1 AIR FORCE SUSTAINMENT CENTER TEAM TINKER Source Selection Process and Keys to Writing Proposals Van Garmon AFMC AFSC/PZCAB I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1

2 Department of Defense Source Selection Procedures DoD Source Selection Procedures Effective May 2016 Roles and Responsibilities of Main Members Rating Definitions Evaluation Activities Documentation Requirements Discussions Debriefings 2

3 Best Value Award to a higher rated, higher priced offeror If the SSA reasonably determines that Technical Superiority and / or Superior Technical Risk PRICE DIFFERENCE WITH LOWER PRICED OFFERORS and / or Superior Past Performance 3

4 Source Selection Organization SSA SSAC Source Selection Authority Source Selection Advisory Council SSEB Chair Source Selection Evaluation Board SSEB Past Technical Price PCO Performance 4

5 Source Selection Authority (SSA) Makes the award decision Approves entering and closing discussion Procurement Contracting Officer (PCO) Directs the evaluation of proposals Source of all direct communication between the Government and offerors Source Selection Evaluation Board (SSEB) Evaluate proposals Documents evaluation results Assigns ratings Source Selection Team Main Members 5

6 Source Selection Evaluation SSEB does not compare proposals against each other SSEB evaluates each proposal against the stated evaluation criteria Offeror A Offeror A EVALUATION CRITERIA Offeror B Offeror C Offeror B Offeror C 6

7 Source Selection Decision SSA does compare proposals against each other SSA offeror comparison is based on the following considerations Offeror A Technical and Past Performance information for each offeror Offeror B Offeror C total evaluated price for each offeror Factor order of importance as stated in the RFP 7

8 Request for Proposal SECTION L INSTRUCTIONS TO OFFERORS INSTRUCTIONS REGARDING PROPOSAL CONTENT AND FORMAT Describe technical approach Provide past performance information Provide pricing data Includes format requirements, accepted document types, page limitations, etc SECTION M EVALUATION FACTORS FOR AWARD EVALUATION CRITERIA Criteria for award selection Evaluation factors and subfactors, and order of importance in relation to each other Trade-off considerations Proposals will be evaluated against stated criteria 8

9 Evaluation Factors Factors Subfactors FACTOR 1 TECHNICAL FACTOR 2 TECHNICAL RISK FACTOR 3 PAST PERFORMANCE 1 Resources 2 Transition 3 Data Systems 4 Program Management FACTOR 4 PRICE 9

10 Relative Importance of Factors and Subfactors Example: For this solicitation, technical acceptability is a prerequisite to the best value analysis and potential trade-off between Past Performance and Price. The Order of Importance is used to explain how the other factors will be traded off on technically acceptable proposals. For all technically acceptable proposals, Factor 2 (Past Performance) will be evaluated on a basis approximately equal to Factor 3 (Price). 10

11 Exchanges with Offerors During Evaluation of Proposals Exchanges with offerors are conducted through Evaluation Notices (ENs) Three types of ENs Clarifications limited exchanges when award without discussions is contemplated Communications exchanges leading to the establishment of a competitive range Discussions formal negotiations conducted after the establishment of a competitive range Conducted with every offeror within the competitive range Tailored to each offeror, based on deficiencies and other issues within the proposal. 11

12 TECHNICAL and TECHNICAL RISK 12

13 Difference Between Technical and Technical Risk TECHNICAL Depicts how well the proposal meets the technical criteria listed in the RFP Rated as: Acceptable / Unacceptable Or, for tradeoff purposes: B P G Y R Deficiencies TECHNICAL RISK Assesses the potential of the offeror s proposed technical approach for disruption of schedule, increased costs, degradation of performance, the need for increased Government oversight. Rated as: LOW MODERATE HIGH Weaknesses 13

14 Technical Rating Definitions Rating Definition Acceptable Proposal meets the requirements of the solicitation. Unacceptable Proposal does not meet the requirements of the solicitation. Deficiency: A material failure of a proposal to meet a Government Requirement, or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level 14

15 Technical Evaluation Each subfactor includes a list of criteria which defines the minimum requirements for that subfactor 1- Resources 3 elements (a-c) 2- Transition 2 elements (a-b) 3- Data Systems 3 elements (a-c) 4- Program Management 4 elements (a-d) In order to be rated Acceptable for the Technical Factor, the offeror must meet all criteria in each element within each subfactor. Failure to meet any element criteria (deficiency) will result in an Unacceptable rating for the corresponding subfactor. An Unacceptable subfactor rating will result in an overall Unacceptable rating for the Technical Factor. 15

16 Technical Evaluation Section L Instructions to Offerors Subfactor 1 Resources a) The Offeror shall provide an approach for manpower and organization. As a minimum, the proposal must include an offeror s organization chart, and describe overall total manning numbers, and total manning numbers for each specific functional area. The proposal shall also include an approach for sustaining proposed manpower levels during the contract performance period (PWS 1.10). Section M Evaluation Factors for Award Subfactor 1 Resources a) The Government will assess the offeror s proposed manpower and organization approach. To be acceptable, the approach must include a sufficient number of qualified personnel, which ensures all workload requirements can be successfully accomplished in accordance with PWS

17 Technical Evaluation Section L Instructions to Offerors Subfactor 2 Transition a) The offeror shall provide an approach for transition. As a minimum, the approach must describe hiring and training personnel, obtaining all equipment, and inventory transfer from the outgoing contractor. The approach must also include transition milestones from contract award through the start date of contract performance. (PWS 1.11). Section M Evaluation Factors for Award Subfactor 2 Transition The Government will assess the offeror s proposed transition approach. To be acceptable, the approach must ensure the offeror will be fully operational by contract performance start date, in accordance with PWS

18 Technical Evaluation Section L Instructions to Offerors Subfactor 3 Data Systems a) The offeror shall provide an approach to obtain and maintain access to required data systems. As a minimum, the approach must include current certification levels, a process for obtaining new certifications, and a process for updating all certifications before they expire. (PWS 1.4). Section M Evaluation Factors for Award Subfactor 3 Data Systems a) The Government will assess the offeror s approach to obtain and maintain data systems. To be acceptable, the approach must ensure all certifications meet CPFA requirements and are current throughout the entire contract period of performance in accordance with PWS

19 Technical Evaluation TECHNICAL FACTOR RATED AS ACCEPTABLE, UNACCEPTABLE RESOURCES TRANSITION DATA SYSTEMS PROGRAM MANAGEMENT a) a) Deficiency a) a) Deficiency b) Deficiency b) b) b) c) c) c) Deficiency d) 19

20 Technical Risk Evaluation TECHNICAL RISK FACTOR RATED AS LOW, MODERATE, HIGH RESOURCES TRANSITION DATA SYSTEMS PROGRAM MANAGEMENT a) a) a) a) Weakness b) Weakness b) b) Weakness b) Weakness c) c) c) d) 20

21 Technical Proposal Preparation Make sure the technical proposal stays within the required page limit. Additional pages beyond the page limit can not be considered by the Government evaluation team. The Government evaluation team can only consider information contained in the proposal. Instructions to Offerors (Section L or Addendum to FAR ) provides specific details which must be addressed in the technical proposal. The proposal should not merely agree to meet requirements. It should describe the offeror s approach to successfully accomplish the requirements The technical proposal does not have to address all PWS requirements. 21

22 Technical Proposal Preparation Evaluation Factors for Award (Section M or Addendum to FAR ) provides a Measure of Merit which must be achieved in order to be technically acceptable. Provide convincing rationale of how the proposal will meet requirements. Ensure all requirements within each subfactor (and corresponding PWS paragraphs) are addressed and met. The Technical evaluation does not consider.. Past Performance information Company awards 22

23 PAST PERFORMANCE 23

24 Performance Confidence Assessment Rating Measures the level of confidence the Government has in the offeror s likelihood of successfully performing the proposed effort. Rating is established through a review and analysis of the offeror s recent, relevant, and past performance. Performance evaluation focuses on portion of effort the offeror accomplished on previous/current contracts compared to the portion to be performed on the proposed effort. Emphasis is on demonstrated performance 24

25 Confidence Definitions Rating Substantial Confidence Satisfactory Confidence Neutral Confidence Limited Confidence No Confidence Definition Based on the offeror s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort. Based on the offeror s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort. No recent/relevant performance record is available or the offeror s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance Based on the offeror s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort. Based on the offeror s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort. 25

26 Past Performance Evaluation RECENCY RELEVANCY Reflects how relevant the contractor s previous work is to the proposed acquisition VERY RELEVANT RELEVANT SOMEWHAT RELEVANT NOT RELEVANT PERFORMANCE QUALITY Describes how well the contractor performed the previous work BLUE -- EXCEPTIONAL PURPLE -- VERY GOOD GREEN -- SATISFACTORY YELLOW -- MARGINAL RED -- UNSATISFACTORY GRAY -- UNKNOWN CONFIDENCE RATING 26

27 Past Performance Past Performance volume from the offeror s proposal Data Sources Contract Information Sheets (Prime and Subcontractors) Provided by contractor as part of proposal Questionnaires Included as part of the RFP package Completed by contractor references Submitted directly to Past Performance Evaluation Team Contractor Performance Assessment Reporting System (CPARS) Government database of contractor performance records on government contracts Other sources as needed 27

28 Relevancy and Performance Quality Relevancy Considerations Scope (Fuels services, Contractor Logistics Support, etc) Magnitude (size such as contract value, number of orders, etc) Complexity (specific functions within technical subfactors) Contract Type (Firm Fixed Price, etc) Performance Considerations Positive performance (Satisfactory to Exceptional ratings) Adverse performance Issues How significant was the issue? Did the contractor take any corrective actions? Did the corrective actions result in improved performance? 28

29 Past Performance Evaluation Technical Price Program Title PPQ / CPARs SF 1 RES SF 2 TR SF3 DS SF4 PM Contract Type AMT REL PF BETA, INC (Prime) 1 ABC AFB FAAAA-12-C / 3 VR E SR S SR S R S FFP / IDIQ $87M R S 2 3 XYZ Corp ZZZZ VFY AFB FAAAB-13-C / 0 VR S R M R M NR NR T&M / FFP $23M SR M 1 / 1 R S R VG SR S VR VG FFP / T&M $45M R S ZETA CORP (Subcontractor) 4 5 Beta, Inc ABC AFB FAAAA-10-C / 0 R E SR S N/A N/A N/A 1 / 4 VR S R S N/A N/A N/A TOTAL: 7 / 8 -- Exceptional -- Very Good ANY CPARS LESS THAN SATISFACTORY? Y: N: X -- Satisfactory -- Marginal -- Unsatisfactory -- Unknown VR -- Relevant R -- Relevant SR -- Somewhat Relevant NR -- Not Relevant UK -- Unknown 29

30 Past Performance Additional Notes Offerors should describe, in detail, the work performed on previous or current contracts as it relates to overall Scope, Magnitude, and Complexity (the criteria in the Technical subfactors). Offerors should provide the portion of effort to be performed by each member of the team (Prime and subcontractors) as it relates to the criteria in the Technical Subfactors Be specific when describing which companies will be performing each criteria. Past Performance evaluation is based on rating each member of the offeror s team for relevancy and performance for the portion of effort they are proposed to perform. Offerors should provide details regarding any adverse performance issues, and any related corrective actions. 30

31 FACTOR 3 PRICE 31

32 Price Evaluation Reasonableness Price proposal should address all RFP requirements Competitive market should establish price reasonableness PCO makes the determination of price reasonableness Realism Price will be evaluated to ensure adequate understanding of the requirement and to ensure the price does not pose a risk to performance Provide rationale to support price Balance Generally refers to price increases or decreases from year to year. Provide rationale for any price decrease from one year to another, or any price increase over 5%. 32

33 Three Phases of Source Selection Evaluation INITIAL EVALUATION Initial Evaluation offeror s proposal ENs prepared and finalized DISCUSSIONS Evaluation of EN responses Follow-up ENs FINAL EVALUATION Receive FPRs from offerors Final evaluation of proposals Initial Ratings established Award w/o Discussions Competitive Range Send ENs to Offerors Ratings adjusted Based on EN responses Request for Final Proposal Revisions (FPR) Final ratings established RESULT RESULT RESULT Best Value Decision 33

34 TRADE-OFF ANALYSIS AND AWARD DECISION 34

35 Evaluation Summary Alpha Beta Technical ACCEPTABLE ACCEPTABLE Technical Risk LOW LOW Past Performance SUBSTANTIAL CONFIDENCE SATISFACTORY CONFIDENCE Price (M) $26M $23M Trade-off considerations are not strictly based on a comparison of ratings. They are also based on specific differences between the offerors. 35

36 Technical Risk Trade-off Analysis Alpha, Inc. Risk Rating LOW No Weaknesses Trade-off consideration Beta, Inc. Risk Rating LOW Weakness 3a: The WONDER database program does not include any contingency plans in the event the program becomes inoperable or disabled. Impact 3a: Without a back-up plan, there is a possibility information stored in WONDER could be lost, which would cause significant delays to the mission requirements, as the offeror restores or attempts to recover the information. Also, the offeror must continue to meet PWS requirements during the time WONDER is unavailable. 36

37 Past Performance Trade-off Analysis Alpha, Inc. Confidence Rating SUBSTANTIAL Very Relevant in all areas Trade-off consideration Overall Satisfactory to Exceptional Performance. No adverse issues Beta, Inc. Confidence Rating SATISFACTORY Very Relevant in Scope Small Magnitude Overall Satisfactory to Exceptional Performance. No adverse issues No Relevancy in Transition No Relevancy in Supply Inventory 37

38 Summary Source Selection is a Subjective process Source Selection Evaluation Team (SSET) strives for consistency with each offeror SSA determines which offeror represents the best value to the Government based on a comparison of offerors against the evaluation criteria 38

Section M: Evaluation Factors for Award HQ R LRDR Section M: Evaluation Factors for Award For HQ R-0002

Section M: Evaluation Factors for Award HQ R LRDR Section M: Evaluation Factors for Award For HQ R-0002 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 LRDR Section M: Evaluation Factors for Award For 1 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 Table of

More information

UNCLASSIFIED RFP SECTIONS L&M. Table Exchange CONTRACTING OFFICERS & PROGRAM MANAGERS UNCLASSIFIED DISTRIBUTION A: APPROVED FOR PUBLIC RELEASE

UNCLASSIFIED RFP SECTIONS L&M. Table Exchange CONTRACTING OFFICERS & PROGRAM MANAGERS UNCLASSIFIED DISTRIBUTION A: APPROVED FOR PUBLIC RELEASE RFP SECTIONS L&M Table Exchange CONTRACTING OFFICERS & PROGRAM MANAGERS Keys to Submitting Successful Proposals Early Requirement Analysis - Source Sought/RFI Synopsis & Market Survey Analysis Response

More information

Army Enterprise Resource Planning (ERP) Services

Army Enterprise Resource Planning (ERP) Services Army Enterprise Resource Planning (ERP) Services Army Enterprise Resource Planning (ERP) Services SOLICITATION NUMBER: W52P1J-14-R-0059 Army Contracting Command Rock Island (ACC-RI) 1 Rock Island Arsenal

More information

NAVAIR SOURCE SELECTION PROCESS OVERVIEW

NAVAIR SOURCE SELECTION PROCESS OVERVIEW 1 NAVAIR SOURCE SELECTION PROCESS OVERVIEW Presented to: Navy Gold Coast 8 August 2012 Presented by: Sandy Scharn-Stevens Deputy Director for NAWCWD Contracts Report Documentation Page Form Approved OMB

More information

RFP Sections L&M Exchange CONTRACTING OFFICERS & PROGRAM MANAGERS

RFP Sections L&M Exchange CONTRACTING OFFICERS & PROGRAM MANAGERS SPECIAL OPERATIONS FORCES INDUSTRY CONFERENCE Win Transform People RFP Sections L&M Exchange CONTRACTING OFFICERS & PROGRAM MANAGERS UNCLASSIFIED DISTRIBUTION A: APPROVED FOR PUBLIC RELEASE RFP Sections

More information

Defense Microelectronics Activity (DMEA) Advanced Technology Support Program IV (ATSP4) Small Business Set-Aside RFP. Pre-Proposal Conference

Defense Microelectronics Activity (DMEA) Advanced Technology Support Program IV (ATSP4) Small Business Set-Aside RFP. Pre-Proposal Conference Defense Microelectronics Activity (DMEA) Advanced Technology Support Program IV (ATSP4) Small Business Set-Aside RFP Pre-Proposal Conference 5 March 2015 03/05/2015 Page-1 Disclaimer The ATSP4 information

More information

The ABCs of Government Proposal Evaluation

The ABCs of Government Proposal Evaluation Veteran Entrepreneur Training Symposium The ABCs of Government Proposal Evaluation Susan Gerbing gmg Management, Inc 1 How Does the Government Score My Proposal? The ABCs of Government Evaluation Proposal

More information

Source Selection. NAVAIR Public Release SPR ; Distribution Statement A Approved for Public Release; distribution is unlimited

Source Selection. NAVAIR Public Release SPR ; Distribution Statement A Approved for Public Release; distribution is unlimited Source Selection Presented by: Barbara J Petrzilka Contracting Officer Naval Air Warfare Center Aircraft Division Lakehurst, NJ barbara.petrzilka@navy.mil 732-323-2067 10 MAY 2016 The process the Government

More information

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES J 1 8 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO.(If applicable)

More information

Current Practices are Threatening Past Performance as an Effective Tool

Current Practices are Threatening Past Performance as an Effective Tool Current Practices are Threatening Past Performance as an Effective Tool Breakout Session #: D01 Gary Poleskey, Colonel, USAF (Ret) Vice President, Dayton Aerospace, Inc. CPCM, Fellow Date: Tuesday, July

More information

SOURCE SELECTION PLAN. {Insert if Phase I or Phase II} {Insert Project Name} {Insert Project Acronym} SOLICITATION XXXXXX-xx-R-xxxx

SOURCE SELECTION PLAN. {Insert if Phase I or Phase II} {Insert Project Name} {Insert Project Acronym} SOLICITATION XXXXXX-xx-R-xxxx SOURCE SELECTION PLAN {Insert if Phase I or Phase II} {Insert Project Name} {Insert Project Acronym} SOLICITATION XXXXXX-xx-R-xxxx {INSERT MONTH & YEAR} COORDINATION: Contracting Officer Date IPT Leader

More information

PHASE 4 - Post-Award. Type of Feedback Type of Contract Feedback Category Feedback

PHASE 4 - Post-Award. Type of Feedback Type of Contract Feedback Category Feedback PHASE 4 - Post-Award Type of Feedback Type of Feedback Category Feedback Commodity (Competitive) Use of the Bid Evaluation Model (BEM), when validated, is a best practice approach to evaluating competitive,

More information

PHASE 2 - Pre-Final Proposal Revision

PHASE 2 - Pre-Final Proposal Revision Type of Feedback Type of Feedback Category Feedback, multipleaward IDIQ PHASE 2 - Pre-Final Proposal Revision ing Officer (CO) prepared a worksheet/checklist that included every requirement to be evaluated

More information

TCAQ UNCLASSIFIED. Together, we deliver.

TCAQ UNCLASSIFIED. Together, we deliver. 1 United States Transportation Command (USTRANSCOM) Acquisition Tips Presented by: Suzanne Mudd-Yarber 2 Overview Where to Access Information about USTRANSCOM Business Opportunities Tips on Proposal Preparation

More information

HOWEVER, IT S NOT THAT SIMPLE.

HOWEVER, IT S NOT THAT SIMPLE. 10 Contract Management November 2015 An explanation of why the source selection process takes as long as it does, along with some tips for both government and industry to speed up the process. BY MARGE

More information

Source Selection The Good and Not So Good

Source Selection The Good and Not So Good Source Selection The Good and Not So Good Breakout Session #: F01 Steve Busch, VP Acquisition Programs Kepler Research Inc. Date: Tuesday, July 26 Time: 4:00pm 5:15pm AGENDA Current DoD Policy Waivers

More information

Decision. SKE International, Inc. Matter of: B ; B File: Date: June 5, 2008

Decision. SKE International, Inc. Matter of: B ; B File: Date: June 5, 2008 United States Government Accountability Office Washington, DC 20548 Decision Comptroller General of the United States DOCUMENT FOR PUBLIC RELEASE The decision issued on the date below was subject to a

More information

Best Practices for Source Selection Planning

Best Practices for Source Selection Planning Best Practices for Source Selection Planning Breakout Session # D02 Debra W. Scheider, Director Office of Contracts, CPCM, Fellow, NRO Stephen Spoutz, Director Acquisition Center of Excellence, NRO Date

More information

It s Not Just LPTA: Best Practices for the Lowest-Price Technically Acceptable Process

It s Not Just LPTA: Best Practices for the Lowest-Price Technically Acceptable Process It s Not Just LPTA: Best Practices for the Lowest-Price Technically Acceptable Process Breakout Session # B02 Kenneth Gilliland, Attorney, U.S. Army Armament Research, Development and Engineering Center

More information

Developing Effective Capture and Proposal Strategies. Presented by Red Team Consulting

Developing Effective Capture and Proposal Strategies. Presented by Red Team Consulting Developing Effective Capture and Proposal Strategies Presented by Red Team Consulting September 14, 2017 INTRODUCTION Red Team s major areas of support include: Proposal management Capture management and

More information

The Department of Defense (DoD) finds it difficult to determine when higher. Tools for Deciphering Best Value. William Sims Curry

The Department of Defense (DoD) finds it difficult to determine when higher. Tools for Deciphering Best Value. William Sims Curry Tools for Deciphering Best Value William Sims Curry The Department of Defense (DoD) finds it difficult to determine when higher technical ratings for contractor proposals justify paying a higher price.

More information

AFARS APPENDIX AA ARMY SOURCE SELECTION SUPPLEMENT

AFARS APPENDIX AA ARMY SOURCE SELECTION SUPPLEMENT AFARS APPENDIX AA ARMY SOURCE SELECTION SUPPLEMENT 28 November 2017 TABLE OF CONTENTS CHAPTER 1: PURPOSE, ROLES, AND RESPONSIBILITIES... 1 1.1 Purpose... 1 1.2 Applicability and Waivers... 1 1.3 Best Value

More information

Source Selection for Construction and AE Contracts

Source Selection for Construction and AE Contracts Source Selection for Construction and AE Contracts Shea Zahner, PE Deputy Assistant Operations Officer NAVFAC SE Mike Davis, PE Senior Project Manager NAVFAC SE Camilla Baker Supervisory Contract Specialist

More information

Little Rock District. Submitting Winning Best Value Proposals

Little Rock District. Submitting Winning Best Value Proposals Little Rock District Submitting Winning Best Value Proposals Sandra Easter Contracting Division Characteristics Winning Best Value Proposals Possess the necessary production and facilities or the ability

More information

Best Value Acquisition Using Source Selection Trade-Off Procedures

Best Value Acquisition Using Source Selection Trade-Off Procedures U.S. Army Tankautomotive and Armaments Command Best Value Acquisition Using Source Selection Trade-Off Procedures An SSEB Introduction to the Process Source Selection Information- See FAR 3.104 Robert

More information

Click to edit Master title style

Click to edit Master title style Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level» Fifth level Contractor Performance Information: Key to the DoD s Superior Supplier Program Click

More information

SBIR Procedures Unique Procedural Flexibilities & Other Streamlining Opportunities

SBIR Procedures Unique Procedural Flexibilities & Other Streamlining Opportunities SBIR Procedures Unique Procedural Flexibilities & Other Streamlining Opportunities 2017 DoD Small Business Training Week April 3-7, 2017 #SBTW17 Presented By Earl Anderson, Contracting Officer Washington

More information

Small Business Participation Goal and Subcontracting Goals

Small Business Participation Goal and Subcontracting Goals Small Business Participation Goal and Subcontracting Goals Presented by OSBP January 2017 Discussion Areas Purpose Differences Common Mistakes Additional Note to Large Businesses CPARS and Small Business

More information

Understanding the Government s Source Selection Process An Industry Perspective

Understanding the Government s Source Selection Process An Industry Perspective Understanding the Government s Source Selection Process An Industry Perspective 1 November 2017 Presented By: Rodger D. Pearson Professor of Services Acquisition Presentation Purpose This presentation

More information

Developing Effective Capture and Proposal Strategies for Government Evaluations. Presented by Red Team Consulting

Developing Effective Capture and Proposal Strategies for Government Evaluations. Presented by Red Team Consulting Developing Effective Capture and Proposal Strategies for Government Evaluations Presented by Red Team Consulting February 23, 2017 INTRODUCTION Red Team s major areas of support include: Proposal management

More information

Brief to CON 301 on DoD s Past Performance Policy

Brief to CON 301 on DoD s Past Performance Policy Brief to CON 301 on DoD s Past Performance Policy DUSD - LeAntha Sumpter Use of Contractor Past Performance Information by the Government (A Time Tested Idea) 1961 President Kennedy appointed the Bell

More information

AFARS Appendix AA ARMY SOURCE SELECTION MANUAL

AFARS Appendix AA ARMY SOURCE SELECTION MANUAL AFARS Appendix AA ARMY SOURCE SELECTION MANUAL February 2007 \ AFARS Revision #21, dated May 22, 2007 TABLE OF CONTENTS ARMY SOURCE SELECTION MANUAL (FEB 07) CHAPTER 1: INTRODUCTION Purpose 1 Scope 1 Definitions

More information

DATA ITEM DESCRIPTION

DATA ITEM DESCRIPTION DATA ITEM DESCRIPTION Title: HUMAN SYSTEMS INTEGRATION PROGRAM PLAN Number: Approval Date: 20070404 AMSC Number: N7716 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility:

More information

Policy and Procedure Examples

Policy and Procedure Examples Appendix 1 Policy and Procedure Examples Four sample documents are shown in this appendix to illustrate the type of administrative guidelines that should be developed in support of project operations within

More information

Negotiating Price in Competitive Acquisitions

Negotiating Price in Competitive Acquisitions Negotiating Price in Competitive Acquisitions Breakout Session #: G01 Presented by: Janie L Maddox Date: July 26 Time: 9:45 1 Before we begin, where are we? 1. Proposals have been evaluated Evaluation

More information

US Army Corps of Engineers Tulsa District

US Army Corps of Engineers Tulsa District US Army Corps of Engineers Tulsa District Subcontracting Success Gene Snyman Small Business Deputy 10 FEB 2016 Agenda Overview Small Business Participation Factor Small Business Subcontracting Plan Subcontracting

More information

Industry Outreach Program Partnering for the Future 10 August 2010

Industry Outreach Program Partnering for the Future 10 August 2010 Partnering for the Future Focus Topic: Standardized Processes within Contracting.The GOOD, The BAD and The UGLY Limited Gov t Budget $$ versus Limited Industry Marketing $$ Limited Industry B&P $$$ Limited

More information

Strategies for Response to Sources Sought Notices

Strategies for Response to Sources Sought Notices PORT HUENEME ASSISTANCE FOR SMALL BUSINESS Strategies for Response to Sources Sought Notices The information provided in this document is provided as information only and does not reflect the official

More information

Approved for Public Release; Distribution Unlimited The MITRE Corporation. All rights reserved.

Approved for Public Release; Distribution Unlimited The MITRE Corporation. All rights reserved. Approved for Public Release; Distribution Unlimited. 14-2256 -2014 The MITRE Corporation. All rights reserved. The Art of Evaluation Criteria Breakout Session #E02 Erin M. Schultz, The MITRE Corporation

More information

Request for Proposal (RFP) Overview

Request for Proposal (RFP) Overview Request for Proposal (RFP) Overview 15 Dec 05 Presented by: SMC Acquisition Center of Excellence Purpose Help members of an acquisition team become more familiar with the sections of an RFP, and understand

More information

Aiming for Best Value in Government Contracts

Aiming for Best Value in Government Contracts Aiming for Best Value in Government Contracts John Dobriansky, MS, MBA, CPCM, Fellow Dr. Rene G. Rendon, CFCM, CPCM, Fellow Breakout Session A03 Date: July 22, 2013 Time: 11:30-12:45pm Learning Objectives

More information

Solicitation Overview and Virtual Site Visit Procedures for the Enhanced Army Global Logistics Enterprise (EAGLE) Afghanistan W52P1J-15-R-0004

Solicitation Overview and Virtual Site Visit Procedures for the Enhanced Army Global Logistics Enterprise (EAGLE) Afghanistan W52P1J-15-R-0004 ACC U.S. - Rock Army Island Contracting Command - Rock Island (ACC-RI) Solicitation Overview and Virtual Site Visit Procedures for the Enhanced Army Global Logistics Enterprise (EAGLE) Afghanistan W52P1J-15-R-0004

More information

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES J 1 7 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO.(If applicable)

More information

SbAST Checklist APPENDIX B. Updated 31 May 2013 PR#

SbAST Checklist APPENDIX B. Updated 31 May 2013 PR# APPENDIX B Control Number SbAST Checklist PR# Updated 31 May 2013 The following checklist will assist you in organizing the necessary information for the Delivery/Task Order (D/TO). The SbAST team will

More information

How to Write Customer Focused Proposals

How to Write Customer Focused Proposals How to Write Customer Focused Proposals Jeff Cuskey, CPCM, CFCM, CSCM, CPP Acquisition & Contracting Consulting (831) 601-9947. Cuskey@Comcast.net Copyright 2017 Jeff Cuskey All Rights Reserved PROFESSIONAL

More information

Best Practices for a FAR 15 Procurement PART 3 PREPARING AWARD DECISION DOCUMENTS

Best Practices for a FAR 15 Procurement PART 3 PREPARING AWARD DECISION DOCUMENTS Best Practices for a FAR 15 Procurement PART 3 PREPARING AWARD DECISION DOCUMENTS Agenda Prepare Source Selection Decision Document Price Analysis Typical FAR Part 15 Source Selection Process Source: DISA

More information

NAVAIR-Industry Communication Plan for Competitive Procurements. 12 December 2017

NAVAIR-Industry Communication Plan for Competitive Procurements. 12 December 2017 NAVAIR-Industry Communication Plan for Competitive Procurements 12 December 2017 TABLE OF CONTENTS I. INTRODUCTION/PURPOSE... 1 II. APPLICATION... 2 III. COMMUNICATION PLAN BY COMPETITIVE PROCESS PHASE...

More information

Pre-Proposal Conference

Pre-Proposal Conference Pre-Proposal Conference Solicitation Number: : N69450-15-R-0606 Project Name: TN/MS/FL PANHANDLE MED. MACC SEED Project; Corry Station A School Unaccompanied Housing Project Location: NAVAL AIR STATION

More information

Verbal Questions From BOA Holder Meeting-November 6, 2013 Category Question Government Response

Verbal Questions From BOA Holder Meeting-November 6, 2013 Category Question Government Response Task Order What do you use to determine if you will use best value Acquisition Strategy or LPTA? Task Order Why are the milestones for numerous small business Acquisition Strategy set asides so close together?

More information

Breakout Session #: A14 Presented by: Bridget Gauer. Date: July 24, 2017 Time: 11:15AM-12:30PM

Breakout Session #: A14 Presented by: Bridget Gauer. Date: July 24, 2017 Time: 11:15AM-12:30PM Breakout Session #: A14 Presented by: Bridget Gauer Date: July 24, 2017 Time: 11:15AM-12:30PM 1 Is This You? 2 Can We Help? 3 What We Will Discuss Today? 1. What is a GWAC? 2. How Source Selection Procedures

More information

Version 1.0. The Contract Management Standard Final Edition. Version 1.0

Version 1.0. The Contract Management Standard Final Edition. Version 1.0 The Management Standard Final Edition 1 Purpose of the Management Standard The purpose of the Management Standard is to describe the nature of contract management in terms of the contract management processes

More information

AD-A I. vijsang ELECTE DEPARTMENT OF THE AIR FORCE AIR UNIVERSITY AIR FORCE INSTITUTE OF TECHNOLOGY

AD-A I. vijsang ELECTE DEPARTMENT OF THE AIR FORCE AIR UNIVERSITY AIR FORCE INSTITUTE OF TECHNOLOGY AD-A244 0196I M ELECTE vijsang.199213 (B DISTRIUTION STATMi T Anrc-vtv f:'r public r.i.as, Dajtrilbutiou Unlimited DEPARTMENT OF THE AIR FORCE AIR UNIVERSITY AIR FORCE INSTITUTE OF TECHNOLOGY Wright-Patterson

More information

Chapter 15. Competitive Negotiation: Evaluating Proposals

Chapter 15. Competitive Negotiation: Evaluating Proposals Chapter 15. Competitive Negotiation: Evaluating Proposals Summary This chapter describes the steps to be taken in order to properly evaluate each proposal received in response to an RFP. Essential Information

More information

AWARD TERM PLAN FOR THE OPERATION AND MAINTENANCE OF THE SPECIAL OPERATIONS FORCES SUPPORT ACTIVITY (SOFSA) USZA22-03-D APRIL 2003

AWARD TERM PLAN FOR THE OPERATION AND MAINTENANCE OF THE SPECIAL OPERATIONS FORCES SUPPORT ACTIVITY (SOFSA) USZA22-03-D APRIL 2003 AWARD TERM PLAN FOR THE OPERATION AND MAINTENANCE OF THE SPECIAL OPERATIONS FORCES SUPPORT ACTIVITY (SOFSA) USZA22-03-D-0006 1 APRIL 2003 DATE: APPROVED: 1.0 POLICY. The USSOCOM has determined that the

More information

XPO Logistics Worldwide Government Services, LLC

XPO Logistics Worldwide Government Services, LLC United States Government Accountability Office Washington, DC 20548 Decision Comptroller General of the United States DOCUMENT FOR PUBLIC RELEASE The decision issued on the date below was subject to a

More information

OASIS SB Program Open Season On ramp Overview. How to get on OASIS OASIS Program Management Office Slide Deck Version: July 10, 2018

OASIS SB Program Open Season On ramp Overview. How to get on OASIS OASIS Program Management Office Slide Deck Version: July 10, 2018 U.S. General Services Administration OASIS SB Program Open Season On ramp Overview How to get on OASIS OASIS Program Management Office Slide Deck Version: July 10, 2018 1 OASIS and OASIS Small Business

More information

Government Proposals Technical, Management and Past Performance Guidelines

Government Proposals Technical, Management and Past Performance Guidelines Government Proposals Technical, Management and Past Performance Guidelines P.O. Box 22667, Knoxville, Tennessee 37933 Phone: 865.414.0310/ E-mail: alanbakercpc@aol.com Phone: 865.414.8310: E-mail: reneebakercpc@aol.com

More information

Version 1.0. The Contract Management Standard Final Edition. Version 1.0

Version 1.0. The Contract Management Standard Final Edition. Version 1.0 The Management Standard Final Edition 1 Purpose of the Management Standard The purpose of the Management Standard is to describe the nature of contract management in terms of the contract management processes

More information

REQUEST FOR OFFER RFO: For: Business Continuity Program Development Consultant Services. For: Covered California

REQUEST FOR OFFER RFO: For: Business Continuity Program Development Consultant Services. For: Covered California REQUEST FOR OFFER RFO: 2017-04 For: Business Continuity Program Development Consultant Services For: Covered California Date: Tuesday, September 19, 2017 You are invited to review and respond to this Request

More information

Decision. Matter of: Logistics 2020, Inc. File: B ; B Date: November 6, 2013

Decision. Matter of: Logistics 2020, Inc. File: B ; B Date: November 6, 2013 United States Government Accountability Office Washington, DC 20548 Decision Comptroller General of the United States DOCUMENT FOR PUBLIC RELEASE The decision issued on the date below was subject to a

More information

Instructions to Offerors

Instructions to Offerors Instructions to Offerors 1. Instruction to Offerors: A. Preparation and Submittal: The following instructions cover the preparation and submittal of the offeror s proposal for this solicitation. To assure

More information

NAVFACSW Procurement Forum-- Improving Environmental Contract Vehicles and Execution

NAVFACSW Procurement Forum-- Improving Environmental Contract Vehicles and Execution NAVFACSW Procurement Forum-- Improving Environmental Contract Vehicles and Execution MISSION Environmental Restoration delivers sustainable, innovative, cost effective remediation solutions with stakeholder

More information

Aeronautical Systems Center

Aeronautical Systems Center Aeronautical Systems Center Emerging Policy 12 May 09 John Brannan Dave Pressler ASC/AQ john.brannan@wpafb.af.mil david.pressler@wpafb.af.mil Report Documentation Page Form Approved OMB No. 0704-0188 Public

More information

RFP 3512R09 Strategic Consultant Services for the Office of Policy and Public Private Partnerships Addendum 3 Appendix H Questions & Answers

RFP 3512R09 Strategic Consultant Services for the Office of Policy and Public Private Partnerships Addendum 3 Appendix H Questions & Answers 1. Question Is pre-registration required for the pre-proposal conference on May 3? Answer Pre-registration is not required. Please refer to Section I-8 of the RFP for further information. 2. Question Please

More information

SEC ESTABLISHMENT OF PANEL ON CONTRACTING INTEGRITY.

SEC ESTABLISHMENT OF PANEL ON CONTRACTING INTEGRITY. SEC. 813. ESTABLISHMENT OF PANEL ON CONTRACTING INTEGRITY. (a) Establishment- (1) IN GENERAL- The Secretary of Defense shall establish a panel to be known as the `Panel on Contracting Integrity'. (2) COMPOSITION-

More information

Koontz Electric Company, Inc.

Koontz Electric Company, Inc. United States Government Accountability Office Washington, DC 20548 Comptroller General of the United States Decision Matter of: Koontz Electric Company, Inc. File: B-407946 Date: April 5, 2013 Dean Hoover

More information

PUBLIC NOTICE REQUEST FOR QUALIFICATIONS SUBMISSION

PUBLIC NOTICE REQUEST FOR QUALIFICATIONS SUBMISSION PUBLIC NOTICE REQUEST FOR QUALIFICATIONS SUBMISSION NAVY LODGING PROGRAM INTERIOR DESIGN IDIQ Public Notice Page 1 of 7 I. General Information Single Award IDIQ Contract Interior Design Services Requirement

More information

Number: DI-HFAC-81743A Approval Date: Office of Primary Responsibility: AS/AIR 4.6 Applicable Forms: N/A

Number: DI-HFAC-81743A Approval Date: Office of Primary Responsibility: AS/AIR 4.6 Applicable Forms: N/A DATA ITEM DESCRIPTION Title: HUMAN SYSTEMS INTEGRATION PROGRAM PLAN Number: Approval Date: 20110421 AMSC Number: N9190 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility:

More information

DEPARTMENT OF THE NAVY NAVAL AIR SYSTEMS COMMAND RADM WILLIAM A. MOFFETT BUILDING BUSE ROAD, BLDG 2272 PATUXENT RIVER, MARYLAND

DEPARTMENT OF THE NAVY NAVAL AIR SYSTEMS COMMAND RADM WILLIAM A. MOFFETT BUILDING BUSE ROAD, BLDG 2272 PATUXENT RIVER, MARYLAND DEPARTMENT OF THE NAVY NAVAL AIR SYSTEMS COMMAND RADM WILLIAM A. MOFFETT BUILDING 47123 BUSE ROAD, BLDG 2272 PATUXENT RIVER, MARYLAND 20670-1547 NAVAIR INSTRUCTION 4200.39C CHANGE TRANSMITTAL 1 From: Commander,

More information

Acquisition Plan Nuclear Weapons Production Plants

Acquisition Plan Nuclear Weapons Production Plants Acquisition Plan Nuclear Weapons Production Plants 1. Purpose The purpose of this paper is to set forth the acquisition plan the Department of Energy (DOE) intends to utilize to competitively select the

More information

NUWCDIVNPT SeaPort-e Council Meeting

NUWCDIVNPT SeaPort-e Council Meeting NUWCDIVNPT SeaPort-e Council Meeting May 19, 2016 Q1: NUWC is enforcing a policy stating: A CAC can only be issued to someone with an Interim clearance, if their FBI Fingerprint check has been returned

More information

Comprehensive Health Services, Inc.

Comprehensive Health Services, Inc. United States Government Accountability Office Washington, DC 20548 Decision Comptroller General of the United States DOCUMENT FOR PUBLIC RELEASE The decision issued on the date below was subject to a

More information

Given design trade studies, interpret the results to recommend the most cost-effective concept for development.

Given design trade studies, interpret the results to recommend the most cost-effective concept for development. 1 Summarize the Planning, Programming, Budgeting and Execution (PPBE) process. Analyze the financial structure and the movement of funds within the PPBE. 2 Given a scenario, develop an appropriate PMO

More information

Decision. Matter of: Booz Allen Hamilton, Inc. File: B ; B Date: May 26, 2016

Decision. Matter of: Booz Allen Hamilton, Inc. File: B ; B Date: May 26, 2016 United States Government Accountability Office Washington, DC 20548 Decision Comptroller General of the United States DOCUMENT FOR PUBLIC RELEASE The decision issued on the date below was subject to a

More information

CHAPTER 10 FACILITIES EVALUATIONS (PRE-AWARD) SURVEYS PART 1 INTRODUCTION

CHAPTER 10 FACILITIES EVALUATIONS (PRE-AWARD) SURVEYS PART 1 INTRODUCTION CHAPTER 10 FACILITIES EVALUATIONS (PRE-AWARD) SURVEYS PART 1 INTRODUCTION 10-1 PURPOSE. This section prescribes procedures for conducting an evaluation of the facilities and capabilities of an offeror,

More information

ATSP4 RFP Questions and Answers Round 2 Last edited 17 March 2015 Questions have been modified only to provide anonymity

ATSP4 RFP Questions and Answers Round 2 Last edited 17 March 2015 Questions have been modified only to provide anonymity ATSP4 RFP Questions and Answers Round 2 Last edited 17 March 2015 Questions have been modified only to provide anonymity This Q&A document provides responses to questions submitted to DMEA in response

More information

Coastal Environments, Inc.

Coastal Environments, Inc. United States Government Accountability Office Washington, DC 20548 Comptroller General of the United States Decision Matter of: Coastal Environments, Inc. File: B-401889 Date: December 18, 2009 Sherwood

More information

October 19, Cyrus E. Phillips IV (757) Direct Line (703) Facsimile (703) Mobile

October 19, Cyrus E. Phillips IV (757) Direct Line (703) Facsimile (703) Mobile October 19, 2015 Cyrus E. Phillips IV (757) 378-2917 Direct Line (703) 312-0415 Facsimile (703) 819-5944 Mobile lawyer@procurement-lawyer.com VIA ELECTRONIC MAIL Matthew T. Crosby Office of General Counsel

More information

NUWCDIVNPT SeaPort-e Council Meeting

NUWCDIVNPT SeaPort-e Council Meeting NUWCDIVNPT SeaPort-e Council Meeting December 8, 2015 Q1: Please explain the rationale for using Firm Fixed Price CLINS in RFPs. A1: As per FAR 16.202-2 A firm-fixed-price contract is suitable for acquiring

More information

REQUEST FOR PROPOSALS. Construction Manager CM Services Pre-Construction and Construction Services

REQUEST FOR PROPOSALS. Construction Manager CM Services Pre-Construction and Construction Services REQUEST FOR PROPOSALS Construction Manager CM Services Pre-Construction and Construction Services Big Sky Fire Department Station 1 Project Big Sky Fire District OWNER Big Sky, Montana November 2016 Request

More information

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS Professional Construction Management Services Harrisburg International Airport Rehabilitate Runway 13-31 Susquehanna Area Regional

More information

Let s be Practical- Evaluating RFPs for Key Requirements. Breakout Session Speaker: Brad A. Edwards

Let s be Practical- Evaluating RFPs for Key Requirements. Breakout Session Speaker: Brad A. Edwards Let s be Practical- Evaluating RFPs for Key Requirements Breakout Session Speaker: Brad A. Edwards Disclaimer This presentation focuses on proposal evaluations. Not all procurement scenarios can be addressed

More information

Choctaw Staffing Solutions, Inc.

Choctaw Staffing Solutions, Inc. United States Government Accountability Office Washington, DC 20548 Comptroller General of the United States Decision Matter of: File: Choctaw Staffing Solutions, Inc. Date: August 24, 2016 Nathaniel R.

More information

SECTION QUALITY CONTROL

SECTION QUALITY CONTROL SECTION 01 45 00 QUALITY CONTROL PART 1 - GENERAL 1.1 DESCRIPTION This section specifies requirements for Contractor Quality Control (CQC) for Design-Bid-Build (DBB) or Design-Build (DB) construction projects.

More information

NAWCAD Services Acquisition Team (SAT) Overview and Highlights

NAWCAD Services Acquisition Team (SAT) Overview and Highlights NAWCAD Services Acquisition Team (SAT) Overview and Highlights Presented to: Small Business Roundtable April 6, 2018 Presented by: Greg Kennedy, NAWCAD Services Acquisition Team Lead Initiatives to Reduce

More information

PROSPECTIVE OFFEROR TO: PREAWARD SURVEYS. Defense Contract Management Agency WHAT YOU NEED TO KNOW

PROSPECTIVE OFFEROR TO: PREAWARD SURVEYS. Defense Contract Management Agency WHAT YOU NEED TO KNOW PROSPECTIVE OFFEROR TO: S GUIDE PREAWARD SURVEYS Defense Contract Management Agency WHAT YOU NEED TO KNOW INTRODUCTION Congratulations on your selection as a prospective defense supplier! You re well on

More information

STUDENT GUIDE. CON 170 Fundamentals of Cost & Price Analysis. Unit 5, Lesson 1 Cost Analysis Process, Players, and Business Systems

STUDENT GUIDE. CON 170 Fundamentals of Cost & Price Analysis. Unit 5, Lesson 1 Cost Analysis Process, Players, and Business Systems STUDENT GUIDE CON 170 Fundamentals of Cost & Price Analysis Unit 5, Lesson 1 Cost Analysis Process, Players, and Business Systems January 2017 CON170, Unit 5 Lesson 1 Cost Analysis Process and Players

More information

The PPI log is for informational purposes only. It does not amend the RFP. If a revision to the RFP is required, a formal amendment will be issued.

The PPI log is for informational purposes only. It does not amend the RFP. If a revision to the RFP is required, a formal amendment will be issued. 69450-15-R-1090 (/) 1 2-Mar-15 Page 16, Paragraph (2) The solicitation states that the JV prime has one relevant project or each member of the JV has relevant experience. Do you mean either party not both?

More information

General Dynamics Information Technology, Inc.

General Dynamics Information Technology, Inc. United States Government Accountability Office Washington, DC 20548 Decision Comptroller General of the United States DOCUMENT FOR PUBLIC RELEASE The decision issued on the date below was subject to a

More information

Outsourcing is a common practice in several

Outsourcing is a common practice in several Why Should We Care About Outsourcing? Brian Schultz Outsourcing: Practice used by companies to reduce costs by transferring portions of work to outside suppliers rather than completing it internally. (Investopedia)

More information

B , B , B

B , B , B United States Government Accountability Office Washington, DC 20548 Decision Comptroller General of the United States DOCUMENT FOR PUBLIC RELEASE The decision issued on the date below was subject to a

More information

Decision. CMI Management, Inc. Matter of: B ; B File: Date: January 26, 2010

Decision. CMI Management, Inc. Matter of: B ; B File: Date: January 26, 2010 United States Government Accountability Office Washington, DC 20548 Decision Comptroller General of the United States DOCUMENT FOR PUBLIC RELEASE The decision issued on the date below was subject to a

More information

Bid Protest Committee of the ABA Section of Public Contract Law Monthly Meeting: Tuesday, January 16, 12-1:30PM

Bid Protest Committee of the ABA Section of Public Contract Law Monthly Meeting: Tuesday, January 16, 12-1:30PM Bid Protest Committee of the ABA Section of Public Contract Law Monthly Meeting: Tuesday, January 16, 12-1:30PM I. AGENDA Conflicts of Interest Join us for a discussion on "Conflicts of Interest, including

More information

Evaluating Request for Proposal (RFP) Responses. Presented By: Department of General Services Bureau of Procurement

Evaluating Request for Proposal (RFP) Responses. Presented By: Department of General Services Bureau of Procurement Evaluating Request for Proposal (RFP) Responses Presented By: Department of General Services Bureau of Procurement Rev. June, 2014 Agenda What is a Request for Proposal (RFP)? Evaluator Roles & Responsibilities

More information

ATSP4 RFP Questions and Answers Last edited 10 March 2015 Questions have been modified only to provide anonymity

ATSP4 RFP Questions and Answers Last edited 10 March 2015 Questions have been modified only to provide anonymity ATSP4 RFP Questions and Answers Last edited 10 March 2015 Questions have been modified only to provide anonymity This Q&A document provides responses to questions submitted to DMEA in response to both

More information

Defense Microelectronics Activity (DMEA) Advanced Technology Support Program IV (ATSP4) Acquisition Strategy

Defense Microelectronics Activity (DMEA) Advanced Technology Support Program IV (ATSP4) Acquisition Strategy Defense Microelectronics Activity (DMEA) Advanced Technology Support Program IV (ATSP4) Acquisition Strategy DMEA/MEEB 18 March 2014 ATSP 4 03/18/2014 Page-1 Acquisition Strategy Agenda ATSP Unique Features

More information

Subcontract Management Certification Program (ScMCP ) SUBCONTRACT MANAGEMENT TECHNICAL COMPETENCIES. SUBCONTRACT MANAGER (ScM)

Subcontract Management Certification Program (ScMCP ) SUBCONTRACT MANAGEMENT TECHNICAL COMPETENCIES. SUBCONTRACT MANAGER (ScM) Competency 1. Determination of How Best to Satisfy Requirements for the Mission Area a. Provide proactive business advice on requirements documentation based on analysis of requirements and performance-based

More information

Decision. Contrack International, Inc.-Costs. Matter of: B File: Date: February 17, 2010

Decision. Contrack International, Inc.-Costs. Matter of: B File: Date: February 17, 2010 United States Government Accountability Office Washington, DC 20548 Decision Comptroller General of the United States DOCUMENT FOR PUBLIC RELEASE The decision issued on the date below was subject to a

More information

STUDENT GUIDE. CON 170 Fundamentals of Cost & Price Analysis. Unit 4, Lesson 1 Differences between Cost & Price Analysis

STUDENT GUIDE. CON 170 Fundamentals of Cost & Price Analysis. Unit 4, Lesson 1 Differences between Cost & Price Analysis STUDENT GUIDE CON 170 Fundamentals of Cost & Price Analysis Unit 4, Lesson 1 Differences between Cost & Price Analysis April 2018 STUDENT PREPARATION Required Student Preparation Read FAR subpart 15.4,

More information

STUDENT GUIDE. CON 170 Fundamentals of Cost & Price Analysis. Unit 4, Lesson 1 Differences between Cost & Price Analysis

STUDENT GUIDE. CON 170 Fundamentals of Cost & Price Analysis. Unit 4, Lesson 1 Differences between Cost & Price Analysis STUDENT GUIDE CON 170 Fundamentals of Cost & Price Analysis Unit 4, Lesson 1 Differences between Cost & Price Analysis July 2018 STUDENT PREPARATION Required Student Preparation Read FAR subpart 15.4,

More information