1 153 Electrical Arrangements to the Service Buildings at Various Location in Chennai July Supply and Erection Electrical Products and Wiring 152 Revamping of Electrical and Instrumentation / FPSO BROTOJOYO Jan Supply and Erection of Electrical, Instrumentation and Control 151 Electrification of DAE UGC CSR Building 150 Revamping of Electrical and Instrumentation / FPSO BROTOJOYO 149 Revamping of Electrical and Instrumentation / FPSO BROTOJOYO 148 Revamping of Electrical and Instrumentation / FPSO BROTOJOYO Jan Dec Dec Dec Design Manufacturing, Supply, Installation, Testing, and Electrical systems. Design, Engineering, Manufacture, Supply, Erection, Install and Heat Tracing Design, Engineering, Manufacture, Supply, Erection, Install and Fire Alarm Panel Design, Engineering, Manufacture, Supply, Erection, Install and Electric Control and DCS

2 147 Revamping of Dec Design, Electrical and Engineering, Instrumentation / Manufacture, FPSO Supply, Erection, BROTOJOYO Install and E- and Instrumentation 146 Electrical and Automation Panel Nov Design, Engineering, Manufacture, Supply and MMC cum VFD Panels, UPS, JUNCTION Boxes and PLC Panels 145 Building Management s Nov Supply and Installation of BMS 144 Automation for Air Conditioning Equipments 143 Electrical for RECLAIMER Nov Nov Design, Manufacture, Supply, Installation, Testing, Commissioning and Training of Automation. Design, Engineering, Supply, Electrical.

3 142 Control Upgradation for EAF III Project Nov Design, Supply, Erection, Testing, PLC based Control 141 Electrical and Control systems for Wagon Tippler and Side Arm Charger ( Vedanta Aluminum Limited, Orissa ) Oct Design, Engineering, Supply, Erection of Electrical and Control systems. 140 Electrical and Control systems for Wagon Tippler and Side Arm Charger ( Bellary Thermal Power Station, Karnataka Power Corporation ) Oct Design, Engineering, Supply, Erection of Electrical and Control systems. 139 Electrical and Control systems for Stacker & Reclaimer ( Bellary Thermal Power Station, Karnataka Power Corporation ) Oct 2010 Design, Engineering, Supply, Erection of Electrical and Control systems th Oxidizer Line at Cristal Pigment Plant 137 Control for Nitrogen Package Sep Sep Detail Design Engineering, PDMS Modeling of Mechanical and Piping. Design, Engineering of PLC and Power Distributed Panels

4 136 Electrical Works at LOBS Project Site Aug 2010 Supply, Installation, Testing & LT Switchgears ( Excluding Supply ), Cabling, Lighting etc at LOBS Project Site 135 PLC Based Control for Fuel Recovery Jul Design, Engineering for PLC, MCC and VFD s 134 ROC Plant Jun Design and Detail Engineering of Electrical, Instrumentation and control system 133 Electrical and Automation Panel Apr Design, Engineering, Manufacture, Supply of MMC cum VFD Panels, UPS, JUNCTION Boxes and PLC Panels. 132 OGIP IK WELLHEAD Apr Site survey, design and detail engineering for modification of Existing E- with deck extension 131 OGIP SD WELLHEAD Mar

5 130 GOHDS REVAMP PROJECT AT MRPL Mar Supply and Installation of Electrical & Instrumentation work 129 B193 Detailed Engineering Feb Pre-Bid Engineering support 128 D1 Development Project Feb Pre-Bid Engineering support 127 Tank Level and Temperature Measurement Jan Design, Engineering, Commissioning and Supply of Instrumentation and PLC Panel 126 B193 Process Platform Jan Pre-Bid Engineering support 125 PLC Jan Supply, Installation, Commissioning and Testing of PLC system 124 Electrification of Modified Hall Jan Electrical Works 123 Drive Panels for Printing Machines - 47 Nos. Dec Manufacturing and Supply

6 122 Compression Test Bed Facility at SIEMENS, Vadodara Dec SITC of Electrical and Instrumentation Package 121 HRDC Building Dec Electrical Works , KKNPP,KKNPP Starter Panel Nov Manufacture, and Supply of Stater Panel Copper Bus Bar Nov Supply,Fabrication & Installation of Copper Bus Bar 118 Electrical for Wagon Tippler Nov Design, Engineering, Supply, Electrical s. 117, DAE, KALPAKKAM Power Control Center Nov Manufacture,Supply, Erection, Commissioning and Testing of Control panel 116 Electrical and Control systems for Stacker & Reclaimer (Paradeep project of ESSAR STEEL) Nov Design, Engineering, Supply, Electrical and Control systems WPP Well Head Platform Oct Pre-Bid Engineering support

7 114 Orient Cement Plant Oct Manufacture and supply of MCC Panel 113 Orient Cement Plant Oct Manufacture and supply of Control desk 112 Automatic Cotton Feeding Oct Design, Engineering and Supply of PLC 111 INS KATTABOMMAN Modification of compressor control system Sep Manufacture and supply of compressor control system 110 EXCEL TEXTRONICS VFD Panel Aug Manufacture and Supply of VFD Panel. 109 Drive Panel Aug Manufacture and Supply of Drive Panel. 108 B-193 Well head Aug Pre-Bid Engineering support 107 Automation for 10 MW Bio Mass Power plant Jun Design, Engineering, Supply, DCS system

8 106 Fertilizer &Chemical Plant May Design and Detail Engineering & supply of PLC control system 105 OGIP IB WELLHEAD 104 OGIP SR WELLHEAD 103 OGIP NH WELLHEAD 102 Electrical and Control systems for Paddle Feeder. (Santaldih Thermal Power plant) 101 Automation for Amine Sweetening Plant Apr Apr Apr Apr Apr Site survey, design and detail engineering for modification of Existing E- with deck extension Design, Engineering, Supply, Electrical and Control systems. Design, Engineering and PLC system 100 OGIP RS2 WELLHEAD Mar Site survey, design and detail engineering for modification of Existing E- with deck extension

9 99 OGIP SE WELLHEAD Mar OGIP N4 WELLHEAD Mar OGIP NJ WELLHEAD 96 OGIP NV WELLHEAD 95 OGIP SP WELLHEAD 94 OGIP NM WELLHEAD 93 OGIP SB WELLHEAD Mar Mar Mar Mar Mar

10 92 OGIP IF WELLHEAD Mar Site survey, design and detail engineering for modification of Existing E- with deck extension 91 Electrical Distribution system with DG sets Mar Design, Engineering, Supply, Erection of Electrical distribution systems and DG sets. 90 Unit Mar Design and Detail Engineering of Electrical, Instrumentation and control system 89 OGIP RS11 WELLHEAD 88 OGIP WELLHEAD 87 OGIP NW WELLHEAD 86 OGIP SS WELLHEAD Feb Feb Feb Feb Site survey, design and detail engineering for modification of Existing E- with deck extension

11 85 OGIP SJ WELLHEAD Feb OGIP SN WELLHEAD Feb OGIP IG WELLHEAD Feb Site survey, design and detail engineering for modification of Existing E- with deck extension 82 OGIP IA WELLHEAD Feb Site survey, design and detail engineering for modification of Existing E- with deck extension 81 JEYA VISHNU TEX PROCESSORS PVT LTD PLC based water level control panel Feb Manufacture and Supply of PLC Control Panel. 80 Automation for Sinter Plant Feb Design, Engineering, Erection and PLC system 79 OGIP SY WELLHEAD Jan

12 78 OGIP SM WELLHEAD Jan OGIP N8 WELLHEAD 76 OGIP N9 WELLHEAD Jan Jan Drive Panels for Printing Machines 21 Nos. Jan Manufacturing and Supply 74 Drive Panels for process Pumps Jan Design,Engineering, Installation, Commissioning 73 MHN Process Platform Dec Pre-Bid Engineering support 72 6th Chlorinator Dec Design and Detail Engineering of Electrical, Instrumentation and control system

13 71 Automatic cotton feeding system May Design, Engineering, Installation, Erection 70 Digital Counting system for Castings 69 Automation of Cup Cake Machine 68 GLOBAL CONVEYOR Automation of Material Handling 67 Automatic cotton feeding system May-2008 Design, Engineering, Installation, Commissioning Mar-2008 Design, Engineering, Installation, Commissioning Feb-2008 Design, Engineering, Installation, Commissioning Feb-2008 Design, Engineering, Installation, PLC 66 Design and Detail Engineering of ONGC - OGIP Power to ESP Jan-2008/ Mar-09 Design and Detail Engineering for Offshore Grid interconnectivity Project comprising of Electrical Instrumentation, Structural modification Telecommunication, Catholic Production, JTube Design, SCADA etc., 65 Control Panel for Ready-mix Concrete preparation plant 64 Automatic cotton feeding system Nov-2007 Design, Engineering, Installation, PLC Aug-2007 Design, Engineering, Installation, PLC

14 63 Automatic cotton feeding system July-2007 Design,Engineering, Installation, PLC 62 Automation control panel for chillers p/c and plant room equipments G.KUPPUSWAMYNAIDU MEMORIALHOSPITAL MW Captive Power Plant July-2007 Design,Engineering, Installation, PLC July-2007 Design, Engineering, Erection of DCS 60 10MW Bio-Mass Power Plant July-2007 Design, Engineering, Erection of DCS 59 3 MW Captive Power Plant May-2007 Design, Engineering, Erection of DCS 58 SAXI TEG regeneration package 57 PURE GROUP -Modec TEG Package June-2007 June-2007 Design and Engineering of Gas Dehydration and TEG Regeneration (160 MMscfd, 22 USgpm (99.8% wt TEG conc.) MMscfd, Fuel Gas conditioning for Gas Turbine Generator 56 FRADE FPSO TEG regeneration package June-2007 Design and Engineering of Gas Dehydration and TEG Regeneration

15 55 SBM / CHEVRON - FRADE FPSO Desander and Sand Jetting water feed pump package June-2007 Design & Enginnering of sand removal system 54 PETROBRAS- GENERIC FPSO GAS 53 SRKP Field Development TSIOC/Modec 52 SHELL BC-10 FPSO- TEG Package 51 RAS GAS OFFSHORE EXPANSION PROJECT PH-2 50 ARMADA PEKASHA FPSO Aug-2007 Aug-2007 June-2007 Apr-2007 Feb-2007 Detailed engineering of Flare and Drain Module,Water Injection Module and Gas dehydration/fuel gas module. FPSO Topsides Basic design and Engineering - production and treatment of 25,000 BOPD Design and Engineering of Gas Dehydration and TEG Regeneration (45 MMscfd,11USgpm (99.78% wt TEG conc.) Design engineering of condensate and water strainers (Basket strainers) Existing system review and design 49 PETROBRAS- FPSO OPPORTUNITY OIL Jan-2007 Gas comp capacity of 3,500k m3/day and De-sulphated water inj capacity of 22k m3/day.

16 48 SBM Saxi Bataque TEG Package Dec-2006 Design and Engage of Gas Dehydration and TEG Regen Sys (160 MMscfd, 22 USgpm (99.8% wt TEG conc.) 47 SBM/Chevron- FRADE FPSO Gas Dehydration and TEG Regeneration package 46 PETROBRAS- FPSO OPPORTUNITY OIL 45 KIZOMBA- C FPSO MONDO Dec-2006 Sep-2006 Sep-2006 Design and Engineering of Gas Dehydration and TEG Regen Sys (116.6 MMscfd, 18 USgpm (99.5% wt TEG conc.) FPSO Topsides design Engg & (Bidsupport)prodandtreatment of 16k m3/day, Gas comp capacity of 3,500k m3/day & De-sulphated water inj capacity of 22km3/day Design and Engineering of Gas Dehydration and TEG Regeneration 44 Premier Oil MERU Project July-2006 Design, Review and Optimization of Marine Energy Resource Unit (MERU) 43 POLVO-FPSO COTP 500BPD May-2006 Design, Review and Optimization of Crude Oil Topping Plant (COTP) 42 Global Techno s Engineering EPCC for MOGA and Transit Line Mar-2006 Produced water treatment system 41 MODEC INTERNATIONAL LLC / PETROBRAS PRA-1 FSO Project- Fuel Gas Skid Package Feb MMscfd, Fuel Gas conditioning for Gas Turbine Generator

17 40 SHELL(SSB)- F13 Glycol Dehydration package Mar MMSCFD gas flow/ 132 USgpm (98.8% wt Glycol concentration) 39 Ujung Pangkah Development Project Gas Dehydration and TEG Regeneration Package July MMSCFD gas flow/ 30USgpm (98.98% wt Glycol concentration) 38 TESMA/Singapore PETROCHINA- TBA/TBC- Field Development April-2006 FPSO Topside Process and Utilities 37 JORD International PTTEP Arthit Field Development Central Facilities Nov-2005 HP Production Separator Sand Jet Design case 36 COOEC HZ21-1 Development Project Aug-2005 Commissioning services 35 Capixaba FPSO of IHCGUSTO/SBM For Petrobras/Brazil July-2005 Separators Design Assistance 34 SUMANDAK Processing Platform B of Petronas Cargali Sdn. Bhd./Malaysia Dec-2005 FEED for gas Processing Facility 33 FPSO Kikeh-Murphy Sabah Oil.Ltd. - Chemical Injection Package Nov-2005 Chemical Injection

18 32 FPSO Kikeh-Murphy Sabah Oil.Ltd.- Nitrogen Generator Package and Nitrogen Intensifier Nov-2005 Membrane Technology, N2 purity 95%, 100 Nm3/hr 31 FPSO Kikeh-Murphy Sabah Oil.Ltd.- Gas Dehydration And TEG Regeneration Package Nov MMscfd / 19 USgpm( 99.8% Wt Glycol Concentration) 30 CACT OG, China. Feasibility Study for Marginal Field Development Dec-2005 Feasibility Study 29 Panyu 4-2/5-1 Well head Platform Modifications. Sep-2005 Pre-Commissioning and Commissioning Procedure & IOM 28 OKUME TLP Modec International May-2005 Methanol Injection 27 OKUME TLP Modec International May-2005 Methanol Injection 26 OKUME TLP Modec International May-2005 Chemical Injection 25 OKUME TLP Modec International May-2005 Chemical Injection

19 24 SUMANDAK Processing Platform B of Petronas Cargali Sdn. Bhd./Malaysia May-2005 Sea Water Treatment And Deaeration- Conceptual Design 23 Rong Doi Field Development/Vietnam For Korean National Oil Corporation June MMscfd / 18 USgpm( 99.0% Wt Glycol Concentration) 22 Capixaba FPSO of IHCGUSTO/SBM For Petrobras/Brazil May MMscfd / 7.5 USgpm( 99.5% Wt Glycol Concentration) 21 FEED Mar-2005 Pipeline Heaters PC Myanmar (Hong Kong) Ltd 20 Back Processing Facility Block 51 Nov-2004 On Shore Processing Facility, Tank Form, Utilities Etc. 19 D1 WWIP Sep-2004 Fine Filters Package 18 Rehmat Gas Processing Facilities/Bid Support June x 62 MMscfd / 10 gpm Sumatec Corporation Sdn.Bhd 17 /NanHaiwest FPSO (Hai Yang She You 111) Debottlenecking Project June-2004 FPSO Capacity Upgrade Studies

20 16 PCSB Fuel Gas Package- May-2004 Fuel Gas Package Bid Support 15 BR-E CO2 Topsides Talisman Malaysia Limited Dec-2004 Condensate Stabilization And Flash Gas Recovery 14 Basis and Detailed Engineering of BAOBAB FPSO Gas Processing Module May-2004 Gas Dehydration, Gas Hydrocarbon Dew point Control, Gas Metering 13 Basis and Detailed Engineering of BAOBAB FPSO Separation Packages 4 Skids May-2004 RVP, BS&W, OIL IN WATER 12 Gas Dehydration And TEG Regeneration Facility -Venezuela July x 17 MMscfd / 3.4 gpm 11 CPOC/Thailand CO2 Removal Facility/Bid Support June MMscfd, CO2 Mole frac Training for IBA / EXXON Mobil - Gas Dehydration And TEG Regeneration /Bid Support 9 Prai Power Sdn.Bhd. TENAGA NAZAR - Trouble Shooting/ (350MW Combine cycle gas turbine project Prani, Pulau Pinang.Malaysia) April/May 2003 Feb-2003 Training Operators and Engineers Trouble shooting of Diesel Handling

21 8 Salman Oil & Gas Field, Gas Dehydration And TEG Regeneration July x 300 MMscfd / 55 GPM 7 KINARUT Development - ERB West Tie - in May MMscfd / 6 GPM 6 MISC - FPSO Project- Gas Dehydration May MMscfd / 14 GPM 5 BOABAB Field Development-FPSO Topsides / CNR International (Côte d' Ivoire) S.A.R.L.- Bid Support 4 Espadarte FPSO Brazil - Trouble Shooting of Gas Dehydration Facility Nov ,000 BPD with 78% Water Cut/ 64 MMscfd/ 9 GPM Dec MMscfd 3 General Electric/ Turbine Encloser Structural General Arrangement Dec-2003 Engineering Support 2 OKUME & OVENG Field's - FPSO Topsides Triton Eqaterial Quinea Inc./Bid Support Oct ,000 BPD with 60% Water cut. Gas Flow Rate 70 MMscfd 1 Santa Fe Energy Resources Of China,Ltd. / China Offshore Oil Nanhai West Corporation Process Design Engineering of PANYU FPSO Topsides May ,000 BPD with 0-90% Water Cut, Highly Waxy, High Dew point