1 Software Testing Life Cycle STLC (Software Testing Life Cycle) is an integral component of SDLC (Software Development Life Cycle). Testing has become a distinct phenomenon during and after the development of software. No software is released to the customer without a comprehensive testing by QC or testing team in the organization. The Scope and Methodology may vary from product to product, customer to customer, and organization to organization. The Software Testing Life Cycle, (STLC), is the road map to a product success. QALAB consists of a set of phases that define what testing activities to do and when to do them. It also enables communication and synchronization between the various groups that have input to the overall testing process. Software testing life cycle identifies what test activities to carry out and when (what is the best time) to accomplish those test activities. Even though testing differs between organizations, there is a testing life cycle. Software Testing Life Cycle consists of six (generic) phases: 1. Test Planning, 2. Test Analysis, 3. Test Design, 4. Construction and verification, 5. Testing Cycles, 6. Final Testing and Implementation and Post Implementation. Software testing has its own life cycle that intersects with every stage of the SDLC. The basic requirements in software testing life cycle is to control/deal with software testing Manual, Automated and Performance. Test Planning This is the phase where Project Manager has to decide what things need to be tested, do I have the appropriate budget etc. Naturally proper planning at this stage would greatly reduce the risk of low quality software. This planning will be an ongoing process with no end point. 1 / 10

2 Activities at this stage would include preparation of high level test plan. The Software Test Plan (STP) is designed to prescribe the scope, approach, resources, and schedule of all testing activities. The plan must identify the items to be tested, the features to be tested, the types of testing to be performed, the personnel responsible for testing, the resources and schedule required to complete testing, and the risks associated with the plan.). Almost all of the activities done during this stage are included in this software test plan and revolve around a test plan. Test Analysis Once test plan is made and decided upon, next step is to delve little more into the project and decide what types of testing should be carried out at different stages of SDLC, do we need or plan to automate, if yes then when the appropriate time to automate is, what type of specific documentation I need for testing. Proper and regular meetings should be held between testing teams, project managers, and development teams, Business Analysts to check the progress of things which will give a fair idea of the movement of the project and ensure the completeness of the test plan created in the planning phase, which will further help in enhancing the right testing strategy created earlier. We will start creating test case formats and test cases itself. In this stage we need to develop Functional validation matrix based on Business Requirements to ensure that all system requirements are covered by one or more test cases, identify which test cases to automate, begin review of documentation, i.e. Functional Design, Business Requirements, Product Specifications, Product Externals etc. We also have to define areas for Stress and Performance testing. Test Design Test plans and cases which were developed in the analysis phase are revised. Functional validation matrix is also revised and finalized. In this stage risk assessment criteria is developed. If you have thought of automation then you have to select which test cases to automate and begin writing scripts for them. Test data is prepared. Standards for unit testing and pass / fail criteria are defined here. Schedule for testing is revised (if necessary) & finalized and test environment is prepared. 2 / 10

3 Construction and verification In this phase we have to complete all the test plans, test cases, complete the scripting of the automated test cases, Stress and Performance testing plans needs to be completed. We have to support the development team in their unit testing phase. And obviously bug reporting would be done as when the bugs are found. Integration tests are performed and errors (if any) are reported. Testing Cycles In this phase we have to complete testing cycles until test cases are executed without errors or a predefined condition is reached. Run test cases --> Report Bugs --> revise test cases (if needed) --> add new test cases (if needed) --> bug fixing --> retesting (test cycle 2, test cycle 3.). Final Testing and Implementation In this we have to execute remaining stress and performance test cases, documentation for testing is completed / updated, provide and complete different matrices for testing. Acceptance, load and recovery testing will also be conducted and the application needs to be verified under production conditions. Post Implementation In this phase, the testing process is evaluated and lessons learnt from that testing process are documented. Line of attack to prevent similar problems in future projects is identified. Create plans to improve the processes. The recording of new errors and enhancements is an ongoing process. Cleaning up of test environment is done and test machines are restored to base lines in this stage. 3 / 10

4 Areas to consider during the Software Testing Lifecycle. Planning and Control Implementing an effective planning and control solution for your testing activities will promote efficiency, improve communications and organizational structure. Better planning and control means fewer mistakes. Manual Testing Despite the proliferation of automated solutions, manual testing still accounts for more than half of all testing. Imagine what life would be like if you could cut the time you spent on manual testing by half. With Original Software this dream is now reality with the revolutionary Test Drive-Assist, a solution specifically designed to assist manual testing. Test Data Management (TDM) Test Data Management (TDM) is fundamental to the success of your data strategy; after all, data drives the entire testing procedure. With bad data comes poor testing, results you cannot trust, and a whole lot of wasted time, money and effort. It pays to get the data management right. Software Test Automation Effectively deployed software automation solutions can have a significantly positive affect on functional and regression testing timescales. With code free technology and self- updating scripts, you can be assured that your testing assets will be re-usable, easy to use, easy to manage, and virtually maintenance free. Unlike some other tools we could mention. 4 / 10

5 Load Testing Replicating the behavior on an application under stress can help avoid machine overloads, unnecessary infrastructure investments and the implementation of enhancements that fail to scale up. An effective load test will provide assurances that your application or website will cope with heavy simultaneous usage without crashing. Results, Reporting & Corporate Governance For many corporate compliance mandates, and for general testing best practice, it is key that your company develops its own IT best practice methodology. A QA plan that formalizes how you company handles change to software systems. This means that for every system change you must be able to show what was tested, when it was tested, how, by whom, what were the results, how many defects were there, and how they were rectified before going live. Software Testing Life Cycle Flow The Steps are to be followed from the start of testing of software to the end of the testing are as follows: 1. Before the dynamic testing, there is a static testing. Static testing includes review of documents required for the software development. This includes following activities: (a) All the documents related to customer requirements and business rules that are required for software design and development should be handed over to QA. These documents should be complete and dually signed by client and representative of the company. (b) QA reviews these documents. The reviewing of documents includes comprehensive and thorough study of the documents. If any discrepancy is found then it should be noted and raised 5 / 10

6 in the review meeting with the Development team. (c) After this there should be a formal meeting between the QA and development team regarding these documents, the agenda of this meeting mainly includes what is missing in the document, QA queries to be answered by Development/Project Team and/or clarification required for any confusions. 2. After the Software development or build of a module, QA starts dynamic testing. If during the development the requirement has been changed on customer demand or due to any other reason, then that should be documented and a copy of this revised document is given to the QA and also discussed as explained in point 1 above. 3. Development and testing environment should be made clear to the QA by the Development team. It includes the following activities: (a) Server to hit for Testing (b) Installation of latest build on the test server. (c) Modules/Screens to test. (d) Test duration as decided by test manager and project manager mutually based on of work and team strength. (e) Demo of the software on test server by development team to the QC members. scope 4. After this Test cases and test scenarios are prepared and then the Test execution by QC. 5.A comprehensive Report of Bugs is prepared by the Testers and a review/verification by QC/QA/Testing Head takes place. Before handing over this report to Development Team there is a thorough review of Bugs List by Test Manager and in case of any clarification required on a bug submitted, the Testing Head discusses the bugs with the assigned tester. 6.Release of bug report by QC Team to Development Team. 7. Discussion/simulation of bugs by QC with development team if development team requires and time required for fixing the bugs should be made clear by Development team at this stage. 6 / 10

7 8.Feedback from Development team on reported bugs with the stipulated time frame required to fix all bugs. 9. Any changes in the software being made in respect to fix these bugs should be made clear to the QA team by the Development team. 10. Testing team then Retests or verifies the bugs fixed by the development team. 11. Submitting the retesting bug report to the Test manager and after this the step 5 to step 10 are followed until the product has reached a stage where it can be released to customer. 12. Criteria for ending the testing should be defined by management or Test Manager Like when all major bugs are reported and fixed. Major bugs mean the bugs that affect the Business of the Client. Terminologies in STLC 1. Test Strategy: Test Strategy is a Document, developed by the Project manager, which contains what type of technique to follow and which module to test. 2. Test Plan: Test plan is a Document, developed by the Test Lead, which contains "What to Test, How to Test", "When to Test", "Who to Test". 3. Test Scenario: A name given to Test Cases is called Test Scenario. This Test Scenario was done by the Test Engineer. 7 / 10

8 4. Test Cases: It is also document and it specifies a Testable condition to validate functionality. These Test Cases are deal by the Test Engineer. Sample testing cycle followed in any organization. 1. Requirements analysis: Testing should begin in the requirements phase of the software development life cycle. During the design phase, testers work with developers in determining what aspects of a design are testable and with what parameters those tests work. 2. Test planning: Test strategy, test plan, test bed creation. Since many activities will be carried out during testing, a plan is needed. 3. Test development: Test procedures, test scenarios, test cases, test datasets, test scripts to use in testing software. 4. Test execution: Testers execute the software based on the plans and tests and report any errors found to the development team. 8 / 10

9 5. Test reporting: Once testing is completed, testers generate metrics and make final reports on their test effort and whether or not the software tested is ready for release. 6. Test result analysis: Or Defect Analysis, is done by the development team usually along with the client, in order to decide what defects should be treated, fixed, rejected (i.e. found software working properly) or deferred to be dealt with later. 7. Defect Retesting: Once a defect has been dealt with by the development team, it is retested by the testing team. 8. Regression testing: It is common to have a small test program built of a subset of tests, for each integration of new, modified, or fixed software, in order to ensure that the latest delivery has not ruined anything, and that the software product as a whole is still working correctly. 9. Test Closure: Once the test meets the exit criteria, the activities such as capturing the key outputs, lessons learned, results, logs, documents related to the project are archived and used as a reference for future projects. Summary and Conclusion 9 / 10

10 Successfully developed and tested software will eventually become part of a product and enter a maintenance phase, during which the software will undergo modification to correct errors and to comply with changes to requirements. Like the initial development, modifications will follow a software development lifecycle, but not necessarily using the same lifecycle model as the initial development. Hence throughout the Software Testing Lifecycle (STL), quality assurance checks need to be carried out to ensure our new or upgraded application is error and risk free. Different stages of the STL require very different QA checks. Regardless of what stage we are at, whether it be at the initial planning stage or at the final reporting and auditing stage, we can be confident that Original Software will have a solution for us. 10 / 10

Testing Masters Technologies

Testing Masters Technologies 1. How will you receive the project requirements? A. The finalized SRS will be placed in a project repository; we will access it from there 2. What will you do with SRS? A. SRS stands for software requirement

More information

About the Tutorial. Audience. Prerequisites. Copyright & Disclaimer STLC

About the Tutorial. Audience. Prerequisites. Copyright & Disclaimer STLC i About the Tutorial Software Testing Lifecycle is a standard procedure divided into different phases, followed by the QA Team to complete all testing activities. This is a brief tutorial that introduces

More information

Software Testing(TYIT) Software Testing. Who does Testing?

Software Testing(TYIT) Software Testing. Who does Testing? Software Testing(TYIT) Software Testing Testing is the process of evaluating a system or its component(s) with the intent to find whether it satisfies the specified requirements or not. In simple words,

More information

Testing 2. Testing: Agenda. for Systems Validation. Testing for Systems Validation CONCEPT HEIDELBERG

Testing 2. Testing: Agenda. for Systems Validation. Testing for Systems Validation CONCEPT HEIDELBERG CONCEPT HEIDELBERG GMP Compliance for January 16-17, 2003 at Istanbul, Turkey Testing for Systems Validation Dr.-Ing. Guenter Generlich guenter@generlich.de Testing 1 Testing: Agenda Techniques Principles

More information

BASICS OF SOFTWARE TESTING AND QUALITY ASSURANCE. Yvonne Enselman, CTAL

BASICS OF SOFTWARE TESTING AND QUALITY ASSURANCE. Yvonne Enselman, CTAL BASICS OF SOFTWARE TESTING AND QUALITY ASSURANCE Yvonne Enselman, CTAL Information alines with ISTQB Sylabus and Glossary THE TEST PYRAMID Why Testing is necessary What is Testing Seven Testing principles

More information

INTERNATIONAL JOURNAL OF PURE AND APPLIED RESEARCH IN ENGINEERING AND TECHNOLOGY

INTERNATIONAL JOURNAL OF PURE AND APPLIED RESEARCH IN ENGINEERING AND TECHNOLOGY INTERNATIONAL JOURNAL OF PURE AND APPLIED RESEARCH IN ENGINEERING AND TECHNOLOGY A PATH FOR HORIZING YOUR INNOVATIVE WORK A REVIEW ON SOFTWARE TESTING AND QUALITY PROCESS IMPROVEMENT MS. NILAJA A. DESHMUKH

More information

ISTQB CTFL BH QuestionsAnswers with Explanation

ISTQB CTFL BH QuestionsAnswers with Explanation ISTQB CTFL BH0-10 - QuestionsAnswers with Explanation For Software Testing Articles Visit @ http://softwaretestinghelp.com Join the Best Software Testing Training Course @ http://softwaretestinghelp.org

More information

Testing. CxOne Standard

Testing. CxOne Standard Testing CxOne Standard CxStand_Testing.doc November 3, 2002 Advancing the Art and Science of Commercial Software Engineering Contents 1 INTRODUCTION... 1 1.1 OVERVIEW... 1 1.2 GOALS... 1 1.3 BACKGROUND...

More information

Digital Industries Apprenticeship: Occupational Brief. Software Tester. March 2016

Digital Industries Apprenticeship: Occupational Brief. Software Tester. March 2016 Digital Industries Apprenticeship: Occupational Brief Software Tester March 2016 1 Digital Industries Apprenticeships: Occupational Brief Level 4 Software Tester Apprenticeship Minimum Standards and Grading

More information

SYSTEM MODERNIZATION BEST PRACTICES

SYSTEM MODERNIZATION BEST PRACTICES tl SYSTEM MODERNIZATION BEST PRACTICES SYSTEM MODERNIZATION WORKING GROUP C1 5912-C aamva_systemmodernization_dvd_insert.indd 1 6/7/17 11:01 AM System Modernization Best Practices provides a roadmap to

More information

Fundamentals Test Process

Fundamentals Test Process Fundamentals Test Process Fundamental Test Process 5 Phases of the Fundamental Test Process Fix test design and repeat Fix component or test cases/scripts and repeat Test Planning and Control Test Analysis

More information

The Software Quality Center of Excellence

The Software Quality Center of Excellence The Software Quality Center of Excellence A X I S T E C H N I C A L G R O U P A N A H E I M H E A D Q U A R T E R S, 300 S. H A R B O R, B L V D. S U I T E 904, A N A H E I M, CA 92805 PHONE :( 714) 491-2636

More information

This document describes the overall software development process of microcontroller software during all phases of the Company Name product life cycle.

This document describes the overall software development process of microcontroller software during all phases of the Company Name product life cycle. Maturity Process Owner Check Release Description Valid Name / Department Name / Department Name / Department Detailed procedure for software development Title: Software Development Procedure Purpose: This

More information

PLM APPLICATION TESTING

PLM APPLICATION TESTING RETAIL PLM APPLICATION TESTING IN RETAIL DOMAIN Abstract Retail PLM application is an intuitive, web-based solution ideal for footwear, apparel, and consumer products. While every attempt is made to focus

More information

Software Development Life Cycle:

Software Development Life Cycle: Software Development Life Cycle: The systems development life cycle (SDLC), also referred to as the application development life-cycle, is a term used in systems engineering, information systems and software

More information

Test Management Test Planning - Test Plan is a document that is the point of reference based on which testing is carried out within the QA team.

Test Management Test Planning - Test Plan is a document that is the point of reference based on which testing is carried out within the QA team. Test Management Test Planning - Test Plan is a document that is the point of reference based on which testing is carried out within the QA team. - It is also a document we share with the Business Analysts,

More information

ISTQB Certified Tester. Foundation Level. Sample Exam 1

ISTQB Certified Tester. Foundation Level. Sample Exam 1 ISTQB Certified Tester Foundation Level Version 2015 American Software Testing Qualifications Board Copyright Notice This document may be copied in its entirety, or extracts made, if the source is acknowledged.

More information

FAQ: Implementation Complete Phase

FAQ: Implementation Complete Phase FAQ: Implementation Complete Phase Question 1: How can I determine if the Implementation Complete milestone has been met? Response: There are several industry accepted measures for the Implementation Complete

More information

REQUIREMENT DRIVEN TESTING. Test Strategy for. Project name. Prepared by <author name> [Pick the date]

REQUIREMENT DRIVEN TESTING. Test Strategy for. Project name. Prepared by <author name> [Pick the date] REQUIREMENT DRIVEN TESTING Test Strategy for Project name Prepared by [Pick the date] [Type the abstract of the document here. The abstract is typically a short summary of the contents of

More information

QUALITY ASSURANCE PLAN OKLAHOMA DEPARTMENT OF HUMAN SERVICES ENTERPRISE SYSTEM (MOSAIC PROJECT)

QUALITY ASSURANCE PLAN OKLAHOMA DEPARTMENT OF HUMAN SERVICES ENTERPRISE SYSTEM (MOSAIC PROJECT) QUALITY ASSURANCE PLAN OKLAHOMA DEPARTMENT OF HUMAN SERVICES ENTERPRISE SYSTEM (MOSAIC PROJECT) MOSAIC Quality Assurance Plan v04.02 Prepared by: Approved by: QUALITY ASSURANCE PLAN APPROVALS QA/QC Program

More information

Cost of Changing the Activities in SDLC. Minimum of Cost at this level. code debuging unit test integration. Activity

Cost of Changing the Activities in SDLC. Minimum of Cost at this level. code debuging unit test integration. Activity Software Development Life Cycle (SDLC) This is a work flow for creating a new software/application. Usually, any company that is in the software business follows the same route and structure. In this document

More information

The 13th Annual International Software Testing Conference in India

The 13th Annual International Software Testing Conference in India Title of Paper: Paradigm Shift in Software testing Submitted for: The 13th Annual International Software Testing Conference in India Authors: Preeti Arora, Preeti.arora@hsc.com Hema Ravi, Hema.ravi@hughes.com

More information

Quality Assurance Analyst II

Quality Assurance Analyst II Quality Assurance Analyst II Location: [Asia & Pacific] [Philippines] Town/City: Pasig City Category: Information Technology PURPOSE OF POSITION: A Quality Assurance Analyst II works on multiple programs/systems

More information

WORK PLAN AND IV&V METHODOLOGY Information Technology - Independent Verification and Validation RFP No IVV-B

WORK PLAN AND IV&V METHODOLOGY Information Technology - Independent Verification and Validation RFP No IVV-B 1. Work Plan & IV&V Methodology 1.1 Compass Solutions IV&V Approach The Compass Solutions Independent Verification and Validation approach is based on the Enterprise Performance Life Cycle (EPLC) framework

More information

Introduction. Fundamental concepts in testing

Introduction. Fundamental concepts in testing INF 3121 Software Testing - Lecture 01 Introduction. Fundamental concepts in testing 1. Why is testing necessary?? 4. Fundamental test process 5. The psychology of testing 1 1. Why is testing necessary?

More information

T Software Testing and Quality Assurance Test Planning

T Software Testing and Quality Assurance Test Planning T-76.5613 Software Testing and Quality Assurance 10.10.2007 Test Planning Juha Itkonen Outline Test planning, purpose and usage of a test plan Topics of test planning Exercise References: IEEE Std 829-1998,

More information

A Review Paper on Software Testing

A Review Paper on Software Testing A Review Paper on Software Testing Amit M. Kale 1, Vivek V. Bandal 2, Komal Chaudhari 3 1,2Bachelor Student, Dept. of Electrical Engineering 3Professor, Dept. of Computer Engineering ----------------------------------------------------------------------***---------------------------------------------------------------------

More information

VC SOFTWARE PROJECT MANAGEMENT PLAN

VC SOFTWARE PROJECT MANAGEMENT PLAN VC SOFTWARE PROJECT MANAGEMENT PLAN Supporting Process Plan This part will contain plans for the supporting processes that span the duration of the software project. Team #4 Members: Yazeed Al-Swailem

More information

Summary of TL 9000 R4.0 Requirements Beyond ISO 9001:2000

Summary of TL 9000 R4.0 Requirements Beyond ISO 9001:2000 This summary identifies the additional TL 9000 Release 4.0 requirements beyond those stated in ISO 9001:2000. See the TL 9000 R4.0 Handbook for the actual TL 9000 R4.0 requirements. ISO 9001:2000 section

More information

Implementing an Automated Testing Program

Implementing an Automated Testing Program Implementing an Automated Testing Program An Innosphere Ritepaper INNOSPHERE SYSTEMS DEVELOPMENT GROUP LTD. 147 WYNDHAM ST. NORTH, SUITE 306 GUELPH, ONTARIO, CANADA, N1H 4E9 TEL: 519.766.9726 WWW.INNOSPHERE.CA

More information

Advantages and Disadvantages of. Independent Tests. Advantages. Disadvantages

Advantages and Disadvantages of. Independent Tests. Advantages. Disadvantages 8.0 Test Management Outline 8.1 Test organisation 8.2 Test planning and estimation 8.3 Test program monitoring and control 8.4 Configuration management 8.5 Risk and testing 8.6 Summary Independent Testing

More information

1. Can you explain the PDCA cycle and where testing fits in?

1. Can you explain the PDCA cycle and where testing fits in? 1. Can you explain the PDCA cycle and where testing fits in? Software testing is an important part of the software development process. In normal software development there are four important steps, also

More information

Software configuration management

Software configuration management Software configuration management Bởi: Hung Vo Introduction A system can be defined as a collection of components organized to accomplish a specific function or set of functions. The configuration of a

More information

Instrument Control System Project Management

Instrument Control System Project Management Project Documentation Document PMCS-0021 Revision A Instrument Control System Project Management Bret Goodrich Software September 2015 Advanced Technology Solar Telescope 950 N. Cherry Avenue Tucson, AZ

More information

How mature is my test organization: STDM, an assessment tool

How mature is my test organization: STDM, an assessment tool How mature is my test organization: STDM, an assessment tool Bonney Joseph, (Bonney.joseph@wipro.com) Nikhil Gupta, (Nikhil.gupta@wipro.com) Abstract Software ing thought of as a support function until

More information

Skill Category 7. Quality Control Practices

Skill Category 7. Quality Control Practices Skill Category 7 Quality Control Practices Testing Concepts Developing Testing Methodologies Verification and Validation Methods Software Change Control Defect Management Process Management Processes CSQA

More information

Integration and Testing

Integration and Testing Integration and Testing 1 Today Software Quality Assurance Integration Test planning Types of testing Test metrics Test tools 2 Deliverables by Phase Possible Deliverables by Phase Concept Document Statement

More information

Building an Enterprise QA Centre of Excellence Best Practices Discussion IBM Corporation

Building an Enterprise QA Centre of Excellence Best Practices Discussion IBM Corporation Building an Enterprise QA Centre of Excellence Best Practices Discussion 2015 IBM Corporation Objectives Pleased to take this opportunity to present the Enterprise QACoE The objectives of the session are

More information

ADVISORY CIRCULAR AC

ADVISORY CIRCULAR AC GHANA CIVIL AVIATION AUTHORITY ADVISORY CIRCULAR AC-00-002 DEVELOPMENT OF AN ACCEPTABLE QUALITY ASSURANCE SYSTEM SECTION 1 GENERAL 1.1 PURPOSE This Advisory Circular (AC) provides guidance to organizations

More information

Software Testing Level Part 2. Adam Hendra Brata

Software Testing Level Part 2. Adam Hendra Brata Software Testing Level Part 2 Adam Hendra Brata Agenda : Part 2 Acceptance Testing Alpha Beta 2 Testing Activities Object Design Document System Design Document Requirements Analysis Document Client Expectation

More information

PRES The Effects of Software Process Maturity on Software Development Effort

PRES The Effects of Software Process Maturity on Software Development Effort PRES 15053 The Effects of Software Process Maturity on Software Development Effort Dashboard Concept Lagging Leading Management Tool Quality 80 100 120 Scope 60 BUFFER CONSUMPTION 140 DEFECT DISTRIBUTION

More information

CRM System Tester. Location London Department Supporter and Community Partnerships. CRM Project Manager Salary Band C

CRM System Tester. Location London Department Supporter and Community Partnerships. CRM Project Manager Salary Band C CRM System Tester Location London Department Supporter and Community Partnerships Reports to (Job Title) CRM Project Manager Salary Band C Matrix manager (if applicable) Click here to enter text. Competency

More information

Software Quality Assurance and Testing STUDY NOTES

Software Quality Assurance and Testing STUDY NOTES Software Quality Assurance and Testing STUDY NOTES Unit 1. Introduction Software Testing Software testing is the process of evaluation a software item to detect differences between given input and expected

More information

Program Lifecycle Methodology Version 1.7

Program Lifecycle Methodology Version 1.7 Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated

More information

It s time to be more Optimistic about Negative Testing 12 th Annual International Software Testing Conference Saroj Patnaik 20-October-2012

It s time to be more Optimistic about Negative Testing 12 th Annual International Software Testing Conference Saroj Patnaik 20-October-2012 It s time to be more Optimistic about Negative Testing 12 th Annual International Software Testing Conference 2012 Saroj Patnaik 20-October-2012 Background Our existing QA approach: Understanding the user

More information

Technical Integration Testing Requirements. Trusted Digital Identity Framework August 2018, version 1.0

Technical Integration Testing Requirements. Trusted Digital Identity Framework August 2018, version 1.0 Technical Integration Testing Requirements Trusted Digital Identity Framework August 2018, version 1.0 Digital Transformation Agency This work is copyright. Apart from any use as permitted under the Copyright

More information

Stat Production Services for Oracle E-Business Suite (Onsite and Remote)

Stat Production Services for Oracle E-Business Suite (Onsite and Remote) Stat Production Services for Oracle E-Business Suite (Onsite and Remote) Description The Stat Production Services for Oracle E-Business Suite is designed to assist the customer with the implementation

More information

Led by the Author Attended by a peer group Varying level of formality Knowledge gathering Defect finding

Led by the Author Attended by a peer group Varying level of formality Knowledge gathering Defect finding Technical Review Walkthrough Review Inspection Review Informal Review A Technical Review is a type of peer review, and is considered to be a formal review type, even though no Managers are expected to

More information

PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3)

PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3) PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3) 3.1 IV&V Methodology and Work Plan 3.1.1 NTT DATA IV&V Framework We believe that successful IV&V is more than just verification that the processes

More information

CSV Inspection Readiness through Effective Document Control. Eileen Cortes April 27, 2017

CSV Inspection Readiness through Effective Document Control. Eileen Cortes April 27, 2017 CSV Inspection Readiness through Effective Document Control Eileen Cortes April 27, 2017 Agenda Background CSV Readiness CSV and Change Management Process Inspection Readiness Do s and Don ts Inspection

More information

ISTQB-Level1 ASTQB. American Software Testing Qualifications Board Level 1

ISTQB-Level1 ASTQB. American Software Testing Qualifications Board Level 1 ASTQB ISTQB-Level1 American Software Testing Qualifications Board Level 1 Download Full Version : https://killexams.com/pass4sure/exam-detail/istqb-level1 QUESTION: 46 Comparing TMMi and TPI, which is

More information

Stat Production Services for PeopleSoft (Onsite and Remote)

Stat Production Services for PeopleSoft (Onsite and Remote) Stat Production Services for PeopleSoft (Onsite and Remote) Description The Stat Production Services for PeopleSoft is designed to assist the customer with the implementation of the Stat for PeopleSoft

More information

Appendix C: MS Project Software Development Plan and Excel Budget.

Appendix C: MS Project Software Development Plan and Excel Budget. 1. Introduction. Appendix C: MS Project Software Development Plan and Excel Budget. Project: PickUp Game App The Project plan for this Application consist of 76 days; In this plan is defined how long each

More information

Agile Test Plan How to Construct an Agile Test Plan

Agile Test Plan How to Construct an Agile Test Plan Agile Test Plan How to Construct an Agile Test Plan XBOSoft White Paper How to Construct an Agile Test Plan www.xbosoft.com 2 Agile is changing not only the way we develop software but the way we work

More information

Surviving the Top Ten Challenges of Software Testing

Surviving the Top Ten Challenges of Software Testing Surviving the Top Ten Challenges of Software Testing: A Closer Look at Understanding Software Testing Randy Rice, CQA, CSTE Rice Consulting Services, Inc. 405-692-7331 http://www.riceconsulting.com rcs@telepath.com

More information

Medidata Clinical Cloud (MCC) Validation

Medidata Clinical Cloud (MCC) Validation 1 Medidata Clinical Cloud (MCC) Validation Medidata develops, validates, installs, maintains and supports all components of Medidata s cloud-based, Software as a Service (SaaS) platform, i.e., the Medidata

More information

Testing throughout the software life cycle. Software Testing: INF3121 / INF4121

Testing throughout the software life cycle. Software Testing: INF3121 / INF4121 Testing throughout the software life cycle Software Testing: INF3121 / INF4121 Summary: Week 2 Software development models Sequential / Iterative-Incremental / Testing within a life cycle Test levels Component

More information

QUEST Boston Full Lifecycle Testing of Commercial off the Shelf (COTS) Software. Thursday, April 7 th, :00 AM 12:00 PM

QUEST Boston Full Lifecycle Testing of Commercial off the Shelf (COTS) Software. Thursday, April 7 th, :00 AM 12:00 PM Thursday, April 7 th, 2011 11:00 AM 12:00 PM QUEST Boston 2011 Full Lifecycle Testing of Commercial off the Shelf (COTS) Software PRESENTER: Saeid Vakili COMPANY: Ontario Ministry of Education This was

More information

International Journal of Advanced Research in Computer Science and Software Engineering

International Journal of Advanced Research in Computer Science and Software Engineering Volume 2, Issue 8, August 2012 ISSN: 2277 128X International Journal of Advanced Research in Computer Science and Software Engineering Research Paper Available online at: www.ijarcsse.com Improvement in

More information

WHITE PAPER. LEVERAGING A TESTING METHODOLOGY TO ENSURE HIGH QUALITY BANKING APIs. Venkata Griddaluri IBS Open APIs Manager of Quality Assurance

WHITE PAPER. LEVERAGING A TESTING METHODOLOGY TO ENSURE HIGH QUALITY BANKING APIs. Venkata Griddaluri IBS Open APIs Manager of Quality Assurance LEVERAGING A TESTING METHODOLOGY TO ENSURE HIGH QUALITY BANKING APIs Venkata Griddaluri IBS Open APIs Manager of Quality Assurance Why Quality Assurance is Needed The need for high-quality projects and

More information

CMMI-DEV V1.3 CMMI for Development Version 1.3 Quick Reference Guide

CMMI-DEV V1.3 CMMI for Development Version 1.3 Quick Reference Guide processlabs CMMI-DEV V1.3 CMMI for Development Version 1.3 Quick Reference Guide CMMI-DEV V1.3 Process Areas Alphabetically by Process Area Acronym processlabs CAR - Causal Analysis and Resolution...

More information

Observatory Control System Project Management

Observatory Control System Project Management Project Documentation Document PMCS-0020 Revision A Observatory Control System Project Management Bret Goodrich Software September 1, 2015 Advanced Technology Solar Telescope 950 N. Cherry Avenue Tucson,

More information

Subject : Computer Science. Paper : Software Quality Management. Module : Quality Management Activities Module No: CS/SQM/15

Subject : Computer Science. Paper : Software Quality Management. Module : Quality Management Activities Module No: CS/SQM/15 e-pg Pathshala Subject : Computer Science Paper : Software Quality Management Module : Quality Management Activities Module No: CS/SQM/15 Quadrant 1 : e-text QUALITY MANAGEMENT ACTIVITIES Software quality

More information

NCOVER. ROI Analysis for. Using NCover. NCover P.O. Box 9298 Greenville, SC T F

NCOVER. ROI Analysis for. Using NCover. NCover P.O. Box 9298 Greenville, SC T F NCOVER ROI Analysis for Test Coverage Using NCover NCover P.O. Box 9298 Greenville, SC 29601 T 864.990.3717 F 864.341.8312 conversation@ncover.com www.ncover.com Table of Contents Executive Summary 2 Cost

More information

Also we will try to recap what we studied in the last class. (Refer Slide Time: 00:35)

Also we will try to recap what we studied in the last class. (Refer Slide Time: 00:35) Embedded Software Testing Unit 3: Static analysis and code reviews & Metrics Lecture 5 Seer Akademi-NPTEL MOU Hi all welcome to the next session of our embedded software testing that unit 3 series and

More information

TESTING COTS APPLICATIONS

TESTING COTS APPLICATIONS A Comprehensive Hands-On Introduction "1 of 6" in ISTQB Certified Foundation Tester Level Certification Course" A B O U T O U R T R A I N E R S Our trainers have spent the last 2 decades implementing Software

More information

Project Management Knowledge Areas SECTION III

Project Management Knowledge Areas SECTION III Project Management Knowledge Areas SECTION III 1 Project Integration Management CHAPTER 4 2 The Key to Overall Project Success: Good Project Integration Management Project managers must coordinate all

More information

Quantifying the Value of Investments in Micro Focus Quality Center Solutions

Quantifying the Value of Investments in Micro Focus Quality Center Solutions Dynamic Value Brief Application Delivery Management Quantifying the Value of Investments in Micro Focus Quality Center Solutions Manage software testing and IT quality management with consistent processes

More information

Project Remedies Solution Set s Ability to Transform your IT Organization. A Selection of Use Cases from Project Remedies Inc.

Project Remedies Solution Set s Ability to Transform your IT Organization. A Selection of Use Cases from Project Remedies Inc. Project Remedies Solution Set s Ability to Transform your IT Organization A Selection of Use Cases from Project Remedies Inc. August 2016 Project Remedies Solution Set s Ability to Transform an IT Organization

More information

Cambridge University Press Agile Testing: How to Succeed in an Extreme Testing Environment John Watkins Excerpt More information

Cambridge University Press Agile Testing: How to Succeed in an Extreme Testing Environment John Watkins Excerpt More information 1 Introduction If you try to make the software foolproof, they will just invent a better fool! Dorothy Graham 1.1 Why Agile? In today s highly competitive IT business, companies experience massive pressures

More information

PROJECT MANAGEMENT. Quality Management (QM) Course 7 Project Management Knowledge Areas (5) Risk Management (RM)

PROJECT MANAGEMENT. Quality Management (QM) Course 7 Project Management Knowledge Areas (5) Risk Management (RM) PROJECT MANAGEMENT Course 7 Project Management Knowledge Areas (5) Quality Management (QM) Risk Management (RM) Cătălina Mancaș QM + RM Processes: Inputs Tools & Techniques Outputs Project Quality Management

More information

Testing Phases Conference Room Pilot

Testing Phases Conference Room Pilot CHAPTER 18 TESTING Have you every wondered why a software program blows-up the first time it is used, even though those who developed the program insist they previously tested it? Multiply this situation

More information

E-BOOK. Five signs you need a modern DevOps solution

E-BOOK. Five signs you need a modern DevOps solution E-BOOK Five signs you need a modern DevOps solution Contents 3 Introduction Five signs 4 5 6 7 8 9 10 12 Web and mobile development is out of sync with IBM i development Deployment is not fully automated

More information

ITIL Intermediate Lifecycle Stream:

ITIL Intermediate Lifecycle Stream: ITIL Intermediate Lifecycle Stream: SERVICE TRANSITION CERTIFICATE Sample Paper 2, version 6.1 Gradient Style, Complex Multiple Choice QUESTION BOOKLET Gradient Style Multiple Choice 90 minute paper Eight

More information

The SaaS LMS and Total Cost of Ownership in FDA-Regulated Companies

The SaaS LMS and Total Cost of Ownership in FDA-Regulated Companies The SaaS LMS and Total Cost of Ownership in FDA-Regulated Companies The SaaS LMS and Total Cost of Ownership in FDA-Regulated Companies By Rob Sims, UL Compliance to Performance When Life Sciences companies

More information

Buy:

Buy: Chapter-1.0 CONTENTS OF CMMI MATURITY LEVEL 3 DOCUMENT KIT (More than 160 document files) A. The Total Editable Document kit has 8 main directories as below in word/excel. CMMI-V1.3 Maturity Level 3 (Dev)

More information

Intermediate Certificate in Software Testing Syllabus. Version 1.4

Intermediate Certificate in Software Testing Syllabus. Version 1.4 Intermediate Certificate in Software Testing Syllabus February 2010 Background This document is the syllabus for the intermediate paper which leads to the practitioner level of qualification, as administered

More information

Test Management: Part I. Software Testing: INF3121 / INF4121

Test Management: Part I. Software Testing: INF3121 / INF4121 Test Management: Part I Software Testing: INF3121 / INF4121 Summary: Week 6 Test organisation Independence Tasks of the test leader and testers Test planning and estimation Activities Entry and exit criteria

More information

Carry out automated tests on software products/applications/modules

Carry out automated tests on software products/applications/modules Overview This unit is about carrying out automated tests to verify the functionality, usability, compatibility, security and/or performance of software products/applications/ modules. Applicable NOS Unit

More information

Information Technology Independent Verification and Validation

Information Technology Independent Verification and Validation Florida Department of Management Services Information Technology Independent Verification and Validation RFP No. Work Plan and Methodology ; 2:30 PM EST 2150 River Plaza Drive Suite 380 Sacramento California

More information

7. Model based software architecture

7. Model based software architecture UNIT - III Model based software architectures: A Management perspective and technical perspective. Work Flows of the process: Software process workflows, Iteration workflows. Check Points of The process

More information

Feature Articles: Software Development Technologies

Feature Articles: Software Development Technologies Feature Articles: Software Development Technologies Research and development Software Development Standards and their Operations Abstract The Augmatiks Service Innovation Laboratories has made special

More information

Challenges of Managing a Testing Project: (A White Paper)

Challenges of Managing a Testing Project: (A White Paper) Challenges of Managing a Testing Project: () Page 1 of 20 Vinod Kumar Suvarna Introduction Testing is expected to consume 30 50 % of the Project Effort, Still properly managing testing project is not considered

More information

Before we begin, let s talk briefly about why GIS data quality is important.

Before we begin, let s talk briefly about why GIS data quality is important. 1 2 Before we begin, let s talk briefly about why GIS data quality is important. Regardless of whether you are producing or consuming GIS data, it is important that the data you use meets some agreed upon

More information

6.1 Introduction Objective Acceptance Testing CHAPTER 7: Black Box Testing Introduction Objectives...

6.1 Introduction Objective Acceptance Testing CHAPTER 7: Black Box Testing Introduction Objectives... This course provides a highly practical bottom-up introduction to software testing and quality assurance. Each organization performs testing and quality assurance activities in different ways. This course

More information

Testing and Quality Assurance Techniques

Testing and Quality Assurance Techniques Testing and Quality Assurance Techniques Sandy Sorkin Coastal Technologies 615 Valley Road - Upper Montclair, NJ 07043 (973) 744-2900 - Fax (973) 744-2129 www.coastaltech.com 1998 Coastal Technologies

More information

SPARK Forms Builder Service Subscription SOFTWARE SUPPORT AND MAINTENANCE AGREEMENT

SPARK Forms Builder Service Subscription SOFTWARE SUPPORT AND MAINTENANCE AGREEMENT 1. OVERVIEW SPARK Forms Builder Service Subscription SOFTWARE SUPPORT AND MAINTENANCE AGREEMENT This Software Support and Maintenance Agreement ("Agreement") sets forth the terms and conditions which ITLAQ

More information

Validation and Automated Validation

Validation and Automated Validation TOP INDUSTRY QUESTIONS Validation and Automated Validation 1 Table of Contents 03 04 07 10 13 16 19 INTRODUCTION SECTION 1 - Validation Standards How is validation defined under Title 21 CFR Part 11? What

More information

NetVault Backup System Administration Complete Instructorled

NetVault Backup System Administration Complete Instructorled NetVault Backup System Administration Complete Instructorled Training The NetVault Backup System Administration Complete Instructor-led training course is designed to instruct students on the essentials

More information

SC119 Umoja Plant Maintenance Overview. Umoja Plant Maintenance Overview Version 7 1

SC119 Umoja Plant Maintenance Overview. Umoja Plant Maintenance Overview Version 7 1 SC119 Umoja Plant Maintenance Overview Umoja Plant Maintenance Overview Version 7 Last Copyright Modified: 20 United February, Nations 2015 1 Agenda Course Introduction Module 1: Plant Maintenance Overview

More information

Australia and New Zealand Testing Board. Testing as a Service. Carol Cornelius ANZTB Capital Quality Consulting

Australia and New Zealand Testing Board. Testing as a Service. Carol Cornelius ANZTB Capital Quality Consulting Testing as a Service TaaS Carol Cornelius ANZTB Capital Quality Consulting Testing as a Service - Forrester Sourcing professionals are moving away from their historic emphasis on staff augmentation in

More information

Oh No, DevOps is Tough to Implement!

Oh No, DevOps is Tough to Implement! [DISTRIBUTION STATEMENT Please copy and paste the appropriate distribution statement into this space.] Oh No, DevOps is Tough to Implement! Hasan Yasar Copyright 2018 Carnegie Mellon University. All Rights

More information

Test Metrics: A Practical Approach to Tracking & Interpretation

Test Metrics: A Practical Approach to Tracking & Interpretation Test Metrics: A Practical Approach to Tracking & Interpretation Prepared By: Shaun Bradshaw Director of Quality Solutions Questcon Technologies Abstract It is often said, You cannot improve what you cannot

More information

THIS IS ONLY MODEL RESUME - DO NOT COPY AND PASTE INTO YOUR RESUME. WE ARE NOT RESPONSIBLE. Name: xxxxxx ID: xxxxxx Ph: xxxxxx

THIS IS ONLY MODEL RESUME - DO NOT COPY AND PASTE INTO YOUR RESUME. WE ARE NOT RESPONSIBLE. Name: xxxxxx  ID: xxxxxx Ph: xxxxxx Name: xxxxxx Email ID: xxxxxx Ph: xxxxxx TECHNICAL SUMMARY: Having 9 years of experience in Information Technology in Project Life cycle and QA testing life cycle. Quality Assurance: Reviewing and converting

More information

Data Warehousing provides easy access

Data Warehousing provides easy access Data Warehouse Process Data Warehousing provides easy access to the right data at the right time to the right users so that the right business decisions can be made. The Data Warehouse Process is a prescription

More information

DORNERWORKS QUALITY SYSTEM

DORNERWORKS QUALITY SYSTEM DORNERWORKS QUALITY SYSTEM ALIGNMENT WITH CMMI INTRODUCTION Since its beginning, DornerWorks has had quality as one of our main goals. We have delivered solutions for over a dozen aircraft, including several

More information

ALM120 Application Lifecycle Management 11.5 Essentials

ALM120 Application Lifecycle Management 11.5 Essentials ALM120 Application Lifecycle Management 11.5 Essentials Instructor-Led Workshop OVERVIEW This course provides the tools you need to implement and use Application Lifecycle Management 11.50. Students learn

More information

PMP Exam Prep Coaching Program

PMP Exam Prep Coaching Program PMP Exam Prep Coaching Program Project Management 1 Project Management Develop Project Charter Develop Project Management Plan Direct and Manage Project Work Monitor and Control Project Work Close Project

More information

Asset Manager 9.3 Upgrade

Asset Manager 9.3 Upgrade Asset Manager 9.3 Upgrade Marla Hay, Mentor Graphics Richard VanderHoek, Evergreen Consulting VIVIT Webinar January 31 st, 2012 Agenda Introduction Mentor Graphics/Evergreen Asset Management at Mentor

More information

A Guide to the Business Analysis Body of Knowledge (BABOK Guide), Version 2.0 Skillport

A Guide to the Business Analysis Body of Knowledge (BABOK Guide), Version 2.0 Skillport A Guide to the Business Analysis Body of Knowledge (BABOK Guide), Version 2.0 by The International Institute of Business Analysis (IIBA) International Institute of Business Analysis. (c) 2009. Copying

More information