1 DESIGN CRITERIA PACKAGE FOR DESIGN-BUILD SERVICES FOR FACILITY RENEWALS AT APOLLO ELEMENTARY SCHOOL PREPARED FOR: THE SCHOOL BOARD OF BREVARD COUNTY Nte: FISH plans are nt included in this dcument. PREPARED BY: 874 Dixn Bulevard, Cca Flrida Revisin 1 11/9/2015

2 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Table f Cntents 1.0 EXECUTIVE SUMMARY PROJECT SITE DESIGN GUIDELINES CODE COMPLIANCE MAINTENANCE AND ACCESSIBILITY MECHANICAL DESIGN CRITERIA ELECTRICAL DESIGN CRITERIA SCOPE OF WORK BASE BID SCHOOL SECURITY EDUCATIONAL TECHNOLOGY SAFETY AND BUILDING CODE DEFICIENCY CORRECTIONS CENTRAL MECHANICAL PLANT RENEWAL COOLING AND HEATING CONTROL SYSTEM RENEWAL AIR CONDITIONING AND AIR DISTRIBUTION EQUIPMENT RENEWAL EXTERIOR BUILDING WALL FINISH SYSTEM RENEWAL BUILDING WATER AND SANITARY PIPING SYSTEM RENEWAL ELECTRICAL DISTRIBUTION SYSTEM RENEWAL DESIGN ALTERNATIVES VARIABLE AIR VOLUME SYSTEMS DEDICATED OUTSIDE AIR UNITS BID ADDITIVES CHILLED WATER PIPING REPLACEMENT EXTERIOR DEVICES INSULATION REPLACEMENT SWITCHBOARD REPLACEMENT RESTROOM ACCESSIBILITY DOOR HARDWARE ELECTRIC WATER COOLER ACCESSIBILITY APPENDICES Prject# i Rev. 1-11/9/2015

3 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE 1.0 EXECUTIVE SUMMARY On Nvember 4, 2014, Brevard Cunty vters apprved a 1/2 cent sales tax fr a 6-year perid. This revenue is specifically designated fr schl security, educatinal technlgy and facility renewal imprvements. Reference Attachment A fr specific categries that qualify fr funding. This prject is funded by this sales tax initiative; therefre, all f the prject requirements fr the Design-Build teams shall incrprate facility renewal aspects f the existing Apll Elementary Schl campus. Basic prject requirements are identified in the Scpe f Wrk sectin f this dcument. It is the respnsibility f the Design-Build team t perfrm detailed design f the renvated facilities fr permitting, and cnstructin f said renvatins. Design-Build teams shall incrprate all Schl Bard f Brevard Cunty (SBBC) Design Guidelines and prcesses fr submittals, permitting, and staff reviews. Prject# Rev. 1-11/9/2015

4 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE 2.0 PROJECT SITE The Apll Elementary Schl campus was cnstructed in 1965 and is lcated n 15 acres in Titusville, FL and cnsists f ne riginal building (Building #1), with an area f 65,582 square feet. Three additinal classrm buildings (Buildings #2-4) were cnstructed in 1990 fr an additinal 30,761 square feet. A small flammable strage building (Building #5) was added in 1967 fr an additinal 121 square feet, and a larger material strage building (Building #6) was added in 2009 fr an additinal 432 square feet. The current capacity f the schl is at 902 student statins. Reference the Site Plan and FISH Plan fr maps f the Apll Elementary Schl campus. Because f the age f the riginal schl and deferred maintenance n the campus due t SBBC budgetary cnstraints, a large prtin f the existing electrical and mechanical systems are riginal equipment and are in need f replacement. Figure 1 Apll Elementary Schl Aerial Image Prject# Rev. 1-11/9/2015

5 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE 3.0 DESIGN GUIDELINES 3.1 CODE COMPLIANCE It shall be the respnsibility f the Design-Build team t research all cdes, standards, and requirements applicable t the prject, and t apply them t the final design. The final Cnstructin Dcuments shall als cmply with all applicable lcal, state and federal regulatins and laws current at the time f apprval. Cde cmpliance shall include (but nt limited t) the fllwing: Flrida Building Cde (FBC 2014) Building Flrida Building Cde (FBC 2014) Accessibility Flrida Building Cde (FBC 2014) Energy Cnservatin Flrida Building Cde (FBC 2014) Existing Building Flrida Building Cde (FBC 2014) Fuel Gas Flrida Building Cde (FBC 2014) Mechanical Flrida Building Cde (FBC 2014) Plumbing Flrida Fire Preventin Cde (FFPC 2014) American Sciety f Heating, Refrigeratin and Air Cnditining (ASHRAE) Natinal Electric Cde (NEC 2011) Natinal Fire Prtectin Assciatin Life Safety Cde (NFPA 101) Natinal Fire Prtectin Assciatin Fire Alarm and Signaling Cde (NFPA 72) State Requirements fr Educatinal Facilities (SREF 2014) The Schl Bard f Brevard Cunty Design Standards 3.2 MAINTENANCE AND ACCESSIBILITY The Design-Build team shall give cnsideratin t the prcess invlved in maintenance f the facility and its cmpnents. Factrs t be cnsidered include ease f access, required clearance fr service, rutes fr maintenance, travel distances required f maintenance persnnel, and efficient lcatin and distributin f maintenance facilities. The Design-Build team shall graphically shw required clearance fr equipment (including required installatin clearances and rutes) as part f the required design submittals. Prject# Rev. 1-11/9/2015

6 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE 3.3 MECHANICAL DESIGN CRITERIA GENERAL HVAC REQUIREMENTS The Design-Build team shall fllw The Brevard Pubic Schl (BPS) facility standard specificatins in additin t the fllwing criteria. HVAC system design, equipment selectin, and energy cnservatin shall meet the requirements f the 2014 Flrida Building Cde Mechanical. In additin, the latest editins f the design and applicatin guidelines f the Industrial Ventilatin Manual, ASHRAE Handbks, and SMACNA shall be utilized. Cling and heating lads shall be perfrmed t prperly size all equipment. The vlume f utside air/ventilatin fr all areas shall be determined by using the Ventilatin Rate Prcedure in accrdance with latest editin f ASHRAE Standard 62. The use f the Indr Air Quality (IAQ) Prcedure shall be used t achieve air quality equivalent t the Ventilatin Rate Prcedure preference. If minimum utside air ventilatin is reduced by using Glbal Plasma Slutins (GPS) bi-plar inizatin generatr prducts, then GPS IAQ spreadsheet calculatins shall be shwn n the Cnstructin Dcuments. The GPS bi-plar inizatin generatrs shall have a set f dry cntacts allwing fr the Building Autmatin System (BAS) t mnitr the unit s peratinal status. A Life Cycle Cst Analysis (LCCA) shall be perfrmed t determine the mst efficient HVAC system t be used. Prvide a cpy f the engineering cling/heating lad calculatins, LCCA and the 2014 Flrida Building Cde, Chapter 13, Flrida Energy Efficiency Cde fr Building Cnstructin (FEEC) t the BPS Facilities Department Design Services fr review during the Design Develpment. The HVAC engineering lad calculatins shall be determined using the utdr design parameters fr the mnth f AUGUST and the fllwing design parameters: Summer Design Parameters Indr Design = 76 F db and 55% RH Outdr Design = 92.2 F db and 77.8 F wb Winter Design Parameters Indr Design = 70 F db Outdr Design = 38.6 F db Atmsphere Clearness factr = 0.90 Lighting Heat Gain = 1.5 W/SF Prject# Rev. 1-11/9/2015

7 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Occupant Heat Gain (Elementary Schls) 200 BTUH Sensible & 150 BTUH Latent (Children) 250 BTUH Sensible & 200 BTUH Latent (Adults) Occupant Hurs Elementary Schls = 7:00 AM t 3:00 PM The Design-Build team shall be respnsible t retain a Test & Balance (TAB) firm t balance the HVAC system t plus 10 r minus 5 percent f design values prir t Substantial Cmpletin. Substantial cmpletin shall nt ccur until 30 days after apprval f certificatin by an independent Cmmissining agent, under cntract with the BPS, wh shall verify the results f the Design-Build team s TAB firm. Typical peratinal test and balancing shall include airside balance, waterside balance, smke detectrs, lighting cntrls, peratinal testing f cntrls, and fire and smke damper testing, if needed. Installatin f rftp equipment shuld be avided where pssible. When the installatin f rftp equipment r piping is unavidable, permissin and a waiver shall be requested frm the BPS Facilities Department. Upn apprval, a clearance f 18 inches under the equipment (if n curb is furnished) r piping shall be prvided fr rf maintenance. The equipment shall be anchred t sustain hurricane frce winds as utlined in ASCE Standard 7-98 and details f the methd f anchring shall be prvided n the mechanical drawings and detailed n the structural drawings. Ensure psitive pressure in all areas except in kitchens, tilets, custdian rms, etc. Shw CFM values n all supply and return air penings s that the system can be prperly balanced. Building psitive pressure shall nt impact the peratin f exterir drs. Nise levels due t air cnditining unit fan, ventilating equipment, ducts, grilles, diffusers and air system pressure reducing devices shall cnfrm t the RC Nise Rating Prcedure utlined in the latest editin f the ASHRAE HVAC Applicatins Handbk. Classrms and all spaces, ther than thse listed belw, shall be designed fr a nise criteria range f RC-25(N) t RC-30(N). The exceptins shall be: Crridr, Lbbies... RC-40(N) Chiller Rms... RC-60(N) Strage, Tilets, Custdial... RC-45(N) Mechanical Rms... RC-45(N) Kitchens... RC-40(N) Nte: Duct attenuatin may be necessary in certain areas. Prject# Rev. 1-11/9/2015

8 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Shuld the air cnditining equipment nise levels exceed thse listed abve, ther methds f reducing the nise levels shall be entertained and require apprval by the BPS Facilities Department. Exterir-installed air-cled chillers, pumps, cling twers and accessries shall be designed s that the nise levels d nt exceed the lcal Cunty Nise Ordinances at the prperty line r be transmitted t an adjacent classrm. All air cnditining equipment installed n grade such as air-cled chillers, cling twers, DX cndenser units, etc., shall be prvided with enclsures t prevent unauthrized access. Enclsures arund air-cled chillers r cling twers shall be an aesthetically-pleasing and sund-attenuating CMU wall enclsure in lieu f using chain-link fencing. Grade-munted A/C equipment such as DX cndenser units may be enclsed with chain-link fencing. Special attentin and cnsideratin shall be prvided when air-cled chillers r cling twers are t be lcated adjacent t residential areas. Nise levels generated by this and ther equipment shall nt exceed 55 dba at the prperty line. Cnsultant t review lcal requirements. The fllwing requirements shall be adhered t by the Design-Build team in rder t ensure that final cnstructin dcuments are crrect and brught up-t-date. Field verificatin shall be perfrmed by the Design-Build team. The Design-Build team shall verify all existing cnditins t ensure the feasibility f cnstructin in rder that the wrk can be perfrmed in a timely manner and t prevent cnflicts and/r delays in the field during cnstructin. A cmplete set f demlitin plans fr areas within the scpe-f-wrk shall be prvided as part f the cntract dcuments. Demlitin plans shall include ALL mechanical equipment such as HVAC air handling units (AHU s), ductwrk, ductwrk sizes including CFM values, exhaust fans, natural r prpane gas system, sanitary system, strm drain system, dmestic water system plumbing fixtures, etc., whether the equipment r systems are t remain, t be remved, r t be reused. A cmplete updated set f remdeled r renvated plans fr areas within the scpe f wrk shall be prvided and shall include all new mechanical equipment such as HVAC AHU s, ductwrk, ductwrk sizes including CFM values, exhaust fans, natural r prpane gas system, sanitary system, strm drain system, dmestic water system, plumbing fixtures, etc. Plans shall als include the new plumbing fixture cunt (fixture units) being added t the existing sanitary system. Shuld the existing HVAC system be extended t serve new areas, the AHU and all terminal devices serving areas ther than thse in the scpe f wrk (but n the same HVAC system), shall als be prperly rebalanced. The entire system alng with the new CFM values shall be shwn n the plans. Prject# Rev. 1-11/9/2015

9 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE All existing HVAC equipment t be reused in existing schl facilities requiring renvatin wrk shall be shwn n schedules n the plans by the Design-Build team. The existing HVAC cntrls shall be replaced t satisfy the life safety cde and energy cnservatin requirements. All existing equipment, electrical data and capacities shall be listed s that prper testing and balancing can be perfrmed. In additin, the Design- Build team shall prvide a maintenance schedule describing all cleaning and repair wrk t be perfrmed, if required. Unless therwise specified, when selecting HVAC, plumbing r ther mechanical equipment, a minimum f three manufacturers cmplete with selected series types shall be prvided. All new HVAC equipment shall be tagged and identified in a sequential numerical frmat in crdinatin with the existing HVAC equipment s as nt t repeat AHU numbers, exhaust fan numbers, etc. Fr all mechanical cmpnents requiring maintenance (AHU s, VAV terminal units, dampers, valves, etc.) that are installed abve drpped ceilings, the lcatins shall be marked n the ceiling grid with hard plastic labels indicating the equipment tag infrmatin. HVAC SYSTEM Bth air-cled and water-cled chilled water systems shall be designed s that each zne air handling unit (AHU) des nt exceed a ttal f 20 HP cnnected fan mtr lad. Pre-cnditining f the utside air, if capable, shall be required t maintain humidity cntrl. Areas t be zned separately are the Administratin Area, Media Center, Music Area, Kitchen, and Dining/Multipurpse Rm. Additinal cling shall be prvided n the stage when in use fr perfrmances requiring stage lighting. Extreme care shall be prvided t maintain the prper humidity levels within cnditined spaces. The fllwing is a minimum requirement that shall be fllwed: The use f VAV systems with discharge temperature cntrls. Utilize tw-way, mdulating chilled water valves with a three way, tw psitin chilled water valve at the end f the lp t prevent pump dead-heading. In single zne systems such as required fr the kitchen and dining areas, utilize variable frequency drives t perfrm better humidity cntrl during part lad. Outside air intake ducts shall be directly cnnected t the AHU and psitined s that the utside air des nt bypass the chilled water cil with untreated air. In areas with high ventilatin rates such as dining areas, media centers, etc., avid excessive space humidity by precnditining the utdr air. The AHU s serving these areas shall have a multi-psitin utside air damper cntrlled by CO 2 sensrs lcated within the space. Prject# Rev. 1-11/9/2015

10 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Utilize an utside air pre-cnditining unit with ht gas reheat t maintain prper space humidity and temperature cnditins fr the large assembly areas and multiple classrm areas, if ecnmically justified thrugh a Life Cycle Cst Analysis (LCCA). Maintain all cnditined spaces with a minimum f 10 percent psitive pressure relative t the utdr by supplying mre utdr air than ttal exhaust. Exceptins will ccur such as the kitchen, tilets, etc., where negative pressure is a cde requirement. The water- r air-cled chillers shall be prvided with primary/secndary lps. The primary lp pumps shall be designed with cnstant vlume flw fr the chillers while the secndary lp pumps shall be designed fr variable vlume flw fr the building distributin t the AHU cils. Other methds prviding energy savings such as prviding variable vlume flw n the primary lp shall be cnsidered t determine its feasibility. In additin, autmatic islatin valves shall be prvided n each f the chiller discharge chilled water piping in rder t prevent blending when ne f the tw chillers is ffline. A cnstant air vlume (CAV) system shall be selected fr the Kitchen. The Multipurpse/Dining Rm shall be prvided with a single zne AHU equipped with a variable frequency drive mtr because f the variable lads and the large area invlved. All ther areas shall be prvided with VAV air handling systems using variable frequency drive mtrs fr fan cntrl. Variable inlet vanes are nt recmmended. VAV bxes with electric strip heaters shall be evaluated t select the system mst apprpriate fr the prject. Key evaluatin criteria shall include, but nt be limited t the fllwing: Energy efficiency Life Cycle Cst Perfrmance Cmfrt Sund Criteria The central statin air handling unit shall be duble walled with 1 inch thick/3 PCF density r 2 inch thick/1-1/2 PCF density uncmpressed insulatin having a minimum R- value f 4.2 sandwiched between the tw panels cnstructed f galvanize steel and cntain a 4 inch flat filter sectin with access mdules fr cil maintenance. The AHU unit shall cntain a slped stainless steel drain pan with a bttm drain in lieu f a flat galvanized steel drain pan. Outside air intakes shall be 18 inches (minimum) abve grade. All dampers shall be lw-leakage and crrsin-resistant. All utside air dampers shall be andized aluminum with high perfrmance gaskets. In systems designed with air-cled chillers, the cils shall be prvided with a factryapplied spray-prcessed cating fr crrsin prtectin. Prject# Rev. 1-11/9/2015

11 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Mechanical rms (lcated n the building perimeter nly) shall be prvided with a supply air diffuser supplying a minimum amunt f cnditined air in rder t prevent cndensatin frm frming n the AHU casing. The use f return air plenums, whether ceilings r mechanical rms, is nt permitted. In rder t minimize the intrductin f mist-laden utside air int the building interir during unccupied perids, prvide a mtr-perated, 2-psitin utside air damper at each f the mechanical rm utside makeup air penings arranged t pen ne-half hur befre classes start and t clse ne-half hur after classes end. The mtrized utside air dampers shall be designed t remain clsed during unccupied evenings, weekends, and hlidays. Prvisin shall als be made fr a manual vlume damper n the duct dwnstream f the mtrized utside air damper t prperly balance the required quantity f utside air. Crdinate with the structural engineer and install the AHU s n 6 inch cncrete pads in the mechanical rms. Cncrete pad shall extend a minimum f 6 inches beynd the AHU ftprint n all sides unless therwise nted and have chamfered edges. In mechanical rms, prvide a flr drain with a backwater valve and cnnect the cndensate int the site strm drain system catch basins nly after apprval by the BPS Facilities Design Services Department prir t design. Flr drains installed in frnt f the AHU where they can becme a tripping hazard are nt permitted. The installatin f thermstats in classrms and ther areas shall be crdinated with BPS facilities department. All AHU mtrs, with the exceptin f fractinal HP mtrs, shall be NEMA standard design, sund rated, and be f the grease-lubricated ball bearing type. Mtrs shall be high efficiency types wund fr specified vltage, have a minimum pwer factr f 85 t 100% lad, and a minimum efficiency f 91.7% at 100% lad per IEEE Test Prcedure 112, Methd B. All AHU three phase mtrs shall be prtected against cntact failure, lss f any phase (single phasing), lw vltage, high vltage, vltage unbalance and phase reversal. The prtectin device shall be capable f prviding autmatic pwer system range sensing, adjustable trip delay, restart delay and vltage adjustment; unbalance trip indicatr, LED status readut, and shall be as specified in the BPS Electrical Design Criteria. Prvide Y-type strainers with blwdwn valves n the CHW supply line upstream f each AHU cling cil. Als prvide a drain valve and air vent directly n each f the cling cils. Prject# Rev. 1-11/9/2015

12 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE During cnstructin, all AHU s shall be fitted with 2 inch depth, MERV 8, UL Class 2, medium efficiency, dispsable extended area, mini-pleated filters. In additin, all supply and return air ductwrk penings shall be fitted with blanket type, dispsable plyethylene sheet in rder t prevent cnstructin debris frm entering and accumulating inside the duct surfaces. At the discretin f SBBC, the AHU air filters may be remved and replaced as needed in rder t keep the cling cil and system clean. Prir t test and balance, the 2 inch cnstructin air filters shall be remved and replaced with a new set f 2 inch final air MERV 8 filters and the ductwrk pening plyethylene sheets shall be remved and discarded. The filters installed in the AHU s shall be taped t each ther t facilitate filter remval and prevent air bypass. Initial resistance f the 2 inch filters shall nt exceed 0.40 Inches WG at 500 FPM with a recmmended final resistance f 0.60 t 0.90 Inch WG. The Design-Build team shall prvide a metal strap with the end turned up at the bttm and ends f each AHU filter frame t facilitate sliding the filters ut fr easy remval and replacement. DUCTWORK The supply, return and utside air ductwrk shall be fabricated f galvanized steel and sealed in cmpliance with SMACNA HVAC Duct Cnstructin Standards Metal and Flexible. The use f fiberglass duct bard fr duct cnstructin r expsed fiberglass duct liner is nt permitted in all existing r new facilities. Fr rectangular ductwrk f pressure classes 2 t 4, ensure that duct is fabricated with Pittsburgh lck seam cnstructin. Snaplck seam cnstructin f any variety fr 2 t 4 pressure class rectangular duct is nt permitted. Fr single wall and duble wall rund r val ductwrk f pressure classes 2 t 4, ensure that ductwrk is fabricated with spiral lck seam cnstructin. Snaplck seam cnstructin f any variety fr 2 t 4 pressure class ductwrk is nt permitted. Fittings are t be fabricated by the same manufacturer as the ductwrk. Fr single wall and duble wall rund r val ductwrk f pressure classes 2 and lwer, ducts with dimensins greater than 12 inches are t be fabricated with spiral lck seam cnstructin. Snaplck seam cnstructin n rund r val ductwrk f 12 inches r less is permissible. Prvide duble wall insulated duct fr use as a sund attenuatin liner fr the first 20 feet f supply and return air ducts ff the AHU. In rder t attenuate nise and fr flexibility, use UL 181 Class 1 cmmercial grade insulated flexible duct t cnnect the supply air diffusers and return air grilles t the supply and return air distributin duct. Flexible duct shall have a minimum R-value f 6.0 and be cnstructed f an aluminum fil laminate inner cre liner encapsulating a steel wire helix, factry installed high density fiberglass blanket insulatin, and a metalized reinfrced vapr barrier jacket. Hard duct drps shuld nly be used as a last ptin. Flexible duct shall be ne-piece and shall be installed per SMACNA standards. Prject# Rev. 1-11/9/2015

13 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Exhaust ductwrk shall be fabricated f galvanized steel. The supply and return air ducts shall be fully insulated lcated in uncnditined spaces r in mechanical rms. Outside air ducts shall als be insulated. The exhaust ducts shall be uninsulated. Supply and return air duct insulatin in cncealed areas shall be fiberglass blanket insulatin f a minimum R-6 insulatin value. In expsed areas such as mechanical rms, rigid fiberglass insulatin bard in lieu f fiberglass blanket insulatin shall be used ver the ductwrk. 12 gauge galvanized steel impale type anchr pins adhered t the duct exterir with mastic shall be prvided. The use f self-adhesive type anchr pins fr the fiberglass blanket insulatin is nt permitted. Where duble wall insulated duct is prvided in areas such as mechanical rms, the use f external rigid fiberglass insulatin bard will nt be required. All expsed ductwrk nt cntaining insulatin shall be cleaned, primed, and painted with tw cats f paint. The clr shall be selected by the architect. The supply and return air ducts shall be prvided with 45 she taps and vlume dampers. Shuld 45 branch takeffs (she taps) nt be apprpriate, tw-piece rund bellmuth spin-in r tw-piece cnical takeffs prvided with vlume dampers will be acceptable. Supply and return air duct branches r sub-branches are t be prvided with vlume dampers fr balancing purpses. Smke detectrs are required n the supply air and return air ductwrk f the AHU units. The supply air smke detectr shall be installed in the ductwrk dwnstream f the unit discharge but befre the electric resistance duct heater. Smke detectrs shall nt be required n AHU s having a capacity f less than 2000 CFM. Duct sealers such as mastic shall be water-based, fire resistive, nn-txic and cmpatible with mating materials. Under n circumstances will the use f petrleumbased prducts be permitted fr duct r insulatin sealant r adhesive purpses. Mastic sealant shall be applied t all duct transverse jints and lngitudinal seams. HVAC r exhaust ducts shall nt be supprted frm jist crss and lateral bracing r frm galvanized steel decking. Shuld the deck be cnstructed f cncrete, supprt frm the cncrete deck shall be permitted. During duct system cnstructin, prvide temprary clsure such as with taped plyethylene sheet n all pen ductwrk t prevent cnstructin dust frm entering and accumulating inside ductwrk. After installatin, and prir t test and balance, the duct system shall be cleaned by frcing high velcity air thrugh it t remve the accumulated cnstructin dust. T btain sufficient air, half the system shuld be cleaned at a time dependent n the system size. Equipment that may be subject t damage frm excessive dust r dirt shall be prtected with cnstructin filters r bypassed during cleaning. Prject# Rev. 1-11/9/2015

14 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE A duct leakage test shall be perfrmed n all 2 t 4 pressure class duct systems prir t being insulated in rder t determine the integrity f the duct. Maximum duct leakage rate shall nt exceed 2% f the ttal design CFM at 1-1/2 times the design external static pressure. 2 and lwer pressure class duct systems are nt required t have a duct leakage test perfrmed. The Design-Build team shall be respnsible fr test and balancing f the system upn cmpletin. Fr grid-type ceilings, the ceiling supply air diffusers shall be 2 x 2 lay-in aluminumluvered types with rund necks. Ceiling return air grilles shall be aluminum hinged, luvered, r eggcrate types. The tp panel f the S/A diffuser abve the ceiling shall be fully insulated with the uter edges f the insulatin adhered t the ceiling grid with silver fil tape. The use f perfrated type diffusers fr supply air is nt permitted. Fr plastered ceilings such as in the kitchen, the ceiling supply air diffusers shall be surface-munt aluminum-luvered. Ceiling return air grilles shall be aluminum hinged, luvered types. The tp panel f bth the supply air diffusers and the return air grilles abve the ceiling shall be fully insulated. The use f perfrated type diffusers fr supply air is nt permitted. Duct penings in smke barrier walls shall be prvided with smke dampers in accrdance with the 2014 FBC Mechanical Cde. Electrical cnnectin shall be perfrmed by the fire alarm specialist. In buildings nt cntaining a supervised autmatic fire sprinkler system, duct penings in the ne hur fire rated crridr shall be prvided with fire/smke dampers. Electrical cnnectin shall be perfrmed by the fire alarm specialist. All fire dampers, smke dampers, cmbinatin fire/smke dampers, duct heaters and autmatic temperature cntrl devices shall be prvided with access drs f the maximum size permitted by the duct dimensins. Access drs shall be hinged with cam latches and fully gasketed t the perimeter. Labels shall be prvided t identify lcatins f dampers. VENTILATION AND EXHAUST In building perimeter tilets and custdian rms, use ceiling exhaust fans cntaining gravity dampers and terminating with a brick vent r extruded aluminum luver. Shuld a sidewall exhaust nt be pssible, then terminate with a rftp cap. Minimize all rf penetratins at all times in rder t prevent ptential rf leaks. All gang tilet exhaust fans, exhaust fans serving multiple single-user restrms (if served by a cmmn AHU), and general purpse exhaust fans in assembly areas such as dining rms, auditriums, etc., shall be started and stpped by the BAS in accrdance with the ccupancy schedule. The exhaust fan(s) shall perate cntinuusly and the assciated AHU s utside air cntrl damper shall remain in the pen psitin during ccupied hurs. The fan(s) shall turn ff and utside air damper clse during evenings, weekends and hlidays when the building is unccupied. Prject# Rev. 1-11/9/2015

15 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Ceiling-munted exhaust fans in custdian rms that are nt cntrlled by the BAS shall be electrically interlcked t the AHU serving that zne s that the exhaust fan perates when the AHU is energized. These areas shall be cntinuusly exhausted during ccupied perids. Operatin f exhaust fans that serve nly a single-user restrm shall be interlcked with the restrm light switch. In flammable strage rms, prvide a mechanical ventilatin system cnsisting f an explsin-prf upblast exhaust fan sized fr twenty (20) air changes per hur. The galvanized steel exhaust duct main shall split int tw vertical branches extending frm flr t ceiling in rder t exhaust fumes frm bth the flr and ceiling levels. The exhaust fan shall perate cntinuusly. In the kitchen and multi-purpse/dining area, prvide full dr width, crrsin-resistant galvanized steel insect fly fans with adjustable full length discharge nzzles ver every exterir dr. Ensure that each insect fly fan unit is energized with a dr micrswitch fr autmatic peratin. Kiln rms cntaining either ne r tw kilns shall be capable f exhausting a capacity based n twenty (20) air changes per hur. Typically, single kiln installatins shall be exhausted at the rate f 200 CFM. The exhaust fan shall be autmatically started and stpped by a wall-munted thermstat, with a setpint f 85 F. All new exhaust fans, supply air fans, etc., shall be tagged and identified in a sequential numerical frmat in crdinatin with the existing equipment s as nt t repeat the existing exhaust fan r supply fan numbers. CHILLED AND CONDENSER WATER PIPING The Design-Build team shall furnish the initial treatment f the chilled water system and prvide ne year treatment service. The ne year treatment service shall include mnthly inspectins, with the system treated as necessary. A mnthly reprt shall be submitted t Plant Operatins and Maintenance. Prvisin shall be made by the Design-Build team fr furnishing and installing the chemical pt feeder, wells, taps, electrical service and the required piping cnnectins. The electrical services shall include a 120 vlt dedicated service t the water treatment system and a 120 vlt hkup t the slenid fr bleed purpses. Only Schedule 40 black steel pipe with welded jints and dielectric fittings at pints f cnnectins t dissimilar metals shall be apprved fr the chilled water (CHW) and cndenser water (CW) main piping. Abve grund chilled water piping runuts t the individual AHU s f sizes 2 inches and smaller may be Type L cpper nt t exceed 20 feet in length. Usage f PVC pipe fr the chilled and cndenser water piping is nt permitted with the sle exceptin f the abve grund cndenser water cnnectin t the cling twer, which shall be schedule 80 PVC. Undergrund piping shall be duble-walled black steel. Prject# Rev. 1-11/9/2015

16 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Upn installatin, and after pressure testing, the chilled water and cndenser water piping shall be flushed with water in rder t remve sand and ther freign cntaminants. Undergrund chilled water and cndenser water piping shall nt be installed less than 36 inches belw grade and shall be prvided with expansin lps as necessary. A detail f the expansin lp with dimensins shall be shwn n the plan. As-built drawings fr the undergrund piping shall include centerline distances frm existing buildings and tp f pipe elevatins. Upn cmpletin f the chilled water and cndenser water piping installatin and prir t insulating the basket strainers, the Design-Build team shall flush the piping systems with water in rder t remve sand and ther freign cntaminants. The strainers shall be remved, cleaned and re-installed during this cleaning prcedure. The chilled water and cndenser water piping shall be chemically cleaned by the Design-Build team in rder t remve mill slag, dirt, il and/r ther freign cntaminants. The strainers shall then be remved again, cleaned and reinstalled. Upn cmpletin, the chilled water and cndenser water piping shall be drained, flushed and a nitrite slutin shall be applied t prevent pipe xidatin. When field-insulating the black steel chilled water piping in bth the building interir and exterir spaces, tw-piece pre-frmed fam glass insulatin such as Famglas as manufactured by Pittsburgh Crning with Pittwrap CW jacket fr undergrund piping will be used. The use f factry pre-insulated plyurethane fam black steel pipe with extruded PVC r high density plyethylene jacket such as manufactured by Thermacr, Perma-Pipe, Rvanc, Thermal Pipe, r Insul-Tec is apprved fr exterir undergrund piping nly. Fiberglass insulatin will nt be apprved. Details f the undergrund chilled water and cndenser water pipe anchrs, sleeves and expansin lps r jints shall be shwn n the plans. Install the valves inside the building mechanical rms in an accessible lcatin. Valves fr the chilled water system shall be as fllws: Brnze bdy ball valves with stainless steel balls and stems fr islating and thrttling duty in sizes up t 2-1/2 inches. Bubble-tight, ductile irn, lug bdy butterfly valves with EPDM seats and silicn brnze discs fr islating and thrttling duty in sizes 3 inches and larger. Ductile irn bdy plug valves fr precisin balancing applicatins. Required at each piece f equipment, branch tap, main riser and at ther lcatins t allw system islatin and balancing. All valves shall be tagged and the lcatins marked when installed abve ceilings. Prject# Rev. 1-11/9/2015

17 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE CHILLERS Water- r air-cled chillers shall cntain refrigerants nt scheduled t be phased ut immediately, such as HCFC-123, HFC-134A r HFC-410A refrigerants. Prvide an air-cled chiller with multiple refrigeratin circuits r water-cled chiller with minimum 2 cmpressrs and cling twer with variable speed fan drives. Chillers shall be prvided with the manufacturer s micrprcessr mdule in additin t an internet interface t the BPS Energy Management System specified in the BPS Specificatins. The EMS shall be able t mnitr, display and cntrl the data available frm the chiller micrprcessr mdule. The chiller shall be Enabled by a single cntact clse at the Central Cntrl Panel. The chiller manufacturer shall prvide all the recmmended high and lw alarm limits t be set n the EMS. The chiller manufacturer s startup persnnel shall setup the new chiller t perate with the manufacturer s reset schedule utilizing the chilled water return temperature. When the existing water-cled r air-cled chiller is t be replaced at an existing schl facility, the replacement chiller must be specified within the FPL Chiller Prgram criteria. Fr further infrmatin, please cntact the FPL Prgram Specialist. Refrigerants frm all water-cled chillers at existing schl facilities scheduled fr replacement and cntaining CFC-11 r CFC-12 shall be recvered by the BPS District Maintenance persnnel. All ther HVAC equipment refrigerant recvery shall be the respnsibility f the Design-Build team in cmpliance with the Clean Air Act. The chiller water makeup line shall be prvided with a pressure reducing backflw preventer similar t the Wilkens #975RPZ r Watts #909RP backflw preventer t prevent cntaminatin f the dmestic water line. Unless the design criteria requires a higher pressure, adjust the PRV t maintain 12 PSI pressure n the chilled water pump suctin. Refrigerant discharge t the atmsphere is permitted slely fr the water-cled chiller pressure relief device r rupture seal. In cmpliance with Sectin 608 f the Clean Air Act, venting chiller refrigerant int the atmsphere via the same device during servicing r dispsing f HVAC equipment is nt recmmended. All water-cled chillers cntaining either Grup A1 refrigerants such as HCFC-22 and HFC-134A r Grup B1 refrigerants such as HCFC-123 shall be prvided with a dedicated exhaust fan, xygen deprivatin sensrs, and a self-cntained xygen breathing apparatus (if applicable) lcated utside the main entrance t the chiller rm t mnitr any refrigerant leak and t warn f xygen levels belw 19.5% in accrdance with ASHRAE Standard 15. Upn activatin, the sensr shall activate an alarm lcated at all entrance drs t the chiller rm and start the exhaust fan t create rm negative pressure. Air makeup shall be prvided by means f wall luvers r ther methd apprved by the BPS Facilities Department Design Services. Prject# Rev. 1-11/9/2015

18 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE In additin t the standard manufacturer s ne year parts and labr warranty n the chiller, an extended fur year parts and labr warranty n the cmpressr and mtr shall be required. When replacing r installing a new water-cled chiller, the specificatin shall include a statement that a ttal f fifteen hurs shall be prvided fr training BPS Maintenance Persnnel by the HVAC manufacturer s technical representatives. The ttal shuld be cmprised f seven and ne-half hurs f classrm instructin and seven and ne-half hurs f hands-n training. A ttal f seven and ne-half hurs training shall be prvided fr air-cled chillers. Training shuld start at the time f equipment startup and be cmpleted prir t Substantial Cmpletin. ENERGY MANAGEMENT SYSTEM (EMS) The EMS equipment which starts and stps the HVAC equipment and ptimizes its perfrmance shall be manufactured by ne f the fllwing: Siemens, Jhnsn Cntrls, r Autmated Lgic Cntrls. The EMS shall perate n a Micrsft Windws 2012 server. All fees and licenses must be included at n additinal charge. The Central Cntrl Panel shall be lcated in the Main Equipment Rm. A simplified sequence f peratin geared t a nn-technical individual explaining the HVAC system peratin shall be installed behind a Plexiglas r lexan cver adjacent t the Cntrl Panel. An electrical schematic drawing f the equipment shall als be prvided in a similar manner fr use by repairmen during servicing f the equipment. All AHU s, Chiller, Cling Twer, pumps, general purpse exhaust fans, tilet exhaust fans, and utside air dampers shall be started and stpped frm a Central r lcal Cntrl Panel. The EMS shall be capable f prviding temperature cntrl, maintenance lgs, etc. thrugh the use f space temperature and humidity sensrs. Mnitring alarm and cntrl pints shall be prvided fr the prpsed new chiller. They shall include the fllwing as a minimum: Chiller ON/OFF Status. Chilled Water Temperature Setpint. Evapratr and Cndenser Water Flw Pressure Differential. Cmpressr Status including Current Limiting Setpint. Evapratr Entering and Leaving Water Temperature. Cndenser Entering and Leaving Water Temperature. Evapratr and Cndenser Refrigerant Temperatures. Cndenser Refrigerant Pressure. All Mtr Bearing Temperatures. All Mtr Winding Temperatures. Prject# Rev. 1-11/9/2015

19 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Phase Current fr Each Phase. Diagnstic Status. COMMISSIONING A third party cmmissining agent will be prvided by SBBC. The Design-Build team and assciated subcntractrs shall prvide all necessary labr, materials and equipment fr the entirety f the cmmissining prcess, as required by the cmmissining agent. PLUMBING All plumbing design shall be in cmpliance with the 2014 Flrida Building Cde - Plumbing, the latest American Disability Act (ADA), and the U.S Architectural and Transprtatin Barriers Cmpliance Bard. N piping carrying dmestic water shall be run thrugh any f the electrical rms, cmmunicatins equipment rms r cmmunicatin clsets. In additin, d nt penetrate dmestic water lines used fr electrical grunding thrugh and int the electrical rms. Terminate the water line utside the electrical rms and prvide grunding straps. Undergrund cpper pipe shall be installed in a cntinuus plastic sleeve free f dirt and misture. Installatin f any plumbing piping inside the blck cres f exterir walls is nt recmmended. Crdinate with the architect and install piping in furred walls. Each building sanitary drain shall be prvided with a tw-way grade cleanut within five feet f the junctin f the building drain and building sewer immediately after exiting the building. If the tw-way cleanut is installed in a grass area, it shall be embedded in an 18 x18 x4 thick cncrete pad. Each hrizntal sanitary and strm drainage pipe shall be prvided with a cleanut at the upstream end f the pipe and in changes in directin greater than 45 degrees. Offset cleanuts s that they are nt lcated in classrms r building entrances whenever pssible. Cleanuts shall be brass bdy and tp and prvided at 50 ft intervals fr hrizntal sanitary drain pipes f 3 inches r less and 100 ft intervals fr pipes 4 inches and larger. Jint cnnectins fr jining dmestic water pipe shall be free f lead. Threaded cnnectins shall be made with nn-lead bearing cmpunds. Jint cnnectins fr gas cpper pipe shall be welded r brazed with lead-free slder. All shutff valves installed n dmestic water piping in building interirs fr pipe sizes less than 3 inches shall be full flw ball valves fr pipe. The use f gate valves is nt permitted. Prject# Rev. 1-11/9/2015

20 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE All primary rf drain system strm drain runff shall be cnnected t discharge directly int the strm drain system. The use f splash blcks r discharging nt grade is nt recmmended. All secndary emergency rf drain system strm drain runff shall be terminated abve grade and at least 6 feet frm the building s edge. In n instance will the use f PVC piping, such as fr the dmestic water, sanitary, grease, strm drain, fire sprinkler systems, etc., be permitted fr abve finished flr installatin in any prtin f the building interir. Sanitary, grease and strm drain system piping installed belw grade within the building interir can be either cast irn r Schedule 40 PVC. All sanitary piping within a length f 25 feet r less frm ptential discharges f 140 F r greater must be cast irn. Dmestic water heaters fr all areas ther than the kitchen shall be sized fr a 70 F temperature rise and prvided with quarter turn full flw ball valves in lieu f gate valves n the cld and ht water supply lines. In additin, heat traps shall be prvided n the CW and the HW lines if they are nt already integral with the water heater. Whenever ht water is required fr areas such as shwers, clinic sinks, handwash sinks, lavatries, etc., the temperature f the water shall nt exceed 110 F. Shelf-munted electric water heaters shall be prvided with a galvanized steel safety pan cntaining a pan drain. Bth the 1 inch pan drain and the 3/4 inch P&T relief drain shall be made f cpper and run separately int a mp sink r flr drain. The shelfmunted water heaters in the custdian rms shall be munted clse t, but nt directly ver, the mp sink in rder t allw installatin and access t the mp rack ver the mp sink. Discharge 6 inches abve the exterir grade shall be apprved nly if n ther methd f discharge is available. Maintain headrm clearance and prvide prtectin padding if needed. Electric water heaters shall be wired and cntrlled by the BPS Energy Management System fr ON/OFF peratin in rder t de-energize the unit during unccupied perids. 3/4 inch flush-munted anti-siphn wall hydrants shall be prvided fr all building interir and exterir installatins with the sle exceptin being the mechanical rms where nly 3/4 inch hse bibbs shall be used. All wall hydrants, whether interir r exterir, shall be installed 30 inches AFF r finished grade. All dmestic ht water piping shall be insulated with 3/4 inch fiberglass insulatin. All rf drain bdies, hrizntal rf drain piping, and hrizntal waste drain piping carrying AHU cndensate shall als be insulated. Air admittance valves (AAW) used t eliminate venting t the utdrs are nt recmmended. A vent terminal shall be a minimum f 10 feet frm any dr, windw, r fresh air intake. Prject# Rev. 1-11/9/2015

21 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE 3.4 ELECTRICAL DESIGN CRITERIA NORMAL POWER DISTRIBUTION SYSTEM The Design-Build team shall visit the site, determine the present lad cnditins (max. demand) and prvide detailed infrmatin n the existing service including vltage/phases, switchgear, number f cnductrs, cnduit size, etc. The Design-Build team shall crdinate with FPL regarding the existing lad, plus the lad that will be added, t determine if the existing FPL transfrmers and/r vault need t be replaced. If the FPL service is upgraded, the Design-Build team shall determine if the existing switchgear AIC rating is apprpriate r needs t be replaced. Prvide the fllwing infrmatin n the wrking drawings. Pwer Distributin System - Indicate the fllwing characteristics: Vltage Phases Wires Ampacity Service Pint - Lcate pint f service and cnnectin t FPL surce. Main Distributin - Prvide the fllwing: Free standing switchbard/fusible/breakers Distributin panel/fusible/breakers Surge Prtectin - Manufacturer and characteristics Shrt circuit bracing fr new switchbards Fault Current - Prvide fault current analysis in symmetrical RMS amps at specified vltage. Grunding System: Cnnect t Building Steel Water system Driven grund system (minimum f tw 3/4" x 10 feet) Cnnect the telephne equipment rm grund t the service grund system. The existing electrical rm shuld be used fr the main switchbard. Ensure that this rm pens t the exterir. Prvide dedicated electrical rms thrughut the facility. N strage shall be allwed in electrical rms. Prvide vltage drp cmputatins fr all large feeders. Fr the existing facilities, the cnsultant shall test the existing grunding system and prvide a field LOG reprt fr evaluatin by the BPS Design Services Sectin. Prject# Rev. 1-11/9/2015

22 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE SITE DISTRIBUTION Systems - Ruting f all listed systems is required. Installatin: Nrmal lighting and pwer Emergency lighting and pwer Fire Alarm Intercm Televisin Telephne Energy management Electrical Service Telephne Service Cmputer Netwrking Undergrund: Individual raceways Ductbank Manhles/Handhles sized by NEC Prvide separate manhles fr nrmal pwer, emergency pwer and cmmunicatins. Grunding One Line Diagram (Pwer) - Indicate the existing installatin and new system(s). LIGHTING Ensure all new cnstructin cmplies with this sectin and the building cdes referenced elsewhere in these rules. Illuminatin f Means f Egress: Prvide illuminatin f each means f egress under prvisins with this rule fr every educatinal plan. Fr the purpses f this rule, means f egress includes designated stairs, aisles, crridrs, ramps, escalatrs, cvered walkways and ther passageways leading t the public right f way. Ensure illuminatin f means f egress is cntinuus during the time that the building is ccupied. Utilize lighting at such places fr such time as required t maintain the illuminatin t the minimum required ft-candles. Illuminate means f egress at all pints including angles, intersectins f crridrs, passageways, stairways, ramps, landings and exit dr t a minimum f nt less than ne (1) ft-candle, measured at the flr. In places f assembly, the illuminatin at the flrs f exit access may be reduced as required during perfrmances t a minimum f nt less than ne-fifth (1/5) ftcandle. Prject# Rev. 1-11/9/2015

23 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Ensure illuminatin is frm a surce f reasnably assured reliability such as public utility electric service. Arrange illuminatin s that the failure f any single lighting cmpnent such as the failure f an electric bulb r the failure f ne branch circuit will nt leave any means f egress in darkness. Where electricity is used as a surce f illuminatin f means f egress, make the installatin under prvisins f NFPA 70, Natinal Electrical Cde. General Illuminatin: Ensure illuminatin levels in educatinal facilities cnfrm t the IES lighting handbk latest editin. Design and circuit illuminatin s that the failure f any single lighting cmpnent such as an electric bulb r failure f ne branch circuit will nt leave any ccupied area in darkness. Classrm Lighting: Ensure the average initial illuminance level is nt less than 60 RAW ftcandles. Base the average initial illuminance level n a light lss factr equal t the prduct f the ballast factr (BF) when multiplied by the vltage drp factr (VDF). Vltage drp is nrmally taken as 3 percent. Therefre, the vltage drp factr will be LLF = BF x VDF = BF x All ther factrs shall be taken as ne. Ensure the minimum RAW ft-candle illuminance level is nt less than frty (40) ft-candles. The maximum allwable rate f RAW ft-candle levels at task height within any 4 ft distance frm ne anther shall be at a rati f tw t ne (2:1). Prvide a cmputer illuminance analysis printut fr every typical classrm layut and special use areas. Cnsider surface reflectance as clse as pssible t actual and prperly dcument. Base the lamp lumen utput n lamp manufacturer's published data. In specific cases, a full visibility analysis might be required, in which case visual cmfrt prbability and equivalent sphere illuminatin must be cnsidered. Classrm lighting fixtures shall be riented perpendicular t the white bard. Chalkbard Lighting: Prvide supplementary lighting fr the chalkbard s the rati f task backgrund existence t chalkbard existence des nt exceed three t ne (3:1). Indirect Lighting Systems: Ensure the surface luminance (brightness) f any surface des nt exceed 250 ft-lamberts. Ensure the unifrmity rati des nt exceed five t ne (5:1). Prject# Rev. 1-11/9/2015

24 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Emergency Lighting: Prvide emergency lighting where required by NFPA 101. In additin, prvide emergency lighting in grup tilets, electrical rms, student ccupied areas, mechanical rms serving the EHPA shelter, and the generatr rm. When maintenance f illuminatin depends upn changing frm ne energy surce t anther, ensure that there is n appreciable interruptin f illuminatin during the changever. When emergency lighting is prvided by a prime mverperated electric generatr, a delay f nt mre than ten (10) secnds shall be permitted. Suitably illuminate every exit sign by a reliable light surce. Cntinuusly illuminate externally r internally illuminated signs whether in the nrmal r emergency pwer mde. Externally Illuminated Signs: Illuminated by nt less than five (5) ftcandles and emply a cntrast rati between letters and backgrund f nt less than ne t tw (1:2). In an internally-illuminated sign with translucent letters and an paque backgrund, ensure the average luminance f the letters are a minimum f tw (2) ft-lamberts and a maximum f three (3) ft-lamberts. Illuminate the letters such that the brightest spt is nt mre than fur (4) times as bright as the darkest spt. In an internally-illuminated sign with translucent backgrund and paque letters, ensure the average luminance f the backgrund is a minimum f three (3) ft- lamberts. Illuminate the backgrund such that the brightest spt is nt mre than fur (4) times as bright as the darkest spt. Ensure the cntrast rati between letters and backgrund is at least ne t tw (1:2). In an internally-illuminated sign with translucent backgrund and translucent letters, ensure the average luminance f the brighter prtin is a minimum f six (6) ft-lamberts due t internal surces nly. Illuminate the backgrund such that the brightest spt is nt mre than fur (4) times as bright as the darkest spt. Ensure the entrust rati between letters and backgrund is at least ne t tw (1:2). D nt install self-luminus r phsphrescent exit signs in educatinal r ancillary facilities. Ensure illuminatin f exit signs are at the required level fr the emergency lighting f a minimum f 90 minutes. Illuminatin may decline t 60% f the required illuminatin level after 90 minutes. Internally-illuminated Exit Signs: Illuminated by Light Emitting Dides (L.E.D.'s) cnfigured in such a way that failure f any ne (1) single L.E.D. will nt disrupt the cntinued illuminatin f the remaining L.E.D.'s. Single Face and Duble Face Signs shall nt cnsume mre than 2 watts. Ensure the rated average life f the sign is at least 30 years. Prject# Rev. 1-11/9/2015

25 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE 4.0 SCOPE OF WORK The scpe f wrk fr this prject is primarily based n facility cnditin assessments SBBC perfrmed in Attachment E is a summary f these assessment reprts, where facility cmpnents are categrized and a Cnditin Cde is assigned t each categry. Attachment E was then filtered using the qualificatins as stated in Attachment A t create a third list, Attachment F. Attachment F shws the categries that are apprved fr schl security, educatinal technlgy and facility renewal imprvements as part f this prject, as well as the budget allwance. Specific items t be perfrmed as part f this prject that are specifically cvered under Attachment F will be cvered under the Base Bid sectin f the scpe f wrk. The Base Bid sectin has been rganized t mimic the structure f Attachment F t help facilitate the interpretatin f the reprt. On sme ccasins, repairs and/r replacements have been made since the cnceptin f the Attachment F list. In thse instances, this dcument will indicate that a repair/replacement has already been perfrmed and that part f Attachment F is n lnger part f the scpe f wrk. At SBBC s discretin, thse funds may be diverted t ther prtins f the prject. In additin t the facility renewal items as identified by SBBC s cnditin assessment reprts, there are als items included in this Design Criteria Package that were unearthed during TLC Engineering s field inspectin visits in preparatin f this reprt. The majrity f these items are included in either the Bid Alternatives r Bid Additives sectins f the scpe f wrk. The Bid Alternatives items are intended t be designed and priced as substitutins fr certain parts f the Base Bid. Bid Additives items are additinal wrk intended t be perfrmed by this prject, if budget allws. Upn prject award, it is at SBBC s full discretin as t which (if any) bid alternatives r bid additives are exercised. The anticipated cnstructin schedule fr this prject is a ne-summer break perid. It is understd, fr this t be accmplished, the Design-Build team will need enugh time fr verificatin f existing cnditins, cnfirmatin f design, cmplete final cnstructin dcuments, and t have prcurement f equipment prir t the start f summer break. It is estimated that the Design-Build team will need apprximately 7-8 mnths fr this effrt. Prject# Rev. 1-11/9/2015

26 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE 4.1 BASE BID SCHOOL SECURITY The design and cnstructin f security fencing and public access cntrl system shall be part f the scpe fr this prject. All campus buildings, playgrunds and ball field areas shall be prtected. The design shall establish a single pint f entry t a receptin with a secure dr at the schl frnt ffice fr the general public. A security camera shall be installed at this entry pint with a viewing mnitr fr the receptin area. Designated rutes fr delivery services shall remain pen and unimpeded. Prperty perimeter and service entry fencing shall be cnstructed f galvanized steel chain link. All ther security fencing shall be cnstructed with vinyl-cated chain link, except rnamental aluminum fencing shall be installed alng the frnt face f the schl. All fencing, whether security r rnamental, shall be six (6) feet high. Panic hardware with prtectin plates shall be installed at all gates t allw fr egress frm the interir f the campus. See Schl Bard f Brevard Cunty Design Standards fr mre details regarding the fencing and gate cnstructin specificatins. The Design-Build team shall crdinate with SBBC fr additinal schl-specific requirements EDUCATIONAL TECHNOLOGY The Design-Build s educatinal technlgy scpe f wrk fr this prject will include HVAC upgrades f the Cmmunicatins Equipment Rm (if necessary), additinal circuits and data drps t classrms, and inspectin and repair f existing technlgy infrastructure. Nte that the Technlgy Equipment Renewal items shwn n Attachment F will nt be part f this prject s scpe f wrk. COMMUNICATIONS EQUIPMENT ROOM HVAC The Cmmunicatins Equipment Rm (Rm 5) shall be served by a dedicated D/X mini-split system that perates cntinuusly (including unccupied perids such as nights, weekends, hlidays, etc.) while maintaining set pints f 76 F and 50% relative humidity. The Design- Build team shall perfrm heat lad calculatins fr the current equipment in the rm plus an additinal 30% capacity fr future technlgy needs. The existing D/X mini-split serving the Cmmunicatins Equipment Rm is a 1-tn Mitsubishi PKA mdel that is in satisfactry cnditin and utilizes EPA-cmpliant R410A refrigerant. If, after updated heat lad calculatins are perfrmed, the unit is apprpriately sized fr the rm, the existing mini-split system may be left in place. If nt adequately sized, the Design-Build team shall replace bth the mini-split air handler and cndensing unit as part f the base bid. Prject# Rev. 1-11/9/2015

27 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Figure 2 Cmmunicatins Equipment Rm Mini-Split System (Rm 5) TECHNOLOGY CIRCUITS As part f the educatinal technlgy upgrades scpe f wrk, the Design-Build team shall prvide tw (2) additinal dedicated 20-amp circuits int every classrm. These circuits will be used fr cmputer statins and a charging statin. Crdinate with SBBC fr desired lcatins f the new circuits. Additinally, the Design-Build team shall identify and label all circuits at the schl s campus, including existing circuits alng with thse t be installed as part f this prject s scpe f wrk. Figure 3 Example f New Circuits Prject# Rev. 1-11/9/2015

28 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE CATEGORY-6 CABLING As part f the infrastructure imprvements fr the schl s technlgy upgrade, the Design- Build team shall prvide tw data drps (D2) t be installed in every prjectr plate fund thrughut the schl s campus. Figure 4 Example f Prjectr Plate with Data Drps EXISTING RACEWAYS AND DATA As part f the educatinal technlgy base bid scpe f wrk, the Design-Build team shall inspect all existing cmputer raceways and data drps fund thrughut the schl s campus fr deficiencies and make repairs/replacements, as necessary. New Tytn raceways shall be installed where data and pwer runs need t be cmbined. Figure 5 Examples f Existing Technlgy Infrastructure Deficiencies Prject# Rev. 1-11/9/2015

29 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE SAFETY AND BUILDING CODE DEFICIENCY CORRECTIONS The existing strm water drainage system fr Building #1 is unable t adequately handle perids f heavy rainfall at the schl. A secndary verflw system was recently installed t help alleviate the main drainage system, but that system has cnsistently been verrun as well. The rainwater leaders are undersized thrughut the building, which is cntributing t many f these prblems. The Design-Build team shall evaluate the current strm drain system and implement crrective actins t bring the system in cmpliance with current plumbing cdes. The drainage system is designed t be discharged int a trench drain and then dispersed thrughut the site. This was a cmmn drainage system fr a schl f this age. As time ges n and changes are made t the site (resurfacing f pavement, cnstructin f additinal buildings, sidewalks, mechanical yards, etc.), blckages f the drainage flw away frm the building can be created. As part f the evaluatin f the strm drain system, the Design-Build team shall assess the discharges frm the rf. If the system requires mdificatin, the discharges shuld be directed t an pen area away frm any buildings CENTRAL MECHANICAL PLANT RENEWAL The central mechanical plant fr Building #1 cnsists f a 2-pipe cling/heating system with primary/secndary lps. The primary lp circulates water via tw (2) pumps (P-8 & P-9) thrugh either an air-cled chiller (cling mde) r prpane gas biler (heating mde). The secndary lp cnsists f six (6) circulating pumps (P-1 & P-2 thru P-7). The chilled water system cntains an air-cled chiller, seven (7) ice strage tanks, heat exchanger, and circulating pump (P-2). The biler and secndary lp pumps are lcated in the main mechanical rm (Rm 55). The primary lp pumps are lcated in their wn exterir pump vault next t the mechanical rm. The chiller, ice strage tanks, heat exchanger and pump P-2 are lcated in the chiller yard. 2-pipe heating/cling systems are mstly ineffective fr Brevard Cunty schls, as the number f true heating days thrughut the year is minimal. During the winter mnths, the area may experience a heating scenari fr half the day, and then a cling scenari fr the ther half. The time it takes t switch the water system frm cling t heating and t allw the system t adjust is ften nt wrth the hassle cnsidering a cling cnditin ftentimes fllws within a few hurs. Many lcal schls are simply leaving the water system in cling mde and cmpensating fr cler days by using space heaters, r switching the water system t heating mde fr several days and sweating ut the htter prtins f the day. Prject# Rev. 1-11/9/2015

30 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Since the principle behind the 2-pipe heating/cling system seems t be ineffective in Brevard cunty, and since the purpse is being largely circumvented anyway, the desire is t switch t a different heating/cling system. Fr the base bid, the 2-pipe heating/cling system will be cnverted t cling nly. Heating will be prvided thrugh the use f electric heaters installed at each chilled water air handler. As part f this cnversin, new electrical service will need t be supplied t each electric heater, and the existing biler and assciated piping and valves demlished. See the subsectins belw fr mre specifics. PUMPS The primary lp, secndary lp, and ice strage water circulating pumps are all at r near the end f their life expectancy. The Design-Build team shall replace the seven (7) pumps and assciated valves and recnnect t the existing chilled water piping. The pump vlutes and valves shall be insulated. See Sketch #1 fr specific lcatins f the pumps. Figure 6 Ice Strage Water Pump (P-2) Prject# Rev. 1-11/9/2015

31 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Figure 7 Primary Lp Water Pumps (P-8 & P-9) Figure 8 Secndary Lp Water Pump (P-1) Prject# Rev. 1-11/9/2015

32 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Figure 9 Secndary Lp Water Pumps (P-3 & P-4) Figure 10 Secndary Lp Water Pump (P-5) Prject# Rev. 1-11/9/2015

33 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Figure 11 Secndary Lp Water Pump (P-6) Figure 12 Secndary Lp Water Pump (P-7) Prject# Rev. 1-11/9/2015

34 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE CHILLERS The existing air-cled screw chiller is a 250 tn, 2004, Trane mdel that is near the end f its life expectancy and beginning t shw signs f wear. The Design-Build team shall replace the chiller and recnnect t the existing piping. The cntrller shall be replaced as part f the scpe f wrk utlined in Sectin Cling and Heating Cntrl System Renewal. See Sketch #1 fr lcatin f the equipment. Figure 13 Air-Cled Screw Chiller HEATING BOILERS The existing biler serving the ht water system n campus is a 2004 prpane gas Hurst mdel. As part f the base-bid and cnversin t a chilled-water-nly 2-pipe system, the biler and all assciated piping and valves are t be demlished. Prject# Rev. 1-11/9/2015

35 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Figure 14 Hurst Prpane Gas Heating Biler REFRIGERANT MONITORING Attachment F indicates that a refrigerant mnitring system is t be installed. Hwever, since an air-cled utdr chiller is being utilized n campus, a refrigerant mnitring system is unnecessary. The refrigerant mnitr system will nt be part f the scpe f wrk fr this prject. Prject# Rev. 1-11/9/2015

36 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE COOLING AND HEATING CONTROL SYSTEM RENEWAL The existing HVAC cntrllers n campus use a cmbinatin f nw bslete Jhnsn Cntrls Metasys and Siemens/Landis & Gyr/Pwers 600 systems. The Design-Build team shall prvide an updated and cmplete HVAC cntrls system fr the chiller, pumps and air handlers that are t be replaced as part f this prject as well as the existing air handlers that are t remain. Wrk shall include (but nt limited t) the fllwing: New main panel, sub-panels, sensrs, cntrllers, cabling, interface cmpnents, and sftware prgrammed with the sequence f peratins fr the HVAC system. The DDC sub-panels shall cmmunicate with the glbal cntrller. The cntrl system shall be set up s that an ff-site cntrller can mnitr the schl s HVAC system thrugh the n-campus Siemens cntrl system. Prvide cntrl cmpnents t VAV terminal units serving the admin wing f Building #1. Prvide sensrs in the IDF cmmunicatins rm (Rm 5) and kitchen dry strage (Rm 62) t allw fr mnitring f relative humidity (RH), as well as rm temperature and air cnditiner status. Prvide an electric meter fr the chiller that is tied int the BAS, t allw fr SBBC t mnitr pwer usage. New Direct Digital Cntrl (DDC) system may be prvided by any f the fllwing acceptable manufacturers: Siemens, Jhnsn Cntrls, Inc., r Autmated Lgic Crp. See Sketch #1 fr existing cntrl panel lcatins. Prject# Rev. 1-11/9/2015

37 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE AIR CONDITIONING AND AIR DISTRIBUTION EQUIPMENT RENEWAL CHILLED/HOT WATER AIR HANDLING UNITS The majrity f the chilled/ht water air handling units serving Building #1 are riginal t the building s cnstructin and are well beynd their life expectancy. Five (5) large abve-ceiling air handlers (AHU) serve the admin area (Rms 35-44), library (Rm 45), and cafeteria (Rm 46). Classrms and sme ancillary rms are served by chilled/ht water fan cils units (FCU), which are either ceiling-munted r flr-munted in the rm being served. Restrms are served by small abve-ceiling fan cil units. Buildings #2-4 are served by flr-munted chilled water air handling units with electric heaters. See Sketch #1 fr existing air handler lcatins. The base bid will entail replacement f each f these air handlers, additin f electric heaters, and recnnectin t the existing ductwrk and chilled/ht water piping. The lne exceptin is the admin wing AHU and its assciated VAV terminal units, which are in satisfactry cnditin and will remain in place. Additinal items t be included in the AHU replacement scpe f wrk includes: Demlish the tw (2) existing AHU s lcated abve the ceiling at Rms 39 and 44. These air handlers are ut f service and were discnnected during the admin wing HVAC renvatin prject. Demlish the existing ceiling-munted FCU at the kitchen dry strage rm (Rm 62). A D/X mini-split system nw serves that rm, rendering the chilled/ht water FCU useless. Belw is a summary f the quantity and lcatins f the air handling units and fan cil units that are being served by the chilled/ht water system: Building #1 (5) Abve-ceiling AHU, (31) Ceiling-munted FCU, (7) Flr-munted FCU, (4) Abve-ceiling FCU Building #2 (5) Flr-munted AHU Building #3 (4) Flr-munted AHU Building #4 (4) Flr-munted AHU Prject# Rev. 1-11/9/2015

38 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Figure 15 Abve-Ceiling Chilled/Ht Water Air Handling Unit Serving Library (Typ. 2) Figure 16 Abve-Ceiling Chilled/Ht Water Air Handling Unit Serving Cafeteria (Typ. 2) Prject# Rev. 1-11/9/2015

39 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Figure 17 Flr-Munted Chilled/Ht Water Fan Cil Unit (Crridrs & Kitchen) Figure 18 Ceiling-Munted Chilled/Ht Water Fan Cil Unit (Classrm) Prject# Rev. 1-11/9/2015

40 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Figure 19 Abve-Ceiling Chilled/Ht Water Fan Cil Unit (Restrm) Figure 20 Flr-Munted Chilled Water AHU (Typ. Of Buildings #2-4) Prject# Rev. 1-11/9/2015

41 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Figure 21 Abve-Ceiling Chilled/Ht Water AHU T Be Demlished (Typ. 2) Figure 22 Ceiling-Munted Chilled/Ht Water FCU T Be Demlished (Dry Strage) Prject# Rev. 1-11/9/2015

42 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE D/X PACKAGE SYSTEMS The nly D/X package system fund n campus is the package unit serving the kitchen area f Building #1. The unit utilizes EPA nn-cmpliant R-22 refrigerant and shall be replaced as part f the base bid. Figure 23 D/X Package Unit (Kitchen) D/X SPLIT SYSTEMS An abve-ceiling D/X split system AHU in Rm 6 f Building #1 utilizes EPA nn-cmpliant R-22 refrigerant and shall be replaced as part f the base bid. The rf-munted cndensing unit (CU) shall be replaced as well. If feasible, lcate the new CU t grade level in rder t allw easier access fr maintenance f the unit. The D/X mini-split system serving the kitchen dry strage (Rm 62) is in satisfactry cnditin with EPA-cmpliant R-410A refrigerant. Therefre, this AHU and CU are nt part f the AHU replacement scpe f wrk. See Sketch #1 fr existing air handler and cndensing unit lcatins. Prject# Rev. 1-11/9/2015

43 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Figure 24 D/X Split System AHU (Rm 6) EXTERIOR BUILDING WALL FINISH SYSTEM RENEWAL EXTERIOR SEALANTS A significant amunt f caulking at the wall, dr, windw and expansin jints arund the perimeter f Buildings 1-4 are deterirated and/r missing. The white caulking that is fund at the exterir windw and dr frames f Building #1, as well as at the expansin jints, is an asbests-cntaining material (ACM) and shall be abated as part f the base bid. The Design- Build team shall replace the sealants at all deterirated and ACM exterir jints. See the Asbests-Cntaining Materials Summary Reprt fr mre details. Prject# Rev. 1-11/9/2015

44 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Figure 25 Example f Deterirated Dr Frame Sealant Figure 26 Example f Missing Mrtar Jint Prject# Rev. 1-11/9/2015

45 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE SOFFITS Prtins f the sffits surrunding the exterirs f Buildings 1-4 are in varius stages f disrepair. Cmmn damages include panel cracking, jint degradatin, and separatin between panels and vents (see figures). The Design-Build team shall repair all damages t the sffits at Buildings 1-4 as part f the base bid, and paint t match existing finishes. Figure 27 Examples f Deterirated Sffits Prject# Rev. 1-11/9/2015

46 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE BUILDING WATER AND SANITARY PIPING SYSTEM RENEWAL SANITARY PIPING The majrity f sanitary piping in Building #1 is riginal and apprximately 50 years ld. Due t the age f the pipe and aggressive sil f the area, there is cncern that the pipe may be severely deterirated. The Design-Build team shall camera-inspect the sanitary pipe at Building #1 and, alng with SBBC, evaluate the cnditin f the sanitary piping. If determined t be in need f immediate replacement, the Design-Build team shall replace the deterirated prtins f piping as part f the base bid. See Sheets P-1 thru P-3 f the Original As-Built Drawings fr apprximate ruting f the existing sanitary piping. SUPPLY PIPING The majrity f ptable water piping at Building #1 is ruted undergrund and is apprximately 50 years ld. Due t the age f the pipe and aggressive sil f the area, there is cncern that the pipe may be severely deterirated. The Design-Build team shall investigate the cnditin f the piping by cutting ut samples f the riginal piping and examining its integrity. If, after evaluatin by the Design-Build team and SBBC, the piping is deemed t be in satisfactry cnditin, the Design-Build team shall patch the remved sectins f pipe and leave the remainder f the piping intact. If the piping is fund t be in pr cnditin, then the riginal piping shall be replaced in its entirety as part f this bid additive. If replacement is deemed necessary, then the new piping shall be cpper and ruted abve-ceiling. New service shutff valves shall be installed inside each building. Regardless f the evaluatin f the ptable water piping system, all riginal undergrund service shutff gate valves shall be replaced with same sized ball valves, and valve bxes enlarged, if necessary. See Sheets P-1 thru P-3 f the Original As-Built Drawings fr apprximate ruting f the existing ptable water piping, as well as service valve lcatins. Prject# Rev. 1-11/9/2015

47 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Figure 28 Typical Interir Water Line Shutff Gate Valve ELECTRICAL DISTRIBUTION SYSTEM RENEWAL Prvide an Electrical System cmplete in place, tested and apprved, as needed fr a cmplete, usable and prper installatin. All equipment shall be installed per manufacturer s recmmendatins and per Sectin 3.4 Electrical Design Criteria. Where the wrd shuld is used in the manufacturer s recmmendatins, substitute the wrd shall. PANEL BOARDS The majrity f panel bards n campus are riginal t the cnstructin f the schl and are a mixture f GE, Siemens, and Square D lighting and appliance panels. See Sheets E-1 thru E-4 f the Original As-Built Drawings fr specific lcatins. The Design-Build team shall replace the existing panels in accrdance with Sectin 3.4 Electrical Design Criteria and the fllwing requirements: Prvide minimum f 20% spare breakers and 20% spare capacity. Increase panel rating and assciated distributin (breaker, cnduit and wire) as required. Replace existing cnduit and feeders frm distributin bards t all branch panels and transfrmers. Refresh panels with new breakers in supprt fr new HVAC equipment. Update and type circuit directries in panels. Prvide arc flash study and labeling fr all panels. Crrect cde-required clearance issues t bring new panel installatins up t current cde. Prject# Rev. 1-11/9/2015

48 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Minimum list f existing panels t be replaced/upgraded: 277/480V MDP1/MCC, HA, HB, H2, H3, H4 120/208V L1, L2, L3, L4, AP, LA, LB, K, K1 Branch wiring in supprt f new HVAC equipment shall meet the fllwing requirements: All branch wiring shall be insulated cpper cnductrs in cnduit. Cnductrs shall be THHN r THWN-2. Use minimum 1-inch cnduit. All expsed cnduit shall be galvanized rigid steel. EMT may be used where cncealed in wall and abve ceilings. Flexible cnduit shall be allwed fr vibrating r mvable equipment cnnectins, such as mtrs, but shall nt exceed six feet in length. In wet lcatins, the flexible cnduit and cnnectins shall be IP65 rated. PVC cnduit shall nly be used undergrund, under slab, r encased in cncrete. Junctin bxes shall be IP42 in all areas except wet lcatins. Wet lcatin bxes shall be rated IP65. Wire size shall be #12 AWG minimum and stranded, except cntrl wiring, which may be smaller gauge and type as apprpriate. Cnductrs shall be THHN r THWN-2. Each HVAC unit will be prvided with a dedicated supply circuit. Each HVAC unit will be prvided with ne weatherprf duplex GCFI receptacle, accessible frm utside the unit withut pening it. Prvide dedicated circuits and cnnectins, as required by HVAC and ther equipment, per equipment manufacturers requirements. Prvide fused discnnect switches, as required by equipment manufacturer, and size fuse per nameplate maximum vercurrent prtectin ratings. TRANSIENT VOLTAGE SURGE SUPPRESSORS The majrity f the electrical panels n campus d nt have transient vltage surge suppressin (TVSS) / surge prtective devices (SPD). The Design-Build team shall prvide TVSS fr all panel bards n campus, including: campus service entrance switchbard, distributin panel t each building, all building service entrance 480Y/277V panels (Type 1) and all 208Y/120V branch circuit panels (Type 2). Prject# Rev. 1-11/9/2015

49 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Figure 29 Panel MDP1 And Mtr Cntrl Center (Rm 55) Figure 30 Existing Electrical Panels (Rm 55) Prject# Rev. 1-11/9/2015

50 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Figure 31 Existing Electrical Panel (Rm 56) Figure 32 Existing Electrical Panels (Crridr) Prject# Rev. 1-11/9/2015

51 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE 4.2 DESIGN ALTERNATIVES VARIABLE AIR VOLUME SYSTEMS In rder t allw fr mre accurate cling f the spaces and increased energy efficiency, this design alternative will explre ptins f cnverting the HVAC systems in Buildings #2-4 int variable air vlume systems. Recmmendatin wuld be t add VAV terminal units t serve each unique zne. Re-design ductwrk, as necessary. The Design-Build team shall prvide a design and Life Cycle Cst Analysis (LCCA) fr the prpsed VAV systems. It will be at the discretin f SBBC as t whether r nt the cnstructin f this ptin will be implemented DEDICATED OUTSIDE AIR UNITS With the intrductin f the GPS bi-plar inizatin devices int HVAC systems, the ventilatin requirements shuld change significantly. The Design-Build team shall explre the ecnmic feasibility f adding dedicated utside air units t prvide the ventilatin requirements f Buildings #1-4 in cnjunctin with the replacement f the existing AHUs as identified Sectin f this dcument. The Design-Build team shall prvide a design and Life Cycle Cst Analysis (LCCA) fr the prpsed dedicated utside air systems. It will be at the discretin f SBBC as t whether r nt the cnstructin f this ptin will be implemented. Prject# Rev. 1-11/9/2015

52 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE 4.3 BID ADDITIVES CHILLED WATER PIPING REPLACEMENT The majrity f the 2-pipe cling/heating distributin piping at Building #1 is riginal t the cnstructin f the campus and may be in need f replacement. As part f this bid additive, the Design-Build team shall investigate the cnditin f the piping by cutting ut samples f the riginal piping and examining its integrity. If, after evaluatin by the Design-Build team and SBBC, the piping is deemed t be in satisfactry cnditin, the Design-Build team shall patch the remved sectins f pipe and leave the remainder f the piping intact. If the piping is fund t be in pr cnditin, then the riginal distributin piping and insulatin shall be replaced in its entirety. Reference Sheet AC-1 f the Original As-Built Drawings fr apprximate water distributin pipe ruting. Nte that the black mastic n the piping insulatin is an asbests-cntaining material. See the Asbests-Cntaining Materials Summary Reprt fr mre details EXTERIOR DEVICES INSULATION REPLACEMENT The insulatin f the heat exchanger and expansin tank lcated in the chiller yard is in very pr cnditin and shall be replaced by the Design-Build team as part f this bid additive. The team shall als inspect the cnditin f the heat exchanger and tank itself. If fund t be in pr cnditin, the Design-Build team shall replace the heat exchanger and expansin tank and recnnect t the existing piping. Prject# Rev. 1-11/9/2015

53 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE Figure 33 Heat Exchanger (Chiller Yard) Figure 34 Expansin Tank (Chiller Yard) Prject# Rev. 1-11/9/2015

54 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE SWITCHBOARD REPLACEMENT The service switchbard fr the Apll Elementary Schl campus is antiquated and may be at, r near, capacity. Recmmend replacement/upgrade f the electrical service frm the existing 1200A, 480Y/277V, 3-phase, 4-wire Westinghuse Pw-R-Line PRL4 MDP t a 2500A, 480Y/277V, 3-phase, 4-wire NEMA 3R main switchbard. Final switchbard size and NEMA rating shall be finalized during the design. Figure 35 Westinghuse Switchbard MDP (Rm 55) RESTROOM ACCESSIBILITY Sme f the restrms lcated in Building #1 have elements that d nt cmply with ADA regulatins fr accessibility. The Design-Build team shall prvide a design plan and cst estimate t mdify the existing restrms in rder t cmply with ADA requirements. Prject# Rev. 1-11/9/2015

55 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE DOOR HARDWARE Numerus drs n campus have rbital-style dr knbs r thumb latch lcksets that are nt ADA cmpliant. Exceptins include all exterir drs at Building #1 and a few interir drs at Building #1. Fr this bid additive, the Design-Build team shall prvide a cst estimate t replace all exterir and interir ADA nn-cmpliant dr knbs with lever-style handles that match thse fund elsewhere n campus ELECTRIC WATER COOLER ACCESSIBILITY One (1) interir and ne (1) exterir electric water cler at Building #1 d nt cmply with ADA regulatins fr accessibility. Fr this bid additive, the Design-Build team shall prvide a cst estimate and prduct selectin t replace the ADA nn-cmpliant electric water clers fund n campus. Figure 36 ADA Nn-Cmpliant Electric Water Cler Prject# Rev. 1-11/9/2015

56 APOLLO ELEMENTARY SCHOOL DESIGN CRITERIA PACKAGE 5.0 APPENDICES A. Attachment A Priritizatin f Facility Assessment Categries B. Attachment E Campus Capital Needs Detail Reprt C. Attachment F Campus Capital Needs Sales Surtax Funded Detail Reprt D. Scpe f Wrk Csts E. Site Plan F. FISH Plan G. Sketch #1 Mechanical Equipment Lcatins H. Asbests-Cntaining Materials Summary Reprt I. Facility Inventry Reprt J. Original As-Built Drawings K. Buildings #2-4 Additin Drawings L HVAC Mdificatins Drawings Prject# Rev. 1-11/9/2015

57 APPENDIX A ATTACHMENT A: Priritizatin f Facility Assessment Categries

58 Attachment A 2014 Facility Assessment Priritizatin f Facility Assessment Categries Categries in Facility Assessment - Surtax Funding Status Facility Renewal 1. Safety and Building Cde Deficiency Crrectins (Cnditin Cde 1 & 2 Funded) 2. ADA Cde Deficiency Crrectin (Cnditin Cde 1 & 2 Funded) 3. Fire Alarm System Renewal (Cnditin Cde 1 & 2 Funded) 4. Central Mechanical Plant Renewal (Cnditin Cde 1 & 2 Funded) 5. Cling and Heating Cntrl System Renewal (Cnditin Cde 1 & 2 Funded) 6. Air Cnditining and Air Distributin Equipment Renewal (Cnditin Cde 1 & 2 Funded) 7. Rfing System Renewal (Cnditin Cde 1 & 2 Funded) 8. Exterir Building Wall Finish System Renewal (Cnditin Cde 1 & 2 Funded) 9. Exterir Dr/Windw/Luver System Renewal (Cnditin Cde 1 & 2 Funded) 10. Building Water and Sanitary Piping System Renewal (Cnditin Cde 1 & 2 Funded) 11. Water Heating System Renewal (Cnditin Cde 1 & 2 Funded) 12. Electrical Supply System (Transf., Switchgear, Wiring) Renewal (Cnditin Cde 1 & 2 Funded) 13. Electrical Distributin System Renewal (Cnditin Cde 1 & 2 Funded) 14. Electrical Cmpnents (Lightning Prt., Intercm, Gen.) Renewal (Cnditin Cde 1 Funded) 15. Interir and Exterir Lighting Equipment Renewal (Cnditin Cde 1 Funded) 16. Air Supply and Exhaust System Renewal (Cnditin Cde 1 Funded) 17. Site Utility Systems (Gas, Electric, Strm, Water, Sanitary) Renewal (Cnditin Cde 1 Funded) 18. Site Imprvements (Parking, Paving, Walks, Signage) Renewal (Nt Funded) 19. Site Facilities (Pavilins, Athletic/Playfields, Cncessins) Renewal (Nt Funded) 20. Restrm Fixtures Renewal (Nt Funded) 21. Plumbing Systems General (Custdial, Labs, Rf Drains, Water Funtains) (Nt Funded) 22. Interir Dr Assembly Renewal (Nt Funded) 23. Restrm Finishes and Accessries Renewal (Nt Funded) 24. Building Cabinetry Renewal (Nt Funded) 25. Interir Specialties (Lckers, Theater Equip., Audit. Seating, Bleachers) Renewal (Nt Funded) 26. Interir Wall Finishes Renewal (Nt Funded) 27. Interir Ceiling Renewal (Nt Funded) 28. Flring System Renewal (Nt Funded) 29. Interir Signage Renewal (Nt Funded) 30. Interir Stair System Renewal (Nt Funded) 31. Indr/Outdr Pl Renewal (Nt Funded) 32. Building Fundatin System Renewal (Nt Funded) 33. Building Structural System Renewal (Nt Funded) Brevard Public Schls Facilities Services July 22, 2014 Page 1 f 2

59 Categries in Facility Assessment - Surtax Funding Status (Cnt.) Educatinal Technlgy 1. Technlgy Building Cabling (Fully Funded - Legislative Cmpliance & Missin Delivery) 2. Technlgy Equipment Renewal (Fully Funded - Legislative Cmpliance & Missin Delivery) 3. Classrm Technlgy Infrastructure (Electric, HVAC & Data) (Fully Funded - Legislative Cmpliance & Missin Delivery) st Century Classrm Equipment Renewal (Nt Funded) District Schl Security 1. Fencing (Fully Funded - Critical Safety Enhancement) 2. Access Cntrl (Fully Funded - Critical Safety Enhancement) 3. Cameras (Nt Funded) Categries Nt Included in Facility Assessment Additinal Classrm Space New Facility Requirements fr Academic Prgrams Furniture and Equipment Renewal Fd Service Equipment Renewal New Playgrunds New Middle Schl Gym A/C New PE Pavilins Equity Prjects Landscaping Brevard Public Schls Facilities Services July 22, 2014 Page 2 f 2

60 APPENDIX B ATTACHMENT E: Campus Capital Needs Detail Reprt

61 Facility Attachment E Campus Capital Needs Detail Reprt Facilities Services 2700 Judge Fran Jamiesn Way Viera, Flrida Cnditin Cde Estimate Apll Elementary 2.64 $8,246,528 District Schl Security 1.67 $142,767 Perimeter/Entry Fencing and Gates 1.00 $92,069 Pedestrian Access and Safety (Fencing) 1.00 $92,069 Building Access Security Equipment 1.00 $24,335 Public Access Cntrl 1.00 $24,335 Campus Security Camera System 3.00 $26,363 Security Cameras 3.00 $26,363 Educatinal Technlgy 2.22 $216,864 Technlgy Equipment Renewal 1.40 $111,413 Cmputer Replacement 3.00 $32,203 Server Replacement 1.00 $25,004 Switch Replacement 1.00 $16,203 Telephne System Replacement 1.00 $26,322 Wireless Access Pints Replacement 1.00 $11,681 Classrm Technlgy Infrastructure (Electrical, HVAC and Data) 1.00 $90,242 Student Statins Pwer/ Technlgy HVAC 1.00 $90,242 21st Century Classrm Equipment Renewal 4.00 $15,209 Audi Equipment Replacement 4.00 $5,070 Dcument Camera Replacement 4.00 $5,070 Prjectr / Screen Replacement 4.00 $5,070 Facility Renewal 2.67 $7,886,897 Safety and Building Cde Deficiency Crrectins 1.67 $96,623 Open Cde Issues 1.67 $96,623 ADA Cde Deficiency Crrectins 3.25 $31,920 Barrier Free Rute ROW Sidewalk t Building Entry 4.00 $3,420 Exterir Ramps and Walks 3.00 $13,680 Handicap Parking 3.00 $11,970 Passenger Lading Znes 3.00 $2,850 Fire Alarm System Renewal 3.00 $67,001 Fire Alarm System 3.00 $67,001 Central Mechanical Plant Renewal 2.29 $1,025,103 Bster Pumps, Chilled Water, VFD's and Recirculatin pumps 1.00 $89,228 Chillers 2.00 $417,747 Heating Bilers 2.00 $61,851 Makeup Water Secndary Backflw Preventer and Water Treatment 3.00 $62,865 Piping and Valves, Distributin Piping, Insulatin, Tanks and Chilled Water 4.00 $160,204 Refrigeratin Rm Mnitring and Ventilatin 1.00 $10,140 TES Ice Strage Tank Capacity Punds 3.00 $223,069 Cling and Heating Cntrl System Renewal 2.00 $83,144 Building Autmatin System 2.00 $83,144 Air Cnditining and Air Distributin Equipment Renewal 1.00 $754,379 HVAC Systems EPA Nn Cmpliant Refregerant 1.00 $111,535 Wall Hung, Rftp, Air Handlers, Split Systems, Unit Ventilatrs, Water Surce Heat Pumps and 1.00 $642,844 Unitary Systems Rfing System Renewal 3.00 $920,017 Cnditin Rating f the Rf 3.00 $911,225 July 22, 2014

62 Facility Attachment E Campus Capital Needs Detail Reprt Facilities Services 2700 Judge Fran Jamiesn Way Viera, Flrida Cnditin Cde Estimate Apll Elementary 2.64 $8,246,528 Facility Renewal 2.67 $7,886,897 Rfing System Renewal 3.00 $920,017 Gutters and Dwnsputs 3.00 $8,793 Exterir Building Wall Finish System Renewal 2.50 $129,294 Expansin / Cntrl Jints 3.00 $5,669 Exterir Finish 3.67 $57,284 Exterir Sealants 1.33 $30,188 Sffits 2.33 $36,153 Exterir Dr/Windw/Luver System Renewal 3.20 $174,848 Luvers and Vents 3.00 $4,123 Main Entry Drs 3.00 $7,215 Main Entry Hardware 3.00 $15,093 Other Exterir Dr Hardware 3.00 $4,639 Other Exterir Drs 3.00 $3,092 Windws 3.67 $140,686 Building Water and Sanitary Piping System Renewal 2.20 $79,855 Sanitary Piping 2.33 $31,774 Supply Piping Any Galvanized Abve Grade 2.00 $48,081 Water Heating System Renewal 3.00 $14,195 Water Heaters 3.00 $14,195 Electrical Supply System (Transfrmers, Switchgear and Wiring) Renewal 3.67 $13,916 Mtr Cntrl Centers 3.00 $4,639 Multiple Service Feeds 4.00 $6,700 Service Switchgear 4.00 $2,577 Electrical Distributin System Renewal 2.77 $472,240 Devices Switches and Receptacles 3.67 $45,146 Feeders 3.00 $6,700 Panel bards Cnditin / Capacity 2.33 $181,085 Transfrmers 3.00 $114,992 TSS Surge Suppressin 2.00 $124,317 Electrical System Cmpnents (Lightning Prtectin, Intercm and Generatrs) Renewal 2.40 $489,926 Equipment 2.67 $262,123 Kitchen Equipment Supply 2.00 $160,802 Lightning Prtectin 2.00 $67,001 Interir and Exterir Lighting Equipment Renewal 3.00 $175,949 Crridr / Cmmn Area Lighting 3.00 $28,029 Emergency Cnditin and Cde Cmpliance 4.00 $20,342 Exterir Perimeter Building Munted Lighting 2.33 $21,168 Lighting Cntrls Building Level 4.00 $23,717 Mtin Detectin Only 2.00 $30,185 Restrm Lighting 2.50 $30,176 Rm Lighting Instructinal 3.33 $22,332 Air Supply and Exhaust System Renewal 3.00 $239,292 Exhaust Fans Art Kiln Rm, Lcker Rms, Restrms, Science 2.00 $23,321 Metal, Fiberglass Ductwrk and Insulatin Supply and Return 4.00 $215,971 Site Utility Systems (Gas, Electrical, Strmwater, Water, Sanitary) Renewal 3.25 $258,039 July 22, 2014

63 Facility Attachment E Campus Capital Needs Detail Reprt Facilities Services 2700 Judge Fran Jamiesn Way Viera, Flrida Cnditin Cde Estimate Apll Elementary 2.64 $8,246,528 Facility Renewal 2.67 $7,886,897 Site Utility Systems (Gas, Electrical, Strmwater, Water, Sanitary) Renewal 3.25 $258,039 Backflw Preventer 4.00 $2,850 Cmpactr 4.00 $8,379 Electrical Service 4.00 $14,250 Gas Distributin System 4.00 $8,550 Sanitary Cllectin / Septic System 3.00 $5,700 Strm Water Management 2.00 $136,800 Vice / Data System 3.00 $8,550 Water Distributin Systems Identify Galvanized 2.00 $72,960 Site Imprvements (Parking, Paving, Walks and Signage) Renewal 2.70 $339,346 Emergency Vehicle Access 3.00 $13,395 Off site Sidewalks / Crsswalks 3.00 $30,176 Off Site Signage 3.00 $6,703 On Site Sidewalks / Crsswalks Ersin 2.00 $48,281 On Site Signage 3.00 $13,406 Paving Bus Driveway Asphalt / Cncrete 3.00 $50,285 Paving Parking Lt Asphalt / Cncrete 3.00 $85,500 Perimeter Fencing 2.00 $32,194 Striping / Pavement Markings / Speed Bumps 2.00 $9,120 Student Drp ff Asphalt / Cncrete 3.00 $50,285 Site Facilities (Pavilins, Athletic/Play Fields and Cncessins) Renewal 3.56 $240,367 Dumpster Aprn, Pad, Enclsure 2.00 $26,813 Exterir Furniture 4.00 $2,679 Hardcurt Curts Outdr 2.00 $128,738 Irrigatins Systems Cnditin and Need 4.00 $3,352 PE Equipment Strage Areas 4.00 $25,143 Playgrund Areas Impact Material and Edging 4.00 $3,352 Playgrund Canpies 4.00 $15,088 Playgrund Equipment Cnditin and Safety 4.00 $20,115 Walkway Canpies Freestanding 4.00 $15,088 Restrm Fixtures Renewal 2.25 $504,090 ADA Fixture Prvisins Heights 1.67 $79,149 Lavatries / Sinks 2.67 $186,478 Urinals 2.33 $64,783 Water Clsets 2.33 $173,680 Plumbing System General (Custdial, Labs, Rf Drains, Water Funtains) 1.60 $204,705 Custdial Clsets Mp Sinks 1.67 $187,181 Grease Traps Indr / Outdr 2.00 $7,731 Water Funtains Self Cntained Water Cler 1.00 $9,792 Interir Dr Assembly Renewal 2.29 $176,476 Classrm Dr and Frame 3.33 $43,443 Classrm Hardware 1.67 $124,788 Hallway Fire / Smke Dr 1.00 $8,246 Restrm Finishes and Accessries Renewal 2.67 $104,684 Restrm Accessries 3.00 $20,124 July 22, 2014

64 Facility Attachment E Campus Capital Needs Detail Reprt Facilities Services 2700 Judge Fran Jamiesn Way Viera, Flrida Cnditin Cde Estimate Apll Elementary 2.64 $8,246,528 Facility Renewal 2.67 $7,886,897 Restrm Finishes and Accessries Renewal 2.67 $104,684 Restrm ADA Accessibility Large Stall 1.00 $7,215 Restrm Screen Partitins 3.00 $20,342 Restrm Signage 1.00 $3,092 Restrm Tilet Partitins 3.00 $12,945 Restrm Walls 3.00 $40,966 Building Cabinetry Renewal 2.67 $315,561 Cabinetry 2.67 $315,561 Interir Specialties (Lckers, Theater Equipment, Auditrium Seating, Bleachers) Renewal 3.00 $5,669 Theater Curtains 3.00 $5,669 Interir Wall Finishes Renewal 3.00 $304,213 Mveable / Operable Walls 1.00 $3,092 Wall Finishes Other 3.33 $263,019 Wall Finishes Restrms 3.33 $38,102 Interir Ceiling Renewal 2.75 $185,775 Ceiling ACT 2.67 $175,983 Ceiling Drywall 3.00 $9,792 Flring System Renewal 2.17 $356,134 Flring Carpet 2.00 $18,554 Flring Terrazz 2.00 $174,202 Flring Tile 3.00 $108,747 Flring VCT 2.00 $3,092 Flring Wd 2.00 $37,623 Restrm Flring 2.00 $13,916 Interir Signage Renewal 1.00 $30,417 Signage Directinal 1.00 $6,700 Signage Rm Side Munt r Dr Munt 1.00 $23,717 Building Fundatin System Renewal 3.50 $66,045 Slab n Grade 3.00 $8,762 Structure Fundatin / Ftings 3.67 $57,284 Building Structural System Renewal 3.00 $27,673 Cvered Walkways Cnnected t Structure 3.00 $23,035 Structure 3.00 $4,639 July 22, 2014

65 APPENDIX C ATTACHMENT F: Campus Capital Needs Sales Surtax Funded Detail Reprt

66 Facility Attachment F Campus Capital Needs Sales Surtax Funded Detail Reprt Facilities Services 2700 Judge Fran Jamiesn Way Viera, Flrida Cnditin Cde Estimate Apll Elementary 1.38 $2,226,016 District Schl Security 1.00 $116,404 Perimeter/Entry Fencing and Gates $92,069 Pedestrian Access and Safety (Fencing) 1.00 $92,069 Building Access Security Equipment $24,335 Public Access Cntrl 1.00 $24,335 Educatinal Technlgy 1.33 $201,654 Technlgy Equipment Renewal $111,413 Cmputer Replacement 3.00 $32,203 Server Replacement 1.00 $25,004 Switch Replacement 1.00 $16,203 Telephne System Replacement 1.00 $26,322 Wireless Access Pints Replacement 1.00 $11,681 Classrm Technlgy Infrastructure (Electrical, HVAC and Data) $90,242 Student Statins Pwer/ Technlgy HVAC 1.00 $90,242 Facility Renewal 1.43 $1,907,957 Safety and Building Cde Deficiency Crrectins $88,944 Open Cde Issues 1.00 $88,944 Central Mechanical Plant Renewal $578,965 Bster Pumps, Chilled Water, VFD's and Recirculatin pumps 1.00 $89,228 Chillers 2.00 $417,747 Heating Bilers 2.00 $61,851 Refrigeratin Rm Mnitring and Ventilatin 1.00 $10,140 Cling and Heating Cntrl System Renewal $83,144 Building Autmatin System 2.00 $83,144 Air Cnditining and Air Distributin Equipment Renewal $754,379 Wall Hung, Rftp, Air Handlers, Split Systems, Unit Ventilatrs, Water Surce Heat Pumps and 1.00 $642,844 Unitary Systems HVAC Systems EPA Nn Cmpliant Refrigerant 1.00 $111,535 Exterir Building Wall Finish System Renewal $64,091 Exterir Sealants 1.33 $30,188 Sffits 2.00 $33,903 Building Water and Sanitary Piping System Renewal $74,366 Sanitary Piping 1.00 $26,285 Supply Piping 2.00 $48,081 Electrical Distributin System Renewal $264,067 Panel Bards 1.00 $149,978 TSS Surge Suppressin 1.50 $114,089 July 22, 2014

67 APPENDIX D SCOPE OF WORK COSTS

68 FACILITY RENEWAL SCOPE OF WORK COSTS Schl Bard f Brevard Cunty CAMPUS CAPITAL NEEDS SALES SURTAX FUNDED DETAIL REPORT Nte: Estimates include ttal prject csts, including material, labr, design, fees, permitting, cntingency, etc. TLC Engineering fr Architecture Prject Number: Date: 11/9/2015 Cnditin Cde SBBC Estimate TLC Estimate Categry and Needs APOLLO ELEMENTARY SCHOOL 1.38 $2,226,016 $2,281,500 District Schl Security 1.00 $116,404 $115,000 Perimeter/Entry Fencing and Gates $92,069 $90,000 Pedestrian Access and Safety (Fencing) 1.00 $92,069 $90,000 Building Access Security Equipment $24,335 $25,000 Public Access Cntrl 1.00 $24,335 $25,000 Ntes Educatinal Technlgy 1.33 $201,655 $90,000 Technlgy Equipment Renewal $111,413 $0 Cmputer Replacement 3.00 $32,203 $0 Server Replacement 1.00 $25,004 $0 Switch Replacement 1.00 $16,203 $0 Telephne System Replacement 1.00 $26,322 $0 Wireless Access Pints Replacement 1.00 $11,681 $0 Classrm Technlgy Infrastructure (Electrical, HVAC and Data) $90,242 $90,000 Student Statins Pwer / Technlgy HVAC 1.00 $90,242 $0 Nt in TLC DCP Scpe Facility Renewal 1.43 $1,907,957 $2,076,500 Safety and Building Cde Deficiency Crrectins $88,944 $100,000 Open Cde Issues 1.00 $88,944 $100,000 Central Mechanical Plant Renewal $578,966 $295,000 Bster Pumps, Chilled Water, VFD's and Recirculatin Pumps 1.00 $89,228 $100,000 Chillers 2.00 $417,747 $180,000 Heating Bilers 2.00 $61,851 $15,000 Refrigeratin Rm Mnitring and Ventilatin 1.00 $10,140 $0 Cling and Heating Cntrl System Renewal $83,144 $137,500 Building Autmatin System 2.00 $83,144 $137,500 Air Cnditining and Air Distributin Equipment Renewal $754,379 $824,000 Wall Hung, Rftp, Air Handlers, Split Systems, Unit Ventilatrs, Water Surce Heat Pumps and Unitary Systems 1.00 $642,844 $724,000 HVAC Systems EPA Nn-Cmpliant Refrigerant 1.00 $111,535 $100,000 Exterir Building Wall Finish System Renewal $64,091 $75,000 Exterir Sealants 1.33 $30,188 $45,000 Sffits 2.00 $33,903 $30,000 Building Water and Sanitary Piping System Renewal $74,366 $255,000 Sanitary Piping 1.00 $26,285 $150,000 $5,000 Supply Piping 2.00 $48,081 $70,000 $30,000 Nt Required Camera Test System Remainder f System Test & Valves Only Page 1 f 2

69 FACILITY RENEWAL SCOPE OF WORK COSTS Schl Bard f Brevard Cunty CAMPUS CAPITAL NEEDS SALES SURTAX FUNDED DETAIL REPORT Nte: Estimates include ttal prject csts, including material, labr, design, fees, permitting, cntingency, etc. TLC Engineering fr Architecture Prject Number: Date: 11/9/2015 Categry and Needs Cnditin Cde SBBC Estimate TLC Estimate Electrical Distributin System Renewal $264,067 $390,000 Panel Bards 1.00 $149,978 $300,000 TSS Surge Suppressin 1.50 $114,089 $90,000 Ntes Bid Additives $400,000 Chilled Water Piping Replacement $185,000 $1,000 Exterir Devices Insulatin Replacement $4,000 Switchbard Replacement $50,000 Restrm Accessibility $90,000 Dr Hardware $65,000 Electric Water Cler Accessibility $5,000 Inspectin f Piping PROJECT COST SUMMARY District Schl Security Educatinal Technlgy Facility Renewal Bid Additives Prject Cst Ttals SBBC Estimate TLC Estimate $116,404 $115,000 $201,655 $90,000 $1,907,957 $2,076,500 N/A $400,000 $2,226,016 $2,681,500 Page 2 f 2

70 APPENDIX E SITE PLAN

71 N SITE PLAN DRAWN BY: BELLANGER, RICK APOLLO ELEMENTARY DATE: 14 SEPT 2009 SEC TRAILER HARDCOURT PARKING PLAY BUS LOOP BLDG. NO. 01 KNOX MCRAE ROAD BLDG. NO. 04 BLDG. NO. 03 BLDG. NO. 02 BUS LOOP PARKING PLAY

72 APPENDIX F FISH PLAN

73 APPENDIX G SKETCH #1: Mechanical Equipment Lcatins

74 APPENDIX H ASBESTOS-CONTAINING MATERIALS SUMMARY REPORT

75

76 APPENDIX I FACILITY INVENTORY REPORT

77 FLORIDA INVENTORY OF SCHOOL HOUSES (FISH) FACILITY INVENTORY REPORT ORGANIZATION: FACILITY: FACILITY USE: 5-BREVARD COUNTY SCHOOL DISTRICT ANDREW JACKSON MIDDLE, APOLLO ELEMENTARY, HERBERT C HOOVER MIDDLE, MELBOURNE SENIOR HIGH, PINEWOOD ELEMENTARY, SABAL ELEMENTARY ALL DISTRICT: 5 BREVARD COUNTY SCHOOL DISTRICT FACILITY: 4-A APOLLO ELEMENTARY Primary Use: ELEMENTARY Grades Hused: PK - 06 DOE Validatin Date: Capital Outlay Classificatin: SCHOOL RECOMMENDED FOR CONTINUED USE MASTER SCHOOL ID MSID Name Status 61 APOLLO ELEMENTARY SCHOOL Default CAPITAL OUTLAY FTE Year: 2014 / 2015 PK: : : : : : : 0.00 PK-12: KG: : : : : : : 0.00 Adult: 0.00 Ttal: SCHOOL CAPACITY SCHOOL CAPACITY YEAR ROUND CAPACITY UTILIZATION FACTOR PRIMARY USE 902 1, ELEMENTARY Page 1 f 149 Reprt Date: 8/31/ :44:22 AM

78 FLORIDA INVENTORY OF SCHOOL HOUSES (FISH) FACILITY INVENTORY REPORT PARCEL: KNOX MCRAE DRIVE TITUSVILLE, FL Parking: DEVELOPED Owner: SCHOOL BOARD Fire: 7 Athletic: NO ATHLETIC FACILITY Water: PUBLIC Plice: CITY Sewage: PUBLIC Plan: COMPACT Drainage: ADEQUATE Landscape: DEVELOPED Playgrund: INCLUDED WITH SITE Acreage: Date Acquired: 1/1/1965 Lease Expiratin Date: DISTRICT: 5 BREVARD COUNTY SCHOOL DISTRICT FACILITY: 4-A APOLLO ELEMENTARY BUILDING: 1 - Building Number Owner: SCHOOL BOARD Light: INADEQUATE Cling: CENTRAL Use: ELEMENTARY Mech Vent: ADEQUATE Heat Surce: OIL Year Cnstructed: 1966 Artificial Lighting: SHIELDED FLORESCENT Heat Distributin: CENTRAL HOT WATER Year Mdified: Educatinal TV: COMMERCIAL CABLE Heat Capacity: ADEQUATE Average Age NSF: 1970 Intercm: TWO WAY COMPLETE Walls: BRICK Relcatable Units: 0 Telephne: PARTIAL SYSTEM Struct Cmp: COMBINATION OF 1-3 Stries: 1 Crridr: DOUBLE INSIDE ROOM NET SQ FT DESIGN CODE DESCRIPTION STU STA FLR LOC FLOOR COVER YEAR CONST CONDITION BLDG PAR FAC P E MULTIPURPOSE ROOM (MIDDLE-SR HIGH) 0 01 CARPET 1966 SATISFACTORY PRIMARY SKILLS LAB (K-3) CARPET 1966 SATISFACTORY A TEACHER PLANNING OFFICE 0 01 CARPET 1966 SATISFACTORY Page 2 f 149 Reprt Date: 8/31/ :44:22 AM

79 FLORIDA INVENTORY OF SCHOOL HOUSES (FISH) FACILITY INVENTORY REPORT 002B STUDENT RESTROOM (BOTH SEXES) 0 01 CERAMIC TILE 1966 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1966 SATISFACTORY A TEACHER PLANNING OFFICE 0 01 CARPET 1966 SATISFACTORY B STUDENT RESTROOM (BOTH SEXES) 0 01 TERRAZZO 1966 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1966 SATISFACTORY A STUDENT RESTROOM (BOTH SEXES) 0 01 TERRAZZO 1966 SATISFACTORY OTHER P E SPACE 0 01 CARPET 1966 SATISFACTORY OTHER P E SPACE 0 01 CARPET 1966 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1966 SATISFACTORY A STUDENT RESTROOM (BOTH SEXES) 0 01 TERRAZZO 1966 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1966 SATISFACTORY A STUDENT RESTROOM (BOTH SEXES) 0 01 TERRAZZO 1966 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1966 SATISFACTORY A STUDENT RESTROOM (BOTH SEXES) 0 01 TERRAZZO 1966 SATISFACTORY PRIMARY SKILLS LAB (K-3) CARPET 1966 SATISFACTORY A ITINERANT OFFICE 0 01 CARPET 1966 SATISFACTORY ART - ELEMENTARY 0 01 CARPET 1966 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1966 SATISFACTORY A E S E ITINERANT 0 01 CARPET 1966 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1966 SATISFACTORY INTERMEDIATE/MIDDLE CLASSROOM (4-8) CARPET 1966 SATISFACTORY INTERMEDIATE/MIDDLE CLASSROOM (4-8) CARPET 1966 SATISFACTORY INTERMEDIATE/MIDDLE CLASSROOM (4-8) CARPET 1966 SATISFACTORY INTERMEDIATE/MIDDLE CLASSROOM (4-8) CARPET 1966 SATISFACTORY Page 3 f 149 Reprt Date: 8/31/ :44:22 AM

80 FLORIDA INVENTORY OF SCHOOL HOUSES (FISH) FACILITY INVENTORY REPORT PRIMARY CLASSROOM (K-3) CARPET 1966 SATISFACTORY A TEACHER PLANNING OFFICE 0 01 CARPET 1966 SATISFACTORY B STUDENT RESTROOM (BOTH SEXES) 0 01 TERRAZZO 1966 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1966 SATISFACTORY A STUDENT RESTROOM (BOTH SEXES) 0 01 TERRAZZO 1966 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1966 SATISFACTORY A TEACHER PLANNING OFFICE 0 01 CARPET 1966 SATISFACTORY B STUDENT RESTROOM (BOTH SEXES) 0 01 TERRAZZO 1966 SATISFACTORY INTERMEDIATE/MIDDLE CLASSROOM (4-8) CARPET 1966 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1966 SATISFACTORY A STUDENT RESTROOM (BOTH SEXES) 0 01 TERRAZZO 1966 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1966 SATISFACTORY A STUDENT RESTROOM (BOTH SEXES) 0 01 TERRAZZO 1966 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1966 SATISFACTORY A STUDENT RESTROOM (BOTH SEXES) 0 01 TERRAZZO 1966 SATISFACTORY INTERMEDIATE/MIDDLE CLASSROOM (4-8) CARPET 1966 SATISFACTORY PRIMARY SKILLS LAB (K-3) 0 01 CARPET 1966 SATISFACTORY A TEACHER PLANNING OFFICE 0 01 CARPET 1966 SATISFACTORY PRIMARY SKILLS LAB (K-3) 0 01 CARPET 1966 SATISFACTORY INTERMEDIATE/MIDDLE CLASSROOM (4-8) CARPET 1966 SATISFACTORY A TEACHER PLANNING OFFICE 0 01 CARPET 1966 SATISFACTORY INTERMEDIATE/MIDDLE CLASSROOM (4-8) CARPET 1966 SATISFACTORY INTERMEDIATE/MIDDLE CLASSROOM (4-8) CARPET 1966 SATISFACTORY INTERMEDIATE/MIDDLE CLASSROOM (4-8) CARPET 1966 SATISFACTORY Page 4 f 149 Reprt Date: 8/31/ :44:22 AM

81 FLORIDA INVENTORY OF SCHOOL HOUSES (FISH) FACILITY INVENTORY REPORT INTERMEDIATE/MIDDLE CLASSROOM (4-8) CARPET 1966 SATISFACTORY INTERMEDIATE/MIDDLE CLASSROOM (4-8) CARPET 1966 SATISFACTORY RECEPTION AREA 0 01 CARPET 1966 SATISFACTORY PRINCIPAL/DIRECTOR OFFICE 0 01 CARPET 1966 SATISFACTORY A STUDENT RESTROOM (BOTH SEXES) 0 01 CERAMIC TILE 1966 SATISFACTORY B GENERAL SCHOOL STORAGE 0 01 CARPET 1966 SATISFACTORY ASSISTANT PRINCIPAL/OTHER OFFICE 0 01 CARPET 1966 SATISFACTORY B GENERAL SCHOOL STORAGE 0 01 CARPET 1966 SATISFACTORY CONFERENCE ROOM 0 01 CARPET 1966 SATISFACTORY MATERIAL STORAGE 0 01 CARPET 1966 SATISFACTORY STUDENT RESTROOM (MALE) 0 01 CERAMIC TILE 1966 SATISFACTORY BOOKKEEPING OFFICE 0 01 CARPET 1966 SATISFACTORY CLINIC 0 01 CARPET 1966 SATISFACTORY A STUDENT RESTROOM (BOTH SEXES) 0 01 CERAMIC TILE 1966 SATISFACTORY PRODUCTION WORKROOM 0 01 CARPET 1966 SATISFACTORY TEACHER LOUNGE/DINING 0 01 CARPET 1966 SATISFACTORY STUDENT RESTROOM (FEMALE) 0 01 CERAMIC TILE 1966 SATISFACTORY LIBRARY (READING ROOM/STACKS) 0 01 CARPET 1966 SATISFACTORY A MEDIA SMALL GROUP ROOM 0 01 CARPET 1966 SATISFACTORY B AUDIO VISUAL STORAGE 0 01 CARPET 1966 SATISFACTORY C CONFERENCE ROOM 0 01 CARPET 1966 SATISFACTORY DINING AREA 0 01 TERRAZZO 1966 SATISFACTORY A STAGE STORAGE 0 01 WOOD 1966 SATISFACTORY B STAGE 0 01 WOOD 1966 SATISFACTORY Page 5 f 149 Reprt Date: 8/31/ :44:22 AM

82 FLORIDA INVENTORY OF SCHOOL HOUSES (FISH) FACILITY INVENTORY REPORT KITCHEN FOOD PREPARATION 0 01 TERRAZZO 1966 SATISFACTORY CUSTODIAL EQUIPMENT STORAGE 0 01 CONCRETE 1966 SATISFACTORY CUSTODIAL EQUIPMENT STORAGE 0 01 CONCRETE 1966 SATISFACTORY STAFF RESTROOM (BOTH SEXES) 0 01 CERAMIC TILE 1966 SATISFACTORY STUDENT RESTROOM (MALE) 0 01 CERAMIC TILE 1966 SATISFACTORY KITCHEN FOOD PREPARATION 0 01 TERRAZZO 1966 SATISFACTORY TEACHER LOUNGE/DINING 0 01 COMPOSITION TILE 1966 SATISFACTORY STAFF RESTROOM (FEMALE) 0 01 CERAMIC TILE 1966 SATISFACTORY MECHANICAL ROOM 0 01 CONCRETE 1966 SATISFACTORY ELECTRICAL ROOM 0 01 CONCRETE 1966 SATISFACTORY CUSTODIAL SERVICE CLOSET 0 01 CONCRETE 1966 SATISFACTORY STUDENT RESTROOM (MALE) 0 01 CERAMIC TILE 1966 SATISFACTORY STUDENT RESTROOM (FEMALE) 0 01 CERAMIC TILE 1966 SATISFACTORY KITCHEN DISH WASHING 0 01 TERRAZZO 1966 SATISFACTORY OTHER FOOD SERVICE 0 01 TERRAZZO 1966 SATISFACTORY A OTHER FOOD SERVICE 0 01 OTHER 1966 SATISFACTORY B OTHER FOOD SERVICE 0 01 OTHER 1966 SATISFACTORY KITCHEN CHAIR STORAGE 0 01 TERRAZZO 1966 SATISFACTORY OTHER FOOD SERVICE 0 01 CONCRETE 1966 SATISFACTORY OTHER FOOD SERVICE 0 01 CARPET 1966 SATISFACTORY KITCHEN DRY STORAGE 0 01 CONCRETE 2013 SATISFACTORY A KITCHEN DRY STORAGE 0 01 CONCRETE 2013 SATISFACTORY INSIDE CIRCULATION 0 01 TERRAZZO 1966 SATISFACTORY Page 6 f 149 Reprt Date: 8/31/ :44:22 AM

83 FLORIDA INVENTORY OF SCHOOL HOUSES (FISH) FACILITY INVENTORY REPORT COVERED WALKWAY 0 01 CONCRETE 1980 SATISFACTORY Satisfactry Unsatisfactry Failed Standards Scheduled Fr Replacement Square Feet Student Statins Square Feet Student Statins Square Feet Student Statins Square Feet Student Statins Permanent 65, TOTAL 65, Page 7 f 149 Reprt Date: 8/31/ :44:22 AM

84 FLORIDA INVENTORY OF SCHOOL HOUSES (FISH) FACILITY INVENTORY REPORT DISTRICT: 5 BREVARD COUNTY SCHOOL DISTRICT FACILITY: 4-A APOLLO ELEMENTARY BUILDING: 2 - Building Number Owner: SCHOOL BOARD Light: ADEQUATE Cling: NONE Use: ELEMENTARY Mech Vent: ADEQUATE Heat Surce: NONE Year Cnstructed: 1975 Artificial Lighting: UNSHIELDED INCANDESCENT Heat Distributin: NO HEAT PROVIDED Year Mdified: Educatinal TV: NONE Heat Capacity: NONE Average Age NSF: 1990 Intercm: NONE Walls: CONCRETE Relcatable Units: 0 Telephne: NONE Struct Cmp: CONCRETE Stries: 1 Crridr: NONE ROOM NET SQ FT DESIGN CODE DESCRIPTION STU STA FLR LOC FLOOR COVER YEAR CONST CONDITION BLDG PAR FAC ASSISTANT PRINCIPAL/OTHER OFFICE 0 01 CARPET 1990 SATISFACTORY CONFERENCE ROOM 0 01 CARPET 1990 SATISFACTORY ASSISTANT PRINCIPAL/OTHER OFFICE 0 01 CARPET 1990 SATISFACTORY RESOURCE ROOM 0 01 CARPET 1990 SATISFACTORY A GENERAL SCHOOL SPACE 0 01 CARPET 1990 SATISFACTORY MECHANICAL ROOM 0 01 CONCRETE 1990 SATISFACTORY CUSTODIAL SERVICE CLOSET 0 01 CONCRETE 1990 SATISFACTORY ELECTRICAL ROOM 0 01 CONCRETE 1990 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1990 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1990 SATISFACTORY A INSIDE CIRCULATION 0 01 CARPET 1990 SATISFACTORY B STUDENT RESTROOM (MALE) 0 01 CERAMIC TILE 1990 SATISFACTORY Page 8 f 149 Reprt Date: 8/31/ :44:22 AM

85 FLORIDA INVENTORY OF SCHOOL HOUSES (FISH) FACILITY INVENTORY REPORT 208C MECHANICAL ROOM 0 01 CONCRETE 1990 SATISFACTORY D STUDENT RESTROOM (FEMALE) 0 01 CERAMIC TILE 1990 SATISFACTORY E TEACHER PLANNING OFFICE 0 01 CARPET 1990 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1990 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1990 SATISFACTORY A INSIDE CIRCULATION 0 01 CARPET 1990 SATISFACTORY B STUDENT RESTROOM (MALE) 0 01 CERAMIC TILE 1990 SATISFACTORY C MECHANICAL ROOM 0 01 CONCRETE 1990 SATISFACTORY D STUDENT RESTROOM (FEMALE) 0 01 CERAMIC TILE 1990 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1990 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1990 SATISFACTORY A INSIDE CIRCULATION 0 01 CARPET 1990 SATISFACTORY B STUDENT RESTROOM (MALE) 0 01 CERAMIC TILE 1990 SATISFACTORY C MECHANICAL ROOM 0 01 CONCRETE 1990 SATISFACTORY D STUDENT RESTROOM (FEMALE) 0 01 CERAMIC TILE 1990 SATISFACTORY E TEACHER PLANNING OFFICE 0 01 CARPET 1990 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1990 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1990 SATISFACTORY A INSIDE CIRCULATION 0 01 CARPET 1990 SATISFACTORY B STUDENT RESTROOM (MALE) 0 01 CERAMIC TILE 1990 SATISFACTORY C MECHANICAL ROOM 0 01 CONCRETE 1990 SATISFACTORY D STUDENT RESTROOM (FEMALE) 0 01 CERAMIC TILE 1990 SATISFACTORY Page 9 f 149 Reprt Date: 8/31/ :44:22 AM

86 FLORIDA INVENTORY OF SCHOOL HOUSES (FISH) FACILITY INVENTORY REPORT MATERIAL STORAGE (LARGE) 0 01 CONCRETE 1990 SATISFACTORY Satisfactry Unsatisfactry Failed Standards Scheduled Fr Replacement Square Feet Student Statins Square Feet Student Statins Square Feet Student Statins Square Feet Student Statins Permanent 11, TOTAL 11, Page 10 f 149 Reprt Date: 8/31/ :44:22 AM

87 FLORIDA INVENTORY OF SCHOOL HOUSES (FISH) FACILITY INVENTORY REPORT DISTRICT: 5 BREVARD COUNTY SCHOOL DISTRICT FACILITY: 4-A APOLLO ELEMENTARY BUILDING: 3 - Building Number Owner: SCHOOL BOARD Light: ADEQUATE Cling: CENTRAL Use: ELEMENTARY Mech Vent: ADEQUATE Heat Surce: ELECTRIC Year Cnstructed: 1990 Artificial Lighting: SHIELDED FLORESCENT Heat Distributin: CENTRAL HOT AIR Year Mdified: Educatinal TV: CLOSED CIRCUIT Heat Capacity: ADEQUATE Average Age NSF: 1990 Intercm: TWO WAY COMPLETE Walls: BRICK Relcatable Units: 0 Telephne: PARTIAL SYSTEM Struct Cmp: COMBINATION OF 1-3 Stries: 1 Crridr: SINGLE OUTSIDE ROOM NET SQ FT DESIGN CODE DESCRIPTION STU STA FLR LOC FLOOR COVER YEAR CONST CONDITION BLDG PAR FAC MUSIC - ELEMENTARY 0 01 COMPOSITION TILE 1990 SATISFACTORY A TEACHER PLANNING OFFICE 0 01 COMPOSITION TILE 1990 SATISFACTORY B MUSIC RELATED SPACE 0 01 COMPOSITION TILE 1990 SATISFACTORY C MUSIC RELATED SPACE 0 01 COMPOSITION TILE 1990 SATISFACTORY D MUSIC RELATED SPACE 0 01 COMPOSITION TILE 1990 SATISFACTORY MECHANICAL ROOM 0 01 CONCRETE 1990 SATISFACTORY ELECTRICAL ROOM 0 01 CONCRETE 1990 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1990 SATISFACTORY A INSIDE CIRCULATION 0 01 CARPET 1990 SATISFACTORY B STUDENT RESTROOM (BOTH SEXES) 0 01 CERAMIC TILE 1990 SATISFACTORY C MECHANICAL ROOM 0 01 CONCRETE 1990 SATISFACTORY D STUDENT RESTROOM (BOTH SEXES) 0 01 CERAMIC TILE 1990 SATISFACTORY Page 11 f 149 Reprt Date: 8/31/ :44:22 AM

88 FLORIDA INVENTORY OF SCHOOL HOUSES (FISH) FACILITY INVENTORY REPORT 304E TEACHER PLANNING OFFICE 0 01 CARPET 1990 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1990 SATISFACTORY E S E PART-TIME CARPET 1990 SATISFACTORY A INSIDE CIRCULATION 0 01 CARPET 1990 SATISFACTORY B STUDENT RESTROOM (MALE) 0 01 CERAMIC TILE 1990 SATISFACTORY C MECHANICAL ROOM 0 01 CONCRETE 1990 SATISFACTORY D STUDENT RESTROOM (FEMALE) 0 01 CERAMIC TILE 1990 SATISFACTORY E S E PART-TIME CARPET 1990 SATISFACTORY E S E FULL-TIME CARPET 1990 SATISFACTORY E S E FULL-TIME CARPET 1990 SATISFACTORY ITINERANT OFFICE 0 01 CARPET 1990 SATISFACTORY E S E SUPPLEMENTARY INSTRUCTION 0 01 CARPET 1990 SATISFACTORY INTERMEDIATE/MIDDLE CLASSROOM (4-8) CARPET 1990 SATISFACTORY MECHANICAL ROOM 0 01 CONCRETE 1990 SATISFACTORY E S E SUPPLEMENTARY INSTRUCTION 0 01 CARPET 1990 SATISFACTORY E S E SUPPLEMENTARY INSTRUCTION 0 01 CARPET 1990 SATISFACTORY CUSTODIAL SERVICE CLOSET 0 01 CERAMIC TILE 1990 SATISFACTORY Satisfactry Unsatisfactry Failed Standards Scheduled Fr Replacement Square Feet Student Statins Square Feet Student Statins Square Feet Student Statins Square Feet Student Statins Permanent 9, TOTAL 9, Page 12 f 149 Reprt Date: 8/31/ :44:22 AM

89 FLORIDA INVENTORY OF SCHOOL HOUSES (FISH) FACILITY INVENTORY REPORT DISTRICT: 5 BREVARD COUNTY SCHOOL DISTRICT FACILITY: 4-A APOLLO ELEMENTARY BUILDING: 4 - Building Number Owner: SCHOOL BOARD Light: ADEQUATE Cling: CENTRAL Use: ELEMENTARY Mech Vent: ADEQUATE Heat Surce: ELECTRIC Year Cnstructed: 1990 Artificial Lighting: SHIELDED FLORESCENT Heat Distributin: CENTRAL HOT AIR Year Mdified: Educatinal TV: CLOSED CIRCUIT Heat Capacity: ADEQUATE Average Age NSF: 1990 Intercm: TWO WAY COMPLETE Walls: BRICK Relcatable Units: 0 Telephne: PARTIAL SYSTEM Struct Cmp: COMBINATION OF 1-3 Stries: 1 Crridr: SINGLE OUTSIDE ROOM NET SQ FT DESIGN CODE DESCRIPTION STU STA FLR LOC FLOOR COVER YEAR CONST CONDITION BLDG PAR FAC ELECTRICAL ROOM 0 01 CONCRETE 1990 SATISFACTORY MECHANICAL ROOM 0 01 CONCRETE 1990 SATISFACTORY RESOURCE ROOM 0 01 CARPET 1990 SATISFACTORY RESOURCE ROOM 0 01 CARPET 1990 SATISFACTORY STAFF RESTROOM (FEMALE) 0 01 CERAMIC TILE 1990 SATISFACTORY RESOURCE ROOM 0 01 CARPET 1990 SATISFACTORY STAFF RESTROOM (MALE) 0 01 CERAMIC TILE 1990 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1990 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1990 SATISFACTORY A INSIDE CIRCULATION 0 01 CARPET 1990 SATISFACTORY B STUDENT RESTROOM (MALE) 0 01 CERAMIC TILE 1990 SATISFACTORY C MECHANICAL ROOM 0 01 CONCRETE 1990 SATISFACTORY Page 13 f 149 Reprt Date: 8/31/ :44:22 AM

90 FLORIDA INVENTORY OF SCHOOL HOUSES (FISH) FACILITY INVENTORY REPORT 408D STUDENT RESTROOM (FEMALE) 0 01 CERAMIC TILE 1990 SATISFACTORY E TEACHER PLANNING OFFICE 0 01 CARPET 1990 SATISFACTORY INTERMEDIATE/MIDDLE CLASSROOM (4-8) CARPET 1990 SATISFACTORY INTERMEDIATE/MIDDLE CLASSROOM (4-8) CARPET 1990 SATISFACTORY A INSIDE CIRCULATION 0 01 CARPET 1990 SATISFACTORY B STUDENT RESTROOM (MALE) 0 01 CERAMIC TILE 1990 SATISFACTORY C MECHANICAL ROOM 0 01 CONCRETE 1990 SATISFACTORY D STUDENT RESTROOM (FEMALE) 0 01 CERAMIC TILE 1990 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1990 SATISFACTORY PRIMARY CLASSROOM (K-3) CARPET 1990 SATISFACTORY A INSIDE CIRCULATION 0 01 CARPET 1990 SATISFACTORY B STUDENT RESTROOM (MALE) 0 01 CERAMIC TILE 1990 SATISFACTORY C MECHANICAL ROOM 0 01 CONCRETE 1990 SATISFACTORY D STUDENT RESTROOM (MALE) 0 01 CERAMIC TILE 1990 SATISFACTORY E TEACHER PLANNING OFFICE 0 01 CARPET 1990 SATISFACTORY Satisfactry Unsatisfactry Failed Standards Scheduled Fr Replacement Square Feet Student Statins Square Feet Student Statins Square Feet Student Statins Square Feet Student Statins Permanent 9, TOTAL 9, Page 14 f 149 Reprt Date: 8/31/ :44:22 AM

91 FLORIDA INVENTORY OF SCHOOL HOUSES (FISH) FACILITY INVENTORY REPORT DISTRICT: 5 BREVARD COUNTY SCHOOL DISTRICT FACILITY: 4-A APOLLO ELEMENTARY BUILDING: 5 - Building Number Owner: SCHOOL BOARD Light: NONE Cling: NONE Use: ELEMENTARY Mech Vent: NONE Heat Surce: NONE Year Cnstructed: 1967 Artificial Lighting: NONE Heat Distributin: NO HEAT PROVIDED Year Mdified: Educatinal TV: NONE Heat Capacity: NONE Average Age NSF: 1967 Intercm: NONE Walls: HOLLOW BLOCK Relcatable Units: 0 Telephne: NONE Struct Cmp: CONCRETE Stries: 1 Crridr: NONE ROOM NET SQ FT DESIGN CODE DESCRIPTION STU STA FLR LOC FLOOR COVER YEAR CONST CONDITION BLDG PAR FAC FLAMMABLE STORAGE 0 01 CONCRETE 1967 SATISFACTORY Satisfactry Unsatisfactry Failed Standards Scheduled Fr Replacement Square Feet Student Statins Square Feet Student Statins Square Feet Student Statins Square Feet Student Statins Permanent TOTAL Page 15 f 149 Reprt Date: 8/31/ :44:22 AM

92 FLORIDA INVENTORY OF SCHOOL HOUSES (FISH) FACILITY INVENTORY REPORT DISTRICT: 5 BREVARD COUNTY SCHOOL DISTRICT FACILITY: 4-A APOLLO ELEMENTARY BUILDING: 6 Owner: SCHOOL BOARD Light: ADEQUATE Cling: NONE Use: ELEMENTARY Mech Vent: ADEQUATE Heat Surce: NONE Year Cnstructed: 2009 Artificial Lighting: SHIELDED FLORESCENT Heat Distributin: NO HEAT PROVIDED Year Mdified: Educatinal TV: NONE Heat Capacity: NONE Average Age NSF: 2009 Intercm: NONE Walls: OTHER Relcatable Units: 0 Telephne: NONE Struct Cmp: STEEL Stries: 1 Crridr: NONE ROOM NET SQ FT DESIGN CODE DESCRIPTION STU STA FLR LOC FLOOR COVER YEAR CONST CONDITION BLDG PAR FAC MATERIAL STORAGE (LARGE) 0 01 CONCRETE 2009 SATISFACTORY Satisfactry Unsatisfactry Failed Standards Scheduled Fr Replacement Square Feet Student Statins Square Feet Student Statins Square Feet Student Statins Square Feet Student Statins Permanent TOTAL Page 16 f 149 Reprt Date: 8/31/ :44:22 AM

93 FLORIDA INVENTORY OF SCHOOL HOUSES (FISH) FACILITY INVENTORY REPORT STUDENT STATIONS BY DESIGN CODE FOR: FACILITY: APOLLO ELEMENTARY Satis Stu Sta Unsat Stu Sta Sat Unsat Satis Rms Unsatis Rms Fail Std Stu Sta Repl Stu Sta Fail Std Rms Repl Rms Design Cde Design Cde Descriptin Perm Md Rel Perm Md Rel Tt Tt Perm Md Rel Perm Md Rel Rel Rel Rel Rel PRIMARY CLASSROOM (K-3) INTERMEDIATE/MIDDLE CLASSROOM (4-8) PRIMARY SKILLS LAB (K-3) RESOURCE ROOM ART - ELEMENTARY MUSIC - ELEMENTARY E S E PART-TIME E S E FULL-TIME E S E SUPPLEMENTARY INSTRUCTION E S E ITINERANT MUSIC RELATED SPACE P E MULTIPURPOSE ROOM (MIDDLE-SR HIGH) OTHER P E SPACE PRINCIPAL/DIRECTOR OFFICE ASSISTANT PRINCIPAL/OTHER OFFICE BOOKKEEPING OFFICE RECEPTION AREA PRODUCTION WORKROOM CONFERENCE ROOM CLINIC GENERAL SCHOOL STORAGE ITINERANT OFFICE TEACHER PLANNING OFFICE TEACHER LOUNGE/DINING Page 17 f 149 Reprt Date: 8/31/ :44:22 AM

94 FLORIDA INVENTORY OF SCHOOL HOUSES (FISH) FACILITY INVENTORY REPORT Satis Stu Sta Unsat Stu Sta Sat Unsat Satis Rms Unsatis Rms Fail Std Stu Sta Repl Stu Sta Fail Std Rms Repl Rms Design Cde Design Cde Descriptin Perm Md Rel Perm Md Rel Tt Tt Perm Md Rel Perm Md Rel Rel Rel Rel Rel GENERAL SCHOOL SPACE CUSTODIAL SERVICE CLOSET FLAMMABLE STORAGE CUSTODIAL EQUIPMENT STORAGE DINING AREA KITCHEN DRY STORAGE KITCHEN FOOD PREPARATION KITCHEN DISH WASHING KITCHEN CHAIR STORAGE OTHER FOOD SERVICE STAGE STAGE STORAGE LIBRARY (READING ROOM/STACKS) AUDIO VISUAL STORAGE MEDIA SMALL GROUP ROOM INSIDE CIRCULATION COVERED WALKWAY MECHANICAL ROOM ELECTRICAL ROOM MATERIAL STORAGE MATERIAL STORAGE (LARGE) STUDENT RESTROOM (BOTH SEXES) STUDENT RESTROOM (MALE) STUDENT RESTROOM (FEMALE) STAFF RESTROOM (MALE) STAFF RESTROOM (FEMALE) Page 18 f 149 Reprt Date: 8/31/ :44:22 AM

95 FLORIDA INVENTORY OF SCHOOL HOUSES (FISH) FACILITY INVENTORY REPORT Satis Stu Sta Unsat Stu Sta Sat Unsat Satis Rms Unsatis Rms Fail Std Stu Sta Repl Stu Sta Fail Std Rms Repl Rms Design Cde Design Cde Descriptin Perm Md Rel Perm Md Rel Tt Tt Perm Md Rel Perm Md Rel Rel Rel Rel Rel STAFF RESTROOM (BOTH SEXES) Ttals: Page 19 f 149 Reprt Date: 8/31/ :44:22 AM

96 APPENDIX J ORIGINAL AS-BUILT DRAWINGS

97

98 APPENDIX K BUILDINGS #2-4 ADDITION DRAWINGS

99

100

101

102

103

104

105

106

107

108

109 APPENDIX L 2011 HVAC MODIFICATIONS DRAWINGS

110

111

112

113