1 Salient Features of Proposed Project Namely Surya Emerald proposed to be developed by M/s. Surya Buildcon 1 Project Name and Location Address Surya Emerald Proposed to be developed by M/s. Surya Buildcon at O.P..-91/1, F.P..-91/1, Survey.-691/692/1+2/P, T.P.S..-51, Vill.:Makarba, Tal.: Vejalpur, Dist.- Ahmedabad 2 Project Developer M/s. Surya Buildcon 3 Correspondence Address Surya Emerald, Opp. Adiraj Bungalows, B/h Jayantilal Park, Iscon-Ambli Road, Makarba Ahmedabad 4 Project Cost Rs. 63 Crores 5 Total Plot Area (m²) 5353 Sq.mt. 6 Total Built-Up Area (m²) Sq.mt. 7 Total FSI Area (m²) Sq.mt 8 Total. of Units 105 flats 9 Parking Area (m²) Sq.mt 10 Source and Water requirement 82 kl/day water will be sourced from Ahmedabad Municipal Corporation 11 Rainwater Harvesting System 2 percolation well will be constructed for Ground Water recharge 12 Solid Waste generation Approx. 262 kg/day 13 Fire and Safety As per NBC and Ahmedabad Municipal Corporation all Fire and Safety measures will be adopted/installed during construction as well as during operation phase 14 ENVIRONMENTAL MANAGEMENT PLAN During Construction Mechanical Erection Fume generation due to welding and allied activities will be negligible and restricted to project site. All workers will be trained to use welding shields and follow safer practice. Vehicle movement All vehicles will be properly serviced and will be required to carry valid PUC certificate. Dusting during storage and handling Solid Waste During Operation Wastewater Municipal waste Greenbelt Tarpaulin sheet covers will be used on the material during transportation. se masks will be provided to all workers. Continuous water sprinkling will be done for dust suppression. Construction debris will be sold to organization using the same for landfill purposes. Domestic solid waste will be collected by AMC for ultimate disposal to their landfill site. Used Oil & used bags /liners will be sold to authorized recyclers. The domestic wastewater generated will be discharged to drainage line of Municipal Corporation The municipal solid waste will be stored on site before it is collected by AMC for ultimate disposal to their landfill site. Greenbelt will be developed and maintained in order to increase site Aesthetics as well as Abatement of ise pollution. For, M/s. Surya Buildcon

2 (I) BASIC INFORMATION 1 Name of the Project FORM 1 [Vide Paragraph - 6 of tification dated 14 th September 2006] : Form 1 Suraya Emerald 3 & 4 BHK residential apartments proposed to be developed by M/s. Surya Buildcon 2 Sr.. in the schedule : 8(a) - [Building and Construction projects] of the Schedule of EIA tification, Proposed capacity/ area/length /tonnage to be handled/ command area/ lease area/ number of wells to be drilled. : Final Plot area : 5353 m 2 Total Built-up Area : m 2 Total FSI area : m 2 Total Flats : 105 Flats Please refer Annexure 1 : Land Ownership Document & Partners Annexure- 2 : NA Certificate Annexure- 3 : Zoning Certificate Annexure-4 : T.P Scheme showing location of project Annexure-5 : Area Statement Annexure-6 : Location of the Project 4 New/ Expansion / Modernization : New Project 5 Existing capacity / Area etc. : t Applicable 6 Category of the project i.e. A or B : Category B [Sub - Category B2] Project Activity. 8 (a) 7 Does it attract the general condition? If yes, then specify. 8 Does it attract the specific condition? If yes, then specify. : : 9 Location : Please refer Annexure 6: Location of Project Site Plot/Survey/Khasra. : O.P..-91/1, F.P..- 91/1, Survey.- 691/ 692/1+2/P, T.P.S..-51 Village : Makarba Taluka : Vejalpur District : Ahmedabad State : Gujarat Surya Emerald Page - 1 of 16

3 10 Nearest railway station/ airport along with distance in kms. : Railway Station: Vastrapur Approx. 4 km. Airport: Ahmedabad Approx. 15 km. Form 1 11 Nearest town, city, district Headquarters along with distance in kms. 12 Village panchayats, Zilla parishad, municipal corporation, local body (complete postal addresses with telephone nos. to be given) : Ahmedabad the proposed project is within limits of the Ahmedabad Municipal Corporation (AMC). : The proposed project is within limits of the Ahmedabad Municipal Corporation (AMC). Central Zone, Municipal Corporation Building, Khamsa 13 Name of the applicant : Shri Shetalbhai D. Patel 14 Registered Address : Surya Emerald, Opp. Adiraj Bungalows,, B/h Jayantilal Park, Iscon-Ambli Road, Makarba Ahmedabad 15 Address for correspondence Name : Shri Shetalbhai D. Patel Designation (Owner/partner/CEO) : Partner Address : Surya Emerald, Opp. Adiraj Bungalows, B/h Jayantilal Park, Iscon-Ambli Road, Makarba Ahmedabad Pin code : contact@suryaansh.in Telephone. : (+91) Fax. : (+91) Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet. : t Applicable 17 Interlinked Projects. : t Applicable 18 Whether separate application of interlinked project has been submitted? : t Applicable 19 If yes, date of submission. : t Applicable 20 If no, reason. : t Applicable 21 Whether the proposal involves approval/clearance under: if yes, details of the same and their status to : t Applicable Surya Emerald Page - 2 of 16

4 be given. a) The Forest (Conservation) Act, 1980? b) The wildlife (protection) Act, 1972? c) The C.R.Z. tification, 1991? Form 1 22 Whether there is any Government Order/ Policy relevant/ relating to the site? : t Applicable 23 Forest land involved (hectares). : t Applicable 24 Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? Name of the court Case. Orders/directions of the court, if any land its relevance with the proposed project. : t Applicable I hereby give an undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. Date : vember, 2015 Place: Ahmedabad M/s. SuryaBuildcon Surya Emerald, Opp. Adiraj Bungalows, B/h. Jayantilal Park, Iscon-Ambli Road, Makarba, Ahmedabad Surya Emerald Page - 3 of 16

5 Form 1 (II) ACTIVITY 1) Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr.. Information/Checklist confirmation Yes / Details there of (with approximate quantities/rates, wherever possible) with source of information data 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes The construction project is to be developed on an open land area hence a permanent change in land use will occur. However the same will not be environmentally adverse. Various construction activities, construction material handling & storage, construction waste disposal etc. will bring changes to the site topsoil. However, construction wastes are inert in nature and will be used for levelling of low lying areas and development of greenbelt area at the project site itself. It may be noted that there will not be any change in land use, land cover, or topography during the operational activities. 1.2 Clearance of existing land, vegetation and buildings? t applicable due to the fact that the proposed project is to be developed on an open land area. 1.3 Creation of new land uses? Yes Creation of new land use will not bring change in topography, land use, water bodies etc. 1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Please refer Annexure 7: Geo Technical Investigation Report 1.5 Construction works? Yes Various construction activities, construction material handling & storage, construction waste disposal etc. will bring change to site topsoil. However, construction wastes are inert in nature and will be used for levelling of low lying areas and development of greenbelt area at the project site itself. 1.6 Demolition works? demolition work will be required to carry out, since the proposed project is to be developed on an open land area. Surya Emerald Page - 4 of 16

6 Form Temporary sites used for construction works or housing of construction workers? t applicable because local contractors/ workers will be given preference for various construction activities. Since local workers/contractors are easily available, there will be no requirement for housing for construction workers. 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations. 1.9 Underground works including mining or tunnelling? t applicable because the proposed project is to be developed on an open land area. Various construction activities, construction material handling & storage, construction waste disposal etc. will bring change to the site topsoil. However, construction wastes are inert in nature and will be used for levelling of low lying areas and development of green belt area at project site itself. t Applicable 1.10 Reclamation works? t Applicable 1.11 Dredging? t Applicable 1.12 Offshore structures? t Applicable 1.13 Production & manufacturing processes? t Applicable 1.14 Facilities for storage of goods or materials? 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Storage of goods and materials to be used for various construction activities will bring changes to the site topsoil; however, the effect would be very marginal. Approximately, 63 kl/day of sewage to be generated during the operation phase will be discharged to drainage network of Ahmedabad Municipal Corporation (AMC) Approximately; 262 kg/day of Municipal Waste to be generated during the operation phase, will be collected by Ahmedabad Municipal Corporation for its ultimate Surya Emerald Page - 5 of 16

7 Form 1 disposal to its landfill site. Therefore, this activity would not have adverse impact on topography, land use, changes in water bodies etc Facilities for long term housing of operational workers? Since, local workers will be employed; no housing facilities will be required New road, rail or sea traffic during construction or operation? 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? The proposed project is to be developed within Makarba area of Ahmedabad City where existing transportation facilities are enough to take care of increased traffic. new road, rail, air, waterborne or other transport infrastructure including new or altered routes and stations, ports, airports is envisaged. Existing transportation facilities will be used for the proposed project. t Applicable 1.20 New or diverted transmission lines or pipelines? 1.21 Impoundment, damming, culverting, realignment or other changes to hydrology of watercourses or aquifers? such activities are required to be carried out. t Applicable because water will be obtained through Ahmedabad Municipal Corporation (AMC) during operation and construction phase & however, if ground water is required to be extracted we shall obtain appropriate permission from the Central Ground Water Authority (CGWA) Stream crossings? t Applicable 1.23 Abstraction or transfers of water from ground or surface waters? t Applicable because water will be obtained through Ahmedabad Municipal Corporation (AMC) during operation phase and during construction phase & however, if ground water is required to be extracted we shall obtain appropriate permission from the Central Ground Water Authority (CGWA). Surya Emerald Page - 6 of 16

8 1.24 Changes in water bodies or the land surface affecting drainage or run-off? t Applicable Form 1 Excess runoff water will be diverted to Two (2) percolation wells within the site. Sewage to be generated from proposed project will be discharged to drainage network of Ahmedabad Municipal Corporation 1.25 Transport of personnel or materials for construction, operation or decommissioning Most of the construction materials will be bought from local suppliers. It may be noted that local people will be given preference for all the activities related to the proposed project. Hence, transport of personnel or materials for construction, operation or decommissioning will not bring change to topography, land use, water bodies etc Long-term dismantling or decommissioning or restoration works? t Applicable 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? t Applicable Yes As the proposed project is to develop 3&4 BHK residential apartments, there will be permanent influx of people Introduction of alien species? t Applicable 1.30 Loss of native species or genetic diversity? t Applicable 1.31 Any other actions? t Applicable 2) Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply). Sr.. Information/Checklist confirmation Yes/ Details there of (with approximate quantities/ rates, wherever possible) with source of information data 2.1 Land especially undeveloped or agricultural land (ha) Yes The proposed project is to be developed on ha (5353 m 2 ) of open land area and not use in agriculture. Surya Emerald Page - 7 of 16

9 Form Water (expected source & competing users) unit: KLD Yes Water will be obtained through Ahmedabad Municipal Corporation (AMC) during operation phase and purchase from local tanker suppliers during construction phase & however, if ground water is required to be extracted we shall obtain appropriate permission from the Central Ground Water Authority (CGWA). Please refer Annexure 8: Details of Water Consumption & Wastewater Generation 2.3 Minerals (MT) t Applicable 2.4 Construction material stone, aggregates, sand/soil (expected source MT) 2.5 Forests and timber (Source MT) Yes Yes Most of the construction materials will be bought from local suppliers. Material Approx. Quantity Steel 1308 MT Cement 3000MT Sand 4000 m 3 Grit/Kapachi 4460 m 3 Most of the carpentry work will be carried out by use of processed engineering wood instead of wood. 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW). Yes Power will be sourced from UGVCL Approximately 18 KW of power will be required during construction phase whereas the same during operation phase would be approximately 0.5MW. 2.7 Any other natural resource (use appropriate standard units) t Applicable 3) Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or environment or raise concerns about actual or perceived risks to human health. Sr.. Information/Checklist confirmation Yes Details there of (with approximate quantities/ rates, wherever possible) with source of information data 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the t Applicable Surya Emerald Page - 8 of 16

10 environment (flora, fauna, and water supplies). Form Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases). t Applicable 3.3 Affect the welfare of people e.g. by changing living conditions? t Applicable 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., t Applicable 3.5 Any other causes other causes identified 4) Production of solid wastes during construction or operation or decommissioning (MT/month) Sr.. Information/Checklist confirmation Yes / Details there of (with approximate quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes t Applicable 4.2 Municipal waste (domestic and/ or commercial wastes) Yes Please refer Annexure 9: Details of Municipal Waste, of Form Hazardous wastes (as per Hazardous Waste Management Rules) Yes Used oil and used bags/liners to be generated due to various construction activities will be sold to authorized recyclers. 4.4 Other industrial process wastes t Applicable 4.5 Surplus product t Applicable 4.6 Sewage sludge or other sludge from effluent treatment t Applicable 4.7 Construction or demolition wastes Yes Construction waste will be generated due to various construction activities, construction material handling & storage etc. However; the same would be inert in nature and will be used Surya Emerald Page - 9 of 16

11 Form 1 for levelling of low lying areas and development of green belt area at the project site itself. 4.8 Redundant machinery or equipment t Applicable 4.9 Contaminated soils or other materials t Applicable 4.10 Agricultural waste t Applicable 4.11 Other solid wastes t Applicable 5) Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr). Sr.. Information/Checklist confirmation Yes / Details there of (with approximate quantities/ rates, wherever possible) with source of information data 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources. t Applicable 5.2 Emissions from production processes. 5.3 Emissions from materials handling including storage or transport. 5.4 Emissions from construction activities including plant and equipment. 5.5 Dust or odour from handling of materials including construction materials, sewage and waste. Yes Yes Yes t Applicable High levels of Suspended Particulate Matter (SPM) may be noted due to the various construction activities like handling and storage of construction materials. However, continuous water sprinkling will be done and temporary wind shield barriers will be provided by the use of bamboos and G.I. sheets to prevent the said problem. During construction activities concentration of SPM in ambient air will slightly increase for that particular time only. Due to the handling of construction materials, concentration of SPM in ambient air will increase for that particular time only. There will be no any odour problem during the handling of construction materials. During Surya Emerald Page - 10 of 16

12 Form 1 construction phase adequate sanitation facilities will be provided for the construction workers 5.6 Emissions from incineration of waste. t Applicable 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris). t Applicable 5.8 Emissions from any other sources. t Applicable 6) Generation of ise and Vibration and Emission of Light and Heat. Sr.. Information/Checklist confirmation Yes / Details thereof (with approximate quantities/ rates, wherever possible) with source of information data 6.1 From operation of equipment e.g. engines, ventilation plant, crushers. Yes Adequate sound enclosures will be provided to all the equipments and machineries generating high noise during construction phase. Also, earplugs and earmuffs will be provided to all workers working in such areas. Greenbelt area will be developed and maintained within the site premises which will help to abate the noise pollution. 6.2 From industrial or similar t Applicable processes. 6.3 From construction or demolition. Yes During construction activities, construction equipments, including dozer, scrapers, power tools etc. will be the major sources of noise generation. However, noise will be limited for that particular time. Nevertheless, care/steps will be taken to reduce/avoid such noise pollution and keep the noise level within the prescribed limit. 6.4 From blasting or piling. t Applicable because no such activities will be carried out. Surya Emerald Page - 11 of 16

13 6.5 From construction or operational traffic. Yes Form 1 ise will be generated due to construction as well as operational traffic; however the quantum would be very marginal and may happen for short period only. 6.6 From lighting or cooling systems. t Applicable 6.7 From any other sources. t Applicable 7) Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea. Sr.. Information/Checklist confirmation Yes / Details there of (with approximate quantities/ rates, wherever possible) with source of information data 7.1 From handling, storage, use or spillage of hazardous materials. t Applicable 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge). 7.3 By deposition of pollutants emitted to air into the land or into water. t applicable due to the fact that the wastewater to be generated from proposed project will be discharged to the drainage line of AMC. t Applicable 7.4 From any other sources. t Applicable 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? t Applicable Surya Emerald Page - 12 of 16

14 Form 1 8) Risk of accidents during construction or operation of the Project, which could affect human health or the environment. Sr.. Information/Checklist confirmation Yes/ Details there of (with approximate quantities/ rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances. t Applicable 8.2 From any other causes t Applicable 8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Floods are not likely to occur as water bodies are far away. Earth-quake resistance structure will be builtup as per relevant I.S. code. Please refer Annexure 10:Structural Design Certificate 9) Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality. Sr.. Information/Checklist confirmation Yes / Details there of (with approximate quantities/ rates, wherever possible) with source of information data 9.1 Lead to development of supporting utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Development of supporting facilities like petrol pumps, hotels etc. is likely to occur in surrounding area. Supporting infrastructure (roads, power supply, waste or wastewater treatment, etc.) Housing development Extractive industries Supply industries Other Surya Emerald Page - 13 of 16

15 9.2 Lead to after-use of the site, which could have an impact on the environment. t Applicable Form Set a precedent for later developments. t Applicable 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effect (III) ENVIRONMENTAL SENSITIVITY Sr.. Areas Name / Identity 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value. ne Aerial distance (within 15 Kms.) from the proposed project location boundary t Applicable 2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests. 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration. ne ne t Applicable t Applicable 4 Inland, coastal, marine or underground waters. ne t Applicable 5 State, National boundaries. ne t Applicable 6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas. ne t Applicable 7 Defence installations. ne t Applicable Surya Emerald Page - 14 of 16

16 Form 1 8 Densely populated or built-up area 9 Areas occupied by sensitive manmade land uses (hospitals, schools, places of worship, community facilities). 10 Areas containing important, high quality or scarce resources. (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals). 11 Areas already subjected to pollution or environmental damage. (Those where existing legal environmental standards are exceeded). 12 Areas susceptible to natural hazard, which could cause the project to present environmental problems. (Earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions). Ahmedabad City Yes ne ne ne The project site is within limits of the Ahmedabad Municipal Corporation (AMC). Hospitals, schools, institutes, places of worship, community places etc. are within arms reach. t Applicable t Applicable Floods are not likely to occur as water bodies are far away. Earthquake resistance structure will be built-up as per relevant IS code. Please refer Annexure 10: Structural Design Certificate Surya Emerald Page - 15 of 16

17 Form 1 (IV) PROPOSED TERMS OF REFERENCE (TOR) FOR EIA STUDIES It may be note that our project falls under Category-B, Sub-Category-B2 It would not be out of place to mention that we shall collect and add any other data/information that your Department feels necessary. We request you to consider our application for the Environmental Clearance Certificate. Thanking You, Yours sincerely, For, M/s. Surya Buildcon Surya Emerald Page - 16 of 16

18 List of Annexure Annexure. Description Page. 1 Land Ownership Documents 2 2 NA Certificate 3 3 Zoning Certificate 4 4 T.P Scheme showing location of project 5 5 Area Statement 6 6 Location of Project Site 7 7 Geo Technical Investigation Report 9 8 Details of Water Consumption and Wastewater Generation 10 9 Details of Municipal Waste Structural Design Certificate 12 Annexures of Form 1 Surya Emerald Page - 1

19 Annexure -1: Land possession documents Please refer attached Land possession documents Annexures of Form 1 Surya Emerald Page - 2

20

21

22

23 Annexure -2: NA Certificate Please refer attached NA Certificate Annexures of Form 1 Surya Emerald Page - 3

24

25

26

27 Annexure -3: Zoning Certificate Please refer attached Zoning Certificate Annexures of Form 1 Surya Emerald Page - 4

28

29 Annexure -4: T.P. Scheme showing location of project Please refer attached T.P.Scheme showing location of project Annexures of Form 1 Surya Emerald Page - 5

30

31

32

33

34

35 Annexure -5: Area Statement Description Area (m 2 ) Total plot area 5353 Total Proposed Built-up area Total Proposed F.S.I. area Total proposed parking area Total green covered area 769 Lawn covered area (common plot) = 285 m 2 Tree covered area peripheral of all plot boundary = 484 m 2 Annexures of Form 1 Surya Emerald Page - 6

36 Annexure -6: Location of Project Site Figure 1: Key Plan Annexures of Form 1 Surya Emerald Page - 7

37 Figure-2: Google Image Annexures of Form 1 Surya Emerald Page - 8

38 Annexure-7: Geo-Technical Investigation Report Please refer the attached the Geotechnical Investigation Report Annexures of Form 1 Surya Emerald Page - 9

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55 Annexure - 8: Details of Water Consumption & Wastewater During Construction: Sr.. Description 1 Domestic (50 workers X 50 l/day) 2 Construction & Sprinkling Activities Water Consumption (kl/day) Wastewater Generation (kl/day) Mode of Disposal The domestic wastewater generated will be 20 Nil disposed off through a septic tank/ soak pit system. Total (1+2) During Operation Phase: Sr.. Description Water Consumption (kl/day) Wastewater Generation (kl/day) Mode of Disposal 1 Domestic * Domestic wastewater will be discharged 2 Gardening 3 -- off through AMC (769 m 2 x 4 l / m 2 ) Drainage System. Total te *: 105 flats X 5 persons/ flat X 150 l / capita/ day = 79 kl/day Annexures of Form 1 Surya Emerald Page - 10

56 Annexure -9: Details of Municipal Waste During Construction: Sr.. Description 1 Domestic (50 workers X 250 g /capita/ day) Waste Mode of Disposal Generation (kg/day) 13 The domestic waste generated will be stored in bins in proper manner before its collection by the AMC. During Operation Phase Description Waste Generation (kg/day) Mode of Disposal Domestic 262 Garbage generated from each (105 flats X 5 persons/ flat X 500 g/ capita /day) individual unit will be emptied daily into the community bins (80 lit. capacity) provided at various Total 262 locations. These community bins will be emptied daily by the AMC. Calculation of community bins: Total. of units = 105 Community bin required = 10 l/ Unit Community bin required = 105 units x 10 l / Unit = 1050 l Provision made = 80 l capacity x 14 bins = 1120 l Annexures of Form 1 Surya Emerald Page - 11

57 Annexure - 10: Structural Engineering Design Certificate Annexures of Form 1 Surya Emerald Page - 12