Real title. Unlocking Remote Oilfield Development. SMi Gas to Liquids Conference 25 th 26 th October 2011 LONDON

Size: px
Start display at page:

Download "Real title. Unlocking Remote Oilfield Development. SMi Gas to Liquids Conference 25 th 26 th October 2011 LONDON"

Transcription

1 Real title Unlocking Remote Oilfield Development SMi Gas to Liquids Conference 25 th 26 th October 2011 LONDON Iain Baxter Director of Business Development CompactGTL plc Slide CompactGTL plc

2 Stranded Oil! Satellite image of gas flaring in Nigeria 250 km Slide CompactGTL plc

3 Options for Associated Gas (ANG) Distance to market for converted product [km] Modular GTL Gas to Wire 50 Reinjection & Flaring CNG 200 Associated Gas MMscf/d FLNG Pipeline 400 Slide CompactGTL plc

4 Emerging offshore ANG utilization options CNG High infrastructure cost Economics favourable at 200+ MMscfd Limitations: High gas rate needed & sensitive to distance to market FLNG High infrastructure cost Economics favourable at 400+ MMscfd Limitations: High gas rate needed Gas to Wire High cost for deep water and remote fields Limitations: Low gas rate only & sensitive to distance to market Slide CompactGTL plc

5 ANG : An increasing obstacle to Oil E&P where: High distance of oilfield to ANG market Distance to gas infrastructure Distance to power transmission infrastructure Constrained by political or commercial borders Difficult terrain Low ANG flowrates Low, non-commercial ANG flow-rates ( MMscf/d) Production decline over field life Flaring constraints Local & National Government World Bank IOC environmental governance Re-injection constraints Reservoir susceptible to damage or gas break-through Cost of deep re-injection well completions & equipment High reservoir pressure Slide CompactGTL plc

6 Existing Fields with Problematic ANG: Market Analysis Sample 2009 No. of Fields by Region Africa (Central) Africa (North) West Africa Australasia Caucasus Europe (North West) Europe (UK) Latin America (Atlantic) Middle East - NW Arabia Middle East - SE Arabia & Iran N America (Frontier) N America (US GoM Deepwater) Russia South East Asia Onshore 335 Existing Fields Offshore 174 Existing Fields No. of Fields by Region Africa (Central) Africa (North) Africa (Southern& East) West Africa Australasia Caucasus Central Asia latin America (Andean) Latin America (Atlantic) Middle East - NW Arabia Middle East - SE Arabia & Iran N America (Frontier) Russia South East Asia Screening Factors include: Remaining commercial liquids reserves > 50 AND <400mmbbls Distance to gas market & infrastructure GOR / Forecast associated gas production profile Slide CompactGTL plc

7 A new solution for ANG 2-50MMscf/d Modular GTL : Convert ANG to syncrude then Co-mingle and transport with the natural crude ONSHORE Slide CompactGTL plc OFFSHORE Image courtesy of SBM Offshore

8 Process Overview Modular CompactGTL Plant Feed Water Gas Treatment SMR Modules Heat Recovery & Compression FT Modules Waste Water Optional Power No Oxygen Required! Optional Gas for Power Gen ANG Syncrude Separators Oil & Liquids Processing Crude Export Slide CompactGTL plc

9 Why is this now possible? Conventional Tubular steam Reformer / ATR Conventional FT reactor e.g. slurry phase 10x increase in specific throughput Compact SMR Reactor Compact FT Reactor CompactGTL reactors using brazed plate & fin construction Slide CompactGTL plc

10 Workable ANG Solution - Requirements Production decline scaleability High availability & operability Gas composition variability Feasible utilities Feasible effluent streams Onshore: Poor infrastructure/ access Offshore: FPSO integration & certification Flexible, Modular Plant No catalyst handling on site Slide CompactGTL plc

11 Oilfield Development Benefits Creates Win-Win for all parties: Increased tax (or PSC profit oil) for the NOC and Government Environmental compliance / regulatory support Oil Company in control: No gas take-off arrangements / additional marketing Project accelerator / avoids 3 rd party delays ANG bookable as reserves Bottom Line: Increased oil production revenue: From increased crude production (otherwise shut-in) From syncrude production Project N Enhancer Slide CompactGTL plc

12 Enhanced Oilfield N Case 1 : GTL vs a feasible but high cost ANG option Gas Re-Injection or Pipeline to Market Oilfield N Integrated CompactGTL Oilfield N Syncrude 10MMscfd ANG Processed to 1,000 bpd Syncrude Facilities Capital Cost Facilities Capital Cost Gas Disposal Crude Revenue GTL Plant Crude Revenue Operations & Tax Operations & Tax Penalties or Delay GTL Opex Slide CompactGTL plc

13 Enhanced Oilfield N Case 2 : GTL liberates shut-in production Existing or Planned Field subject to ANG Flaring Cap Oilfield N Integrated CompactGTL Oilfield N Liberated Crude Revenue Syncrude 10MMscfd ANG Flaring cut liberates 10,000 bpd GOR=1,000 Facilities Capital Cost Operations & Tax Existing Crude Revenue Facilities Capital Cost GTL Plant Operations & Tax Crude Revenue Slide CompactGTL plc GTL Opex

14 Solution Delivery World Class Partners Slide CompactGTL plc

15 CompactGTL Commercialisation History Lab Scale UK Pilot Plant Petrobras Plant Client Studies Commissioned Commissioned 2009 Onwards 2008 Dec Years lab scale R&D 5 Years development engineering specifically as an ANG solution 5 Years manufacturing supply chain development 3 rd Party scrutiny by world-class industry groups >3 years plant operational experience Slide CompactGTL plc

16 Demonstration Plant Construction 2009/10 Plant constructed by Zeton Inc, Burlington, Canada SMR & FT Reactors fabricated by Sumitomo Precision Products, Osaka, Japan Slide CompactGTL plc

17 World s first small scale fully integrated GTL facility! Gas pre-treatment Pre-reforming Reforming Waste heat recovery Process steam generation Syngas compression Final commissioning December 2010 Plant running and under test Slide CompactGTL plc Fischer Tropsch synthesis FT cooling water system Tail gas recycling Image shown courtesy of Petrobras

18 Client Conceptual Study Example 1: 5MMscfd ANG Deepwater Offshore Proposed oilfield development Deepwater, low GOR, 15 year life Continuous flaring not permitted Re-injection prohibitive 100km to nearest sub-sea gas line Pipeline CAPEX estimate: US$ 150MM CompactGTL Solution for CAPEX & OPEX comparable to pipeline Additional syncrude revenue No 3 rd party gas take-off No flow assurance issues Modular GTL Plant Integrated with Suezmax FPSO Slide CompactGTL plc

19 Client Conceptual Study: Example 2: 10MMscf/d ANG Onshore Existing oilfield operation GOR = 1, years life remaining Flaring reduction targets restricting production Re-injection prohibitive Terrain & distance prevent gas gathering CompactGTL Solution 10MMscf/d plant gives 1,000 bpd syncrude 10,000 bpd liberated crude production New oil revenue: US$ 150MM/yr [@ $40 oil] Pre-Tax IRR > 40% IRR insensitive to OPEX & oil price 10 MMscfd Modular Onshore GTL Plant Slide CompactGTL plc

20 CompactGTL Unlocking Remote Oilfield Development Compelling economics achievable for numerous remote oilfield developments >3 Years plant operating experience Volume reactor & catalyst supply chain fully established Highly resourced market leading FEED / EPC partners established Engineering & operations team with World-scale GTL experience Several projects globally at conceptual & pre-feed stage Slide CompactGTL plc

21 Real title Unlocking Remote Oilfield Development 21 st World Upstream Conference 19 th 21 st September 2011 GENEVA Iain Baxter Director of Business Development CompactGTL plc Slide CompactGTL plc