Rosa Phase I Location Capacity Fuel Source Status. : Uttar Pradesh : 600 MW. : Coal. : Operational. Rosa Phase II Location Capacity Fuel Source Status

Size: px
Start display at page:

Download "Rosa Phase I Location Capacity Fuel Source Status. : Uttar Pradesh : 600 MW. : Coal. : Operational. Rosa Phase II Location Capacity Fuel Source Status"

Transcription

1 Coal Based Projects Rosa Phase I Rosa Phase II : Uttar Pradesh : 600 MW : Operational : Uttar Pradesh : 600 MW : Operational

2 Butibori Power Project : Maharashtra : 600 MW : Operational Sasan Ultra Mega Power Project : Madhya Pradesh : 3,960 MW : Under Construction Krishnapatnam Ultra Mega Power Project : Andhra Pradesh : 4,000 MW : Imported Coal : Under Implementation Chitrangi Power Project : Madhya Pradesh : 3,960 MW : Under Construction Tilaiya Ultra Mega Power Project : Jharkhand : 3,960 MW : Under Development

3 Gas Based Projects Reliance Power is developing almost 10,000 MW of gas based power capacities at multiple locations. Samalkot Power Project : Andhra Pradesh : 2,400 MW : Gas Dadri Power Project : Under Construction : Uttar Pradesh : 7,480 MW : Gas : Under Development Hydroelectric Projects Reliance Power is developing 4,620 MW of hydroelectric power capacities at seven locations Tato II : 700 MW

4 Siyom : 1,000 MW Urthing Sobla : Uttarakhand : 400 MW Kalai II Amulin Emini : 1,200 MW : 420 MW : 500 MW

5 Mihundon : 400 MW Business Unmatched scale of mining operation with the best in class equipments Our fuel business is primarily focused on the captive fuel sources which have been allocated or acquired by us for our power projects and also the exploration of Coal Bed Methane and Oil and Gas Blocks which have been allotted to us for exploration. The development of these resources would make us one of the largest captive producer in the power sector. Sasan Coal Mines The Government of India had allocated Moher, Moher Amroli extension and Chhatrasal coal mines in the Singrauli coalfields to Sasan Power Limited, the company developing Sasan Ultra Mega Power Project. The allocation was made in the year Sasan Power Limited was transferred to the company in the year Subsequent to the transfer, the company along with the strategic partner North American Coal Corporation Limited developed a detailed mine plan for the Sasan coal mines. North American Coal Corporation Limited, the strategic partner for developing and operating coal mines, is an American coal mining and mining services company and ranks as America s largest lignite coal producer. Detailed mine plans have been prepared on the basis of available geological information in the geological reports, site specific features such as forest area, railway lines, roads and rivers. These detailed project reports address various issues, including mine size, quality of coal, details of coal seams, quantity of production, selection of appropriate technology, broad equipment specification, implementation schedule, production schedule, environmental impact and surface infrastructure requirement. The mine plan also address issues for and coordination of, disposal of overburden during the mining process and reclamation and rehabilitation of mined areas. According to the mine plans prepared by the company for these mines and subsequently approved by the Ministry of Coal, Government of India, the aggregate coal reserves of these mines are around 700 MT with a production level of 25 mtpa. The average stripping ratio of the mines would be 4 with an average calorific value of the coal would be around 4600 kcal. The Moher and Moher Amroli and Chhatrasal coal mines are approximately 20 km from the Sasan project and 40 Km from the Chitrangi project.

6 Coal production from these mines have commenced in September On reaching peak capacity, the mines will be amongst the largest coal mines in India.In order to produce coal from these mines in the most productive and cost-efficient manner, the company evaluated coal mining equipments from reputed vendors from different countries. The company would be procuring the best-in-class and large capacity coal mining equipments such as Draglines, Shovels, Dumpers from the most reputed companies in the world. The productivity being targeted with these equipments would be the best in the country and the company would seek to benchmark its productivity with the best coal producers in the world. Along with its strategic partner, the company has put in place a coal mining team capable of implementing these plans. The team is lead by very experienced coal mining professional who had developed and operated coal mines in the same area. The other members of the team too are people having rich experience of developing and operating coal mines. The experienced management team is supported by other young coal mining professionals who are also being trained in the deployment of the high quality equipments being procured for the project. Pictures for Sasan Coal Mines Tilaiya Coal Mines The Government of India has allocated Kerandari BC coal block in North Karanpura coal fields the state of Jharkhand to Jharkhand Integrated Power Company Limited which is developing Tilaiya Ultra Mega Power Project. The allocation was made in the year Jharkhand Integrated Power Limited was transferred to the company in the year Subsequent to the transfer, the company along with the strategic partner North American Coal Corporation Limited developed a detailed mine plan for the Tilaiya coal mines. North American Coal Corporation Limited, the strategic partner for developing and operating coal mines, is an American coal mining and mining services company and ranks as America s largest lignite coal producer. Detailed mine plans have been prepared on the basis of available geological information in the geological reports, site specific features such as forest area, railway lines, roads and rivers. These detailed project reports address various issues, including mine size, quality of coal, details of coal seams, quantity of production, selection of appropriate technology, broad equipment specification, implementation schedule, production schedule, environmental impact and surface infrastructure requirement. The mine plan also address issues for and coordination of, disposal of overburden during the mining process and reclamation and rehabilitation of mined areas. According to the mine plans prepared by the company for these mines which have been submitted for approval to the Ministry of Coal, Government of India, the aggregate coal reserves

7 of these mines are around 1.2 billion tonnes and the mine plans envisage a production level of 40 mtpa. The Tilaiya coal mines are approximately 100 kms from the Tilaiya power plant. The production of coal from these mines are being planned such that tit meets the coal requirements of the Tilaiya power project, On commencement of production, the company will be the largest coal mining company in the private sector in the country. In order to produce coal from these mines in the most productive and cost-efficient manner, the company is evaluating coal mining equipments from reputed vendors from different countries. The company would be procuring the best-in-class and large capacity coal mining equipments. The productivity being targeted with these equipments would be the best in the country and the company would seek to benchmark its productivity with the best coal producers in the world. Along with its strategic partner, the company would put in place a coal mining team capable of implementing these plans. The team would be comprise of experienced coal mining professional who have developed and operated coal mines supported by other young coal mining professionals who would be trained in the deployment of the high quality equipments being procured for the project. Pictures for Tilaiya Coal Mines Coal Mines In Indonesia The company, through its subsidiary Reliance Coal Resources Private Limited has acquired 100% economic interest in two coal companies in Indonesia which own three coal mines in Indonesia. These coal mines are located in South Sumatra in Indonesia. The company has evaluated these mines and they have significant resource potential which can support coal production of upto 30 million tonnes per annum. The coal mines in Indonesia are located at an average distance of around 200 km from the nearest port in Bengkulu. We are planning to develop coal mines such that they commence production in We are also planning to develop the railway infrastructure facilities for transporting the coal from the mines to the port in Indonesia.

8 Coal Bed Methane Coal Bed Methane is a natural gas absorbed in coal and lignite seams and is an eco-friendly source of energy. Coal Bed Methane is a natural gas absorbed in coal and lignite seams and is an eco-friendly source of energy. Coal is both the source and reservoir rock for CBM. CBM production is done by simple depressurization and dewatering process. To harness this new source of energy in the country, the Government approved a comprehensive CBM policy in July, 1997 for exploration and production of CBM gas In the year 2006 an RNRL-led Consortium won four CBM blocks in CBM III round, having an acreage of 3,251 sq. kms, The CBM blocks are located in Madhya Pradesh (one Block), Andhra Pradesh (one Block) and Rajasthan (two Blocks). Block Name State Acreage (sq.kms) Estimated CBM Reserves (BCM)* Barmer (4) Rajasthan Barmer (5) Rajasthan Kothagudem A.P Sohagpur M.P Plateau Production(MMSCM/D)** TOTAL * Estimates by DGH ** As estimated by our consultant GCA, Singapore, and internal studies The company plans to develop power plants which can use the gas which is produced from these blocks After signing the contracts for all four blocks with the Government of India on November 7, 2006, the Company has obtained Petroleum Exploration Licence (PEL) for three of the blocks in MP and Rajasthan. The consortium has completed the Environment Impact Assessment study, geological and remote sensing studies in all the four blocks. Preliminary geological assessment has also been completed. The core hole drilling and testing is expected to commence soon.

9 Oil and Gas Exploration RNRL-led consortium (RNRL, RELINFRA, Geopetrol and NaftoGaz) RNRL-led consortium (RNRL, RELINFRA, Geopetrol and NaftoGaz) won one oil and gas block in the state of Mizoram and received the letter of award on February 12, The Company signed a contract with the Government of India on March 2, 2007 for exploration and production of Oil and Gas block having acreage of 3,619 Sq. Kms. Petroleum Exploration License (PEL) was notified by the Government of Mizoram on November 20, The Company has completed environmental impact assessment studies, geochemical studies and geological studies in line with the work commitment. Block Name State Acreage (sq.kms) Total estimated** Peak Production Rate (MMSCMD) High Medium Low MZ-ONN-2004/2 Mizoram *MMSCMD - Million Standard Cubic Meter per day**estimates by DGH : Reliance Power Website