1 COST ESTIMATION FOR UPGRADATION AND DEVELOPMENT OF WASTE PROCESSING AND DISPOSAL FACILITY AT PERUNGUDI SITE (Phase-1&2) Particulars Area (sq m) /Capacity Cost (Rs. In Crore) Phase-1 (Construction of New SLF to be combined with Phase-2, Compost Plant and other infrastructure Facilities) 1 Area of Landfill Area of Bottom Liner Area of Side Liner Top/Cover Liner on side slopes upto 15m height except side facing Phase Crest Area of top/cover liner at 15 m height (To be clubbed with phase-2 for providing final cover liner). Till Such time to be covered temporarily Development of compost plant including segregation platform for Waste (MT/day) Area For Leachate Evaporation Pond (M2) Workshop having basic tools and equipments including shed (sq m) Labor Rest Room (sq m) Office Building (sq m) Length of Green Belt - 25 m wide (m) Length of Internal Road - 8 m Wide (m) Length of Bund (m), Height 5 to 7 meters Waste Shifting (cum) Cost for Phase Phase-2 (Closure of Existing Dumpsite and Development of SLF above it) 1 Area of Landfill Area of Bottom Liner Top/Cover Liner on crest and side slopes except sides facing phase 3 & 4, Area of side slopes of Phase -1 upto 15 m height Cost for Phase

2 COST ESTIMATION FOR UPGRADATION AND DEVELOPMENT OF WASTE PROCESSING AND DISPOSAL FACILITY AT KODUNGAIYUR SITE (Phase-1 & Closure of existing waste body) Area (sq m) /Capacity Cost (Rs. In Crore) Particulars 1 Phase-1 (Waste Shifting, Construction of New SLF, Compost Plant and other infrastructure Facilities) 2 Area of Landfill Area of Bottom Liner Area of Side Liner Top/Cover Liner on side slopes upto 15m height except side facing Phase Crest Area of top/cover liner at 15 m height (To be clubbed with phase-2 for providing final cover liner). Till Such time to be covered temporarily Length of Green Belt - 25 m wide (m) Length of Internal Road - 8 m Wide (m) Length of Bund (m), 8 m Wide (m) Waste Shifting (cum) Development of compost plant including segregation platform for Waste (MT/day) Area For Leachate Evaporation Pond (M2) Workshop having basic tools and equipments including shed (sq m) Labor Rest Room (sq m) Office Building (sq m) Area of Closed Waste Body(M2)- Compaction & Cover liner Cost for Phase

3 ANNEXURE - 1 Drawings and Cost for Up-gradation of Perungudi & Kodungaiyur Sites

4 AREA CALCULATION & COST AND LIFE ESTIMATION FOR UPGRADATION AND DEVELOPMENT OF WASTE PROCESSING AND DISPOSAL FACILITY AT PERUNGUDI SITE Particulars Area (sq m) /Capacity Cost (Rs. In Crore) Life (Years)* Phase-1 (Construction of New SLF to be combined with Phase-2, Compost Plant and other infrastructure Facilities) 1 Area of Landfill Area of Bottom Liner Area of Side Liner Top/Cover Liner on side slopes upto 15m height except side facing Phase Crest Area of top/cover liner at 15 m height (To be clubbed with phase-2 for providing final cover liner). Till Such time to be covered temporarily Development of compost plant including segregation plateform for Waste (MT/day) Area For Leachate Evaporation Pond (M2) Workshop having basic tools and equipments including shed (sq m) Laoour Rest Room (sq m) Office Building (sq m) Length of Green Belt - 25 m wide (m) Length of Internal Road - 8 m Wide (m) Length of Bund (m), Height 5 to 7 meters Waste Shifting (cum) Cost and Life for Phase Phase-2 (Closure of Existing Dumpsite and Development of SLF above it) 1 Area of Landfill Area of Bottom Liner Top/Cover Liner on crest and side slopes except sides facing phase 3 & 4, Area of side slopes of Phase -1 upto 15 m height Area of Side slopes facing phase 3&4 (To be clubbed with Phase 3&4) Cost and Life for Phase Phase-3 (Construction of New SLF to be combined with Phase-2) 1 Area of Landfill Area of Bottom Liner Top/Cover liner of crest and side slopes except side facing Phase

5 Particulars Area (sq m) /Capacity Cost (Rs. In Crore) Life (Years)* 4 Area For Leachate Evaporation Pond (M2) Cost and Life for Phase Phase-4 (Construction of New SLF to be combined with Phase-2) 1 Area of Landfill Area of Bottom Liner Top/Cover liner of crest and side slopes except side facing Phase Cost and Life for Phase Phase-5 (Construction of New SLF) 1 Area of Landfill Area of Bottom Liner Area of Side Liner Area of Top Liner Cost and Life for Phase TOTAL COST AND LIFE (Phase-1 to 5) * The life has been calculated considering 2.5% growth rate per year for solid waste generation and disposal. Through implementation of recycling & reuse practices and segregation of inert materials, the life of SLF will increase by 35-40%

6 AREA CALCULATION & COST AND LIFE ESTIMATION FOR UPGRADATION AND DEVELOPMENT OF WASTE PROCESSING AND DISPOSAL FACILITY AT KODUNGAIYUR SITE Area (sq m) /Capacity Cost (Rs. In Crore) Life (Years)* Particulars 1 Phase-1 (Waste Shifting, Construction of New SLF, Compost Plant and other infrastructure Facilities) 2 Area of Landfill Area of Bottom Liner Area of Side Liner Top/Cover Liner on side slopes upto 15m height except side facing Phase Crest Area of top/cover liner at 15 m height (To be clubbed with phase-2 for providing final cover liner). Till Such time to be covered temporarily Length of Green Belt - 25 m wide (m) Length of Internal Road - 8 m Wide (m) Length of Bund (m), 8 m Wide (m) Waste Shifting (cum) Development of compost plant including segregation plateform for Waste (MT/day) Area For Leachate Evaporation Pond (M2) Workshop having basic tools and equipments including shed (sq m) Laoour Rest Room (sq m) Office Building (sq m) Area of Closed Waste Body(M2)- Compaction & Cover liner Cost and Life for Phase Phase-2 (Construction of New SLF to be combined with Phase-1) 19 Area of Landfill Area of Bottom Liner Area of Side Liner Top/Cover Liner on crest and side slopes except side facing phase 3, Area of side slopes of Phase - 1 upto 15 m height Area of Side slopes facing phase 3 (To be clubbed with Phase 3) Cost and Life for Phase Phase-3 (Construction of New SLF to be combined with Phase-1&2) 26 Area For Leachate Evaporation Pond (M2)

7 Area (sq m) /Capacity Cost (Rs. In Crore) Life (Years)* Particulars Area of Landfill Area of Bottom Liner Top/Cover liner of crest and side slopes except side facing Phase Cost and Life for Phase TOTAL COST AND LIFE (Phase-1 to 3) * The life has been calculated considering 2.5% growth rate per year for solid waste generation and disposal. Through implementation of recycling & reuse practices and segregation of inert materials, the life of SLF will increase by 35-40%

8 FINAL REPORT on UP-GRADATION PLAN FOR EXISTING DUMPSITES AT PERUNGUDI & KODUNGAIYUR (CHENNAI ) for Corporation of Chennai, Chennai (Environment Management Group) National Productivity Council New Delhi, India

9 ACKNOWLEDGEMENT National Productivity Council sincerely thanks Thiru M.P.Vijayakumar, I.A.S. Commissioner, Corporation of Chennai for entrusting the work Upgradation of MSW Dumpsites of Corporation of Chennai. Our sincere thanks are due to Thiru T.Udhyachandran, I.A.S., Deputy Commissioner, Corporation of Chennai for his guidance and support during the study. We are also thankful to Thiru A.Swaminathan, Chief Engineer, Corporation of Chennai for his co-ordination and support during the study. We also extend our gratitude to Thiru Gurumurthy, Executive Engineer and Thiru Umapathi, Executive Engineer from Corporation of Chennai for their support. We place on record our sincere appreciation for the inputs provided by Thiru P.U. Asnani, USEPA Expert on SWM during the meeting at Chennai. We are also thankful to M/s Geo Marine Consultants (P) Ltd, Chennai for carrying out contour survey despite odd conditions at site. It is our privilege and duty to convey thanks to officers of various Central and State Government Departments who provided valuable inputs, relevant data and information on various aspects of the region. Last but not the least, we thank all who are with the study & field visits directly and indirectly for their co-operation and help. (Dr. A.K.Saxena) Group Head (Env. Mgmt.)

10 STUDY TEAM Dr.A.K.SAXENA Director(Env.Mgmt) Member A.SHAJAHAN Dy. Director Member K.D.BHARDWAJ Dy. Director Member VINAY KUMAR Asst. Director Member SALIL DUTT Asst. Director Member S.BASKARAN Asst. Director Member

11 CHAPTER No. CONTENTS TITLE PAGE No. ACKNOWLEDGEMENT 1. INTRODUCTION STUDY TEAM 1.1 Background Objective Scope of Work Methodology Need for Study Problems Legal Requirement 6 1 PRESENT MSWM SYSTEM AND 8 DETAILS OF DISPOSAL SITE About Chennai MSW Generation at Chennai Composition of Municipal Solid Waste Collection, Handling, Transportation, Treatment & Disposal Collection Transportation Treatment Disposal Issues/Problems of Dumpsites Site Details History Observations 19 ENVIRONMENTAL ASSESSMENT OF SITES Environmental Problems Fire Menace 20

12 CHAPTER No. TITLE PAGE No Dust Pollution Water Pollution Physiography of Dumpsites Site Management Machinery Manpower Field Study Latitude and Longitude 23 3 Contd Ambient Air Quality Monitoring Surface and ground water sampling 27 and analysis Noise Levels Municipal Solid Waste 34 Characteristics Soil Characteristics Secondary Data Rainfall Temperature Humidity Cloudiness Winds Special Weather Phenomenon 43 SITE EVALUATION BASED ON LOCATIONAL 44 CRITERIA AND HAZARD POTENTIAL RATING Locational Criteria Site Evaluation as per MSW Rules, Hazard Potential Rating of Perungudi and 58 Kodungaiyur Dumpsites

13 CHAPTER No. TITLE PAGE No. 4.4 Scaling Criteria & Weightage 68 PLAN FOR UPGRADATION OF DUMPSITES Plan for Up-gradation Infrastructure facilities and other 107 requirements 5.3 Stepwise implementation plan for closing 107 of existing waste 5.4 Construction procedure of SLF 109

14 CHAPTER-1 INTRODUCTION

15 CHAPTER-2 PRESENT MSWM SYSTEM AND DETAILS OF DISPOSAL SITE

16 CHAPTER-3 ENVIRONMENTAL ASSESSMENT OF SITES

17 CHAPTER-4 SITE EVALUATION BASED ON LOCATION CRITERIA AND HAZARD POTENTIAL RATING

18 CHAPTER- 5 PLAN FOR UPGRADATION

19 CHAPTER-6 CLOSURE & UPGRADATION PLAN FOR EXISTING SITE

20 CHAPTER- 7 DESIGN AND DEVELOPMENT OF SANITARY LANDFILL FACILITY

21 CHAPTER- 8 ENVIRONMENT MANAGEMENT PLAN

22 CHAPTER- 9 RECOMMENDATIONS AND CONCLUSION

23 Mr.MANU SRIVASTAVA, I.A.S. Commissioner NAGPUR MUNICIPAL CORPORATION Nagpur No.5051/Env. Dt.3/4/2004 Dear Mr.Srivastava, Sub: Draft Report on Design & Guidance for Upgradation of Existing Dumpsite at Nagpur We are thankful to you for entrusting the work Design & Guidance for Upgradation of Existing Dumpsite at Nagpur to NPC. After completing investigation, monitoring and data collection, we now forward the draft report (3 nos.) for your perusal. We suggest that discussion on the report may be held during oneday training programme on Municipal Solid Waste Management for NMC officials to be organised by AIILSG, Bombay, at Nagpur. Assuring our best of service in our common interest of a Green World. Thanking you, Yours sincerely, (M.ASHOK)

24 Senior Consultant-Environment Management for Head Mr.A.K.JAIN, I.A.S. Senior Advisor Solid Waste Management Cell ALL INDIA INSTITUTE OF LOCAL SELF GOVERNMENT Sthanikraj Bhavan, C.D.Barfiwala Marg Andheri-West Bombay No.5051/Env. Dt.3/4/2004 Dear Mr.Jain, Sub: Draft Report on Design & Guidance for Upgradation of Existing Dumpsite at Nagpur We have finalised the draft report on Design & Guidance for Upgradation of Existing Dumpsite at Nagpur and a copy of this report is forwarded to you. Regarding oneday training programme on Municipal Solid Waste Management for NMC officials we request you to finalise the date (12/4/4) with NMC and inform us. The coverage of this programme has been informed to you and after finalising the coverage you may please send us a copy. Assuring our best of service in our common interest of a Green World. Thanking you, Yours sincerely, (M.ASHOK)

25 Senior Consultant-Environment Management for Head Ms.NUTAN UNITED STATES ASIA ENVIRONMENTAL PARTNERSHIP American Centre 10, New Marine Lines Churchgate Bombay. No.5051/Env. Dt.3/4/2004 Dear Ms.Nutan, Sub: Report on Design & Guidance for Upgradation of Existing Dumpsite at Nagpur As requested by you we are forwarding a copy of report on Design & Guidance for Upgradation of Existing Dumpsite at Nagpur. We would be glad to associate with USAEP in execution of environment related projects. Should there be any such, kindly invite us for discussion. Looking forward to fruitful professional interaction with USAEP and assuring our best of service in our common interest of a Green World. Thanking you, Yours sincerely, (M.ASHOK)

26 Senior Consultant-Environment Management for Head Mr.MANU SRIVASTAVA, I.A.S. Commissioner NAGPUR MUNICIPAL CORPORATION Nagpur Dt.26/6/2004 No Dear Sir, Sub: 1) O & M Manual for SLF 2) Earmarking of various sites in Development Plan Map The Operation & Maintenance Manual for Sanitary Landfill Facility prepared by NPC is enclosed (hard copy and soft copy). You are requested to make sufficient copies for distribution during the programme scheduled on 30 th June. Kindly refer to the discussion we have had with you on item no.2 of the above subject. Subsequently, we visited various vacant plots around Bhandewadi site along with Dr.Ganvir and Mr.Jambulkar. After discussion with them and as required by you, we have earmarked various sites for -Compost & Pelletisation -Modern Slaughter House -ETP Extension -Plastic Recycling -Debris Depot -Future SLF -Energy Project etc. on Development Plan map. planning. Hope you may find this useful for your future Thanking you, Yours sincerely, (K.D.BHARDWAJ) Deputy Director-Environment Management for Director General