DRAFT ENVIRONMENTAL IMPACT REPORT/ ENVIRONMENTAL ASSESSMENT CONTENTS CENTINELA SOLAR ENERGY PROJECT

Size: px
Start display at page:

Download "DRAFT ENVIRONMENTAL IMPACT REPORT/ ENVIRONMENTAL ASSESSMENT CONTENTS CENTINELA SOLAR ENERGY PROJECT"

Transcription

1 CONTENTS DRAFT ENVIRONMENTAL IMPACT REPORT/ ENVIRONMENTAL ASSESSMENT CENTINELA SOLAR ENERGY PROJECT CHAPTER 1.0 INTRODUCTION 1.1 PURPOSE OF THE DOCUMENT PROJECT BACKGROUND Project Overview Project Location OBJECTIVES AND PURPOSE AND NEED FOR THE PROPOSED ACTION Applicant Imperial County BLM Purpose and Need JOINT CEQA/NEPA DOCUMENT CEQA EIR NEPA EA Review & Certification Process AGENCY ROLES AND RESPONSIBILITIES Imperial County Bureau of Land Management Other Agency Reviews and/or Consultations POSSIBLE BENEFITS OF THE PROPOSED ACTION Social and Environmental Benefits Promoting Stable Electricity Prices Job Creation Minimal Use of Imported Fuels Protecting Public Health Improving Air Quality Benefits to Communities with a Plurality of Minority or Low Income Populations RELATIONSHIP TO STATUTES, REGULATIONS AND OTHER PLANS Federal State Local PUBLIC PARTICIPATION OPPORTUNITIES/COMMENTS AND COORDINATION Notice of Preparation Scoping Meeting Airport Land Use Commission Meeting AVAILABILITY OF REPORTS STRUCTURE OF THIS EIR/EA Draft EIR/EA Technical Appendices ISSUES TO BE ADDRESSED ISSUES SCOPED OUT FROM FURTHER ENVIRONMENTAL REVIEW

2 CHAPTER 2.0 PROPOSED ACTION AND ALTERNATIVES 2.1 PROPOSED ACTION AND ALTERNATIVES Introduction Project Background Purpose and Need / Objectives Alternatives Development and Screening Overview of Alternatives Considered in Detail ACTION ALTERNATIVES INCLUDING THE PROPOSED ACTION Proposed Action Alternative 1 Double Circuit Gen tie Line Structures Alternative 2 Reduced CSE Facility Site Alternative 3 Use Existing Electric Line Towers and 230 kv Line Looping and Undercrossing NO ACTION ALTERNATIVE Alternative 4 No Action/No project Alternative COMPARISON OF IMPACTS BY ALTERNATIVE FEDERAL LEAD AGENCY PREFERRED ALTERNATIVE AND CEQA ENVIRONMENTALLY SUPERIOR ALTERNATIVE ALTERNATIVES CONSIDERED BUT ELIMINATED FROM DETAILED ANALYSIS Single Circuit Gen tie Line Shifted Eastward Double Circuit Gen tie Line Shifted Eastward Gen tie Line Undercrossing Use Existing Electric Towers and 230 kv Line Looping Reduced Encroachment on Federal Land while Still Interconnecting at Imperial Valley Substation Interconnection to the 500 kv Line via a New Substation on Private Lands Interconnection to the 230 kv Lines South of Imperial Valley Substation via a New Substation on Federal Lands Interconnection to Imperial Valley Substation at Alternative Voltages (e.g., 500 kv or <230 kv) INTENDED USES OF THE EIR/EA/AUTHORIZING ACTIONS Discretionary Actions and Approvals Subsequent/Concurrent Entitlements to Implement the proposed project Discretionary Actions and Approvals by Other Agencies ENVIRONMENTAL SETTING 3.1 VISUAL RESOURCES Regulatory Framework Affected Environment LAND USE AND SPECIAL DESIGNATIONS Regulatory Framework Affected Environment TRANSPORTATION AND CIRCULATION Regulatory Framework Affected Environment AIR QUALITY Regulatory Framework

3 3.4.2 Affected Environment GREENHOUSE GAS EMISSIONS/CLIMATE CHANGE Greenhouse Gases Regulatory Framework Affected Environment GEOLOGY AND SOILS Regulatory Framework Affected Environment CULTURAL RESOURCES Regulatory Framework Affected Environment NOISE Regulatory Framework Affected Environment AGRICULTURAL RESOURCES Regulatory Framework Affected Environment HAZARDS & HAZARDOUS MATERIALS Regulatory Framework Affected Environment HYDROLOGY AND WATER QUALITY Regulatory Framework Affected Environment CULTURAL RESOURCES Regulatory Framework Affected Environment PALEONTOLOGICAL RESOURCES Regulatory Framework Affected Environment ENVIRONMENTAL JUSTICE Regulatory Framework Affected Environment RECREATION Regulatory Framework Affected Environment ENVIRONMENTAL CONSEQUENCES COUNCIL ON ENVIRONMENTAL QUALITY ANALYSIS (EIR) NEPA ANALYSIS (EA) Direct and Indirect Impacts VISUAL RESOURCES Methodology for Analysis CEQA Significance Criteria/NEPA Requirements Environmental Consequences Mitigation Measures Residual Impacts After Mitigation LAND USE AND SPECIAL DESIGNATIONS

4 4.2.1 Methodology for Analysis CEQA Significance Criteria/NEPA Requirements Environmental Consequences Mitigation Measures Residual Impacts After Mitigation TRANSPORTATION AND CIRCULATION Methodology for Analysis CEQA Significance Criteria/NEPA Requirements Environmental Consequences Mitigation Measures Residual Impacts After Mitigation AIR QUALITY Methodology for Analysis CEQA Significance Criteria/NEPA Requirements Environmental Consequences Mitigation Measures Residual Impacts After Mitigation GREENHOUSE GAS EMISSIONS/CLIMATE CHANGE Methodology for Analysis CEQA Significance Criteria/NEPA Requirements Environmental Consequences Mitigation Measures Residual Impacts After Mitigation GEOLOGY AND SOILS Methodology for Analysis CEQA Significance Criteria/NEPA Requirements Environmental Consequences Mitigation Measures Residual Impacts After Mitigation CULTURAL RESOURCES Methodology for Analysis CEQA Significance Criteria/NEPA Requirements Environmental Consequences Mitigation Measures Residual Impacts After Mitigation NOISE Methodology for Analysis CEQA Significance Criteria/NEPA Requirements Environmental Consequences Mitigation Measures Residual Impacts After Mitigation AGRICULTURAL RESOURCES Methodology for Analysis CEQA Significance Criteria/NEPA Requirements Environmental Consequences Mitigation Measures Residual Impacts After Mitigation

5 4.10 Hazards and Hazardous Materials Methodology for Analysis CEQA Significance Criteria/NEPA Requirements Environmental Consequences Mitigation Measures Residual Impacts After Mitigation HYDROLOGY AND WATER QUALITY Methodology for Analysis CEQA Significance Criteria/NEPA Requirements Environmental Consequences Mitigation Measures Residual Impacts After Mitigation BIOLOGICAL RESOURCES Methodology for Analysis CEQA Significance Criteria/NEPA Requirements Environmental Consequences Mitigation Measures Residual Impacts After Mitigation PALEONTOLOGICAL RESOURCES Methodology for Analysis CEQA Significance Criteria/NEPA Requirements Environmental Consequences Mitigation Measures Residual Impacts After Mitigation ENVIRONMENTAL JUSTICE Methodology for Analysis CEQA Significance Criteria/NEPA Requirements Environmental Consequences Mitigation Measures Residual Impacts After Mitigation RECREATION Methodology for Analysis NEPA Requirements Environmental Consequences Mitigation Measures Residual Impacts After Mitigation Chapter 5.0 CUMULATIVE IMPACTS NEPA Process CEQA Process Visual Resources Geographic Scope Timeframe Existing Cumulative Conditions Cumulative Visual Resource Impacts LAND USE AND SPECIAL DESIGNATIONS Geographic Scope

6 5.2.2 Timeframe Existing Cumulative Conditions Cumulative Land Use and Special Designation Impacts TRANSPORTATION AND CIRCULATION Geographic Scope Timeframe Existing Cumulative Conditions Cumulative Transportation and Circulation Impacts Mitigation Measures Residual Impacts After Mitigation AIR QUALITY Geographic Scope Timeframe Existing Cumulative Conditions Cumulative Air Quality Impacts GREENHOUSE GAS EMISSIONS AND CLIMATE CHANGE GEOLOGY AND SOILS Geographic Scope Timeframe Existing Cumulative Conditions Cumulative Geology and Soils Impacts CULTURAL RESOURCES Geographic Scope Timeframe Existing Cumulative Conditions Cumulative Cultural Resources Impacts NOISE Geographic Scope Timeframe Existing Cumulative Conditions Cumulative Noise Impacts AGRICULTURAL RESOURCES Geographic Scope Timeframe Existing Cumulative Conditions Cumulative Agricultural Resources Impacts HAZARDS AND HAZARDOUS MATERIALS Geographic Scope Timeframe Existing Cumulative Conditions Cumulative Hazards and Hazardous Materials Impacts HYDROLOGY AND WATER QUALITY Geographic Scope Timeframe Existing Cumulative Conditions Cumulative Hydrology and water quality Impacts BIOLOGICAL RESOURCES

7 Geographic Scope Timeframe Existing Cumulative Conditions Cumulative Biological Resources Impacts PALEONTOLOGICAL RESOURCES Geographic Scope Timeframe Existing Cumulative Conditions Cumulative Paleontological Resources Impacts ENVIRONMENTAL JUSTICE Geographic Scope Timeframe Existing Cumulative Conditions Cumulative Environmental Justice Impacts RECREATION Geographic Scope Timeframe Existing Cumulative Conditions Cumulative Recreation Impacts Chapter 6.0 OTHER CEQA REQUIRED CONSIDERATIONS 6.1 PROPOSED ACTION Significant Irreversible Environmental Changes Growth Inducing Impacts Unavoidable Significant Environmental Impacts Chapter 7.0 EFFECTS FOUND NOT TO BE SIGNIFICANT EFFECTS FOUND NOT TO BE SIGNIFICANT Chapter 8.0 EIR/EA PREPARERS AND PERSONS AND ORGANIZATIONS CONTACTED EIR/EA PREPARERS AND PERSONS & ORGANIZATIONS CONTACTED EIR/EA Preparers Persons and Organizations Contacted United States Fish and Wildlife Service Native American Consultation/Coordination and Section 106 Consultation/Coordination Chapter 9.0 REFERENCES REFERENCES

8 LIST OF FIGURES Figure Regional Location Map Figure Aerial Map of Project Site and Surrounding Figure 2.0 3a Project Overview Map Figure 2.0 3b Gen tie Line Route through Federal Land Managed by BLM Figure CSE Facility and Private Property Easement Parcels Figure Project Layout Figure Centinela Solar CUP Sheet 1 (Index Sheet) Figure Representative PV Mounting Foundations Figure Representative 1 MW Block Fixed Tilt Mount Figure Representative 1 MW Single Axis Tracker Mount Figure Representative PV Mounting Profile Fixed Tilt Mount Structure Figure Representative PV Mounting Profile Horizontal Axis Tracker Structure Figure Representative 1 MW Encased Inverter Enclosure/Pad Figure CSE Facility Substation (Conceptual) Figure CSE Facility Substation (Conceptual) Looking South Figure Common Services Area Facilities Figure Representative Fence Detail Figure Access Gates and Staging Areas Overview Map Figure Proposed IID Crossings Woodbine Canal and Wells Drain Figure Proposed IID Crossing Carpenter Drain No Figure Location of Widening of Existing IID Crossing Woodbine Canal Figure Project Location with Respect to CDCA Corridor N Figure Gen Tie Line Alignment Towers Figure Gen Tie Line Alignment Towers Figure Gen Tie Line Alignment Towers Figure Gen Tie Line Alignment Towers Figure Typical Single Pole Structure Single Circuit (Delta) Figure Typical Single Pole Structure Single Circuit (Phase Over Phase) Figure Typical Single Pole Structure Double Circuit (Suspension/Braced) Figure Typical 3 Pole Dead End Structure Figure Typical H Frame Undercrossing Structure Figure Typical Single Pole Structure Double Circuit (Suspension/ I String) Figure Typical Lattice Structure Single Circuit Figure Typical Lattice Structure Double Circuit Figure Typical Roadway Sections Figure Typical Conductor Stringing Activities Figure Typical Conductor Stringing Activities Figure Alternative Gen tie Line Figure Alternative 2 Reduced CSE Facility Figure Alternative 3 Gen Tie Line Towers Figure Key Observation Point Map Figure KOP #1 Non BLM Land (Imperial County) Figure KOP #2 Non BLM Land (Imperial County) Figure KOP #3 Non BLM Land (Imperial County) Figure KOP #3 Non BLM Land (Imperial County) Figure KOP #5 Non BLM Land (Imperial County)

9 Figure KOP #6 BLM Land Figure Project Site Zoning Figure Surrounding Land Uses Figure 3.3 1a Existing (Year 2011) Roadway and Freeway Segment Conditions Figure 3.3 1b Existing (Year 2011) Roadway and Freeway Segment Conditions Figure 3.3 2a Existing (Year 2011) Roadway and Freeway Segment Volumes Figure 3.3 2b Existing (Year 2011) Roadway and Freeway Segment Volumes Figure Ambient Air Quality Monitoring Stations (SSAB ARB) Figure Map of Regional Faults and Seismicity Figure Soils Map Figure Noise/Land Use Compatibility Guidelines Figure Important Farmlands Map Figure Salton Sea Watershed Figure FEMA Map Figure Study Area Figure Potential Southwestern Willow Flycatcher Migratory Habitat Figure Flat tailed Horned Lizard Occurrences Figure Burrowing Owl Occurrences Figure Loggerhead Shrike Occurrences Figure Golden Eagle Occurrences Figure Census Tract 119, Imperial County, California Figure Western Colorado Route Designation Sheet # Figure 4.1 1B KOP #1 Visual Simulation of Proposed CSE Facility (Looking southwest from Brockman Road) Figure 4.1 2A KOP #2 Visual Simulation of Proposed CSE Facility (Looking northwest from Brockman Road) Figure 4.1 3B KOP #3 Visual Simulation of Proposed Gen tie Line (Looking Southeast along SR 98 in Imperial County) Figure 4.1 4B KOP #4 Visual Simulation of Proposed CSE Facility PV solar field (Looking West from Brockman Road north of Kubler Road)) Figure 4.1 5B KOP #5 Visual Simulation of Proposed CSE Facility PV solar field (looking east from Fisher Road) Figure 4.1 6B KOP #6 Visual Simulation of Proposed Gen tie Line (Looking east along SR 98 on BLM Land) Figure 4.3 1a Existing (Year 2011) Project Volumes Figure 4.3 1b Existing (Year 2011) Roadway Conditions Figure Regional Construction Distribution Figure 4.3 3a Local Construction Distribution Figure 4.3 3b Local Construction Distribution Figure 4.3 4a Construction Trip Assignment Figure 4.3 4b Construction Trip Assignment Figure Access Gates and Staging Areas Overview Figure 4.3 6a Shuttle and Equipment Trip Assignment Figure 4.3 6b Shuttle and Equipment Trip Assignment Figure 4.3 7a Project (Construction and Shuttle) Trip Assignment Figure 4.3 7b Project (Construction and Shuttle) Trip Assignment

10 Figure 4.3 8a Existing (Year 2011) + Project Volumes Figure 4.3 8b Existing (Year 2011) + Project Volumes Figure 4.3 9a Year 2012 Volumes Figure 4.3 9b Year 2012 Volumes Figure a Year 2012 Plus Project Volumes Figure b Year 2012 Plus Project Volumes Figure Phase I Construction Schedule (175 MW) Figure Noise Monitoring Locations Figure Corono Noise Monitoring Locations Figure Proposed Equipment Locations Figure Proposed Action Gen tie Line Alignment through FEMA Zone Figure Alternative 3 Gen tie Line Alignment through FEMA Zone A Figure Cumulative Projects Map (Within 1, 5, and 15 mile radius Figure Cumulative Projects Map (Areas Beyond 15 Mile Radius) Figure 5.3 1A Cumulative Project (New Development) Volumes Figure 5.3 1B Cumulative Project (New Development) Volumes Figure 5.3 2A Year 2012 Plus Project Plus Cumulative Volumes Figure 5.3 2B Year 2012 Plus Project Plus Cumulative

11 LIST OF TABLES Table Estimated Criteria Pollutant Emission Reductions Created By Project Table Summary of NOP Comments Table Privately Owned Parcels CSE Facility Site Table Privately Owned Parcels Gen tie Line Table Gen tie Line Disturbance Acreage Details (Federal Land) Table Gen tie Line Construction Schedule Table Design Features and Best Management Practices CSE Facility Table and Gen tie Line Design Features and Best Management Practices for the Gen tie Line on Federal Land Table Comparison of Alternatives Table Determining Visual Resource Inventory Classes Table Visual Resource Management Objectives by Class Table Consistency with General Plan Table General Plan Consistency Analysis Table Summary of Project Site Zoning Table Project Consistency with Southern California Association of Governments Intergovernmental Review Policies Table General Plan Consistency Analysis Table Un Signalized and Signalized Intersection Level of Service (HCM 2000) Table Roadway Segment Daily Capacity and LOS (Imperial County) Table Freeway Level of Service Table Intersection Location and Date of Count Table Roadway Segment and Date of Count Table Freeway Segment and Date of Count Table Existing (Year 2011) Intersection LOS Table Existing (Year 2011) Roadway Segment LOS Table Existing (Year 2011) Freeway LOS Table Ambient Air Quality Standards Table Project Consistency with Applicable SCAG Regional Transportation Plan Goals Table Consistency With General Plan Policies Table Latest Three Year Ambient Air Quality data near Project Site Table State of California GHG Emissions by Sector Table Global Warming Potentials and Atmospheric Lifetimes of GHGs Table Estimated Changes in Nonrenewable Energy Potentially Needed to Meet California Loads, Table Changes in Nonrenewable Energy, Table General Plan Consistency Analysis Table Summary of Earthquake Faults and Activity in the Vicinity of the Project Site Table Summary of Project Site Soils Table General Plan Consistency Analysis Table Archaeological Investigations within a One mile Radius of the APE Table Recorded Cultural Resources within a One mile Radius of the APE Table Summary of Cultural Resources within the Survey Area Table Summary of Cultural Resources within the Survey Area Table General Plan Consistency Analysis Table Roadway Noise Impact Zones

12 Table Project Site Ambient Noise Levels Table General Plan Consistency Analysis Table Department of Conservation Important Farmlands On Site Table Soil Capability Classes Class Description Table Table Storie Index Ratings Grade Index Rating Description Table Imperial County Change in Agricultural Land Use Summary ( ) Table Soil Suitability Map Symbol Mapping Unit Capability Table Project Consistency With Applicable General Plan Seismic and Public Safety Policies Table Summary of Site Reconnaissance Table General Plan Consistency Analysis Table Imperial County General Plan Consistency Analysis Table Vegetation Communities/Land Cover Types Within The CSE Facility and Gen tie Line (Private Lands) Survey Area Table Vegetation Communities/Land Cover Types Within The CSE Gen tie Line (BLM administered Lands) Survey Area Table Special Status Plant Species Potentially Occurring in the Gen tie Survey Area Table Project Consistency With Applicable General Plan Seismic and Public Safety Policies Table Economic and Demographic Comparison, Table Minority Population Comparison (By Percent) Table Low Income Population Comparison (By Percent) Table Visual Resource Management (VRM) Scenic Quality Rating Table Project Trip Generation Summary Table Construction Workforce Sources Based on Census 2000 Populations (85 Percent Local) Table Significance Criteria Table Existing (Year 2011) Plus Project Intersection LOS Table Existing (Year 2011) Plus Project Freeway LOS Table Year 2012 Intersection LOS (Without Project) Table Year 2012 Roadway Segment LOS (Without Project) Table Year 2012 Freeway LOS (Without Project) Table Year 2012 With and Without Project Intersection LOS Table Year 2012 With and Without Project Roadway Segment LOS Table Year 2012 With and Without Project Freeway LOS Table Phase I Construction Equipment and Durations as Modeled Table ICAPCD Screening Thresholds for Criteria Pollutants Table Expected Construction Emissions Summary Table Expected Construction Emissions Summary Table Expected Construction Emissions Summary (Tons per Year) Table Generating Hours (Peak Electricity Consumption Table Non Generating Hours (Peak Electricity Consumption) Table Estimated Criteria Pollutant Emission Reductions Created by the Proposed Action Table Comparison of Alternatives for Cumulative Greenhouse Gas Emissions Impacts Table National Register of Historic Places Status and Potential for Impacts Table Historic resources More Than 45 Years Old Table National Register of Historic Places Status and Potential for Impacts

13 Table Historic resources More Than 45 Years Old Table Property Line Noise Level Limits Table Opening Year Traffic Noise Levels without Project Table Year Traffic Noise Levels With Project Table Year without Project/Year with Project Noise Levels Table Construction Grading Noise Levels (Phase I & II) Table PV Panel Installation Noise Levels Table Transformer/Inverter and Tracker Noise Nearest Property Line Table Measured Corona Noise Levels Table Final LESA Score Sheet Summary Table List of Cumulative Projects Agricultural Resources Table Contribution to Cumulative Farmland Impacts Proposed Action and Alternatives 1, 2, and Table Increase in Storm Water Flows by Basin Table Vegetation Community Impacts By Alternative Table Acres of Jurisdictional Waters Impacted by the Proposed Project or an Alternative Table Acres of CDFG Jurisdictional Areas Impacted by the Proposed Project or an Alternative Table Potential Fossil yield Classification (PFYC) of Geologic Units Table List of Paleontological Collecting Localities and Fossils Discovered Table Visual Quality Rating Guidance Table Visual Resource Management (VRM) Scenic Quality Rating Table Table Table Table Table Table Table Table Table Visual Sensitivity Visual Change Guidance for Review of Impact Significance List of Cumulative Projects within the Jurisdiction of BLM in the Vicinity of the Proposed Action List of Cumulative Projects within the Jurisdiction Imperial County and Nearby Cities and Communities List of Cumulative Projects within the Jurisdiction of BLM in the Vicinity of the Visual Resources List of Cumulative Projects within Imperial County in the Vicinity of the Visual Resources List of Cumulative Projects within the Jurisdiction of BLM in the Vicinity of the Land Use and Special Designations List of Cumulative Projects within Imperial County in the Vicinity of the Proposed Action for the Analysis of Cumulative Impacts to Land Use and Special Designations List of Cumulative Projects Within the Jurisdiction of BLM in the Vicinity of the Transportation and Circulation List of Cumulative Projects Within Imperial County in the Vicinity of the Proposed Action for the Analysis of Cumulative Impacts to Transportation and Circulation Table Year 2012 Plus Project Plus Cumulative Intersection LOS Table Year 2012 Plus Project Plus Cumulative Segment LOS Table Year 2012 Plus Project Plus Cumulative Freeway LOS

14 Table Horizon Year 2050 Segment Operations Table Impact Summary Table List of Cumulative Projects Within the Jurisdiction of BLM in the Vicinity of the Air Quality Table List of Cumulative Projects Within Imperial County in the Vicinity of the Air Quality Table List of Cumulative Projects within the Jurisdiction of BLM in the Vicinity of the Geology and Soils Table List of Cumulative Projects within the Jurisdiction of Imperial County in the Vicinity of the Geology and Soils Table List of Cumulative Projects Within the Jurisdiction of BLM in the Vicinity of the Cultural Resources Table List of Cumulative Projects Within Imperial County in the Vicinity of the Proposed Action for the Analysis of Cumulative Impacts to Cultural Resources Table Year Traffic Noise Levels (With Project + Cumulative) Table Year vs. Year Plus Project Plus Cumulative Noise Table List of Cumulative Projects Within the Jurisdiction of BLM in the Vicinity of the Agricultural Resources Table List of Cumulative Projects Within Imperial County in the Vicinity of the Agricultural Resources Table List of Cumulative Projects Within the Jurisdiction of BLM in the Vicinity of the Hazards and Hazardous Materials Table List of Cumulative Projects Within Imperial County in the Vicinity of the Proposed Action for the Analysis of Cumulative Impacts to Hazards and Hazardous Materials Table List of Cumulative Projects Within the Jurisdiction of BLM in the Vicinity of the Hydrology and Water Quality Table List of Cumulative Projects Within Imperial County in the Vicinity of the Hydrology and Water Quality Table List of Cumulative Projects Within the Jurisdiction of BLM in the Vicinity of the Biological Resources Table List of Cumulative Projects Within Imperial County in the Vicinity of the Proposed Action for the Analysis of Cumulative Impacts to Biological Resources Table Approved or Proposed Actions in the Imperial Valley Table List of Cumulative Projects Within the Jurisdiction of BLM in the Vicinity of the Paleontological Resources

15 Table Table Table Table Table List of Cumulative Projects Within Imperial County in the Vicinity of the Proposed Action for the Analysis of Cumulative Impacts to Paleontological Resources List of Cumulative Projects Within the Jurisdiction of BLM in the Vicinity of the Environmental Justice List of Cumulative Projects Within Imperial County in the Vicinity of the Environmental Justice List of Cumulative Projects Within the Jurisdiction of BLM in the Vicinity of the Recreation List of Cumulative Projects Within Imperial County in the Vicinity of the Proposed Action for the Analysis of Cumulative Impacts to Recreation