1 Capacity Market Topics Resource Targets, Qualifications, Performance Standards, Must Offer Jacqueline DeRosa, Senior Market and Product Economist Capacity Market Stakeholder Meeting September 19, 2007

2 Agenda Resource Targets RA Qualifications Existing, Planned Generation, Demand Response Imports Performance Standards Must Offer 2

3 Resource Adequacy Targets - Proposals Summary: Four proposals include forward assessment and determination RA Targets Four proposals include continuation (in some form) of the collaborative RA Target development process that is in place today 3

4 RA Target - Proposals CFCM Five years prior to delivery year Requirements for local areas with transfer limitation and level of internal generation, and installed MWs Max amount of imports (by path and total) Cal CIM Three to Four Year Planning Elements Include Load Forecasting and Establishing Reserve Margin Definition of Load Pockets 4

5 RA Target - Proposals Mirant Retain existing procurement timelines Do not move to multi-year forward procurement requirement Move from monthly peak to annual peak demand PGE Six Years Ahead Comprehensive Forward Assessment Conducted Every Three Years Reliability, Competitiveness, Environmental and Performance Needs of System Local Area Prescriptive determination 5

6 RA Targets CAISO Assessment Build off RA procurement targets System Peak load plus PRM Annual Peak approach warrants consideration Locational Capacity Requirements Multi year forward assessment based on established RA targets Can inform investment decisions Supports bilateral procurement Could support integration with transmission planning Details? Could include other reliability requirements 6

7 Operational Attributes - Proposals CFCMA, Mirant, Constellation Include local price signals and encourages development of AS markets to inform investment decisions CFCM - Could add a price adder to meet more targeted operational goals PG&E - Comprehensive Assessment and CRFO to procure operational characteristics Mirant - Annual product to provide more operational certainty 7

8 Operational Attributes - CAISO Assessment Multi year forward obligation for system and local could direct investment What is the most effective and efficient way to attract investment in needed operational attributes? (1) Rely on combination of CCM and locational and spot AS markets (2) Use price adders in CCM for attributes (3) Target CRFO to procure attributes CAISO supports identification and development of spot markets but is this enough to encourage investment? 8

9 Resource Qualification - Proposals All proposals Support definition of product and clear rules to qualify CFCM All capacity must be offered into auction New Generation and repowerings -- with development criteria to be established Delisting Demand response Imports 9

10 Resource Qualification - Proposals Constellation Forced outages used to adjust QC on an annual basis (combined with testing to compute average) Forced outage data will impact subsequent periods Scheduled outages are already in PRM Mirant Demand response should be based on rolling average availability at peak Import capacity - Derating Net QC based on testing, and forced outages 10

11 Resource Qualification Proposals, Continued and CAISO Assessment Proposals Continued PG&E Qualification rules under CAM - undefined CAISO Assessment Existing RA program s resource qualification requirements are sound framework Carefully consider what resources qualify and should be uniform to all participants 11

12 Resource Qualification - CAISO Assessment Continued Once qualified, capacity may be traded bilaterally or through CCM, or other procurement mechanism Supports Listing and Delisting concept All internal capacity must offer into auction unless it formally delists New and Repowerings should meet milestones Demand Response Currently being discussed in multiagency process 12

13 Resource Qualification - Imports All Four There is a Need to Accommodate Imports in CA CFCM - CAISO recommends max amount of imports from external control areas; can be self supplied and bid in CalCim - Don t revisit; Supports maximum use of imports Mirant Qualifying criteria needs to be made more stringent, less reliance on financial penalties PG&E secured in bilateral, included in RA Registry, and can participate in CAM 13

14 Resource Qualification Imports CAISO Assessment RAR Tariff: Imports limited by total system and path import capability as determined by CAISO Imports have DA MOO, no RT obligation unless selected in RUC (except for dynamically scheduled) Standardized product All QC should be treated the same with respect to availability and performance requirements 14

15 Resource Qualification Imports CAISO Assessment Imports May be warranted to re-examine qualifying criteria; but don t want to discourage Accommodate limited amount of seasonal capacity swaps? Would forward obligation inhibit imports? 15

16 Must Offer - Proposals CFCM Must Offer to DA, RUC, RT and AS; If not selected, no obligation. Supply obligation is transferable External cannot be selected to meet local and must offer obligation Mirant Consistent with CAISO Tariff Control area certification process for imports or mechanism to discount Constellation - DA Must Offer Obligation and RUC 16

17 Must Offer Obligation - CAISO Assessment Continuation of must offer requirements for RA resources from DA, RUC, and into RT Must offer for Energy and AS Imports not qualified to meet local capacity requirements 17

18 Performance Standards - Proposals CFCM Availability metric: EFORd as all hours availability metric and EFORp to provide additional incentive during peak hours Penalty to units not available Only in year of underperformance Does not adjust QC of resource, except if chronic 18

19 Performance Standards - Proposals Mirant Net Qualifying Metric, based on UCAP, QC based on past performance and adjusted QC Penalties for non-compliance Constellation Net Qualifying Metric like Mirant Strong performance incentive where current year forced outages impact QC in subsequent period 19

20 Performance Standards CAISO Assessment Clear rules for compliance, performance requirements, capacity targets, and qualifying capacity CAISO has provisions in Tariff that provide for determination of Net QC: Deliverability, Performance, Testing Specific performance metrics should address overall and peak availability Impacts on current year capacity payments provides incentives to perform 20

Day Ahead Market Enhancements: Issue Paper/Straw Proposal

Day Ahead Market Enhancements: Issue Paper/Straw Proposal Day Ahead Market Enhancements: Issue Paper/Straw Proposal Don Tretheway Senior Advisor, Market Design Policy Megan Poage Senior Market Design & Regulatory Policy Developer March 7, 2018 Agenda Time Topic

More information

BPM Change Management Meeting

BPM Change Management Meeting BPM Change Management Meeting September 26, 2017 Julia Payton BPM Change Management Process BPM_CM@caiso.com Agenda BPM Change Management Meeting, September 26, 2017 Topic Introduction/meeting overview

More information

Business Practice Manual for Reliability Requirements. Version 34

Business Practice Manual for Reliability Requirements. Version 34 Business Practice Manual for Reliability Requirements Version 34 Last Revised: January 1, 2009July 28, 2010 Approval History Approval Date: 3/27/09 Effective Date: 3/31/09 BPM Owner: Chetty Mamandur BPM

More information

ISO-NE FCM Capacity Market Design Scott M. Harvey. October 9, 2007

ISO-NE FCM Capacity Market Design Scott M. Harvey. October 9, 2007 ISO-NE FCM Capacity Market Design Scott M. Harvey October 9, 2007 Summary The ISO-NE FCM capacity market design embodies many improvements over the prior ISO-NE capacity market. Five of these improvements

More information

September 29, Docket No. ER

September 29, Docket No. ER California Independent System Operator Corporation September 29, 2017 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

LOLE is expressed as hours per year with the usual target criteria being (0.1 days/year) or 1- day in 10-years MISO Tariff: Module E-1 - The

LOLE is expressed as hours per year with the usual target criteria being (0.1 days/year) or 1- day in 10-years MISO Tariff: Module E-1 - The 1 2 3 4 LOLE is expressed as hours per year with the usual target criteria being (0.1 days/year) or 1- day in 10-years MISO Tariff: Module E-1 - The Transmission Provider will calculate and post the Planning

More information

GADS and LOLE Considerations in Gas- Electric Coordination. ENGCTF June 13, 2013

GADS and LOLE Considerations in Gas- Electric Coordination. ENGCTF June 13, 2013 GADS and LOLE Considerations in Gas- Electric Coordination ENGCTF June 13, 2013 Generating Availability Data System (GADS) National database of electric generator performance, produced by the North American

More information

Gas-Electric Coordination in PJM: Trends, Issues, Interactions, and Looking Ahead

Gas-Electric Coordination in PJM: Trends, Issues, Interactions, and Looking Ahead Gas-Electric Coordination in PJM: Trends, Issues, Interactions, and Looking Ahead Harvard Electricity Policy Group 68 th Plenary Session Paul M. Sotkiewicz, Ph.D. Chief Economist PJM Interconnection October

More information

PJM Manual 18: PJM Capacity Market Revision: 38 Effective Date: July 27, Prepared by Capacity Market Operations

PJM Manual 18: PJM Capacity Market Revision: 38 Effective Date: July 27, Prepared by Capacity Market Operations PJM Manual 18: PJM Capacity Market Revision: 38 Effective Date: July 27, 2017 Prepared by Capacity Market Operations PJM 2017 Table of Contents Table of Contents Table of Exhibits...9 Approval...10 Current

More information

Market Settlements - Advanced

Market Settlements - Advanced Market Settlements - Advanced RPM Module PJM State & Member Training Dept. PJM 2017 Capacity vs. Energy Capacity A commitment of a resource to provide energy during PJM emergency under the capped energy

More information

Virtual Bidding and Scheduling Requirements in MRTU

Virtual Bidding and Scheduling Requirements in MRTU Virtual Bidding and Scheduling Requirements in MRTU Gary A. Stern, Ph.D. Director of Market Southern California Edison Virtual Bidding SCE s Position Virtual bidding (VB) should not be implemented in California

More information

Generation Capacity Mechanisms and Resource Adequacy Planning

Generation Capacity Mechanisms and Resource Adequacy Planning Generation Capacity Mechanisms and Resource Adequacy Planning Jennifer Heintz Public Service Commission of the State of Missouri February 7, 2013 Abu Dhabi, UAE Electricity Markets in the U.S. and Canada

More information

Stakeholder Process: Commitment Cost Bidding Improvements. Summary of Submitted Comments

Stakeholder Process: Commitment Cost Bidding Improvements. Summary of Submitted Comments Stakeholder Process: Commitment Cost Bidding Improvements Attachment A Summary of Submitted Comments Two stakeholder initiatives are consolidated into one memo as both propose market improvements to ISO

More information

6.1.9 IFM Initial Conditions

6.1.9 IFM Initial Conditions 6.1.9 IFM Initial Conditions A Generating Unit that was committed in the previous day s Day-Ahead Market (IFM or RUC) run (TD-2 for TD-1) but was de-committed before HE24 would normally be considered initially

More information

PJM ARR and FTR Market

PJM ARR and FTR Market PJM ARR and FTR Market PJM State & Member Training Dept. PJM 2016 Objectives Explain the concepts and principles of Auction Revenue Rights and Financial Transmission Rights Describe how to participate

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents California Independent System Operator Corporation 8. Ancillary Services... 3 8.1 Scope... 3 8.2 Ancillary Services Standards... 4 8.2.1 Determination Of Ancillary Service Standards...

More information

Comparison of Installed Capacity (ICAP) & Unforced Capacity (UCAP) Capacity Value Calculation Methods. Eligibility WG Meeting #3 July 4, 2017

Comparison of Installed Capacity (ICAP) & Unforced Capacity (UCAP) Capacity Value Calculation Methods. Eligibility WG Meeting #3 July 4, 2017 Comparison of Installed Capacity (ICAP) & Unforced Capacity (UCAP) Capacity Value Calculation Methods Eligibility WG Meeting #3 July 4, 2017 Overview The following materials provide an examination of the

More information

Load Serving Entity Definition Refinement Draft Final Proposal

Load Serving Entity Definition Refinement Draft Final Proposal Updated: September 21, 2016 Table of Contents 1. Executive Summary... 4 2. Scope of Initiative... 6 3. Changes to this proposal... 6 4. Stakeholder Engagement... 7 5. Background... 8 Allocation of Congestion

More information

Demand Response. Mathangi Srinivasan. New York Market Orientation Course (NYMOC) Senior Market Trainer, NYISO. March 20-23, 2018 Rensselaer, NY 12144

Demand Response. Mathangi Srinivasan. New York Market Orientation Course (NYMOC) Senior Market Trainer, NYISO. March 20-23, 2018 Rensselaer, NY 12144 Demand Response Mathangi Srinivasan Senior Market Trainer, NYISO New York Market Orientation Course (NYMOC) March 20-23, 2018 Rensselaer, NY 12144 1 Demand Response Module Objectives Upon completion of

More information

SAM 2.0 Stakeholder Comment Matrix

SAM 2.0 Stakeholder Comment Matrix SAM 2.0 Stakeholder Comment Matrix The AESO welcomes stakeholder input on the working group conclusions and discussion context contained in Section 5 of SAM 2.0. Please review the following instructions

More information

PJM Proposal for Incremental Auction Redesign

PJM Proposal for Incremental Auction Redesign PJM Proposal for Incremental Auction Redesign Jeff Bastian Manager, Capacity Market Operations Incremental Auction Senior Task Force May 31, 2017 www.pjm.com RPM Depends on Physical Resources RPM is designed

More information

Supply Plan Template Jennie Sage Lead Compliance Analyst

Supply Plan Template Jennie Sage Lead Compliance Analyst Supply Plan Template Jennie Sage Lead Compliance Analyst Instructions Supply Plan Template will be available on CAISO website in Excel format Submitted to the CAISO each month via e- mail Each Scheduling

More information

SAM 3.0 Stakeholder Comment Matrix

SAM 3.0 Stakeholder Comment Matrix SAM 3.0 Stakeholder Comment Matrix The AESO welcomes stakeholder input on the working group provisional recommendations and discussion context contained in Section 5 of SAM 3.0. Please review the following

More information

CAISO s Flexible Resource Adequacy and Must Offer Obligation Phase 2 Revised Straw Proposal Public Generating Pool and Public Power Council Comments

CAISO s Flexible Resource Adequacy and Must Offer Obligation Phase 2 Revised Straw Proposal Public Generating Pool and Public Power Council Comments CAISO s Flexible Resource Adequacy and Must Offer Obligation Phase 2 Revised Straw Proposal Public Generating Pool and Public Power Council Comments May 22, 2017 Public Generating Pool (PGP) and Public

More information

Business Practice Manual for Market Operations

Business Practice Manual for Market Operations Business Practice Manual for Market Operations Version 5354 Revised: July 13October 30, 2017 Page 1 of 345 Approval History Approval Date: March 23, 2009 Effective Date: March 31, 2009 BPM Owner: David

More information

Temporary Shutdown of Resource Operations. Straw Proposal

Temporary Shutdown of Resource Operations. Straw Proposal Temporary Shutdown of Resource Operations June 21, 2017 Market & Infrastructure Policy Table of Contents 1. Executive Summary... 3 2. Plan for Stakeholder Engagement... 4 3. Background... 4 4. Scope of

More information

2013/2014 RPM Base Residual Auction Results

2013/2014 RPM Base Residual Auction Results Executive Summary The 2013/2014 Reliability Pricing Model (RPM) Base Residual Auction (BRA) cleared 152,743.3 MW of unforced capacity in the RTO at a Resource Clearing Price of $27.73/MW-day. This MW and

More information

2018/2019 RPM Base Residual Auction Planning Period Parameters

2018/2019 RPM Base Residual Auction Planning Period Parameters Introduction The planning parameters for the 2018/2019 RPM Base Residual Auction (BRA) that is to be conducted in May of 2015 were posted on the PJM RPM website on January 30, 2015. Two versions of the

More information

RPM 301 Performance in Reliability Pricing Model

RPM 301 Performance in Reliability Pricing Model RPM 301 Performance in Reliability Pricing Model PJM State & Member Training Dept. PJM 2017 Disclaimer: PJM has made all efforts possible to accurately document all information in this presentation. The

More information

Resource Adequacy Straw Proposal. Seasonality. for addressing. July 31, 2015 MISO Staff

Resource Adequacy Straw Proposal. Seasonality. for addressing. July 31, 2015 MISO Staff Resource Adequacy Straw Proposal for addressing Seasonality July 31, 2015 MISO Staff Executive Summary MISO appreciates the stakeholder feedback it received in response to its Issues Statement on Facilitating

More information

Stakeholder Comments Template

Stakeholder Comments Template Stakeholder Comments Template Submitted by Company Date Submitted Melanie Gillette mgillette@cedmc.org 916-671-2456 California Efficiency + Demand Management Council 12/18/2017 Please use this template

More information

ICAP Reform Proposals In New England and PJM

ICAP Reform Proposals In New England and PJM ICAP Reform Proposals In New England and PJM John D. Chandley LECG Cambridge, MA Revised: October 6, 2005 Table of Contents Page Introduction...1 Common Issues Driving ICAP Reform Efforts in New England

More information

Commitment Cost Enhancements Phase 3 Action Plan

Commitment Cost Enhancements Phase 3 Action Plan Commitment Cost Enhancements Phase 3 Action Plan November 10, 2017 Table of Contents 1. Executive Summary... 3 2. Background... 3 3. Stakeholder Engagement... 6 4. Summary of Stakeholder Comments... 6

More information

Installed Capacity Manual. August 2017

Installed Capacity Manual. August 2017 MANUAL 4 Installed Capacity Manual August 2017 Version: 6.37 Effective Date: 08/25/2017 Committee Acceptance: 08/09/2017 BIC This document was prepared by: NYISO Capacity Market Products New York Independent

More information

5.1.1 Day-Ahead Economic Bids for Supply

5.1.1 Day-Ahead Economic Bids for Supply 5.1.1 Day-Ahead Economic Bids for Supply 5.1.1.3 Multi-Stage Generating Resources A Scheduling Coordinator cannot submit a Bid to the CAISO Markets for a MSG Configuration into which the Multi-Stage Generating

More information

Impact of EIM Imports on Carbon and REC accounting. Clare Breidenich Western Power Trading Forum Regional Issues Forum September 7, 2017

Impact of EIM Imports on Carbon and REC accounting. Clare Breidenich Western Power Trading Forum Regional Issues Forum September 7, 2017 Impact of EIM Imports on Carbon and REC accounting Clare Breidenich Western Power Trading Forum Regional Issues Forum September 7, 2017 Treatment of Electricity Imports under California Cap and Trade Program

More information

3. Overview of Market Instruments

3. Overview of Market Instruments 3. Overview of Market Instruments 3.2 Ancillary Services Bids Four types of Ancillary Services are used by CAISO in its markets Regulation Up, Regulation Down, Spinning Reserve, and Non-Spinning Reserve.

More information

Modeling Transmission Outages in the CRR Network Model

Modeling Transmission Outages in the CRR Network Model Modeling Transmission Outages in the CRR Network Model Lorenzo Kristov Market & Product Development Dept. CRR Stakeholder Meeting June 14, 2007 Outline of Today s Discussion CRR Revenue Adequacy Timing

More information

Comments of Northern California Power Agency CAISO Load Granularity Refinements Issue Paper. September 20, 2010

Comments of Northern California Power Agency CAISO Load Granularity Refinements Issue Paper. September 20, 2010 651 Commerce Drive Roseville, CA 95678 phone (916) 781-3636 fax (916) 783-7693 web www.ncpa.com Comments of Northern California Power Agency CAISO Load Granularity Refinements Issue Paper September 20,

More information

December 2014 John Dalton

December 2014 John Dalton ISO-New England Forward Capacity Auction #9 Summary Price Forecast December 2014 John Dalton 978-369-2465 jdalton@poweradvisoryllc.com ISO-New England s upcoming Forward Capacity Auction prices are likely

More information

Capacity Performance Training. March 16, 2015

Capacity Performance Training. March 16, 2015 Capacity Performance Training March 16, 2015 Training Objectives Provide Capacity Market Sellers with information necessary to participate in the Reliability Pricing Model (RPM) under a Capacity Performance

More information

Flexible Resource Adequacy Criteria and Must Offer Obligation Phase 2. Revised Straw Proposal Short Term Solutions

Flexible Resource Adequacy Criteria and Must Offer Obligation Phase 2. Revised Straw Proposal Short Term Solutions Flexible Resource Adequacy Criteria and Must Offer Obligation Phase 2 Short Term Solutions May 1, 2017 Table of Contents 1. Executive Summary... 3 2. Changes to Scope and Timing... 4 3. Plan for Stakeholder

More information

Capacity Accreditation and External Resource Zones 06/30/2016

Capacity Accreditation and External Resource Zones 06/30/2016 Capacity Accreditation and External Resource Zones 06/30/2016 Overview MISO requested guidance on areas that require additional discussion and resolution in the seasonal / locational proposal In the last

More information

SAM 3.0 Stakeholder Comment Matrix

SAM 3.0 Stakeholder Comment Matrix SAM 3.0 Stakeholder Comment Matrix The AESO welcomes stakeholder input on the working group provisional recommendations and discussion context contained in Section 5 of SAM 3.0. Please review the following

More information

2. Market Operations Overview

2. Market Operations Overview 2. Market Operations Overview 2.5 Market Information This section summarizes and describes the common information that is used by the Day-Ahead and Real-Time processes. 2.5.1 Resource Static Data Static

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff. Appendix A. Master Definition Supplement

California Independent System Operator Corporation Fifth Replacement Electronic Tariff. Appendix A. Master Definition Supplement Appendix A Master Definition Supplement - Access Charge A charge paid by all Utility Distribution Companies, Small Utility Distribution Companies, and MSS Operators with Gross Load in a PTO Service Territory,

More information

2017/2018 RPM Base Residual Auction Planning Period Parameters

2017/2018 RPM Base Residual Auction Planning Period Parameters Introduction The RPM Base Residual Auction (BRA) for the 2017/2018 Delivery Year is scheduled to be conducted in May of 2014. This document describes the 2017/2018 BRA planning period parameters and also

More information

LOLE Fundamentals Loss of Load Expectation (LOLE) Fundamentals

LOLE Fundamentals Loss of Load Expectation (LOLE) Fundamentals Loss of Load Expectation (LOLE) Fundamentals March 13, 2014 Last material update: 03/12/2014 LOLE Agenda 2 Loss of Load Expectation (LOLE) Fundamentals Sections LOLE Background LOLE Study Connections to

More information

Final Flexible Capacity Needs Assessment for 2018

Final Flexible Capacity Needs Assessment for 2018 Final Flexible Capacity Needs Assessment for 2018 April 28, 2017 1 Table of Contents 1. Introduction... 3 2. Summary... 3 3. Defining the ISO System-Wide Flexible Capacity Need... 5 4. Forecasting Minute-by-Minute

More information

Pricing Logic Under Flexible Modeling of Constrained Output Generating Units

Pricing Logic Under Flexible Modeling of Constrained Output Generating Units Draft Final Proposal Pricing Logic Under Flexible Modeling of Constrained Output Generating Units April 14, 2008 This is the third CAISO paper on this issue. An Issue Paper was posted on February 1, 2008

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 34. Real-Time Market... 3 34.1 Inputs To The Real-Time Market... 3 34.1.1 Day-Ahead Market Results as Inputs to the Real-Time Market... 3 34.1.2 Market Model and System Information...

More information

Market Performance Report February 2014

Market Performance Report February 2014 Market Performance Report February 2014 March 26, 2014 ISO Market Quality and Renewable Integration CAISO 250 Outcropping Way Folsom, California 95630 (916) 351-4400 Executive Summary 1 The market performance

More information

Summary of 2016 MISO State of the Market Report

Summary of 2016 MISO State of the Market Report Summary of 2016 MISO State of the Market Report Presented to: MISO Board Markets Committee David B. Patton, Ph.D. MISO Independent Market Monitor July 20, 2017 Introduction As the Independent Market Monitor

More information

ISO Course Outline. Market Transactions Class

ISO Course Outline. Market Transactions Class ISO Course Outline Purpose Market Transactions Class This two-day training class is intended to be one of the cornerstones of the market training program and is designed to review the market concepts and

More information

Introduction to RRG Drafting Team Proposal

Introduction to RRG Drafting Team Proposal November 17, 2003 Introduction to RRG Drafting Team Proposal SUMMARY This introduction will review the overall task the RRG drafting team took on, set out the overall guiding principles it used, and describe

More information

Reliability Demand Response Product

Reliability Demand Response Product Reliability Demand Response Product Straw Proposal Prepared for The Reliability Demand Response Product Stakeholder Initiative July 12, 2010 Table of Contents 1 Executive Summary... 1 2 Background... 3

More information

Draft Whitepaper to Platte River Board of Directors

Draft Whitepaper to Platte River Board of Directors Draft Whitepaper to Platte River Board of Directors Report on Organized Power Markets RTOs and ISOs Presented for the October 2016 Board Meeting Overview This report on the potential formation of a regional

More information

Convergence Bidding and the Enforcement of Day-Ahead Commitments in Electricity Markets. James Bushnell and Frank Wolak June 1, 2006.

Convergence Bidding and the Enforcement of Day-Ahead Commitments in Electricity Markets. James Bushnell and Frank Wolak June 1, 2006. Convergence Bidding and the Enforcement of Day-Ahead Commitments in Electricity Markets James Bushnell and Frank Wolak June 1, 2006 Summary Operators of electricity markets continue to struggle with the

More information

CCA Terms Glossary. Valley Clean Energy Alliance. i CCA Terms Glossary

CCA Terms Glossary. Valley Clean Energy Alliance. i CCA Terms Glossary CCA Terms Glossary Valley Clean Energy Alliance i CCA Terms Glossary Table of Contents Energy Basics... 1 Wholesale Energy Services... 1 Finance... 2 Rate Setting... 3 Call Center and Data Management...

More information

A Forward Clean Energy Market for New England?

A Forward Clean Energy Market for New England? Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Timothy J. Brennan Integrating Markets and

More information

Outage Types and Entering Tickets PJM State & Member Training Dept.

Outage Types and Entering Tickets PJM State & Member Training Dept. Outage Types and Entering Tickets PJM State & Member Training Dept. Objectives Students will be able to: Describe the outage reporting process and requirements 2 edart edart stands for Dispatcher Applications

More information

January 27, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

January 27, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 January 27, 2017 Re: California

More information

1st International Conference on Large-Scale Grid Integration of Renewable Energy in India Durgesh Manjure, MISO Energy September 6, 2017

1st International Conference on Large-Scale Grid Integration of Renewable Energy in India Durgesh Manjure, MISO Energy September 6, 2017 Centralized Energy & Operating Reserves Markets: A MISO perspective 1st International Conference on Large-Scale Grid Integration of Renewable Energy in India Durgesh Manjure, MISO Energy September 6, 2017

More information

Problem Statement on PJM Capacity Performance Definition

Problem Statement on PJM Capacity Performance Definition Problem Statement on PJM Capacity Performance Definition PJM Staff Draft Problem Statement August 1, 2014 This page is intentionally left blank. PJM 2014 www.pjm.com 2 P a g e Introduction The events of

More information

PEAK DEMAND REDUCTION STRATEGY

PEAK DEMAND REDUCTION STRATEGY ADVANCED ANERGY DVANCED E ECONOMY NERGY E ECONOMY the business voice of advanced energy PEAK DEMAND REDUCTION STRATEGY Prepared by Navigant Consulting Brett Feldman, Senior Research Analyst Matthew Tanner,

More information

The Polar Vortex and Future Power System Trends National Coal Council Annual Spring Meeting May 14, 2014

The Polar Vortex and Future Power System Trends National Coal Council Annual Spring Meeting May 14, 2014 The Polar Vortex and Future Power System Trends National Coal Council -- 2014 Annual Spring Meeting May 14, 2014 Outline Introduction to ICF Overview of the Key Issues Price Volatility During Winter 2014

More information

Day-ahead ahead Scheduling Reserve (DASR) Market

Day-ahead ahead Scheduling Reserve (DASR) Market Day-ahead ahead Scheduling Reserve (DASR) Market Agenda Implementation Overview of the DASR Market Market Clearing Process Market Clearing Example Performance Compliance Market Settlements Appendix: emkt

More information

California ISO. Q Report on Market Issues and Performance. July 10, Prepared by: Department of Market Monitoring

California ISO. Q Report on Market Issues and Performance. July 10, Prepared by: Department of Market Monitoring California Independent System Operator Corporation California ISO Q1 2017 Report on Market Issues and Performance July 10, 2017 Prepared by: Department of Market Monitoring TABLE OF CONTENTS Executive

More information

Market Performance Report February 2017

Market Performance Report February 2017 Market Performance Report February 217 April 7, 217 ISO Market Quality and Renewable Integration CAISO 25 Outcropping Way Folsom, California 9563 (916) 351-44 Executive Summary 1 The market performance

More information

ANNUAL REPORT ON MARKET ISSUES & PERFORMANCE

ANNUAL REPORT ON MARKET ISSUES & PERFORMANCE ANNUAL REPORT ON MARKET ISSUES & PERFORMANCE Department of Market Monitoring ACKNOWLEDGEMENT The following members of the Department of Market Monitoring contributed to this report Eric Hildebrandt Keith

More information

Capacity Deliverability. May 27, 2015 MISO-PJM JCM

Capacity Deliverability. May 27, 2015 MISO-PJM JCM Capacity Deliverability May 27, 2015 MISO-PJM JCM Key Takeaways and Objective Capacity deliverability seeks to eliminate barriers for capacity transactions across the seam MISO is evaluating options to

More information

Uniform Price vs. Differentiated Payment Auctions

Uniform Price vs. Differentiated Payment Auctions Uniform Price vs. Differentiated Payment Auctions A Discussion of Advantages and Disadvantages PREPARED FOR Independent Electricity System Operator ICA Fundamentals and Concepts Stakeholder Meeting PREPARED

More information

2015/2016 RPM First Incremental Auction Results

2015/2016 RPM First Incremental Auction Results Introduction This document provides information for PJM stakeholders regarding the results of the 2015/2016 Reliability Pricing Model (RPM) First Incremental Auction. Incremental Auctions provide both

More information

Gas-Electric Coordination A NYISO Perspective

Gas-Electric Coordination A NYISO Perspective Gas-Electric Coordination A NYISO Perspective Rana Mukerji Senior Vice President Market Structures New York Independent System Operator Energy in the Northeast Boston, MA September 9, 2013 Generation Capacity

More information

Policy Initiatives Catalog

Policy Initiatives Catalog Prepared by Market and Infrastructure Policy November 8, 2017 CAISO/M&ID/MIP Table of Contents 1 Introduction... 4 2 Initiative Categorization... 5 3 Stakeholder Submissions... 6 3.1 Submissions Incorporated...

More information

2012 Statewide Load Impact Evaluation of California Aggregator Demand Response Programs Volume 1: Ex post and Ex ante Load Impacts

2012 Statewide Load Impact Evaluation of California Aggregator Demand Response Programs Volume 1: Ex post and Ex ante Load Impacts 2012 Statewide Evaluation of California Aggregator Demand Response Programs Volume 1: Ex post and Ex ante s CALMAC Study ID PGE0318.01 Steven D. Braithwait Daniel G. Hansen David A. Armstrong April 1,

More information

SAN DIEGO GAS & ELECTRIC COMPANY

SAN DIEGO GAS & ELECTRIC COMPANY SAN DIEGO GAS & ELECTRIC COMPANY REPORT ON DEMAND RESPONSE INTEGRATION INTO CAISO WHOLESALE MARKETS January 31, 2011 Contents 1. Executive Summary... 3 2. Status of Program Transition to Wholesale Market

More information

Western Power Trading Forum comments on CRR Analysis. Ellen Wolfe for WPTF December 19,

Western Power Trading Forum comments on CRR Analysis. Ellen Wolfe for WPTF December 19, Western Power Trading Forum comments on CRR Analysis Ellen Wolfe for WPTF December 19, 2017 ewolfe@resero.com 916 791-4533 Summary Study is thorough and points to a number of underlying drivers Study did

More information

Federal Energy Regulatory Commission Working Paper on Standardized Transmission Service and Wholesale Electric Market Design

Federal Energy Regulatory Commission Working Paper on Standardized Transmission Service and Wholesale Electric Market Design Federal Energy Regulatory Commission Working Paper on Standardized Transmission Service and Wholesale Electric Market Design To enhance competition in wholesale electric markets and broaden the benefits

More information

Two Settlement PJM /06/2016

Two Settlement PJM /06/2016 Two Settlement PJM 2016 Objectives Describe Two-Settlement process Day-Ahead Market Balancing Market Explain Virtual Transactions and their settlement Inc Offers Dec Bids Up-to Congestion Transactions

More information

1. Is there a preference between MW and MWh? RPS need for San Diego Gas & Electric is based upon a percentage of retail sales, which is in MWh.

1. Is there a preference between MW and MWh? RPS need for San Diego Gas & Electric is based upon a percentage of retail sales, which is in MWh. 1. Is there a preference between MW and MWh? RPS need for San Diego Gas & Electric is based upon a percentage of retail sales, which is in MWh. There is no target for MW of renewable capacity (except in

More information

Briefing on 2018 Policy Initiatives Roadmap and Annual Plan

Briefing on 2018 Policy Initiatives Roadmap and Annual Plan Briefing on 2018 Policy Initiatives Roadmap and Annual Plan Greg Cook Director, Market and Infrastructure Policy EIM Governing Body Meeting General Session January 23, 2018 The ISO previously committed

More information

Resource Adequacy Deliverability for Distributed Generation DG Deliverability Assessment Results

Resource Adequacy Deliverability for Distributed Generation DG Deliverability Assessment Results Resource Adequacy Deliverability for Distributed Generation 2017-2018 DG Deliverability Assessment Results February 21, 2018 Resource Adequacy Deliverability for Distributed Generation 1 Introduction In

More information

and on peak new ISO the monthly

and on peak new ISO the monthly March 1, 20122 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20426 RE: California Independent System Operator Corporation Docket No.

More information

Analysis of the 2019/2020 RPM Base Residual Auction

Analysis of the 2019/2020 RPM Base Residual Auction Analysis of the 2019/2020 RPM Base Residual Auction The Independent Market Monitor for PJM August 31, 2016 Monitoring Analytics 2016 www.monitoringanalytics.com Introduction This report, prepared by the

More information

The Virtues of A Virtual RTO

The Virtues of A Virtual RTO The Virtues of A Virtual RTO Jim Mayhew Mirant September 26, 2003 Harvard Electricity Policy Group 1 A Virtual RTO? An Organization That is a RTO in All but Name? Minimum Attributes? Regional Security

More information

Policy and Regulatory Approaches to Grid Integration of Renewable Energy in the US

Policy and Regulatory Approaches to Grid Integration of Renewable Energy in the US Policy and Regulatory Approaches to Grid Integration of Renewable Energy in the US Amy Rose, Ph.D. Energy Analyst National Renewable Energy Laboratory US RE policies & regulations are set at multiple levels

More information

Load Granularity Refinements Issue Paper

Load Granularity Refinements Issue Paper Load Granularity Refinements Issue Paper September 22, 2014 Table of Contents I. Introduction... 3 II. Background... 3 III. Scope of Initiative and Plan for Stakeholder Engagement... 4 IV. FERC s Reasons

More information

Energy Auction for the CPV Sentinel Generating Facility

Energy Auction for the CPV Sentinel Generating Facility Energy Auction for the CPV Sentinel Generating Facility Energy Auction Instructions and Terms and Conditions of Participation Updated June 11, 2013 A. GENERAL A.1. Company ( SCE ) seeks to sell, by this

More information

CALMAC Study ID PGE0354. Daniel G. Hansen Marlies C. Patton. April 1, 2015

CALMAC Study ID PGE0354. Daniel G. Hansen Marlies C. Patton. April 1, 2015 2014 Load Impact Evaluation of Pacific Gas and Electric Company s Mandatory Time-of-Use Rates for Small and Medium Non-residential Customers: Ex-post and Ex-ante Report CALMAC Study ID PGE0354 Daniel G.

More information

Local Market Power Mitigation Enhancements

Local Market Power Mitigation Enhancements Local Market Power Mitigation Enhancements Draft Final Proposal May 6, 2011 CAISO/M&ID/CRH May 6, 2011 page 1 Draft Final Proposal Local Market Power Mitigation Enhancements Table of Contents 1. Introduction...

More information

Introduction to the Energy Imbalance Market (EIM Module 1)

Introduction to the Energy Imbalance Market (EIM Module 1) Introduction to the Energy Imbalance Market (EIM Module 1) Cynthia Hinman Lead Client Trainer Webinar July 25, 2013 The information contained in these materials is provided for general information only

More information

Outage Coordination Training MISO Training

Outage Coordination Training MISO Training MISO Last material update: 05/19/2015 Course Content and Disclaimer 2 1 2 3 4 Course Description This course will review MISO's outage study processes and the coordination opportunities with TOs and MPs.

More information

Description of EDC Data and Documents in the Additional Data Portion of the BGS Auction Data Room

Description of EDC Data and Documents in the Additional Data Portion of the BGS Auction Data Room of Data and Documents in the Additional Data Portion of the BGS Auction Data Room Revised 9-15-2017 This document provides descriptions of data posted to the additional data page of the BGS Auction Data

More information

Load Management Performance Report 2015/2016

Load Management Performance Report 2015/2016 Load Management Performance Report 2015/2016 August 2016 PJM has made all efforts possible to accurately document all information in this report. However, PJM cannot warrant or guarantee that the information

More information

Business Practice Manual for Managing Full Network Model. Version 1011

Business Practice Manual for Managing Full Network Model. Version 1011 Business Practice Manual for Managing Full Network Model Version 1011 Last Revised: November 16, 2016January 31, 2017 Approval History Approval Date: October 1, 2009 Effective Date: October 1, 2009 BPM

More information

TPP-GIP Integration Proposal November 30, 2011

TPP-GIP Integration Proposal November 30, 2011 TPP-GIP Integration Proposal November 30, 2011 Major Elements of Proposal Demand-Based Planning of Network Upgrades in the TPP Synchronize GIP, TPP and the LSE Procurement Processes Allocation of Deliverability

More information

CHOPTANK ELECTRIC COOPERATIVE, INC. P.S.C. Md. No. 3 Fifth Revised Page No. 59 COGENERATION AND SMALL POWER PRODUCTION RATE SCHEDULE X

CHOPTANK ELECTRIC COOPERATIVE, INC. P.S.C. Md. No. 3 Fifth Revised Page No. 59 COGENERATION AND SMALL POWER PRODUCTION RATE SCHEDULE X Fifth Revised Page No. 59 908 COGENERATION AND SMALL POWER PRODUCTION RATE SCHEDULE X A. AVAILABILITY Available to members of the Cooperative for purchases of electricity by the Cooperative from qualified

More information

LOAD SERVING ENTITIES PJM REGION

LOAD SERVING ENTITIES PJM REGION Intra-PJM Tariffs --> RELIABILITY ASSURANCE AGREEMENT PJM Interconnection, L.L.C. Rate Schedule FERC No. 44 RELIABILITY ASSURANCE AGREEMENT Among LOAD SERVING ENTITIES in the PJM REGION Effective Date: