1 WAMBO COAL PTY LTD NORTH WAMBO UNDERGROUND MINE LONGWALL 10A MODIFICATION ENVIRONMENTAL ASSESSMENT ATTACHMENT 2 Relevant Environmental Planning Instruments and Government Policies

2 A2 PLANNING FRAMEWORK Clause 5(3) relevantly provides: This Attachment provides further discussion on the requirements and application of environmental planning instruments and relevant NSW government policy to the Modification. References to Sections 1 to 5 in this Attachment are references to the sections of the Main Report of the EA. Internal references within this Attachment are prefixed with A2. A2.1 SINGLETON LOCAL ENVIRONMENTAL PLAN 2013 The Wambo Coal Mine is wholly within the Singleton LGA (Figure 1). The following subsections identify the provisions in the Singleton LEP which have relevance to the Modification. Wambo lies wholly within land zoned RU1 Primary Production. Under the Singleton LEP open cut mining is permissible on lands in the RU1 Zone with development consent. Underground mining is not listed as a permissible use under the Singleton LEP. The Singleton LEP states: Note. A type of development referred to in the Land Use Table is a reference to that type of development only to the extent it is not regulated by an applicable State environmental planning policy. The following State environmental planning policies in particular may be relevant to development on land to which this Plan applies: State Environmental Planning Policy (Mining, Petroleum Production and Extractive Industries) 2007 Clause 4 of the Mining SEPP relevantly provides: 4 Land to which Policy applies This Policy applies to the State. Clause 5(3) gives the Mining SEPP primacy where there is any inconsistency between the provisions in the SEPP and the provisions in any other environmental planning instrument (subject to limited exceptions). 5 Relationship with other environmental planning policies (3) if this Policy is inconsistent with any other environmental planning instrument, whether made before or after this Policy, this Policy prevails to the extent of the inconsistency. The practical effect of clause 5(3) for Wambo is that if there is any inconsistency between the provisions of the Mining SEPP and those contained in the Singleton LEP, the provisions of the Mining SEPP will prevail. Clauses 6 and 7 of the Mining SEPP provide what types of mining development are permissible without development consent and what types are permissible only with development consent. In this regard, clause 7(1) states: 7 Development permissible with consent (1) Mining Development for any of the following purposes may be carried out only with development consent: underground mining carried out on any land, The term underground mining in the Mining SEPP is given an extended definition in clause 3(2) as follows: underground mining means: mining carried out beneath the earth s surface, including bord and pillar mining, longwall mining, top-level caving, sub-level caving and auger mining, and shafts, drill holes, gas and water drainage works, surface rehabilitation works and access pits associated with that mining (whether carried out on or beneath the earth s surface), but does not include open cut mining. The effect of clause 7(1), in conjunction with the operation of clause 5(3) of the Mining SEPP, is that notwithstanding any prohibition contained in the land use table of the Singleton LEP, the Wambo Coal Mine may be carried out with development consent. A2-1

3 Clause 2.3(2) of the Singleton LEP relevantly provides: (2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone. The consent authority for the Modification is the Minister for Planning (Section 5.1). Under the Singleton LEP the objectives of the RU1 Zone are: To encourage sustainable primary industry production by maintaining and enhancing the natural resource base. To encourage diversity in primary industry enterprises and systems appropriate for the area. To minimise the fragmentation and alienation of resource lands. To minimise conflict between land uses within this zone and land uses within adjoining zones. The Modification is consistent with the general objectives of the RU1 zone as mining is a primary industry and the Modification would enhance the productivity of the Wambo. The Modification would not significantly alter the compatibility of the Wambo with adjoining land uses and agistment of stock would be able to continue in the Modification area following subsidence remediation. A2.2 STATE ENVIRONMENTAL PLANNING POLICIES State Environmental Planning Policy (Mining, Petroleum Production and Extractive Industries) 2007 The Mining SEPP regularises the various environmental planning instruments that previously controlled mining activities. Clause 2 Clause 2 sets out the aims of the Mining SEPP as follows: Clause 7 to provide for the proper management and development of mineral, petroleum and extractive material resources for the purpose of promoting the social and economic welfare of the State, and to facilitate the orderly and economic use and development of land containing mineral, petroleum and extractive material resources, and to establish appropriate planning controls to encourage ecologically sustainable development through the environmental assessment, and sustainable management, of development of mineral, petroleum and extractive material resources. Clause 7(1) of the Mining SEPP states that development for any of the following purposes may be carried out only with development consent: underground mining carried out on any land, mining carried out: (ii) on land that is, immediately before the commencement of this clause, the subject of a mining lease under the Mining Act 1992 or a mining licence under the Offshore Minerals Act 1999, The Modification comprises mining within existing Wambo mining and coal leases (Figure 2). Clause 12 Clause 12 of the Mining SEPP requires that, before determining an application for consent for development for the purposes of mining, petroleum production or extractive industry, the consent authority must: Clause 5(3) of the Mining SEPP gives it primacy where there is an inconsistency between the provisions of the Mining SEPP and the provisions of any other environmental planning instrument (except the State Environmental Planning Policy (Major Development) 2005, State Environmental Planning Policy No. 14 [Coastal Wetlands] and State Environmental Planning Policy No. 26 [Littoral Rainforest]). consider: (i) the existing uses and approved uses of land in the vicinity of the development, and A2-2

4 (ii) (iii) whether or not the development is likely to have a significant impact on the uses that, in the opinion of the consent authority having regard to land use trends, are likely to be the preferred uses of land in the vicinity of the development, and any ways in which the development may be incompatible with any of those existing, approved or likely preferred uses, and evaluate and compare the respective public benefits of the development and the land uses referred to in paragraph (i) and (ii), and evaluate any measures proposed by the applicant to avoid or minimise any incompatibility, as referred to in paragraph (iii). Land use in the vicinity of Wambo is characterised by a combination of coal mining operations, agricultural land uses and the village of Warkworth. Land use in the Modification area includes areas of vegetation and cleared grazing land and is wholly located on WCPL-owned land. The potential impacts of the Modification on existing agricultural improvements, mining-related infrastructure and vegetation as a result of mine subsidence are described in Appendices A and E and summarised in Sections 4.2, 4.3 and 4.7. The Modification would not result in additional noise and air quality impacts to adjoining land users as it would use the current North Wambo Underground Mine major surface infrastructure and would not alter the operation of the mine (Section 4.1). The Modification would allow for the extraction of additional coal reserves adjoining the existing North Wambo Underground Mine that can be economically mined with underground mining methods. WCPL would, where practicable, implement a range of measures to avoid or minimise incompatibility of the Modification with existing and future land uses in the Modification area. This would be achieved through the implementation of the existing Wambo environmental management system. Clause 12AA Clause 12AA of the Mining SEPP requires that: (1) In determining an application for consent for development for the purposes of mining, the consent authority must consider the significance of the resource that is the subject of the application, having regard to: the economic benefits, both to the State and the region in which the development is proposed to be carried out, of developing the resource, and any advice by the Director-General of the Department of Trade and Investment, Regional Infrastructure and Services as to the relative significance of the resource in comparison with other mineral resources across the State. (2) The following matters are (without limitation) taken to be relevant for the purposes of subclause (1) : employment generation, expenditure, including capital investment, the payment of royalties to the State. (3) The Director-General of the Department of Trade and Investment, Regional Infrastructure and Services is, in providing advice under subclause (1), to have regard to such matters as that Director-General considers relevant, including (without limitation): (d) the size, quality and availability of the resource that is the subject of the application, and the proximity and access of the land to which the application relates to existing or proposed infrastructure, and the relationship of the resource to any existing mine, and whether other industries or projects are dependent on the development of the resource. (4) In determining whether to grant consent to the proposed development, the significance of the resource is to be the consent authority s principal consideration under this Part. A2-3

5 (5) Accordingly, the weight to be given by the consent authority to any other matter for consideration under this Part is to be proportionate to the importance of that other matter in comparison with the significance of the resource. (6) To avoid doubt, the obligations of a consent authority under this clause extend to any application to modify a development consent. The Modification would allow the recovery of an additional 1.9 Mt of ROM coal. Wambo produces metallurgical and thermal coal for export and domestic customers. The development of first workings for the proposed Longwall 10A and the Modification would extend employment for the North Wambo Underground Mine workforce by approximately 6 months. The Modification is a natural extension to the existing approved North Wambo Underground Mine. The additional coal would be mined by the proposed Longwall 10A using the existing surface infrastructure of the North Wambo Underground Mine and would require no additional surface disturbance. Clause 14 Clause 14(1) of the Mining SEPP requires that, before granting consent for development for the purposes of mining, petroleum production or extractive industry, the consent authority must consider whether or not the approval should be issued subject to conditions aimed at ensuring that the development is undertaken in an environmentally responsible manner, including conditions to ensure the following: that impacts on significant water resources, including surface and groundwater resources, are avoided, or are minimised to the greatest extent practicable, that impacts on threatened species and biodiversity, are avoided, or are minimised to the greatest extent practicable, that greenhouse gas emissions are minimised to the greatest extent practicable. In addition, clause 14(2) requires that, without limiting clause 14(1), in determining a development application for development for the purposes of mining, petroleum production or extractive industry, the consent authority must consider an assessment of the greenhouse gas emissions (including downstream emissions) of the development, and must do so having regard to any applicable State or national policies, programmes or guidelines concerning greenhouse gas emissions. The potential impacts of the Modification on groundwater and surface water resources are discussed in Sections 4.4 and 4.5, including measures to minimise potential impacts which are described in Sections and The potential impacts of the Modification on threatened species and biodiversity are described in Sections 4.7 and 4.8, including measures to minimise potential impacts which are described in Sections and Existing Wambo greenhouse gas abatement measures and the Modification greenhouse gas emissions estimate are described in Section This section of the EA provides a quantitative assessment of potential scope 1, 2 and 3 greenhouse gas emissions of the Modification. Clause 15 Clause 15 of the Mining SEPP requires that: (1) Before granting consent for development for the purposes of mining, petroleum production or extractive industry, the consent authority must consider the efficiency or otherwise of the development in terms of resource recovery. (2) Before granting consent for the development, the consent authority must consider whether or not the consent should be issued subject to conditions aimed at optimising the efficiency of resource recovery and the reuse or recycling of material. (3) The consent authority may refuse to grant consent to development if it is not satisfied that the development will be carried out in such a way as to optimise the efficiency of recovery of minerals, petroleum or extractive materials and to minimise the creation of waste in association with the extraction, recovery or processing of minerals, petroleum or extractive materials. A2-4

6 The Modification would allow for the extraction of additional coal reserves adjoining the existing North Wambo Underground Mine that can be economically mined with underground mining methods. It is in WCPL s financial interest to maximise the efficiency of coal recovery and minimise the generation of coal reject which requires disposal. Clause 16 Clause 16(1) of the Mining SEPP requires that, before granting consent for development for the purposes of mining or extractive industry that involves the transport of materials, the consent authority must consider whether or not the consent should be issued subject to conditions that do any one or more of the following: require that some or all of the transport of materials in connection with the development is not to be by public road, limit or preclude truck movements, in connection with the development, that occur on roads in residential areas or on roads near to schools, require the preparation and implementation, in relation to the development, of a code of conduct relating to the transport of materials on public roads. The primary public road network transport routes to and from Wambo include routes that are adjacent to rural areas, industrial/commercial areas, residential areas and schools. Wambo product coal would continue to be transported from site by rail. As the maximum production rate at Wambo would not change as a result of the Modification and the Modification would not result in any additional demand for employees/contractors, there would be no change in the vehicle movements associated with consumable deliveries or employee and contractor vehicle movements to Wambo. Given the above, it is considered the Modification would not result in any significant changes to the potential road transport impacts of Wambo. Clause 17 Clause 17 of the Mining SEPP requires that before granting consent for development for the purposes of mining, petroleum production or extractive industry, the consent authority must consider whether or not the approval should be issued subject to conditions aimed at ensuring the rehabilitation of land that will be affected by the development. In particular, the consent authority must consider whether conditions of the consent should: (d) require the preparation of a plan that identifies the proposed end use and landform of the land once rehabilitated, or require waste generated by the development or the rehabilitation to be dealt with appropriately, or require any soil contaminated as a result of the development to be remediated in accordance with relevant guidelines (including guidelines under section 145C of the Act and the Contaminated Land Management Act 1997), or require steps to be taken to ensure that the state of the land, while being rehabilitated and at the completion of the rehabilitation, does not jeopardize public safety. At the cessation of the Modification (i.e. completion of mining the proposed Longwall 10A), a rehabilitation programme would be implemented for the Modification area (Section 3.9). The proposed management of coal reject material is discussed in Section 3.5 and the management of other wastes is described in Section 2.6. One of the key Wambo rehabilitation objectives is the creation of safe, stable, adequately drained post-mining land that is consistent with the surrounding landscape (Section 2.11). State Environmental Planning Policy No. 33 (Hazardous and Offensive Development) Clause 13 of SEPP 33 requires the consent authority, in considering a Development Application for a potentially hazardous or a potentially offensive industry, to take into account: in the case of development for the purpose of a potentially hazardous industry a preliminary hazard analysis prepared by or on behalf of the applicant, and A2-5

7 (d) any feasible alternatives to the carrying out of the development and the reasons for choosing the development the subject of the application (including any feasible alternatives for the location of the development and the reasons for choosing the location the subject of the application) The Modification would not significantly alter the consequences or likelihood of a hazardous event occurring at Wambo as the operational activities on-site would be generally unchanged. Notwithstanding, environmental management plans and monitoring programmes would be reviewed, and if necessary, revised by WCPL to include the Modification and manage any associated environmental risks. State Environmental Planning Policy No. 44 (Koala Habitat Protection) SEPP 44 requires the consent authority for any Development Application in certain LGAs (including Singleton) to consider whether land subject to a Development Application is "potential Koala habitat" or "core Koala habitat". FloraSearch (Appendix E) and Niche (Appendix F) consider the Modification area comprises potential Koala habitat, but does not comprise core Koala habitat. State Environmental Planning Policy No. 55 (Remediation of Land) SEPP 55 aims to provide a State-wide planning approach to the remediation of contaminated land. Under SEPP 55, planning authorities are required to consider the potential for contamination to adversely affect the suitability of the site for its proposed use. A consent authority must consider the following under clause 7(1) of SEPP 55: it has considered whether the land is contaminated, and if the land is contaminated, it is satisfied that the land is suitable in its contaminated state (or will be suitable, after remediation) for the purpose for which the development is proposed to be carried out, and if the land requires remediation to be made suitable for the purpose for which the development is proposed to be carried out, it is satisfied that the land will be remediated before the land is used for that purpose. Further, under clause 7(2), before determining an application for consent to carry out development that would involve a change of use of land, the consent authority must consider a report specifying the findings of a preliminary investigation of the land concerned, carried out in accordance with the contaminated land planning guidelines. Because the Modification is within existing Wambo mining and coal leases, no change of use is proposed and no preliminary land contamination investigation is required. A2.3 STRATEGIC REGIONAL LAND USE POLICY As part of the Strategic Regional Land Use Policy, the NSW Government introduced a Gateway Process for the upfront assessment of the impacts of State Significant mining and coal seam gas proposal on Strategic Agricultural Land (NSW Government, 2012c). The Modification area is wholly contained within existing Wambo mining leases, therefore the Gateway Process does not apply to assessment of the Modification (NSW Government, 2012c). Strategic Agricultural Land as mapped in the Mining SEPP is described in Section and presented on Figure 9. An assessment of potential impacts on agricultural land and resources is presented in Section An assessment against the provisions of the Aquifer Interference Policy is provided in Section A2.4. A2.4 AQUIFER INTERFERENCE POLICY The AIP (NSW Government, 2012a) has been developed by the NSW Government as a component of the NSW Government's Strategic Regional Land Use Policy. The AIP applies State-wide and details water licence and impact assessment requirements. A2-6

8 The AIP has been developed to ensure equitable water sharing between various water users and proper licensing of water taken by aquifer interference activities such that the take is accounted for in the water budget and water sharing arrangements. The AIP also aims to enhance existing regulation, contributing to a comprehensive framework to protect the rights of all water users and the environment in NSW. The NSW Water Management Act, 2000 defines an aquifer interference activity as that which involves any of the following: the penetration of an aquifer; the interference with water in an aquifer; the obstruction of the flow of water in an aquifer; the taking of water from an aquifer in the course of carrying out mining or any other activity prescribed by the regulations; and the disposal of water taken from an aquifer in the course of carrying out mining or any other activity prescribed by the regulations. A Groundwater Assessment (HydroSimulations, 2014) has been prepared in consideration of the AIP and the key conclusions are summarised below. Water Source The AIP requires all water taken by aquifer interference activities to be accounted for within the extraction limits set by the relevant Water Sharing Plan. The Water Sharing Plan relevant to Wambo is the Water Sharing Plan for the Hunter Unregulated and Alluvial Water Sources Licensing to account for water taken from the coal seams and other hardrock units that comprise the porous rock aquifer is also required at Wambo under the NSW Water Act, Baseline Groundwater Conditions Baseline groundwater conditions and the existing observed impacts of the approved Wambo operations on alluvial and porous rock aquifers are presented in Section 2 of HydroSimulations (2014). Modelling of Potential Impacts The Groundwater Assessment included predictive modelling of the cumulative groundwater impacts using a three-dimensional numerical model. Detail on the development and calibration of the numerical model is provided in Appendix B. The numerical model used for the North Wambo Underground Mine Modification (Longwalls 9 and 10) was extended to include the life of approved mining at Wambo and to include dewatering of existing workings in the Whybrow Seam in advance of active mining at the North Wambo Underground Mine. The potential impacts of the Modification have been assessed by making comparisons between the currently approved and the proposed modified mine plan for the North Wambo Underground Mine. Licensing Requirements Details of the current groundwater licences held by WCPL are summarised in Table A2-1. The predicted annual groundwater volumes required to be licensed for the approved operations and for the Modification are summarised in Table A2-2. Comparison of WCPL s licence entitlements against the predicted annual licensing requirements shows that adequate licences are available to account for the potential take of water associated with the approved North Wambo Underground Mine operations and the Modification (HydroSimulations, 2014). Post-closure annual licensing requirements are expected to be less than the licensing requirements during operation. Given WCPL currently holds adequate licenses to account for the potential take of water associated with the approved North Wambo Underground Mine operations and the Modification, it is expected WCPL will have adequate licences to account for the potential post-closure take of water. Notwithstanding, the numerical groundwater model would be refined over progression of the mine life in order to more accurately calculate the post-closure licensing requirements associated with Wambo. A2-7

9 Table A2-1 Groundwater Licence Summary Licence Number Description Facility Valid to Extraction Limits Licences under the Water Management Act, 2000 (Alluvial Aquifer) WAL Well No. 2 Well Perpetuity 70 ML/year Licences under the Water Act, 1912 (Porous Rock Aquifer) 20BL Dewatering (Bore No. 1) Bore 25/10/ ML/year 20BL Well Domestic, Stock Well Perpetuity 11 ML/year 20BL Dewatering (Bore No. 2) Bore 21/05/ ML/year 20BL Dewatering Bore Bore 7/08/ ML/year 20BL Well - Stock Bore Perpetuity 5 ML/year Source: HydroSimulations (2014). 1 Assigned to the Lower Wollombi Brook Water Source. 2 WCPL is in consultation with NOW regarding renewal of these licences. Table A2-2 Groundwater Licensing Requirement Summary Water Sharing Plan Management Zone/ Groundwater Source Predicted Annual Inflow Volumes Requiring Licensing (ML/annum) Currently Approved Modification Hunter Unregulated and Alluvial Water Sources Water Sharing Plan 2009 Lower Wollombi Brook Average 8.1 Average 9.2 Water Act, 1912 Porous Rock Average 408 Maximum 692 Average 413 Maximum 692 Source: After HydroSimulations (2014). Minimal Impact Considerations The AIP establishes minimal impact considerations for highly productive and less productive groundwater. Figure 9 shows the NOW mapping of highly productive groundwater in the vicinity of Wambo, which indicates a highly productive alluvial aquifer exists adjacent to Wollombi Brook. An assessment of the Modification against the minimal impact considerations in the NSW Aquifer Interference Policy (the AIP) was conducted as part of the Groundwater Assessment (HydroSimulations, 2014). The Groundwater Assessment concluded that the Modification is within the Level 1 minimal impact considerations outlined in the AIP for highly productive groundwater. Limited information is available on three privately owned bores in the vicinity of Wambo. Depending on the extraction depth and nature of bores, these bores may experience more than 2 m cumulative drawdown as a result of the approved Wambo operations (HydroSimulations, 2014). No additional privately owned registered bores are predicted to be impacted by the Modification. WCPL would continue to implement the Surface and Groundwater Response Plan (WCPL, 2010f) in the event a complaint is received in relation to loss of groundwater supply. Therefore, Wambo (including the Modification) is within the Level 2 minimal impact considerations outlined in the AIP for less productive groundwater. A2-8

10 Relevant Mitigation and Contingency Measures Other Groundwater Users The Surface and Groundwater Response Plan (WCPL, 2010f) includes a process to deal with a complaint received in relation to loss of groundwater supply. WCPL would continue to implement the Surface and Groundwater Response Plan (WCPL, 2010f) for the Modification. Monitoring and Reporting of Water Make WCPL would continue to monitor and report groundwater extraction as required under the conditions of its water licences. The numerical groundwater model would continue to be refined over progression of the mine life at Wambo. A2-9

ATTACHMENT 5 AQUIFER INTERFERENCE POLICY AND WATER LICENSING ADDENDUM

ATTACHMENT 5 AQUIFER INTERFERENCE POLICY AND WATER LICENSING ADDENDUM ATTACHMENT 5 AQUIFER INTERFERENCE POLICY AND WATER LICENSING ADDENDUM COWAL GOLD MINE EXTENSION MODIFICATION TABLE OF CONTENTS A5 AQUIFER INTERFERENCE POLICY CONSIDERATIONS AND WATER LICENSING ADDENDUM

More information

ATTACHMENT 2. Aquifer Interference Policy Considerations and Water Licensing COWAL GOLD OPERATIONS MINE LIFE MODIFICATION

ATTACHMENT 2. Aquifer Interference Policy Considerations and Water Licensing COWAL GOLD OPERATIONS MINE LIFE MODIFICATION ATTACHMENT 2 Aquifer Interference Policy Considerations and Water Licensing COWAL GOLD OPERATIONS MINE LIFE MODIFICATION Environmental Assessment 2016 TABLE OF CONTENTS A2 AQUIFER INTERFERENCE POLICY CONSIDERATIONS

More information

Hunter Valley Operations South

Hunter Valley Operations South Hunter Valley Operations South This booklet outlines a modification proposal being prepared for Coal & Allied s Hunter Valley Operations (HVO) South mining activities. In this booklet you will find an

More information

State Environmental Planning Policy (Mining, Petroleum Production and Extractive Industries) 2007

State Environmental Planning Policy (Mining, Petroleum Production and Extractive Industries) 2007 Page 1 of 21 State Environmental Planning Policy (Mining, Petroleum Production and Extractive Industries) 2007 [2007-65] Status Information Currency of version Current version for 1 October 2011 to date

More information

Environmental Risk Analysis

Environmental Risk Analysis Appendix 10 11 12 13 14 15 16 17 18 191 Groundwater Controlled UHSA Air Agricultural Historic EIS Preliminary Environmental Blasting Quality Surface Secretary s Noise Statement Aboriginal Economic Action

More information

Moolarben Coal Complex UG1 Optimisation Modification. Environmental Assessment APPENDIX F SURFACE WATER ASSESSMENT REVIEW

Moolarben Coal Complex UG1 Optimisation Modification. Environmental Assessment APPENDIX F SURFACE WATER ASSESSMENT REVIEW Moolarben Coal Complex UG1 Optimisation Modification Environmental Assessment APPENDIX F SURFACE WATER ASSESSMENT REVIEW Moolarben Coal Complex UG1 Optimisation Modification Surface Water Assessment Review

More information

ATTACHMENT 2 COMMUNITY INFORMATION

ATTACHMENT 2 COMMUNITY INFORMATION ATTACHMENT 2 COMMUNITY INFORMATION Wilpinjong Coal Wilpinjong s 75W modification November, 2012 The Wilpinjong Coal Mine is located in the developing western coalfields of NSW and produces a high quality

More information

WAMBO COAL PTY LTD REPORT 2 NORTH WAMBO UNDERGROUND MINE EXTRACTION PLAN LONGWALLS 8 TO 10A GROUNDWATER IMPACT ASSESSMENT REVIEW

WAMBO COAL PTY LTD REPORT 2 NORTH WAMBO UNDERGROUND MINE EXTRACTION PLAN LONGWALLS 8 TO 10A GROUNDWATER IMPACT ASSESSMENT REVIEW WAMBO COAL PTY LTD NORTH WAMBO UNDERGROUND MINE EXTRACTION PLAN LONGWALLS 8 TO 10A REPORT 2 GROUNDWATER IMPACT ASSESSMENT REVIEW Date: To: From: Re: Ref: 9 April 2015 Micheal Alexander Director Projects

More information

WAMBO COAL MINE MINING OPERATIONS PLAN

WAMBO COAL MINE MINING OPERATIONS PLAN WAMBO COAL MINE MINING OPERATIONS PLAN 2015 2020 PREPARED BY WAMBO COAL PTY LTD March 2015 MOP Amendment B Wambo Coal Mine Mining Plan Introduction Wambo Coal Pty Limited Mining Plan Name of Mine: Wambo

More information

Chapter 4 Planning and statutory requirements. Chapter 4 Planning and statutory requirements

Chapter 4 Planning and statutory requirements. Chapter 4 Planning and statutory requirements Chapter 4 Planning and statutory requirements Chapter 4 Planning and statutory requirements Contents Page number 4. Planning and statutory requirements 4-1 4.1 Approval under the EPBC Act 4-1 4.1.1 Controlled

More information

United Wambo Open-Cut Coal Mine Project Groundwater Impact Assessment

United Wambo Open-Cut Coal Mine Project Groundwater Impact Assessment Australasian Groundwater and Environmental Consultants Pty Ltd (AGE) Report on United Wambo Open-Cut Coal Mine Project Groundwater Impact Assessment Prepared for Umwelt Australia Pty Ltd Project No. G1733

More information

Environmental Impact Statement. Avoca Tank Project

Environmental Impact Statement. Avoca Tank Project ABN 88 100 095 494 Environmental Impact Statement for the Avoca Tank Project Prepared by: R.W. CORKERY & CO. PTY. LIMITED July 2014 This page has intentionally been left blank ABN 88 100 095 494 Environmental

More information

in brief corrs Policy What it means for developments in april 2012

in brief corrs Policy What it means for developments in   april 2012 corrs in brief april 2012 Delivery of the Strategic Regional Land Use Policy What it means for developments in regional areas The NSW Government has recently released a number of draft plans, policies

More information

Submission: State Environmental Planning Policy (Mining, Petroleum Production and Extractive Industries) Amendment (Resource Significance) 2013

Submission: State Environmental Planning Policy (Mining, Petroleum Production and Extractive Industries) Amendment (Resource Significance) 2013 Reply to: Steve Phillips Hunter Region Coordinator, Lock the Gate Alliance PO Box 290 Newcastle, 2300 Submission: State Environmental Planning Policy (Mining, Petroleum Production and Extractive Industries)

More information

Section 3 - Consultation and Issue Identification

Section 3 - Consultation and Issue Identification ENVIRONMENTAL ASSESSMENT 3-1 MUDGEE STONE COMPANY PTY LTD 3Section 3 Consultation and Issue Identification P R E A M B L E This section describes how the environmental issues assessed in the Environmental

More information

Newstan Colliery S75W Modification Project Briefing Paper

Newstan Colliery S75W Modification Project Briefing Paper 2 Table of Contents 1 INTRODUCTION...5 2 EXISTING DEVELOPMENT APPROVALS...6 2.1 CONSENTS, LEASES AND LICENSES...7 3 THE PROJECT...8 3.1 MINING METHOD...11 3.2 MINING AND PLANT EQUIPMENT...12 3.3 MINE INFRASTRUCTURE

More information

Spur Hill Underground Coking Coal Project. Groundwater Assessment for Gateway Application. Tuesday 16 June 2015

Spur Hill Underground Coking Coal Project. Groundwater Assessment for Gateway Application. Tuesday 16 June 2015 Spur Hill Underground Coking Coal Project Groundwater Assessment for Gateway Application Tuesday 16 June 2015 HydroSimulations 2 Track record in groundwater assessment and modelling for water resources,

More information

(No. of pages excluding this page = 10)

(No. of pages excluding this page = 10) SPECIALIST CONSULTANT STUDIES 3-65 BIG ISLAND MINING PTY LTD (No. of pages excluding this page = 10) Ltd BIG ISLAND MINING PTY LTD 3-66 SPECIALIST CONSULTANT STUDIES This page has intentionally been left

More information

BOGGABRI COAL PROJECT MODIFICATION ENVIRONMENTAL ASSESSMENT

BOGGABRI COAL PROJECT MODIFICATION ENVIRONMENTAL ASSESSMENT BOGGABRI COAL PROJECT MODIFICATION ENVIRONMENTAL ASSESSMENT PREPARED FOR BOGGABRI COAL PTY LIMITED JULY 2013 Project No. WHC-12-08 Document No. 00532603.doc TABLE OF CONTENTS EXECUTIVE SUMMARY ES-1 1 INTRODUCTION

More information

Santos Gas Field Development Project (GFD Project)

Santos Gas Field Development Project (GFD Project) Santos Gas Field Development Project (GFD Project) EPBC Approval No. 2012 / 6615 Annual Environmental Return 2017 Santos Ltd l 2017 GFD Project AER (2012/6615) l February 2018 Page 1 of 17 Introduction

More information

TABLE OF CONTENTS LIST OF FIGURES. Mt Arthur Coal Open Cut Modification Environmental Assessment

TABLE OF CONTENTS LIST OF FIGURES. Mt Arthur Coal Open Cut Modification Environmental Assessment Executive Summary TABLE OF CONTENTS ES1 BACKGROUND ES-1 ES2 EXISTING OPERATIONS ES-1 ES3 MODIFICATION OVERVIEW ES-1 ES4 CONSULTATION ES-1 ES5 COMMUNITY INITIATIVES AND INVOLVEMENT ES-3 ES6 ENVIRONMENTAL

More information

ENVIRONMENTAL MANAGEMENT STRATEGY (EMS)

ENVIRONMENTAL MANAGEMENT STRATEGY (EMS) Established 1907 ENVIRONMENTAL MANAGEMENT STRATEGY (EMS) APPROVED BY MSC DATE: JUNE 2017 Version 1 2 3 Date February 2005 December 2010 December 2015 Section Modified All All All 4 June 2017 All Reason

More information

WAMBO COAL ENVIRONMENTAL MANAGEMENT STRATEGY

WAMBO COAL ENVIRONMENTAL MANAGEMENT STRATEGY WAMBO COAL ENVIRONMENTAL MANAGEMENT STRATEGY Document No. WA-ENV-MNP-501 March 2018 Document Control Document No. Title General Description Document Owner WA-ENV-MNP-501 Outlines the strategic context

More information

Environmental Planning and Assessment Act 1979

Environmental Planning and Assessment Act 1979 New South Wales State Environmental Planning Policy (Mining, Petroleum Production and Extractive Industries) Amendment 2010 under the Environmental Planning and Assessment Act 1979 Her Excellency the Governor,

More information

Water Sharing Plan for the Central Coast Unregulated Water Sources Amendment Order 2016

Water Sharing Plan for the Central Coast Unregulated Water Sources Amendment Order 2016 New South Wales Water Sharing Plan for the Central Coast Unregulated Water Sources Amendment Order 2016 under the Water Management Act 2000 I, Niall Blair, the Minister for Lands and Water, in pursuance

More information

12. STATUTORY REQUIREMENTS

12. STATUTORY REQUIREMENTS 12. STATUTORY REQUIREMENTS (SMP GUIDELINES SECTION 6.9) This section identifies the statutory requirements that apply to the SMP Area and the proposed mining operation in relation to any potential subsidence

More information

State Environmental Planning Policy No 62 Sustainable Aquaculture

State Environmental Planning Policy No 62 Sustainable Aquaculture Page 1 of 16 State Environmental Planning Policy No 62 Sustainable Aquaculture [2000-473] Status Information Currency of version Current version for 23 February 2011 to date (accessed 6 February 2012 at

More information

Planning Proposal - Amendment to Lake Macquarie Local Environmental Plan 2014 Biodiversity Offsets PP_2016_LAKEM_001_00

Planning Proposal - Amendment to Lake Macquarie Local Environmental Plan 2014 Biodiversity Offsets PP_2016_LAKEM_001_00 Planning Proposal - Amendment to Lake Macquarie Local Environmental Plan 2014 Biodiversity Offsets PP_2016_LAKEM_001_00 Local Government Area: ame of Draft LEP: Lake Macquarie City Planning Proposal Biodiversity

More information

Advice to decision maker on coal mining project

Advice to decision maker on coal mining project . Advice to decision maker on coal mining project IESC 2015-063: West Muswellbrook Project New Development Requesting agency The New South Wales Mining and Petroleum Gateway Panel Date of request 27 January

More information

WAMBO COAL MINE MINING OPERATIONS PLAN

WAMBO COAL MINE MINING OPERATIONS PLAN WAMBO COAL MINE MINING OPERATIONS PLAN 2015 2020 PREPARED BY WAMBO COAL PTY LTD May 2017 MOP Amendment F Wambo Coal Mine Mining Plan Wambo Coal Pty Limited Mining Plan Name of Mine: Wambo Coal Pty Ltd

More information

SUBMISSION GUIDE ECOLOGICALLY SUSTAINABLE DEVELOPMENT. May

SUBMISSION GUIDE ECOLOGICALLY SUSTAINABLE DEVELOPMENT. May SUBMISSION GUIDE ECOLOGICALLY SUSTAINABLE DEVELOPMENT May 2017 1 CONTENTS Part 1: The new Biodiversity Offsets Scheme 5 What is the Biodiversity Offsets Scheme? 6 Step 1: The proponent determines if the

More information

Environmental Management Strategy. June 2018

Environmental Management Strategy. June 2018 Environmental Management Strategy June 2018 Environmental Management Strategy DOCUMENT CONTROL DOCUMENT DETAILS Title Environmental Management Strategy Reference ENV 001 02 Environmental Management Strategy

More information

Preliminary Environmental Assessment

Preliminary Environmental Assessment Centennial Coal Newstan Lochiel Project March 2011 Page 1 Page 2 TABLE OF CONTENTS 1.0 INTRODUCTION...9 1.1 BACKGROUND...9 1.2 PROJECT OVERVIEW...9 1.3 PRELIMINARY ENVIRONMENTAL ASSESSMENT...10 1.4 THE

More information

Environmental impact assessment of council roadside activities

Environmental impact assessment of council roadside activities Environmental impact assessment of council roadside activities Developed on behalf of LGNSW for the Council Roadside Reserve Project 2016-2019 Introduction These slides cover legislative obligations in

More information

BENGALLA Mining Company. Contamination Assessment

BENGALLA Mining Company. Contamination Assessment BENGALLA Mining Company U Contamination Assessment U CONTINUATION OF BENGALLA MINE PRELIMINARY CONTAMINATION ASSESSMENT Prepared by: HANSEN BAILEY 6 / 127 129 John Street SINGLETON NSW 2330 July 2013 For:

More information

SUBMISSION NUMBER 13 SUNWATER BYERWEN COAL PTY LTD BYERWEN COAL PROJECT

SUBMISSION NUMBER 13 SUNWATER BYERWEN COAL PTY LTD BYERWEN COAL PROJECT SUBMISSION NUMBER 13 SUNWATER BYERWEN COAL PTY LTD BYERWEN COAL PROJECT AIEIS for the 13. SUBMISSION NUMBER 13 SUNWATER 13.1 Issue Number 13.1 Section 3.2 of the Byerwen Coal project Terms of Reference

More information

Central NSW Regional Contaminated Land Policy Template

Central NSW Regional Contaminated Land Policy Template Central NSW Regional Contaminated Land Policy Template Contamination Central: Supporting safe, stable and sustainable redevelopment of land in Central West NSW. Funded by the New South P a g e 1 {Instruction

More information

STATEMENT OF FACTS AND CONTENTIONS

STATEMENT OF FACTS AND CONTENTIONS COURT DETAILS STATEMENT OF FACTS AND CONTENTIONS Court Land and Environment Court of New South Wales Class 1 Case number 10998 of 2010 TITLE OF PROCEEDINGS Applicant Hunter Environment Lobby Inc. First

More information

Section 3. Legislative Framework and Impact Assessment Process

Section 3. Legislative Framework and Impact Assessment Process Section 3 Legislative Framework and Impact Assessment Process 22 Cameco Australia Pty Ltd 3. Legislative Framework and Impact Assessment Process 3.1 Key Legislative Requirements The Project requires environmental

More information

Integra Underground Section 96(1A) Application Statement of Environmental Effects. Delivering sustainable solutions in a more competitive world

Integra Underground Section 96(1A) Application Statement of Environmental Effects. Delivering sustainable solutions in a more competitive world Integra Underground Section 96(1A) Application Statement of Environmental Effects Integra Coal Operations May 2008 0082094 FINAL www.erm.com Delivering sustainable solutions in a more competitive world

More information

Independent Environmental Audit

Independent Environmental Audit November 2014 Independent Environmental Audit Trevor Brown & Associates APPLIED ENVIRONMENTAL MANAGEMENT CONSULTANTS Independent Environmental Audit November 2014 Independent Environmental Audit November

More information

tel fax ABN

tel fax ABN AECOM Australia Pty Ltd Level 21, 420 George Street Sydney NSW 2000 PO Box Q410 QVB Post Office NSW 1230 Australia www.aecom.com +61 2 8934 0000 tel +61 2 8934 0001 fax ABN 20 093 846 925 15 June 2018

More information

Appendix General Environmental Risk Analysis

Appendix General Environmental Risk Analysis Proposed Solar Power Station Near Moree, NSW (MOREE SOLAR FARM) Appendix Prepared by BP Solar & Walsh Consulting January 011 Background The body of the identifies all significant environmental risks identified

More information

ASSESSMENT REPORT. ALBION PARK QUARRY Increased Production Rate Modification (10639 of 2005 MOD 2)

ASSESSMENT REPORT. ALBION PARK QUARRY Increased Production Rate Modification (10639 of 2005 MOD 2) ASSESSMENT REPORT ALBION PARK QUARRY Increased Production Rate Modification (10639 of 2005 MOD 2) 1 BACKGROUND Cleary Bros (Bombo) Pty Ltd owns and operates a hard rock quarry and processing plant near

More information

Balranald Mineral Sands Project

Balranald Mineral Sands Project Balranald Mineral Sands Project NSW Environmental Impact Statement Prepared for Iluka Resources Limited May 2015 Volume 2 Appendix A - Secretary's Environmental Impact Assessment Requirements Appendix

More information

Executive Summary INTRODUCTION THE APPLICANT

Executive Summary INTRODUCTION THE APPLICANT ENVIRONMENTAL IMPACT STATEMENT EMC METALS AUSTRALIA PTY LTD INTRODUCTION This Environmental Impact Statement (EIS) has been prepared by R.W. Corkery & Co. Pty. Limited on behalf of EMC Metals Australia

More information

STATE SIGNIFICANT DEVELOPMENT ASSESSMENT Metz Solar Farm (SSD 7931)

STATE SIGNIFICANT DEVELOPMENT ASSESSMENT Metz Solar Farm (SSD 7931) STATE SIGNIFICANT DEVELOPMENT ASSESSMENT Metz Solar Farm (SSD 7931) 1. BACKGROUND Infinergy Pacific (the Applicant) proposes to develop a new 100 megawatt (MW) solar farm near Armidale in the Armidale

More information

ENVIRONMENTAL IMPACT STATEMENT

ENVIRONMENTAL IMPACT STATEMENT RED HILL MINING LEASE ENVIRONMENTAL IMPACT STATEMENT Section 02 Project Rationale and Alternatives Section 02 Project Rationale and Alternatives 2.1 Project Rationale 2.1.1 Project Need The Red Hill Mining

More information

LEPs and SEPPs. Planning, Development & Heritage. Local environmental plans (LEPs) Last updated: January 2013

LEPs and SEPPs. Planning, Development & Heritage. Local environmental plans (LEPs) Last updated: January 2013 Planning, Development & Heritage LEPs and SEPPs Last updated: January 2013 These Fact Sheets are a guide only and are no substitute for legal advice. To request free initial legal advice on an environmental

More information

ENVIRONMENTAL MANAGEMENT STRATEGY

ENVIRONMENTAL MANAGEMENT STRATEGY ENVIRONMENTAL MANAGEMENT STRATEGY ASHTON COAL PROJECT Version D Date: 2 June 2017 CONTENTS 1 PURPOSE...3 2 SCOPE...4 2.1 Background and Project Overview... 4 2.2 Strategic Context and Scope... 7 3 PROCEDURAL

More information

Report by the Mining & Petroleum Gateway Panel to accompany a Conditional Gateway Certificate for the West Muswellbrook Project

Report by the Mining & Petroleum Gateway Panel to accompany a Conditional Gateway Certificate for the West Muswellbrook Project Report by the Mining & Petroleum Gateway Panel to accompany a Conditional Gateway Certificate for the West Muswellbrook Project May 2015 1 Report by the Mining & Petroleum Gateway Panel to accompany a

More information

Overview and key environmental issues

Overview and key environmental issues Blue Mountains Draft Local Environmental Plan 2013 1 Information Sheet 4 Overview and key environmental issues Use this document in conjunction with Information Sheet 5: SUBMISSION WRITING GUIDE AND SUMMARY

More information

left over, or an unwanted by-product, from an industrial, commercial, domestic or other activity; or

left over, or an unwanted by-product, from an industrial, commercial, domestic or other activity; or 14. Waste Management 14.1. Waste Management Regulations The regulatory requirements governing waste management are provided within the EP Act, the EPR and associated Environmental Protection (Waste Management)

More information

Part A - Introduction

Part A - Introduction ENVIRONMENTAL ASSESSMENT A - 1 INTEGRA COAL OPERATIONS PTY LTD Part A - Introduction Part A Preamble Introduction This Part introduces the proposal to develop an open cut coal mine within and adjacent

More information

SEARs project justification and conclusion

SEARs project justification and conclusion 31 Project justification and conclusion This chapter presents a justification for the project and a conclusion to the environmental impact statement (EIS). The justification is based on the strategic need

More information

WAMBO COAL PTY LTD ATTACHMENT 1 ENVIRONMENTAL ASSESSMENT NORTH WAMBO UNDERGROUND MINE MODIFICATION WAMBO CONSOLIDATED DEVELOPMENT CONSENT

WAMBO COAL PTY LTD ATTACHMENT 1 ENVIRONMENTAL ASSESSMENT NORTH WAMBO UNDERGROUND MINE MODIFICATION WAMBO CONSOLIDATED DEVELOPMENT CONSENT WAMBO COAL PTY LTD NORTH WAMBO UNDERGROUND MINE MODIFICATION ENVIRONMENTAL ASSESSMENT ATTACHMENT 1 WAMBO CONSOLIDATED DEVELOPMENT CONSENT Development Consent Section 80 of the Environmental Planning &

More information

3.0 Natural Resource Management Policies. 3.4 Resource Extraction Policies

3.0 Natural Resource Management Policies. 3.4 Resource Extraction Policies 3.0 Natural Resource Management Policies 3.4.1 Mineral Aggregates INTRODUCTION Oxford County is characterized by significant reserves of mineral aggregates, including bedrock-derived crushed stone and

More information

in brief corrs Delivery of the Strategic Regional Land Use Policy What it means for coal and gas projects on or near strategic agricultural land

in brief corrs Delivery of the Strategic Regional Land Use Policy What it means for coal and gas projects on or near strategic agricultural land corrs in brief Delivery of the Strategic Regional Land Use Policy What it means for coal and gas projects on or near strategic agricultural land The NSW Government has recently released a number of draft

More information

Consultation Regulatory Impact Statement

Consultation Regulatory Impact Statement Consultation Regulatory Impact Statement Post Implementation Review of the Industry Levy to fund the petroleum and gas water functions of the Office of Groundwater Impact Assessment December 2016 This

More information

Works, services and infrastructure code

Works, services and infrastructure code 9.4.11 Works, services infrastructure code 9.4.11.1 Application (1) This code applies to assessable development identified as requiring assessment against the Works, services infrastructure code by the

More information

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PIRMP)

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PIRMP) Established 1907 POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PIRMP) DATE: JULY 2018 Version Date Section Modified 1 July 2018 All Reason for Modification Original Management Plan Review Team MCC Environmental,

More information

SUBMISSION. NSW Department of Primary Industries - Water Draft Water Sharing Plan for the North Coast Fractured and Porous Rock Groundwater Sources

SUBMISSION. NSW Department of Primary Industries - Water Draft Water Sharing Plan for the North Coast Fractured and Porous Rock Groundwater Sources SUBMISSION NSW Department of Primary Industries - Water Draft Water Sharing Plan for the North Coast Fractured and Porous Rock Groundwater Sources March 2016 0 NSW Minerals Council PO Box H367 Australia

More information

Coal Mine ENVIRONMENTAL ASSESSMENT. Proposed Stage 3 Extension to Underground Mining & Associated Infrastructure VOLUME 1 Main Text Appendices 1-5

Coal Mine ENVIRONMENTAL ASSESSMENT. Proposed Stage 3 Extension to Underground Mining & Associated Infrastructure VOLUME 1 Main Text Appendices 1-5 Austar Coal Mine Austar Coal Mine ENVIRONMENTAL ASSESSMENT Proposed Stage 3 Extension to Underground Mining & Associated Infrastructure VOLUME 1 Main Text Appendices 1-5 O C T O B E R 2 0 0 8 Umwelt Environmental

More information

LIDDELL COAL OPERATIONS

LIDDELL COAL OPERATIONS LIDDELL COAL OPERATIONS APPENDIX T Economic Assessment (Gillespie Economics, 2013) APPENDICES Liddell Coal Operations Proposed Modification Economic Assessment Prepared for Liddell Coal Operations Pty

More information

Office of Coal Seam Gas

Office of Coal Seam Gas Office of Coal Seam Gas Reviewing the regulatory outlook for Coal Seam Gas development in NSW 28 February 2014 Rachel Connell Director, Office of Coal Seam Gas Titles Existing Renewals New Petroleum Exploration

More information

2.0 Description of Existing Mine Operations

2.0 Description of Existing Mine Operations 2.0 2.1 Mine History Austar Coal Mine is an amalgamation of several older mines and operates within a number of mining leases under 12 separate development consents issued by Cessnock City Council between

More information

Mineral Identified: Hybrid Climax Style Porphyry Molybdenum with copper / silver overprint Mineralisation Age: 418Ma

Mineral Identified: Hybrid Climax Style Porphyry Molybdenum with copper / silver overprint Mineralisation Age: 418Ma 1. DEVELOPMENT RATIONALE Dart Mining NL (Dart) has submitted an application for a retention Licence (RL006616) over the project footprint of the Unicorn Porphyry and associated key mining infrastructure

More information

Chapter 6 Objective: Protect and Enhance the Environment

Chapter 6 Objective: Protect and Enhance the Environment Chapter 6 Objective: Protect and Enhance the Environment 49 Irish Water Water Services Strategic Plan Our Strategic Aims Ensure that Irish Water services are delivered in a sustainable manner which contributes

More information

sydney + Q,-un lt-fa SCHEDULE 1 2o1s SCHEDULE 2

sydney + Q,-un lt-fa SCHEDULE 1 2o1s SCHEDULE 2 As delegate for the Minister for Planning and lnfrastructure, I 1, subject tc the conditions in Schedule 2. approval refened to in Schedule ChrisWilson Executive Director Development Assessment Systems

More information

Section 75J of the Environmental Planning and Assessment Act 1979

Section 75J of the Environmental Planning and Assessment Act 1979 Project Approval Section 75J of the Environmental Planning and Assessment Act 1979 I approve the project application referred to in Schedule 1, subject to the conditions in Schedules 2 to 4. These conditions

More information

WAMBO COAL BLAST MANAGEMENT PLAN. Document No. WA-ENV-MNP-507 July 2017

WAMBO COAL BLAST MANAGEMENT PLAN. Document No. WA-ENV-MNP-507 July 2017 WAMBO COAL BLAST MANAGEMENT PLAN Document No. WA-ENV-MNP-507 July 2017 Approved 10 July 2017 Document Control Document No. Title General Description Document Owner WA-ENV-MNP-507 Blast Management Plan

More information

RPE.3.4. Rural Production Environment. Index. RPE.1.1 Description and Expectations

RPE.3.4. Rural Production Environment. Index. RPE.1.1 Description and Expectations RPE.1 Index RPE.1 RPE.1.1 RPE.1.2 RPE.1.3 RPE.1.4 RPE.2 RPE.2.1 RPE.2.2 RPE.2.3 RPE.3 Landuse Description and Expectations Objectives Policies Guidance Note Eligibility Rules Notification Rules Discretionary

More information

Zone R2 Low Density Residential. Zone R3 Medium Density Residential. Zone IN4 Working Waterfront. Zone SP1 Special Activities. Zone SP2 Infrastructure

Zone R2 Low Density Residential. Zone R3 Medium Density Residential. Zone IN4 Working Waterfront. Zone SP1 Special Activities. Zone SP2 Infrastructure Planning Proposal Lake Macquarie Local Environmental Plan 2014 (Amendment No. 21) Rezoning at Freemans Drive, Cooranbong and Permitting Utility Infrastructure in a Range of Zones RZ/3/2014 Local Government

More information

1 Introduction 1-1. Project Need and Objectives

1 Introduction 1-1. Project Need and Objectives Introduction 1 CONTENTS 1 Introduction 1-1 1.1 1.1 Introduction Introduction 1-1 1-1 1.2 1.2 Project Overview Project Overview 1-1 1-1 1.3 1.3 Project Site Project Site 1-1 1-1 1.4 1.4 The Proponent The

More information

Mining & the Environment: What you need to know & how to have your say

Mining & the Environment: What you need to know & how to have your say Mining & the Environment: What you need to know & how to have your say Capertee Valley 13 July 2014 Belinda Rayment Solicitor Emily Ryan Outreach Solicitor About EDO NSW Community legal centre specialising

More information

LAW OF THE REPUBLIC OF INDONESIA NUMBER 7 OF 2004 REGARDING WATER RESOURCES

LAW OF THE REPUBLIC OF INDONESIA NUMBER 7 OF 2004 REGARDING WATER RESOURCES LAW OF NUMBER 7 OF 2004 REGARDING WATER RESOURCES BY THE GRACE OF THE ALMIGHTY GOD, THE PRESIDENT OF Considering : a. that water resources is the gift of the Almighty God which gives benefits for the realization

More information

Managing Country. Aboriginal Communities. Overview. Last updated: March 2013

Managing Country. Aboriginal Communities. Overview. Last updated: March 2013 Aboriginal Communities Managing Country Last updated: March 2013 These Fact Sheets are a guide only and are no substitute for legal advice. To request free initial legal advice on an environmental or planning

More information

BSM SD PLN 0126 MANAGEMENT PLAN 1. COMMITMENT AND POLICY 2. BACKGROUND. 1.1 Purpose. 1.2 Scope. 2.1 Development Consent Requirements

BSM SD PLN 0126 MANAGEMENT PLAN 1. COMMITMENT AND POLICY 2. BACKGROUND. 1.1 Purpose. 1.2 Scope. 2.1 Development Consent Requirements Blakefield South Mine MANAGEMENT PLAN 1. COMMITMENT AND POLICY 1.1 Purpose The purpose of the Construction Noise Management Plan (CNMP) is to provide a structured process for managing, monitoring and reporting

More information

E2. Water quantity, allocation and use

E2. Water quantity, allocation and use E2. Water quantity, allocation and use E2.1. Introduction E2 Water quantity, allocation and use Demand for water already equals or exceeds availability in some surface waterbodies and aquifers. Future

More information

Managing the impacts of coal mining on underground water. Daniel Larsen Principal Project Officer, Central Region

Managing the impacts of coal mining on underground water. Daniel Larsen Principal Project Officer, Central Region Managing the impacts of coal mining on underground water Daniel Larsen Principal Project Officer, Central Region Overview The assessment process The role of DNRM Current groundwater management provisions

More information

FACT SHEET Land and Property

FACT SHEET Land and Property FACT SHEET Land and Property Introduction Glencore Coal Assets Australia (GCAA) is part of the broader Glencore group, one of the world s largest global diversified natural resource companies. GCAA is

More information

Traffic Management Plan. for the. Dargues Gold Mine

Traffic Management Plan. for the. Dargues Gold Mine for the for the Diversified Minerals Pty Ltd ABN: 22 603 135 584 Level 10, 56 Pitt Street SYDNEY NSW 2000 Telephone: (02) 8272 4100 Email: info@divminerals.com.au Big Island Mining Limited ABN: 12 112

More information

8. Greenhouse Gas Emissions

8. Greenhouse Gas Emissions 8. Greenhouse Gas Emissions This section provides a summary of the greenhouse gas assessment undertaken, and the potential impacts identified, in regards to the Project (Mine) during construction and operation.

More information

Dendrobium Mine. Waste Management Plan

Dendrobium Mine. Waste Management Plan Dendrobium Mine Waste Management Plan DOCUMENT SIGN OFF SHEET AND REVISION LOG Document Owner: Authorised by: Peter McMillan 25/06/2018 (Name) (Date) Peter McMillan 25/06/2018 (Name) (Date) VERSION HISTORY

More information

BLAST MANAGEMENT STRATEGY

BLAST MANAGEMENT STRATEGY BLAST MANAGEMENT STRATEGY For Boggabri Tarrawonga Maules Creek Complex J U L Y 2 0 1 4 Idemitsu Australia Resources Boggabri Coal Pty Ltd Whitehaven Coal Pty Ltd Tarrawonga Coal Pty Ltd, Maules Creek Coal

More information

Strategic Regional Priorities for the Hunter Joint Organisation Environment Division

Strategic Regional Priorities for the Hunter Joint Organisation Environment Division Strategic Regional Priorities for the Hunter Joint Organisation Environment Division Background Hunter Councils, and now the Hunter Joint Organisation of Councils has been delivering regional environmental

More information

Development Consent Conditions

Development Consent Conditions Revision D 31 October 2008 Page J-1 Table 22 Development Consent s Development Consent s 3.9 The Applicant shall design underground mining operations to ensure no direct hydraulic connection between the

More information

17 HAZARDOUS SUBSTANCES AND WASTE MANAGEMENT

17 HAZARDOUS SUBSTANCES AND WASTE MANAGEMENT 17 HAZARDOUS SUBSTANCES AND WASTE MANAGEMENT 17.1 Background 17.1.1 Hazardous Substances Under the Resource Management Act, Council has responsibility for managing the use, development or protection of

More information

Self Assessment Questionnaire Inrushes and Subsidence Major Hazard Standard

Self Assessment Questionnaire Inrushes and Subsidence Major Hazard Standard WMC Environment, Health & Safety Management System Self Assessment Questionnaire Inrushes and Subsidence Major Hazard Standard MHS-09 DocsOpen : 57250, 11/07/2000 Uncontrolled copy check web for latest

More information

Carrington Pit Extended. Statement of Environmental Effects - Volume 1. Delivering sustainable solutions in a more competitive world

Carrington Pit Extended. Statement of Environmental Effects - Volume 1. Delivering sustainable solutions in a more competitive world Carrington Pit Extended Statement of Environmental Effects - Volume 1 Coal & Allied Operations Pty Ltd October 2005 www.erm.com Delivering sustainable solutions in a more competitive world Approved by:

More information

TABLE OF CONTENTS. Atlas-Campaspe Mineral Sands Project Environmental Impact Statement

TABLE OF CONTENTS. Atlas-Campaspe Mineral Sands Project Environmental Impact Statement TABLE OF CONTENTS 1 INTRODUCTION 1-1 1.1 PROJECT OVERVIEW 1-1 1.1.1 Purpose of this Report 1-1 1.1.2 Project Summary 1-1 1.1.3 Land Tenure, Development Application Area, Tenements and Zoning 1-7 1.1.4

More information

Appendix J Socio-Economic Assessment

Appendix J Socio-Economic Assessment Appendix J Socio-Economic Assessment MT ARTHUR COAL OPEN CUT MODIFICATION SOCIO-ECONOMIC ASSESSMENT PREPARED BY GILLESPIE ECONOMICS October 2012 HVE-11-01 DOC. ID: 482858 TABLE OF CONTENTS Section Page

More information

Land to the South of Old Mill Road, Sandbach Environmental Impact Assessment Environmental Statement: Non-Technical Summary

Land to the South of Old Mill Road, Sandbach Environmental Impact Assessment Environmental Statement: Non-Technical Summary Environmental Impact Assessment Report prepared by: Ecus Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW 0114 266 9292 September 2013 Page Left Intentionally Blank 2 INTRODUCTION This Non Technical

More information

H28. Special Purpose Quarry Zone

H28. Special Purpose Quarry Zone H28. Special Purpose Quarry Zone H28.1. Zone description Mineral resources are important to Auckland s economy and development. The Special Purpose Quarry Zone provides for significant mineral extraction

More information

Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary

Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until 2035 Non Technical Summary SLR Consulting Limited Project Ref: 403.00079.00474

More information

aemc Wambo Coal Mine Independent Environmental Audit - June August 2011 Prepared for: Wambo Coal Pty Limited PMB 1 Singleton NSW 2330

aemc Wambo Coal Mine Independent Environmental Audit - June August 2011 Prepared for: Wambo Coal Pty Limited PMB 1 Singleton NSW 2330 Wambo Coal Mine Independent Environmental Audit - June 2011 18 August 2011 Prepared for: Wambo Coal Pty Limited PMB 1 Singleton NSW 2330 Report by: Trevor Brown & Associates ABN: 23 084 906 963 3 Forwood

More information

State Environmental Planning Policy (Infrastructure) 2007

State Environmental Planning Policy (Infrastructure) 2007 New South Wales State Environmental Planning Policy (Infrastructure) 2007 under the Environmental Planning and Assessment Act 1979 Her Excellency the Governor, with the advice of the Executive Council,

More information

Stratford Extension Project Technical Overview

Stratford Extension Project Technical Overview Stratford Extension Project Technical Overview November 2012 Yancoal Australia Limited Level 11, 68 York Street Sydney NSW 2000 Stratford Coal Pty Ltd 3364 The Bucketts Way Stratford NSW 2422 PO Box 168

More information

Application for Subsidence Management Approval. Subsidence Management Plan ANNEX D. Bettys Creek Subsidence Management Plan

Application for Subsidence Management Approval. Subsidence Management Plan ANNEX D. Bettys Creek Subsidence Management Plan Application for Subsidence Management Approval Subsidence Management Plan ANNEX D Bettys Creek Subsidence Management Plan Subsidence Management Plan Bettys Creek Glennies Creek Longwall Panels 10 to 17

More information