NEW HORIZONS ONLINE LIVE
|
|
- Terence Long
- 6 years ago
- Views:
Transcription
1 NEW HORIZONS ONLINE LIVE WELCOME TO Certified Associate of Project Management (CAPM ) Fifth Edition PMBOK Guide - Please configure your audio: Meeting Audio Setup Wizard
2 The Project Life Cycle Overview
3 The Project Life Cycle Overview
4 The Project Life Cycle Overview
5 The Project Life Cycle Overview
6 6 Project Life Cycle Overview
7 7 Project Life Cycle Overview
8 The Project Life Cycle Overview Project Life Cycle
9 The Project Life Cycle Overview Project Life Cycle Project Management Life Cycle
10 The Project Life Cycle Overview Project Life Cycle Project Management Life Cycle Product Life Cycle
11 Project Phases
12 Project Phases Project Charter signed
13 Project Phases Project Charter signed Baselines signed
14 Project Phases Project Charter signed Baselines signed Deliverable Accepted
15 Project Phases Project Charter signed Baselines signed Deliverable Accepted Project Closed
16 Project Management Process Interactions
17 17 Project Phases
18 Project Information
19 Project Information
20 Knowledge Areas
21 Knowledge Areas I See Two Crows Quietly Having Coffee Reading Poetry Silently.
22 Knowledge Areas I I Integration See S Scope Two T Time Crows C Cost Quietly Q Quality Having H Human Resources Coffee C Communication Reading R Risk Poetry P Procurement Silently S Stakeholder
23
24
25
26 Develop Project Charter (Initiating) Inputs Tools & Techniques Outputs 1. Project statement of work 2. Business case 3. Agreements 4. Enterprise environmental factors 5. Organizational process assets 1. Expert judgment 2. Facilitation techniques 1. Project charter 26
27 27 Business Case
28 28 Return On Investment (ROI)
29 Net Present Value - NPV The current value of an amount of money to be received in the future, based on a time period and interest rate NPV = FV/(1+interest rate) time period E.g. Receiving a check for $5,000 in two years, based on an interest rate of 5% is [5,000/(1+.05) 2 ] = 4,535.15
30 Develop Project Charter (Initiating) Inputs Tools & Techniques Outputs 1. Project statement of work 2. Business case 3. Agreements 4. Enterprise environmental factors 5. Organizational process assets 1. Expert judgment 2. Facilitation techniques 1. Project charter 30
31 Develop Project Charter (Initiating) Inputs Tools & Techniques Outputs 1. Project statement of work 2. Business case 3. Agreements 4. Enterprise environmental factors 5. Organizational process assets 1. Expert judgment 2. Facilitation techniques 1. Project charter 31
32 Identify Stakeholders Inputs Tools & Techniques Outputs 1. Project charter 2. Procurement documents 3. Enterprise environmental factors 4. Organizational process assets 1. Stakeholder analysis 2. Expert judgment 3. Meetings 1. Stakeholder register 32
33 Identify Stakeholders Inputs Tools & Techniques Outputs 1. Project charter 2. Procurement documents 3. Enterprise environmental factors 4. Organizational process assets 1. Stakeholder analysis 2. Expert judgment 3. Meetings 1. Stakeholder register 33
34 Identify Stakeholders Inputs Tools & Techniques Outputs 1. Project charter 2. Procurement documents 3. Enterprise environmental factors 4. Organizational process assets 1. Stakeholder analysis 2. Expert judgment 3. Meetings 1. Stakeholder register 34
35 Develop Project Management Plan (Planning) Inputs Tools & Techniques Outputs 1. Project charter 2. Outputs from other processes 3. Enterprise environmental factors 4. Organizational process assets 1. Expert judgment 2. Facilitation techniques 1. Project mgt. plan 35
36
37 Develop Project Management Plan (Planning) Inputs Tools & Techniques Outputs 1. Project charter 2. Outputs from other processes 3. Enterprise environmental factors 4. Organizational process assets 1. Expert judgment 2. Facilitation techniques 1. Project mgt. plan 37
38 Develop Project Management Plan (Planning) Inputs Tools & Techniques Outputs 1. Project charter 2. Outputs from other processes 3. Enterprise environmental factors 4. Organizational process assets 1. Expert judgment 2. Facilitation techniques 1. Project mgt. plan 38
39 Direct and Manage Project Work (Executing) Inputs Tools & Techniques Outputs 1. Project mgt. plan 2. Approved change requests 3. Enterprise environmental factors 4. Organizational process assets 1. Expert judgment 2. Project management information system 3. Meetings 1. Deliverables 2. Work performance data 3. Change requests 4. Project management plan updates 5. Project documents updates 39
40 Direct and Manage Project Work (Executing) Inputs Tools & Techniques Outputs 1. Project mgt. plan 2. Approved change requests 3. Enterprise environmental factors 4. Organizational process assets 1. Expert judgment 2. Project management information system 3. Meetings 1. Deliverables 2. Work performance data 3. Change requests 4. Project management plan updates 5. Project documents updates 40
41 Direct and Manage Project Work (Executing) Inputs Tools & Techniques Outputs 1. Project mgt. plan 2. Approved change requests 3. Enterprise environmental factors 4. Organizational process assets 1. Expert judgment 2. Project management information system 3. Meetings 1. Deliverables 2. Work performance data 3. Change requests 4. Project management plan updates 5. Project documents updates 41
42 Control Scope Direct & Manage Project Work Control Schedule Control Cost Control Quality Work Performance Data Control Communications Control Risks Control Procurements Control Stakeholder Engagement 42 Validate Scope
43 Monitor and Control Project Work (Monitoring and Controlling) Inputs Tools & Techniques Outputs 1. Project mgt. plan 2. Schedule forecasts 3. Cost forecasts 4. Validated changes 5. Work performance information 6. Enterprise environmental factors 7. Organizational process assets 1. Expert judgment 2. Analytical techniques 3. Project management information system 4. Meetings 1. Change requests 2. Work performance reports 3. Project mgt. plan updates 4. Project documents updates 43
44 44
45 Monitor and Control Project Work (Monitoring and Controlling) Inputs Tools & Techniques Outputs 1. Project mgt. plan 2. Schedule forecasts 3. Cost forecasts 4. Validated changes 5. Work performance information 6. Enterprise environmental factors 7. Organizational process assets 1. Expert judgment 2. Analytical techniques 3. Project management information system 4. Meetings 1. Change requests 2. Work performance reports 3. Project mgt. plan updates 4. Project documents updates 45
46 Monitor and Control Project Work (Monitoring and Controlling) Inputs Tools & Techniques Outputs 1. Project mgt. plan 2. Schedule forecasts 3. Cost forecasts 4. Validated changes 5. Work performance information 6. Enterprise environmental factors 7. Organizational process assets 1. Expert judgment 2. Analytical techniques 3. Project management information system 4. Meetings 1. Change requests 2. Work performance reports 3. Project mgt. plan updates 4. Project documents updates 46
47 Perform Integrated Change Control (Monitoring and Controlling) Inputs Tools & Techniques Outputs 1. Project mgt. plan 2. Work performance reports 3. Change requests 4. Enterprise environmental factors 5. Organizational process assets 1. Expert judgment 2. Meetings 3. Change control tools 1. Approved change requests 2. Change log 3. Project mgt. plan updates 4. Project documents updates 47
48 Perform Integrated Change Control (Monitoring and Controlling) Inputs Tools & Techniques Outputs 1. Project mgt. plan 2. Work performance reports 3. Change requests 4. Enterprise environmental factors 5. Organizational process assets 1. Expert judgment 2. Meetings 3. Change control tools 1. Approved change requests 2. Change log 3. Project mgt. plan updates 4. Project documents updates 48
49 Perform Integrated Change Control (Monitoring and Controlling) Inputs Tools & Techniques Outputs 1. Project mgt. plan 2. Work performance reports 3. Change requests 4. Enterprise environmental factors 5. Organizational process assets 1. Expert judgment 2. Meetings 3. Change control tools 1. Approved change requests 2. Change log 3. Project mgt. plan updates 4. Project documents updates 49
50 50
51 Monitor and Control Project Work (Monitoring and Controlling) Inputs Tools & Techniques Outputs 1. Project mgt. plan 2. Schedule forecasts 3. Cost forecasts 4. Validated changes 5. Work performance information 6. Enterprise environmental factors 7. Organizational process assets 1. Expert judgment 2. Analytical techniques 3. Project management information system 4. Meetings 1. Change requests 2. Work performance reports 3. Project mgt. plan updates 4. Project documents updates 51
52 Monitor and Control Project Work (Monitoring and Controlling) Inputs Tools & Techniques Outputs 1. Project mgt. plan 2. Schedule forecasts 3. Cost forecasts 4. Validated changes 5. Work performance information 6. Enterprise environmental factors 7. Organizational process assets 1. Expert judgment 2. Analytical techniques 3. Project management information system 4. Meetings 1. Change requests 2. Work performance reports 3. Project mgt. plan updates 4. Project documents updates 52
53 Perform Integrated Change Control (Monitoring and Controlling)
54 Perform Integrated Change Control (Monitoring and Controlling) Inputs Tools & Techniques Outputs 1. Project mgt. plan 2. Work performance reports 3. Change requests 4. Enterprise environmental factors 5. Organizational process assets 1. Expert judgment 2. Meetings 3. Change control tools 1. Approved change requests 2. Change log 3. Project mgt. plan updates 4. Project documents updates 54
55 Perform Integrated Change Control (Monitoring and Controlling) Inputs Tools & Techniques Outputs 1. Project mgt. plan 2. Work performance reports 3. Change requests 4. Enterprise environmental factors 5. Organizational process assets 1. Expert judgment 2. Meetings 3. Change control tools 1. Approved change requests 2. Change log 3. Project mgt. plan updates 4. Project documents updates 55
56 Perform Integrated Change Control (Monitoring and Controlling) Inputs Tools & Techniques Outputs 1. Project mgt. plan 2. Work performance reports 3. Change requests 4. Enterprise environmental factors 5. Organizational process assets 1. Expert judgment 2. Meetings 3. Change control tools 1. Approved change requests 2. Change log 3. Project mgt. plan updates 4. Project documents updates 56
57 57
58
59 Close Project or Phase (Closing) Inputs Tools & Techniques Outputs 1. Project mgt. plan 2. Accepted deliverables 3. Organizational process assets 1. Expert judgment 2. Analytical techniques 3. Meetings 1. Final product, service, or result transition 2. Organizational process asset updates 59
60 Close Project or Phase (Closing) Inputs Tools & Techniques Outputs 1. Project mgt. plan 2. Accepted deliverables 3. Organizational process assets 1. Expert judgment 2. Analytical techniques 3. Meetings 1. Final product, service, or result transition 2. Organizational process asset updates 60
61 Close Project or Phase Inputs Tools & Techniques Outputs 1. Project mgt. plan 2. Accepted deliverables 3. Organizational process assets 1. Expert judgment 2. Analytical techniques 3. Meetings 1. Final product, service, or result transition 2. Organizational process asset updates 61
62
63 Plan Scope Management (Planning) Inputs Tools & Techniques Outputs 1. Project mgt. plan 2. Project charter 3. Enterprise environmental factors 4. Organizational process assets 1. Expert judgment 2. Meetings 1. Scope mgt. plan 2. Requirements mgt. plan 63
64 Plan Scope Management (Planning) Inputs Tools & Techniques Outputs 1. Project mgt. plan 2. Project charter 3. Enterprise environmental factors 4. Organizational process assets 1. Expert judgment 2. Meetings 1. Scope mgt. plan 2. Requirements mgt. plan 64
65 Plan Scope Management (Planning) Inputs Tools & Techniques Outputs 1. Project mgt. plan 2. Project charter 3. Enterprise environmental factors 4. Organizational process assets 1. Expert judgment 2. Meetings 1. Scope mgt. plan 2. Requirements mgt. plan 65
66 Collect Requirements Inputs 1. Scope mgt. plan 2. Requirements mgt. plan 3. Stakeholder mgt. plan 4. Project charter 5. Stakeholder register 66
67 Collect Requirements Tools & Techniques 1. Interviews 2. Focus groups 3. Facilitated workshops 4. Group creativity techniques 5. Group decision-making techniques 6. Questionnaires and surveys 7. Observations 8. Prototypes 9. Benchmarking 10. Context diagrams 11. Document analysis 67
68 Collect Requirements Outputs 1. Requirements documentation 2. Requirements traceability matrix 68
Compiled by Rajan Humagai
Compiled by Rajan Humagai www.pavementengineering.com.au Project Processes Inputs, Tools & Techniques and Outputs. (Based on PMBOK 5 th Edition) 1. Project Integration 1. Develop 1. Project Statement Of
More informationKnowledge Areas According to the PMBOK edition 5. Chapter 4 - Integration
Knowledge Areas According to the PMBOK edition 5 Chapter 4 - Integration 4.1 - Develop Project Charter Process Project statement of work Expert Judgment Project charter Business case Facilitation techniques
More informationFundamentals of Project Management for the Acting PM Presented by the NYS Forum Project Management Workgroup. Session 2.
Fundamentals of Project Management for the Acting PM Presented by the NYS Forum Session 2 Scope Management Dan Miller Project Manager, Revenue and Transportation Cluster, NYSOITS Biography 24 years as
More informationSummary of 47 project management processes (PMBOK Guide, 5 th edition, 2013)
Summary of 47 project management processes (PMBOK Guide, 5 th edition, 2013) Integration Management: processes & activities needed to properly coordinate all aspects of the project to meet stakeholder
More informationProject Scope. Management. module 3. pmbok-105
pmbok-105 module 3. Project Scope Management PMI is abbreviation for Project Management Institute as well as trade and service mark registered in the United States and other nations; PMBOK, is trademarks
More informationInformation Technology Project Management, Sixth Edition
Management, Sixth Edition Scope refers to all the work involved in creating the products of the project and the processes used to create them A deliverable is a product produced as part of a project, such
More information17/12/1437. Lecture. Project Scope Management. Lecture 4. Project Management Knowledge Areas Section 3 Chapter 5. Project Scope Management.
17/12/137 Project Management Knowledge Areas Section 3 Chapter 5 Project Scope Management 2 of 33 1 17/12/137 Quick Re-cab Plan Scope Management Collect Requirement Define Scope Create WBS Validate Scope
More informationIntegration Mgmt / Initiating Process Group 4.1 Develop Project Charter
1 Mgmt / Initiating Process Group 4.1 Develop Project Charter Project statement of work Business Case Contract Enterprise environmental factors Project charter Expert judgement 26/02/2013 18:22:56 1 2
More informationSampler For the PMBOK Guide 5 th Edition. Summary Edition For the PMBOK Guide Fourth Edition
Sampler For the PMBOK Guide 5 th Edition Summary Edition For the PMBOK Guide Fourth Edition SamplerBy Projerra Management Inc. For the PMBOK Fourth Edition THANK YOU Thank you for downloading the VisuAL
More informationLCS International, Inc. PMP Review. Chapter 3 Developing the Project Scope Statement. Presented by David J. Lanners, MBA, PMP
PMP Review Chapter 3 Developing the Project Scope Statement Presented by David J. Lanners, MBA, PMP These slides are intended to be used only in settings where each viewer has an original copy of the Sybex
More informationProject Stakeholder Management
Jambo (Swahili) Project Management Process Groups Project 4. Integration Management Initiating Planning Executing 5. Scope Monitoring & Controlling Closing Knowledge Areas 6. Time 7. Cost 8. Quality 9.
More informationThe 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th
The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th www.pmlead.net PMI, PMP, CAPM and PMBOK Guide are trademarks of the Project Management Institute, Inc. PMI has not endorsed and did not
More informationConnoisseur Solutions Project Scope Management
Project Scope Management Project Scope Management Project Scope Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete
More informationProject Scope Management
Project Scope Management Understand the importance of good project scope management. Discuss methods for collecting and documenting requirements in order to meet stakeholder needs and expectations. Explain
More informationDefining Project Scope
Defining Project Scope Casey Ayers PMP MBA CaseyAyers.com @caseyayers linkedin.com/in/caseyayers PMP is a registered mark of the Project Management Institute, Inc. Module Overview Overview Project Scope
More informationProject Management Body of Knowledge Chapter 3 Project Processes
Project Management Body of Knowledge Chapter 3 Project Processes PMP Exam Prep PMBOK Chapter 1 - Introduction Chapter 2 - Organizational Influences & Life Cycles Chapter 3 - Project Processes Chapter 3
More informationTHE PMP EXAM PREP COURSE
THE PMP EXAM PREP COURSE Session 2 PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. www.falconppm.com Agenda 9:00 10:15 Practice the PMP Questions 10:15 10:30 Break 10:30
More informationPROJECT SCOPE MANAGEMENT
PROJECT SCOPE MANAGEMENT DEFINE SCOPE Process by process group Planning 5.1 Plan Scope Management 5.2 Collect Requirements 5.3 Define Scope 5.4 Create WBS Monitoring and Controlling 5.5 Validate Scope
More informationProject Integration Management
Project Integration Management Presented by Project Masters Inc. *Throughout this presentation, we reference and recognize the following trademarks, service marks, and copyrights of the Project Management
More informationA Guide to the Project Management Body of Knowledge (PMBOK Guide) Sixth Edition Errata 3 rd Printing
A Guide to the Body of Knowledge (PMBOK Guide) Sixth Edition Errata 3 rd Printing NOTE: The following errata only pertain to the first and second printing of the PMBOK Guide Sixth Edition. In order to
More informationProject Integration Management. For the PMP Exam using PMBOK Guide 5 th Edition
Project Integration Management For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. Contacts Name: Khaled El-Nakib, PMP
More informationNEW HORIZONS ONLINE LIVE. Certified Associate of Project Management (CAPM ) PMBOK Guide, 5th Edition DAY 3
NEW HORIZONS ONLINE LIVE Certified Associate of Project Management (CAPM ) PMBOK Guide, 5th Edition DAY 3 Plan Quality Management 1. Project mgt. 2. Stakeholder register 3. Risk register 4. Requirements
More informationFalcon Training PMP & CAPM Exam Preparation Course
Falcon Training PMP & CAPM Exam Preparation Course Chapter 1-3: Project Framework Review Questions 1. What is the primary role of the portfolio manager? A. To deliver the unique product, service, or result
More informationPMP Exam Prep Study Group Input-Output-Tools #3a
PMP Exam Prep Study Group Input-Output-Tools #3a Presented by Project Masters Inc. *Throughout this presentation, we reference and recognize the following trademarks, service marks, and copyrights of the
More informationFor the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc.
For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. 1 Contacts Name: Khaled El-Nakib, MSc, PMP, PMI-RMP URL: http://www.khaledelnakib.com
More informationPMBOK 2012 FIFTH EDITION CHANGES
PMBOK 2012 FIFTH EDITION CHANGES 1 Scope of Update Alignment with ISO 21500 Ensure harmonization with any other relevant PMI standards. Reposition Section 3 (The Standard for Project Management) as a stand-alone,
More informationhello sä-läm Salâm good-bye kh -dä hä -f z
Salâm s Project Management Process Groups Project Integration Management Knowledge Areas Stakeholders Initiating Planning Executing Scope Time Cost Quality Human Resources Communications Risk Procurement
More informationJapanCert 専門 IT 認証試験問題集提供者
JapanCert 専門 IT 認証試験問題集提供者 http://www.japancert.com 1 年で無料進級することに提供する Exam : PMP Title : Project Management Professional Vendor : PMI Version : DEMO Get Latest & Valid PMP Exam's Question and Answers from
More informationIntegration Houston Community College Fall, 2017
Integration Houston Community College Fall, 2017 Project Integration Management What Is the Integration Knowledge Area? PMI: The processes and activities to identify, define, combine, unify and coordinate
More informationPROJECT INTEGRATION MANAGEMENT. 1 Powered by POeT Solvers Limited
PROJECT INTEGRATION MANAGEMENT 1 www.pmtutor.org Powered by POeT Solvers Limited PROCESSES BY PROCESS GROUP Initiating Planning Executing Monitoring and controlling Closing 4.1 Develop Project Charter
More informationGuten Tag. (good day)
Guten Tag (good day) 4.5 Perform Integrated Change Control How a person may percieve change: paideiagroup.com 4.5 Perform Integrated Change Control Consider what change is: Crossing unknown territory Departing
More informationScope Management. 2. Meetings 2. Requirements Management Plan 3. EEF 4.OPA
Scope Management 5.1 Plan Scope Management: The process of creating scope management plan that documents how project scope will be defined, validated and controlled # Requirement: Condition or capability
More informationProject Communications Management
Project Communications Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. 2013 PMstudy.com.
More informationOverview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition
Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Topics for Discussion PMI Foundational Standards Harmonization of PMI s Foundational Standards Top 10 changes
More informationPMP Exam Preparation Workshop. Chapter # 5 Project Scope Management
PMP Exam Preparation Workshop Chapter # 5 Copyright PMI SOC 2013 1 Learning Objectives By the end of this session you will understand: How scope management processes relate to the process groups Project
More informationInformation Technology Project Management, Eighth Edition. Note: See the text itself for full citations.
Management, Eighth Edition Note: See the text itself for full citations. } Understand the importance of good project scope management } Describe the process of planning scope management } Discuss methods
More informationIntegration Knowledge Area
Integration Knowledge Area Develop Project Charter Project statement of work Expert judgment Project charter Business case Contract (if third party project) EEF: government/industry standards, organizational
More informationInitiation Group Process. Planning Group Process
Initiation Group Process Develop Project Charter Project statement of work Expert judgment Project charter Business case Contract (if third party project) EEF: government/industry standards, organizational
More informationPROJECT SCOPE MANAGEMENT. 1 Powered by POeT Solvers Limited
PROJECT SCOPE MANAGEMENT 1 www.pmtutor.org Powered by POeT Solvers Limited At the end of this training, our goal is for you to: Be able to define the term scope Be able to identify primary sources who
More informationCH (5) Hot Topics Scope Management
CH (5) Hot Topics Scope Management 1 CH ( 5 ) Scope Management 1 Introduction This knowledge area requires you to understand six processes, as described in the book PMP plan scope management, collect requirements,
More informationIT Certification Exams Provider! Weofferfreeupdateserviceforoneyear! h ps://
IT Certification Exams Provider! Weofferfreeupdateserviceforoneyear! h ps://www.certqueen.com Exam : PMI-001 Title : Project Management Professional Version : Demo 1 / 5 1.Which document defines how a
More informationProject Stakeholders Management. Unit 13
Project Stakeholders Management Unit 13 Project Communication Management Project Stakeholder Management includes the processes required to identify the people, groups, or organizations that could impact
More informationPMP Exam Preparation Course Project Scope Management
Project Scope Management 1 Product Scope Product scope The features and functions that are to be included in your products or service or result of the project. Completion is measured against the product
More informationQuizzes for 1 st Study Group Session
Quizzes for 1 st Study Group Session General 1. Business analysis is performed: a. Sequentially and in order. b. According to logical relationships (dependencies). c. Iteratively or simultaneously. d.
More informationINTEGRATION MANAGEMENT
1 INTEGRATION MANAGEMENT 4.1 Develop Project Charter: The process of developing a document that formally authorize a project or a phase and provides the project manager with the authority to apply organizational
More informationPMP Exam Prep Coaching Program
PMP Exam Prep Coaching Program Project Management 1 Project Management Develop Project Charter Develop Project Management Plan Direct and Manage Project Work Monitor and Control Project Work Close Project
More informationManaging Risk with PM 2
Managing Risk with PM 2 lex.vander.helm@capgemini.com Lex van der Helm Lead trainer - Capgemini Academy Introduction Risk Risk Management Risk Management in PM 2 Process Steps & Artefacts 2 Speaker's name
More informationProject Integration. Monitoring & Controlling Processes. Planning. Processes. Initiating Processes. Executing Processes. Process
PMBOK 5 Ed. DEI- Project Integration Monitoring & Controlling Processes Planning Processes Enter phase/ Start project Initiating Processes Closing Processes Exit phase/ End project Executing Processes
More informationPMBOK Guide Fifth Edition Pre Release Version October 10, 2012
5.3.1 Define Scope: Inputs PMBOK Guide Fifth Edition 5.3.1.1 Scope Management Plan Described in Section 5.1.3.1.The scope management plan is a component of the project management plan that establishes
More informationProject Management Process Groups. PMP Study Group Based on the PMBOK Guide 4 th Edition
Project Management Process Groups PMP Study Group Based on the PMBOK Guide 4 th Edition Introduction PM Process Groups In order for a project to be successful, the project team must: Select appropriate
More informationTable of Contents. Introduction xxv. Assessment Test xxxvi. Chapter 1 What Is a Project? 1. Is It a Project? 2. Projects versus Operations 3
Table of Contents Introduction xxv Assessment Test xxxvi Chapter 1 What Is a Project? 1 Is It a Project? 2 Projects versus Operations 3 Stakeholders 5 Project Characteristics 7 What Is Project Management?
More informationPMP Certification Course Outline
PMP Certification Course Outline (I) Becoming a PMP (II) Project Management Framework o Project Management Processes for a Project o Project Management Context (III) Project Management Environment o Project
More informationUnit 11: Stakeholder Management (PMBOK Guide, Chapter 13)
(PMBOK Guide, Chapter 13) Stakeholder management identifies people, groups, and organizations that could impact or be impacted by the project. The topic has increased in importance with each new edition
More informationInformation Technology Project Management, Sixth Edition. Note: See the text itself for full citations. More courses at cie-wc.edu
Management, Sixth Edition Note: See the text itself for full citations. More courses at cie-wc.edu Understand the importance of good project scope management Discuss methods for collecting and documenting
More informationPMBOK Synopsis Contents
PMBOK Synopsis Contents PMBOK Synopsis... 1 PMI Essential Terms ( AC, P8)... 4 Initiating Process- Develop Project Charter ( RM. 97)... 5 ITTO Develop Project Charter... 5 Initiating Process- Identify
More informationAppendix. Process Inputs and Outputs
3601cA.fm Page 493 Wednesday, October 26, 2005 12:47 AM Appendix A Process and Throughout this book, PMP: Management Professional Study Guide, 3rd Edition, I ve discussed the inputs and outputs to the
More informationPMP Exam Prep Coaching Program
PMP Exam Prep Coaching Program 1 Charter Direct and Manage Work Monitor and Control Work Perform Integrated Change Control Close or Phase 2 Vinai Prakash, PMCHAMP.COM 1 Defines how the project is executed,
More informationProject Management Session 6.2. Project Initiation Phase Integration Management
Project Management Session 6.2 Project Initiation Phase Integration Management 1 Project Phases & Knowledge Areas 1. Integration 2. Scope Management 3. Time Management 4. Cost Management 5. Quality Management
More informationProject Management Process Groups. Monitoring & Controlling. Initiating Planning Executing. Closing. Check & Act. Rita: A project ends here!
(Semaphore) Project Management Process Groups Initiating Planning Executing Monitoring & Controlling Closing Rita: Start Plan Do Check End & Act A project ends here! Project Management Process Groups Initiating
More informationKhozema Ali Shabbar CS 447
Khozema Ali Shabbar CS 447 Understand the importance of good project scope management Discuss methods for collecting and documenting requirements in order to meet stakeholder needs and expectations Explain
More informationGuten Tag. (good day)
Guten Tag (good day) Project Management s Project 4. Integration Management Knowledge Areas 13. Stakeholder Initiating Planning Executing 5. Scope 6. Time 7. Cost 8. Quality 9. Human Resources 10. Communications
More informationPMI EXAM - PMI-001. Project Management Professional v5. Buy Full Product.
PMI EXAM - PMI-001 Project Management Professional v5 Buy Full Product http://www.examskey.com/pmi-001.html Examskey PMI PMI-001 exam demo product is here for you to test the quality of the product. This
More informationProject Management Professional(PMP ) Course
and Program Professional(PMP ) Course CERTIFICATE: Professional (PMP ) DURATION: 4 Days COURSE DELIVERY: Classroom PDUs: 35 LANGUAGE: English With a charter to enable and enhance the industry's competency
More informationProject Management CSC 310 Spring 2017 Howard Rosenthal
Project Management CSC 310 Spring 2017 Howard Rosenthal 1 No?ce This course is based on and includes material from the text: Effective Project Management - Traditional, Agile, Extreme 7TH Edition Authors:
More informationExam Questions PMI-001
Exam Questions PMI-001 Project Management Professional https://www.2passeasy.com/dumps/pmi-001/ 1. A reward can only be effective if it is: A. Given immediately after the project is completed. B. Something
More informationCertified Associate in Project Management (CAPM)
Certified Associate in Project Management (CAPM) E X A M I N AT I O N CO N T E N T O U T L I N E Project Management Institute PMI Certified Associate in Project Management (CAPM) Exam Content Outline October
More informationPROJECT INTEGRATION MANAGEMENT. 1 Powered by POeT Solvers LImited
PROJECT INTEGRATION MANAGEMENT 1 www.pmtutor.org Powered by POeT Solvers LImited MAJOR PROJECT DOCUMENTS Before we begin Integration, let's summarize the project's major documents: ALL are formally approved
More informationExpert Reference Series of White Papers. Changes to the. PMBOK Guide, 4th Edition, and What You Should Know
Expert Reference Series of White Papers Changes to the PMBOK Guide, 4th Edition, and What You Should Know 1-800-COURSES www.globalknowledge.com Changes to the PMBOK Guide, 4th Edition, and What You Should
More informationQuizzes for 1 st Study Group Session
Quizzes for 1 st Study Group Session General 1. Business analysis is performed: a. Sequentially and in order. b. According to logical relationships (dependencies). c. Iteratively or simultaneously. d.
More informationPROJECT STAKEHOLDER MANAGEMENT
PROJECT STAKEHOLDER MANAGEMENT October 14, 2010 ASQ Meeting Rex M. Holmlin, P.E., PMP Visiting Professor of Project Management Mason School of Business College of William and Mary ASQ Tools & Techniques
More informationFundamentals of Project Management For the Acting PM. Project Integration and Closeout Management
Fundamentals of Project Management For the Acting PM Presented by NYS Forum Project Integration and Closeout Management Presenter: Lisa Greene-Maybee Tying It All Together Scope Time Cost Integration Quality
More informationPMP Exam Prep Coaching Program
PMP Exam Prep Coaching Program Project Management 1 Project Management Develop Project Charter Develop Project Management Plan Monitor and Control Perform Integrated Change Control Close Project or Phase
More informationContrasting CMMI and the PMBOK. Systems Engineering Conference October 2005
Contrasting CMMI and the PMBOK Systems Engineering Conference October 2005 Wayne Sherer U.S. Army ARDEC Sandy Thrasher, PMP Anteon Corporation Overview Purpose Considerations for Comparison Similarities
More informationWhy does the PMBOK change? Ensures standards are up-to to-date and reflect ever-evolving evolving knowledge in the profession Standards are aligned, i
PMBOK 4 th Edition Overview Colleen A. McGraw 16 October 2009 Why does the PMBOK change? Ensures standards are up-to to-date and reflect ever-evolving evolving knowledge in the profession Standards are
More informationProject Management Knowledge Areas SECTION III
Project Management Knowledge Areas SECTION III 1 Project Integration Management CHAPTER 4 2 The Key to Overall Project Success: Good Project Integration Management Project managers must coordinate all
More informationThe Project Charter. January 14, Presented by Mark Spain, PMP
The Project Charter January 14, 2010 Presented by Mark Spain, PMP Have you? Prepared a project charter? Authorized a project charter? Wished you had a project charter? The Theoretical Project Charter PMBOK:
More informationThe Planning Process Group
Assalam-o-alaikum Project Management Process Groups Project Integration Management Knowledge Areas Initiating Planning Executing Scope Time Cost Quality Human Resources Communications Monitoring & Controlling
More informationPMP TRAINING COURSE CONTENT
PMP TRAINING COURSE CONTENT SECTION1: INTRODUCTION PMI, PMP AND PMBOK What is PMI, PMP, and PMBOK? What do I get out of PMP? How do I get certified? Exam qualifications and PM experience Guidelines to
More informationErrata 1 st Printing. Errata 2 nd Printing
Errata 1 st Printing NOTE: The following errata only pertain to the first printing of the PMBOK Guide Fifth Edition. In order to verify the print run of your book (or PDF), refer to the bottom of the copyright
More informationOverview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Changes
Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Changes PMI -- Project Management Institute» Leading global association for the project management profession»
More informationCSU Project Management Certificate Program. Project Scope Management
CSU Project Management Certificate Program Project Scope Management Instructor: George Angel eaglebusiness@hotmail.com 303-678-9466 1 Scope gone wild! client wants what? 2 Project Scope Management Agenda
More informationPROJECT MANAGEMENT OVERVIEW
Chapter One PROJECT MANAGEMENT OVERVIEW Project management itself is not a new concept. It has been practiced for hundreds, even thousands of years. Any large undertaking requires a set of objectives,
More informationComparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition, and ISO 21500
Comparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition, and ISO 21500 Thierry Labriet, STS STS SA, Lausanne, Switzerland +41 21 510 11 50 office@sts.ch www.sts.ch 1 Contents 1 Foreword... 3 2 Executive
More informationProject vs Operation. Project Constraints. Pankaj Sharma, Pankaj Sharma,
Project vs Operation PROJECTS OPERATIONS Temporary Ongoing Unique Repetitive Closes after attaining the objectives Objective is to sustain business Prototyping the new car model Assembly line production
More informationGuten Tag. (good day)
Guten Tag (good day) What is the #1 problem many people have on a project? What is the #1 problem many people have on a project? Communication Project Management Process Groups Project 4. Integration Management
More informationMalay (Rumi, Roman script)
Hai Malay (Rumi, Roman script) Project Management Process Groups Project Integration Management Initiating Planning Executing Scope Monitoring & Controlling Closing Knowledge Areas Time Cost Quality Human
More informationProject Management CSC 310 Spring 2018 Howard Rosenthal
Project Management CSC 310 Spring 2018 Howard Rosenthal 1 Notice This course is based on and includes material from the text: A User s Manual To the PMBOK Guide Authors: Cynthia Stackpole Snyder Publisher:
More informationSuccessful Project Management. Overview Houston Community College Fall, 2017
Successful Project Management Overview Houston Community College Fall, 2017 Agenda Introduction Project Management Processes What Is a Process? Inputs, Tools and Techniques, Outputs Process Groups Overview
More informationMASTERING PROJECT MANAGEMENT - PROJECT MANAGEMENT PROFESSIONAL ( PMP ) CERTIFICATION SEMINAR
MASTERING PROJECT MANAGEMENT - PROJECT MANAGEMENT PROFESSIONAL ( PMP ) CERTIFICATION SEMINAR Monday - Friday June 25-29, 2018 Book and pay before 4 June 2018 and get a discount per delegate. i This course
More informationProject Risk Management
Hujambo (Swahili) Project Management Process Groups Initiating Planning Executing Monitoring & Controlling Closing Project 4. Integration Management 5. Scope Knowledge Areas 6. Time 7. Cost 8. Quality
More informationPMP PMBOK Guide Sixth Edition Training Course Agenda
PMP PMBOK Guide Sixth Edition Training Course Agenda 1. Introduction What are PMI and PMP Certification Application Requirements for the PMP Exam Guidelines to Complete the PMP Application About the PMP
More informationSoftware Project & Risk Management Courses Offered by The Westfall Team
Software Project & Risk Management is a 5-day course designed to provide a knowledge base and practical skills for anyone interested in implementing or improving Software Project and Risk Management techniques
More informationEmbracing Change Through Simple Change Control
PM Tools Workshops Embracing Change Through Simple Change Control Matthew J. Weaver, PMP, CSM, ITIL President/CEO, Project Weavers, LLC PMI, PMBOK, PMP, and CAPM are registered marks of the Project Management
More informationDana Goulston, PMP Co-author, the PMBOK Guide, 3 rd edition
, so what s new? by Dana Goulston, PMP Co-author, the PMBOK Guide, 3 rd edition presented to: October 8, 2009 Copyright 2009, all rights reserved No reproduction without written consent from the author
More informationDefinition. Name of the tool or technique Project mission statement
Tools and Techniques Definitions (or by alphabetic order ; see below) A definition of each of the tools and techniques is provided below. The primary sources of definitions were the PMBOK Guide and Max
More informationStakeholder Strategies with Successful Solutions
Risk Methodology 7 th Annual Symposium Strategies with Successful Solutions By Dwight Davis, MBA, CPT, PMP dwight@dwightdavis.org August 1, 01 create your future www.utdallas.edu Introduction Dwight Davis
More informationChapter One PROJECT MANAGEMENT OVERVIEW
Chapter One PROJECT MANAGEMENT OVERVIEW Project management itself is not a new concept. It has been practiced for hundreds, even thousands of years. Any large undertaking requires a set of objectives,
More informationBABOK v2.0 Snapshots
BABOK v2.0 Snapshots Hi, As we know, each knowledge area of BABOK v 2.0 has several parts which provide details about the knowledge area. For this reason, I have developed a snapshot package for BABOK
More informationAgenda. PMBOK Guide Third Edition. PMI Standards Background. PMI Life Cycle Plan for Standards. Presented by Kevin Chui, PMP. How Did We Get Here?
Agenda PMBOK Guide Third Edition Presented by Kevin Chui, PMP Vice President, PMI Hong Kong Chapter Background PMBOK Guide 2004 Update Project Structural Changes to the Standard Process Group Changes Knowledge
More informationPMP Q&As. Project Management Professional. Pass PMI PMP Exam with 100% Guarantee. Free Download Real Questions & Answers PDF and VCE file from:
PMP Q&As Project Management Professional Pass PMI PMP Exam with 100% Guarantee Free Download Real Questions & Answers PDF and VCE file from: 100% Passing Guarantee 100% Money Back Assurance Following Questions
More information