Work Plan and IV&V Methodology

Size: px
Start display at page:

Download "Work Plan and IV&V Methodology"

Transcription

1 Work Plan and IV&V Methodology ISG Public Sector has been helping public sector organizations acquire and implement (from a project oversight and organizational change management perspective) new, enterprise-wide systems for the past 18 years. While 18 years of history may not seem extensive, the individuals on our staff average 19 years of public sector and/or system implementation experience. During this 18-year time frame, every client we have worked with has achieved success. Following are the state governments we have assisted: Alaska Idaho Michigan Nevada Washington Arizona Kansas Minnesota Tennessee West Virginia Arkansas Kentucky Mississippi Texas Wisconsin Florida Louisiana Nebraska Virginia Independence is one of the distinguishing characteristics of our firm in comparison to other project management and quality assurance vendors. We have no formal or informal alliances or affiliations with any software or implementation vendors, and we have never received compensation from any of them. We are truly independent in fact and appearance. Our Independent Verification and Validation (IV&V) approach is based upon the best practices we have used in managing numerous, largescale systems projects for our state and local government and higher education clients. Our approach goes beyond software development activities that are the focus of IV&V standards such as the Institute of Electrical and Electronics Engineers (IEEE) Standard 1012, to include the entire project life cycle. TYPICAL SOFTWARE PROJECT LIFE CYCLE Project Start-Up Requirements Development RFP Development Proposal Evaluation & Negotiation Implementation Start-Up System Design Construction System Deployment Post Go-Live Support Planning Acquisition Implementation Stabilization IV&V Activities A general description of the key IV&V activities we perform in each phase of a typical project s life cycle are described below. Phase 1: Project Start-Up The cornerstone of our approach is to ensure that a robust project management framework is established. Our approach is based upon principles contained in the Project Management Institute s A Guide to the Project Management Body of Knowledge (see description below). Once this framework is established, we work to ensure that a structured, disciplined approach to managing the project is maintained, which will significantly increase the likelihood that the project will yield high-quality products and services for the State of Florida. Page 1

2 Project Management Body of Knowledge ISG Public Sector utilizes the principles and practices set forth in the Project Management Body of Knowledge as a guide in the conduct of our project management and other professional engagements: A Guide to the Project Management Body of Knowledge (PMBOK Guide) and the Government Extension to A Guide to the Project Management Body of Knowledge. The PMBOK Guide has become the de facto standard for the project management profession. The Project Management Body of Knowledge (PMBOK ) is an inclusive term that describes the sum of knowledge within the profession of project management. The PMBOK Guide identifies and describes the subset of principles and practices within the PMBOK that are generally accepted and applicable to most projects most of the time. The guide also provides a common lexicon for talking about project management. Project management is a relatively young profession, and while there is substantial commonality around what is done, there is relatively little commonality in the terms used. An extensive glossary further aids in standardizing definitions of the most important concepts, terms, and phrases. We review the project management framework of the project and document recommendations for addressing any deficiencies we find, as well as offer recommendations for improvements based on our extensive experience in managing largescale systems projects in the public sector. We also verify that the project-management processes are executed as designed and according to prescribed timing (e.g., issuing status reports, reviewing risk logs, etc.). Furthermore, we work with each client to develop a comprehensive project plan for our IV&V activities, and we integrate the IV&V plan with the overall plan for the project. Phase 2: Requirements Development ISG has assisted a wide variety of clients in developing system requirements functional, general/technical, interface, and data conversion. Drawing on this experience, we will review the planned requirements-development process before the process is executed and make recommendations for any necessary improvements. We will also review the requirements themselves and document recommendations for improvement. Furthermore, we will work to ensure that the best practices we have learned over the years for developing requirements are incorporated into the requirementsdevelopment process. Examples of those best practices include the following: Focus on what the system must do not how. The system design will be completed after product selection; Emphasize process change in lieu of software modifications to protect software warranties and facilitate future system upgrades; Develop the system requirements at a level of detail required to differentiate among available products; Provide one requirement, not multiple requirements, per line item; and Document each requirement in such a way as to support proper validation. Phase 3: RFP Development We will review the planned structure for the Request for Proposal (or other solicitation document[s]) to help ensure the document is comprehensive (e.g., terms and conditions, scope of work, minimum mandatory requirements, etc.). We will also review the content of the RFP once it is developed to make sure it clear and in accordance with the State s laws and applicable policies. In performing our reviews, we will draw from our extensive experience in developing solicitation documents for enterprise-wide software and associated implementation assistance in the public sector. Page 2

3 Phase 4: Proposal Evaluation and Negotiation We will review the evaluation process and verify that it is in keeping with the State s laws and applicable policies. We will also help ensure the evaluation criteria are reflective of the project s goals and objectives. Furthermore, we will draw from our significant experience in negotiating software and services contracts to advise the State in formulating its negotiation strategy with each shortlisted vendor(s). Phase 5: Implementation Start-Up Critical project management and reporting tools and techniques should be established during the Implementation Start-Up phase. We will perform a gap analysis to verify that the proper project management processes are in place to help ensure a successful project implementation. Our review will address (but not be limited to) the following: Project plan establishment and monitoring Status reporting Issue management and resolution Standard meeting commitments Risk management Roles and responsibilities Change control Documentation standards and version control Deliverable review and acceptance Meeting protocol This gap analysis will be based on ISG s experience with large public sector transformation projects. ISG Public Sector will typically provide IV&V services for the duration of the implementation project. Ongoing IV&V activities include (but are not limited to): Examining issue and problem resolution; Monitoring project timelines and deadlines (including submission of deliverables) per the detailed project plan; variances from the planned schedule must be researched and contingency plans established, where necessary, to ensure that the project remains on schedule; Preparing or reviewing risk assessments and providing advice on risk management efforts; Attending project status meetings; Delivering written status reports to project executive management; Planning and conducting executive and management briefings; Reviewing project deliverables to ensure that they meet standards for deliverables per the RFP responses; Performing project milestone reviews; Scrutinizing the quality of vendor performance; Monitoring contract specifics between the vendor(s) and State (including enforcement of penalties when necessary); Monitoring the project budget and project scope; Evaluating resource needs (including people, space, and facilities) in accordance with project phasing and scheduling; and Providing overall project guidance and direction and project governance and project management levels. Phase 6: System Design During this phase of the project, the implementation vendor will lead development of the To Be business processes to be supported by the new system. In phase 7 (Construction), the system will be configured and custom items will be developed (e.g., interfaces, automated workflows, etc.) that will support the agreed-upon design. ISG s focus during this phase of the project will be to participate on key design teams and verify that all requirements are addressed by the design so that there are no costly changes after the system has been developed. During this phase, we typically provide the following services: Anticipate problems and offer solutions; and Verify the designed business processes are within the context of the system requirements and project vision, and monitor to help ensure that: (1) non-value-added activities are not built into the new processes, and (2) compliance is maintained with required specifications per the State s procurement document, the implementation vendor s response, and all other binding documents that support the project effort. Page 3

4 Also during this phase, organizational change management (OCM) activities become a critical component of the overall implementation effort. ISG will review and provide recommendations regarding the planning for, assessments of, and results of efforts to assess the following: Readiness assessment of end users; Leadership alignment and executive sponsorship; Role mapping and end-user skills fit/gap analysis; End-user training; Workforce transition; Communications; Identification of key areas of change; and Identification and elimination of barriers to success. Additional OCM-related tasks performed during this phase may include: Monitoring actual progress against the communications and change management plans; Reporting to the Steering Committee on plan success; Managing and coordinating agency liaison activities; Preparing and evaluating the results of change readiness surveys; Designing presentation materials associated with change issues; and Reviewing project communications. Phase 7: Construction During this phase, the implementation vendor will configure or build the system and develop custom items (e.g., interfaces, automated workflows, etc.) to support the agreed-upon design. ISG s team will provide ongoing project review, quality assurance, and subject matter expertise for key software components. During this phase, we will participate in the following activities: Anticipate problems and offer solutions; Monitor the progress of enhancement, interface, and data conversion activities; Examine construction of the new system to ensure that all requirements (functional and technical) are addressed; and Monitor activities such as: Tracking actual progress against the communications and change management plan, Reporting to the Steering Committee on plan success, Maintaining user agency leadership alignment/sponsorship, Reviewing ongoing communications with user agencies, Identifying and addressing potential barriers to success, Managing and coordinating agency liaison activities, Evaluating the various components of end-user training, including the curriculum, materials, instructors, techniques, facilities, and logistics to ensure that employees are properly educated and able to function effectively in their new roles, Reviewing role-mapping activities, Developing content for the project website, Helping State employees begin the transition into their new roles, Designing presentation materials associated with change issues, and Reviewing communication documents. Once the system has been developed, ISG will assist in confirming that the system operates as designed, including its integration with State legacy systems that will remain in operation. We will also review the test plans, interview State staff, and review testing results to help ensure that requirements are addressed and that stakeholder expectations are met. Page 4

5 Phase 8: System Deployment At the beginning of this phase, the software construction will have been completed and accepted by the State, and the software will be in the process of being rolled-out. During this phase, ISG will assist in: Reviewing and validating results of user acceptance testing; Evaluating the effectiveness of end-user training; Monitoring completion and testing of cutover plans and go-live checklists; and Participating in a project governance assessment of State s readiness to go live with the new system. Phase 9: Post Go-Live Support After go live, ISG consultants will assist the post-implementation support team in identifying and resolving problems and in providing support to the user agencies and the vendor community (where applicable). We will also evaluate stability and provide feedback to speed optimization of the new business processes, assess unique and periodic transaction activities (e.g., year-end closing activities, if applicable), and assess other operational concerns as directed by project governance. As the final project task, ISG Public Sector will conduct a Post-Implementation Review to recap project status, recommended plans for the future, and lessons learned. Deliverables ISG s methodology produces a standard set of deliverables that are tailors to the particular circumstances of the engagement (e.g., size and scope of the effort, nature of the system being deployed, etc.). We establish deliverable expectations at the outset of each engagement and collaborate with project leadership and the governance structure to adapt those deliverables to address issues and risks as they are encountered. Our typical IV&V deliverable include (but are not limited to): IV&V Management Plan Report of Initial Review Periodic Reviews Management Briefings Post-Implementation Review Other Deliverables as Mutually Agreed to by State and ISG Public Sector Management Below, we have provided a high-level project plan in Gantt form that represents how our methodology might be employed on an 18 month engagement. The first six months would be used for RFP issuance and vendor selection. The implementation is assumed to take place for the next 11 months and is followed by a 1 month post-go live support period. Our methodology is flexible and the timeline can be extended or compressed based on individual project needs. Page 5

Information Services Group Public Sector

Information Services Group Public Sector IV&V Assessment Report - Deliverable IVV2.2 Presented by: Information Services Group Public Sector October 8, 2018 2018 Information Services Group, Inc. All Rights Reserved Copyright 2018, Information

More information

Information Services Group Public Sector

Information Services Group Public Sector IV&V Assessment Report - Deliverable IVV2.2 Presented by: Information Services Group Public Sector December 12, 2018 2018 Information Services Group, Inc. All Rights Reserved Copyright 2018, Information

More information

PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3)

PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3) PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3) 3.1 IV&V Methodology and Work Plan 3.1.1 NTT DATA IV&V Framework We believe that successful IV&V is more than just verification that the processes

More information

Information Services Group Public Sector

Information Services Group Public Sector IV&V Assessment Report - Deliverable IVV2.2 Presented by: Information Services Group Public Sector November 8, 2018 2018 Information Services Group, Inc. All Rights Reserved Copyright 2018, Information

More information

PART THREE - WORK PLAN AND IV&V METHODOLOGY WORK PLAN. FL IT IV&V Work Plan

PART THREE - WORK PLAN AND IV&V METHODOLOGY WORK PLAN. FL IT IV&V Work Plan WORK PLAN FL IT IV&V Work Plan PART THREE - WORK PLAN AND IV&V METHODOLOGY ID Task Name Duration 1 FL IT IV&V Project Work Plan 261 days 2 DDI / SI Contract Award 0 days 3 Project Initiation and Planning

More information

Project Management. Risk Management

Project Management. Risk Management Brandt s History of IV&V Success Using over 30 years of experience supporting local, state, and federal agencies, Brandt provides IV&V services using proven, strategic methodologies to ensure project success

More information

IT PROJECT ANALYST/MANAGER

IT PROJECT ANALYST/MANAGER IT PROJECT ANALYST/MANAGER I. DESCRIPTION OF WORK Positions in this banded class are responsible for project management work involving planning and coordination of information technology projects. To ensure

More information

Information Technology Independent Verification and Validation

Information Technology Independent Verification and Validation Florida Department of Management Services Information Technology Independent Verification and Validation RFP No. Work Plan and Methodology ; 2:30 PM EST 2150 River Plaza Drive Suite 380 Sacramento California

More information

CERT Resilience Management Model, Version 1.2

CERT Resilience Management Model, Version 1.2 CERT Resilience Management Model, Organizational Process Focus (OPF) Richard A. Caralli Julia H. Allen David W. White Lisa R. Young Nader Mehravari Pamela D. Curtis February 2016 CERT Program Unlimited

More information

Project Management Body of Knowledge (PMBOK)

Project Management Body of Knowledge (PMBOK) Project Management Body of Knowledge (PMBOK) Enterprise & Project Management Please note that these slides are not intended as a substitute to reading the recommended text for this course. Objectives Explain

More information

Part Work plan and IV&V methodology

Part Work plan and IV&V methodology Part 3 4.4.3 Work plan IV&V methodology EY s IV&V methodology is an explicit risk quantitative process that proactively identifies the interrelationship of factors conditions that could impede the success

More information

Information Technology Services Project Management Office Operations Guide

Information Technology Services Project Management Office Operations Guide Information Technology Services Project Management Office Operations Guide Revised 3/31/2015 Table of Contents ABOUT US... 4 WORKFLOW... 5 PROJECT LIFECYCLE... 6 PROJECT INITIATION... 6 PROJECT PLANNING...

More information

SYSTEM MODERNIZATION BEST PRACTICES

SYSTEM MODERNIZATION BEST PRACTICES tl SYSTEM MODERNIZATION BEST PRACTICES SYSTEM MODERNIZATION WORKING GROUP C1 5912-C aamva_systemmodernization_dvd_insert.indd 1 6/7/17 11:01 AM System Modernization Best Practices provides a roadmap to

More information

Who Should be on Your Project Team: The Importance of Project Roles and Responsibilities

Who Should be on Your Project Team: The Importance of Project Roles and Responsibilities Who Should be on Your Project Team: The Importance of Project s and One significant factor contributing to the success of projects is having the right people engaged in the process. Who are the right stakeholders

More information

M3 Playbook Guidance. 1.1 Establish Initial Customer PMO and Processes. Human Resources (HR)/Staffing Plan

M3 Playbook Guidance. 1.1 Establish Initial Customer PMO and Processes. Human Resources (HR)/Staffing Plan M3 Playbook Guidance Phase 1: Readiness This guidance is intended for use by organizations to confirm and validate that their plans are comprehensive and have adequate level of detail for proper migration

More information

Project Planning and Management (PPM) V2.0. WBS Dictionary

Project Planning and Management (PPM) V2.0. WBS Dictionary Project Planning and Management (PPM) V2.0 WBS Dictionary Software as a Service (SaaS) Version 1.0 August 2014 1 Table of Contents PPM V2.0 Work Breakdown Structure (WBS) Dictionary 1 Project Type: Software

More information

1.0 PART THREE: Work Plan and IV&V Methodology

1.0 PART THREE: Work Plan and IV&V Methodology 1.0 PART THREE: Work Plan and IV&V Methodology 1.1 Multi-Faceted IV&V Methodology Large, complex projects demand attentive and experienced IV&V and project management support to meet expectations. Monitoring

More information

APPENDIX O CONTRACTOR ROLES, RESPONSIBILITIES AND MINIMUM QUALIFICATIONS

APPENDIX O CONTRACTOR ROLES, RESPONSIBILITIES AND MINIMUM QUALIFICATIONS APPENDIX O CONTRACTOR ROLES, RESPONSIBILITIES AND MINIMUM QUALIFICATIONS Shared denotes whether a Contractor Resource may be responsible for that in addition to another identified. Contractor Required

More information

AGENCY FOR STATE TECHNOLOGY

AGENCY FOR STATE TECHNOLOGY AGENCY FOR STATE TECHNOLOGY PROJECT RISK & COMPLEXITY ASSESSMENT TOOL Risk & Complexity Assessment Model for State Information Technology Projects Purpose: In order to determine the level of risk associated

More information

Modernization and Migration Management (M3) Playbook GSA, Unified Shared Services Management

Modernization and Migration Management (M3) Playbook GSA, Unified Shared Services Management Modernization and Migration Management (M3) Playbook GSA, Unified Shared Services Management Introduction How to Read an Activity Description Objective: Provides the overall objective of the activity :

More information

Position Description - APPLICATIONS MANAGER

Position Description - APPLICATIONS MANAGER Page: 1 Water Authority Position Description APPLICATIONS MANAGER Status APPROVED Position Code APMG Level I29 Date Aug 2018 Job descriptions are intended to present a general list of the tasks/duties

More information

Modernization and Migration Management (M3) Playbook GSA, Unified Shared Services Management

Modernization and Migration Management (M3) Playbook GSA, Unified Shared Services Management Modernization and Migration Management (M3) Playbook GSA, Unified Shared Services Management Introduction 3 Updated date: 7/2/216 Version 1. How to Read an Activity Description Objective: Provides the

More information

7.11b: Quality in Project Management: A Comparison of PRINCE2 Against PMBOK

7.11b: Quality in Project Management: A Comparison of PRINCE2 Against PMBOK by Peter Whitelaw, Rational Management Pty Ltd, Melbourne Introduction This comparison takes each part of the PMBOK and provides comments on what match there is with elements of the PRINCE2 method. It's

More information

Monthly Independent Verification and Validation Assessment Report

Monthly Independent Verification and Validation Assessment Report Monthly Independent Verification and Validation Assessment Report Florida Planning, Accounting, and Ledger Management (PALM) Project February 2018 Date: 3/12/2018 Version 1.0 Table of Contents Executive

More information

Project Risk Management (PRM)

Project Risk Management (PRM) Project Risk Management (PRM) Course Agenda Project Management Overview The Role of Project Risk Management Monitoring Projects Project Risk Assessments 2 Famous Last Words I cannot imagine any condition

More information

A GeoTalent White Paper Key Steps for Implementing a Talent Management System

A GeoTalent White Paper Key Steps for Implementing a Talent Management System A GeoTalent White Paper Key Steps for Implementing a Talent Management System Implementing a talent management system requires resources and procedures from both the customer organization and the vendor.

More information

KEY SUCCESS FACTORS FOR MAJOR PROGRAMS THAT LEVERAGE IT. The 7-S for Success Framework

KEY SUCCESS FACTORS FOR MAJOR PROGRAMS THAT LEVERAGE IT. The 7-S for Success Framework KEY SUCCESS FACTORS FOR MAJOR PROGRAMS THAT LEVERAGE IT The 7-S for Success Framework May 2014 This document sets forth a framework of critical success factors for large scale government IT projects. ACT-IAC

More information

2012 Medicaid Enterprise System Conference

2012 Medicaid Enterprise System Conference 2012 Medicaid Enterprise System Conference O3: Leveraging Independent Verification and Validation (IV&V) to improve project success Introduction of Panel Agenda PCG North Highland, CSG, Washington Role

More information

Review of the management of data quality in the My Government of Canada Human Resources system. Office of Audit and Evaluation

Review of the management of data quality in the My Government of Canada Human Resources system. Office of Audit and Evaluation Review of the management of data quality in the My Government of Canada Human Resources system Office of Audit and Evaluation Table of Contents Executive summary... i Introduction... 1 Definition of internal

More information

Information Services Group Public Sector

Information Services Group Public Sector IV&V Assessment Report - Deliverable IVV2.2 Presented by: Information Services Group Public Sector February 12, 2019 2019 Information Services Group, Inc. All Rights Reserved Copyright 2019, Information

More information

TABLE OF CONTENTS ONLY

TABLE OF CONTENTS ONLY TABLE OF CONTENTS ONLY Business Continuity Compensation Report - United States of America Compensation Review May 2017 Benchmarking. Plan Ahead. Be Ahead. Data collected between January March 2017 with

More information

Project Management Process Groups. PMP Study Group Based on the PMBOK Guide 4 th Edition

Project Management Process Groups. PMP Study Group Based on the PMBOK Guide 4 th Edition Project Management Process Groups PMP Study Group Based on the PMBOK Guide 4 th Edition Introduction PM Process Groups In order for a project to be successful, the project team must: Select appropriate

More information

WORK PLAN AND IV&V METHODOLOGY Information Technology - Independent Verification and Validation RFP No IVV-B

WORK PLAN AND IV&V METHODOLOGY Information Technology - Independent Verification and Validation RFP No IVV-B 1. Work Plan & IV&V Methodology 1.1 Compass Solutions IV&V Approach The Compass Solutions Independent Verification and Validation approach is based on the Enterprise Performance Life Cycle (EPLC) framework

More information

The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th

The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th www.pmlead.net PMI, PMP, CAPM and PMBOK Guide are trademarks of the Project Management Institute, Inc. PMI has not endorsed and did not

More information

QUALITY ASSURANCE PLAN OKLAHOMA DEPARTMENT OF HUMAN SERVICES ENTERPRISE SYSTEM (MOSAIC PROJECT)

QUALITY ASSURANCE PLAN OKLAHOMA DEPARTMENT OF HUMAN SERVICES ENTERPRISE SYSTEM (MOSAIC PROJECT) QUALITY ASSURANCE PLAN OKLAHOMA DEPARTMENT OF HUMAN SERVICES ENTERPRISE SYSTEM (MOSAIC PROJECT) MOSAIC Quality Assurance Plan v04.02 Prepared by: Approved by: QUALITY ASSURANCE PLAN APPROVALS QA/QC Program

More information

Project and Program Management in ehealth

Project and Program Management in ehealth Project and Program Management in ehealth Foundational Curricula: Cluster 10: Leadership & Management Module 19: Project and Resource Management Unit 1: Project and Program Management in ehealth 53/60

More information

Modernization and Migration Management (M3) Playbook GSA, Unified Shared Services Management

Modernization and Migration Management (M3) Playbook GSA, Unified Shared Services Management Modernization and Migration Management (M3) Playbook GSA, Unified Shared Services Management Introduction How to Read an Activity Description Objective: Provides the overall objective of the activity :

More information

Temple University Role Inventory Form

Temple University Role Inventory Form Position Specifications Job Class: Role Inventory Title: Family: IS Department Title: Level: IS1 Salary Grade: BU: FLSA: School/College/Department: Sub Department: Reports To: Prepared By: Reviewed By:

More information

Transformation Services. Maximize the value of your investments

Transformation Services. Maximize the value of your investments Transformation Services Maximize the value of your investments The true realization of business value Making significant investments in software systems to improve your organization s business operations

More information

DRAFT CTCLINK PROJECT CHARTER. SBCTC ctclink PROJECT MANAGEMENT OFFICE. Revised Aug-Sept 2018 to reflect project reorganization and restart

DRAFT CTCLINK PROJECT CHARTER. SBCTC ctclink PROJECT MANAGEMENT OFFICE. Revised Aug-Sept 2018 to reflect project reorganization and restart DRAFT CTCLINK PROJECT CHARTER SBCTC ctclink PROJECT MANAGEMENT OFFICE Revised Aug-Sept 2018 to reflect project reorganization and restart Table of Contents Table of Contents... 2 Introduction... 3 Purpose...

More information

Solution Analysis and Design Strategy (D18)

Solution Analysis and Design Strategy (D18) (D18) Department of Financial Services Date: 11/29/2018 Revision: 1.0 Table of Contents Table of Contents... 2 Revision History... 3 Executive Summary... 4 1 Introduction... 4 2 Solution Analysis and Design

More information

Work Plan and IV&V Methodology

Work Plan and IV&V Methodology Work Plan and IV&V Methodology Technology initiatives and programs should engage with an IV&V process at the project planning phase in order to receive an unbiased, impartial view into the project planning,

More information

Job Family Matrix. Core Duties Core Duties Core Duties

Job Family Matrix. Core Duties Core Duties Core Duties Job Function: Information Technology Job Family Matrix Job Family: IT Project Management - Professional Job Family Summary: Perform or manage a range of activities related to the design, planning, execution,

More information

Summary of 47 project management processes (PMBOK Guide, 5 th edition, 2013)

Summary of 47 project management processes (PMBOK Guide, 5 th edition, 2013) Summary of 47 project management processes (PMBOK Guide, 5 th edition, 2013) Integration Management: processes & activities needed to properly coordinate all aspects of the project to meet stakeholder

More information

PMP MOCK EXAMS BASED ON PMBOK 5TH EDITION

PMP MOCK EXAMS BASED ON PMBOK 5TH EDITION PMP MOCK EXAMS http://www.tutorialspoint.com/pmp-exams/pmp_mock_exams_set4.htm Copyright tutorialspoint.com BASED ON PMBOK 5TH EDITION Here are 200 objective type sample questions and their answers are

More information

Project Charter. Academic Toolbox Renewal Project. Project Manager: Haniyeh Yousofpour. Division: CIO Department: Project Management Office

Project Charter. Academic Toolbox Renewal Project. Project Manager: Haniyeh Yousofpour. Division: CIO Department: Project Management Office ITS Project Management Framework Project Charter Academic Toolbox Renewal Project Project Manager: Haniyeh Yousofpour Division: CIO Department: Project Management Office 1 ITS Project Management Framework

More information

CHAPTER 2: IMPLEMENTATION PHASES AND OFFERINGS

CHAPTER 2: IMPLEMENTATION PHASES AND OFFERINGS CHAPTER 2: IMPLEMENTATION PHASES AND OFFERINGS Objectives Introduction The objectives are: Describe the purpose of the phase planning activity, preconditions, and deliverables in the implementation methodology.

More information

Business Centre Client Services Manager

Business Centre Client Services Manager Business Centre Client Services Manager Created: 15 August 2017 Group: People & Corporate Services Job family: Other Position number: TBA Hours worked per week: 35 Manager s title: Head of Business Centre

More information

Product Documentation SAP Business ByDesign February Business Configuration

Product Documentation SAP Business ByDesign February Business Configuration Product Documentation PUBLIC Business Configuration Table Of Contents 1 Business Configuration.... 4 2 Business Background... 5 2.1 Configuring Your SAP Solution... 5 2.2 Watermark... 7 2.3 Scoping...

More information

IT Services Management

IT Services Management RL Information Consulting LLC IT Services Management INFRASTRUCTURE ARCHITECTURE PLANNING Service Brief Prepared by: Rick Leopoldi August 4, 2009 Copyright 2009 RL Information Consulting LLC. All rights

More information

Predict. Prevent. Protect. Transform.

Predict. Prevent. Protect. Transform. Optum solution uses global positioning system technology for Optum (CES) is an open-architecture claims editing tool that Program Integrity Solutions Optum provides 30 years worth of government expertise

More information

D6.5 Documentum Compliance Manager Rapid Success Program

D6.5 Documentum Compliance Manager Rapid Success Program D6.5 Documentum Compliance Manager Rapid Success Program 1. Introduction This document provides an overview of, and requirements for participation in the EMC D6.5 Documentum Compliance Manager Rapid Success

More information

Job Family Matrix. Develop, forecast, and administer complex budgets Verify budget, identify, analyze and resolve discrepancies

Job Family Matrix. Develop, forecast, and administer complex budgets Verify budget, identify, analyze and resolve discrepancies Job Function: Finance Job Family: Financial Administration and Operations Professional Job Family Summary: Perform or manage financial and business operational practices to create the highest level of

More information

IT Service Provider and Consumer Support Engineer Position Description

IT Service Provider and Consumer Support Engineer Position Description Engineer Position Description April 8, 2015 Engineer Position Description April 8, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level Definitions...

More information

Oregon Employment Department Modernization Update

Oregon Employment Department Modernization Update Oregon Employment Department Modernization Update Kay Erickson, Director Renee Royston, Modernization Program Director February 2018 Status Update to the Joint Committee on Ways and Means Subcommittee

More information

What We Know Now: Lessons Learned Implementing Federal Financial Systems Projects

What We Know Now: Lessons Learned Implementing Federal Financial Systems Projects Forum: Driving Performance Strategies for More Effective Government What We Know Now: Lessons Learned Implementing Federal Financial Systems Projects By Debra Cammer Hines and Angela Carrington This contribution

More information

POSITION DESCRIPTION. Senior Director of Innovation and Commercialization Location:

POSITION DESCRIPTION. Senior Director of Innovation and Commercialization Location: POSITION DESCRIPTION Title: Project Manager Employee: TBD FLSA Status: Exempt Reports to: Senior Director of Innovation and Commercialization Location: Minnesota, arranged with supervisor Avg # travel

More information

Software Project & Risk Management Courses Offered by The Westfall Team

Software Project & Risk Management Courses Offered by The Westfall Team Software Project & Risk Management is a 5-day course designed to provide a knowledge base and practical skills for anyone interested in implementing or improving Software Project and Risk Management techniques

More information

ERP Selection for Multi-faceted Higher Education Systems in the Software-as-a-Service Era

ERP Selection for Multi-faceted Higher Education Systems in the Software-as-a-Service Era ERP Selection for Multi-faceted Higher Education Systems in the Software-as-a-Service Era Steven Fulkerson, President s Delegate, ERP Selection Committee, The University of Arkansas System David Hemingson,

More information

3 PART THREE: WORK PLAN AND IV&V METHODOLOGY (SECTION 5.3.3)

3 PART THREE: WORK PLAN AND IV&V METHODOLOGY (SECTION 5.3.3) 3 PART THREE: WORK PLAN AND IV&V METHODOLOGY (SECTION 5.3.3) Emagine IT s approach to Independent Verification and Validation (IV&V) has been shaped over the years by hands-on experience and contributions

More information

Management Excluded Job Description

Management Excluded Job Description Management Excluded Job Description 1. Position Identification Position Number 993234 Position Title Department Reports to (title) Associate Director, Supply Management Purchasing Services Director, Purchasing

More information

Project Management Framework with reference to PMBOK (PMI) July 01, 2009

Project Management Framework with reference to PMBOK (PMI) July 01, 2009 Project Management Framework with reference to PMBOK (PMI) July 01, 2009 Introduction Context Agenda Introduction to Methodologies What is a Methodology? Benefits of an Effective Methodology Methodology

More information

Project Management Process Groups. Monitoring & Controlling. Initiating Planning Executing. Closing. Check & Act. Rita: A project ends here!

Project Management Process Groups. Monitoring & Controlling. Initiating Planning Executing. Closing. Check & Act. Rita: A project ends here! (Semaphore) Project Management Process Groups Initiating Planning Executing Monitoring & Controlling Closing Rita: Start Plan Do Check End & Act A project ends here! Project Management Process Groups Initiating

More information

Title: Project Director Location: Tallahassee, FL Clearance: none required

Title: Project Director Location: Tallahassee, FL Clearance: none required Title: Project Director Location: Tallahassee, FL Clearance: none required Position Overview: The Project Director (PD) shall define, establish, and direct the planning and operations of the Project Management

More information

ServiceNow Custom Training and Adoption

ServiceNow Custom Training and Adoption ServiceNow Custom Training and Adoption Overview... 3 Adoption Toolkit Deliverables... 3 Change Enablement Deliverables... 4 Custom Training Deliverables... 5 Custom Training Applications by Business Function...

More information

CMMI-DEV V1.3 CMMI for Development Version 1.3 Quick Reference Guide

CMMI-DEV V1.3 CMMI for Development Version 1.3 Quick Reference Guide processlabs CMMI-DEV V1.3 CMMI for Development Version 1.3 Quick Reference Guide CMMI-DEV V1.3 Process Areas Alphabetically by Process Area Acronym processlabs CAR - Causal Analysis and Resolution...

More information

Does your company lease any provider networks from other dental plans or network management companies? (Please check all that apply)

Does your company lease any provider networks from other dental plans or network management companies? (Please check all that apply) Name Company Phone Email Address Which type of Dental benefit products does your company currently offer? (Please check all that apply) 1. 2. 3. DEPO 4. Dental Indemnity 5. Medicaid/CHIP 6. Medicare 7.

More information

Department of Navy Audit Update

Department of Navy Audit Update Department of Navy Audit Update Northern Virginia Chapter Association of Government Accountants April 28, 2017 Victoria Crouse, Chief Strategy Officer Agenda What We ve Done Journey to Date: Key Milestones

More information

Project Manager CAFM Project (Fixed Term) EHA

Project Manager CAFM Project (Fixed Term) EHA It is important to note that this job description is a guide to the work you will initially be required to undertake. It may be changed from time to time to meet changing circumstances. It does not form

More information

Case Study: market growth strategy. - Selection of slides

Case Study: market growth strategy. - Selection of slides Case Study: market growth strategy - Selection of slides 1 Objective of the collaboration Situation: The Client, global AC player, would like to enhance its positioning in the USA In this sense, the overall

More information

REQUIREMENTS DOCUMENTATION

REQUIREMENTS DOCUMENTATION REQUIREMENTS DOCUMENTATION Project Title: Date Prepared: Stakeholder Requirement Category Priority Acceptance Criteria REQUIREMENTS DOCUMENTATION Project Title: Date Prepared: Stakeholder Requirement Category

More information

Annex 2: Statement of work. Table of contents

Annex 2: Statement of work. Table of contents UNFCCC/CCNUCC Page 1 Annex 2: Statement of work Table of contents Annex 2... 2 Objective... 2 Engagement... 2 Overall approach... 2 Partnering... 3 Quality and reviews... 3 Developer contract... 4 Operator

More information

IT MANAGER - BUSINESS & TECHNOLOGY APPLICATIONS (12235) ( )

IT MANAGER - BUSINESS & TECHNOLOGY APPLICATIONS (12235) ( ) GENERAL DESCRIPTION OF WORK IT MANAGER - BUSINESS & TECHNOLOGY APPLICATIONS (12235) (31000275) Positions in this banded class are responsible for supervisory and managerial work in directing a designated

More information

Introduction... 1 Management... 2 Activities... 3 Schedules... 5 Resources... 6

Introduction... 1 Management... 2 Activities... 3 Schedules... 5 Resources... 6 Successful Projects don t Happen by Chance. Project XYZ Configuration and Change Control Plan Introduction... 1 Management... 2 Activities... 3 Schedules... 5 Resources... 6 Introduction This configuration

More information

HOUSE OF REPRESENTATIVES KNOTT COMMITTEE ROOM 116 OCTOBER 24, 2018

HOUSE OF REPRESENTATIVES KNOTT COMMITTEE ROOM 116 OCTOBER 24, 2018 HOUSE OF REPRESENTATIVES KNOTT COMMITTEE ROOM 116 OCTOBER 24, 2018 3 FACILITATOR: MELISSA TURNER 4 FACILITATOR: MELISSA TURNER 5 FACILITATORS: DAYMON JENSEN, RACHAEL LIEBLICK, MELISSA TURNER Budget FY

More information

EKOLU & Associates, LLC Health Information Systems Management

EKOLU & Associates, LLC Health Information Systems Management EKOLU & Associates, LLC Health Information Systems Management Lessons Learned Lessons Learned History is a giant. The present is a gnome on the giant s shoulders; as long as the gnome is able to keep his

More information

GENERAL REQUIREMENTS FOR ENGINEERING AND DESIGN

GENERAL REQUIREMENTS FOR ENGINEERING AND DESIGN Project Procedures GENERAL REQUIREMENTS FOR ENGINEERING AND DESIGN 07/28/2011 PAGE 1 OF 7 1.0 PURPOSE 1.1 PURPOSE OF ENGINEERING PROJECT PROCEDURES This P-4 series of Engineering Project Procedures provides

More information

An Assessment of Parcel Data in the United States 2005 Survey Results

An Assessment of Parcel Data in the United States 2005 Survey Results An Assessment of Parcel Data in the United States 2005 Survey Results May 2006 Prepared by David Stage and Nancy von Meyer for the Federal Geographic Data Committee s Subcommittee on Cadastral Data Overview:

More information

The Ministry. Project XYZ. Assurance Plan V.02 July Document Approval. Approved by Senior Responsible Officer

The Ministry. Project XYZ. Assurance Plan V.02 July Document Approval. Approved by Senior Responsible Officer The Ministry Project XYZ Assurance Plan V.02 July 2014 Document Approval Name / Title Sign-off Date Approved by Senior Responsible Officer Endorsed by the Project Board Endorsed by Chief Executive Endorsed

More information

PMI Scheduling Professional (PMI-SP)

PMI Scheduling Professional (PMI-SP) PMI Scheduling Professional (PMI-SP) E X A M I N AT I O N CO N T E N T O U T L I N E Project Management Institute PMI Scheduling Professional (PMI-SP) Exam Content Outline Published by: Project Management

More information

Watershed Condition Framework

Watershed Condition Framework US Forest Service - Watershed Condition Classification Maps http://www.fs.fed.us/publications/watershed/ Page 1 of 2 1/9/2013 Watershed Condition Framework The Forest Service has released the first national

More information

IT Service Provider & Consumer Support Engineer Job Description

IT Service Provider & Consumer Support Engineer Job Description Engineer Job Description December 1, 2015 For internal use of MIT only. Engineer Job Description December 1, 2015 Page i Table of Contents General Characteristics... 1 Job Path... 2 Explanation of Proficiency

More information

Quality Management_100_Quality Checklist Procedure

Quality Management_100_Quality Checklist Procedure Quality Management_100_Quality Checklist Procedure Last updated 05/15/2017 Audience: Project Team, Process Owners, Project Management Office Frequency: As Required This procedure provides detailed information

More information

State of Florida Department of Financial Services. Invitation to Negotiate DFS RM ITN 13/14-07 For Insurance Management System

State of Florida Department of Financial Services. Invitation to Negotiate DFS RM ITN 13/14-07 For Insurance Management System State of Florida Department of Financial Services Invitation to Negotiate DFS RM ITN 13/14-07 For Insurance Management System Addendum #2 Modifications to the ITN documentation ITN, Section 2.2, Schedule

More information

Receive and file information technology services report IT providing an update on the city s Enterprise Resource Planning (ERP) systems.

Receive and file information technology services report IT providing an update on the city s Enterprise Resource Planning (ERP) systems. Page 1 of Report IT-04-18 SUBJECT: Enterprise System update TO: FROM: Committee of the Whole Information Technology Services Report Number: IT-04-18 Wards Affected: not applicable File Numbers: 200-06

More information

TABLE OF CONTENTS ONLY

TABLE OF CONTENTS ONLY TABLE OF CONTENTS ONLY Business Continuity Compensation Report - United States of America Compensation Review July 2015 Benchmarking. Plan Ahead. Be Ahead. Data collected between February May 2015 with

More information

Chapter One PROJECT MANAGEMENT OVERVIEW

Chapter One PROJECT MANAGEMENT OVERVIEW Chapter One PROJECT MANAGEMENT OVERVIEW Project management itself is not a new concept. It has been practiced for hundreds, even thousands of years. Any large undertaking requires a set of objectives,

More information

Oregon Department of Justice

Oregon Department of Justice Oregon Department of Justice Ellen F. Rosenblum, Attorney General Oregon Department of Justice Division of Child Support Oregon Child Support System Project Presentation to the Joint Committee On Information

More information

Transformation Programme. Sourcing Workstream PROCUREMENT PLAN. Inland Revenue. 28/06/2013 v1.0 FINAL Reference:

Transformation Programme. Sourcing Workstream PROCUREMENT PLAN. Inland Revenue. 28/06/2013 v1.0 FINAL Reference: Inland Revenue Transformation Programme Sourcing Workstream PROCUREMENT PLAN Project Sponsor: Greg James Prepared by: Sourcing Team Date: 28/06/2013 v1.0 FINAL Reference: 2013050 Document Control File

More information

Monthly Independent Verification and Validation Assessment Report

Monthly Independent Verification and Validation Assessment Report Monthly Independent Verification and Validation Assessment Report Florida Planning, Accounting, and Ledger Management (PALM) Project October 2017 Date: 11/13/2017 Version 1.0 Table of Contents Executive

More information

Project+ Examination Blueprint Version June 1, 2003

Project+ Examination Blueprint Version June 1, 2003 Introduction The Project + examination is designed for business professionals involved with projects with a technology component. The examination is designed for candidates possessing at least 12 months

More information

Project Manager s Roadmap We re all smarter together

Project Manager s Roadmap We re all smarter together Version 7.0a Project Manager s Roadmap We re all smarter together Think Top Down! Methodology Checklists Define Plan Execute Close Conflict Resolution Modes Contract Outsource Management Mentoring References

More information

Maximizing The Value Of Your Smart Grid Investment

Maximizing The Value Of Your Smart Grid Investment Maximizing The Value Of Your Smart Grid Investment Publication Date: August 25, 2015 Author: Kody M. Salem and Kara Truschel EXECUTIVE SUMMARY With thorough planning and a rigorous approach to updating

More information

IT MANAGER - BUSINESS & TECHNOLOGY APPLICATIONS (12235) ( )

IT MANAGER - BUSINESS & TECHNOLOGY APPLICATIONS (12235) ( ) GENERAL DESCRIPTION OF WORK Positions in this banded class are responsible for supervisory and managerial work in directing a designated team of computer applications analysts and applications programmers

More information

Fixed Scope Offering For Oracle Fusion HCM SaaS Implementation

Fixed Scope Offering For Oracle Fusion HCM SaaS Implementation Fixed Scope Offering For Oracle Fusion HCM SaaS Implementation Agenda Company Profile Business Objectives Business Challenges Solution Proposal Scope - Business Process Scope - Application Implementation

More information

Services Description. Transformation and Plan Services. Business Transformation and Plan Services

Services Description. Transformation and Plan Services. Business Transformation and Plan Services Services Description Business ation and Plan Services Business ation and Plan Services SAP Business ation and Plan Services provides consulting and prototyping services to facilitate Licensee innovation

More information

PMI LUNCH AND LEARN OCTOBER 29, 2018

PMI LUNCH AND LEARN OCTOBER 29, 2018 PMI LUNCH AND LEARN OCTOBER 29, 2018 Agenda Project Update Procurement Activities Lessons Learned PMI Lunch and Learn 10/29/2018 PMI Lunch and Learn 10/29/2018 Florida PALM Project Update Establishment

More information

Project Charter For Florida PALM

Project Charter For Florida PALM For Florida PALM Department of Financial Services Date: 09/15/2017 Version: 4.1 Table of Contents Project Overview... 3 Implementation Approach... 7 Project Organization Structure... 8 Assumptions...13

More information

This resource is associated with the following paper: Assessing the maturity of software testing services using CMMI-SVC: an industrial case study

This resource is associated with the following paper: Assessing the maturity of software testing services using CMMI-SVC: an industrial case study RESOURCE: MATURITY LEVELS OF THE CUSTOMIZED CMMI-SVC FOR TESTING SERVICES AND THEIR PROCESS AREAS This resource is associated with the following paper: Assessing the maturity of software testing services

More information

ISACA Systems Implementation Assurance February 2009

ISACA Systems Implementation Assurance February 2009 ISACA Pressures Today Pressure to increase realization of value from IT spending Pressure to deliver on IT projects at a time when resources/budgets are constrained Pressure from risk of technology-based

More information