Subcontractor Pre-qualification Statement
|
|
- Aron Mark Morrison
- 5 years ago
- Views:
Transcription
1 Subcontractor Pre-qualification Statement By submitting this Statement, Subcontractor affirms that the information provided herein is true and sufficiently complete so as not to be misleading. All fields must be completed in order to be processed by CK Construction Corp. Failure to complete all fields may result in a nonprequalification of your firm. PROJECT NAME: SUBMITTED TO: ADDRESS: CK Construction Corp S. Painter Lane West Haven, Utah SUBMITTED BY: SUBCONTRACTOR NAME: PHYSICAL ADDRESS: PHONE/ CELL FAX NUMBERS: ADDRESS: SECONDARY CONTACT INFORMATION FOR E-BUILDER COORESPONDENCE: NAME: PHONE/ CELL (Will be used for sending information, bid documents, addenda, bid forms, clarifications, etc.) Minority Business Enterprise Status. MBE WBE DBE (Please attach certificate & check all that apply) Plans Digital or Printed, please check one.
2 CHECK THE BOXES NEXT TO THE BID PACKAGES FOR WHICH SUBMITTING FIRM WISHES TO PRE-QUALIFY: 2A Earthwork 2B Site Utilities 2C Drilled Piers 3A Foundations 3C Reinforcing Material 3E Slabs, Steps, and Misc 4 Masonry 5 Steel Material 6 Steel Erection 7A Gypsum Board Assemblies 7B EFIS 7C Acoustical Ceilings 8A Roof Insulation 8B Architectural Metal 8C Shingled Roofing 8D Membrane Roofing 9 Doors & Hardware 10 Aluminum Doors, Windows 11A Overhead Doors & Grilles 11B Wood Windows material 11C Unit Skylights 11D Translucent Panels 11E Folding Doors 12 Painting 13A Ceramic Tile Flooring 13B Wood Flooring 13C Resilient Flooring & Carpet 13D Composition Flooring 13E Epoxy Flooring 13F Concrete Stain and Sealant 14A Architectural Casework 14B Laboratory Casework 15 Specialties 16A Prefabricated Partitions 16B Stage Curtain & Rigging 16C Stage Lighting & Sound 16D Laundry Equipment 16E Food Service Equipment 16F Gymnasium Equipment 17A Elevators 17B Lifts 17C Hoists & Cranes 18 Mechanical 19A Electrical 19B Technology 20A Fencing 20B Irrigation Systems 20C Landscaping 21A Asphalt Pavement 21B Site Concrete 22A Pre Fabricated Detention Cells 22B Security Metal & Hardware 22C Security Fencing 22D Security Electronics 23A Asbestos Abatement 23B Building Demolition 23C Precast Concrete 23D Driven Piles 23E Drilled Piers 23F Sprayed Fire Resistive Materials 23G Pre Engineered Buildings 23H Metal Lockers 23J Wood Framing Labor 23K Exterior Bleachers 23L Synthetic Surfaces 24A Playground Surfaces 24B Playground Equipment 24A Playground Surfaces 24B Playground Equipment 24C Pedestrian Bridge 25 Ice Rink Cooling System 26 Crane Equipment 27A Foamed in Place Insulation 27B Cellulose Sprayed Insulation CK Construction Corp.-Subcontractor Pre-qualification Statement Page 2 of 6
3 1. ORGANIZATION 1.1 How many years has your organization been in business as a Subcontractor? 1.2 How many years has your organization been in business under its present business name? Under what other or former names has your organization operated? 1.3 If your organization is a corporation, answer the following: Date of incorporation: State of incorporation: President s name: Vice-president s name(s): Secretary s name: Treasurer s name: 1.4 If your organization is a partnership, answer the following: Date of organization: Type of partnership (if applicable): Name(s) of general partner(s): 1.5 If your organization is individually owned, answer the following: Date of organization: Name of owner: 1.6 If the form of your organization is other than those listed above, describe it and name the principals: 2. LICENSING 2.1 List jurisdictions and trade categories in which your organization is legally qualified to do business, and indicate registration or license numbers, if applicable. 2.2 List jurisdictions in which your organization s partnership or trade name is filed. Page 3 of 6
4 3. EXPERIENCE 3.1 List the categories of work that your organization normally performs with its own forces What are your Firm s Manpower Capabilities (crews and sizes)? Please write in which States your company is willing to work. 3.2 Claims and Suits. (If the answer to any of the questions below is yes, please attach details.) Has your organization ever failed to complete any work awarded to it? Are there any judgments, claims, arbitration proceedings or suits pending or outstanding against your organization or its officers? Has your organization filed any law suits or requested arbitration with regard to construction contracts within the last five years? Has your organization failed to complete its portion of work by the contract completion date within the past five years? Are there now pending and/or have there ever been Liquidated Damages assessed against your organization? 3.3 Within the last five years, has any officer or principal of your organization ever been an officer or principal of another organization when it failed to complete a construction contract? (If the answer is yes, please attach details.) 3.4 On a separate sheet, list major construction projects your organization has in progress, giving the name of project, phone & fax number for the general contractor and architect, contract amount, percent complete and scheduled completion date State total worth of work in progress and under contract: Page 4 of 6
5 3.5 On a separate sheet, list the major projects your organization has completed in the past five years, giving the name of project, contact information for the general cont ractor and architect, contract amount, date of completion and percentage of the cost of the work performed with your own forces State average annual amount of construction work performed during the past five years: 3.6 On a separate sheet, list the construction experience and present commitments of the key individuals of your organization. 3.7 On a separate sheet, list past work history with CK Construction Corp. 4. REFERENCES 4.1 Supplier References (Include contact name, phone & fax number). (minimum of three): General Contractor References (Include contact name and phone number). (minimum of three): 4.2 Banking Reference (Include Contact Name and Phone): 4.3 Surety: Bonding Company and Information: Please answer the following questions: Are you able to provide a 100% performance/payment bond? YES NO Are you able to provide a bid bond? YES NO Please provide a letter from your surety company Current bond Single and Aggregate limits and Bond Rate(as a percentage): 4.4 Insurance: Name of insurance company: Name, address, & phone # of agent: Page 5 of 6
6 5.SAFETY 5.1 OSHA Reported Accident/Incident History Provide OSHA 300 Summary Log for the last 3 full years, or the last full years your company has been in business. 5.2 Experience Modification Rate EMRs are obtained from your worker's compensation insurance carrier. Present year Last Year Two Years Ago EMR Effective Date(MM DD YYYY) 6.FINANCING 6.1 Financial Statement The following information is taken from Subcontractor s latest audited financial statement: (If an audited financial statement is not provided a bond may be required. Please complete Section 4.3 fully.) Current Assets (e.g., cash, joint venture accounts, accounts receivable, notes receivable, accrued income, deposits, materials inventory and prepaid expenses); Net Fixed Assets; Other Assets; Current Liabilities (e.g., accounts payable, notes payable, accrued expenses, provision for income taxes, advances, accrued salaries and accrued payroll taxes); Other Liabilities (e.g., capital, capital stock, authorized and outstanding shares par values, earned surplus and retained earnings) Name, address, and phone number of firm preparing financial statement, and date thereof: Is the referenced financial statement for the identical organization named on page one? If not, explain the relationship and financial responsibility of the organization whose financial statement is provided (e.g., parent-subsidiary). 6.2 Will the organization whose financial information is provided act as guarantor of the contract for construction? Page 6 of 6
Document A305. The Undersigned certifies under oath that the information provided herein is true and sufficiently complete so as not to be misleading.
TM Document A305 Contractor s Qualification Statement 1986 The Undersigned certifies under oath that the information provided herein is true and sufficiently complete so as not to be misleading. SUBMITTED
More informationDocument A305 TM. Contractor's Qualification Statement
Contractor's Qualification Statement Document A305 TM 1986 The Undersigned certifies under oath that the information provided herein is true and sufficiently complete so as not to be misleading. SUBMITTED
More informationSubcontractor Pre-Qualification Statement Hunt / Moss, A Joint Venture
Subcontractor Pre-Qualification Statement Hunt / Moss, A Joint Venture 1. SUBMITTED BY: DATE: Name of Firm: Street Mailing Address (If different): Primary Fax: E-mail: Website: Address of the office that
More informationSUBCONTRACTOR S QUALIFICATION STATEMENT
SUBCONTRACTOR S QUALIFICATION STATEMENT Thank you for your interest in working with DivisionOne Construction. Please complete the following Subcontactor Qualifications and return to our office at bid@d1construction.com:
More informationAIA Document A305 - Electronic Format CONTRACTOR S QUALIFICATION STATEMENT
AIA Document A305 - Electronic Format CONTRACTOR S QUALIFICATION STATEMENT THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES: CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO IT'S COMPLETION OR
More informationPrequalification Form
1.0 General Information Date: 1.1 Name of Firm _ County Telephone Toll Free Fax Website _ for Bid Purposes: Name Phone 1.2 Legal Identity: Sole Proprietorship Partnership Corporation Limited Liability
More informationSubcontractor Qualification Form
Subcontractor Qualification Form Date Submitted: General Information Company Name: Mailing Address: Physical Address: Email: Primary Contact: License Number (if applicable): Contracting Specialty: Street/PO
More informationSUBCONTRACTOR/SUPPLIER PRE-QUALIFICATION QUESTIONNAIRE
SUBCONTRACTOR/SUPPLIER PRE-QUALIFICATION QUESTIONNAIRE PLEASE SUBMIT FORM BY E-MAIL OR FAX TO: Trish Greene tgreene@hannigconstruction.com e-mail@hannigconstruction.com Fax 812.235.1218 INFORMATION DATE:
More information1.5 Other than persons listed above, number of full-time office employees: 1.6 Number of full-time, permanent field employees:
1.4 Names of officers, owners, partners and principals. Identify relationship of each to firm and if active in firm: 1.5 Other than persons listed above, number of full-time office employees: 1.6 Number
More informationWork Performed Please see the attached list of Construction Codes and mark all that your company typically performs
SUBCONTRACTOR PROFESSIONAL SERVICES PREQUALIFICATION FORM Prequalification Form will NOT be accepted unless completed in its entirety. Business Information Company Name: Primary Address 1: Primary Address
More informationSub-Contractor/Supplier Pre-Qualification Questionnaire
CURRENT DATE: *Please submit form by Fax or E-Mail to: 317.846.3113 info@allieddiversified.com COMPANY NAME: CONTACT: ADDRESS: STREET: CITY: STATE: ZIP: PHONE: FAX: E-MAIL: WEBSITE: 1. ORGANIZATION 1.1
More informationBuilder Qualification Application Montserrat
Builder Qualification Application Montserrat Please return the completed form, review fee, and all requested information to Montserrat HOA, 9411 Marbella Drive, Fort Worth, Texas, 76126. If you have any
More informationDOCUMENT BID DOCUMENT
DOCUMENT 00 40 00 BID DOCUMENT 1 Submit bids in compliance with Document 00 21 00Instructions to Bidders. Fill in blanks which pertain to the project or indicate N/A. The Owner reserves the right to reject
More informationREQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK FOR THE NEW
REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK FOR THE NEW Fire Station No. 1, Fire Administration, Training/Emergency Operations, and Public Works Service Center DUE April 17, 2017 BY 4:00
More informationPennsylvania Turnpike Commission Harrisburg, Pennsylvania
Pennsylvania Turnpike Commission Harrisburg, Pennsylvania NOTICE TO CONTRACTORS REQUEST FOR PREQUALIFICATION PLYMOUTH MEETING MAINTENANCE FACILITY RELOCATION AND CONSTRUCTION PLYMOUTH TOWNSHIP, MONTGOMERY
More informationDAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower
DOCUMENT 001153 - REQUEST FOR QUALIFICATIONS 1.1 PURPOSE, LAWS, AND REGULATIONS A. The purpose of the Prequalification Procedure described in this Document is to provide Owner with a mechanism to evaluate
More informationSubcontractor Prequalification Form
Subcontractor Prequalification Form Project: Company Name: Address: City: State: Zip: Contact: Phone #: Fax #: Email: Company Type: If Certified: Type of Work: Corporation Partnership Individual Joint
More informationSERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS
SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS INDIANA UNIVERSITY BIDDING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 (REVISED 2005) MINORITY,
More informationLEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies
MasterFormat LEVEL TWO NUMBERS AND TITLES Introductory Information 00001 Project Title Page 00005 Certifications Page 00007 Seals Page 00010 Table of Contents 00015 List of Drawings 00020 List of Schedules
More informationTABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE
TABLE OF CONTENTS SECTION TITLE DATE Division 00 Procurement and Contracting Requirements 000101... Project Title Page 000116... CAD Standards 001116... Invitation to Bid 002113... Instructions to Bidders
More informationPREQUALIFICATION AND ADVERTISEMENT FOR BIDS
PREQUALIFICATION AND ADVERTISEMENT FOR BIDS Sealed Bid Proposals for UAB Project No. 170177 Honors College Building located at 1321 10th Avenue South, Birmingham AL 35205 will be received by The Facilities
More information4.1.3 Project Manual
4.1.3 Project Manual (*Section requires Filed Sub-Bid) PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP Division 00 Procurement and Contracting Requirements Section 00 01 03 Project Directory Section 01
More informationTABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS
AIA General Conditions... GC-1 to GC-44 Amendments to General Conditions... AM-1 to AM-2 Supplements to General Conditions... SU-1 to SU-7 00200 Instructions To Bidders... 1 3 00201 Contractor s Bidding
More informationName of company: Mailing Address: City: State: Zip: - Street Address: City: State: Zip: -
SUBCONTRACTOR QUALIFICATION FORM Instructions: Elaboration of the following requested information or additional information deemed to be useful for evaluation of your firm s capabilities may be attached
More informationGENERAL INFORMATION. Yrs. Yrs. Yrs. How many years has your organization been in business under your present firm name:
SUBCONTRACTOR / SUPPLIER PREQUALIFICATION FORM Complete all portions of this form and return to AlliedCook Construction Corp. with a copy of your Certificate of Insurance indicating current limits. This
More informationSUB PREQUAL FORM. prequalificatiom form information WE USE TEXTURA! Who requested prequal from R. C. Stevens? Check it out at
SUB 2014 PREQUAL FORM WE USE TEXTURA! Check it out at www.texturacorp.com R. C. Stevens Construction Company has automated our monthly payment application process by leveraging an online application provided
More informationDIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT
TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders
More informationADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:
ADDENDUM NO. 1 TO THE DRAWINGS AND SPECIFICATIONS FOR THE New Dishman-McGinnis Elementary School Bowling Green Independent Schools Bowling Green, Kentucky BG 12-256 RTA 1209 March 11, 2013 To All Plan
More informationMcPherson Contractors, Inc.
McPherson Contractors, Inc. Construction Manager Manual Jardine K-8 Campus Bid Package #2 Building Package Invitation to Bid *****FROM***** McPherson Contractors, Inc. 3501 SW Fairlawn Rd., Suite 100 Topeka,
More informationDIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT
TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders
More informationLEED TM POINT DOCUMENTATION
LEED TM POINT DOCUMENTATION 1100 SUMMARY LEED PROGRAM 1101 REQUIREMENTS 1125 SUMMARY OF MULTIPLE CONTRACTS WORK 1140 RESTRICTIONS 1210 ALLOWANCES 1230 ALTERNATES 1250 CONTRACT MODIFICATION PROCEDURES 1270
More informationCREC ACADEMY OF AEROSPACE AND ENGINEERING PHASE 2 GENERAL CONSTRUCTION STATE PROJECT # EA WINDSOR, CT. INVITATION TO BID
CREC ACADEMY OF AEROSPACE AND ENGINEERING PHASE II GENERAL CONSTRUCTION STATE PROJECT # 241-0099EA WINDSOR, CT. 1. Sealed proposals for the trade contracts listed below will be received by Capitol Region
More informationADDENDUM 2 - JULY 14, 2015
7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures
More informationPREQUALIFICATION APPLICATION
COMPANY INFORMATION BUSINESS INFORMATION Company Name: Parent Company: Previous Company Name(s): Type of Company: Corporation Partnership Sole Proprietor Joint Venture Other If Other, please specify: State
More informationTABLE OF CONTENTS Public Safety Building
DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary
More informationSECTION PAYMENT PROCEDURES
SECTION 012900 PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract including General and Supplementary Conditions and other Division 01 Specifications Sections apply
More informationAPPLICATION AND CERTIFICATE FOR PAYMENT
AND CERTIFICATE FOR PAYMENT TO OWNER: MASTER TEMPLATE - SAVE PROJECT FILE 1 DATE: 10/5/2012 PERIOD TO: ARCHITECT: PROJECT NO: CONTRACTOR'S FOR PAYMENT Application is made for payment, as shown below, in
More informationDIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT
TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders
More informationInvitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project:
RLS CONSTRUCTION GROUP Phone: 717-502-6680 Fax: 717-502-6681 www.rlscg.com Invitation to Bid RLS Construction Group requests your firm to submit a quotation on the following project: Project: Location:
More informationG703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project
Billing Requirements G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project Sitework / Paving Excavation and Grading Labor
More informationRIVERSIDE CHURCH OF CHRIST. Lafayette, LA
SECTION 000010 INVITATION FOR BIDS Bids for will be received in the office of Church Development Construction Services, 708 S. Rosemont Road, Suite #101,, until 12:00 noon Local Prevailing Time on Friday,
More informationDOCUMENT B. 2. The low bidder shall submit this Expanded Subcontractors Listing to the Owner within 24 hours after the bid opening.
DOCUMENT 00 43 36B EXPANDED SUBCONTRACTORS LISTING TO: CLARK COUNTY SCHOOL DISTRICT hereinafter called "Owner" FROM: ~AU;)"''"-' Oeve\,(;p,-...e,.,,... IA... t. ~o~ t>.m..e>u,i-j (Print Company Name) Pe-Mo1..,,,-t,:;>.tJ
More informationJMU Capital Projects SWaM Outreach Event Presentations
JMU Capital Projects SWaM Outreach Event Presentations Kjellstrom + Lee Contact: Jessica Marcus jmarcus@kjellstromandlee.com Project: College of Business Renovation/Expansion Please contact Kjellstrom
More informationJohns Hopkins University APL Building 201 December 5, Rob Dahms,
INVITATION TO BID BID DUE DATE: January 5, 2018 TO: 1:00 PM Rob Dahms, rdahms@tcco.com MWSDBE OUTREACH/ PRE-BID CONFERENCE: LOCATION: December 19, 2017 Tentative 9:00 AM JHU APL Building 200, 1 st Floor
More informationSUBCONTRACTOR / SUPPLIER (Circle one) PRE-QUALIFICATION FORM
SUBCONTRACTOR / SUPPLIER (Circle one) PRE-QUALIFICATION FORM Company Legal Name: Street Address: City, State, Zip Code: Mailing Address): (if different from above) City, State, Zip: Phone: Fax: Website
More informationADDENDUM NO. 2 Consisting of 3 pages and Attachments
10404-125 Street, Edmonton, AB. T5N 1T2 Tel: 780.455.5975 Fax: 780.454.2397 info@cdyarchitect.com ADDENDUM NO. 2 Consisting of 3 pages and Attachments PROJECT: Maina Centre Ville Phase II, Beaumont, Alberta
More informationPROCUREMENT AND CONTRACTING DOCUMENTS GROUP
PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 11 00 Notice To Bidders 00 21 00 Instructions To Bidders 00 22 00 Supplementary Instructions To Bidders
More informationPREQUALIFICATION DOCUMENTS FOR SUBCONTRACTORS FOR
1. PROJECT TICE PREQUALIFICATION DOCUMENTS FOR SUBCONTRACTORS FOR York Hall Biology/Chemistry Renovation UNIVERSITY OF CALIFORNIA SAN DIEGO a) BNBuilders, Inc. (BNB) intends to award lump sum contracts
More informationPrequalification Statement 11.16
COMPANY INFORMATION Prequalification Statement 11.16 It is recommended that you have the Adobe Acrobat Reader version 8 or newer installed on your computer to complete this Fillable Adobe PDF form. Adobe
More informationREQUEST FOR SUB/VENDOR BIDS
Presidio Dolores Apartments 12473 Cuatro Aces Circle San Elizario, TX 79849 CONTACT PERSON: TOM SHERIDAN tsheridan@pavilionconstruction.com REQUEST FOR SUB/VENDOR BIDS DEADLINE FOR BID SUBMISSION 1/11/2011,
More informationSECTION 2 DIVISION 01C DESIGN SERVICES PROJECT GUIDELINES (INFORMAL)
SECTION 2 DIVISION 01C DESIGN SERVICES PROJECT GUIDELINES (INFORMAL) PART 1 - PROJECT TITLE PAGE February 8, 2018 Project No. PROJECT NAME PART 2 - PROJECT GUIDELINES 2.1 BIDDERS/CONTRACTORS SHOULD CHECK
More informationDivision 00 Procurement and Contracting Requirements
SECTION 00 01 10 TABLE OF CONTENTS Division SECTION NO. VOLUME ONE Title SECTION TITLE Division 00 Procurement and Contracting Requirements 00 11 00 Invitation to Bidders 00 21 00 Instructions to Bidders
More informationPROJECT MANUAL FOR: CP AGRICULTURAL ENGINEERING RAIN TOWER REPAIRS CP HULSTON HALL STAIR TOWER REPAIRS
ADDENDUM #01 DATE: MAY 6, 2016 Page 1 of 2 TO CONTRACT DOCUMENTS ENTITLED: PROJECT MANUAL FOR: CP151322 AGRICULTURAL ENGINEERING RAIN TOWER REPAIRS CP160372 HULSTON HALL STAIR TOWER REPAIRS AT UNIVERSITY
More informationREQUEST FOR PROPOSAL (RFP) for the Construction of Base Building Requirements for the new Alaska Gallery exhibit.
REQUEST FOR PROPOSAL (RFP) for the Construction of Base Building Requirements for the new Alaska Gallery exhibit. 1. INVITATION The Anchorage Museum is soliciting bids from qualified general contractors
More informationTulare-Kings Counties Builders Exchange, Inc.
Tulare-Kings Counties Builders Exchange, Inc. MEMBERSHIP APPLICATION ATTENTION: Board of Directors, Tulare-Kings Counties Builders Exchange 823 W Center Ave, Visalia, CA 93291 P.O. Box 667, Visalia, CA
More informationA. Remove Table of Contents and insert new attached Table of Contents.
ADDENDUM NO. 01 PROJECT Colby Glass E.S. Window Upgrades and ADA Work PROJECT NO. 16043 DATE February 07, 2018 TO: All Prime Contract Bidders and all others to whom Drawings and Specifications have been
More informationCONTRACTOR LICENSE APPLICATION Please complete each field; insert N/A if not applicable. Incomplete applications will not be processed.
ADMINISTRATIVE USE ONLY: P.O. Box 70, Wright, WY 82732 APPROVED DENIED 201 Wright Blvd. License # Facsimile: 307-464-0813 buildingofficial@wrightwyoming.com CONTRACTOR LICENSE APPLICATION Please complete
More informationABC Membership Application (2018)
ABC Membership Application (2018) General Information Northern Ohio Chapter 2018 Membership Application & Investment Schedule Company Name Phone Fax Street City State Zip Web Address Field Employees #
More informationBERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA OFC FAX
BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA 95132 408-923-1871 OFC 408-926-8329 FAX PREQUALIFICATION PACKAGE INSTRUCTIONS FOR PROSPECTIVE MEP SUBCONTRACTORS FEBRUARY
More informationHouston Dynamo Stadium
Houston Dynamo Stadium Doing Business with Manhattan Construction Company The Project Agenda Upcoming Bid Packages Bidding Information Project Requirements doing business with Manhattan Contact Information
More informationJob Cost Summary 11/27/08
by Division with % Complete Job# = 186 Sample Company 2005 Job Cost Summary 186 Williams Post Office 1 General Requirements 1000.000 GENERAL REQUIREMENTS % COMPLETE 25 % COMPLETE % COMPLETE % COMPLETE
More informationMinneapolis Community and Technical College T-Building Floor 2 Student Affairs Cost Estimating Form Templates - Exhibit C
2 3 4 5 6 7 8 9 0 2 3 4 5 6 7 8 9 20 2 22 23 24 25 26 27 28 29 30 3 32 33 34 35 36 37 38 39 40 4 42 43 44 45 46 DIVISION 02 EXISTING CONDITIONS Demolition; Removal & Disposal: CMU Partitions AD Quan UM
More informationCONTRACTOR S PREQUALIFICATION FORM
Toronto Catholic District School Board Materials Management Department 80 Sheppard Avenue East, Toronto, ON M2N 6E8 Phone: 416/222-8282 Fax: 416/512-3440 www.tcdsb.org CONTRACTOR S PREQUALIFICATION FORM
More informationContractor Pre-qualification profile and Questionnaire
Contractor Pre-qualification profile and Questionnaire Company Name Date Vale Pre-Qualification and Profile Questionnaire Feb 2014 Page 1 of 13 1. GENERAL INFORMATION Company Name: Telephone Number: Web
More informationibidpro Trade Code List
ibidpro List 00011G - Blueprinting Services 00990G - General Labor 01000G - General Contractor 013233 - Photographic Documentation 014529 - Testing Laboratory Services 015123 - Temporary Heating, Cooling,
More informationAlameda County Waste Management Authority Model Specification Update March 2004 SECTION CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
SECTION 01505 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT 1.01 SUMMARY A. Section specifies diversion of construction and demolition (non-hazardous) debris from landfill. B. Related requirements specified
More informationJ~e~~r Senior Director of Construction Services Facilities Design and Construction UNIVERSITY OF CALIFORNIA, SAN DIEGO.
BERKELEY DAVIS IR VINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SAN!' A BARBARA SANT A CRUZ OFFICE OF THE ASSIST ANT VICE CHANCELLOR CAMPUS ARCHITECT - FACILITIES DESIGN & CONSTRUCTION TEL:
More informationFranklin Hall Renovation TABLE OF Document Indiana University Bloomington
VPS Project No. 2013022.00 Page 1 SPECIFICATIONS VOLUME I INTRODUCTORY INFORMATION Document 000010 - Table of Contents... 6 Document 000011 - Certification and Seals... 2 Document 000012 - Project Directory...
More informationMAPLES COMMUNITY CENTRE EXPANSION WINNIPEG, MANITOBA CLASS 'C' ESTIMATE
MAPLES COMMUNITY CENTRE EXPANSION WINNIPEG, MANITOBA CLASS 'C' ESTIMATE October 17, 2013 Revised: April 9, 2014 MAPLES COMMUNITY CENTRE EXPANSION WINNIPEG, MANITOBA CLASS 'C' ESTIMATE Prepared For: PRAIRIE
More informationContractors wishing to submit bids for this contract must be prequalified by the Pennsylvania Turnpike Commission.
SPECIAL PREQUALIFICATION PROCESS FOR TURNPIKE INDUSTRIAL PARK BUILDING RENOVATIONS LOWER SWATARA TOWNSHIP, DAUPHIN COUNTY PENNSYLVANIA TURNPIKE COMMISSION CONSTRUCTION CONTRACT NO. T-247.38F003-3-02 GENERAL
More informationREQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES. For the renovation of existing apartment buildings. August 15, 2016
REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES For the renovation of existing apartment buildings August 15, 2016 INVITATION Bath Housing Development Corporation is soliciting proposals for
More informationThis presentation was prepared by TeHota Construction Management, LLC. on behalf of Hunt Construction Group for the AT&T Center Renovation Project.
February 11, 2015 This presentation was prepared by TeHota Construction Management, LLC. on behalf of Hunt Construction Group for the AT&T Center Renovation Project. It is provided, as a courtesy, to those
More informationMaintenance and Operations 1302 Service Road Tustin, California (714) CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20
Maintenance and Operations 1302 Service Road Tustin, California 92780 (714) 730-7515 CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 The Tustin Unified School District ( District ) has determined that
More informationDoing Business with the Metropolitan Washington Airports Authority
Doing Business with the Metropolitan Washington Airports Authority MWMCA Quarterly Economic Summit Brown Advisory November 7, 2017 Introduction to MWAA Ronald Reagan Washington National Airport Washington
More informationAPPLICATION FOR CONTRACTOR REGISTRATION AND RENEWAL OF REGISTRATION INSTRUCTIONS AND CHECKLIST
City of North Royalton Mayor Robert A. Stefanik Community Development, Building Division Dan Kulchytsky Building Commissioner 11545 Royalton Road, North Royalton, OH 44133 Phone: 440-582-3000 Fax: 440-582-3089
More informationEmergency Department Addition Bid Tabulation Summary 5/18/2016
Bid Package 01 Demolition Jerry's Contracting* $17,100 x x N/A $17,100 Add Site Bid Package 02 Concrete Concrete CS Cunningham Construction $335,193 x x x $335,193 Epic Concrete $336,967 x $336,967 Nate
More informationOttawa Elementary. Buchanan Middle Schools Additions and Remodels. Pre-Bid Meeting February 13, and
Ottawa Elementary and Buchanan Middle Schools Additions and Remodels Pre-Bid Meeting February 13, 2014 The SKILLMAN Corporation Project Administration Construction Management Buchanan Community Schools
More informationPORTLAND COMMUNITY COLLEGE SW 49 th Avenue Portland, Oregon ADDENDUM NO. 4
RE: ITB: PORTLAND COMMUNITY COLLEGE 12000 SW 49 th Avenue Portland, Oregon 97219 Sylvania Campus Bookstore Remodel Dated: February 22, 2017 April 11, 2017 ADDENDUM NO. 4 This addendum, together with the
More informationNew Hall High School Project Summary Report to the Board of Education June 3, 2015
New Hall High School Project Summary Report to the Board of Education June 3, 2015 Trade Procurement Status: Bid Package# Description Status Firm 1 Mass Excavation Awarded John Pohar & Sons 2 Concrete
More informationTHE BID DUE DATE FOR ALL BID PACKAGES HAS BEEN EXTENDED TO THURSDAY, APRIL 12, 2:00 P.M.
Flanders Elementary School East Lyme, Connecticut State Project. 045-0060 A/RR/CV ADDENDUM NO. 2 March 29, 2018 THE BID DUE DATE FOR ALL BID PACKAGES HAS BEEN EXTENDED TO THURSDAY, APRIL 12, 2018 @ 2:00
More informationRequest for Proposals
Request for Proposals Construction Manager at Risk Services for Kansas State University Office Park Phase II 1810 Kimball Avenue, Manhattan, Kansas Issued by: Director of Construction Kansas State University
More informationDIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT
TABLE OF CONTENTS INTRODUCTORY INFORMATION Section 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Invitation
More informationPAULDING COLLEGE & CAREER ACADEMY
PAULDING COLLEGE & CAREER ACADEMY 000110 OF THE PROJECT MANUAL FOR THE CONSTRUCTION OF: PAULDING COLLEGE & CAREER ACADEMY DALLAS, GEORGIA DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 000101 TITLE
More informationDESIGN & CONSTRUCTION GUIDELINES
DESIGN & CONSTRUCTION GUIDELINES EDITION: USF FACILITIES MANAGEMENT - DC 5 DCG FACILITIES MANAGEMENT DESIGN & CONSTRUCTION PHONE: (813) 974-2845 4202 E. FOWLER AVENUE, OPM 1000 TAMPA, FLORIDA 33620-7550
More informationAPPLICATION FOR BUILDERS REGISTRATION FORM 1
APPLICATION FOR BUILDERS REGISTRATION FORM 1 In accordance with the Builder's Law and Regulations 2015(Revision) Please deliver this form, accompanied by the relevant fee & required documentation to: The
More informationThis Addendum is directed to all prime Contract Bidders, and all others to whom Drawings and Specifications have been issued by the Architect.
North Campus Entrance and related work Wallace State Community College ADDENDUM 3 PART 1 - GENERAL Project: North Campus Entrance and related work [B.C. # 2016259] Owner: Wallace State Community College
More informationSchedule T5. Tender Documents. This tender is for: Tender Documents: The documents issued for this tender include the following: Tender Schedules
Schedule T Tender Documents T This tender is for: Contract: Location: Tender Documents: Norrie Home 56 Hardinge Road The documents issued for this tender include the following: Tender Schedules Schedule
More informationProject Manual Index of Specifications Shenandoah Schools Concession Building
INDEX OF SPECIFICATIONS Division 0..BIDDING AND CONTRACT REQUIREMENTS 00 11 13 Advertisement for Bids 00 21 13 Instructions to Bidders 00 41 00 Bid Forms 00 43 13 Bid Security Form 00 72 00 General Conditions
More informationOutreach Meeting September 29, 2016
Outreach Meeting September 29, 2016 Introductions Project Overview Heavy Civil GC/CM Process S/DBE Goals Bid Package Breakdown SDBE Opportunities Working w/kiewit-hoffman E130 is initial section of Eastlink
More informationConcrete. Conveying Systems. Doors, Windows & Interiors
Concrete Concrete : Cast-in-Place Concrete Concrete : Cementitious Decks Concrete : Concrete Accessories Concrete: Concrete Block & Brick Concrete : Concrete Coring & Sawing Concrete : Concrete Curing
More informationUniversity of Central Florida Downtown Campus / Dr. Phillips Academic Commons Pre-Bid Phase II Package Structural, Architectural and MEP
University of Central Florida Downtown Campus / Dr. Phillips Academic Commons Pre-Bid Phase II Package Structural, Architectural and MEP Agenda Introduction (5 minutes) UCF Introduction (5 minutes) Project
More informationKU West Campus LEEP II High Bay Facility Project # , A (c)
Number Revision Title Rev Date Discipline Bulletin Drawings B-West Structural Category S051 0 General Notes - Sheet 1 7/31/13 Structural Bid Package B- West Campus S052 0 General Notes - Sheet 2 7/31/13
More informationSpring Lake Public Schools. Spring Lake, MI. March RE: High School Storage Buildings
Spring Lake Public Schools Spring Lake, MI March 2018 RE: High School Storage Buildings Advertisement for bids Bid Proposal Sealed bids for Spring Lake Public Schools-High School Storage Buildings will
More informationPREQUALIFICATION QUESTIONNAIRE
PREQUALIFICATION QUESTIONNAIRE FOR HUENEME ROAD RECYCLED WATER PIPELINE PROJECT PHASE II THE PROJECTS AND PREQUALIFICATION In the coming months, the City of Oxnard ( City ) will be bidding a project for
More informationINVITATION TO TENDER ITT No. PS RODDAN LODGE CONSTRUCTION ADDENDUM NO. 16
FINANCE, RISK AND SUPPLY CHAIN MANAGEMENT Supply Chain Management August 2, 2018 INVITATION TO TENDER ITT No. PS20180883 RODDAN LODGE CONSTRUCTION ADDENDUM NO. 16 RE: REVISIONS TO BASE PRICE TABLE IN SCHEDULE
More informationScope of Work Bid Package C-4 - West Polished Concrete
Scope of Work Bid Package C-4 - West Polished Concrete CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools,
More informationNOTICE TO BIDDERS / ADVERTISEMENT FOR BIDS GEORGE C. SIMKINS JR. ELEMENTARY SCHOOL
Samet Corporation/SRS, Inc. -- a joint venture company NOTICE TO BIDDERS / ADVERTISEMENT FOR BIDS GEORGE C. SIMKINS JR. ELEMENTARY SCHOOL Samet Corporation / SRS, Inc. a joint venture (SSJV) as Construction
More informationCM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements
SECTION A CM INSTRUCTIONS TO BIDDERS SECTION B BID CATEGORY DESCRIPTIONS & BID FORMS BC-07: Building HVAC and Plumbing BC-08: Building Electric BC-09: General Trades BC-10: Masonry BC-11: Precast Structural
More informationSPECIFICATION REVISION LOG
DOCUMENT 00 - BIDDING REQUIREMENTS Refer to FSD Website for latest versions DIVISION 01 - GENERAL REQUIREMENTS Refer to FSD Website for latest versions DIVISION 2 - SITE WORK Current Issue 02221 Demolition
More informationCM AT RISK RFQ INTEREST FORM (For Submission to Cambridge Housing Authority Immediately) Revitalization of Frank J. Manning Apartments
CM AT RISK RFQ INTEREST FORM (For Submission to Cambridge Housing Authority Immediately) Instructions: If your firm is interested in responding to this RFQ for Prequalification of CM at Risk firms for
More information