1 BEE BRANCH WATERSHED GREEN INFRASTRUCTURE SUMMARY

2 purpose & background PURPOSE & BACKGROUND Through the Bee Branch Watershed Green Infrastructure Project, the City proposes to install permeable interlocking concrete pavement at 42 different locations in the Bee Branch Watershed. When constructed, the 42 different locations will total approximately 268,000 square feet (6.2 acres) of pervious pavement for an estimated total cost of $9.42 million and result in approximately 2,400 pounds per year of TSS and 750,000 cubic feet of runoff going into the ground rather than the Mississippi River.

3 SUSTAINABLE DUBUQUE Sustainability is defined by a community s ability to meet the environmental, economic, and social equity needs of today without reducing the ability of future generations to meet their needs. Since 2006, the Dubuque Mayor and City Council have identified becoming a more Sustainable City as one of their top priorities. To that end, our City continues to implement a community-defined sustainability plan. Sustainable Dubuque is a holistic approach to making our community sustainable. Our model involves a three-part approach that addresses: Environmental and Ecological Integrity Economic Prosperity Social and Cultural Vibrancy Dubuque is a community that values Environmental Integrity Economic Prosperity Social/Cultural Vibrancy Healthy Air: fresh, clean air, reduced greenhouse gas emissions and minimized health risks. Clean Water: water as the source of life and seeks to preserve and manage it in all forms. Native Plants and Animals: biodiversity through the preservation, restoration and connection of nature and people. Regional Economy: a diversified regional economy with opportunities for new and green markets, jobs, products and services. Smart Energy Use: energy conservation and expanded use of renewable energy as a means to save money and protect the environment. Resource Management: the benefits of reducing, reusing and recycling resources. Community Design: the built environment of the past, present and future which contributes to its identity, heritage and sense of place. Green Buildings: a productive and healthy built environment. Healthy Local Foods: the benefits of wholesome food from local producers, distributors, farms, gardens and hunters. Community Knowledge: education, empowerment and engagement to achieve economic prosperity, environmental integrity and social/cultural vibrancy. Reasonable Mobility: safe, reasonable and equitable choices to access live, work and play opportunities. One of the 11 Principles to the Dubuque Model identified by Dubuque citizens is Clean Water. Sustainable Dubuque is a community that values water as a source of life and seeks to preserve and manage it in all forms. The Bee Branch Watershed Green Infrastructure Project would offer a significant and measurable improvement on water quality in the Bee Branch Creek and Mississippi River. STATE REVOLVING LOAN FUND SECONDARY FUNDING During the 2009 Iowa General Assembly session, legislation was passed to allow a new method for funding water quality protection. Senate File 339 amended the Iowa Code to add a new category of projects that can be financed with sewer revenues. This new category, called water resource restoration, includes locally directed, watershed-based projects to address water quality impairments. Before this amendment, utility revenues could only be used for construction and improvements for the wastewater system itself. With the new legislation, wastewater utilities can also finance and pay for projects, within or outside the city limits, that cover best management practices for nonpoint source pollution control. 3

4 EMPLOYMENT IMPACT The Bee Branch Green Infrastructure Project will not only improve water quality, but it will also create and preserve jobs. Following guidance by the US DOT, a project the size of the Bee Branch Green Infrastructure Project will create or preserve approximately 102 jobs over the three year project life. CITY COUNCIL SUPPORT The City Manager will present a resolution to the City Council at their February 20, 2012 regular meeting. If approved as anticipated, a copy of the resolution will be attached to this document as Exhibit A for the meeting with Iowa DNR and IFA on February 22, 2012.

5 summary The Bee Branch Watershed covers approximately 6.5 square miles of the City of Dubuque and is almost fully developed. PROPOSAL SUMMARY Following an intense thunderstorm in 1999, the City of Dubuque commissioned an engineering study and the development of the Drainage Basin Master Plan (DBMP). In addition to identifying at-risk properties, the DBMP identified three major projects to provide flood control and water quality improvement: the Carter Road Detention Basin; the expansion and improvement of the 32nd Street Detention Basin; and the restoration of the Bee Branch Creek. The City has completed the first two projects, and the Bee Branch Creek Restoration Project is currently under construction. For the most part, these projects address stormwater management on a regional scale after runoff has already been increased due to development. With the Bee Branch Watershed Green Infrastructure Project, the City of Dubuque proposes to take stormwater management a step further by managing it at the site, when rainfall hits the ground. The Bee Branch Watershed Green Infrastructure Project includes over six acres in permeable paver alleys and parking lots which will result in preventing almost 2,400 pounds of sediment and 750,000 cubic feet of runoff per year from entering the Mississippi River. BEE BRANCH CREEK RESTORATION PROJECT BACKGROUND In May 1999, many Dubuque residents living in the 6.5-square mile Bee Branch Watershed (Figure 1) experienced heavy rains that resulted in significant basement flooding and costly furnace and foundation repairs. Unfortunately, that scenario repeated itself in 2002, 2004, 2010 and 2011 as heavy rainfall over the watershed caused flooding in more than 1,100 homes and businesses. Among the causes were the frequent and intense rainfall events, uncontrolled development from over 30 years ago, and an undersized storm sewer system. Therefore, the City initiated the Bee Branch Creek Restoration Project to replace almost one-mile of storm sewer with a creek and floodplain that resembles the one that traversed the area approximately 100 years ago. The design of the restored creek meanders through a 15 to 25-foot wide flood management corridor. The location of the project will extend 4,500 feet from the 16th Street Detention Basin north to Comiskey Park at 24th and Elm Streets. This open waterway system will transition former industrial use to commercial land-use that is compatible in nature with the adjacent residential areas. The project was designed through a highly interactive citizen engagement process and includes many amenities that enhance the existing low income neighborhoods while providing a model to address stormwater management and water quality. RESTORATION PROJECT INCLUDES: Daylighting 4,500 feet of buried creek; Restoring creek and associated floodplain; Lower Bee Branch overlook, floating bioisland, rain gardens and bioswales; Creating a linear park along the open waterway; Amphitheater adjacent to an elementary school to provide opportunities for outdoor education; Recreation bike/hike trails that connect to the urban bike system and to the regional trails; and Planting of over 1,000 trees, neighborhood fruit orchards, and community garden space. 5

6 RESTORATION PROJECT BENEFITS: Reduces flood risk for over 1,100 homes and businesses; Integrates land management, historic preservation, natural preservation, and watershed management in an urban area; Creates a local amenity and tourist attraction through a community engagement process; and Supports 7 of 11 City Sustainability Principles Figure 1. Bee Branch Watershed and location of the Bee Branch Restoration Project 6

7 GREEN INFRASTRUCTURE Green Infrastructure is an approach to stormwater management that is cost-effective, sustainable, and environmentally friendly. Green Infrastructure management approaches and technologies infiltrate, evapotranspire, capture and reuse stormwater to maintain or restore natural hydrology. At the largest scale, the preservation and restoration of natural landscape features (such as forests, floodplains and wetlands) are critical components of green stormwater infrastructure. On a smaller scale, green infrastructure practices include rain gardens, porous pavements, green roofs, infiltration planters, trees and tree boxes, and rainwater harvesting for non-potable uses such as toilet flushing and landscape irrigation. Figure 2 shows a green alley constructed in Dubuque as part of a 2010 pilot project. PERMEABLE INTERLOCKING PAVERS Figure 2. Green alley pilot project in Dubuque. The Iowa Stormwater Manual differentiates porous pavement into three different types: pervious concrete pavement; porous asphalt pavement; and permeable interlocking concrete pavers (PICP). A typical detail of PICP design is provided in Figure 3. Regardless of the material, the stormwater management principle is generally the same for each pavement: openings in the pavement surface allow rainfall and runoff to be quickly transferred below the pavement into rapidly infiltrating soils or into a rock storage bed. The rock storage bed then acts as an underground pond that holds water and allows it to infiltrate back into the ground. Figure 3. Typical detail of a permeable interlocking concrete pavement (PICP) 7

8 GREEN ALLEY PROJECT LOCATION, SCHEDULE AND COST Through the Bee Branch Watershed Green Infrastructure Project, the City proposes to install permeable interlocking concrete pavement at 42 different locations in the Bee Branch Watershed. Approximately 40 will be green alleys for a total area of approximately 219,000 square feet at an estimated cost of $8.75 million. Two installations are proposed in parking lots over an area of approximately 49,000 square feet at an estimated cost of $663,000. When constructed, the 42 different locations will total approximately 268,000 square feet (6.2 acres) of pervious pavement for an estimated total cost of $9.42 million. The City proposes to implement the project over three years. Table 1 outlines the annual schedule and budget for constructing alleys and/or parking lots in 2012, 2013, and Table 1. Summary of proposed schedule and budget Year Surface Area (sq ft) Cost 2012 Alleys 69,776 $2,891,300 Parking Lots 0 $ Alleys 87,376 $3,316,400 Parking Lots 49,315 $663, Alleys 61,440 $2,545,882 Parking Lots 0 $0 TOTAL 267,907 $9,416,795 To date, the City has converted four standard alleys to pervious, which is approximately 1% of all alleys in the Bee Branch Watershed. This percentage would increase to almost 20% upon completion of the Bee Branch Watershed Green Infrastructure Project. City staff estimate that approximately $35 million is necessary to convert all alleys to pervious surface. 8

9 water quality benefits WATER QUALITY BENEFITS The greatest benefit of pervious pavement is that it allows water to go back into the ground where it went prior to development. Although sometimes more costly than other Green Infrastructure practices, pervious pavement is typically the most efficient at removing pollutants from runoff because the pollutants are allowed to go back into the ground rather conveyed to another practice that requires regular maintenance to remove the collected pollutants. City of Dubuque staff used the computer models WinSLAMM and P8 to simulate the water quality benefit of the proposed Bee Branch Watershed Green Infrastructure Project. P8 was used to determine the expected pollutant loading and runoff volume, while WinSLAMM was used to determine the pollutant removal and volume abstraction percentages. WinSLAMM was chosen for the removal percentages because it includes a specific calculation routine for pervious pavement, and it is based on actual field observations, with minimal reliance on theoretical processes that have not been adequately documented or confirmed in the field. The models predict that the Bee Branch Watershed Green Infrastructure Project could reduce total suspended solids (TSS) loading to the Mississippi River by approximately 67% and runoff volume by approximately 50%. When fully constructed, this project will result in approximately 2,400 pounds per year of TSS and 750,000 cubic feet of runoff going into the ground rather than the Mississippi River. The EPA Fact Sheet Permeable Interlocking Concrete Pavement supports these results by reporting a reduction in TSS of 67-81% and a 34-66% reduction in runoff volume for designs with an underdrain. 9

10 EXISTING STATE REVOLVING FUND LOAN The City of Dubuque and the Iowa Housing Authority entered into a State Revolving Fund Loan agreement in the amount of $64,885,000 on August 18, 2010 to upgrade the City s wastewater treatment plant. Terms of the loan include a one-time 1% initiation fee of $648,850, 3% annual interest rate, and a 0.25% annual administration fee. The administration fee is based on the requested loan amount until disbursements are finalized and then the administration fee is assessed against the outstanding balance as of June 1 each year. The loan will be paid over 26 years with semi-annual interest payments due June 1 and December 1, and an annual principal payment due June 1. Principal payments begin June 1 after the final loan distribution. It is estimated that the first principal payment will be made June 1, Semi-annual interest payments will be made during the construction period. A summary of the loan terms is provided in Table 2. As of February 10, 2012, the City has received $38,043,784 in loan disbursements, including the roll in of $95,500 from the Plant Study Loan and $3,200,000 from the Planning and Design Loan. Total disbursements plus loan initiation fee equals $38,692,634. Total interest paid is $1,368,750 and is listed in Table 3. Per the DNR guidance document for sponsored project applications, the City proposes that the August 2010 SRF loan and related loan application be amended to allow the City to use a portion of the interest to pay costs of the Bee Branch Watershed Green Infrastructure Project (Project). The City expects to enter into a separate construction contract for the Project and to request Project-related disbursements at the same time it makes requests for disbursements for Wastewater Treatment Plant costs under the existing loan. Figure 4. Aerial view of wastewater treatment plant prior to construction. Table 2. Loan summary Loan Closing Date August 18, 2010 Final Maturity Date June 1, 2039 Loan Period in Years 26 Total Loan Amount Requested $64,885, Less: 1% Initiation Fee $648, Net Proceeds to Borrower $64,236, Annual Interest Rate 3.00% Total Interest $33,201, Servicing Fee Rate 0.25% Total Servicing Fees $2,965, Total Loan Costs $36,815, Table 3. Total interest paid on loan as of February 10, Date Initiation Annual Semi-Annual Total Fee Administration Fee Interest 8/18/2010 $648, $648, /1/ $37, $37, /1/ $162, $158, $321, /1/ $361, $361, TOTAL $648, $162, $557, $1,368,

11 EXISTING 28E AGREEMENT The adoption of Iowa Code Chapter 28E in 1965 provided political subdivisions with a great expansion of their authority for intergovernmental cooperation. The essence of this legislation was to permit any governmental agency to undertake any activity jointly with any other agency so long as each agency has the power to undertake that particular activity on its own. As an example, since cities, townships, counties, and schools can establish libraries, it became possible for a library to be a joint undertaking by a combination of these types of local governments. The City of Dubuque and Dubuque County currently have a 28E agreement in place for an urban conservation program. The agreement created an urban conservationist position to perform urban conservation and watershed related activities pertinent to Dubuque County, the City of Dubuque, and the Dubuque Soil & Water Conservation District. Among others, the Urban Conservationist responsibilities include: Participating in any educational/outreach programs in accordance with the City s NPDES permit and stormwater/ watershed program. Providing technical assistance for any urban conservation activities, including, in-field assessment, design, and public/ private projects. Continuing a strong connection with the City s sustainability efforts, building upon needs and necessary improvements. The City is in the process of creating a new 28E agreement for the SRF sponsored project option. A draft of the new 28E agreement is attached as Exhibit B. FOR MORE INFORMATION: Lead point of contact for the City of Dubuque: Teri Goodmann Assistant City Manager City of Dubuque 50 West 13th Street Dubuque, Iowa tgoodman@cityofdubuque.org Assisting with the project, all communications should copy: David Lyons Smarter Sustainable Dubuque Project Manager dlyons@cityofdubuque.org S M A R T E R 11

Problem Assessment: The Bee Branch Watershed, where over 50% of Dubuque s

Problem Assessment: The Bee Branch Watershed, where over 50% of Dubuque s Problem Assessment: The Bee Branch Watershed, where over 50% of Dubuque s residents either live or work, has been hit hard with flash flooding that inundates basements and rushes down streets. In the early

More information

Introduction to Sustainable Infrastructure

Introduction to Sustainable Infrastructure Introduction to Sustainable Infrastructure Bernardinus Herbudiman, ST., MT. Emma Akmalah, Ph.D. L/O/G/O The Concept of Sustainability Sustainability is an economic state where the demands placed upon the

More information

Texas Nonpoint Source Pollution Program Grant Cycle

Texas Nonpoint Source Pollution Program Grant Cycle Texas Nonpoint Source Pollution Program and the 2010 Grant Cycle Texas Commission on Environmental Quality Anju Chalise Clean Water Act 319(h) Grants Federal funds provided by EPA Funds administered by

More information

Green Infrastructure. Jesse Schomberg University of Minnesota Sea Grant Program

Green Infrastructure. Jesse Schomberg University of Minnesota Sea Grant Program Green Infrastructure Jesse Schomberg University of Minnesota Sea Grant Program Forest Cover Storage (Wetlands) What alters this process? Altered runoff patterns North Shore Streams: Miles of Stream

More information

Financing Green Infrastructure: Taking (Low Interest) Loans for Granted?

Financing Green Infrastructure: Taking (Low Interest) Loans for Granted? Financing Green Infrastructure: Taking (Low Interest) Loans for Granted? Council of Infrastructure Financing Authorities Stacey Isaac Berahzer Environmental Finance Center at the University of North Carolina,

More information

June 27, 2012 Holly Galavotti U.S. EPA

June 27, 2012 Holly Galavotti U.S. EPA June 27, 2012 Holly Galavotti U.S. EPA Urban stormwater is a leading source of water quality impairment Urban stormwater identified as source of impairment (2004 WQ Report) 22,559 miles of impaired rivers

More information

Dustin Miller. Water Quality Trading in Iowa: Forming Partnerships for Success. September 15, 2016 Des Moines Annual Conference

Dustin Miller. Water Quality Trading in Iowa: Forming Partnerships for Success. September 15, 2016 Des Moines Annual Conference Iowa League of Cities Water Quality Trading in Iowa: Forming Partnerships for Success 2016 Annual Conference September 15, 2016 Des Moines Dustin Miller Role Clean of Cities Water in Act Water Quality

More information

Post-Development Stormwater Runoff Performance Standards

Post-Development Stormwater Runoff Performance Standards Post-Development Stormwater Runoff Performance Standards December 9, 2014 Topics Why performance standards? What practices/requirements are in effect in other States? The Workgroup s preliminary and final

More information

11. Public Utilities. Key Terminology: OVERVIEW STORMWATER MANAGEMENT WATERSHED MANAGEMENT ORGANIZATIONS AND COMMISSIONS. Inventory and Analysis

11. Public Utilities. Key Terminology: OVERVIEW STORMWATER MANAGEMENT WATERSHED MANAGEMENT ORGANIZATIONS AND COMMISSIONS. Inventory and Analysis Inventory and Analysis 11. Public Utilities Urbanized (drainage): Defined as an area where natural soils, waterways, and environmental functions are replaced with impervious surfaces (roads, parking lots,

More information

Iowa s SRF: Options for Financing Green Infrastructure. Patti Cale-Finnegan Iowa Department of Natural Resources

Iowa s SRF: Options for Financing Green Infrastructure. Patti Cale-Finnegan Iowa Department of Natural Resources Iowa s SRF: Options for Financing Green Infrastructure Patti Cale-Finnegan Iowa Department of Natural Resources Iowa Department of Natural Resources Program planning and prioritization Project planning

More information

Skogman Fannie Elms Florence Lakes Chain Stormwater Retrofit Analysis

Skogman Fannie Elms Florence Lakes Chain Stormwater Retrofit Analysis Skogman Fannie Elms Florence Lakes Chain Stormwater Retrofit Analysis Prepared for the ISANTI COUNTY SOIL AND WATER CONSERVATION DISTRICT By Funding provided in part by the Clean Water Fund of the Clean

More information

Class V Well Definition

Class V Well Definition UIC and Green Infrastructure What is Green Infrastructure (GI)? GI is the interconnected network of open spaces and natural areas, such as greenways, wetlands, parks, forest preserves and native plant

More information

Water Resources: Technical Update

Water Resources: Technical Update Water Resources: Technical Update Pervious Pavements for DOT and Municipal Use Presented By: Scott Blossom, P.E., CFM, LEED A.P. Date: March 6, 2015 A Safety Moment 200+ Locations 15,000 Professionals

More information

Paraprofessional Training Session 1

Paraprofessional Training Session 1 Paraprofessional Training Session 1 Part 2: Stormwater Basics November 26, 2012 Rutgers University, Cook Campus Christopher C. Obropta, Ph.D., P.E. Extension Specialist in Water Resources Associate Professor

More information

CITY OF MIDDLETOWN STORM WATER UTILITY ADJUSTMENT AND CREDIT POLICY

CITY OF MIDDLETOWN STORM WATER UTILITY ADJUSTMENT AND CREDIT POLICY CITY OF MIDDLETOWN STORM WATER UTILITY ADJUSTMENT AND CREDIT POLICY JANUARY 2006 1 SECTION 1 - INTRODUCTION The City of Middletown established a Storm Water Utility on September 6 th, 2005, with the passage

More information

Nonpoint Source Storm Water Management Plan

Nonpoint Source Storm Water Management Plan Nonpoint Source Storm Water Management Plan Christine Pomeroy Dept. of Civil & Environnmental Eng. University of Utah Carl Adams Watershed Protection Utah Division of Water Quality Definitions Nonpoint

More information

Sustainable Water Resource Practices

Sustainable Water Resource Practices Sustainable Water Resource Practices This section is related to and shoudl be read in conjunction with the Land Use Element, and Conservation Element. Implementing sustainable water resource practices

More information

Flood Mitigation Plan

Flood Mitigation Plan City of Huntsville, Alabama Flood Mitigation Plan 2001 Prepared by Flood Mitigation Planning Committee June 1, 2001 City of Huntsville, Alabama Flood Mitigation Plan Executive Summary 1973 1999 Prepared

More information

City of Tacoma Stormwater Management Program Assessment. Attachment B3

City of Tacoma Stormwater Management Program Assessment. Attachment B3 City of Tacoma Stormwater Management Program Assessment Attachment B3 Attachment B3. City of Tacoma Stormwater Management Program Assessment The following discussion includes an assessment of the appropriateness

More information

Clean Water SRF WATER RESOURCE RESTORATION Sponsored Projects. APPLICATION COMPLETENESS CHECKLIST September 2014

Clean Water SRF WATER RESOURCE RESTORATION Sponsored Projects. APPLICATION COMPLETENESS CHECKLIST September 2014 Clean Water SRF WATER RESOURCE RESTORATION Sponsored Projects APPLICATION COMPLETENESS CHECKLIST September 2014 Pre-application consultation held _January 15 th, 2015_ (date) Hard copy and CD containing

More information

TABLE OF CONTENTS. Introduction. Lower Platte South NRD Past and Present 1. Map of Lower Platte South NRD 2. Vision for the Future 3.

TABLE OF CONTENTS. Introduction. Lower Platte South NRD Past and Present 1. Map of Lower Platte South NRD 2. Vision for the Future 3. TABLE OF CONTENTS Introduction ii Lower Platte South NRD Past and Present 1 Map of Lower Platte South NRD 2 Vision for the Future 3 Vision Table 5 i INTRODUCTION The Master Plan is the document that expresses

More information

Volume II Recommendations January 2006 City of Madison Comprehensive Plan

Volume II Recommendations January 2006 City of Madison Comprehensive Plan 10 UTILITIES THE PLAN: GOALS, OBJECTIVES, POLICIES AND IMPLEMENTATION RECOMMENDATIONS Volume II Recommendations January 2006 TABLE OF CONTENTS Utilities Overview... 10 1 Summary of Utilities Issues...

More information

Project Priority List scoring worksheet - stormwater Guidance document

Project Priority List scoring worksheet - stormwater Guidance document www.pca.state.mn.us Project Priority List scoring worksheet - stormwater Guidance document PLEASE NOTE: THE MINNESOTA STATE FISCAL YEAR IS FROM JULY 1 JUNE 30 The first step towards receiving either a

More information

Conservation Design Approach for New Development

Conservation Design Approach for New Development Effective Best Management Practices in Urban Areas Chad Christian City of Tuscaloosa, AL Robert Pitt University of Alabama Tuscaloosa, AL Energy Independence and Security Act of 2007 signed into Law on

More information

Water Implications from Smart Growth Approaches

Water Implications from Smart Growth Approaches Water Implications from Smart Growth Approaches 2008 New Partners for Smart Growth Conference: Making the Connection Between Land Use Decisions and Water Lynn Richards US EPA Smart Growth Program February

More information

Concurrent Session B: LID Design Specifications (Chapter 4 in Draft Manual)

Concurrent Session B: LID Design Specifications (Chapter 4 in Draft Manual) Concurrent Session B: LID Design Specifications (Chapter 4 in Draft Manual) Should vs. Must In Chapter 4, should means should, and must means must. Poorly Drained Soils Well-Drained Soils Flat Terrain

More information

Ohio Environmental Protection Agency WATER QUALITY IMPROVEMENT GRANTS LAKE ERIE WATERSHED

Ohio Environmental Protection Agency WATER QUALITY IMPROVEMENT GRANTS LAKE ERIE WATERSHED Ohio Environmental Protection Agency WATER QUALITY IMPROVEMENT GRANTS LAKE ERIE WATERSHED The following summaries describe projects that are recommended funding in the Lake Erie These projects have been

More information

Paying for Improvement: Stormwater Utilities & Drainage Districts Eric W. Fowle, AICP

Paying for Improvement: Stormwater Utilities & Drainage Districts Eric W. Fowle, AICP Paying for Improvement: Stormwater Utilities & Drainage Districts Eric W. Fowle, AICP Executive Director STORMWATER UTILITIES What is a storm water utility? Under state law, a municipality has the authority

More information

Capital Facilities Element

Capital Facilities Element Capital Facilities Element Purpose The Growth Management Act requires cities to prepare a capital facilities element consisting of: 1. An inventory of current capital facilities owned by public entities,

More information

In order to develop these comprehensive watershed retrofit plans, six key tasks were undertaken, each of which is described further below:

In order to develop these comprehensive watershed retrofit plans, six key tasks were undertaken, each of which is described further below: Date: June 26, 2013 To: From: Christin Jolicoeur, Watershed Planner Jason Papacosma, Watershed Programs Manager Arlington County Department of Environmental Services Laura Gardner, Water Resources Engineer

More information

Buffalo Creek Watershed-Based Plan EXECUTIVE SUMMARY

Buffalo Creek Watershed-Based Plan EXECUTIVE SUMMARY Buffalo Creek Watershed-Based Plan EXECUTIVE SUMMARY Prepared for Buffalo Creek Clean Water Partnership By Cardno August 2015 What you will find inside this Executive Summary 1. Introduction 2. Purpose

More information

SEWER SYSTEM IMPROVEMENT PROGRAM. Stormwater Management Toolkit URBAN WATERSHED PLANNING GAME

SEWER SYSTEM IMPROVEMENT PROGRAM. Stormwater Management Toolkit URBAN WATERSHED PLANNING GAME SEWER SYSTEM IMPROVEMENT PROGRAM Stormwater Management Toolkit URBAN WATERSHED PLANNING GAME June 1, 2013 SEWER SYSTEM IMPROVEMENT PROGRAM URBAN WATERSHED PLANNING GAME Stormwater Management Toolkit TABLE

More information

Upper Eastern Shore WIP Workshop November 21, 2014

Upper Eastern Shore WIP Workshop November 21, 2014 Clean Water Optimization Tool for Maryland s Eastern Shore Karen Cappiella Program Director Center for Watershed Protection Upper Eastern Shore WIP Workshop November 21, 2014 Funded by the Town Creek Foundation

More information

Green Infrastructure Financing

Green Infrastructure Financing Green Infrastructure Financing Jennifer Cotting Environmental Finance Center National Center for Smart Growth University of Maryland December 2012 Green Infrastructure Financing What we will cover: Why

More information

STORMWATER FINANCING THE REGULATIONS

STORMWATER FINANCING THE REGULATIONS Save The Bay STORMWATER FINANCING THE REGULATIONS ROBERT BRUTUS CANTOREGGI TOWN OF FRANKLIN DPW DIRECTOR NOVEMBER 17, 2011 Franklin, At a Glance Suburban, Bedroom Community Population: 32, 800+ Density:

More information

ANCR INDIVIDUAL RESPONSES SUMMARY: 2/11/04 WATER RESOURCES GOALS AND OBJECTIVES

ANCR INDIVIDUAL RESPONSES SUMMARY: 2/11/04 WATER RESOURCES GOALS AND OBJECTIVES ANCR INDIVIDUAL RESPONSES SUMMARY: 2/11/04 WATER RESOURCES GOALS AND OBJECTIVES Goal 1: Protect the health and safety of the Dane County population. a. Prevent development that may have an adverse effect

More information

DEFINITIONS KEY FINDINGS COMMUNITY ADAPTATION PLANNING FOR CHANGING LANDSCAPES & CLIMATE. For more information visit

DEFINITIONS KEY FINDINGS COMMUNITY ADAPTATION PLANNING FOR CHANGING LANDSCAPES & CLIMATE. For more information visit KEY FINDINGS & IMPLICATIONS FOR TAKING ACTION DEFINITIONS Community Adaptation is a planning process designed to improve the capacity of local communities to adapt to changing conditions. It requires an

More information

Redwood Heights Stage 2 Update. Citizen s Advisory Committee April 25, 2017

Redwood Heights Stage 2 Update. Citizen s Advisory Committee April 25, 2017 Redwood Heights Stage 2 Update Citizen s Advisory Committee April 25, 2017 Outline Transportation Study Utility Servicing Biodiversity Conservation Strategy Outstanding Items Timeline Water Servicing Limited

More information

15A NCAC 02H.1005 STORMWATER REQUIREMENTS: COASTAL COUNTIES

15A NCAC 02H.1005 STORMWATER REQUIREMENTS: COASTAL COUNTIES 1 1 1 1 1 1 1 1 0 1 0 1 1A NCAC 0H.0 STORMWATER REQUIREMENTS: COASTAL COUNTIES (a) The following definitions are applicable to this rule: (1) Built upon area as defined in Session Law 00- means that portion

More information

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts 1.0 INTRODUCTION The proposed hydromodification base strategy (Base Strategy)

More information

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts 1.0 INTRODUCTION The proposed hydromodification base strategy (Base Strategy)

More information

PUBLIC MEETINGS SCHEDULED ON SPONSORED PROJECTS

PUBLIC MEETINGS SCHEDULED ON SPONSORED PROJECTS To: Interested Stakeholders From: Patti Cale-Finnegan, SRF Coordinator Iowa Department of Natural Resources Date: November 5, 2012 PUBLIC MEETINGS SCHEDULED ON SPONSORED PROJECTS You are invited to attend

More information

Environmental Protection Update Stormwater and Floodplain. February 2, 2017

Environmental Protection Update Stormwater and Floodplain. February 2, 2017 Environmental Protection Update Stormwater and Floodplain Glen Behrend, P.E. 2017 GA Zoning Conference February 2, 2017 INTRODUCTION Today s discussion: Stormwater Overview Stormwater and Smart Growth

More information

Best Management Practices for Stormwater Quality Treatment in Urban Settings. Lower Mississippi River WMO September 2017

Best Management Practices for Stormwater Quality Treatment in Urban Settings. Lower Mississippi River WMO September 2017 Best Management Practices for Stormwater Quality Treatment in Urban Settings Lower Mississippi River WMO September 2017 Stormwater 101 Impervious surfaces (pavement, parking lots, etc.): quickly produce

More information

Sizing Calculations and Design Considerations for LID Treatment Measures

Sizing Calculations and Design Considerations for LID Treatment Measures SCVURPPP C.3 Workshop December 18, 2012 Sizing Calculations and Design Considerations for LID Treatment Measures Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program

More information

DEP Issues Request for Proposals to Develop Green Infrastructure Master Plans and Designs in Three Combined Sewer Areas

DEP Issues Request for Proposals to Develop Green Infrastructure Master Plans and Designs in Three Combined Sewer Areas Subject: DEP Issues Request for Proposals to Develop Green Infrastructure Master Plans and Designs in Three Combined Sewer Areas FOR IMMEDIATE RELEASE 12-16 March 12, 2012 CONTACT: Farrell Sklerov / Mercedes

More information

Public Facilities Element (WAT) (SEW) (SOL) (STM)

Public Facilities Element (WAT) (SEW) (SOL) (STM) Public Facilities Element (WAT) (SEW) (SOL) (STM) Potable Water Sub-Element (WAT) Goal Provide public potable water supply facilities in a manner, which ensures the health, welfare and safety of the residents

More information

Storm Water Resource Plan Criteria and Metrics Checklist

Storm Water Resource Plan Criteria and Metrics Checklist APPENDIX F Storm Water Resource Plan Criteria and Metrics Checklist Prepared for: San Diego Regional Storm Water Copermittee County of San Diego Department of Public County of San Diego, Department of

More information

Design Handbook. Low Impact Development Best Management Practices

Design Handbook. Low Impact Development Best Management Practices Design Handbook for Low Impact Development Best Management Practices Prepared by: 9/2011 Riverside County Flood Control and Water Conservation District 1995 Market Street Riverside, CA 92501 TABLE OF CONTENTS

More information

Updates on EPA Stormwater Program

Updates on EPA Stormwater Program Updates on EPA Stormwater Program Jeremy Bauer U.S. Environmental Protection Agency Office of Water Washington, DC August 2012 1 OVERVIEW OF STORMWATER IMPACTS 2 Impervious Cover and Stormwater Hydrology

More information

What is a stormwater utility fee?

What is a stormwater utility fee? What is a stormwater utility fee? A stormwater utility fee is similar to a water or sewer utility fee. In essence, customers pay a fee to convey stormwater from their properties. The City of Goodlettsville

More information

Water Quality Stewardship Plan (WaQSP)

Water Quality Stewardship Plan (WaQSP) Salt Lake Countywide Water Quality Stewardship Plan (WaQSP) Natalie Rees Salt Lake County Flood Control & Engineering Division 2008 Watershed Symposium COUNTY RESPONSIBILITY AND AUTHORITY Salt Lake County

More information

Before the Funding Wells Run Dry

Before the Funding Wells Run Dry Before the Funding Wells Run Dry Comparing States Clean Water Green Reserve Process and Performance Image: Lowesforpros.com Steve Wise CNT Natural Resources Director October 13, 2009 The Center for Neighborhood

More information

Shirley E. Clark, Ph.D., P.E. October 5, /30/2012

Shirley E. Clark, Ph.D., P.E. October 5, /30/2012 Shirley E. Clark, Ph.D., P.E. October 5, 2012 Prior development decisions have led to directly connected impervious areas and pervious areas with heavily-compacted soils. Prince Georges Cty, MD photo 1

More information

Chapter 1. Introduction

Chapter 1. Introduction Chapter 1 Introduction James P. Heaney, Robert Pitt, and Richard Field Introduction Stormwater has traditionally been considered a nuisance, requiring rapid and complete drainage from areas of habitation.

More information

Stormwater Bio-Infiltration Pilot Project Concept Proposal Submitted by

Stormwater Bio-Infiltration Pilot Project Concept Proposal Submitted by Concept Proposal Submitted by Public Works Department 1947 Center Street, Fourth Floor Berkeley, CA 94704 December 17, 2009 Executive Summary The s Public Works Department submits this concept proposal

More information

Chapter 21 Stormwater Management Bylaw

Chapter 21 Stormwater Management Bylaw Chapter 21 Stormwater Management Bylaw SECTION 1. PURPOSE The purpose of this Bylaw is to: implement the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm

More information

Municipal Stormwater Management Planning

Municipal Stormwater Management Planning Municipal Stormwater Management Planning Christopher C. Obropta, Ph.D., P.E. Water Resources Extension Specialist with Rutgers Cooperative Extension Assistant Professor with Department of Environmental

More information

County of Los Angeles - Department of Public Works

County of Los Angeles - Department of Public Works GENERAL PROJECT INFORMATION County of Los Angeles - Department of Public Works Building and Safety/Land Development Division LOW IMPACT DEVELOPMENT REVIEW SHEET (2017 Los Angeles County Building Code,

More information

Urban Conservation: District & State

Urban Conservation: District & State Urban Conservation: District & State Clare Lindahl Scott County SWCD & Conservation Districts of Iowa Urban Conservation: Iowa SWCD s District Employees Watershed Projects Funding: 319 federal funds from

More information

Lesson W9 Wastewater and CSOs

Lesson W9 Wastewater and CSOs Lesson W9 Wastewater and CSOs Where Does our Water Go When We Flush it Down the Drain? When you flush your toilet or wash your dishes, where does the water go? We learned that only 2-3% of the water used

More information

3F. Hydrology and Water Quality

3F. Hydrology and Water Quality This section provides an analysis of potential hydrological and water quality impacts associated with implementation of the proposed project. The section also evaluates and describes the potential impacts

More information

Frugal Smart Solutions for Pan City Development

Frugal Smart Solutions for Pan City Development Frugal Smart Solutions for Pan City Development 3 rd September 2015 G Ramesh Centre of Excellence in Urban Governance IIM Bangalore Frugal Smart City: Basic Principles 1. It is an Optimum City 2. Seeks

More information

SDC 2.0 Working Group: Goals, Actions and Targets Nature + Water

SDC 2.0 Working Group: Goals, Actions and Targets Nature + Water 1 SDC 2.0 Working Group: Goals, Actions and Targets Nature + Water *KEY: Yellow highlights are proposed new text. NATURE 1 Goal 1: Protect, restore, and expand aquatic ecosystems. Target 1: CURRENT: By

More information

Conservation, Open Space & Groundwater Recharge Element

Conservation, Open Space & Groundwater Recharge Element Conservation, Open Space & Groundwater Recharge Element GOAL 1 ESTABLISH AND MAINTAIN AN INTEGRATED AND URBAN-DEFINING OPEN SPACE NETWORK THAT PROTECTS AND CONSERVES KEY ENVIRONMENTAL FEATURES. Objective

More information

MODEL STORMWATER MANAGEMENT GUIDELINES FOR INFRASTRUCTURE NEW DEVELOPMENT AND REDEVELOPMENT

MODEL STORMWATER MANAGEMENT GUIDELINES FOR INFRASTRUCTURE NEW DEVELOPMENT AND REDEVELOPMENT SALMON-SAFE INC. MODEL STORMWATER MANAGEMENT GUIDELINES FOR INFRASTRUCTURE NEW DEVELOPMENT AND REDEVELOPMENT MAY 2018 Introduction Polluted stormwater is the largest threat to the health of the Pacific

More information

Municipal Separate Storm Sewer Systems (MS4) Implementation. Craig Carson Montgomery County Department of Environmental Protection

Municipal Separate Storm Sewer Systems (MS4) Implementation. Craig Carson Montgomery County Department of Environmental Protection Montgomery County Maryland Municipal Separate Storm Sewer Systems (MS4) Implementation Craig Carson Montgomery County Department of Environmental Protection Montgomery County, Maryland 500 sq. miles 970,000

More information

WATER INFRASTRUCTURE ADVISORY COUNCIL

WATER INFRASTRUCTURE ADVISORY COUNCIL WATER INFRASTRUCTURE ADVISORY COUNCIL CLEAN WATER SRF LOAN PROGRAM AND SURFACE WATER PLANNING GRANTS Presented by: Bruce W. Jones, PE Water Infrastructure Advisory Council Makes recommendations for projects

More information

NJ Future CSO Permittee Meeting

NJ Future CSO Permittee Meeting NJ Future CSO Permittee Meeting 1 Best Practices Carter Strickland, JD HDR 2 Getting the Best LTCP CSO controls will be expensive Include Best Practices to Maximize visible and tangible benefits Create

More information

Stormwater Utility. Frequently Asked Questions. January 2019 CITY OF NORTH RIDGEVILLE Avon Belden Road North Ridgeville, Ohio 44039

Stormwater Utility. Frequently Asked Questions. January 2019 CITY OF NORTH RIDGEVILLE Avon Belden Road North Ridgeville, Ohio 44039 Stormwater Utility Frequently Asked Questions January 2019 CITY OF NORTH RIDGEVILLE 7307 Avon Belden Road North Ridgeville, Ohio 44039 General Stormwater Information/Education 1. What is stormwater runoff?

More information

Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates VNH File No.

Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates VNH File No. Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates 2005 VNH File No. 35317-210-21 Table of Contents Introduction... 3 Goals... 3 Storm water Discussion...

More information

Appendix A Stormwater Site Plan Report Short Form

Appendix A Stormwater Site Plan Report Short Form Appendix A Stormwater Site Plan Report Short Form The Stormwater Site Plan Report Short Form may be used for projects that trigger only Minimum Requirements #1-#5. These projects typically fall within

More information

National Stormwater Calculator. Webcast Logistics

National Stormwater Calculator. Webcast Logistics National Stormwater Calculator Webcast sponsored by EPA's Watershed Academy Wednesday, October 16, 2013 2:00pm 3:30pm Eastern Instructors: Tamara Mittman, Environmental Engineer, U.S. EPA s Office of Wastewater

More information

GOALS, OBJECTIVES AND POLICIES

GOALS, OBJECTIVES AND POLICIES GOALS, OBJECTIVES AND POLICIES GOAL 1: Public Facilities. Needed public facilities shall be provided in a manner which protects investments in existing facilities and promotes orderly compact urban growth.

More information

SUSTAINABLE MUNICIPAL WATER MANAGEMENT PROGRAM

SUSTAINABLE MUNICIPAL WATER MANAGEMENT PROGRAM THE CITY OF ST. CATHARINES SUSTAINABLE MUNICIPAL WATER MANAGEMENT PROGRAM SUSTAINABLE MUNICIPAL WATER MANAGEMENT PROGRAM THE CITY OF ST. CATHARINES Background As a member of the Great Lakes and St. Lawrence

More information

New Orleans Stormwater Regulations and Green Infrastructure Toolkit

New Orleans Stormwater Regulations and Green Infrastructure Toolkit New Orleans Stormwater Regulations and Green Infrastructure Toolkit City of New Orleans Tulane Engineering Forum Urban Green Infrastructure April 20, 2018 Drivers Planning Modify zoning and subdivision

More information

Cost Efficiency and Other

Cost Efficiency and Other Cost Efficiency and Other Factors in Urban Stormwater BMP Selection WIP Local Technical Meeting Series November 2013 Greg Busch MarylandDepartmentof the Environment gbusch@mde.state.md.us 1 Which BMPs

More information

San Antonio Low Impact. Development

San Antonio Low Impact. Development San Antonio Low Impact Our objective is to provide a redevelopment catalyst for the Kelly Center Property, the heart of Port San Antonio. The Billy Mitchell Village redevelopment is to drive inspirational

More information

Post Construction BMP Monitoring: Critical to a Successful Green Infrastructure Program

Post Construction BMP Monitoring: Critical to a Successful Green Infrastructure Program Post Construction BMP Monitoring: Critical to a Successful Green Infrastructure Program Presented by: Kelly Kuhbander, LEED AP, Strand Associates, Inc. April 4, 2013 Regulatory Support for Use of Green

More information

Hoosier Creek Watershed All of Ely drains into Hoosier Creek, which runs north to south along the west side of Ely. Hoosier Creek, Hydrologic Unit Cod

Hoosier Creek Watershed All of Ely drains into Hoosier Creek, which runs north to south along the west side of Ely. Hoosier Creek, Hydrologic Unit Cod Hoosier Creek Watershed All of Ely drains into Hoosier Creek, which runs north to south along the west side of Ely. Hoosier Creek, Hydrologic Unit Code (HUC) 8 07080208, drains into the Coralville Reservoir,

More information

Chapter 7 Plan for Community Facilities & Services

Chapter 7 Plan for Community Facilities & Services Chapter 7 Plan for Community Facilities & Services Crozet is served by numerous County facilities and services, some of which are located within the Development Area. These facilities and services are

More information

DC STORMWATER PLAN CONSOLIDATED TOTAL MAXIMUM DAILY LOAD (TDML) IMPLEMENTATION PLAN

DC STORMWATER PLAN CONSOLIDATED TOTAL MAXIMUM DAILY LOAD (TDML) IMPLEMENTATION PLAN DC STORMWATER PLAN CONSOLIDATED TOTAL MAXIMUM DAILY LOAD (TDML) IMPLEMENTATION PLAN CONTENTS Introduction 1 The Challenge 5 The Solution 7 Tracking Progress 11 What can you do? 15 INTRODUCTION The DC Stormwater

More information

The Scope of Integrated Stormwater Management

The Scope of Integrated Stormwater Management Stormwater Planning Guidebook The Scope of Integrated Stormwater Management Chapter Three 3.1 Overview and Context Connecting the Natural and Built Environments Integration Means Tackling Water Quantity

More information

Credit Calculations and Calculator Functions

Credit Calculations and Calculator Functions MIDS Work Group Meeting May 20, 2010 Credit Calculations and Calculator Functions p-gen3-13c Today s Goals The Foundation for the Credits & Calculator Discuss proposed calculations Performance goal requirement

More information

GOALS, OBJECTIVES AND POLICIES

GOALS, OBJECTIVES AND POLICIES GOALS, OBJECTIVES AND POLICIES GOAL 1: Public Facilities. Needed public facilities shall be provided in a manner which protects investments in existing facilities and promotes orderly compact urban growth.

More information

Water Resources Management/Ecological Engineering Program

Water Resources Management/Ecological Engineering Program Water Resources Management/Ecological Engineering Program Fouad H. Jaber, PhD, PE Associate Professor and Extension Specialist Biological and Agricultural Engineering Texas A&M AgriLife Extension, Urban

More information

6.13 Utilities and Service Systems

6.13 Utilities and Service Systems 6.13 6.13.1 Introduction This section describes impacts for utilities and service systems that would result from construction and operation of the CEQA Alternatives. 6.13.2 Regulatory Setting There are

More information

EXECUTIVE SUMMARY DES PLAINES RIVER WATERSHED-BASED PLAN WHY A WATERSHED-BASED PLAN? WHAT IS A WATERSHED?

EXECUTIVE SUMMARY DES PLAINES RIVER WATERSHED-BASED PLAN WHY A WATERSHED-BASED PLAN? WHAT IS A WATERSHED? Des Plaines River Watershed-Based Plan EXECUTIVE SUMMARY June 2018 EXECUTIVE SUMMARY DES PLAINES RIVER WATERSHED-BASED PLAN WHY A WATERSHED-BASED PLAN? Water is elemental to our lives. Plants and animals,

More information

UW-MADISON GREEN INFRASTRUCTURE PLAN

UW-MADISON GREEN INFRASTRUCTURE PLAN UW-MADISON GREEN INFRASTRUCTURE PLAN Gary Brown, UW-Madison David Wolmutt, SmithGroupJJR GROWING SUSTAINABLE COMMUNITIES OCTOBER 3, 2017 PRESENTATION AGENDA Project Context Evolution of Campus Green Infrastructure

More information

Rainfall, runoff and sediment transport in the Napa River watershed: now and a possible future

Rainfall, runoff and sediment transport in the Napa River watershed: now and a possible future Rainfall, runoff and sediment transport in the Napa River watershed: now and a possible future Lester McKee San Francisco Estuary Institute 5/24/2017 1 The importance of the natural water cycle of infiltration

More information

Section 6: Stormwater Improvements

Section 6: Stormwater Improvements Section 6: Stormwater Improvements A major objective of this study was to identify opportunities for improvements to address the widespread water quality impairments caused by stormwater runoff in the

More information

In order to develop these comprehensive watershed retrofit plans, six key tasks were undertaken, each of which is described further below:

In order to develop these comprehensive watershed retrofit plans, six key tasks were undertaken, each of which is described further below: Date: December 12, 2011 To: From: Re: Jason Papacosma, Watershed Planner Christin Jolincoeur, Watershed Planner Arlington County Department of Environmental Services Gregory Hoffmann, P.E., Program Director

More information

City of Madison: 2017 Capital Budget Capital Improvement Plan

City of Madison: 2017 Capital Budget Capital Improvement Plan City of Madison: 2017 Capital Budget Capital Improvement Plan Agency: Stormwater Utility Project Summary Backyard Drainage Problems 25,000 25,000 25,000 25,000 25,000 25,000 CIPP Lining Storm Sewer 100,000

More information

A Role for Dispersed Groundwater Recharge Systems to Balance the Effects of Hydromodification

A Role for Dispersed Groundwater Recharge Systems to Balance the Effects of Hydromodification ABSTRACT & POWERPOINT PRESENTATION A Role for Dispersed Groundwater Recharge Systems to Balance the Effects of Hydromodification Daniel B. Stephens, Ph.D. Principal Hydrologist Daniel B. Stephens & Associates,

More information

Pennsylvania s Phase III Watershed Implementation Plan

Pennsylvania s Phase III Watershed Implementation Plan Pennsylvania s Phase III Watershed Implementation Plan Informational Meeting Pennsylvania House and Senate Agriculture and Rural Affairs Committees August 16, 2017 Agenda Why Are We Doing This? Progress

More information

Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan

Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan Pennsylvania State Section American Water Resources Association Fall 2011

More information

Stormwater Volume and Treatment Methods Simplifying the Numbers. IAFSM March 10, Presented by: Tom Powers P.E., CFM, LEED AP, CPESC

Stormwater Volume and Treatment Methods Simplifying the Numbers. IAFSM March 10, Presented by: Tom Powers P.E., CFM, LEED AP, CPESC Stormwater Volume and Treatment Methods Simplifying the Numbers IAFSM March 10, 2011 Presented by: Tom Powers P.E., CFM, LEED AP, CPESC Introduction GOALS: Improve understanding of Rate and Volume (Quantity)

More information

MADERA COUNTY STORM WATER RESOURCE PLAN. TAC Meeting #2. August 30th, 2017

MADERA COUNTY STORM WATER RESOURCE PLAN. TAC Meeting #2. August 30th, 2017 MADERA COUNTY STORM WATER RESOURCE PLAN TAC Meeting #2 August 30th, 2017 Meeting Agenda 10:30 Introductions (10 mins) Meet the SWRP team and other TAC Members 10:40 Project Prioritization Approach with

More information

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac) Permit Application No.: 17-181 Rules: Erosion Control, Wetland Protection, and Waterbody Crossings & Structures Applicant: Hennepin County Received: 4/27/17 Project: CSAH 112 Phase II Complete: 9/5/17

More information

INFRASTRUCTURE ELEMENT/NATURAL GROUNDWATER AQUIFER RECHARGE SUB-ELEMENT

INFRASTRUCTURE ELEMENT/NATURAL GROUNDWATER AQUIFER RECHARGE SUB-ELEMENT I. INTRODUCTION A. Purpose As provided in this Natural Groundwater Aquifer Recharge Sub-element, the City of Ocoee has developed guidelines based on the St. Johns River Water Management District s programs.

More information