TEAM INTRODUCTIONS ODOT

Size: px
Start display at page:

Download "TEAM INTRODUCTIONS ODOT"

Transcription

1

2 TEAM INTRODUCTIONS ODOT Randle White - Divisin 8 Engineer Mark Zishka - Divisin 8 Cnstructin Engineer Jennifer Tyler - Claremre Residency Siv Sundaram - Envirnmental Prgrams Ben Mazlmpur - Radway Mhammed Elyazgi - Bridge Diana Barlw - Right-f-Way & Utilities Frank Resler III - Public Invlvement Officer GARVER Brent Schniers - Prject Manager Kirsten McCullugh - Envirnmental Lead Kevin Mre - Radway Lead Matthew Yungbld - Bridge Lead Nick Braddy - Radway Engineer Lacee Stanley - Envirnmental Specialist

3 PURPOSE OF THIS MEETING is t Present Infrmatin and Obtain Public Input n the Reevaluatin f SH-20 Frm NS-408 (209 E. Ave.) t NS-411 (Franklin Rd.) in Rgers Cunty N

4 NS-411 Franklin Rd. Skyline Dr. NS E. Ave. PURPOSE OF THE PROJECT is t Imprve Safety and Traffic Mbility n SH-20 T Owass N EW-490 T Claremre Keetnville Rd.

5 PROJECT HISTORY A Crridr Study and Envirnmental Assessment (EA) fr SH-20 frm US-75 t Claremre was Cmpleted in 2000 With a Finding f N Significant Impact (FONSI) Issued by the Federal Highway Administratin (FHWA). Cllinsville Claremre Owass Surce: 2000 Envirnmental Assessment

6 PROJECT HISTORY EA Apprved a 4-Lane Sectin On Existing Alignment Frm US-75 t 209 th E. Ave. New Alignment at Keetnville Hill and Acrss Verdigris River Cllinsville Current Prject Claremre Designed and/r Cnstructed Owass Surce: 2000 Envirnmental Assessment

7 PROJECT HISTORY The EA Apprved a 4-Lane Divided Radway With Shulders SH-20 is n a New Alignment Suthwest f Existing SH-20 fr the Keetnville Hill Prject Existing SH-20 Prpsed SH-20 Surce: 2000 Envirnmental Assessment

8 PROJECT HISTORY Mdificatins t the Realignment and Typical Sectin are Incrprated int the Prject Because f New Develpments Change t a 5-Lane Curb and Gutter Radway With Center Turn Lane Slight Mdificatin t the Hrizntal Alignment t Avid New Hmes Mre Investigatin Int Vertical Prfile Existing SH-20 New Develpment Prpsed SH-20

9 PROJECT DEVELOPMENT PROCESS Identify Prblem Initial Data Cllectin Develp Preliminary Alternates Initial Alternate Screening Public Meeting TODAY These Steps Were all Fllwed as Part f Develpment f the EA ODOT is Revisiting These Steps in Mre Detail fr the Reevaluatin f this Segment f SH-20

10

11 NS-411 Franklin Rd. Skyline Dr. NS E. Ave. PROJECT CORRIDOR INFORMATION General Data T Owass Tw-Lane Radway - Minr Arterial Lcal Intersecting Rads NS-408 (209 th E. Ave.) NS-410 (Keetnville Rd.) NS-411 (Franklin Rd.) Tw Existing Bridge Structures Verdigris River Overflw Verdigris River Traffic Current (2014) 12,500 Vehicles/Day Future (2037) 18,600 Vehicles/Day Existing Speed Psted at 55 mph Several Areas With Speed Warnings N EW-490 T Claremre Keetnville Rd.

12 NS-411 Franklin Rd. Skyline Dr. NS E. Ave. PROJECT CORRIDOR INFORMATION General Data T Owass Tw-Lane Radway - Minr Arterial Lcal Intersecting Rads NS-408 (209 th E. Ave.) NS-410 (Keetnville Rd.) NS-411 (Franklin Rd.) Tw Existing Bridge Structures Verdigris River Overflw Verdigris River Traffic Current (2014) 12,500 Vehicles/Day Future (2037) 18,600 Vehicles/Day Existing Speed Psted at 55 mph Several Areas With Speed Warnings N EW-490 T Claremre Keetnville Rd.

13 EISTING CONDITIONS WARRANT IMPROVEMENT Hill Slides Radway Deficiencies Sharp Hrizntal Curves Limited Sight Distance Narrw Shulders Restricted Traffic Flw/Capacity Identify Prblem Initial Data Cllectin Preliminary Alternates Alternate Screening

14 EISTING CONDITIONS WARRANT IMPROVEMENT cnt d. Existing Bridge Cnditins Age f Structures vs. Design Life SH-20 Over Tributary t Verdigris River Narrw Width (31-0 Clear Radway) SH-20 Over Verdigris River Narrw Width (31-0 Clear Radway) Cnsidered At-Risk Near Structurally Deficient Identify Prblem Initial Data Cllectin Preliminary Alternates Alternate Screening

15 NS-411 Franklin Rd. Skyline Dr. NS E. Ave. EISTING DEFICIENCIES LEAD TO HIGH ACCIDENT RATE Accident Data 138 Ttal Over Previus 7 Years ( ) 59 Prperty Damage T Owass Injury 3 Fatal x Mre Injury Cllisins Cmpared t Statewide Rate N EW Keetnville Rd T Claremre Identify Prblem Initial Data Cllectin Preliminary Alternates Alternate Screening

16

17 PROJECT AREA CONSTRAINTS Identified Key Prject Features/Cnstraints and Cllected Data Develpments Hmes Businesses Traffic Data Right-f-Way Utilities Gelgical Envirnmental Identify Prblem Initial Data Cllectin Preliminary Alternates Alternate Screening

18 NS-411 Franklin Rd. Skyline Dr. NS E. Ave. Study Area PROJECT AREA CONSTRAINTS cnt d. Area f Data Cllectin Investigate Changed Cnditins Since 2000 EA Cmpare the Impacts f the Different Vertical Optins Database Research and Field Recnnaissance T Owass N EW-490 T Claremre Identify Prblem Initial Data Cllectin Preliminary Alternates Alternate Screening T Keetnville Rd.

19 NS-411 Franklin Rd. Skyline Dr. NS E. Ave. PROJECT AREA CONSTRAINTS cnt d. Hmes and Businesses Numerus Hmes and Businesses Primary Avidance Cnstraint Nise Als a Cnsideratin T Owass N EW-490 T Claremre Keetnville Rd. Identify Prblem Initial Data Cllectin Preliminary Alternates Alternate Screening

20 NS-411 Franklin Rd. Skyline Dr. NS E. Ave. PROJECT AREA CONSTRAINTS cnt d. Cmmunity Facilities Limestne Fire Department Hilldale Baptist Church Lne Elm Cemetery All Will Be Avided T Owass Limestne Fire Department N EW-490 Hilldale Baptist Church Lne Elm Cemetery T Claremre Keetnville Rd. Identify Prblem Initial Data Cllectin Preliminary Alternates Alternate Screening

21 NS-411 Franklin Rd. Skyline Dr. NS E. Ave. PROJECT AREA CONSTRAINTS cnt d. Streams and Wetlands Numerus Streams and Wetlands Verdigris River Critical Habitat fr Rabbitsft (Mussel) T Owass N EW-490 T Claremre Keetnville Rd. Identify Prblem Initial Data Cllectin Preliminary Alternates Alternate Screening

22 NS-411 Franklin Rd. Skyline Dr. NS E. Ave. PROJECT AREA CONSTRAINTS cnt d. Streams and Wetlands Numerus Streams and Wetlands Verdigris River Critical Habitat fr Rabbitsft (Mussel) T Owass N EW-490 T Claremre Keetnville Rd. Identify Prblem Initial Data Cllectin Preliminary Alternates Alternate Screening

23 NS-411 Franklin Rd. Skyline Dr. NS E. Ave. Oil/Gas Wells PROJECT AREA CONSTRAINTS cnt d. Lcatins Frm OK Crpratin Cmmissin Inf Sme Were Field Identified T Owass Surce: Oklahma Crpratin Cmmissin N EW-490 T Claremre Keetnville Rd. Identify Prblem Initial Data Cllectin Preliminary Alternates Alternate Screening

24

25 DEVELOPMENT OF ALTERNATES Cnsistent With Apprved Alignment Frm EA Prpsed Imprvements fr all Alternates 5-Lane Radway Sectin Fur 12-Ft Driving Lanes (Tw Each Directin) 14-Ft Center Turn Lane Curb and Gutter With 2-Ft Shulder 45 mph Design Speed Recnstruct Bridges Imprvements Lead t Increased Capacity and Safety Identify Prblem Initial Data Cllectin Preliminary Alternates Alternate Screening

26 DEVELOPMENT OF ALTERNATES cnt d. Imprvements t Existing Facility nt Feasible Difficult t Keep Existing Radway Open During Cnstructin Existing Sharp Hrizntal Curves Hill Slides Identify Prblem Initial Data Cllectin Preliminary Alternates Alternate Screening

27 Skyline Dr. NS E. Ave. DEVELOPMENT OF ALTERNATES cnt d. SH-20 Hrizntal Alignment Same fr all Alternatives Cnsidered Fllws 2000 EA Alignment Vertical Alignment 3 Alternatives Cnsidered Elevatin Change at Keetnville Cut/Fill/Bridge Cunty Rads T Owass EW-490 T Claremre Keetnville Rd. Identify Prblem Initial Data Cllectin Preliminary Alternates Alternate Screening

28 Skyline Dr. NS E. Ave. DEVELOPMENT OF ALTERNATES cnt d. SH-20 Hrizntal Alignment Same fr all Alternatives Cnsidered Fllws 2000 EA Alignment Vertical Alignment 3 Alternatives Cnsidered Elevatin Change at Keetnville Cut/Fill/Bridge Cunty Rads T Owass EW-490 T Claremre Keetnville Rd. Identify Prblem Initial Data Cllectin Preliminary Alternates Alternate Screening

29 Skyline Dr. NS E. Ave. DEVELOPMENT OF ALTERNATES cnt d. SH-20 Hrizntal Alignment Same fr all Alternatives Cnsidered Fllws 2000 EA Alignment Vertical Alignment 3 Alternatives Cnsidered Elevatin Change at Keetnville Cut/Fill/Bridge Cunty Rads T Owass EW-490 T Claremre Keetnville Rd. Identify Prblem Initial Data Cllectin Preliminary Alternates Alternate Screening

30 ALTERNATE EVALUATION/SCREENING 3 Vertical Alternatives Cnsidered Evaluatin Criteria Impacts t Prperty Cnstructin Methds Impacts t Envirnmental Features Csts Cnstructin, Right-f-Way, Utilities Cmparisn Matrix Design Reprt Review Meetings Identify Prblem Initial Data Cllectin Preliminary Alternates Alternate Screening

31 ALTERNATE EVALUATION/SCREENING ALTERNATE COST GRADING BRIDGE RELOCATIONS ENVIRONMENTAL TOTAL COST (MILLIONS) MA. CUT (FEET) MA. FILL (FEET) BRIDGE LENGTH (FEET) RESIDENTIAL COMMERCIAL POTENTIAL NOISE IMPACTS WETLANDS (ACRE) OIL/GAS WELLS 1 $ N/A 4, A $ , B $ , A $ B $ , Identify Prblem Initial Data Cllectin Preliminary Alternates Alternate Screening

32 ALTERNATE EVALUATION/SCREENING cnt d. Resulted in the Prpsed Alternate Balanced Excavatin Prfile Lwer Fill Heights at Intersectins Lwer Cst ALTERNATE COST GRADING BRIDGE RELOCATIONS ENVIRONMENTAL TOTAL COST (MILLIONS) MA. CUT (FEET) MA. FILL (FEET) BRIDGE LENGTH (FEET) RESIDENTIAL COMMERCIAL POTENTIAL NOISE IMPACTS WETLANDS (ACRE) OIL/GAS WELLS 3A $ Identify Prblem Initial Data Cllectin Preliminary Alternates Alternate Screening

33

34 NS E. Ave. Skyline Dr. Keetnville Rd. NS-411 Franklin Rd. Prpsed Alternate PROPOSED ALTERNATE 5-Lane Sectin (Curb/Gutter) New Hrizntal and Vertical Alignment Remves Prtins Existing SH-20 Realigned Cunty Rd. Cnnectins Recnstructs Bridges Ttal Prject Cst $53.8M T Owass N EW-490 T Claremre

35 PROPOSED ALTERNATE cnt d. N

36 PROPOSED ALTERNATE cnt d. N

37 PROPOSED ALTERNATE cnt d. N

38 NS E. Ave. Skyline Dr. Keetnville Rd. NS-411 Franklin Rd. PROPOSED ALTERNATE cnt d. Prpsed Alternate 5-Lane Sectin (Curb/Gutter) New Hrizntal and Vertical Alignment Remves Prtins Existing SH-20 Realigned Cunty Rd. Cnnectins Recnstructs Bridges Ttal Prject Cst $53.8M T Owass N EW-490 T Claremre

39 NS E. Ave. Skyline Dr. NS E. Ave. Keetnville Rd. NS-411 Franklin Rd. PROPOSED ALTERNATE cnt d. Prpsed Alternate 5-Lane Sectin (Curb/Gutter) New Hrizntal and Vertical Alignment Remves Prtins Existing SH-20 Realigned Cunty Rd. Cnnectins Recnstructs Bridges Ttal Prject Cst $53.8M T Owass N EW-490 T Claremre

40 NS E. Ave. Skyline Dr. Keetnville Rd. NS-411 Franklin Rd. PROPOSED ALTERNATE cnt d. Prpsed Alternate 5-Lane Sectin (Curb/Gutter) New Hrizntal and Vertical Alignment Remves Prtins Existing SH-20 Realigned Cunty Rd. Cnnectins Recnstructs Bridges Ttal Prject Cst $53.8M T Owass EW-490 N EW-490 T Claremre

41 NS E. Ave. Skyline Dr. Keetnville Rd. NS-411 Franklin Rd. PROPOSED ALTERNATE cnt d. Prpsed Alternate 5-Lane Sectin (Curb/Gutter) New Hrizntal and Vertical Alignment Remves Prtins Existing SH-20 Realigned Cunty Rd. Cnnectins Recnstructs Bridges Ttal Prject Cst $53.8M T Owass N EW-490 Keetnville Rd. T Claremre

42 NS E. Ave. Skyline Dr. Keetnville Rd. NS-411 Franklin Rd. NS-411 Franklin Rd. PROPOSED ALTERNATE cnt d. Prpsed Alternate 5-Lane Sectin (Curb/Gutter) New Hrizntal and Vertical Alignment Remves Prtins Existing SH-20 Realigned Cunty Rd. Cnnectins Recnstructs Bridges Ttal Prject Cst $53.8M T Owass N EW-490 T Claremre

43

44 POTENTIAL IMPACTS Ptential Impacts Based n Recnnaissance Data: Acquisitin f Private Prperty and Relcatin f Residents N Impacts t Cmmunity Facilities Sme Nise Impacts Subject t Further Study Changes t Lcal Rad Access and Driveways Channelizatin f Streams and Filling f Wetlands Bridge Designed t Minimize Impacts t Verdigris River and Rabbitsft Critical Habitat Impacts t Oil and Gas Wells Visual Changes Large Cuts and Fills n Keetnville Hill Prpsed Alternate Impact Summary COST GRADING BRIDGE RELOCATIONS ENVIRONMENTAL TOTAL COST (MILLIONS) MA. CUT (FEET) MA. FILL (FEET) BRIDGE LENGTH (FEET) RESIDENTIAL COMMERCIAL POTENTIAL NOISE IMPACTS WETLANDS (ACRE) OIL/GAS WELLS $ Impacts Will be Minimized as Much as Pssible During Design

45

46 ENVIRONMENTAL PROCESS Detailed Envirnmental Studies Will be Perfrmed Archaelgical and Histric Survey Wetland Delineatins Bilgical Assessment USFWS Cnsultatin Hazardus Waste Investigatin Nise Study Re-Slicit Input frm Resurce Agencies and Lcal Officials Prpsed Design and Envirnmental Impacts Will be Cmpared With the Original Envirnmental Assessment An Envirnmental Reevaluatin Will Determine if the Findings f the Original EA Still Apply

47 NET PROJECT STEPS Public Input TODAY Submit Cmments by May 26, 2015 Cmplete Envirnmental Reevaluatin Final Design Right-f-Way Acquisitin Cnstructin 2017

48 THANK YOU! Please Submit Yur Cmments by May 26, 2015 Leave Yur Cmment Frm Here Tnight Mail the Cmment Frm Back t ODOT: Envirnmental Prgrams Divisin Oklahma Department f Transprtatin 200 NE 21 st Street Oklahma City, OK Yur Cmments t ENVIRONMENT@ODOT.ORG QUESTIONS?