Areas occupied by sensitive Yes man-made land uses (hospitals, schools, places of worship, community facilities) Aerial distance (within 15 km) of proposed project location boundary As per master plan Manmade community facilities such as, schools, places of worship will not have any impact due to construction of proposed project, as, they are not located in the vicinity of project. 10 Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) Yes No Yes The project site falls in the notified areas for control and regulation of ground water. The ground water will be extracted by prior permission from competent authority. Not specific The project is located at Seismic Zone-IV according to Indian Standard Seismic Zoning Map. Structural design will be done for this seismic zone as per code. There are no possibilities of the proposed project site getting flooded as per available records. Landslides not applicable as the project site & surrounding land are flat. I hereby undertake that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost. Date: Place:

21 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad FORM-1 A Form-1A 1.0 LAND ENVIRONMENT 1.1 Will the existing land use get significantly altered from the project that is not consistent with the surroundings? (Proposed land use must conform to the approved Master Plan / Development Plan of the area. Change of land use, if any and the statutory approval from the competent authority be submitted). Attach Maps of (i) site location, (ii) surrounding features of the proposed site (within 500 meters) and (iii) the site (indicating levels & contours) to appropriate scales. If not available attach only conceptual plans. The Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad, Haryana. The proposed project site is allotted for construction of hospital as per Faridabad Master Plan, It is thus anticipated that the construction activities of the proposed project would not have an adverse effect on the land use activities in the project area. The development of the green belt and other landscape would enhance the visual aesthetics of the area. The following maps are attached. (i) 500 M Radius Map with location of site. (ii) 10 KM Radius Map (iii) Layout (Conceptual) plan. 1.2 List out all the major project requirements in terms of the land area, built up area, water consumption, power requirement, connectivity, community facilities, parking needs etc. The Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad, Haryana. The Brief description of the proposed project is given below in Table-1: Table-1: Brief description of the Project SUMMARY (Existing+proposed) SN Description Details Unit GENERAL 1 Plot Area SQM 2 Total Built Up Area SQM 3 Total Number of Building Blocks 3 NOS 4 Total no of Hospital Beds 300 NOS 5 Max Height of Building M 6 Max No of Floors (Block - D) (B+ST+7)` NOS 7 Cost of Expansion Project 33.8 CR AREAS 9 Permissible Ground Coverage Area (33/25%) 5033 SQM 10 Proposed Ground Coverage Area ( 29.7%) SQM 11 Permissible FAR Area (150) SQM 12 Total FAR Area (143.6) SQM 13 Total Basement Area SQM 14 Non FAR areas (Mumty, M Room, Guard Rm, Service Floor, Other Misc Structures) SQM ITHC/PRJ/16-17/EIA/70 15 IND TECH HOUSE CONSULT

22 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1A 15 Total Built Up Area SQM WATER 16 Total Water Requirement KLD 17 Fresh water requirement KLD 18 Total Treated Water Requirement KLD 19 Total Treated water Generation (From Treatment in STP & ETP) KLD 20 Proposed STP Capacity 170 KLD 21 Proposed ETP Capacity 45 KLD 22 Treated Water Available for Reuse KLD 23 Recycled Water 163 KLD 24 Surplus treated water 0 KLD RAIN WATER HARVESTING 25 Rain Water Harvesting Potential CUM 26 No of RWH of Pits (Required & Existing) 3 NOS PARKING 27 Total Parking Required 331 ECS 28 Proposed Total Parking 377 ECS 29 Proposed Parking on Surface 220 ECS 30 Proposed Parking in Basement 142 ECS 31 Stilt Parking 15 GREEN AREAS 32 Hospital Pocket Area NA SQM 33 Proposed Green Area (22.74% of Plot Area) 3851 SQM WASTE GENERATION 34 Total Solid Waste Generation 0.91 TPD 35 Quantity of Bio-Medical Waste Generation (15 % of Hosp Waste) 0.09 TPD 36 Quantity of Hazardous waste Generation 4.13 LTS/DAY POWER 37 Total Power Requirement 2004 KW 38 DG set backup 3000 KVA Table-1A: Brief detailed description of the existing Project SN Description Existing Unit GENERAL 1 Plot Area SQM 2 Existing Builtup Area (as/occupancy cert) SQM 3 Number of Building Blocks 1 NOS 4 Total no of Hospital Beds 150 NOS 5 Maximum Height of Building (upto terrace) 15.9 M 6 No of Floors (Block-A) B+G+3 NOS 7 Cost of the project 18 CR AREAS 8 Existing Builtup Area SQM 9 Existing FAR & Non FAR Areas Excluding Basement Existing Basement Area SQM WATER 11 Total Water Requirement 159 KLD 12 Fresh water requirement KLD ITHC/PRJ/16-17/EIA/70 16 IND TECH HOUSE CONSULT

23 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1A 13 Total Treated Water Requirement KLD 14 Existing STP Capacity 90 KLD 15 Treated Water available for Reuse 68.6 KLD 16 Recycled Water 68.6 KLD 17 Surplus Treated Water 0 KLD RAIN WATER HARVESTING 18 Existing RWH Pits 3 NOS PARKING 19 Parking Required as/ bldg byelaws Adequate ECS WASTE GENERATION 21 Total Solid Waste Generation TPD 22 Quantity of Bio-Medical Waste Generation 48 KG/DAY 23 Quantity of Hazardous Waste Generation 2.13 LTS/DAY POWER 24 Total Power Requirement 950 KW 25 DG Set Backup 1500 KVA Table-1B: Comparative Statement of the Project Hosp Details Existing Addition/ Expansion Total NO OF BEDS OPD 500 PATIENTS NURSING INSTITUTE STUDENTS NURSING HOSTEL Building Blocks Existing Addition/ Expansion Toal BLOCK A B+G+3 1 FLOOR B+G+4 BLOCK C B G+3 B+G+3 BLOCK D NIL B+ST+7 B+ST+7 Connectivity: The project site is well connected to NH 2 which is 2.02 km west direction with the road network. Community facilities: The proposed project itself is a part of community facilities. Apart from this other community facilities will be provided in the campus. 1.3 What are the likely impacts of the proposed activity on the existing facilities adjacent to the proposed site? (Such as open spaces, community facilities, details of the existing land use, disturbance to the local ecology). The project will be developed in accordance with Building Bye-laws, MCF norms and NBC norms. ITHC/PRJ/16-17/EIA/70 17 IND TECH HOUSE CONSULT

24 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1A Proposed project will provide all the basic utilities such as proper drainage system, sewerage, water supply and RWH system to recharge ground water aquifer and adequate measures to minimize impact on the surroundings. The proposed development will not have negative impact as the project site and surrounding was vacant and without any vegetation. 1.4 Will there be any significant land disturbance resulting in erosion, subsidence & instability? (Details of soil type, slope analysis, vulnerability to subsidence, seismicity etc may be given). The main reasons for erosion are over exploitation of groundwater, unstable slopes, landslides etc. The proposed site area was primarily a flat land and was not prone to erosion. The proposed construction will involve excavation for foundation. Excavated soil will be used for backfilling, play fields and parking area. The project would involve construction of roads, paved areas and vegetated surfaces which would reduce the chances of erosion. Subsidence was not anticipated, as ground water will not be used. Structural design will be done by Authorized Structural Design Agency. Soil investigation has been done. Seismo-Tectonic Appraisal of the Area: Bureau of Indian Standards (BIS) has prepared a seismic zoning map of India based on tectonic features and records of past earthquakes. The project site falls under Zone-IV as per the Seismic Zoning map of India (IS 1893, Part I, 2002.) Necessary seismic factors as per codes shall be incorporated suitably while designing the structures to safeguard against earthquake risks. 1.5 Will the proposal involve alteration of natural drainage systems? (Give details on a contour map showing the natural drainage near the proposed project site) No, proposal will not involve alteration of natural drainage system. 1.6 What are the quantities of earthwork involved in the construction activity-cutting, filling, reclamation etc. (Give details of the quantities of earthwork involved, transport of fill materials from outside the site etc.) During construction phase, excavation is envisaged for construction of basement and foundation. The excavated top soil will be preserved separately for reusing it for horticulture development. The remaining soil will be properly stored under cover & will be used for site leveling, back filling and road construction. There will be no requirement to bring materials for filling from outside. 1.7 Give details regarding water supply, waste handling etc. during the construction period. Water Supply: During construction stage, treated waste water/tanker water will be used for construction works. This water will be tested for fitness for construction purpose before use. ITHC/PRJ/16-17/EIA/70 18 IND TECH HOUSE CONSULT

25 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1A Waste Generation and Handling: Excavated soil will be stored and covered at site and it will be reused for site leveling, back filling and road construction. The fertile top soil will be reused for landscaping purpose. Broken bricks and waste concrete will be used for cinder filling, road making. Metal will be sold to recyclers. Spillage of oil from the machinery will be properly collected in drums and disposed off. For construction laborers, proper sanitary facilities & wash areas will be provided and good hygienic conditions will be maintained. Handling of waste generated will be done by a good agency approved by SPCB/CPCB. 1.8 Will the low lying areas and wetlands get altered? (Provide details of how low lying and wetlands are getting modified from the proposed activity) No, there is no low lying area observed within and in the vicinity of the project site. 1.9 Whether construction debris and waste during construction cause health hazard? (Give quantities of various types of wastes generated during construction including the construction labor and the means of disposal) The waste generated during construction phase can broadly be classified as construction waste and domestic waste. About 680 MT of construction waste (Calculated using TIFAC (Technology Information, Forecasting, and Assessment Council 40 Kg / sq m) and negligible quantity of domestic waste would be generated from labours employed at site. Most of the construction waste generated will be used on the site as filler material for leveling and development of site and internal road. Construction waste if any remaining will be sent to an approved dumping site/landfill site through authorized agency. Adequate labors per day will be employed during the construction stage of the project. Required sanitary, drinking water and other requisite facilities will be provided at site. Wash areas are constructed and good hygienic conditions have been maintained in labour camp. 2.0 WATER ENVIRONMENT 2.1 Give the total quantity of water requirement for the proposed project with the breakup of requirements for various uses. How will the water requirement met? State the sources & quantities and furnish a water balance statement. Total water requirement for this project is 371 KLD, out of which, approx. 163 KLD treated water from ETP and STP will be reused. The fresh water demand of 208 KLD will be met from MCF. Breakup of water requirements for various uses is given below. Efficient dual plumbing system will be provided for conservation of fresh water. Details of water requirement are given in Table 2 below: Table 2: Total Water Requirement Details of the Project Sl. No. Particulars Details, KLD 1. Total Water Requirement Fresh water requirement Waste water Generation 182 ITHC/PRJ/16-17/EIA/70 19 IND TECH HOUSE CONSULT

26 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1A 4. Treated Water Available for Reuse from ETP & STP Treated water recycled Total Capacity STP Capacity of ETP 45 (Source: Manual on norms and standards for Environmental Clearance of large construction projects, MoEF). Water requirement for horticulture, DG cooling and HVAC purpose will be fulfilled by recycling the treated waste water from onsite STP. Water Balance Diagram is given below:- Water Balance Diagram 2.2 What is the capacity (dependable flow or yield) of the proposed source of water? During operation stage fresh water requirement will be met from MCF. Any shortfall in supply will be met from tanker supplies/extraction of potable water from tube well after the permission of CGWA. 2.3 What is the quality of water required, in case, the supply is not from a municipal source? (Provide physical, chemical, biological characteristics with class of water quality) During operation phase, fresh water requirement shall be sourced from MCF. The quality of water would conform to the desirable drinking water standards as per IS: How much of the water requirement can be met from the recyclin ng of treated wastewater? (Give the details of quantities, sources and usage) Approx.163 KLD of treate ed water from onsite ETP and STP will be used to meet water required for gardening, DG cooling, air conditioners and other purposes.

27 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1A 2.5 Will there be diversion of water from other users? (Please assess the impacts of the project on other existing uses and quantities of consumption) Fresh water conforming to the drinking water standard will be supplied by MCF. Therefore, no diversion of water from other user is expected and no impact on the existing users is anticipated. 2.6 What is the incremental pollution load from wastewater generated from the proposed activity? (Give details of the quantities and composition of wastewater generated from the proposed activity) As estimated, 144 KLD of domestic waste water & 38 KLD trade effluent will be generated from the proposed project which will be treated in onsite STP and ETP. The characteristics of the wastewater and of the effluent after treatment are as follows: Parameters Conc. Value Expected in Wastewater Reclaimed Water Quality mg/l mg/l ph to 8.5 Biochemical Oxygen Demand (BOD5) < 5 Chemical Oxygen Demand (COD) < 30 Suspended Solids <5 Oil & Grease <50 <5 2.7 Give details of the water requirements met from water harvesting? Furnish details of the facilities created. It is proposed to provide Rain Water Harvesting structures as per details attached as Annexure. The rain water collected from the roof top will be collected through the network of storm water drainage lines & conveyed to RWH system. RWH system shall consist of de-silting cum filter chamber, oil and grease separator and pits are designed to store 15 minutes peak hour rainfall, for recharge into ground aquifer& to prevent flooding in the complex. 2.8 What would be the impact of the land use changes occurring due to the proposed project on the runoff characteristics (quantitative as well as qualitative) of the area in the post construction phase on a long term basis? Would it aggravate the problems of flooding or water logging in any way? Due to construction of the project on vacant land there would be change in the runoff characteristics quantitative and qualitative as well. The quantitative change: Runoff coefficient from the project site prior to development of project = 0.2 Runoff coefficient from the project site after development of project = 0.75 (Considering different coefficients for paved area, soft area, terrace etc) Hence incremental runoff = = 0.55 Qualitative change: Runoff from parking areas Storm water drainage & Rain water harvesting system as described in item no: 2.7 above meet quantitative, qualitative & prevention of over flooding/water logging requirements. ITHC/PRJ/16-17/EIA/70 21 IND TECH HOUSE CONSULT

28 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1A 2.9 What are the impacts of the proposal on the ground water? (Will there be tapping of ground water; give the details of ground water table, recharging capacity, and approvals obtained from competent authority, if any) During operation phase of the project water from tube well will be used with permission of CGWA. It is proposed to provide 03 Nos. RWH Pits to recharge ground water aquifers What precautions/measures are taken to prevent the run-off from construction activities polluting land and aquifers? (Give details of quantities and the measures taken to avoid the adverse impacts) The major underground construction activity will not be taken during monsoon period. During the construction stage construction water will be channelized to sedimentation basin with silt trap. The water will be reused after testing for construction How is the storm water from within the site managed? (State the provisions made to avoid flooding of the area, details of the drainage facilities provided along with a site layout indication contour levels) There will be a network of storm water drainage lines to collect runoffs from terrace, which will be channelized to rain water harvesting system. Water so collected will pass through de-silting-cum-filter chamber, oil and grease separators.rwh pits are designed to store 15 minutes peak hour rainfall, for recharge into ground aquifer & to prevent flooding in the complex Will the deployment of construction laborers particularly in the peak period lead to unsanitary conditions around the project site (Justify with proper explanation) Labour camp for labors is not proposed at the site. However, temporary rest rooms, office and first aid/ safety office, drinking water proper sanitation facility will also be made available on site What on-site facilities are provided for the collection, treatment & safe disposal of sewage? (Give details of the quantities of wastewater generation, treatment capacities with technology and facilities for recycling and disposal) During operation phase, the estimated quantity of sewage generation from the project is 144 KLD from domestic effluent & 38 KLD from Laboratories & laundry, which will be treated in onsite STP and ETP having capacity of 170 KLD & 45 KLD respectively. Approx. 163 KLD of treated water from ETP and STP will be recycled Give details of dual plumbing system if treated waste water is used for flushing of toilets or any other use. Treated water will be reused for HVAC, Horticulture, DG Cooling, etc. Garden hydrants are also proposed for use of treated water for horticulture development. 3.0 VEGETATION 3.1 Is there any threat of the project to the biodiversity? (Give a description of the local ecosystem with its unique features, if any) No, there is no threat to biodiversity. The land was vacant & without any vegetation. 3.2 Will the construction involve extensive clearing or modification of vegetation? (Provide a detailed account of the trees & vegetation affected by the project) ITHC/PRJ/16-17/EIA/70 22 IND TECH HOUSE CONSULT

29 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1A The project site was a vacant and devoid of any trees or constructions. Therefore, there was no requirement for extensive clearing or modification of vegetation. 3.3 What are the measures proposed to be taken to minimize the likely impacts on important site features (Give details of proposal for tree plantation, landscaping, creation of water bodies etc along with a layout plan to an appropriate scale) Landscape development plan prepared for the project includes peripheral & avenue plantation with local species, ornamental as well as thick foliage plants especially on the periphery. Trees and plant species for plantation in the project will be selected from the list given below. Table 3: List of Plant Species that are likely to be planted Common Name Jamun Kachnar Arjun Neem Butia Gular Shisham Semal Ashok Kusum Imly Amaltas Gulmohar Scholar Tree Mango Pipal Botanical Name SyzigiumCumini Bauhinia Purpurea TerminaliaArjuna AzadirachtaIndica ButeaMonosperma FicusInfectoria DelbergiaSisso BombaxMelabericum Polyalthialongifolia SchleicheraTrijuga Tamarindusindica Cassia Fistula DelonixRegia AlstoniaScholaris MagniferaIndica FicusReligiosa 4.0 FAUNA 4.1 Is there likely to be any displacement of fauna-both terrestrial and aquatic or creation of barriers for their movement? Provide the details. No fauna has been recorded from the project influenced area. This site is not a natural host to any sensitive creature. Therefore, no animal habitat is likely to be effected due to construction of the proposed building. 4.2 Any direct or indirect impacts on the avifauna of the area? Provide details. No direct or indirect impact on the fauna of the area is envisaged. 4.3 Prescribe measures such as corridors, fish ladders etc. to mitigate adverse impacts on fauna. Not applicable for this project. ITHC/PRJ/16-17/EIA/70 23 IND TECH HOUSE CONSULT

30 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1A 5.0 AIR ENVIRONMENT 5.1 Will the project increase atmospheric concentration of gases and result in heat islands? (Give details of background air quality levels with predicted values based on dispersion models taking into account the increased traffic generation as a result of the proposed constructions) The proposed project will not increase heat island effect significantly. The effect will be negligible due to reduction in hard area plantation along roads and parking lots. Construction Phase The important activities during the construction phase that produce particulate matter and affect the air quality are material storage, transportation and handling of excavated earth and construction materials like cement, sand and aggregates. Gaseous pollutants like SO 2, NO x, CO emitted from the various machineries and vehicles used in construction activities. Appropriate mitigation measure will be employed during this stage of the project to reduce the pollution level to the acceptable limit. Operational Phase During this stage, there will be no major impact on air environment. Low sulpher diesel for DG Set will be used as a fuel which will causes air pollution. But APCM will minimize the pollution load into environment. 5.2 What are the impacts on generation of dust, smoke, odorous fumes or other hazardous gases? Give details in relation to all the meteorological parameters. During construction phase, generation of dust, Particulate Matter is the main pollutant. Other emission sources are intermittent and include emissions of SO 2, NO 2 and CO from materials transport of heavy vehicles on site & periodic operation of DG sets etc. Proper upkeep and maintenance of vehicles, DG sets, sprinkling of water on roads and construction site are some of the measures that would reduce the impact during construction phase. Sources of Air pollution during operational phase The gaseous emission from vehicles. Emissions from DG set while in operation only during power failure. Mitigation measures: The traffic congestion will be avoided by proper parking arrangement and maintaining smooth traffic flow. Regular PUC check up for vehicles. CPCB approved DG sets only will be used. Regular maintenance of DG sets shall be done & low sulphur diesel shall be used. 5.3 Will the proposal create shortage of parking space for vehicles? Furnish details of the present level of transport infrastructure and measures proposed for improvement including the traffic management at the entry & exit to the project site. ITHC/PRJ/16-17/EIA/70 24 IND TECH HOUSE CONSULT

31 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1A No, proposal does not create shortage of parking space for vehicles. Parking provisions meet bye law requirements; well organized parking arrangement has been designed for the project. 5.4 Provide details of the movement patterns with internal roads, bicycle tracks, pedestrian pathways, footpaths etc with area under each category. Movement pattern is given in parking and circulation plan. 5.5 Will there be significant increase in traffic noise & vibrations? Give details of the sources and the measures proposed for mitigation of the above. Ambulance parking & part of visitors parking is provided on surface and remaining parking is in basement & stilt. The source of noise is mainly vehicular noise. Well organized parking arrangement is designed to maintain smooth traffic flow which would help in reducing traffic congestion and noise levels. Trees planned along road & periphery and planned soft areas would act as noise barrier and will reduce the noise level. 5.6 What will be the impact of DG sets & other equipment on noise levels & vibration in & ambient air quality around the project site? Provide details. D.G. Sets will be operated only in case of power failures during construction and operational phase. The Pollutants like SPM, SO x and NO x that may arise from emissions from D.G. sets will be discharged through vent of proper height. D.G. sets will be installed with inbuilt acoustic enclosures to reduce the noise of D.G. sets while in construction or operation. Plantation of trees would act as noise barrier and will reduce noise level. DG sets of 3000 KVA capacities have been proposed for operation phase as power backup during failure of power supply. 6.0 AESTHETICS 6.1 Will the proposed constructions in any way result in the obstruction of a view, scenic amenity or landscapes? Are these considerations taken into account by the proponents? No, the use of proposed site is in conformity with the planned land use. There is no scenic amenity or landscape in its surrounding. 6.2 Will there be any adverse impacts from new constructions on the existing structures? What are the considerations taken into account? Since the design development of the project is done on the basis of development control norms & as per zoning plan approved by local body the construction of the proposed project will not have any adverse impact on the existing structures as structure do not exists in the immediate vicinity of the project. 6.3 Whether there are any local considerations of urban form & urban design influencing the design criteria? They may be explicitly spelt out. ITHC/PRJ/16-17/EIA/70 25 IND TECH HOUSE CONSULT

32 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1A There are no mandatory guidelines issued by local body for development of urban form; however architect has designed the project keeping in mind principles of urban design & urban form. 6.4 Are there any anthropological or archaeological sites or artifacts nearby? State if any other significant features in the vicinity of the proposed site have been considered. No, anthropological or archeological sites of significance do not exist in the vicinity of the project site. However all possible measures will be taken to reduce the impact on air and noise pollution during construction and operation phase. 7.0 SOCIO-ECONOMIC ASPECTS 7.1 Will the proposal result in any changes to the demographic structure of local population? Provide the details. As per census 2011, Faridabad has a population of 18, 09,733 of which male and female were 9,66,110 and 8,43,623 respectively. Post occupancy changes to demographic structure may be negligible as most of the floating population will be from NCR region. (Being hospital and institute of medical science project). 7.2 Give details of the existing social infrastructure around the proposed project. The Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad, Haryana is easily accessible through public transport such as buses, Auto, Taxi etc, Apart from this other community facilities like school, shopping as per master plan are available at convenient distance from the site. 7.3 Will the project cause adverse effects on local communities, disturbance to sacred sites or other cultural values? What are the safeguards proposed? The proposed construction will not have any adverse effects on local communities. 8.0 BUILDING MATERIALS 8.1 May involve the use of building materials with high-embodied energy. Are the construction materials produced with energy efficient processes? (Give details of energy conservation measures in the selection of building materials and their energy efficiency) ISI marked building materials of reputed brands to be procured from 400 km range as far as possible. Preference will be given to locally available building materials. Following building materials and alternative technologies will be used: Some of them are given below: Ready mix concrete with 20-25% fly ash. AAC blocks will be used for walls. Use of Steel of smaller diameter from recycled steel Aluminium with recycled content Use of particles board for door panels ITHC/PRJ/16-17/EIA/70 26 IND TECH HOUSE CONSULT

33 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1A Use of ceramic tiles for wall cladding/flooring Application of heat China massive tile/reflective paint/insulation to terrace. The use of the above alternatives for building materials will help in reducing use of nonrenewable resources and impact on natural resources. 8.2 Transport and handling of materials during construction may result in pollution, noise & public nuisance. What measures are taken to minimize the impacts? Mitigation Measures for Air Pollution during Construction Stage The impact on ambient air quality during construction stage around the project site will be assessed. Various construction activities especially related to handling of loose material likely to cause generation of fugitive dust will affect the air quality of the surrounding area of the project site. To minimize such impact following measures shall be taken: The construction material will be carried in properly covered vehicles. Construction material will be stored at identified site/temporary go downs at site. All the loose material either stacked earth or transported shall be provided with suitable covering such as tarpaulin, etc. Internal roads will be maintained in good conditions with regular sprinkling of water (WBM) to curb the dust nuisance to the surrounding Water sprinkling shall be done at the location where dust generation is anticipated. Tin sheets will barricade the periphery of the plot. Mitigation Measures for Noise Pollution during Construction Stage During the construction stage, expected noise levels shall be in the range of db (A) which will decrease with increase in distance as per the Inverse Square Law. Administrative as well as engineering control of noise will be implemented. Isolation of noise generation sources and temporal differentiation of noise generating activities will ensure minimum noise at receiver s end. To prevent any occupational hazard, ear muff / ear plug shall be given to the workers working around or operating plant and machinery emitting high noise levels. Use of such plant or machinery shall not be allowed during night hour. Careful planning of machinery operation and scheduling of operations shall be done to minimize such impact. 8.3 Are recycled materials used in roads and structures? State the extent of savings achieved? Locally available recyclable & recycle content materials would be given preference. However, bricks made from the fly-ash will be used for construction of pavements, side walls, boundaries for parks etc. Readymade concrete (RMC) will be used in construction. This will result in significant saving in the project cost and reduce pollution. 8.4 Give details of the methods of collection, segregation & disposal of the garbage generated during the operation phases of the project. ITHC/PRJ/16-17/EIA/70 27 IND TECH HOUSE CONSULT

34 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1A As estimated, about 0.91 TPD solid waste will be generated from the project, whereas, the generation of bio-medical waste shall be 0.09 TPD. Waste Management during operation phase: Municipal Solid Waste Sweepers will be engaged for collection and handling of municipal and bio-medical waste. Different colored bins/ containers will be provided at designated places for collection of waste. Adequate number of collection bins separately for biodegradable and nonbiodegradable waste shall be provided as per the Municipal Solid Waste (Management and Handling) Rule, Different colored bins to collect biomedical waste shall be provided in hospital as per requirements. Wastes from such bins shall be collected on daily basis and handed over to authorized agency for treatment and disposal. Appropriate site for storage and segregation will be identified in the project. All waste collection bins shall be properly maintained on regular basis. Arrangement will be made with local civic authority, for providing garbage station or transfer point (preferably near the entry/ exit point of the site), for collection and disposal of inert waste. It will be assured that there is no spillage of waste along the internal roads during collection of wastes. The garbage storage/transfer point will be covered and cleaned every day to as to avoid any nuisance, vectors and unhygienic conditions. Landscape waste comprises of fallen leaves and other vegetative material which shall be collected and treated along with other biodegradable waste. Bio-Medical Waste The management of bio-medical waste shall be done as per Bio-Medical Waste (Management and Handling) Rules, ENERGY CONSERVATION 9.1 Give details of the power requirements, source of supply, backup source etc. What is the energy consumption assumed per square foot of built-up area? How have you tried to minimize energy consumption? Power will be sourced from Dakshin Haryana Bijli Vitran Nigam The Maximum Power demand for the project is estimated to be as around 2004 KW. The power shall be supplied by Dakshin Haryana Bijli Vitran Nigam. DG sets of Capacity: 3000 KVA are proposed to meet requirement of power back up during power failure. Energy Conservation Measures & Management Plan: During operation phase, appropriate energy conservation measures & management plan will be adopted in order to minimize the consumptions of conventional energy. The following measures are suggested for adoption. Details of energy saving measure: o Energy efficient lighting fixtures &LED Lamps will be used for internal and external lighting. o Lighting and switching shall be designed by keeping in mind day light integration. ITHC/PRJ/16-17/EIA/70 28 IND TECH HOUSE CONSULT

35 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1A o o o o Building Envelope shall meet ECBC requirement. Roof treatment shall be planned to conserve energy. Capacitor banks shall be planned for improving the power factor of the power supply. Solar energy will also be used to reduce conventional energy requirements and reduce dependence on non-renewable sources of energy and make environment cleaner. 9.2 What type of, and capacity of, power back-up do you plan to provide? I) Type: Diesel Generator Set II) Capacity: 3000 KVA 9.3 What are the characteristics of the glass you plan to use? Provide specifications of its characteristics related to both short wave and long wave radiation? Energy efficient DGU conforming to ECBC norms shall be used. 9.4 What passive solar architectural features are being used in the building? Illustrate the applications made in the proposed project. Passive solar technique:- Building design and envelope has been optimized through selection of appropriate wall and roof construction material and through adoption of solar passive measures after studying the sun path analysis to design shading devices. Optimizing window design to reduce cooling load (selection of energy efficient low U value materials for envelop, application of high reflecting white China massive tile/reflective paint/insulation to terrace. Day light integrated to reduce artificial lighting demand. Adopting low energy passive cooling strategies: Landscaping to alter micro climate for better condition Peripheral plantation and avenue plantation is provided to shed the hard areas & reduce heat island effect, reduction of noise & air pollution & provide buffer to sun heat. 9.5 Does the layout of streets & buildings maximize the potential for solar energy devices? Have you considered the use of street lighting, emergency lighting and solar hot water systems for use in the building complex? Substantiate with details. Yes, the layout of streets & buildings has been designed to maximize the potential for solar energy devices. Further, solar energy will also be used for street lighting, emergency lighting and water heating etc. 9.6 Is shading effectively used to reduce cooling/heating loads? What principles have been used to maximize the shading of Walls on the East and the West and the Roof? How much energy saving has been effected? Plantation in and around the proposed building would be also act as shield which will reduce the cooling load. Passive solar architectural measures have been adopted to provide shades to windows and roof which would effectively reduce heating of building envelope. External Envelope & Building shall meet U-value criteria of ECBC norms which will reduce heat gain/energy consumption. ITHC/PRJ/16-17/EIA/70 29 IND TECH HOUSE CONSULT

36 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1A 9.7 Do the structures use energy-efficient space conditioning, lighting and mechanical systems? Provide technical details. Provide details of the transformers and motor efficiencies, lighting intensity and air-conditioning load assumptions? Are you using CFC and HCFC free chillers? Provide specifications. Total 800 A/C load has been proposed for the project. System shall be free of CFC and HCFC refrigerant. R134A refrigerant will be used. 9.8 What are the likely effects of the building activity in altering the micro-climates? Provide a self assessment on the likely impacts of the proposed construction on creation of heat island & inversion effects? There will not be any significant change in micro climate due to building activity and due to provision of large green areas & shrubs, plants, trees to shade roads, paths and paved areas to reduce heat island effects. 9.9 What are the thermal characteristics of the building envelope? (a) roof; (b) external walls; and (c) fenestration? Give details of the material used and the U-values or the R values of the individual components. Thermal characteristics of building envelope. Walls-RCC framed structure with AAC Block external walls U- Value of Building envelop will be as per ECBC norms. Specification of glass to be used in hospital block - Roof/ terrace shall be finished high China massive tile/reflective paint/insulation to terrace What precautions & safety measures are proposed against fire hazards? Furnish details of emergency plans. Adequate measures for fire protection have been taken as per the provisions of National Building Code, Local fire bylaws and building bylaws. Internal road will have sufficient load bearing capacity to withstand fire engines. The building materials shall be of appropriate fire resistance standard. Fire suppression system shall have fire extinguishers, Fire hose cabinet, internal and external hydrants and sprinkler system shall be provided in basement as per applicable codes If you are using glass as wall material provides details and specifications including emissive and thermal characteristics. Not applicable, as this project is without any glass wall What is the rate of air infiltration into the building? Provide details of how you are mitigating the effects of infiltration. Air tight construction is proposed with provision of sealants & flashing wherever required. Air infiltration rate is controlled within the limit prescribed in ECBC norms, for main entrance door it is less than 5 l/s-m2 and for other fenestration it is less than 2l/s-m To what extent the non-conventional energy technologies are utilized in the overall energy consumption? Provide details of the renewable energy technologies used. ITHC/PRJ/16-17/EIA/70 30 IND TECH HOUSE CONSULT

37 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1A Provision of solar water heater, SPV plant shall be made as per HAREDA Norms and orders of Haryana Government Renewable Energy Department and conditions of approved zoning Environment Management Plan The Environment Management Plan would consist of all mitigation measures for each item wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project. It would also delineate the environmental monitoring plan for compliance of various environmental regulations. It will state the steps to be taken in case of emergency such as accidents at the site including fire. Table-4: Environment Management Plan Potential SN Action Parameters for Monitoring Timing Impact I. Construction Phase All equipments will be Random checks of Construction activities operated within specified equipment logs/ manuals design parameters. 1. Air Emission 2. Noise Vehicle trips to be minimized to the extent possible Any dry, dusty materials stored in sealed containers or prevented from blowing. Compaction of soil during various construction activities Ambient air quality within the premises of the proposed unit to be monitored. List of all onsite noise generating machinery with age to be prepared. Equipment to be maintained in good working order. Working during night to be minimized. Generation of vehicular noise Implement good working practices (equipment selection and sitting) to minimize noise and also reduce its impacts on human health (ear muffs, safe distances, and enclosures). No machinery running when not required. Acoustic mufflers/enclosures to be provided in large engines Noise to be monitored in ambient air within the plant premises. Vehicle logs Site clearance and construction activities Absence of stockpiles or open containers of dusty materials. Construction logs PM 10, PM 2.5, SO 2, NO x and CO Equipment logs, noise reading Working hour records Maintenance records of vehicles Site working practices records, noise reading Mufflers/enclosures place. Noise reading in Construction activities Construction activities As per SPCB requirement. During construction phase. Construction activities During phase. construction During construction Phase. Prior to use of equipment. As per SPCB requirement or quarterly whichever is lesser. ITHC/PRJ/16-17/EIA/70 31 IND TECH HOUSE CONSULT

38 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1A 3. Wastewater Discharge 4. Soil Erosion Drainage and effluent Management Waste Management Non-routine events and accidental releases Environmental Management Cell/Unit The Noise level will not exceed the permissible limit both during day and night. All equipment operated within specified design parameters. Vehicle trips to be minimized to the extent possible No untreated discharge to be made to surface water, groundwater or soil. Waste water will be discharged to outside drainage. Labour camp with provision of septic tank Take care in disposal of wastewater generated such that soil and groundwater resources are protected. Minimize area extent of site clearance, by staying within the defined boundaries Protect topsoil stockpile where possible at edge of site. Ensure drainage system and specific design measures are working effectively. The design to incorporate existing drainage pattern and avoid disturbing the same. Implement waste management plan that identifies and characterizes every waste arising associated with proposed activities and which identifies the procedures for collection, handling & disposal of each waste arising. Plan to be drawn up, considering likely emergencies and steps required to prevent/limit consequences. The Environmental Management Cell/Unit is to be set up to ensure 8. implementation and monitoring of environmental safeguards. II. Operational Phase Stack emissions from DG 9. Air Emission set to be monitored Ambient air quality within Random checks of Equipment logs/ manuals Vehicle logs No discharge hoses in vicinity of watercourses. Discharge norms for effluents as given by SPCB. Discharge norms for effluents as given by PCB. Site boundaries not extended / breached as per plan document. Effective cover in place. Visual inspection of drainage and records thereof Comprehensive Waste Management Plan in place and available for inspection on-site. Compliance with MSW Rules, 1and Hazardous Wastes (Management, Handling and Trans Boundary Movement Rules), 2008 Mock drills and records of the same A formal letter from the management indicating formation of Environment Management Cell PM, SO 2, NOx, CO PM 10, PM 2.5, SO 2, NOx, and During construction phase. During construction Phase. During construction phase. During construction Phase. During construction Phase. During construction Phase. During phase Prior to site Clearance. During phase During phase During operation phase construction construction construction ITHC/PRJ/16-17/EIA/70 32 IND TECH HOUSE CONSULT

39 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1A 10. Noise Wastewater Discharge Drainage and Effluent Management 13. Energy Usage Emergency preparedness, such as fire fighting Environment Management Cell/Unit the premises of the proposed unit to be monitored. Exhaust from vehicles to be minimized by use of fuel efficient vehicles and well maintained vehicles having PUC certificate. Vehicle trips to be minimized to the extent possible Noise generated from operation of DG set to be optimized and monitored. DG sets are to be provided with acoustic enclosures with appropriate height of chimney above roof level or as specified by PCB Generation of vehicular noise No untreated discharge to be made to surface water, groundwater or soil. Take care in disposal of wastewater generated such that soil and groundwater resources are protected Ensure drainage system and specific design measures are working effectively. Design to incorporate existing drainage pattern and avoid disturbing the same. Replacement of conventional luminaries to energy efficient luminary fittings Fire protection and safety measures to take care of fire and explosion hazards, to be assessed and steps taken for prevention. The Environment Management Cell/Unit to be set up to ensure implementation and monitoring of environmental safeguards. CO as given by SPCB. Vehicle logs to be maintained Vehicle logs Maintain records of vehicles Maintain records of vehicles No discharge hoses in vicinity of watercourses. Discharge norms for effluents as given by SPCB Visual inspection of drainage and records thereof Luminary parameters Mock drill records, on site emergency plan, evacuation plan A formal letter from the management indicating formation of Environment Management Cell During operation Phase During operation phase. During operation phase During operation phase During operation phase During operation phase Table 5: Environment Monitoring Plan (Construction Phase) S. No. Particulars Parameters Frequency 1. Ambient Air Monitoring PM 10, PM 2.5, SO 2, NO x, CO Half Yearly 2. Water Quality Monitoring Drinking Water Standard Half yearly ITHC/PRJ/16-17/EIA/70 33 IND TECH HOUSE CONSULT

40 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Form-1A 3. Noise Level Monitoring 24 Hrs. Noise Level Once in a month Table 6: Environment Monitoring Plan (Operation Phase) S. No. Particulars Parameters Frequency 1. Ambient Air Monitoring PM 2.5, PM 10, SO 2, NOx, CO Half yearly 2. Stack Emission Monitoring PM, SO 2, NO x Half yearly 3. Treated Effluent Monitoring ph, BOD, COD, O& G, Total Suspended Solids Monthly 4. Noise Level Monitoring 24 Hrs. Noise Level Quarterly ITHC/PRJ/16-17/EIA/70 34 IND TECH HOUSE CONSULT

41 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Conceptual Plan 1.0 INTRODUCTION This Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad. Land use of the project site is in conformity with the Faridabad Master Plan, The objective of the study is to carry out Environmental Impact Assessment (EIA) for the proposed project to meet the environmental compliance laid down by the Ministry of Environment and Forest (MoEF), Govt. of India. The scope of the study would be as per the EIA guidelines outlined by the MoEF for new construction project. 2.0 PROJECT DETAILS Figure-1: Master Plan of Faridabad The Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad, Haryana project is planned on a total plot area of sq m, plot area at Faridabad, Haryana. The total built up area will be sq m. Project will provide the following facilities. 300 beded hospital, Basement Parking Nursing College & Hostel The design approach shall be sensitive to environmental issues. The main thrust shall be laid on environmental pollution, energy conservation, safety and use of maintenance and use of current technological development. The Design Philosophy is to ensure fulfillment

42 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Conceptual Plan of all functional requirements in accordance with Design Guidelines, Relevant Standards and Codes as well as local Bye laws. The following design standards/guidelines with latest amendments shall be followed during detailed design of services. In case of any discrepancy, the stringent shall be followed: National Building Code of India Relevant Codes of National Fire Codes Relevant Codes of Bureau of Indian Standards Energy Conservation Building Codes 2009 Indian Electricity Rules 1956 Environmental Guidelines. State Byelaws. IEC 60726/ IS: 2026 (Part 1, II and IV)/ IS 11171(Part III): Transformers (Cast Resin) IEC 60831/ IS & IS 13341: Capacitors IEC 60947/ IS 13947: Specification for low voltage switch gear & control gear BS 6651/ IS 2309: Lightning protection system BS 7430, IS 3043: Earthing & bonding BS 7671 requirements for electrical installation NEC NFPA 70, National Electric Code. The project area statement and its components are as per the table 1 details given below: Table1.Area Statement for Proposed Project SUMMARY (Existing+proposed) SN Description Details Unit GENERAL 1 Plot Area SQM 2 Total Built Up Area SQM 3 Total Number of Building Blocks 3 NOS 4 Total no of Hospital Beds 300 NOS 5 Max Height of Building M 6 Max No of Floors (Block - D) (B+ST+7)` NOS 7 Cost of Expansion Project 33.8 CR AREAS 9 Permissible Ground Coverage Area (33/25%) 5033 SQM 10 Proposed Ground Coverage Area ( 29.7%) SQM 11 Permissible FAR Area (150) SQM 12 Total FAR Area (143.6) SQM 13 Total Basement Area SQM 14 Non FAR areas (Mumty, M Room, Guard Rm, Service Floor, Other Misc Structures) SQM 15 Total Built Up Area SQM ITHC/PRJ/16-17/EIA/70 36 Ind Tech House Consult

43 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Conceptual Plan WATER 16 Total Water Requirement KLD 17 Fresh water requirement KLD 18 Total Treated Water Requirement KLD 19 Total Treated water Generation (From Treatment in STP & ETP) KLD 20 Proposed STP Capacity 170 KLD 21 Proposed ETP Capacity 45 KLD 22 Treated Water Available for Reuse KLD 23 Recycled Water 163 KLD 24 Surplus treated water 0 KLD RAIN WATER HARVESTING 25 Rain Water Harvesting Potential CUM 26 No of RWH of Pits (Required & Existing) 3 NOS PARKING 27 Total Parking Required 331 ECS 28 Proposed Total Parking 377 ECS 29 Proposed Parking on Surface 220 ECS 30 Proposed Parking in Basement 142 ECS 31 Stilt Parking 15 GREEN AREAS 32 Hospital Pocket Area NA SQM 33 Proposed Green Area (22.74% of Plot Area) 3851 SQM WASTE GENERATION 34 Total Solid Waste Generation 0.91 TPD 35 Quantity of Bio-Medical Waste Generation (15 % of Hosp Waste) 0.09 TPD 36 Quantity of Hazardous waste Generation 4.13 LTS/DAY POWER 37 Total Power Requirement 2004 KW 38 DG set backup 3000 KVA Table-1A: Brief detailed description of the existing Project SN Description Existing Unit GENERAL 1 Plot Area SQM 2 Existing Builtup Area (as/occupancy cert) SQM 3 Number of Building Blocks 1 NOS 4 Total no of Hospital Beds 150 NOS 5 Maximum Height of Building (upto terrace) 15.9 M 6 No of Floors (Block-A) B+G+3 NOS 7 Cost of the project 18 CR AREAS 8 Existing Builtup Area SQM 9 Existing FAR & Non FAR Areas Excluding Basement Existing Basement Area SQM WATER ITHC/PRJ/16-17/EIA/70 37 Ind Tech House Consult

44 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Conceptual Plan 11 Total Water Requirement 159 KLD 12 Fresh water requirement KLD 13 Total Treated Water Requirement KLD 14 Existing STP Capacity 90 KLD 15 Treated Water available for Reuse 68.6 KLD 16 Recycled Water 68.6 KLD 17 Surplus Treated Water 0 KLD RAIN WATER HARVESTING 18 Existing RWH Pits 3 NOS PARKING 19 Parking Required as/ bldg byelaws Adequate ECS WASTE GENERATION 21 Total Solid Waste Generation TPD 22 Quantity of Bio-Medical Waste Generation 48 KG/DAY 23 Quantity of Hazardous Waste Generation 2.13 LTS/DAY POWER 24 Total Power Requirement 950 KW 25 DG Set Backup 1500 KVA Table-1B: Comparative Statement of the Project Hosp Details Existing Addition/ Expansion Total NO OF BEDS OPD 500 PATIENTS NURSING INSTITUTE STUDENTS NURSING HOSTEL Building Blocks Existing Addition/ Expansion Total BLOCK A B+G+3 1 FLOOR B+G+4 BLOCK C B G+3 B+G+3 BLOCK D NIL B+ST+7 B+ST+7 ITHC/PRJ/16-17/EIA/70 38 Ind Tech House Consult

45 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Conceptual Plan 3.0 CONNECTIVITY The project site is well connected to major roads. Almost all the surrounding areas are connected through network of roads. Fig 1: Project site Location 4.0 PROJECT SURROUNDINGS The proposed project site is located at Faridabad in the state of Haryana. Project site is at N to E. (Source: Survey of India). The details of site surroundings are given below in Table- 2. Table-2: Site and Surrounding of the project Site S. No. Particulars Details 1. Nearest National Highway NH 2, 2.02 KM West 2. Nearest Railway Station Faridabad Railway Station, 2.70 Km NW 3. Nearest Airport IGI Aiprort, KM NW 4. Nearest Town/ City Faridabad 5. River Body Yamuna River, KM NE Agra Canal, 0.35 km/e Canal, 0.29 km/e 6. Hills/ Valleys Nil 7. Site Topography Plain 8. Archaeologically Important Site Nil

46 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Conceptual Plan 9. National Parks/ Wildlife Sanctuaries Not with in 10 KM 10 Delhi State Boundary Haryana-UP border 11. Reserved/ Protected Forests Nil 12. Seismicity The study area falls under Seismic Zone-IV 500 m and 10 km radius surroundings of the project site are given below in Figure- 3.0 & 4.0 respectively. Figure-3.0: 500 M surroundings of Project Site

47 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Conceptual Plan Figure-4.0: 10 Km Radius Map of the Project Site 5.0 OCCUPANCY DETAILS Total population of the project will be 2408 persons, which includes 300 indoor patients, 300 attendants and 1760 floating. The detailed population breakup is given below in the following Table -3. Table -3 Population Break up POPULATION A. Residing Population No. HOSPITAL BEDS ATTENDANTS NURSING HOSTEL (DOUBLE SEATED RM) 24 48

48 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Conceptual Plan TOTAL 648 B. Working Population HOSPITAL NURSING COLLEGE STUDENTS NURSING COLLEGE (STAFF) PROPERTY MANAGEMT DIVN - MANAGERS & STAFF TOTAL 460 C. Visitors OPD PATIENTS & ATTENDANTS 1000 VISITORS 300 TOTAL 1300 TOTAL POPULATION WATER DEMAND 6.1 Water supply & source The water supply for the project during operation phase will be sourced from MCF. The total water requirement based on the population will be 371 KLD. The daily water requirement calculation for hospital building and waste water generation and reuse details are provided in table 4 and the water balance Diagram is given below in Figure- 5. Table 4: Calculations for Daily Water Demand for the project WATER REQUIREMENT NUMBER OF HOSPITAL BEDS 300 WATER USE POPULATION/ AREA/UNIT RATE IN LTS TOTAL QTY IN KL HOSPITAL 450LPB (FRESH WATER) HOSPITAL BEDS (MULTIPURPOSE USE) LABORATORIES etc LAUNDRY FLUSHING (FRESH) ATTENDANTS (FRESH WATER) DOMESTIC (FRESH) FLUSHING (FRESH) HOSTEL (Nursing) DOMESTIC (FRESH) FLUSHING (TREATED) NON RESIDENTIAL (Stuents/officials/faculty) DOMESTIC (FRESH) FLUSHING (TREATED) VISITORS (incl OPD) ITHC/PRJ/16-17/EIA/70 42 Ind Tech House Consult

49 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Conceptual Plan DOMESTIC (FRESH) FLUSHING (TREATED) TOTAL POPULATION 2408 GARDENING (TREATED) WATER COOLED DG COOLING ( FOR 6 HRS) (TREATED) AIR CONDITIONING (TREATED) TOTAL WATER REQUIREMENT TOTAL WATER REQUIREMENT TOTAL TREATED WATER REQUIREMENT 163 TOTAL FRESH WATER REQUIREMENT CAPACITY OF STP WATER FLOW TO STP (FLUSHING) 100% 56.3 WATER FLOW TO STP (NON FLUSHING) 80% 87.4 TOTAL FLOW TO STP 144 REQUIRED CAPACITY OF (STP 120% OF FLOW TO STP) 172 PROPOSED CAPACITY OF STP 170 TREATED WATER AVAILABLE FROM STP ETP FOR LAB WASTE WATER TREATMENT FLOW TO ETP FROM LABS 90% 8 FLOW TO ETP FROM LAUNDRY 90% 30 CAPACITY OF ETP 45 TREATED WATER FROM ETP 90% TOTAL TREATED WATER AVAILABLE FOR REUSE FROM STP & ETP'S SURPLUS TREATED WATER TO BE DISCHARGED IN PUBLIC SEWER ITHC/PRJ/16-17/EIA/70 43 Ind Tech House Consult

50 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Conceptual Plan 6.2 Sewage Generation Fig 5: Water Balance Diagram Construction phase: Quantity of sewage generated during the construction phase will be negligible and proper management will be done by providing mobile toilets. Operational Phase: Sewage generated during operation phase will be 144 KLD for domestic effluent & 38 KLD from laboratories. Onsite STP and ETP of adequate Capacity will be provided for treatment of domestic effluent as well as waste water generated from hospital and laundry. The treated water from the STP will be stored in separate overhead tanks and the stored water will be used for HVAC, horticultural use, DG cooling and other washing purposes. For disinfection of treated water Ultra violet light disinfection will be provided. Dual plumbing system will be provided for reuse and recycling of treated waste water. 7.0 SOLID WASTE AND BIOMEDICAL WASTE GENERATION The solid waste generated from the project shall be mainly domestic and biomedical waste. Estimated quantity of the municipal waste shall be approx 0.91 TPD TPD bio-medical waste shall be generated from the project. The municipal solid waste so generated shall be first segregated as plastic, glass, paper and other waste separately and disposed off as per MSW Rule, The recyclable waste will be sold to vendors for recycling. Waste other than plastic, paper and glass shall be collected and disposed off at the municipal waste sites. The collected solid waste will be disposed to the nearest disposal site.

51 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Conceptual Plan Biomedical waste shall be managed as per Bio-Medical Waste (Management and Handling) Rules, Table 5: Quantity of Waste Generation for the Project WASTE GENERATION Total Waste Generation Bio-Medical Waste Organic Waste Generation Hazardous Waste Generation (DG Waste Oil) 0.91 TPD 0.09 TPD 0.45 TPD 4.13 Lts/Day 7.1 Waste Management during operation phase Municipal Solid Waste Sweepers will be engaged for handling municipal waste and appropriate site for keeping bin/container at common places would be identified for collection of waste. Adequate number of collection bins separately for biodegradable and nonbiodegradable waste shall be provided as per the Municipal Solid Waste (Management and Handling) Rule, Wastes from such bins shall be collected separately on daily basis. All waste collection bins shall be properly maintained on regular basis. Arrangement will be made with local civic authority, for providing garbage station or transfer point (preferably near the entry/ exit point of the site), where all the waste from collection bins shall be sent for further disposal by the municipal authorities. It will be assured that there is no spillage of waste along the internal roads during collection of wastes. The garbage storage/transfer point will be covered and cleaned every day to as to avoid any nuisance, vectors and unhygienic conditions. Landscape waste comprises of fallen leaves and other vegetative material. It shall be collected at secured location such that it shall not hinder the daily activity or be washed away by the surface run off causing choking of drains, etc. Adequate arrangement shall be worked out with municipal authority to collect and dispose such waste in an appropriate manner Biomedical Waste Management Generation of Biomedical Waste Patient Ward, Intensive Care Units, OPD, Pathology, Blood Bank, Operation Theatre, etc. Segregation of Biomedical Waste Segregation of biomedical waste is done at source & packed in different bags as per Biomedical waste management & handling rules ITHC/PRJ/16-17/EIA/70 45 Ind Tech House Consult

52 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Conceptual Plan Shifting of Biomedical Waste to Biomedical waste Storage Hospital collects all the biomedical waste keeps it in the Biomedical waste storage Disposal & Treatment of Biomedical Waste Biomedical waste transporter comes every day to pick up the waste & transport it to treatment site. Transporter & Treatment site are authorized CPCB Biomedical Waste Management- Collection Facilities Color Coding Yellow Red Blue Type of Container to be used Non-Chlorinated plastic Bags Non-Chlorinated plastic Bags/puncture proof container for shops Non-Chlorinated plastic Bags Waste Category Number Human anatomical waste, discarded medicines and cytoxitic drugs, soiled waste Microbiology Biotechnology and lab waste, Waste Sharps, infectious solid waste Treatment options as per Schedule I Incineration As per Schedule I (rule 7) Chemical Wastes As per Schedule I (rule 7) Black Non-Chlorinated plastic Bags Municipal Waste Disposal in Municipal dump site Radioactive Waste Management Radio Active Waste management for hospitals is covered under Atomic Energy (Safe Disposal of Radioactive Wastes) Rules, The hospital will manage the radioactive waste generated from the hospital as stated under the aforesaid rule and is given below: Institutions such as hospitals and tracer research laboratories, handling small quantities of radioisotopes of short effective half life may, after obtaining the authorization, under rule 3, undertake disposal of radioactive waste, in accordance with the following procedures :- 1. Disposal of Radioactive Waste by release into Sanitary Sewerage system - An authorized person may discharge radioactive waste into a Sanitary sewerage system, provided :- (a) the waste is readily soluble or dispersible in water; (b) the maximum quantity of radioactive material released in the sanitary sewerage system is less than the quantity prescribed in Table I of this Schedule and is not in excess of the quantity which, if diluted by the average daily quantity of sewerage released into the sewerage system by the authorized institution, will result in an average monthly concentration equal to the limits:- (i) as specified in Table 1, or (ii) as specified by the competent authority, on a case by case basis for radionuclides, not listed in Table 1, (c) the gross quantity of radioactive material released into the sewerage system by the institution does not exceed 37 GBq per year; ITHC/PRJ/16-17/EIA/70 46 Ind Tech House Consult

53 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Conceptual Plan (d) when more than one radionuclide is present in the liquid waste, the sum of the ratios of the individual quantities of each of the radioisotopes present and their respective maximum quantities allowed as per Table 1, does not exceed unity; (e) periodic maintenance and monitoring of the path-ways of the liquid effluents, till the effluents reach the sewerage system, is done by the Radiological Safety Officer, to ensure that the appropriate disposal limits and operational limits are not exceeded in and outside the drainage system; (f) a log book is maintained in Form III recording the identity and quantity of each radioisotope disposed, its time of disposal, the name of the person who has supervised the waste disposal and the data on radiation surveillance. 2.Disposal of Solid Radioactive Waste An authorized person may dispose of solid radioactive waste by burial into pits prepared in an exclusive burial ground, provided : (a) the burial ground is located in an isolated site owned by the said person; (b) the site is duly fenced off to prevent unauthorised entry; (c) the site is duly approved by the competent authority for burial of radioactive waste, the approval being governed by factors such as the nature of environment including topographical and geological characteristics of the burial site, usage of ground and surface waters in the general area around the site, with a view to minimize the assessed anticipated risk of accidental dispersal of the waste to potentially affected locations or back to the environment; (d) the total activity in the wastes buried in any one pit of the burial ground does not exceed (i) the limits specified in Table 2 of this schedule; or (ii) the limit specified by the competent authority on a case by case basis; for radionuclides not listed in Table 2 of this Schedule; (e) when more than one radionuclides is present in the solid waste, the sum of the ratios of the individual quantities of each of the radioisotopes present and their respective maximum quantities allowed as per Table 2, does not exceed unity; (f) the depth of the burial pit is so chosen that the wastes have a top layer of compact earth of minimum 120 cm thickness when the pit head is closed; (g) successive burial pits are separated by a distance of at least 180 cm; (h) not more than 12 burials are made in any one year; (i) a closed pit is not opened for reuse till 10 half lives, of the longest lived radioisotope buried in that pit, have elapsed; (j) the burial area is treated as restricted area and subjected to periodic environmental surveillance by the Radiological Safety Officer to ensure that the appropriate disposal limits and operational limits are not exceeded; (k) the material excavated from a closed pit is released for normal disposal, under the supervision of the Radiological Safety Officer before reusing the pit as laid down in (i); (l) periodic monitoring of the burial ground and its environment is done by the Radiological Safety Officer to ensure that the operational limits on radioactive contamination are not exceeded; ITHC/PRJ/16-17/EIA/70 47 Ind Tech House Consult

54 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Conceptual Plan (m) a log book is maintained in Form III recording identity and quantity of each radioisotope buried, description of waste, time of burial, name of the person who has supervised the burial operations and the data on radiation surveillance. 3.Incineration of Radioactive Waste An authorised person may undertake incineration of radioactive wastes, including incineration of radioactive animal card cases, provided the competent authority is duly satisfied that (a) the design of the incinerator is suitable for the intended operations and provides for retention of solid and liquid combustion/scrubbing by products and for controlled discharge of liquid and gaseous effluents; (b) the incineration operations will not result in air borne radioactive contamination in excess of the operational limits prescribed under Radiation Protection Rules, 1971, for unrestricted areas; (c) the solid and liquid radioactive wastes arising from incineration operations will be duly collected and disposed off in accordance with these rules; (d) adequate environmental surveillance, including air monitoring where necessary, will be provided to ensure that the operational limits are not exceeded; (e) the incineration operations are undertaken under direct supervision of the radiological safety officer; (f) up-to-date records are maintained, in Form III annexed to these rules, of the incineration operations indicating the names of radionuclides and their amounts finally disposed in gaseous, liquid and solid form, the details of such disposals, names of the persons involved in these operations and the date of radiation surveillance. 4. Records, etc. Quarterly records, in respect of the disposal operations, shall be submitted to the competent authority in Form IV. 5. Other conditions The authorised person shall abide by (i) such orders as may be issued by notifications, by the competent authority modifying the concentrations prescribed in Table 1 or the quantities prescribed in Table 1 & 2. (ii) any other safety measures stipulated by the competent authority in accordance with these rules. TABLE 1 Disposal limits for sanitary sewerage systems Radionuclide Maximum limit Average monthly on total discharge concentration of per day radioactivity in the discharge (MBq) (MBqM-3 ) H C Na P S C Ca ITHC/PRJ/16-17/EIA/70 48 Ind Tech House Consult

55 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Conceptual Plan Co Sr Sr90+Y Zr95+Nb Mo99+Tc99m Ru106+Rh Sb I I Cs137+Ba137m Ba140+La Ce144+Pr Tm Ir Po TABLE 2 Disposal limits for Ground Burial Radionuclide H C Na P S Cl36 37 Ca Co60 37 Kr Fe Sr89 37 Sr90+Y Zr94+Nb Mo Ru106+Rh Sb I I Xe Cs137+Ba137m 37 Ba140+La Ce144+Pr Tm Maximum activity in a pit (MBq) ITHC/PRJ/16-17/EIA/70 49 Ind Tech House Consult

56 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Conceptual Plan Ir Po (Source: Atomic Energy (Safe Disposal of Radioactive Wastes) Rule, POWER REQUIREMENT DETAILS The power supply shall be supplied by Dakshin Haryana Bijli Vitran Nigam. The connected load for the project will be approx KW. Table: 6 Power Demand Electrical - Demand Load 2004 KW Power Back-Up - DG Sets 3000 KVA DG Stack Height (6M above Tallest Tower) M 8.1 BACKUP POWER DETAILS There is provision of DG set of 3000 KVA for power back up in the proposed project. The DG sets will be equipped with acoustic enclosure to minimize noise generation and adequate stack height for proper dispersion. Energy conservation measures adopted in order to minimize the consumptions of conventional energy. 9.0 CONSTRUCTION OF STORM WATER DRAINS A network of storm water drain with catch basin of appropriate size shall be planed to collected storm water for harvesting RAIN WATER HARVESTING SYSTEM The storm water disposal system for the premises shall be self-sufficient to avoid any collection/stagnation and flooding of water. The amount of storm water run-off depends upon many factors such as intensity and duration of precipitation, characteristics of the tributary area. Rain water will be harvested and the potential for rain water harvesting projected is given as per the table Nos. rain water harvesting pits at selected locations, which will harvest the maximum run-off from the area. Rain water harvesting has been catered to and designed as per the guideline of CGWA. The shaft is having a 3.0 m diameter including weep hole, vent pipe and 3 m depth. Inside the shaft, a recharge well of 3 m diameter is constructed for recharging the available water to the deeper aquifer. The bottom of the recharge structure will be kept 5 m above water level. At the bottom of the shaft a filter media is provided to avoid choking of the recharge well. Design specifications of the rain water harvesting plan are as follows: ITHC/PRJ/16-17/EIA/70 50 Ind Tech House Consult

57 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Conceptual Plan Catchments/roofs would be accessible for regular cleaning. The roof will have smooth, hard and dense surface which is less likely to be damaged allowing release of material into the water. Roof painting has been avoided since most paints contain toxic substances and may peel off. No sewage or wastewater would be admitted into the system. PARTICULARS Table 7: Calculations for storm water Harvesting Potential RAIN WATER HARVESTING ROAD/PAVED PARKING AREA OPEN AREA GREEN AREA ROOF TOP AREA Area (Sq.m.) Runoff coefficient Rainfall (m) Harvesting potential (cu.m.) Net water availability and potential for recharge (cu.m.) per year (considering 20% losses) Rain Water Harvesting Pit Design Particulars Values Unit Peak hourly rate 40 mm/hr for 1 Hour CUM Peak hourly rate 40 mm/hr for 15 min duration CUM Volume of recharge pit 15 CUM No. of recharge pits (Existing) 3 No. Total of 03 Nos. Rain Water Harvesting pits are to be proposed for artificial rain water recharge within the project premises LANDSCAPE & SHELTERBELT DEVELOPMENT : Total green area measuring 3851 m 2 (22.74% of the Plot Area) will be under tree plantation within the site, commercial area and along the plot boundary. Selection of trees to be planted in the project premises are given in list below: List of Evergreen Trees, Dense Foliage, Shady, Ornamental and Flowering Trees for Green Belt Development ITHC/PRJ/16-17/EIA/70 51 Ind Tech House Consult

58 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Conceptual Plan SN Botanical Name Common Name 1 Ficus Infectoria Pakur 2 Delonix regia Gulmohur 3 Cassia fistula Amaltas 4 Azadirachtha Indica Neem 5 Peltophorum ferrugineum Copper pod 6 Ficus retusa Usha 7 Alstonia Scholaris Scholar tree 8 Thespesia populnea Paras Pipal 9 Churasia tabularis Chukrasia 10 Anthocephalus cadamba Kadamba 11 Jacaranda mimosifolia Jacaranda 12 Mimusops Elengi Maulsari 13 Plumeria alba Temple tree 14 Terminalia arjuna Arjuna 15 Bauhinea Variegata Kachnar 16 Sarca indica Ashoka 17 Silver oak Grevillea Robusta 18 Semal Bombax Ceiba 12.0 PARKING FACILITIES Adequate parking provision will be made at the proposed hospital building. There shall also be adequate parking provisions for visitors so as not to disturb the traffic and allow smooth movement at the site Parking Details Table 8: Parking Details 1. Total Parking Required as / Building Bye Laws 331 ECS 2. Proposed Total Parking 377 ECS 13.0 SEISMICITY Based on the tectonic features and records of earthquake, a Seismic Zoning map has been developed for the country by Bureau of Indian Standard (BIS). The area under study falls in Seismic Zone-IV. Suitable seismic coefficients in horizontal and vertical directions respectively, will be adopted while designing the structures. Earthquake resistant construction material will be used FIRE SAFETY In design component of the project, adequate measure has being taken as per the provisions of the National Building Code to provide for fire protection services. Required quantity of water will be stored within the premise to subdue fire if at all required. Water will be supplied from the underground water storage reservoir. Apart from providing sufficient water for firefighting, other measures that have been considered include: ITHC/PRJ/16-17/EIA/70 52 Ind Tech House Consult

59 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Conceptual Plan The internal roads will have sufficient load bearing capacity to withstand fire engines The building materials shall be of appropriate fire resistance standard. Further, design shall include provision for the following: o The electrical systems shall be provided with automatic circuit breakers activated by the rise of current as well as activated by over current. o Fire Alarm systems at appropriate places o Means of escape, o Access for fireman o Adequate fire fighting requirement have been taken into account while designing the electrical distribution system ENVIRONMENTAL POLLUTION MITIGATION MEASURES 16.1 Air Pollution Increased traffic generation due to project (no. of parking space proposed for the project is not going to cause significant increase in atmospheric concentration of gases and will not result in heat island formation as adequate landscaping has been provided. Mitigation Measures for Air Pollution during Construction Stage Air quality around the project site will be impacted during construction stage. Various construction activities especially related to handling of loose material are likely to generate fugitive dust that will affect the air quality of the surrounding area of the project site. To minimize such impacts following measures has been proposed: All the loose material either stacked or transported will be provided with suitable covering such as tarpaulin, etc. Water sprinkling shall be done at the locations where dust generation is anticipated. To minimize the occupational health hazard, proper personal protective gears i.e. mask shall be provided to the workers who are engaged in dust generation activity. Mitigation Measures for Air Pollution during Operational Stage Operation of DG Sets is the only source of air pollution during operational phase. Sufficient stack height will be provided for proper dispersion of pollutants. Also, it is proposed to minimize air pollution by providing plantation as buffer on the periphery of the project site and on the open spaces. An area of 3851 m 2 (22.74% of the Plot Area) has been kept for plantation purposes Water Pollution The source of water pollution during construction and operation phase is due to waste water generated from toilets and washing. Mitigation Measures for Water Pollution during Operational Stage: Waste water generation and treatment and reuse are dealt in Noise Environment ITHC/PRJ/16-17/EIA/70 53 Ind Tech House Consult

60 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Conceptual Plan During construction the machineries used were of highest standard of reputed make adhering to stipulated standard. Hence, insignificant impacts due to construction machinery are envisaged. Apart for this, the construction activities were restricted to day time only. Source of noise for the existing as well post construction phase are from the material handling operations and utility units like cooling tower and DG sets. The DG sets are operated during power failure only and provided with inbuilt acoustic enclosure as per CPCB standard. Mitigation Measures for Noise Pollution during Construction Stage During the construction stage, expected noise levels shall be in the range of db (A) which will decrease with increase in distance as per the Inverse Square Law. Administrative as well as engineering control of noise will be implemented. Isolation of noise generation sources and temporal differentiation of noise generating activities will ensure minimum noise at receiver s end. To prevent any occupational hazard, ear muff / ear plug shall be given to the workers working around or operating plant and machinery emitting high noise levels. Use of such plant or machinery shall not be allowed during night hour. Careful planning of machinery operation and scheduling of operations shall be done to minimize such impact. Mitigation Measures for Noise Pollution during Operation Stage It is envisaged that there shall be maximum movement of light motor vehicles like cars which will lead to some increase in noise levels. It is proposed to minimize the noise levels by providing plantation as buffer on the open spaces and around the periphery of whole complex. Informatory signboards shall be provided to encourage vehicle owners to maintain their vehicle, not to blow horns and follow the emission standards fixed by Government Authorities DG sets will be kept in the acoustic chamber and ambient noise will be within the CPCB standard limits. 17 CONSTRUCTION MATERIALS Following construction materials are required for construction of hospital Building:- 1. Coarse sand 2. Fine sand 3. Stone aggregate 4. Cement 5. Fly Ash 6. Reinforcement steel 7. Plywood & steel shuttering 8. Pipe scaffolding (cup lock system) 9. Bricks/ Fly ash 10. Marble 11. P.V.C. conduit 12. MCBs/DBs 13. PVC overhead water tanks 14. Pavors 15. GI pipe 16. waste water lines 17. S.W. sewer line upto main sewer 18. PVC pipes 19. Glass 20. Joinery hardware Apart from this, in order reduce the overall energy requirement of the building, materials with low U value will be used LIST OF MACHINERY USED DURING CONSTRUCTION (i) Dumper ITHC/PRJ/16-17/EIA/70 54 Ind Tech House Consult

61 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Conceptual Plan (ii) Concrete mixer with hopper (iii) Excavator (iv) DG Sets (v) Cranes (vi) Road roller (vii) Bulldozer (viii) Tower Cranes (ix) Hoist (x) Labor Lifts (xi) Concrete pressure pumps (xii) Mobile transit mixer ITHC/PRJ/16-17/EIA/70 55 Ind Tech House Consult

62 Anshu Hospitals Ltd Environment Clearance For Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector-08 at Faridabad Conceptual Plan

63 ANNEXURE A Site Location Map (on Google) Annexure-A1 500 Mt Radius Map Annexure-A2 10 km Radius Map Annexure-A3 Water balance Diagram Rain Water Harvesting Calculation Site Photographs Electricity Bill Water Bill Bio Medical Agreement Board Of Resolution for authorized Signatory Annexure-A4 Annexure-A5 Annexure-A6 Annexure-A7 Annexure-A8 Annexure-A9 Annexure-A10

64 GOOGLE MAP SHOWING THE PROJECT SITE

65 GOOGLE MAP 500 MT RADIUS

66 GOOGLE MAP 10 KM MT RADIUS S.NO. FEATURES LEGENDS 1 PROJECT SITE 2 ROADS 3 CANAL 4 RLY. LINE S.N Feature Distance 1 NH KM/W 2 FARIDABAD RLY 2.70 KM/NW STN 3 BALLABHGARH 1.75 KM/SW 4 AGRA CANAL 0.35 KM/E 5 CANAL 0.29 KM/E

67

68 RAIN WATER HARVESTING CALCULATION PARTICULARS RAIN WATER HARVESTING ROAD/PAVED PARKING AREA OPEN AREA GREEN AREA ROOF TOP AREA Area (Sq.m.) Runoff coefficient Rainfall (m) Harvesting potential (cu.m.) Net water availability and potential for recharge (cu.m.) per year (considering 20% losses) Rain Water Harvesting Pit Design Particulars Values Unit Peak hourly rate 40 mm/hr for 1 Hour CUM Peak hourly rate 40 mm/hr for 15 min duration CUM Volume of recharge pit 15 CUM No. of recharge pits 3 No.

69 SITE PHOTOGRAPHS

70

71

72

73

74

75

76

77 ANNEXURE B Allotment Letter & Registry Approved Zoning Plan Forest Noc Fire & Aravali Noc Annexure-B1 Annexure-B2 Annexure-B3 Annexure-B4

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94

95 ANNEXURE C Consultant Disclosure NABET Accreditation letter Annexure-C1 Annexure-C2

96 Ind Tech House Consult Annexure-C1 EIA Consultancy Organization: Ind Tech House Consult, G-8/6, Ground Floor, Rohini, Delhi , has been appointed as EIA Consultant to carry out Environmental Impact Assessment Study and Obtaining Environmental Clearance for Proposed Expansion of Sarvodaya Hospital & Research Centre (A Unit of Anshu Hospitals Ltd) At Site No.1, Sector- 08 at Faridabad. Accreditation to NABET Status: Ind Tech House Consult was assessed by the NABET on 30 th and 31 st January 2012 and has provisionally accredited the Consultancy organization in Building and Construction Projects. Similar Assignment: Following are some of projects of similar kind successfully carried out/ ongoing by the Consultancy organization. a. Environmental Impact Assessment for Extension of Parliament House Annexe Project, Parliament House Complex, New Delhi; b. Environmental Impact Assessment for Construction of Group Housing for LokSabha Secretariat, New Delhi; c. Environmental Impact Assessment for Park at Sector 92, Noida (under direction of Hon ble Supreme Court); d. Environmental Impact Assessment for Expansion of LNJP Hospital, New Delhi; e. Environmental Impact Assessment for Construction of Institutional Campus at Rohtak; f. Environmental Impact Assessment for Construction of Police Line by Delhi Armed Police, Dwarka, New Delhi.

97 Intellectual Strength of Ind Tech House Consult I Name : Mr. Arvind Narayan Devikar 1 Status in the : EIA Coordinator Organization 2 Educational Qualification : Bachelor of Architecture (Visvesvaraya Regional College of Engineering Nagpur (1973) 3 Work Experience : 40 Years 4 Work Experience related to EIA : 7 years More than 25 successful EIA projects in Building Construction Sector 5 Previous Organizations Served : Senior Architect, CPWD, Directorate General, CPWD Nirman Bhawan ( ) 6 Specialization : Planning and Designing, Energy Efficient Buildings, Climate Responsive Architectural Design, Passive Energy in Buildings, Energy Conservation, Landscape and Environmental Impact Assessment 7 Additional Qualification : Evaluator and Trainer for GRIHA - Green Rating for Integrated Habitat Assessment; Panel member for National Building Code 2005 in Landscaping, CED 46:p18; Architecture, Energy and Environment Lund University Sweden Planning and Design of Energy Efficient Building CPWD Ghaziabad; Public Administration II Name : Dr. Ravinder Mohan Mehta 1 Status in the : EIA Coordinator Organization 2 Educational : Ph.D. Chemistry Patiala University, Patiala Qualification 3 Work Experience : 38 years in Pharmaceutical Industry, Academics, Laboratory and Environmental Consultancy 4 Work Experience : 10 years

98 related to EIA More than 50 successful EIA projects 5 Previous Organization Served : Ranbaxy Labs, Punjabi University, Nuchem Limited, Senes Consultants India Pvt. Ltd., Voyants Solutions Pvt. Ltd. 6 Additional Qualification : ISO Lead Auditor, Planning Implementing and Auditing of Laboratory Quality System as per NABL/ISO 17025, Environmental Training on Industry and Environment Protection for India, Unit operation and processes for CETP, CIQA as per 17025:1999 III Name : Mrs. Supriti Guha 1 Status in the : EIA Coordinator Organization 2 Educational : B. Tech Chemical Engineering Qualification 3 Work Experience : 15 Years 4 Work Experience related to EIA : 3.5 years More than 10 EIA Studies 5 Previous Organizations Served : West Bengal Pollution Control Board for 12 years as Regional Officer 6 Specialization : Air Quality, Water Pollution, Solid and Hazardous Waste, Environmental Assessment for Industries and Thermal power Plant and Environmental Impact Assessment IV Name : Mr. Suman Banerjee 1 Status in the : EIA Coordinator Organization 2 Educational : B.E. Environmental Engineering Qualification 3 Work Experience : 12 Years 4 Work Experience related to EIA : 8 Years More than 50 successful EIA projects 5 Previous Organizations Served : Common - Hazardous Waste Management Facility at Taloja, Mumbai; Common - Biomedical Waste Management Facility at Taloja, Mumbai; Consultant for JBIC for Environment and Social Guideline

99 Frame Work for Steel and Thermal Power Projects in India; Consultant for JICA for Dedicated Freight Corridor for DFCCL - Ministry of Railways, projects; EIA Consultant and Environmental Trainer for JBIC funded Kerala water supply project for Thiruvananthapuram, Meenad, Cherthala, Kozhikode&Pattuvam. 6 Specialization : Air Pollution, Water Pollution, Noise and Vibration, Green Building, Municipal Solid Waste, Hazardous Waste and Biomedical Waste; Environmental Impact Assessment for Building and Construction Projects, Highway Projects, Area Development Projects, Industrial Estate/ Park/ Leather Park Projects, SEZ, Oil and Natural Gas Exploration Projects, Mineral Beneficiation Projects, Highway and Solid and Hazardous Waste Management Projects; Noise and Vibration assessment and analysis expert 7 Additional Qualification : GRIHA Green Rating for Integrated Habitat Assessment ECBC Energy Conservation Building Code EIA Trainer for CPWD Officials at CPWD Training Institute, Ghaziabad V Name : Mr. Anand Kumar Dubey 1 Status in the Organization : Air Quality, Water Quality, Solid Waste and Ecology and Biodiversity Expert 2 Educational : M. Sc. Environment and Ecology Qualification 3 Work Experience : 7 years 4 Work Experience : 7 years related to EIA 5 Previous Organizations Served : Asian Consulting Engineers Pvt. Ltd. 6 Specialization : Environmental Impact Assessment for Building Construction, Industrial Estates/ Parks, Solid Waste Management, Area Development Projects, Oil and Natural Gas Exploration and Highway Projects

100 VI Name : Dr. Debasish Bhattacharya 1 Status in the : Social Expert Organization 2 Educational Qualification : Ph.D. Tribal Development/ Social Science IIT Kharagpur MRP Regional Planning IIT Kharagpur 3 Work Experience : 25 years 4 Work Experience : 25 years related to EIA 5 Previous Organizations Served : IIT Kharagpur Senior Project Manager LEA Associates SMEC India Pvt. Ltd. Feedback Ventures Pvt. Ltd. Nippon Koei External Funding Agency Projects for World Bank, ADB, JICA 6 Specialization : Tribal Development, Socio economic Development, Social Study in Forest Management, Preparation of RAP, SIA, SE Framework Development, Rehabilitation and Resettlement (R&R) VII Name : Mr. Sameer Vilasrao Deshpande 1 Status in the : Ecology and Biodiversity Expert Organization 2 Educational : M.Sc. Botany Qualification 3 Work Experience : 6.5 years 4 Work Experience : 6.5 years related to EIA 5 Previous Organizations Served : National Environmental Engineering Research Institute - NEERI Nagpur 6 Specialization : Biological Monitoring, preparation of Biodiversity report, conservation plan for scheduled plant and animals, green belt development plan VIII Name : Mr. Rahul RamaraoDeshmukh 1 Status in the : Social Expert

101 Organization 2 Educational Qualification : Master of Social Work Ph.D. Submitted 3 Work Experience : 6 years 4 Work Experience : 6 years related to EIA 5 Previous Organizations Served : National Environmental Engineering Research Institute - NEERI Nagpur 6 Specialization : Socio Economic Monitoring, Rehabilitation and Resettlement, Corporate Social Responsibility IX Name : Mr. Sunil Chandra Gupta 1 Status in the : Risk Assessment and Hazard Management Organization 2 Educational Qualification : M.E. Chemical Engineering, B.E. Chemical Engineering (University of Roorkee) 3 Work Experience : 20 years 4 Work Experience : 20 years related to EIA 5 Previous Organizations Served : Shriram Institute of Industrial Research ERM India Pvt. Ltd. SGS India Pvt. Ltd. 6 Specialization : Risk Assessment and Disaster Management Plan; HAZOP study; Execution of Safety Audit, Hazard Analysis and preparation of Disaster Management Plan; Waste Water Treatment and Disposal; Solid and Hazardous Waste Treatment and Disposal. X Name : Mr. UmeshPratap Singh Chauhan 1 Status in the : Geology Expert Organization 2 Educational : M.Sc. Geology Qualification 3 Work Experience : 30 years 4 Work Experience : 6 years

102 related to EIA 5 Previous Organizations Served : Uttar Pradesh State Mineral Development Corporation Ltd.; Directorate of Geology and Mining 6 Specialization : Mining Plan; R&D project for Mining and Quality Control; Exploration, Surveying and Mapping. XI Name : Dr. Manoj Kumar Mishra 1 Status in the Organization : Air Pollution, Meterology, Modeling and Noise and Vibration Expert 2 Educational Qualification : M.Tech. Atmospheric Sciences University of Pune Ph.D. Atmospheric Sciences (Air Quality Modelling and Micrometeorology IIT Delhi) 3 Work Experience : 14 years 4 Work Experience : 14 years related to EIA 5 Previous Organizations Served : IIT Delhi Research Associate SENES Consultants India Pvt. Ltd. 6 Specialization : Air and Noise Impact Assessment Studies; Air Quality and Noise Modeling by ISCST3, AERMOD, CALPUFF, OCD, CALINE, INM, DHAWANI, TNM, etc.; Air and Noise Modeling for Coal and Gas fired industries, landfill, helipad, wind farms, highways SEZ Projects; 7 Specialized Study : Coastal Atmospheric Boundary Layer (CABL) field experiment at kalpakkam in collaboration with Indira Gandhi Centre for Atomic Research (IGCAR), Bhabha Atomic Research Centre (BARC) Mumbai and Institute of Meteorology and Physics, University of Agriculture, Forestry and Renewable Resources Vienna, Austria XII Name : Dr. Suraj Kumar Sharma 1 Status in the Organization : Hydrology, Ground Water, Water Conservation, Geology and Land Use Expert 2 Educational Qualification : M.Sc. Geology Jammu University Diploma in Remote Sensing Indian Institute of Remote

103 Sensing (IIRS Dehradun) Diploma in Advance Course in Remote Sensing ITC, The Netherlands 3 Work Experience : 46 years 4 Work Experience : 3.5 years related to EIA 5 Previous Organizations Served : Assistant Geologist Geological Survey of India Director Hydrogeologist Central Ground Water Authority Member Hydrogeology Central Ground Water Authority 6 Specialization : Water Harvesting Water Shed Management Ground Water Study under NNRMS Program along with ISRO Appraisal and Examination of Environmental Projects of MoEF Interpretation and Analysis of Aerial photographs and satellite imageries and providing S&T inputs to ground water projects in the states, investigation and exploration of ground water resources, Geological and hydro-geological data processing

104 Ind Tech House Consult (An ISO 9001:2008 Certified Organization) G-8/6, Ground Floor, Sector 11, Rohini, Delhi Tel: , ; Fax:

105 NATIONAL ACCREDITATION BOARD FOR EDUCATION & TRAINING QUALITY COUNCIL OF INDIA QCI Office, 6th Floor, ITPI Building, Ring Road, I.P. Estate, New Delhi Scheme for Accreditation of EIA Consultant Organizations Accreditation Committee Meeting for Re-Accreditationheld on December 09, 2016 The following were present during the meeting: 1. Prof. B.B Dhar - Chairman 2. Dr. Nalni Bhat - Member 3. Dr. S P Chakrabarti - Member 4. Dr. G.K Pandey - Member 5. Prof. C.P Kaushik. - Member 6. Prof. Umesh Kulshrestha -Member Earlier Dr.S.R Wate, and Prof. G.J Chakrapani expressed their inability to attend the meeting. NABET Secretariat was represented by: Mr. A.K Ghose Principal Advisor Mr. A.K Jha Senior Director, Dr. Pawan Kumar Singh Assisstant Director and Ms. Samra Khan Accreditation Officer 1.0 Minutes of the Accreditation Committee meeting dt. December 02, 2016 were approved. 2.0 Following cases were discussed and decisions taken as noted below. Case for Re-Accreditation 2.1 Ind Tech House Consult ( ITHC), Delhi The ACO has been assessed as per Version 3 of the Scheme. Result of the Re-accreditation Assessment (RA) is given below: Category of Approval : The ACO has scored more than 60% marks hence it continues to be accredited with Cat. A. RA 113 th AC Meeting : Dec. 09, 2016 Page 1

106 2.1.2 Scope of Accreditation Sector No.(MoEFCC NABET Sl. Cat. Notification dt. Scheme Sector Description No. September 14,2006 Sectors & Ammendments) 1. 1 Mining of minerals including opencast / 1 (a) (i) B underground mining 2. 2 Offshore and onshore oil and gas exploration, 1 (b) A development & production 3. 3 River Valley projects A 1 (c) 4. 18* Petro-chemical complexes (industries based on processing of petroleum fractions & natural gas and/or reforming to aromatics) A 5 (c) Oil & gas transportation pipeline (crude and 6 (a) refinery/ petrochemical products), passing through national parks/ sanctuaries/coral reefs / ecologically sensitive areas including LNG terminal A Isolated storage & handling of Hazardous 6 (b) chemicals (As per threshold planning quantity indicated in column 3 of schedule 2 & 3 of MSIHC Rules 1989 amended 2000) A Industrial estates/ parks/ complexes/areas, 7 (c) export processing Zones(EPZs), Special Economic Zones(SEZs), Biotech Parks, Leather Complexes A Ports, harbours, break waters and dredging A 7 (e) Common Municipal Solid Waste Management 7 (i) B Facility (CMSWMF) Building and construction projects B 8 (a) Townships and Area development projects B 8 (b) *Approval of sector- 18 is subject to coverage of core functional area- AQ as per the Scheme for Accreditation of EIA Consultant Organizations- Version Sectors approved for EIA Coordinators (ECs) a. Assessed as per RA norms for ECs approved earlier: Earlier approval status Current approval status SI. Name (SA/subsequently) (after RA) Remarks No. Sector Cat. Status Cat. In-house A.N Devikar 38 B 1 Renewed B None 2 Suman Banerjee 3 Supriti Guha 37 B Renewed* B *With Alert 38 B Renewed* B *With Alert 21 B - To be assessed as per IA - norms based on Scheme requirements. 31 B - To be assessed as per IA - norms based on Scheme requirements. 37 B - To be assessed as per IA - norms based on Scheme requirements. RA 113 th AC Meeting : Dec. 09, 2016 Page 2

107 Earlier approval status Current approval status SI. Name (SA/subsequently) (after RA) No. Sector Cat. Status Cat. Remarks 38 B Renewed B None 39 B Renewed B None 4 B - - Resigned 4 R M Mehta 37 B - - Resigned 39 B - - Resigned Empanelled 5 Pankaj Pande Absent during interaction # Reason for Alert will be communicated to ACO. b. Assessed as per IA norms for new sectors of approved ECs and fresh ECs proposed: Sl. Sectors Name No. Applied Recommended Approved Cat. Remarks In-house Somya 27 Yes Yes* A * With observation 1 Dwivedi 28 Yes Yes B None 38 Yes Yes B None 2 Anand Dubey Candidature withdrawn 3 R. M.Mehta Resigned Resigned 4 A.N. Devikar 39 Yes Yes B None Empanelled 2 Yes Yes A None Sameer V 3 Yes Yes A None 5 Deshpande 27 Yes Yes A None Candidature withdrawn 38 Yes Yes B None 2 Yes Yes A None 6 C.A. Moghe Candidature withdrawn 18 # Yes Yes A # See note below Candidature withdrawn 1 Yes Yes B None 7 Alok Pathak 27 Yes Yes A None 31 Yes Yes A None 33 Yes Yes A None 8 Pawan S. Sharma Absent during interaction Absent during interaction 9 Arvind Kumar Yes Yes B None 1 Purohit #Though the candidate is approved for sectors 18, the ACO would be permitted to take up EIAs in this sector on complying with the requirements of approved in-house expert for functional areas AQ * Reason for observation will be communicated to ACO. RA 113 th AC Meeting : Dec. 09, 2016 Page 3

108 2.1.4 Functional Areas (FAs) approved for Functional Area Experts (FAEs): a. Assessed as per RA norms for FAEs approved earlier: Earlier approval status Approval status after RA SI. Name FA approverd in No. Cat. Status Cat. SA/subsequently Remarks In-house 1 Supriti Guha WP B Renewed* A *Upgraded to Cat. A SHW B Renewed* A *Upgraded to Cat. A 2 Suman Banerjee AP B Renewed B None MSW B Renewed* B *With Alert 3 R. M. Mehta WP A - - Resigned MSW A - - Resigned 4 Debashish A *With Alert SE A Renewed* Bhattacharya Empanelled 5 Pankaj Pande GEO Absent during interaction 6 Shrikant Misra SC A Renewed A None 7 Rajver Singh LU B Renewed* A *Upgraded to Cat. A Manoj Mishra Rahul Rama Rao Deshmukh Sameer V. Deshpande AP A Renewed A None AQ A Renewed A None NV A Renewed A None SE A Renewed* B *Cat. Downgraded to B EB B Renewed B None b. Assessed as per IA norms approved experts for new functional areas and fresh FAEs proposed: Sl. No. In- house Name 1 Somya Dwivedi Functional Areas Applied Recommended Approved RA 113 th AC Meeting : Dec. 09, 2016 Page 4 Cat. Remarks SHW Yes Yes B None RH Yes Yes B None 2 Bideh Shukla EB Yes Yes B None SC Yes Yes B None Geo Yes Yes B None Manish Shukla 3 HG Yes Yes B None LU Yes Yes B None 4 U.P.S. Chauhan GEO Yes Yes B None Empanelled AP Yes Yes B None 5 EB Yes Yes A None Alok Pathak SHW Candidature withdrawn AP Absent during interaction 6 Pawan S. Sharma RH Absent during interaction NV Absent during interaction 7 C. A. Moghe WP Yes Yes A None

109 Sl. No. Name Functional Areas Cat. Remarks Applied Recommended Approved SC Yes Yes B None Note: Results of balance candidates and details of the assessment shall be communicated to the ACOs by NABET The meeting concluded with a vote of thanks to and from the Chair. Issued by: A.K Jha Senior Director l NABET Abbreviations ACO AC Cat. IA EC FAE RA SA FAA : Accredited Consultant Organization : Accreditation Committee : Category : Initial Accreditation : EIA Coordinator : Functional Area Expert : Re-Accreditation : Surveillance Assessment : Functional Area Associates RA 113 th AC Meeting : Dec. 09, 2016 Page 5

110 ANNEXURE D Site Layout Plan Landscape Plan Section and Elevation Plan Fire Fighting Schematic Plan Services Plan Annexure-D1 Annexure-D2 Annexure-D3 Annexure-D4 Annexure-D5

111

112

113 Notes 1. The copyright of this drawing belongs to Helix Healthcare Architecture (HHA), New Delhi. 2. This drawing shall not be copied or used without written permission of HHA 3. All dimensions are in millimeters (unless otherwise mentioned). 4. All dimensions shall be read and not measured or scaled 5. Any error / discrepancy in the drawing shall be brought to the notice of HHA Owner's Signature Architect's Signature Hospital Architects Helix Healthcare Architecture 16, Sadhna Enclave, Panchsheel Park ( South)/ New Delhi T: / / helix@hlx.co.in. Web : Project Proposed Expansion of Sarvodaya Super Speciality Hospital and Research Centre At Site No. 1 Sector - 8 Faridabad, Haryana Client Anshu Hospital Ltd. Approval Drawing Drawing Title: Site Layout Plan without (PLANTING PLAN ) Project Code Drawn By Checked By Approved By HHA/24 Jaivir Singh PCS PCS Scale Drawing No. North Date 1:200@A0 001a