CIPS Exam Report for Learner Community:

Size: px
Start display at page:

Download "CIPS Exam Report for Learner Community:"

Transcription

1 CIPS Exam Report for Learner Community: Qualification: Professional diploma in procurement and supply Unit: PD5 - Programme and project management Exam series: Nov 2016 Each element of a question carries equal weighting unless otherwise stated. Question 1 (a) Learning Outcome 1 Describe the differences between leadership and management in the context of programmes and projects. 12 marks Learning outcome addressed: 1.3 Command word explanation: Describe give a full account of something The question required candidates to describe the differences between leadership and management in the context of programmes or projects. Candidates often started by acknowledgment that a key resource in any project are people. This can be in the project team or the supply chain and they will have to be managed and led. A project manager can be described as the person responsible for directing and coordinating human and material resources, but this definition tends to focus on the administrative aspects of project work. However, there is a distinction between the style of leaders and managers according to their primary focus. The respective positions of leaders and managers on a number of issues are shown below. It is a well-known truism that leadership focuses on doing "the right things" while managers focus on doing "the things right", and many candidates will cite this. The course book gives the following definition: Management is the process through which efforts of members of the organisation are co-ordinated, directed and guided to the achievement of organisational goals: the clarification of objectives, planning, organising, directing and controlling other people s work. Leadership is a relationship through which one person influences behaviour and actions of people. Noteworthy that the terms are frequently used interchangeably and there is a myriad of different academic views and variation in definition. NOV16_PD5_EXAM REPORT _LEARNER_COMMUNITY_FV 1/11

2 Kotter suggests that management involves: Planning and budgeting Organising and Staffing Controlling and Problem Solving David Boddy summarises the differences between leadership and management getting things done (management) bringing innovation (leader) i.e. leadership is about where we are going and management is about how we get there. Managing a Project Most writers on project management involve the following: Goals and objectives Telling how and when Shorter range Organisation and structure Autocracy Restraining Maintaining Conforming Imitating Administrating Managing and controlling Procedures Consistency Risk Avoidance Bottom line Leadership on projects Similarly most writers on project management agree that leaders focus on the following in relation to projects: Vision Selling what and why Longer range People Democracy Enabling Developing Challenging Originating Innovating Inspiring Trust Policy Flexibility Risk-opportunity Top line NOV16_PD5_EXAM REPORT _LEARNER_COMMUNITY_FV 2/11

3 Examples of content for merit/distinction grade answers: Better candidates would consider each role and highlight the differences between them. Succinct and accurate definitions of both Following instruction of the question to link to a context of programmes and projects Examples of poorer content/ poorer approaches in answers: Basic description given only Very generic/irrelevant discussion material Not providing technically correct definitions Not following the command word and no evidence of distinguishing Concluding comment: Generally answered fairly well, few distinction answers, with most candidates able to describe the two concepts with a degree of differentiation. There were few candidates who actually, as per the question, explicitly linked to a context of programmes or projects and thus few very high marks. Question 1 (b) Learning Outcome 1 Assess the advantages and disadvantages using project management software in the management of projects. 13 marks Learning outcome addressed: 1.3 Command word explanation: Assess evaluate or judge the importance of something The question required candidates to assess the advantages and disadvantages of using project management software in the management of projects. Project management software can hold detailed project plans in the form of Gantt charts and network diagrams, CPA, budgetary information and facilitate the creation, update and distribution of project plans and status reports such as planned v. actual comparisons. The software can be used to breakdown the content of each project phase into low level work packages/tasks which can be scheduled and resourced at a detailed operational level. Once the relevant data is entered it can provide weekly task lists and create critical paths. It will also help in the allocation of resources, setting start and completion dates and calculating the expected time to complete the various aspects of the individual tasks. NOV16_PD5_EXAM REPORT _LEARNER_COMMUNITY_FV 3/11

4 The software can also offer contingency planning and what if analysis, allowing the review and communication of different solutions. Any agreed schedule changes can be communicated quickly to participants and stakeholders. Shared access to project plans and information can be arranged. The software can help in the production of attractive reports and professional print-outs, to update stakeholders with the appropriate level of detail. Financial/budget and control features of project software will assist at the various stages of the project life cycle, so that actual costs can be compared with budget costs, at the end of the project, it will be useful in providing completion reports. However the use of software comes with a cost. Depending on the complexity of the project there will be a training, licensing, maintenance and time cost. Often a third party input will be required which again can prove expensive. Candidates who developed credible points not mentioned above were credited accordingly. Examples of content for merit/distinction grade answers: Covering advantages and disadvantages Following the command word to develop the assessment within the answer Use of practical examples /personal experience Examples of poorer content/ poorer approaches in answers: Basic overview given Use of bullet points providing only an abstract list Not following the command word Concluding comment: This question on the whole was well tackled with the majority of candidates seemingly comfortable to tackle the question and combine both theory and personal experience. In a small number of submissions very short or bullet answers limited mark award. Some examples of very deep and thorough knowledge in this area. NOV16_PD5_EXAM REPORT _LEARNER_COMMUNITY_FV 4/11

5 Question 2 Learning Outcome 2 An organisation is considering building a new facility. 25 marks Assess THREE different forms of investment appraisal that could be applied in the business case for the new facility. Learning outcome addressed: 2.4 Command word explanation: Assess evaluate or judge the importance of something Candidates were required to assess THREE different forms of investment appraisal. These typically included: Payback analysis: this assesses the time period that is required to pay back the initial investment. The method works by evaluating the inflows of funds, such as the increased profits that can be achieved from the investment and netting these inflows against the expenditures made. The effect of using the payback criterion is that it gives preference to projects which pay back quickly, even if other projects offer better returns in the long term. The average rate of return: This is another relatively simple method to evaluate investment decisions and calculates the average rate of return earned by the money invested. The drawback of the ARR method is that it takes no account of the timing of cashflows. Later cashflows are more speculative than earlier ones, but all are given equal weight in the ARR calculation. Net present value: In this method, the estimated net cashflows for each year are estimated and the appropriate discount factor is applied to calculate the present values of all cashflows over the life of the projects. By totalling these, it is possible to arrive at the net present value (NPV) of the project. A positive NPV will mean that the project will earn a higher level of interest or return than the chosen discount rate. Internal rate of return: The discount rate at which a zero NPV occurs is called the internal rate of return (IRR) of a project. Effectively, this rate can be used as a way of deciding for or against an investment project. Under this method, the higher a project's internal rate of return, the more desirable it is to undertake the project. As such, IRR can be used to rank several prospective projects an organisation is considering. Assuming all other factors are equal among the various projects, the project with the highest IRR would probably be considered the best and undertaken first. Examples of content for merit/distinction grade answers: Ability to provide three types of investment appraisal Setting a relevant context and providing for worked examples NOV16_PD5_EXAM REPORT _LEARNER_COMMUNITY_FV 5/11

6 Examples of poorer content/ poorer approaches in answers: Basic description given only Not providing technically correct answers Not following the command word and no evidence of assessment Total confusion and providing for contracting strategies instead of forms of investment appraisal Incorrect arithmetic in examples Concluding comment: This question gave very mixed responses. Some candidates were able to cover the varying characteristics of three forms of investment appraisal. Some gave context, some didn t. Some candidates only managed one accurate form. Some totally misunderstood the question and answered a question not set on entirely different parts of the syllabus. Overall, those who identified the topic correctly tended to achieve a pass award. Few very strong answers. Question 3 Learning Outcome 3 Explain what is meant by sustainability and suggest how project and programme managers could build sustainability into major projects. 25 marks Learning outcome addressed: 3.2 Command word explanation: Explain give reasons for or account for something The question was designed to assess knowledge of sustainability in a procurement and supply context and a programme and project context. Firstly an explanation of sustainability was required of which there are many; CIPS, EU and WCED all have definitions and providing something like sustainability is often defined as managing the triple bottom line - a process by which companies manage their financial, social and environmental risks, obligations and opportunities. These three impacts are sometimes referred to as profits, people and planet. If used marks were awarded, as were any links to project management in the explanation. There are a number of best practices that foster sustainability, and help organisations move along the path from laggards to leaders. In project management terms these could be; Project Stakeholder Engagement: Organisations can learn from customers, employees and their surrounding community. Engagement is not only about pushing out messages, but understanding opposition, finding common ground and involving stakeholders in joint decision-making within projects; Environmental management systems: These systems provide the structures and processes that help embed environmental efficiency into a firm s culture and mitigate risks once the project is complete. The most widely NOV16_PD5_EXAM REPORT _LEARNER_COMMUNITY_FV 6/11

7 recognized standard worldwide is ISO 14001, but numerous other industry-specific and country-specific standards exist; Reporting and disclosure: Measurement and control are at the heart of instituting sustainable practices. Not only can organisations collect and collate the information, they can also be entirely transparent with outsiders. The Global Reporting Initiative is one of many examples of well-recognised reporting standards; Life cycle analysis: Those organisations wanting to take a large leap forward should systematically analyse the environmental and social impact of the products they use and produce through life cycle analysis, which measure impacts more accurately. Organisations that are sustainable have been shown to attract and retain employees more easily and experience less financial and reputation risk. These organisations are also more innovative and adaptive to their environments in their projects. All of the above can have direct links to building sustainability into projects; however candidates could also have mentioned the 4 Rs, standards from the construction industry (BREEAM etc) and given an example such as the Olympic games of The concepts of sustainability have only recently been linked to projects and project management. Projects are defined as temporary organisations that deliver (any kind of) change to organisations, products, services, business processes, policies or assets. Projects can make a contribution to the sustainable development of organizations. It should therefore be expected that the concepts of sustainability are reflected in projects and project management. And although some aspects of sustainability are found in the various standards of project management, it has to be concluded that the integration of sustainability in projects and project management is not fully recognised yet. The emerging studies on the integration of the concepts of sustainability in projects and project management point out that although the actual responsibility for sustainability may differ by project, the project manager always will have a decisive or influencing role. The project management profession should therefore also take responsibility for a more sustainable future. Candidates sometimes concluded that there is still a lot of work to be done on the implications of Sustainable Project Management and that there is a growing need of expertise, criteria and concepts to practically implement the concept in the management of projects. Examples of content for merit/distinction grade answers: Explanation of the concept and set into context Evidence of insight or experience of sustainability projects Examples of poorer content/ poorer approaches in answers: Basic description given only Expansive response with highly irrelevant content Not following the command word NOV16_PD5_EXAM REPORT _LEARNER_COMMUNITY_FV 7/11

8 Concluding comment: This question was answered well by the majority with a very high pass rate. A few candidates approached by writing everything they knew seemingly about procurement projects generally and as a result after covering their core content invested a lot of time and effort drifting into less to not relevant material. Question 4 (a) Learning Outcome 4 A project for the construction of a new airport is 30% more expensive than was first estimated. Propose a range of techniques that could have been applied to achieve realistic estimated costs for such a project. 13 marks Learning outcome addressed: 4.2 Command word explanation: Propose put forward an arguement or suggestion for consideration The question required candidates to propose a range of techniques that can be applied to achieve realistic estimated costs. The answers could be drawn from the following, although other techniques were proposed: Budgets play an important role in the management of organisations and should be accurate to guide decision making and to track progress. The cost estimates used to prepare budgets applied in a project require accurate data, and the costs of the supply chain make a significant proportion of any budget due to the reliance on external suppliers to provide products and services. The budget will often be a key constraint in any project as there will almost always be a limit to the amount of money available for the project. Budgets can be created in either a top down or bottom up. Projects can adopt the use of work element costing. Under this approach, each element of work and the cost of resources are estimated. In a similar method that is adopted to calculate a critical path or Gantt chart, the project will be broken down into separate activities. Suppliers can be contacted to establish the estimated costs of a project. For producing the estimated costing, suppliers can use a variety of costing information consisting of: Material costings: Material costs will be based on the specifications created for the project. There will be estimates of the quantities of materials required together with their pricing. A contractor that is presenting a price for an activity will be reliant on accurate data from their suppliers for any purchased materials. The value of the activity is therefore calculated by the multiplying of the quantities by the prices for the materials. NOV16_PD5_EXAM REPORT _LEARNER_COMMUNITY_FV 8/11

9 Labour costings: Each activity will comprise of operations and each operation will have been subjected to study and allowed times calculated. In the case of new work for which there is no data, predicted times for the work will be estimated. The calculation of labour costs will consist of the multiplication of estimated labour hours by the rates chargeable for different grades of labour. In addition to the labour costs, other direct costs associated with the project that involve people can be added to the budget. These can include travel and subsistence costs, which can often be significant. Overhead rates: Overheads which cover the indirect costs incurred by suppliers in the performance of project should also be estimated. Separate variable and fixed overhead rates may be established and apportioned to the cost of the activity. It was also relevant to propose the use of life cycle costing (LCC). LCC has primarily focused on the costs associated with capital or fixed assets and its aim has been to go beyond the prices quoted for the asset, as a more accurate view of the assets total costs and will take account of the costs associated with its use, its maintenance and its disposal over its lifetime. Examples of content for merit/distinction grade answers: Providing for a range of techniques Providing a good breadth of the explanation of the techniques proposed Use of examples (sometimes drawn from personal experience) Setting the answer in the context of the questions introduction Examples of poorer content/ poorer approaches in answers: Basic description given only No providing a range of techniques Lack of relevance to the context Concluding comment: Generally answered fairly well, a number of distinction answers, with most candidates able to describe a few techniques and some providing a very expansive list indeed. This was therefore a positively received question and some fresh and worthy techniques awarded marks as well as the more obvious points covered. NOV16_PD5_EXAM REPORT _LEARNER_COMMUNITY_FV 9/11

10 Question 4 (b) Learning Outcome 4 Review the use of value engineering and/or value analysis to manage the escalating costs of a project. 12 marks Learning outcome addressed: 4.1 Command word explanation: Review Examine and assess a subject critically This question required candidates to review the application of value engineering or value analysis to manage the escalating costs a project. A vital element of strategic cost management is value engineering. Rather than focusing on the ongoing costs of an asset as LCC focuses on, the purpose of value engineering is to try and reduce costs, and prevent any unnecessary costs before carrying out a project. Value analysis refers to the process of cost reduction once products or services have been introduced to a project. Value engineering is defined as systematic approach to enhancing the value of a project by seeking optimal design solutions, thereby reducing unnecessary cost, whilst maintaining and enhancing all aspects of quality and function. The designs of major projects are inherently complex and an optimal solution to each aspect of design is not always found. This potentially gives rise to unnecessary cost (comprising all aspects of cost, including time). VE therefore seeks to identify the optimal design solution in terms of the Project Brief and to seek out and eliminate any unnecessary cost, without in any way diminishing function and quality aspects, thereby increasing its value. Unnecessary cost can be considered under five general headings: A. Unnecessary costs of design. B. Unnecessary cost of a component. C. Unnecessary cost of a material. D. Unnecessary cost of poor buildability E. Unnecessary life cycle cost VE is typically implemented through a structured analytical system carried out by a VE Team. The team may be formed from key members of the project team which can include suppliers or contractors. Both VE and Life Cycle Costing (LCC) seek to achieve value for money outcomes and there are similarities in the two techniques. VE focuses on the realisation of benefits by reviewing existing design solutions from the perspective of value, LCC focuses on the total cost of ownership, from initial purchase through to final disposal and replacement. Good candidates illustrated their answers with suitable examples from projects or programmes. NOV16_PD5_EXAM REPORT _LEARNER_COMMUNITY_FV 10/11

11 Examples of content for merit/distinction grade answers: Succinct and accurate definition(s) Illustrating answers with suitable examples Use of headings to build answer to show where costs could be removed Examples of poorer content/ poorer approaches in answers: Basic description given only as opposed to a review Not providing technically correct definition(s) Some not attempting question at all or answering a completely different question with not link whatsoever Concluding comment: Generally candidates tackled this to a satisfactory standard and there were a few very robust answers given. Some papers were very weak on relevant content and thus did not score beyond a bare pass or indeed weren t able to achieve a pass mark. NOV16_PD5_EXAM REPORT _LEARNER_COMMUNITY_FV 11/11

CIPS Exam Report for Learner Community:

CIPS Exam Report for Learner Community: CIPS Exam Report for Learner Community: Qualification: Diploma in Procurement and Supply Unit: D2: Business Needs in Procurement and Supply Exam series: November 2016 Question 1 Learning Outcome 1 Q1(a)

More information

CIPS Exam Report for Learner Community:

CIPS Exam Report for Learner Community: CIPS Exam Report for Learner Community: Qualification: Advanced diploma in procurement and supply Unit: AD2 - Managing risks in supply chains Exam series: March, 2016 Question 1 - Learning Outcome 1.4

More information

CIPS Exam Report for Learner Community:

CIPS Exam Report for Learner Community: CIPS Exam Report for Learner Community: Qualification: Advanced diploma in procurement and supply Unit: AD3 - Improving the competitiveness of supply chains Exam series: Nov 2016 Each element of a question

More information

CIPS Exam Report for Learner Community:

CIPS Exam Report for Learner Community: CIPS Exam Report for Learner Community: Qualification: Advanced diploma in procurement and supply Unit: AD4 - Category management in P&S Exam series: July 2016 Each element of a question carries equal

More information

CIPS Exam Report for Learner Community:

CIPS Exam Report for Learner Community: CIPS Exam Report for Learner Community: Qualification: Professional diploma in procurement and supply Unit: PD4 - Supply chain diligence Exam series: May 2016 Each element of a question carries equal weighting

More information

CIPS Exam Report for Learner Community:

CIPS Exam Report for Learner Community: CIPS Exam Report for Learner Community: Qualification: Diploma Unit: D4 Negotiating and contracting in procurement and supply Exam series: March 2016 Question 1 Learning Outcome 1 (a) Discuss TWO key performance

More information

CIPS Exam Report for Learner Community:

CIPS Exam Report for Learner Community: CIPS Exam Report for Learner Community: Qualification: Advanced diploma in procurement and supply Unit: AD4 - Category management in P&S Exam series: Nov 2016 Each element of a question carries equal weighting

More information

Supply chain management theory, NQF level 6, Credits 10

Supply chain management theory, NQF level 6, Credits 10 SUPPLY CHAIN MANAGER Knowledge modules 132401-001-01-00 KM-01 Supply chain theory, NQF level 6, Credits 10 132401-001-01-00 KM-02 Supply chain service delivery operational planning, NQF level 6, Credits

More information

Advanced Higher Accounting Course Assessment Specification (C700 77)

Advanced Higher Accounting Course Assessment Specification (C700 77) Advanced Higher Accounting Course Assessment Specification (C700 77) Valid from May 2015 This edition: May 2015, version 2.1 This specification may be reproduced in whole or in part for educational purposes

More information

Paper P6 Management Accounting Business Strategy Post Exam Guide May 2007 Examination

Paper P6 Management Accounting Business Strategy Post Exam Guide May 2007 Examination General Comments This examination paper is designed to test the candidates ability to demonstrate their understanding and application of the following key syllabus areas: The evaluation of a product portfolio

More information

CIPS Exam Report for Learner Community:

CIPS Exam Report for Learner Community: CIPS Exam Report for Learner Community: Qualification: Diploma in Procurement and Supply Unit: D1 Contexts of Procurement and Supply Exam series: July 2017 Each element of a question carries equal weighting

More information

CARIBBEAN EXAMINATIONS COUNCIL REPORT ON CANDIDATES WORK IN THE CARIBBEAN ADVANCED PROFICIENCY EXAMINATION MAY/JUNE 2012 MANAGEMENT OF BUSINESS

CARIBBEAN EXAMINATIONS COUNCIL REPORT ON CANDIDATES WORK IN THE CARIBBEAN ADVANCED PROFICIENCY EXAMINATION MAY/JUNE 2012 MANAGEMENT OF BUSINESS CARIBBEAN EXAMINATIONS COUNCIL REPORT ON CANDIDATES WORK IN THE CARIBBEAN ADVANCED PROFICIENCY EXAMINATION MAY/JUNE 2012 MANAGEMENT OF BUSINESS Copyright 2012 Caribbean Examinations Council St Michael,

More information

This examination paper is designed to test candidates ability to demonstrate their understanding and application of the following key syllabus areas:

This examination paper is designed to test candidates ability to demonstrate their understanding and application of the following key syllabus areas: General Comments This examination paper is designed to test candidates ability to demonstrate their understanding and application of the following key syllabus areas: Identify the impact of electronic

More information

Graduate Diploma in Purchasing and Supply. Public Sector Stakeholders and Governance L6-14 LEVEL 6. Senior Assessor s Examination Report

Graduate Diploma in Purchasing and Supply. Public Sector Stakeholders and Governance L6-14 LEVEL 6. Senior Assessor s Examination Report Graduate Diploma in Purchasing and Supply Public Sector Stakeholders and Governance L6-14 LEVEL 6 Senior Assessor s Examination Report November 2009 SECTION A Taking the role of the head of procurement

More information

Level 5 NVQ Diploma in Management and Leadership Complete

Level 5 NVQ Diploma in Management and Leadership Complete Learner Achievement Portfolio Level 5 NVQ Diploma in Management and Leadership Complete Qualification Accreditation Number: 601/3550/5 Version AIQ004461 Active IQ wishes to emphasise that whilst every

More information

CIPS Exam Report for Learner Community:

CIPS Exam Report for Learner Community: CIPS Exam Report for Learner Community: Qualification: Diploma in Procurement and Supply Unit: Contexts of Procurement and Supply Exam series: November 2016 Each element of a question carries equal weighting

More information

Qualification Specification 601/3691/1 icq Level 5 NVQ Diploma in Management and Leadership (RQF)

Qualification Specification 601/3691/1 icq Level 5 NVQ Diploma in Management and Leadership (RQF) Qualification Specification 601/3691/1 icq Level 5 NVQ Diploma in Management and Leadership (RQF) Qualification Details Title : icq Level 5 NVQ Diploma in Management and Leadership (RQF) Awarding Organisation

More information

Level 5 NVQ Diploma in Management and Leadership. Qualification Specification

Level 5 NVQ Diploma in Management and Leadership. Qualification Specification Level 5 NVQ Diploma in Management and Leadership Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification structure 4 Centre requirements 6 Support for

More information

CIPS Exam Report for Learner Community:

CIPS Exam Report for Learner Community: CIPS Exam Report for Learner Community: Qualification: Advanced certificate in procurement and supply operations Unit: AC3 - P&S Workflow Exam series: Nov 2016 Each element of a question carries equal

More information

The senior assessor s report aims to provide the following information: An indication of how to approach the examination question

The senior assessor s report aims to provide the following information: An indication of how to approach the examination question INFORMATION FOR CANDIDATES The senior assessor s report is written in order to provide candidates with feedback relating to the examination. It is designed as a tool for candidates - both those who have

More information

BIIAB Unit Pack. BIIAB Level 3 NVQ Diploma in Sales (QCF) 601/6785/3

BIIAB Unit Pack. BIIAB Level 3 NVQ Diploma in Sales (QCF) 601/6785/3 BIIAB Unit Pack BIIAB NVQ Diploma in Sales (QCF) 601/6785/3 Version 1 BIIAB September 2015 www.biiab.org Contents CFAQ5 R/502/8601 Meeting customers after sales needs CFAQ11 R/502/8615 Obtaining and analysing

More information

Diploma in Public Service Leadership. Syllabus

Diploma in Public Service Leadership. Syllabus Diploma in Public Service Leadership Syllabus 2015-16 Sept 2015 Contents Summary of Diploma in Public Service Leadership Page Key Benefits 3 Accreditation 4 Assessment 4 Fees & Funding 4 Frequently Asked

More information

Level 7 Strategic Management and Leadership (QCF)

Level 7 Strategic Management and Leadership (QCF) Centre Assessment Guidance for Level 7 Strategic Management and Leadership (QCF) Version 2 Contents Page Introduction 3 About these qualifications Titles and qualifications reference numbers 3 Accreditation

More information

CIPS Exam Report for Learner Community:

CIPS Exam Report for Learner Community: CIPS Exam Report for Learner Community: Qualification: Advanced diploma in procurement and supply Unit: AD1 - Management in P&S Exam series: Jan 2017 Each element of a question carries equal weighting

More information

Operations/ Departmental Manager Apprenticeship. Assessment Plan

Operations/ Departmental Manager Apprenticeship. Assessment Plan Operations/ Departmental Manager Apprenticeship Assessment Plan Contents Introduction 1. Summary of Assessment 2. Assessment Overview 3. On-programme Assessment 4. Assessment Gateway 5. End Point Assessment

More information

Foundation Diploma in Purchasing and Supply. Purchasing Contexts L4-05 LEVEL 4. Senior Assessor s Report

Foundation Diploma in Purchasing and Supply. Purchasing Contexts L4-05 LEVEL 4. Senior Assessor s Report Foundation Diploma in Purchasing and Supply Purchasing Contexts L4-05 LEVEL 4 Senior Assessor s Report May 2009 INTRODUCTION All four questions were based on a private limited company called Style of the

More information

CIPS Exam Report for Learner Community:

CIPS Exam Report for Learner Community: CIPS Exam Report for Learner Community: Qualification: Diploma Unit: Negotiating and contracting in procurement and supply Exam series: May 2016 Each element of a question carries equal weighting unless

More information

Recruitment pack LEWISHAM HOMES TWITTER LINKEDIN ONLINE PHONE. lewishamhomes.org.uk/ careers. bit.

Recruitment pack LEWISHAM HOMES TWITTER LINKEDIN  ONLINE PHONE. lewishamhomes.org.uk/ careers. bit. Recruitment pack LEWISHAM HOMES PHONE 0800 028 2 028 or 020 8613 4000 ONLINE lewishamhomes.org.uk/ careers EMAIL hr@lewishamhomes.org.uk TWITTER # lewishamhomes LINKEDIN bit.ly/lhlinked RECRUITMENT PACK

More information

The following points should be noted by candidates when reflecting on the paper just taken, and when preparing for future CIMA examinations:

The following points should be noted by candidates when reflecting on the paper just taken, and when preparing for future CIMA examinations: General Comments It is disappointing to report that the overall performance was poor. The paper included topics that have appeared in several recent papers and candidates who had worked through these papers

More information

Achieve. Performance objectives

Achieve. Performance objectives Achieve Performance objectives Performance objectives are benchmarks of effective performance that describe the types of work activities students and affiliates will be involved in as trainee accountants.

More information

Achieve. FPER Performance objectives

Achieve. FPER Performance objectives Achieve FPER Performance objectives Performance objectives are benchmarks of effective performance that describe the types of work activities trainees will be involved in as certified accounting technicians

More information

CIPS Exam Report for Learner Community:

CIPS Exam Report for Learner Community: CIPS Exam Report for Learner Community: Qualification: Advanced certificate in procurement and supply operations Unit: AD3 - Improving the competitiveness of supply chains Exam series: November 2015 Question

More information

ILM Level 5 NVQ Diploma in Management and Leadership (QCF) 601/3254/1

ILM Level 5 NVQ Diploma in Management and Leadership (QCF) 601/3254/1 ILM Level 5 NVQ Diploma in Management and Leadership (QCF) 601/3254/1 Contents Page Qualification Overview: ILM Level 5 NVQ Diploma in Management 3 and Leadership Mandatory Units Group A Specifications

More information

Carbon Management Plan. Executive Summary

Carbon Management Plan. Executive Summary Carbon Management Plan Executive Summary Carbon Management Plan Executive Summary 2 3 Image cover: Law school University of Leeds. BREEAM rated "very good". Foreword from the Vice-Chancellor We must act

More information

For Portfolio, Programme, Project, Risk and Service Management. APMP for PRINCE2 Practitioners Graham Williams, Principle Consultant, GSW Consulting

For Portfolio, Programme, Project, Risk and Service Management. APMP for PRINCE2 Practitioners Graham Williams, Principle Consultant, GSW Consulting For Portfolio, Programme, Project, Risk and Service Management for Practitioners Graham Williams, Principle Consultant, GSW Consulting White Paper January 2010 2 for Practioners 2009 Introduction The main

More information

BIS Research & Evaluation Framework. Guide for Buyers

BIS Research & Evaluation Framework. Guide for Buyers BIS Research & Evaluation Framework Guide for Buyers Framework reference: CR150025BIS BIS Research & Evaluation Framework: Guide for Buyers Update 22 June 2016 1 P age Research & Evaluation Framework Contract

More information

ASSOCIATION OF ACCOUNTING TECHNICIANS OF SRI LANKA. Examiner's Report AA3 EXAMINATION - JANUARY 2018 (AA32) MANAGEMENT ACCOUNTING AND FINANCE

ASSOCIATION OF ACCOUNTING TECHNICIANS OF SRI LANKA. Examiner's Report AA3 EXAMINATION - JANUARY 2018 (AA32) MANAGEMENT ACCOUNTING AND FINANCE OVERVIEW: ASSOCIATION OF ACCOUNTING TECHNICIANS OF SRI LANKA Examiner's Report AA3 EXAMINATION - JANUARY 2018 (AA32) MANAGEMENT ACCOUNTING AND FINANCE This paper has three sections covering 100 marks,

More information

CIPS Exam Report for Learner Community:

CIPS Exam Report for Learner Community: CIPS Exam Report for Learner Community: Qualification: Professional diploma in procurement and supply Unit: PD2 - Corporate and business stratergy Exam series: January 2016 Question 1 Learning Outcome

More information

QUALIFICATION HANDBOOK

QUALIFICATION HANDBOOK QUALIFICATION HANDBOOK Level 4 NVQ Diploma in Spectator Safety Management (6852-04) October 2011 Version 1.0 Qualification at a glance Subject area City & Guilds number 6852 Spectator Safety Age group

More information

executive acumen programme Leading to the ILM Level 5 Diploma in Leadership and Management

executive acumen programme Leading to the ILM Level 5 Diploma in Leadership and Management executive acumen programme Leading to the ILM Level 5 Diploma in Leadership and Management Our approach We are a passionate coaching company who aim to help everyone achieve their potential. Everything

More information

APM Project Management Qualification

APM Project Management Qualification for PRINCE2 Practitioners APM Project Management Qualification for PRINCE2 Practitioners Syllabus, learning outcomes and assessment criteria aligned to the APM Body of Knowledge 6th edition The syllabus

More information

ASSOCIATION OF ACCOUNTING TECHNICIANS OF SRI LANKA EXAMINER'S REPORT AA2 EXAMINATION - JANUARY 2018 (AA22) COST ACCOUNTING AND REPORTING

ASSOCIATION OF ACCOUNTING TECHNICIANS OF SRI LANKA EXAMINER'S REPORT AA2 EXAMINATION - JANUARY 2018 (AA22) COST ACCOUNTING AND REPORTING ASSOCIATION OF ACCOUNTING TECHNICIANS OF SRI LANKA EXAMINER'S REPORT AA2 EXAMINATION - JANUARY 2018 (AA22) COST ACCOUNTING AND REPORTING The question paper consisted of 4 sections and 10 questions. This

More information

Examiner s report F5 Performance Management December 2017

Examiner s report F5 Performance Management December 2017 Examiner s report F5 Performance Management December 2017 General comments The F5 Performance Management exam is offered in both computer-based (CBE) and paper formats. The structure is the same in both

More information

APMP for PRINCE2 Practitioners The APM Project Management Qualification

APMP for PRINCE2 Practitioners The APM Project Management Qualification for PRINCE2 Practitioners APMP for PRINCE2 Practitioners The APM Project Management Qualification Syllabus, learning outcomes and assessment criteria aligned to the APM Body of Knowledge 6th edition The

More information

LEVEL 4. Foundation Diploma in Purchasing and Supply. Senior Assessor s Examination Report. May 2010 Series

LEVEL 4. Foundation Diploma in Purchasing and Supply. Senior Assessor s Examination Report. May 2010 Series Foundation Diploma in Purchasing and Supply Managing Purchasing and Supply Relationships L4-04 LEVEL 4 Senior Assessor s Examination Report May 2010 Series SECTION A Q1 Classify and describe each of the

More information

Course Report Business Management Level National 5

Course Report Business Management Level National 5 Course Report 2016 Subject Business Management Level National 5 The statistics used in this report have been compiled before the completion of any Post Results Services. This report provides information

More information

Duration Level Technology Delivery Method Training Credits

Duration Level Technology Delivery Method Training Credits MC-PRX Praxis Combined Summary Duration Level Technology Delivery Method Training Credits 5 Days Foundation and Practitioner Project Classroom ILT N/A Introduction The Praxis Framework provides guidance

More information

A marked improvement in the overall standard of work was shown for this session.

A marked improvement in the overall standard of work was shown for this session. Module report Level: Diploma in Professional Marketing Module: Strategic Marketing Please refer to the December 2015 assessment Most candidates produced a solid strategic plan using a SOSTAC (PR Smith)

More information

CIM Level 7 Marketing Leadership Programme

CIM Level 7 Marketing Leadership Programme Qualification Specification: CIM Level 7 Marketing Leadership Programme About CIM CIM (The Chartered Institute of Marketing) has been representing its members and the industry for over 100 years. A Royal

More information

Diploma in Management & Leadership. Syllabus

Diploma in Management & Leadership. Syllabus Diploma in Management & Leadership Syllabus 2015-16 Contents Summary of Diploma in Management & Leadership Page Accreditation 3 Fees & Funding 3 Assessment 3 Contact us 3 Workshop Outlines Unit S8001 Personal

More information

The senior assessor s report aims to provide the following information: An indication of how to approach the examination question

The senior assessor s report aims to provide the following information: An indication of how to approach the examination question INFORMATION FOR CANDIDATES The senior assessor s report is written in order to provide candidates with feedback relating to the examination. It is designed as a tool for candidates - both those who have

More information

Role Description Senior Project Manager; Design & Engineering/ISOC

Role Description Senior Project Manager; Design & Engineering/ISOC Role Description ; Design & Engineering/ISOC Reports To / Line Manager Responsible For Division Sub Division Department Team Location Purpose Of Role Snr Project Manager Delivery of Technology Projects/Workstreams.

More information

Supply Chain Specialist

Supply Chain Specialist Role Title Job Family Supply Chain Specialist Supply Chain Competency Level Pay Range / Scale Principal Officer/Manager PO6 Purpose To support the council s category management approach to procurement

More information

Certificate IV in Project Management Student Assessment Guide

Certificate IV in Project Management Student Assessment Guide Overview The assessment for the Certificate IV in Project Management comprises Team Assignment Development of a detailed Project Management Plan for chosen case study - 30% for blended classes Individual

More information

CIPS Exam Report for Learner Community:

CIPS Exam Report for Learner Community: CIPS Exam Report for Learner Community: Qualification: Professional diploma in procurement and supply Unit: PD4 - Supply chain diligence Exam series: January 2016 Question 1 Learning Outcome 1.3 Homeware,

More information

AUSTRALIAN ENGINEERING COMPETENCY STANDARDS STAGE 2 - EXPERIENCED PROFESSIONAL ENGINEER IN LEADERSHIP AND MANAGEMENT

AUSTRALIAN ENGINEERING COMPETENCY STANDARDS STAGE 2 - EXPERIENCED PROFESSIONAL ENGINEER IN LEADERSHIP AND MANAGEMENT AUSTRALIAN ENGINEERING COMPETENCY STANDARDS STAGE 2 - EXPERIENCED IN LEADERSHIP AND MANAGEMENT The Stage 2 Competency Standards are the profession's expression of the knowledge and skill base, engineering

More information

Level 7 Accountancy / Taxation Professional Apprenticeship

Level 7 Accountancy / Taxation Professional Apprenticeship Level 7 Accountancy / Taxation Professional Apprenticeship End-point assessment technical specification handbook Level 7 end-point assessment technical specification handbook 1 Contents 3 Introduction

More information

Level 3 NVQ Certificate in Management (QCF) Qualification Specification

Level 3 NVQ Certificate in Management (QCF) Qualification Specification Level 3 NVQ Certificate in Management (QCF) Qualification Specification Created: January 2012 Version: 1.0 Accreditation Number: 600/4473/1 Qualification Start Date: 1 st February 2012 Qualification Last

More information

Paper P2 Performance Management Post Exam Guide May 2010 Exam. General Comments

Paper P2 Performance Management Post Exam Guide May 2010 Exam. General Comments General Comments This was the first sitting for the new syllabus and the pass rate was comparable to the equivalent under the previous syllabus. The questions covered a large portion of the syllabus. The

More information

CIPS Exam Report for Learner Community:

CIPS Exam Report for Learner Community: CIPS Exam Report for Learner Community: Qualification: Diploma in procurement and supply Unit: D3 - Sourcing in P&S Exam series: January 2016 Question 1 Learning Outcome 1 a) Explain the term supplier

More information

Certificate in procurement and supply operations Unit content guide. Leading global excellence in procurement and supply

Certificate in procurement and supply operations Unit content guide. Leading global excellence in procurement and supply Certificate in procurement and supply operations Unit content guide Leading global excellence in procurement and supply Introduction The Chartered Institute of Procurement & Supply qualifications ladder

More information

Centre Assessment Guidance. for. CMI SCQF Level 6 First Line Management

Centre Assessment Guidance. for. CMI SCQF Level 6 First Line Management Centre Assessment Guidance for CMI SCQF Level 6 First Line Management Contents Page Introduction 3 About these qualifications 3 Titles and qualifications reference numbers 3 Accreditation dates 3 Qualifications

More information

LEVEL 4. Foundation Diploma in Purchasing and Supply. Senior Assessor s Report. Nov Measuring Purchasing Performance L4-03

LEVEL 4. Foundation Diploma in Purchasing and Supply. Senior Assessor s Report. Nov Measuring Purchasing Performance L4-03 Foundation Diploma in Purchasing and Supply Measuring Purchasing Performance L4-03 LEVEL 4 Senior Assessor s Report Nov 2008 L4-03/SA report/nov 2008 1 INFORMATION FOR CANDIDATES The senior assessor s

More information

Qualification Specification 601/3688/1 icq Level 3 Diploma in Management (RQF)

Qualification Specification 601/3688/1 icq Level 3 Diploma in Management (RQF) Qualification Specification 601/3688/1 icq Level 3 Diploma in Management (RQF) Qualification Details Title : icq Level 3 Diploma in Management (RQF) Awarding Organisation : ican Qualifications Limited

More information

GCSE EXAMINERS' REPORTS

GCSE EXAMINERS' REPORTS GCSE EXAMINERS' REPORTS BUSINESS STUDIES SUMMER 2016 Grade boundary information for this subject is available on the WJEC public website at: https://www.wjecservices.co.uk/marktoums/default.aspx?l=en Online

More information

Technical specifications for City & Guilds Level 7 NVQ Diploma in Strategic Management and Leadership (8624)

Technical specifications for City & Guilds Level 7 NVQ Diploma in Strategic Management and Leadership (8624) Technical specifications for City & Guilds Level 7 NVQ Diploma in Strategic Management and Leadership (8624) Version: 1.0 (March 2017) Version 1.0 (March 2017) Level 7 NVQ Diploma in Strategic Management

More information

Policy Skills Framework

Policy Skills Framework Policy Skills Framework Policy Skills Framework Developing Practising Expert/Leading *Click on boxes to open hyperlinks Policy Skills Framework The Policy Skills Framework (PSF) is a common description

More information

BEING A LEADER. Unit Level 3 Good Practice. Unit Number. Ofqual Reference Credit Value 6. Total Unit Time 60. Guided Learning Hours

BEING A LEADER. Unit Level 3 Good Practice. Unit Number. Ofqual Reference Credit Value 6. Total Unit Time 60. Guided Learning Hours Unit Level 3 Good Practice BEING A LEADER Unit Number Ofqual Reference Credit Value 6 Total Unit Time 60 Guided Learning Hours 3010V1 L/504/9012 25 CMI s Unique Selling Point (USP) is that our centres

More information

Annual Qualification Review

Annual Qualification Review LCCI International Qualifications Level 3 Certificate in Cost Accounting Annual Qualification Review 2011 For further information contact us: Tel. +44 (0) 8707 202909 Email. enquiries@ediplc.com www.lcci.org.uk

More information

Doncaster Council Data Quality Strategy

Doncaster Council Data Quality Strategy Doncaster Council Data Quality Strategy 2016/17-2020/21 Better Data, Better Services Approving Body Date of Approval Date of Implementation Next Review Date Review Responsibility Version Doncaster Council

More information

Examiners Report Feedback. January Pearson Edexcel International GCSE in Commerce (4CM0) Paper 1

Examiners Report Feedback. January Pearson Edexcel International GCSE in Commerce (4CM0) Paper 1 Examiners Report Feedback January 2016 Pearson Edexcel International GCSE in Commerce (4CM0) Paper 1 Edexcel and BTEC Qualifications Edexcel and BTEC qualifications are awarded by Pearson, the UK s largest

More information

Managing Costs and Finances (MA2) February 2014 to August 2015

Managing Costs and Finances (MA2) February 2014 to August 2015 Managing Costs and Finances (MA2) February 2014 to August 2015 This syllabus and study guide are designed to help with teaching and learning and is intended to provide detailed information on what could

More information

DEAF DIRECT: Performance Management Policy: April Performance Management Policy

DEAF DIRECT: Performance Management Policy: April Performance Management Policy Performance Management Policy 1 Contents Introduction Aims of the Performance Management Process Benefits of the Performance Management Process Key Principles of the Process Job Descriptions Planning Performance

More information

Our purpose, values and competencies

Our purpose, values and competencies Our purpose, values and competencies Last updated October 2013 The work we do and how we behave and carry out our work at The Pensions Regulator are driven by our purpose, values and competency framework.

More information

9707 Business Studies November 2008

9707 Business Studies November 2008 BUSINESS STUDIES 9707 Business Studies November 2008 Paper 9707/01 Short Answer/Essay General Comments This Paper proved to be accessible to most candidates although a significant number of candidates

More information

MANAGEMENT CASE STUDY NOVEMBER 2018 EXAM ANSWERS. Variant 2

MANAGEMENT CASE STUDY NOVEMBER 2018 EXAM ANSWERS. Variant 2 MANAGEMENT CASE STUDY NOVEMBER 2018 EXAM ANSWERS Variant 2 These answers have been provided by CIMA for information purposes only. The answers created are indicative of a response that could be given by

More information

Business Support Clerical Grade 5 Competencies. Introduction

Business Support Clerical Grade 5 Competencies. Introduction Business Support Clerical Grade 5 Competencies Introduction Competencies are the skills, knowledge, practical behaviours and attitudes which inform the way you operate in working life. Ulster s competency

More information

Examiner s report F5 Performance Management September 2016

Examiner s report F5 Performance Management September 2016 Examiner s report F5 Performance Management September 2016 General Comments The examination consisted of three sections. Section A contained 15 OT questions for 30 marks, Section B contained 3 OT cases

More information

Working to. Becoming professionally registered through the IET. Stephanie Smith Professional Registration Account Manager

Working to. Becoming professionally registered through the IET. Stephanie Smith Professional Registration Account Manager Working to engineer a better world Becoming professionally registered through the IET Stephanie Smith Professional Registration Account Manager 1 Agenda What next? The IET Application Form Professional

More information

General Certificate of Education examination - June series

General Certificate of Education examination - June series Version 1.0: 08.06 abc General Certificate of Education Economics 5141 ECN2 The National Economy Mark Scheme 2006 examination - June series Mark schemes are prepared by the Principal Examiner and considered,

More information

Level: Diploma in Professional Marketing. Module: Mastering Metrics. Please refer to the December 2014 assessment. Module report

Level: Diploma in Professional Marketing. Module: Mastering Metrics. Please refer to the December 2014 assessment. Module report Module report Level: Diploma in Professional Marketing Module: Mastering Metrics Please refer to the December 2014 assessment This was the first session for Mastering Metrics. The overall pass rate for

More information

Level: Diploma in Professional Marketing. Unit/Module: Mastering Metrics. Please refer to the December 2015 assessment. Overarching performance:

Level: Diploma in Professional Marketing. Unit/Module: Mastering Metrics. Please refer to the December 2015 assessment. Overarching performance: Module report Level: Diploma in Professional Marketing Unit/Module: Mastering Metrics Please refer to the December 2015 assessment Overarching performance: The overall performance for this session of the

More information

Examiners Report/ Lead Examiner Feedback. January NQF BTEC Level 1/Level 2 Firsts in Business. Unit 9: Principles of Marketing (21325E)

Examiners Report/ Lead Examiner Feedback. January NQF BTEC Level 1/Level 2 Firsts in Business. Unit 9: Principles of Marketing (21325E) Examiners Report/ Lead Examiner Feedback January 2017 NQF BTEC Level 1/Level 2 Firsts in Business Unit 9: Principles of Marketing (21325E) Edexcel and BTEC Qualifications Edexcel and BTEC qualifications

More information

E2 Enterprise Management Post Exam Guide November General Comments

E2 Enterprise Management Post Exam Guide November General Comments General Comments The overall performance of candidates in this last of the E2 Enterprise Management examinations reflects in many respects that of previous diets. The main difference is to be found in

More information

London School of International Business. Level 6 Diploma in Business and Administrative Management

London School of International Business. Level 6 Diploma in Business and Administrative Management Level 6 Diploma in Business and Administrative Management 1 Content Support for Centres... 1 Level 6 Diploma in Business and Administrative Management... 3 Entry Requirements... 4 Introduction to Level

More information

ISO whitepaper, January Inspiring Business Confidence.

ISO whitepaper, January Inspiring Business Confidence. Inspiring Business Confidence. ISO 31000 whitepaper, January 2015 Author: Graeme Parker enquiries@parkersolutionsgroup.co.uk www.parkersolutionsgroup.co.uk ISO 31000 is an International Standard for Risk

More information

Certificate IV in Project Management Student Assessment Guide

Certificate IV in Project Management Student Assessment Guide Overview The assessment for the Certificate IV in Project Management comprises Assessment Task Description Percentage Individual Assignment Unit Tests Development of a detailed Project Management Plan

More information

BCS THE CHARTERED INSTITUTE FOR IT BCS HIGHER EDUCATION QUALIFICATIONS BCS Level 5 Diploma in IT PROFESSIONAL ISSUES IN INFORMATION SYSTEMS PRACTICE

BCS THE CHARTERED INSTITUTE FOR IT BCS HIGHER EDUCATION QUALIFICATIONS BCS Level 5 Diploma in IT PROFESSIONAL ISSUES IN INFORMATION SYSTEMS PRACTICE BCS THE CHARTERED INSTITUTE FOR IT BCS HIGHER EDUCATION QUALIFICATIONS BCS Level 5 Diploma in IT PROFESSIONAL ISSUES IN INFORMATION SYSTEMS PRACTICE Wednesday 28th September 2016 - Afternoon Answer any

More information

Head of Finance, Governance and Risk Management in the Residential Tenancies Board (RTB) Assistant Director (Professional Accountant Grade I)

Head of Finance, Governance and Risk Management in the Residential Tenancies Board (RTB) Assistant Director (Professional Accountant Grade I) Head of Finance, Governance and Risk Management in the Residential Tenancies Board (RTB) Assistant Director (Professional Accountant Grade I) Applications are now sought to fill the post of Head of Finance,

More information

UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS General Certificate of Education Advanced Level

UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS General Certificate of Education Advanced Level UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS General Certificate of Education Advanced Level BUSINESS STUDIES 9707/03 Paper 3 Case Study For Examination from 2011 SPECIMEN MARK SCHEME 3 hours MAXIMUM

More information

CMI LEVEL 5 PROFESSIONAL CONSULTING Top Up Document

CMI LEVEL 5 PROFESSIONAL CONSULTING Top Up Document CMI LEVEL 5 PROFESSIONAL CONSULTING Top Up Document CONTENTS 3 Introduction 3 Top Up Summary o o o o Certificate in Management Consultancy Essentials Top Up requirements for the CMI Level 5 Award in Professional

More information

Role and person profile

Role and person profile Role and person profile Post title: Director of Regulation Location: Manchester Business Area: Research and Compliance Department: Compliance Reports to: Director of Research and Compliance Responsible

More information

RISK MANAGEMENT FRAMEWORK

RISK MANAGEMENT FRAMEWORK RISK MANAGEMENT FRAMEWORK Document Type Policy Document owner Lucinda Parr (Secretary and Registrar) Approved by Council Approval date 05 July 2017 Review date Version 1.0 Amendments Related Policies &

More information

NG BAILEY CREATING EXCEPTIONAL ENVIRONMENTS FACILITIES SERVICES

NG BAILEY CREATING EXCEPTIONAL ENVIRONMENTS FACILITIES SERVICES NG BAILEY CREATING EXCEPTIONAL ENVIRONMENTS 02 03 CONTENTS CREATING EXCEPTIONAL ENVIRONMENTS - INTRODUCTION 03 CREATING EXCEPTIONAL ENVIRONMENTS - INTRODUCTION 04 BESPOKE SERVICES TAILORED TO YOU 06 WORKING

More information

The senior assessor s report aims to provide the following information: An indication of how to approach the examination question

The senior assessor s report aims to provide the following information: An indication of how to approach the examination question INFORMATION FOR CANDIDATES The senior assessor s report is written in order to provide candidates with feedback relating to the examination. It is designed as a tool for candidates - both those who have

More information

Assessment Knowledge Module

Assessment Knowledge Module Assessment Knowledge Module Unit HS1 (R/502/3964) Principles of leading a team in the hospitality industry Version 1 April 2015 HS1 (R/502/3964) Version 1 BIIAB April 2015 1 Assessment Feedback Record

More information

Nehemiah UCHA (N.UCHA) Value for Money (VfM) Strategy 2016

Nehemiah UCHA (N.UCHA) Value for Money (VfM) Strategy 2016 Nehemiah UCHA (N.UCHA) Value for Money (VfM) Strategy 2016 Schedule of Contents 1.0 Executive Summary VfM Simply Stated 2.0 Introduction 3.0 What Do We Mean By VfM At Nehemiah? 4.0 How We Compare to Other

More information

Which ONE of the following is an example of an intervening factor that can encourage group effectiveness?

Which ONE of the following is an example of an intervening factor that can encourage group effectiveness? General Comments The overall performance in this diet was poorer than that of recent diets. Many candidates were inadequately prepared and so gave themselves little chance of reaching the required standard.

More information

Unit 5 Leadership and Management

Unit 5 Leadership and Management IFE Level 4 Certificate in Fire Safety and Fire Science Unit 5 Leadership and Management Examiner Report March 2018 Introduction Candidates generally performed well with 66% of candidates attaining a Pass.

More information

AUSTRALIAN ENGINEERING COMPETENCY STANDARDS STAGE 2 - EXPERIENCED PROFESSIONAL ENGINEER

AUSTRALIAN ENGINEERING COMPETENCY STANDARDS STAGE 2 - EXPERIENCED PROFESSIONAL ENGINEER AUSTRALIAN ENGINEERING COMPETENCY STANDARDS STAGE 2 - EXPERIENCED The Stage 2 Competency Standards are the profession's expression of the knowledge and skill base, engineering application abilities, and

More information