2 Presentation Outline History and Basic Theory State-of-the-art Designs/Products Impacts (Technical and Social) Challenges or R&D Focus True Stories of Application/Demonstration Recent Research 2
3 History Early as 5000 B.C First wind turbine 1940s Grandpa s Knob Mid-1940s s Decline in interest in wind turbines 1970s Increase in interest in wind turbine generators Now World s fastest growing energy source 3
4 Basic Theory Harness energy through wind s momentum Wind s momentum turns blades Blades turn the turbine Turbine turns generator Transformers step up voltage from generator Power flows to a substation which connects to a transmission line 4
5 Animation 5
6 Presentation Outline History and Basic Theory State-of-the-art Designs/Products Impacts (Technical and Social) Challenges or R&D Focus True Stories of Application/Demonstration Recent Research 6
7 Enercon E-126 Enercon built 7.58 MW power output Total height: 198m (650ft) Total weight: 6,000t Cost: 11,000,000 7
8 Turbine Details Gearless Variable Speed Single-blade pitch adjustment Direct-drive annular motor SCADA compatible 8
9 Presentation Outline History and Basic Theory State-of-the-art Designs/Products Impacts (Technical and Social) Challenges or R&D Focus True Stories of Application/Demonstration Recent Research 9
10 Technical Advantage Chart uses most conservative estimates Others cite Wind at 0.02 pounds CO2 / kwh Coal estimates as high as 3.6 and natural gas as high as 2 pounds CO2/ kwh 10
11 Technical Disadvantage Source: International Energy Agency Distributing wind farms smooths output power Smoother output curves, less output variability Less variability, less cycling costs 11
12 Technical Impact 12
13 Environmental Impact 13
14 Social Impact 14
15 Impacts Overall Technical: + Renewable + No pollutants + Low operating costs + Scalable - EM Noise - Variability - Transmission Social: + Lease payments + Economic stimulus - Visual impact - Bird/bat mortality - Community conflict
16 Presentation Outline History and Basic Theory State-of-the-art Designs/Products Impacts (Technical and Social) Challenges or R&D Focus True Stories of Application/Demonstration Recent Research 16
17 Disadvantages (Onshore) Reliability/Efficiency Wildlife Noise Aesthetics Geography Land Use
18 Disadvantages (Offshore) Price To Build Hurricane Force Winds High Risk Price For Customers ($1850/KWh) Elements
19 R&D in Wind Power Increasing Efficiency Reducing Cost Floating Point Structures Permit Timelines Weather Modeling
20 Presentation Outline History and Basic Theory State-of-the-art Designs/Products Impacts (Technical and Social) Challenges or R&D Focus True Stories of Application/Demonstration Recent Research 20
21 Overall review of China's wind power industry: status quo, existing problems, and prospective for future development
22 Background Reduce CO2 emit/gdp 40-50% by 2020 Strategy By May 2012, total capacity GW
23 Two Concepts Integrated capacity Installed capacity Gap Local consumption and transmission
24 Critical Problems Low grid access LVRT incapability of wind turbine Distribution mismatch between resources and power consumption Misalignment between wind power planning and network planning Insufficient peak regulation capability
25 Benefits Promote the market of equipment and increase the utilization of wind power Ease the contradiction between wind farms and power grid Lay a foundation for China s future
26 Future Development In the past Switch to the large consumption places Slow down large scale wind farm More distributed and small-scaled installation
27 Future Power Market Short term, main grid will support the distributed power Long term, owner of the distributed power can trade power with main grid Long-distance transmission-hvdc Connection with the HV/extra HV grid Strong Smart Grid
28 Conclusion At the fast-developing period Face several problems: Low grid access Operation problems Economic loss 2 points to achieve: Shift from concentrated construction to distributed development Enhance the transmission capacity
29 Presentation Outline History and Basic Theory State-of-the-art Designs/Products Impacts (Technical and Social) Challenges or R&D Focus True Stories of Application/Demonstration Recent Research 29
30 Low Voltage Ride Through (LVRT) Needed to avoid catastrophic cascade tripping of wind turbines. FERC Order 661A (2005). 3-phase fault with normal clearing (up to 9 cycles). Single line to ground fault with delayed clearing (24 cycles). 30
31 Magnetic Amplifier Magnetic amplifier is essentially a saturable reactor. Each core links with 2 windings: ac winding and control winding. Sufficient dc current (i c ) in control winding, core saturates (point A). Adjust i c such that core operates in linear region (point B). Amplifier since small change in i c causes large change in i a. 31
32 PMSG WT with Magnetic Amplifiers Magnetic amplifiers in series between PMSG and diode rectifier.. Each phase split into two windings to avoid demagnetization of magnetic amplifier during negative half cycle of supply voltage. 32
33 Simulation #1: No Magnetic Amplifiers DC Link Voltage IGBT Voltage Voltage dips of 30%, 60%, and 90% at 0.4 s, 0.8 s, and 1.2 s. Power from wind turbine has no where to go but dc link capacitor. When voltage dips 90%, dc link voltage approaches 2 pu. 33
34 Sim. #2: Magnetic Amplifiers Included DC Link Voltage IGBT Voltage Voltage dip of 90% at 0.5 s. Control winding PI controller senses rise in dc link voltage. Change in dc link voltage reduced dramatically. 34