1 THE FRAMEWORK FOR MINIMIZING CONSTRUCTION TIME AND COST OVERRUNS IN PADANG AND PEKANBARU, INDONESIA HARISAWENI A thesis submitted in fulfilment of the requirements for the award of the degree of Master of Science (Quantity Surveying) Faculty of Built Environment Universiti Teknologi Malaysia JANUARI 2007

2 PSZ 19:16 (Pind. 1/97) UNIVERSITI TEKNOLOGI MALAYSIA BORANG PENGESAHAN STATUS TESIS JUDUL: THE FRAMEWORK FOR MINIMIZING CONSTRUCTION TIME AND COST OVERRUNS IN PADANG AND PEKANBARU, INDONESIA SESI PENGAJIAN : 2006 / 2007 Saya HARISAWENI (HURUF BESAR) mengaku membenarkan tesis (PSM/Sarjana/Doktor Falsafah)* ini disimpan di Perpustakaan Universiti Teknologi Malaysia dengan syarat-syarat kegunaan seperti berikut : 1. Tesis adalah hakmilik Universiti Teknologi Malaysia. 2. Perpustakaan Universiti Teknologi Malaysia dibenarkan membuat salinan untuk tujuan pengajian sahaja. 3. Perpustakaan dibenarkan membuat salinan tesis ini sebagai bahan pertukaran antara institusi pengajian tinggi. 4. **Sila tandakan ( ) SULIT (Mengandungi maklumat yang berdarjah keselamatan atau kepentingan Malaysia seperti yang termaktub di dalam AKTA RAHSIA RASMI 1972) TERHAD (Mengandungi maklumat TERHAD yang telah ditentukan oleh Organisasi/badan di mana penyelidikan dijalankan) TIDAK TERHAD Disahkan oleh (TANDATANGAN PENULIS) (TANDATANGAN PENYELIA) Alamat Tetap: Jl. Rd. Saleh gg. Cimpago No. 12 Padang Sumatera Barat Indonesia PM. Dr. Rosli Abdul Rashid Nama Penyelia Tarikh : Januari 2007 Tarikh : Januari 2007 CATATAN : * Potong yang tidak berkenaan. ** Jika tesis ini SULIT atau TERHAD, sila lampirkan surat daripada pihak berkuasa/organisasi berkenaan dengan menyatakan sekali sebab dan tempoh tesis ini perlu dikelaskan sebagai SULIT atau TERHAD. Tesis dimaksudkan sebagai tesis bagi Ijazah Doktor Falsafah dan Sarjana secara penyelidikan, atau disertasi bagi pengajian secara kerja kursus dan penyelidikan, atau Laporan Projek Sarjana Muda (PSM).

3 We hereby declare that we have read this thesis and in our opinion this thesis is sufficient in terms of scope and quality for the award of the degree of Master of Science (Quantity Surveying) Signature : Name of supervisor I : PM. Dr. Rosli Abdul Rashid Date : Signature : Name of supervisor II : PM. Dr. Razali Adul Hamid Date : Signature : Name of supervisor II : PM. Dr. Kherun Nita Bt. Ali Date :

4 I declare that this thesis entitled, The Framework for Minimizing Construction Time and Cost Overruns in Padang and Pekanbaru, Indonesia is the result of my own research except as cited in references. The thesis has not been accepted for any degree and is not concurrently submitted in candidature of any other degree. Signature :.. Name : Harisaweni Date : Januari 2007

5 Specially Dedicated to My Lovely: Husband (Ardiyansyah B. Syahrom, S.T), Daughter (Naaila Salwa Ardiyansyah). My Beloved Parent: Papa (H. M Nasir), and Mama (Dra. Hj. Hernita Rais), Parent-in-law: Papa (Syahrom), and Mamak (Rosni). Also My Sweet Sister and Brother: (Hersi Oliva, S.Si), (M. Fadli Arif), (Chrisnawati) and family.

6 ACKNOWLEDGEMENT Vision, values and courage are the main gift of this thesis. I am grateful for the inspiration and wisdom of many thoughts that have been instrumental in its formulation. First of all, I have readily acknowledged and thank to Allah SWT, the Omnipotent and Omniscient who created everything and in giving me the ability to begin and complete this project. I also wish to express my sincere appreciation to my supervisors PM. Dr. Rosli Abdul Rashid, PM Dr. Razali B. Adul Hamid and PM Dr. Kherun Nita Bt. Ali, for the guidance, advices, motivations, critics and friendship. Without their help, this thesis would not have been the same as presented here. I am also indebted to Universiti Teknologi Malaysia (UTM) for support in providing the fellowship scholarship for two semesters. My sincere appreciation is also extended to Bapak Prof. Ir. Dr. Zainai B. Mohamed and his wife Ibu Rosnah for help and kindness, so that I can pursue my study here. Many thanks to my friends in UTM K Isal and Sarah, I can not forget about our familiarity and friendship. Last but certainly not least, I want to thank my husband, papa, mama, my sweet sister and brother, and all of my big family, for their affection, prayer and support throughout my study. I love you all.

7 ABSTRACT It has been said that Indonesian constructions often suffer serious cost and time overrun. Kaming et.al., (1997a) and Trigunarsyah (2004) have studied the causes of these problems. However, their studies focused only on the high rise buildings in Jakarta and Yogyakarta. Since Indonesia is a large country with more than 3000 islands, it pertinent to ask whether their findings are also applicable to low-rise constructions in other major cities in the country. It appeared that the low-rise constructions in Padang and Pekanbaru, the two major cities in Sumatera, are also facing the problems of time and cost overrun. The issues bring about some related questions what are the causes of these problems? Are they similar to the findings made by Kaming and Trigunarsyah? How do contractors and managers in Padang and Pekanbaru manage construction cost and time? Are they adhering to the good practice of project cost and time management? What is considered as the best time and cost management practice? What is good time and cost management framework or model like? Generally, the aim of this study is to answer all these questions. But more specifically, the main objectives are threefold; firstly, to identify the major causes of project time and cost overrun in low - rise projects in Padang and Pekanbaru; secondly, to develop and establish the theoretical framework of a good construction time and cost management practice, and thirdly, to compare the time and cost management as currently practiced by contractors and consultants in Padang and Pekanbaru against the theoretical framework of the good time and cost management. The study focused on low-rise projects in Padang and Pekanbaru, Sumatera which are managed by contractors and consultants in class B and M respectively. The study looked at both from contractors and consultants perspectives. Data and information for the study are collected using a combination of documentary analysis and structured interview techniques. The data were systematically compiled and analysed using descriptive statistic techniques. The study shows that the major causes of project time and cost overrun in Padang and Pekanbaru ranges from lack of labour, lack of equipment to material delivery problems and frequent design changes. The study also highlighted that there are several approaches to efficient and effective project time and cost management. They can be summarized in the form of a framework or model that form the basis for the study. It is found that, generally contractors and consultants in Padang and Pekanbaru have adhered to the good time and cost management framework. However, the main area of concern is their lack of emphasis on the control aspects of the management. They are found to be lacking in monitoring the difference between planned and actual time and cost performance and identifying or establishing the deviation or problems associated with it. The study also pointed out that contractors and consultants in Padang and Pekanbaru need a clear and systematic project time and cost management framework that they can use as guidelines or reference for more efficient management.

8 vi ABSTRAK Kaming et.al., (1997a) dan B. Trigunarsyah (2004) masing-masing telah melakukan kajian berkenaan kepada permasalahaan kelebihan masa dan kos pada projek pembinaan di Indonesia. Kajian mereka hanya terfokus kepada bangunan bertingkattingkat banyak di kota-kota besar di Jawa seperti Jakarta dan Yogyakarta. Tetapi, persoalan sekarang adalah apakah temuan kajian mereka dapat digunakan untuk bangunan bertingkat rendah di kota-kota lain di Indonesia, khususnya Padang dan Pekanbaru di Sumatera. Berkaitan dengan isu tersebut, objektif kajian ini adalah untuk mengenal pasti penyebab-penyebab penting dari kelebihan masa dan kos pada projek binaan bertingkat rendah di Padang dan Pekanbaru, untuk menubuhkan prosedur kerja berdasarkan teori untuk sebuah pengurusan masa dan kos konstruksi yang baik, dan untuk membandingkan pengurusan masa dan kos yang diamalkan oleh perusahaan konstruksi di Padang dan Pekanbaru terhadap prosedur kerja secara teori dalam pengurusan masa dan kos. Kajian ini terfokus kepada projek bangunan bertingkat rendah dan terbatas hanya untuk mengkaji amalan yang digunakan oleh kontraktor dan konsultan golongan B dan M di dua kota besar di Sumatera Padang dan Pekanbaru. Kajian dilakukan berdasarkan survey temu muka langsung dengan menggunakan set questionnaire yang telah dipersiapkan. Data dikumpulkan dan dianalisa menggunakan metoda penghitungan purata. Kajian menemukan bahwa projek pembinaan di Padang dan Pekanbaru memerlukan sebuah metoda atau amalan untuk mengurus projek selama proses pembinaan sampai dengan sasaran akhir projek dicapai untuk mengurangi kelebihan masa dan kos. Itu dikarenakan permasalahan kelebihan masa dan kos terjadi selama proses tersebut yang disebabkan oleh aktivitas lingkungan sekitar projek, aktivitas peralatan dan pengurusan, aktivitas-aktivitas perubahan, aktivitas material atau bahan dan aktivitas tenaga kerja atau buruh. Setelah penyebab dari kelebihan masa dan kos dikenal pasti, sebagai sebuah metoda untuk membantu dalam pengurusan masa dan waktu di sebuah projek binaan, peneliti telah mencadangkan dan mengembangkan sebuah prosedur kerja. Prosedur kerja ini akan membantu dalam mengurus masa dan kos untuk mengurangi permasalahan kelebihan masa dan kos di lokasi projek binaan karena prosedur kerja tersebut akan memperlihatkan kepada team kerja projek tahapan prosedur kerja yang mereka harus beri perhatian lebih.

9 vii TABLE OF CONTENT CHAPTER TITLE PAGE DECLARATION DEDICATION ACKNOWLEDGEMENT ABSTRACT ABSTRAK TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES GLOSSARY LIST OF APPENDICES ii iii iv v vi vii xi xiv xv xvi 1 INTRODUCTION 1.1 Background of the Study 1.2 Statement of Issues 1.3 Previous Research 1.4 Objectives of Research 1.5 Research Scope 1.6 Thesis Organization

10 2 INDONESIAN CONSTRUCTION INDUSTRY 2.1 Introduction 2.2 The Indonesian Demography and Economy The Indonesian Construction Industry Construction Industry Performance in Padang and Pekanbaru The Structure of Indonesian Construction Industry Performance of construction projects in Indonesian viii PROJECT TIME AND COST MANAGEMENT 3.1 Introduction 3.2 Project Time and Cost Management Project Time Project Cost Problems Associated with Project Time and Cost The Definition of Project Time and Cost Management Project Management Objectives 3.3 Implication of Time and Cost Overrun 3.4 Causes of Project Time and Cost Overrun PROJECT TIME AND COST MANAGEMENT FRAMEWORK 4.1 Introduction 4.2 Definition of Framework 4.3 The purpose of Framework

11 ix 4.4 Project Time and i. Cost Management ii. Framework Cost Overrun Time and Cost Management in Context of Project Proposed Management Framework Design in The Questionnair Framework Summary of for the Time Data and Analysis Cost Management Discussions Proposed of Framework Development for Management Process Summary RESEARCH METHODOLOGY 79 CHAPTER 6 CONCLUTIONS 5.1 Introduction AND RECOMMENDATIONS Conclusions Research Process Recommendations Data Collection REFERENCES 6 THE MAJOR CAUSES OF TIME AND COST BIBLIOGRAPHY OVERRUN 147 APPENDICES 6.1 Introduction The Major Causes of Project Time and Cost Overrun 100 in Padang and Pekanbaru Contractors Perspectives Consultants Perspectives Combination of the Two Perspectives Conclusions TIME AND COST MANAGEMENT: A COMPARISON BETWEEN THE CURRENT 110 PRACTICE AND Consultant s THE Perspectives THEORETICAL 110 FRAMEWORK i. Time Overrun Introduction ii. Cost Overrun The Comparison between Time and Cost Management 110 as Currently Practiced against the Theoretical Framework

12 x 7.3 The Detailed Study Time Management Cost Management Discussions of Framework Development Conclusion CONCLUTIONS AND RECOMMENDATIONS Conclusions Findings and Conclusions Recommendations Future Study 141 REFERENCES 142 BIBLIOGRAPHY 157 APPENDIX A 160 APPENDIX B 168 APPENDIX C 175 APPENDIX D 189

13 xi LIST OF TABLES No. Title Page 2.1 Indonesian GDP by Industrial Origin (billion rupiahs) and the Percentage of the Growth to the GDP (%), Value of Construction Works in Indonesia According to the Type of Construction (billion rupiahs) from 2000 to Value of Construction Completed by Province (billion rupiahs), in Indonesian Construction Industry since 2000 to Total Number of Companies Register under LPJK, GAPEKSINDO and INKINDO by Province. 2.5 Total Numbers of Big, Medium and Small Companies based on The Organization Registered and the Qualification 2.6 Response rate of project completed on time and within budget 2.7 Response rate of project completed 2.8 Some Example of projects with time and cost overrun problems in Indonesian Construction Projects (Padang) 2.9 Variables of delays and their importance, frequency, and severity in construction in Indonesia (scale of indices for importance, frequency and severity ranges from 0 to 1) 2.10 Variables of cost overruns, their importance, frequency, and severity in Indonesian construction projects (scale of indices for importance, frequency and severity ranges from 0 to 1). 3.1 Comparative ranking of problems that cause time and cost overruns in different countries (Olomolaiye, et, al., 1998) 3.2 Case studies of the common causes of time and cost overrun 3.3 Derive from the synthesis of the previous researches (extracted Table 3.2)

14 xii 4.1 The various practices to reduce project time and cost overrun problems 4.2 The perspectives about several frameworks from several researchers. 5.1 Total Numbers of Big, Medium and Small Companies based on The Organization Registered and the Qualification. 5.2 Number of questionnaires distributed 5.3 Sample of pilot study questions 5.4 Results of the pilot study on causes of time and cost overrun 5.5 Results of pilot study The common causes of time and cost overrun problems (extracted from table 5.2) 5.5 Number of questionnaires distributed 6.1 Mean value of the major factors that cause of time and cost overrun problems contractor s perspectives 6.2 Time and cost overrun major causes and it activity categories based on the importance scale contractor s perspectives 6.3 The rank of the causes of time and cost overrun based on the mean values contractor s perspectives 6.4 Mean value of the major factors that cause of time and cost overrun problems consultant s perspectives 6.5 Time and cost overrun major causes and it activity categories based on the importance scale consultant s perspectives 6.6 The rank of the causes of time and cost overrun based on the mean values consultant s perspectives 6.7 The major factors that causes of time and cost overrun problems as perceived by contractors and consultants 6.8 The rank of the causes of time and cost overrun based on the mean values as perceived by contractors and consultants 7.1 The current practices of time management by the contractors in consultant s perspective 7.2 The current practice of time management by the contractors based on the frequency occurrence scale consultant s perspective

15 xiii 7.3 The current practices of time management by the contractors Contractor s own perspectives The current practice of time management by the contractors based on the frequency occurrence scale Contractor s own perspectives Mean values and the average for the current practices in time management by the contractors as perceived by contractors and consultants The rank of the current practices in time management by the contractors based on mean values average as perceived by the contractors and consultants The current practices of time management by the contractors based on the frequency occurrence scale as perceived by the contractors and consultants The current practices of cost management by the contractors in consultant s perspective The current practice of cost management by the contractors based on the frequency occurrence scale consultant s perspective The current practices of cost management by the contractors Contractor s own perspectives he current practice of cost management by the contractors based on the frequency occurrence scale Contractor s own perspectives Mean values and the average for the current practices in time management by the contractors as perceived by contractors and consultants The rank of the current practices in time management by the contractors based on mean values average as perceived by the contractors and consultants The current practices of cost management by the contractors based on the frequency occurrence scale as perceived by the contractors and consultants 129

16 xiv LIST OF FIGURES No Title Page The percentage of the growth of the Indonesian construction sectors (%) based on the GDP value 2.2 Several landmark construction projects in Pekanbaru 2.3 Several landmark construction projects in Padang 4.1 Basic construction project management philosophy (Ritz, 1994) 4.2 Time management cycle in construction industry (Clough, et. al., 2000) 4.3 Control process to control construction project (Ritz, 1994) 4.4 The essence of the contractor s control function (Ndekugri & McCaffer, 1988) 4.5 The trade-off analysis process in project management (Sunny & Kim, 1992) 4.6 The proposed framework for survey which developed based on the theory and the practices 5.1 The research stages 7.1 The proposed framework for survey (it was included in the questionnaire) which developed based on the theory and the practices 7.2 The survey results about the proposed framework 7.3 The developed framework for construction project in Padang and Pekanbaru based on the responds of the respondents to the proposed framework which was included in the questionnaire 7.4 The Detail of the developed framework for Construction Project in Padang and Pekanbaru

17 xv GLOSSARY BAPEKIN DPU GAPEKSINDO INKINDO Keppres LPJK LPJKN PP PPMK REI BPS : Badan Pengawas Konstruksi dan Investasi Nasional : Dinas Pekerjaan Umum : Gabungan Pengusaha Konstruksi Indonesia : Ikatan Konsultan Indonesia : Keputusan Presiden : Lembaga Pengembangan Jasa Konstruksi : Lembaga Pengembangan Jasa Konstruksi Nasional : Peraturan Pemerintah : Pusat Penilaian Mutu Konstruksi : Real Estate Indonesia : Biro Pusat Statistik

18 xvi LIST OF APPENDICES APPENDIX TITLE PAGE A LIST OF RESPONDENT 160 B PILOT STUDY 168 C QUESTIONNAIRES 175 D RIW CALCULATION 189

19 CHAPTER 1 INTRODUCTION 1.1 Background of the Study Indonesia is a nation of 13,500 islands scattered between Asia and Australia. It has total land area of 1,904,569 km 2, with total population in 2004 was around millions and become the fourth most populous nation in the world after China, India and the United States (BPS, 2004). The growth rate of Indonesian economic showed a better performance. It can show from the increasing of the annual gross domestic product (GDP) of the Indonesian for year to year. The annual gross domestic product (GDP) growth of the Indonesian in 2001 was around 3.83% and it increased sharply became 5.13% in the year 2004, (BPS, 2004). The rapid economic development and a steady growth of population have led to a significant increase in demand for housing, commercial and office buildings, and infrastructure such as roads and highways, airports, seaports, etc in the country. Indonesian construction industry experiences rapid changes and development since the 1950s. It grew rapidly until the economic crisis in 1997 and since that year until 2004, the construction sector has not shown positive signal to get out of the crisis. Since 1997, performance decreasing for each quarter of steeper than its increasing, and also has sharp fluctuation among quarters. It can be prove based on the annual gross domestic product (GDP) growth based on the industrial origin data.

20 2 The construction sector growth rate had decreased sharply since 1997, from 6.94% per-annum during the period of 1997 to 2000 to 5.52% per-annum during 2000 to 2004, (BPS, 2000). The country s rapid economic growth can also be seen in two major cities in the island of Sumatera, namely Padang and Pekanbaru. Padang and Pekanbaru as the central of West Sumatera and Riau province for the last ten years become the main choice of the investor to invest especially for construction projects for the Sumatera areas (Luthfi, 2006). It causes of their location benefit to have a cooperation link with neighbouring countries Malaysia and Singapore. Apart from their strategic location, the rapid growth of Padang and Pekanbaru was also induced by the government s policy of spreading the country s economic and physical growth to other parts of the country. The government realized in the last 25 years the economic development has been concentrated in Java (particularly in Jakarta) because most of the Indonesia s population is concentrated in Java (BPS, 2004). The economic growth of Pekanbaru and Padang itself, from 1998 to 2002 increased to 3.86 % and 2.94% where it was better than other cities in Sumatera where the average of their economic growth was only 0, 57 %. For the GDP value, Pekanbaru city had increased around 46.35% from 1999 to 2000, (www. Pekanbaru. go. id, 2005) and Padang also had increased 35.63% from 1999 to 2002, (www. Padang. go. id, 2005). Both cities enjoyed many favourable and physical. This can be seen by the development of many new buildings and infrastructure projects to support the increasing commercial and manufacturing activities. In fact, these two cities have been ranked on number 1 until 4 among other cities in Sumatera in term of total value of new construction completed and the number of construction companies. It also has a tendency to increase for year to year (BPS, 2004). The increase in construction activities in both Padang and Pekanbaru has contributed towards the growth of the two cities but it has also brought to light some

21 3 of inherent problems that have been mentioned by Kaming et, al., (1997a) and Trigunarsyah (2004). They pointed out that many construction projects in Indonesia suffer the problem of time and cost overrun. Time and cost are the two major elements in project management, apart from quality and scope. One of the biggest challenges in the management of construction project or to one of the project manager is to ensure that the project is completed on time and within estimated cost. Time and cost are the two elements, which are become the major concern to most clients/ owners and subject of continuous discussion and research. As pointed out by many, one of the interesting aspects of construction that makes it more challenging and sometimes full of surprises is that it is a very fragmented industry. It involves myriads of interrelated activities that are carried out by many separate individuals and organisations with different sizes and expertise that may come from different parts of the country. Due to the fragmented and complex nature of construction, many problems could arises everyday during the process of construction cause by factors such as weather, material delivery delay, labour dispute, equipment breakdowns, job accidents, change orders, and numerous other conditions. Many things could go wrong during the whole process of construction. All these problems will have serious impact on the performance of the projects, particularly on time and cost. To the clients, may they be the government or property developer, any delay, cost overrun or both will significantly affect their profit and the viability of the projects. Therefore it is important to properly manage a project time and cost. 1.2 Statement of Issues Like other developing countries, the Indonesian construction industry is also faced with serious time and cost overruns problems and it is become a matter of great concern to the government, private clients and the Indonesian construction community themselves.

22 4 Ir. Trisno Ario Sutanto, (2002) said that many construction projects in Indonesia suffer delays because many contractors are lacking in managerial knowledge and skills to manage the projects activities. The Indonesian Country Procurement Assessment Report (2001) on the other hand pointed out that, the main problems facing the Indonesian construction projects is time and cost overrun. It suggested that many firms and companies particular small and medium, lacks managerial competencies and skilled workers and resources. Then, according to Ir. Panggardjito (2001), there has not been enough market pressure to make them improve their capability, capacity and efficiency. These are some of the reasons why many construction projects in Indonesia cannot achieve an efficient time and cost in projects performance or have time and cost overrun problems. According to Kaming et.al., (1997a) delays and cost overrun are common problem on projects in large project in Indonesia. He identified that % of project managers completed more than 90% of their projects that they handled on time, 15. 2% of completed only between 70 90% of their projects and 30. 3% completed less than 70%. It also identifies only % project managers claimed that 90% of their projects that they handled were completed within budget, 51. 7% completed between 70 90% of their project and 27. 6% completed less than 70%. Trigunarsyah (2004) identified that only 30% of the projects were completed within the budget, 34% were less than the budget, and the remaining 36% exceeded the budget. The study also shows that only 47% of the projects were completed within the schedule, 15% ahead of schedule, and 38% were behind schedule. Both of the previous study above shows that, time and cost overrun problems in construction projects in Indonesia need to be overcome. However, their studies were limited to project in Java Island only. A construction project had the time and cost overrun if it was completed exceeding the time and cost estimated as written in the approval contract (Ali, 1992 and Saldjana, 1998). In the two of previous research above, time and cost overrun were defined as the extension of time beyond planned completion dates traceable to the contractors and it means it have use the same concept with Ali, (1992) and Saldjana, (1998) about when the time and cost overrun occurs.

23 5 As said above Padang and Pekanbaru as the central of West Sumatera and Riau province for the last ten years become the main choice of the investor to invest for the Sumatera areas specifically for construction projects (Luthfi, 2006). Based on statement above about the time and cost overrun problems that faced of by Indonesian construction industry, it means include in it were Padang and Pekanbaru cities. No previous research has been found about the time and cost overrun problem in Padang and Pekanbaru cities because the two of previous research above concentrated in Java; Kaming et.al., (1997a) concentrated their research in big cities Jakarta and Yogyakarta and B. Trigunarsyah (2004) concentrated the research in all big cities in Java. Several methods in managing project time and cost have been suggested or developed by experts; practitioners, and researchers. These methods can be considered to be the framework for the management of construction time and cost. Many construction companies, project management firms as well as individual project managers have adopted these methods in managing their projects. However, despite having these methods, the Indonesian construction is still faced with the problems of time and cost overrun, (Ir. Panggardjito, 2001), The Indonesian Country Procurement Assessment Report and Ir. Trisno Ario Sutanto (2002). The description of the issues and the previous research on the subject of time and cost overrun in Indonesian construction projects highlight some of major issues which can be summarized as: 1. Many books, journals and dissertation also pointed out the common causes of projects delays and cost overruns. What about in Indonesia? It becomes imperative to know what are the major causes that cause the time and cost overrun occurrence in Indonesia particularly in construction projects in Padang and Pekanbaru? 2. What is considered as the method for construction time and cost management as describe by many time and cost management framework? 3. How do the project managers in Padang and Pekanbaru manage the project time and cost? Do they have or follow or adopt any of the methods

24 6 management in framework model? If so, to what extent do they adhere to such a framework model in managing projects? A number of contractors and project managers claimed that some elements in the management framework were not carried out or given much attention. 1.3 Previous Research Based on several previous researches, it is known that time and cost overruns create a bad image for the construction industry in many countries including Indonesia. In several previous researches in several developing countries, we can identify the causes of construction project overrun in terms of time and cost. The studies relating to project problems that concerns the causes of time delays/ or cost overruns have been conducted worldwide from developed countries such USA and UK (Xiao and Proverbs, 2002a and 2002b) to developing countries such as Kuwait (Kartam et al., 2000), Nigeria (Okpala and Aniekwu, 1988; Mansfield et al., 1994; Dlakwa and Culpin, 1990; Okpala, 1986), Saudi Arabia (Assaf et al., 1995), Thailand (Ogunlana, 1996), Hongkong (Chan and Kumaraswamy, 1997), Malaysia (Wang, 1992) and Jordan (Al-Momani, 2000). Based on the research results in Thailand construction projects, Ogunlana (1996) said that, construction industry problems in developing countries could be nested in three layers: problems of shortages or inadequacies in industry infrastructure, problems caused by clients and consultants, and problems caused by contractor s incompetence/ inadequacies. Adequate planning at early stages of project execution is an important factor in reducing delays (time) and cost overrun in developing countries (Chalabi and Camp 1984). The need for a clear intention and understanding of the technical specifications could also reduce bottlenecks in the execution of projects (Jackson, 1990). Contractors on the other hand, do not honour contract deadlines and use shortages of materials as an excuse, and these problems can be averted if

25 7 professionals are more prudent in their design and more knowledgeable about the availability and usage of materials (Okpala and Aniekwu, 1988). The most important delay (time) and cost overrun factors according to contractors were preparation and approval of shop drawings, delays and cost overrun in contractors progress, payment by owners and design changes by owner (Assaf, et. al., 1995). Poor site management and supervision, unforeseen ground conditions, low speed of decision making involving all project teams, client initiated variations and necessary variations of works indicated by Chan and Kumaraswamy (1997) as cause factors for time and cost overruns in Hongkong. Mansfield et al. (1994) investigated the important factors responsible for delays and cost overruns in highway construction projects in Nigeria such as poor contract management, material shortages, inaccurate estimating and overall price fluctuations. On the other hand as said above, there was also previous research about time and cost overrun conducted in Indonesia by Kaming et. al., (1997a). This research identifies the variables that influences construction time and cost overrun group these variables into factors and analyse the relationship of these factors and to further enhance understanding of construction delays and cost overruns. Results of Kaming et. al. (1997a) research reflected the construction management problems on time and cost overrun factors which are limited to highrise projects in Indonesian big cities: Jakarta and Yogyakarta only that are also common in developing countries. On the other hand this research reflected the construction management problems on time and cost overrun in Sumatera particularly in Padang and Pekanbaru. This research studies the problem that were faced by B (big) and M (medium) companies classification where most of these companies concentrate on low-rise projects such as housing, road and others simple buildings because Padang and Pekanbaru still in developing the city areas concept. Kaming et. al. (1997b) also investigated five productivity problems that cause time and cost overruns among seven regions in Indonesia, namely Jakarta,

26 8 Yogyakarta, West Java, Central Java, East Java, Western and Eastern Indonesia. Five specific productivity problems are identified, i. e, lack of materials, rework, absenteeism, lack of equipment and tools and gang interference. Trigunarsyah (2004) survey results point to the fact that contractor involvement in pre-construction phases could reduce time and cost problems during site operation. The studies in other countries also highlighted the appropriate practices or suggested solution to reduce the overrun problems such as in Japan, USA, UK and Malaysia construction projects. There are also studies about the process and procedures, which is provide a framework about time and cost management stages that can be adopted to reduce overrun problems. It is good to refer to other practices because it will help in finding a better way to achieve the best results. It also could say that by adapting these other countries practices, processes or the procedures could help or assist Indonesian construction projects avoid being ambushed by unexpected overrun problems especially on time and cost during the construction process. However, through literature study that has been reviewed by researcher, there is no published previous research on this topic in Padang and Pekanbaru even in whole Indonesian construction projects. 1.4 Objectives of Research Based upon the global notion of Indonesian construction projects condition in the issue statements above, in order to reduce time and cost overrun problems in Indonesian construction projects particularly in Padang and Pekanbaru cities, this research is undertaken to provide a means: 1. To identify the major causes of project time and cost overrun in low - rise projects in Padang and Pekanbaru 2. To establish theoretical framework for a good construction time and cost management

27 9 3. To compare the time and cost management as currently practiced by construction companies in Padang and Pekanbaru against the theoretical time and cost management framework 1.5 Scope of the Research This research reviewed available literature to give a clear and precise understanding of the importance of time and cost management in construction projects performance. It also reviewed factors that cause time and cost overrun and the practices or suggested solution in order to reduce the time and cost overrun problems from the previous researches in other countries. Through literature study that has been reviewed by researcher, there is no published previous research on this topic in Padang and Pekanbaru construction industry. These findings will be used as references to support the research survey and the finding results. The survey was done in Indonesian construction projects with study areas Padang and Pekanbaru with the reason as stated in the research issues and the previous research parts above. Although specific in this two cities area, the results could reflect and assist to other cities in Indonesia which has the same problems in the construction projects especially for time and cost overrun problems. The objectives of study are to identify the major causes of time and cost overrun, to establish the theoretical framework for a good construction time and cost management that have been synthesized from several previous research and to compare time and cost management as currently practiced by construction companies in Padang and Pekanbaru against it. Then, the outcome of this survey that supported by the reviewed findings will become the basis to reduce the occurrence of the time and cost overrun problems which describe in framework for Indonesian construction projects, particularly Padang and Pekanbaru. Ali, (1992) and Saldjana, (1998) had defined about time and cost overrun and also Kaming, et. al., (1997a) and Trigunarsyah, (2004). They have same definition

28 10 about when the time and cost overrun occurs. This study also uses that definition as one of delimitation of this study. The sources of data are the class B (big) and M (medium) contractors and consultants in these two cities (Padang and Pekanbaru) because they have more experience and active in project activities per-year. The companies that are included in this classification are companies with vast experiences in managing projects. However, for Padang and Pekanbaru cities, kind of projects that are executed are many but most of them include in low-rise buildings such as housing, offices and others simple projects. Other limitation for this research is the companies selected for this research must be registered with INKINDO for consultants, GAPEKSINDO for contractors and LPJK for all companies that are not registered under any of them. Further limitation about the research sample will discusses in the methodology of the research. 1.6 Thesis Organization Chapter 2 reviews Indonesian construction industry, which discusses about the Indonesian demography and economic, its construction industry as general and particularly in Padang and Pekanbaru, the structure and the performance of the construction industry; company qualifications, company organizations, project procurement system, and the problems and the current practices of project management in Indonesian construction projects. Chapter 3 reviews project time and cost management which discusses about the definition of project time and cost, the definition of project time and cost management, project management objectives, problems associated with project time and cost, and the issues in project time and cost management and its implication to the project performance.

29 11 Chapter 4 reviews project time and cost management framework which discusses about what is the framework itself, the purpose of framework, the framework for project time and cost management, and the proposed framework for each the project management stages. Chapter 5 describes the methodology that adopted to conduct this research. Chapter 6 presents data analysis results on the major causes of project time and cost overrun based on the survey, discussions and the literature review findings as an achievement of the first objective of this research. Chapter 7 presents data analysis results on comparison of the time and cost management as currently practiced by Indonesian construction projects particularly in Padang and Pekanbaru as areas of study against the theoretical framework for a good construction time and cost management which were described in literature review findings results. From these discussions a proposed framework would be developed that can be used to reduce time and cost overrun problems for construction projects in Padang and Pekanbaru. This chapter shows the achievement of the second and third objective of this research. Chapter 8 presents the conclusions of this research and the recommendations for future research.

30 CHAPTER 2 INDONESIAN CONSTRUCTION INDUSTRY 2.1 Introduction Indonesia has experienced rapid economic development for the last 15 years. It has brought about a significant increase in construction activities that has benefited the country as a whole, but it also brought to light the problem that many construction projects suffered time and cost overrun. Before going further into the issues, it is most appropriate to consider Indonesia as a country; its demography, economies and construction industry. 2.2 The Indonesian Demography and Economic The Indonesian people occupy the world's largest archipelago, stretching more than 3,000 miles from mainland Southeast Asia eastward between Australia and the Philippines. Lying astride the sea lanes of communication between the Pacific and Indian oceans, Indonesia consists of over 13,500 islands with total land area of 1,904,569 km 2, (Bresnan, 1997). Total population of Indonesia in 1990 and 2000 was millions and millions, respectively. While total population in 2004 was around millions and it is the fourth most populous nation in the world after China, India and the United States, (BPS, 2004).

31 13 For the year 2004, growth rate of Indonesian economic showed a better performance than The annual gross domestic product (GDP) of the Indonesian in 2003 was 2, trillion rupiahs and it increased in the year of 2004 become 2, trillion rupiahs. Value of GDP on construction sector was 112, billion rupiahs in 2003 and 134, billion rupiahs in 2004, (BPS, 2004). Table 2.1 below will show the annual gross domestic product (GDP) of the Indonesian from based on the industrial origin and also the percentage of the growth The Indonesian Construction Industry Indonesian construction industry has under gone changes and development since the 1950s and grown rapidly until the The construction sector is very much depends on Indonesian economic as a whole. The economic crisis between 1997 to 2000 causes the industry to suffer and it is not yet recovers. Table 2.1 show the GDP of various economic sectors of the Indonesian Economic. The table shows that the growth of the Indonesian construction industry has been slow after the down turn in The growth of Indonesian construction industry had decreased sharply from 7.44% in 1997 to 6.46% in It has also drop considerably from 7.14% in 2000 to 5.30% in The table also show that the Indonesian construction industry is yet to fully recover from the impact of the 1996 financial crisis. It describe clearly in Figure 2.1, after the table.

32 14 Table 2.1 Indonesian GDP by Industrial Origin (billion rupiahs) and the Percentage of the Growth to the GDP (%), Industrial origin Agriculture, livestock, forestry & fishery 101, , , , , , , , Percentage of growth (%) Mining and quarrying 55, , , , , , , ,892.4 Percentage of growth (%) Manufacturing industry 168, , , , , , , , Percentage of growth (%) Electricity, gas and water supply 7, , , , , , , , Percentage of growth (%) construction 46, , , , , , , , Percentage of growth (%) Trade, hotel and restaurant 99, , , , , , , , 340 Percentage of growth (%) Transport and communication 38, , , , , , , , Percentage of growth (%) Financial, ownership and business services 54, , , , , , , , Percentage of growth (%) Services 55, , , , , , , , Percentage of growth (%) , , , 109, , 290, ,684, ,863, ,045, ,303, % 100 % 100 % 100 % 100 % 100 % 100 % 100 % Source: Statistical Yearbook of Indonesia (BPS, 2000 and BPS, 2004) 14

33 15 The percentage of the growth of the Indonesian construction sectors based on the GDP value (%) (%) Year Figure 2.1 The percentage of the growth of the Indonesian construction sectors (%) based on the GDP value The growth of the Indonesian construction industry has greatly influenced the country s economic development. Construction is considered unique in that it can stimulate the growth of other industrial sectors. The construction values become the main component of output structure of construction companies. Total value of construction that has finished during 2003 was decreased if compared with Total of construction value that have finished in 2002 was about 22.2 trillion rupiahs and in 2003 was about 20.2 trillion rupiahs or decreased about 9.0 percent but in 2004 it was increased 20.3 percent become 24.3 trillion rupiahs (BPS, 2004). Data about the total value of construction work completed and its value by type in Indonesian construction industry since 2000 to 2004 can be seeing in Table 2.2 as follows.

34 16 Table 2.2. Value of Construction Works in Indonesia According to the Type of Construction (billion rupiahs) from 2000 to 2004 Description Residential - Non-residential - Electrical installation - Water supply installation - Sanitary installation - Foundation - Sound system, AC, lift, etc - Water supply network - Gas pipe installation - Electricity network - Road & bridge works - Irrigation/ drainage 1,232,932 4,300,840 1,062, ,065 33,542 30,332 30, , , ,868 6,397,989 2,019,787 1,412,543 4,614,605 1,227, ,327 34,623 23,489 46, ,447 46, ,507 6,185,981 1,372,300 1,595,983 5,129,961 1,427, ,843 41,455 26,249 51, , , ,616 7,001,463 1,558,438 1,372,103 4,547,594 1,167, ,374 37,100 22,839 41, ,499 86, ,834 6,547,822 1,427,471 1,695,054 5,503,004 1,443, ,151 45,675 24,855 56, , , ,596 7,827,454 1,536,090 - Electric power supply 30, , , , ,306 - Construction or improvement of airport, harbor, bus station, etc - Other construction works - Total of value 210, ,397 16,944, ,675 3,240,289 19,086, ,799 3,674,823 22,177, ,054 3,450,716 20,154, ,267 4,228,121 24,340,912 Source: Statistical Yearbook of Indonesian 2004, (BPS, 2004) Table 2.2 above shows the value of the construction works from It shows that there is an increase in value but the annual rate of growth is not very favorable. Table 2.3 below will shows the performance of the construction industry of the various provinces in Indonesia. It shows that the value of work of construction in West Sumatera and Riau province where Padang and Pekanbaru is located be increase year to year.

35 17 Table 2.3 Value of Construction Completed by Province (billion rupiahs), in Indonesian Construction Industry since 2000 to 2004 Year Sumatera Island - Nanggroe Aceh Darussalam - North Sumatera - West Sumatera - Riau - Jambi - South Sumatera - Bengkulu - Lampung - Kepulauan Bangka Belitung Java Island - DKI Jakarta - West Java , , , , , , , , ,469 3,070,608 1,722, , , , , , , , , ,486 3,303,698 2,007, , , , , , , , , ,913 3,554,482 2,338, , , , , , , , , ,725 2,958,110 1,828, ,865 1,360,81 520, , , , , , ,206 3,824,321 2,724,825 - Central Java 1,305,114 1,469,297 1,654,135 1,563,100 1,665,517 - DI Yogyakarta 142, , , , ,161 - East Java 1,974,964 2,109,459 2,253,113 2,293,341 2,411,107 - Banten 309, , , , ,188 - Bali -Bali Island 401, , , , ,648 - West Nusa Tenggara -Lombok Island - East Nusa Tenggara -Timor island Kalimantan Island - West Kalimantan 635, , , , , , , , , , , ,482 1,054, , ,141 - Central Kalimantan 539, , , , ,104 - South Kalimantan 228, , , , ,946 - East Kalimantan Sulawesi Island 911,673 1,135,488 1,459,066 1,119,456 1,230,348 - North Sulawesi 240, , , , ,628 - Central Sulawesi 176, , , , ,443 - South Sulawesi 853, ,952 1,243,376 1,189,102 1,336,575 - South East Sulawesi 143, , , , ,894 - Gorontalo 21,371 24,254 27,407 31,864 36,404 - Maluku -Maluku s Island 64,688 69,474 72,254 70,263 72,257 - North Maluku -Halmahera Island 45,739 50,389 56,839 55,273 58,998 - Papua -Irian Jaya Island 690, , , , ,085 Total of value 16,944,628 19,086,328 22,177,359 20,154,199 24,340,912 Source: Statistical Yearbook of Indonesian 2004, (BPS, 2004)

36 Construction Industry Performance in Padang and Pekanbaru The country economic performance has also influence the economic and physical growth of many of its major cities. Two of them are Padang and Pekanbaru. There two cities have experience favorable economic and physical growth that saw through the growth of the construction sector. For the proper of this study, it is most appropriate to consider the growth of the economy and the construction of these two cities. a) Pekanbaru Pekanbaru is the capital city of province of Riau and it located in the East of Sumatera (See in Fig. 2.3 below). In 1988 Riau province had a population of and in 1999 it had increased to 3,345,467. In 2004, the approximated total is around 5,000,000 people and half of them settled in Pekanbaru (www. Pekanbaru. go. id, 2005). The economic growth of Pekanbaru itself from 1998 to 2002 increased to 3.86 % with a value 504,384 billion rupiahs. At the same time it was better than other cities in Sumatera where the average of their economic growth was only 0, 57 %. On the other hand, GDP of Pekanbaru cities had increased 46.35% with values 2,194 million rupiahs in 1999 and 3,212 million rupiahs in The major income of Pekanbaru comes from petroleum, palm oil and industrial sectors especially construction industry (www. Pekanbaru. go. id, 2005). Although the Indonesian economy is not stable yet, the property business and the construction activities in Pekanbaru in 2005 are still growing up. According to Kampriwoto (2004) as Head of Indonesian Real Estate Organization (REI) it can be proven by the number of the demand for housing projects, school, shops and the infrastructure buildings. Kampriwoto (2004) stated that, the highest demand in construction projects for Pekanbaru is for housing projects. During 2005, all the developers, contractors and consultants have targeted to build around 4000 housing projects. Start of January

37 19 until May 2005, around 2500 of the housing projects were completed and sold out. Till the end of 2005, around 1500 of the housing projects were planned to be built and have to be completed. Beside the housing projects, other projects that have also high demand are infrastructure projects especially roads because in recent years many new cities around Pekanbaru are developed. Its need many new roads and also the improvement of the old roads to connect Pekanbaru and the new cities. Figure 2.2 below shows several landmark construction projects that have been constructed in the last five years in Pekanbaru. Kelok 9 Fly-over Koto Panjang Dam Renovation of Simpang 3 Airport Figure 2.2 Several landmark construction projects in Pekanbaru

38 20 b) Padang Padang is the capital city of West Sumatera with a total land area of 42, km 2. Today, the population of West Sumatera in 2000 was 4, with density 104/ km 2. The economic growth of Padang city from 1998 until 2002 had increased to 2.94% with value 363,440 billion rupiahs. The GDP value of Padang city is 2,485 million rupiahs in 1999 and 3,590 million rupiahs in The major income of Padang city comes from cement, coalmines and farm (www. Padang. go. id, 2005). Same with Pekanbaru, according to Kampriwoto (2004) housing projects also have high demand in Pekanbaru but not as high as in Pekanbaru. Until end 2005, only 2500 housing project demanded has yet to be completed. Recently, for the last 5 years, landmark construction projects that have been constructed in Padang are Minang International Airport (MIA) and fly-over to the airport ( Ketaping / Dukuh fly-over) because its location is at the border of Padang city. Besides that public roads were built to connect to the entire area around the international airport. The new international airport also highlighted the need to improve many old roads in around Padang; make it wider to make the traffic flow smoothly (www. Padang. go. id, 2005). Figure 2.3 below, shows several landmark projects in Padang that have been constructed for the last 5 years. Minang International Airport (MIA)

39 21 Ketaping s/ Duku s gate and fly over perspectives Siti Nurbaya Bridge Figure 2.3 Several landmark construction projects in Padang The Structure of Indonesian Construction Industry a) Company Qualifications The Indonesian construction industry is made up of mainly the contractors, consultants, government s agencies, material supplier, and professional firms and companies. The government and professional bodies have been the key players in bringing about the change and development of the industry in terms of technology, work procedures and business practices. In 2001 the government set up a Construction Development Board (LPJK) to regulate and oversee the systematic practice of contractors and consultants. These include certification of the contractor and private consulting company s status, proper providing recommendations for them to get government projects. With its establishment all private or public contracting and consulting firms and companies

THICKNESS EFFECT ON THE PERFORMANCE OF COMPOSITE TUBE ABDULLAH OMAR BIN ABDUL AZIZ UNIVERSITI MALAYSIA PAHANG

THICKNESS EFFECT ON THE PERFORMANCE OF COMPOSITE TUBE ABDULLAH OMAR BIN ABDUL AZIZ UNIVERSITI MALAYSIA PAHANG THICKNESS EFFECT ON THE PERFORMANCE OF COMPOSITE TUBE ABDULLAH OMAR BIN ABDUL AZIZ UNIVERSITI MALAYSIA PAHANG THICKNESS EFFECT ON THE PERFORMANCE OF COMPOSITE TUBE ABDULLAH OMAR BIN ABDUL AZIZ Report submitted

More information

EFFECT OF PRECIPITATE HARDENING TREATMENT ON MICROSTRUCTURE AND MECHANICAL PROPERTIES OF CAST ALUMINUM SILICON ALLOY (A356) BENJUNIOR BINDAMIN

EFFECT OF PRECIPITATE HARDENING TREATMENT ON MICROSTRUCTURE AND MECHANICAL PROPERTIES OF CAST ALUMINUM SILICON ALLOY (A356) BENJUNIOR BINDAMIN EFFECT OF PRECIPITATE HARDENING TREATMENT ON MICROSTRUCTURE AND MECHANICAL PROPERTIES OF CAST ALUMINUM SILICON ALLOY (A356) BENJUNIOR BINDAMIN UNIVERSITY MALAYSIA PAHANG UNIVERSITI MALAYSIA PAHANG BORANG

More information

DESIGN AND FABRICATE MINI BIOGAS DIGESTER AHMAD AIZAD BIN JAMIL (MB08044) UNIVERSITI MALAYSIA PAHANG

DESIGN AND FABRICATE MINI BIOGAS DIGESTER AHMAD AIZAD BIN JAMIL (MB08044) UNIVERSITI MALAYSIA PAHANG DESIGN AND FABRICATE MINI BIOGAS DIGESTER AHMAD AIZAD BIN JAMIL (MB08044) UNIVERSITI MALAYSIA PAHANG BORANG PENGESAHAN STATUS TESIS JUDUL DESIGN AND FABRICATE THE MINI BIOGAS DIGESTER SESI PENGAJIAN: 2010/2011

More information

BORANG PENGESAHAN STATUS TESIS

BORANG PENGESAHAN STATUS TESIS UNIVERSITI MALAYSIA PAHANG BORANG PENGESAHAN STATUS TESIS JUDUL: EVALUATION AND OPTIMIZATION OF HEAT EXTRACTION DEVICE SESI PENGAJIAN: 2010/2011 Saya AZRI AMZARI BIN RAMLI (880613-35-5401) (HURUF BESAR)

More information

BORANG PENGESAHAN STATUS TESIS

BORANG PENGESAHAN STATUS TESIS PSZ 19:16 (Pind. 1/97) UNIVERSITI TEKNOLOGI MALAYSIA BORANG PENGESAHAN STATUS TESIS JUDUL: MODELING OF SHEAR BOND IN COMPOSITE SLAB USING INTERFACE ELEMENT SESI PENGAJIAN: 2005 / 2006 Saya TOH YIK FUNG

More information

REMOVAL EFFICIENCY OF ZINC AND COPPER IN SYNTHETIC WASTEWATER USING CONSTRUCTED WETLAND ABDUL ZUL AFIF BIN ABD MANAP UNIVERSITI MALAYSIA PAHANG

REMOVAL EFFICIENCY OF ZINC AND COPPER IN SYNTHETIC WASTEWATER USING CONSTRUCTED WETLAND ABDUL ZUL AFIF BIN ABD MANAP UNIVERSITI MALAYSIA PAHANG REMOVAL EFFICIENCY OF ZINC AND COPPER IN SYNTHETIC WASTEWATER USING CONSTRUCTED WETLAND ABDUL ZUL AFIF BIN ABD MANAP UNIVERSITI MALAYSIA PAHANG 2 UNIVERSITI MALAYSIA PAHANG BORANG PENGESAHAN STATUS TESIS

More information

THEORETICAL ANALYSIS OF SOLAR WATER HEATING SYSTEM AHMAD ASYRAF BIN RAMLI BACHELOR OF ENGINEERING UNIVERSITI MALAYSIA PAHANG

THEORETICAL ANALYSIS OF SOLAR WATER HEATING SYSTEM AHMAD ASYRAF BIN RAMLI BACHELOR OF ENGINEERING UNIVERSITI MALAYSIA PAHANG THEORETICAL ANALYSIS OF SOLAR WATER HEATING SYSTEM AHMAD ASYRAF BIN RAMLI BACHELOR OF ENGINEERING UNIVERSITI MALAYSIA PAHANG 2010 UNIVERSITI MALAYSIA PAHANG BORANG PENGESAHAN STATUS TESIS JUDUL: Saya THEORETICAL

More information

MONITORING TOOL WEAR PROCESS IN TURNING MACHINE USING ACOUSTIC EMISSION TECHNIQUE

MONITORING TOOL WEAR PROCESS IN TURNING MACHINE USING ACOUSTIC EMISSION TECHNIQUE MONITORING TOOL WEAR PROCESS IN TURNING MACHINE USING ACOUSTIC EMISSION TECHNIQUE AZLAN BIN MOHD SAINI BACHELOR OF ENGINEERING UNIVERSITI MALAYSIA PAHANG 2010 MONITORING TOOL WEAR PROCESS IN TURNING MACHINE

More information

EXPERIMENTAL INVESTIGATION OF THE MINIMUM QUANTITY LUBRICATION IN END-MILLING OF AA6061T6 BY COATED CARBIDE TOOLS ABDUL MUHAIMIN BIN ARIS

EXPERIMENTAL INVESTIGATION OF THE MINIMUM QUANTITY LUBRICATION IN END-MILLING OF AA6061T6 BY COATED CARBIDE TOOLS ABDUL MUHAIMIN BIN ARIS EXPERIMENTAL INVESTIGATION OF THE MINIMUM QUANTITY LUBRICATION IN END-MILLING OF AA6061T6 BY COATED CARBIDE TOOLS ABDUL MUHAIMIN BIN ARIS Report submitted in partial fulfillment of requirements for award

More information

COMPARISON STUDY OF CORROSION MEASUREMENT TECHNIQUE FADLI BIN

COMPARISON STUDY OF CORROSION MEASUREMENT TECHNIQUE FADLI BIN i COMPARISON STUDY OF CORROSION MEASUREMENT TECHNIQUE FADLI BIN MISLAN@MISHADI This thesis is submitted as a partial fulfilment of the requirements for the award of the Bachelor of Mechanical Engineering

More information

NATURAL GAS DEHYDRATION USING TRIETHYLENE GLYCOL (TEG) AHMAD SYAHRUL BIN MOHAMAD UNIVERSITI MALAYSIA PAHANG

NATURAL GAS DEHYDRATION USING TRIETHYLENE GLYCOL (TEG) AHMAD SYAHRUL BIN MOHAMAD UNIVERSITI MALAYSIA PAHANG NATURAL GAS DEHYDRATION USING TRIETHYLENE GLYCOL (TEG) AHMAD SYAHRUL BIN MOHAMAD UNIVERSITI MALAYSIA PAHANG UNIVERSITI MALAYSIA PAHANG BORANG PENGESAHAN STATUS TESIS PSZ 19:16 (Pind. 1/97) JUDUL : NATURAL

More information

DESIGN AND INVESTIGATE THE MANUAL SUN TRACKING SYSTEM IMRAN BIN AHMAD ROSDI BACHELOR OF ENGINEERING UNIVERSITY MALAYSIA PAHANG

DESIGN AND INVESTIGATE THE MANUAL SUN TRACKING SYSTEM IMRAN BIN AHMAD ROSDI BACHELOR OF ENGINEERING UNIVERSITY MALAYSIA PAHANG DESIGN AND INVESTIGATE THE MANUAL SUN TRACKING SYSTEM IMRAN BIN AHMAD ROSDI BACHELOR OF ENGINEERING UNIVERSITY MALAYSIA PAHANG 2012 UNIVERSITI MALAYSIA PAHANG BORANG PENGESAHAN STATUS TESIS JUDUL: DESIGN

More information

EFFECT OF CUTTING SPEED AND DEPTH OF CUT ON SURFACE ROUGHNESS OF OIL-QUENCHED MILD STEEL YEONG CHOY HUEY UNIVERSITI MALAYSIA PAHANG

EFFECT OF CUTTING SPEED AND DEPTH OF CUT ON SURFACE ROUGHNESS OF OIL-QUENCHED MILD STEEL YEONG CHOY HUEY UNIVERSITI MALAYSIA PAHANG EFFECT OF CUTTING SPEED AND DEPTH OF CUT ON SURFACE ROUGHNESS OF OIL-QUENCHED MILD STEEL YEONG CHOY HUEY UNIVERSITI MALAYSIA PAHANG UNIVERSITI MALAYSIA PAHANG BORANG PENGESAHAN STATUS TESIS JUDUL: Saya

More information

UNIVERSITI MALAYSIA PAHANG BORANG PENGESAHAN STATUS TESIS

UNIVERSITI MALAYSIA PAHANG BORANG PENGESAHAN STATUS TESIS UNIVERSITI MALAYSIA PAHANG BORANG PENGESAHAN STATUS TESIS JUDUL: EFFECT OF HEAT TREATMENT ON EROSION-CORROSION SESI PENGAJIAN: 2011/2012 Saya, AHMAD SYAZWAN BIN YAHYA (900709-11-5205) (HURUF BESAR) mengaku

More information

DEVELOPMENT OF AUTOMATED STORAGE AND RETRIEVAL SYSTEM (AS/RS) PROTOTYPE ABDUL HALIM BIN HADZIR BACHELOR OF ENGINEERING UNIVERSITI MALAYSIA PAHANG

DEVELOPMENT OF AUTOMATED STORAGE AND RETRIEVAL SYSTEM (AS/RS) PROTOTYPE ABDUL HALIM BIN HADZIR BACHELOR OF ENGINEERING UNIVERSITI MALAYSIA PAHANG DEVELOPMENT OF AUTOMATED STORAGE AND RETRIEVAL SYSTEM (AS/RS) PROTOTYPE ABDUL HALIM BIN HADZIR BACHELOR OF ENGINEERING UNIVERSITI MALAYSIA PAHANG 2010 UNIVERSITI MALAYSIA PAHANG BORANG PENGESAHAN STATUS

More information

i v p. i >:S!Of» MFT80DS

i v p. i >:S!Of» MFT80DS : v> i v p. i >:S!Of» K m m m m x i bin hanafi MFT80DS PERPUSTAKAAN KUi TTHO 3 OOOO 00102518 2 KOLEJ UNIVERSITI TEKNOLQGI TUN HUSSEIN ONN BORANG PENGESAHAN STATUS TESIS* JUDUL: l.

More information

EVALUATION OF PRODUCT ASSEMBLABILITY USING LUCAS HULL METHOD

EVALUATION OF PRODUCT ASSEMBLABILITY USING LUCAS HULL METHOD UNIVERSITI TEKNIKAL MALAYSIA MELAKA EVALUATION OF PRODUCT ASSEMBLABILITY USING LUCAS HULL METHOD Thesis submitted in accordance with the requirements of Universiti Teknikal Malaysia Melaka for the Bachelor

More information

UNIVERSITI TEKNOLOGI MALAYSIA

UNIVERSITI TEKNOLOGI MALAYSIA UNIVERSITI TEKNOLOGI MALAYSIA PSZ 19:16 (Pind. 1/97) BORANG PENGESAHAN STATUS TESIS JUDUL: MAINTENANCE FACTORS IN BUILDING DESIGN Saya SESI PENGAJIAN: 2005/2006 ROZITA BINTI ARIS (HURUF BESAR) mengaku

More information

BORANG PENGESAHAN STATUS TESIS***

BORANG PENGESAHAN STATUS TESIS*** UNIVERSITI TEKNOLOGI MALAYSIA BORANG PENGESAHAN STATUS TESIS*** PSZ 19 : 16 JUDUL : THE SELECTION OF CONSTRUCTION S PROJECT MANAGER BY USING ANALYTICAL HIERARCHY PROCESS (AHP) SESI PENGAJIAN : 2005 / 2006

More information

PCRPUSTAKAAN Klli T THO M! :!l Pi I I ill H 3 OOOO

PCRPUSTAKAAN Klli T THO M! :!l Pi I I ill H 3 OOOO IHVIisTlkA'IIOK!i\ UI: CI 1 I S USING TEACH' m i m \ K BIN ISA WDiiO-GENIUS PCRPUSTAKAAN Klli T THO M! :!l Pi I I ill H 3 OOOO 00102566 1 KOLEJ UNIYERSITI TEKNOLOGI TUN HUSSEIN ONN BORANG PENGESAHAN STATUS

More information

SCHEDULING ON TRANSPORTATION FOR INDUSTRIALIZED BUILDING SYSTEMS

SCHEDULING ON TRANSPORTATION FOR INDUSTRIALIZED BUILDING SYSTEMS SCHEDULING ON TRANSPORTATION FOR INDUSTRIALIZED BUILDING SYSTEMS FOONG KOK LI This project report is submitted as a fulfilment of the requirements for the award of the degree of Master of Science (Construction

More information

Development of a Semi-Automated Material Handling System for Laser Cutting Machine

Development of a Semi-Automated Material Handling System for Laser Cutting Machine UNIVERSITI TEKNIKAL MALAYSIA, MELAKA Development of a Semi-Automated Material Handling System for Laser Cutting Machine Thesis submitted in accordance with the requirements of the Universiti Teknikal Malaysia,

More information

BORANG PENGESAHAN STATUS TESIS

BORANG PENGESAHAN STATUS TESIS PSZ 19:16 (Pind. 1/97) UNIVERSITI TEKNOLOGI MALAYSIA BORANG PENGESAHAN STATUS TESIS JUDUL : CORROSION MANAGEMENT OF STEEL REINFORCED CONCRETE SESI PENGAJIAN : 2005 / 2006 Saya CHEW WE-SEN (HURUF BESAR)

More information

BORANG PENGESAHAN STATUS TESIS

BORANG PENGESAHAN STATUS TESIS PSZ 19:16 (Pind. 1/97) UNIVERSITI TEKNOLOGI MALAYSIA BORANG PENGESAHAN STATUS TESIS JUDUL: THE EFFECT OF ECCENTRICITY AT BEAM SUPPORT TO BEAM STIFFNESS Saya SESI PENGAJIAN: 2005/2006 AHMAD ZURISMAN BIN

More information

Manufacturing Process Selection for Circular Blade Using Analytical Hierarchy Process

Manufacturing Process Selection for Circular Blade Using Analytical Hierarchy Process Manufacturing Process Selection for Circular Blade Using Analytical Hierarchy Process This report submitted in accordance with requirement of the Universiti Teknikal Malaysia Melaka (UTeM) for the Bachelor

More information

Line Balancing and Optimization for Single Model Assembly Line at a Small Medium Industry (SMI)

Line Balancing and Optimization for Single Model Assembly Line at a Small Medium Industry (SMI) UNIVERSITI TEKNIKAL MALAYSIA MELAKA Line Balancing and Optimization for Single Model Assembly Line at a Small Medium Industry (SMI) Thesis submitted in accordance with the partial requirements of the Universiti

More information

BORANG PENGESAHAN STATUS TESIS

BORANG PENGESAHAN STATUS TESIS PSZ 19:16 ( Pind. 1 / 97 ) UNIVERSITI TEKNOLOGI MALAYSIA BORANG PENGESAHAN STATUS TESIS JUDUL : CLIENT SATISFACTION ON CONTRACTORS WORK PERFORMANCE SESI PENGAJIAN : 2005 / 2006 Saya I HADIATUL AIDA BINTI

More information

PRODUCTION OPERATING SYSTEMS: A CASE STUDY OF MAKE-TO-STOCK AND MAKE-TO- ORDER SYSTEM

PRODUCTION OPERATING SYSTEMS: A CASE STUDY OF MAKE-TO-STOCK AND MAKE-TO- ORDER SYSTEM PRODUCTION OPERATING SYSTEMS: A CASE STUDY OF MAKE-TO-STOCK AND MAKE-TO- ORDER SYSTEM NUR NADIA RAMADHANI BINTI MD YUSOFF B050810139 UNIVERSITI TEKNIKAL MALAYSIA MELAKA 2012 UNIVERSITI TEKNIKAL MALAYSIA

More information

WATER QUALITY STUDY ON UNIMAS LAKE. Muhammad Shaiful Bin Nordin

WATER QUALITY STUDY ON UNIMAS LAKE. Muhammad Shaiful Bin Nordin WATER QUALITY STUDY ON UNIMAS LAKE Muhammad Shaiful Bin Nordin Bachelor of Engineering (Civil Engineering) 2009 UNIVERSITI MALAYSIA SARAWAK BORANG PENGESAHAN STATUS TESIS Judul: WATER QUALITY STUDY ON

More information

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA UNIVERSITI TEKNIKAL MALAYSIA MELAKA MEASUREMENT ERROR AND UNCERTAINTY ANALYSIS BY EXCEL This report submitted in accordance with the requirements of the Universiti Teknikal Malaysia Melaka (UTeM) for the

More information

BORANG PENGESAHAN STATUS TEStS* JUDUL : CARL'S RESTAURANT DELIVERY ONLINE SYSTEM

BORANG PENGESAHAN STATUS TEStS* JUDUL : CARL'S RESTAURANT DELIVERY ONLINE SYSTEM BORANG PENGESAHAN STATUS TEStS* JUDUL : CARL'S RESTAURANT DELIVERY ONLINE SYSTEM SESI PENGAJIAN : 2009 I 20 I 0 Saya FARAH NABILA BT MD NA WI mengaku membenarkan tesis Projek Sarjana Muda ini disimpan

More information

BORANG PENGESAHAN STATUS TESIS NUR HANISAH BINTI ZUBIR (HURUF BESAR) Tarikh: JUDUL: RAKAN LAP SESI PENGAJLAN: Saya

BORANG PENGESAHAN STATUS TESIS NUR HANISAH BINTI ZUBIR (HURUF BESAR) Tarikh: JUDUL: RAKAN LAP SESI PENGAJLAN: Saya BORANG PENGESAHAN STATUS TESIS JUDUL: RAKAN LAP SESI PENGAJLAN: 2008 12009 Saya NUR HANISAH BINTI ZUBIR (HURUF BESAR) mengaku membenarkan tesis (PSMISarjana/Doktor Falsafah) ini disimpan di Perpustakaan

More information

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA UNIVERSITI TEKNIKAL MALAYSIA MELAKA DESIGN AND SIMULATION OF WATER LEVEL AND FLOW CONTROL SYSTEM USING ANDROID This report submitted in accordance with requirement of the Universiti Teknikal Malaysia Melaka

More information

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA UNIVERSITI TEKNIKAL MALAYSIA MELAKA DESIGN AND SIMULATION OF IN-PIPE GENERATOR This report is submitted in accordance with the requirement of the Universiti Teknikal Malaysia Melaka (UTeM) for the Bachelor

More information

DESIGN ANALYSIS OF SHEET METAL WELDED JOINT BASED ON TRANSIENT THERMAL CONDITION

DESIGN ANALYSIS OF SHEET METAL WELDED JOINT BASED ON TRANSIENT THERMAL CONDITION DESIGN ANALYSIS OF SHEET METAL WELDED JOINT BASED ON TRANSIENT THERMAL CONDITION LAU LI YING B051010051 UNIVERSITI TEKNIKAL MALAYSIA MELAKA 2014 UNIVERSITI TEKNIKAL MALAYSIA MELAKA DESIGN ANALYSIS OF SHEET

More information

UNlVERSITI TEKNOLOGI MALAYSIA BORANG PENGESAHAN STATUS THE SENSITIVITY OF CERAMIC GAS SENSOR BASED ON SESI PENGAJIAN : 1999/2000 SYABRUL HUMAIDI

UNlVERSITI TEKNOLOGI MALAYSIA BORANG PENGESAHAN STATUS THE SENSITIVITY OF CERAMIC GAS SENSOR BASED ON SESI PENGAJIAN : 1999/2000 SYABRUL HUMAIDI UNlVERSITI TEKNOLOGI MALAYSIA PSZ 19:16(Pind. 1/97) BORANG PENGESAHAN STATUS TESIS JUDUL: THE SENSITIVITY OF CERAMIC GAS SENSOR BASED ON SnOz-NbzOs-CuO SYSTEM SESI PENGAJIAN : 1999/2000 Saya SYABRUL HUMAIDI

More information

CHARACTERIZATION AND MODELING OF STATIC RECOVERY PROCESS OF BRASS (COPPER ZINC) ALLOY MOHAMAD HAFIZUL HISYAM BIN YAHYA UNIVERSITI MALAYSIA PAHANG

CHARACTERIZATION AND MODELING OF STATIC RECOVERY PROCESS OF BRASS (COPPER ZINC) ALLOY MOHAMAD HAFIZUL HISYAM BIN YAHYA UNIVERSITI MALAYSIA PAHANG i CHARACTERIZATION AND MODELING OF STATIC RECOVERY PROCESS OF BRASS (COPPER ZINC) ALLOY MOHAMAD HAFIZUL HISYAM BIN YAHYA UNIVERSITI MALAYSIA PAHANG ii UNIVERSITI MALAYSIA PAHANG BORANG PENGESAHAN STATUS

More information

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA UNIVERSITI TEKNIKAL MALAYSIA MELAKA A Study on the Structural Integrity of Octagonal Shape Bottle Design This report submitted in accordance with requirement of the Universiti Teknikal Malaysia Melaka

More information

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA UTeM Library (Pind.1/2005) UNIVERSITI TEKNIKAL MALAYSIA MELAKA BORANG PENGESAHAN STATUS TESIS* JUDUL: The Study of Mechanical Properties and Microstructure of Thermal- Curing Process on Natural Fiber (Kenaf)

More information

BORANG PENGESAHAN STATUS TESIS υ

BORANG PENGESAHAN STATUS TESIS υ UNIVERSITI TEKNOLOGI MALAYSIA PSZ 19:16 (Pind.1/ 97) BORANG PENGESAHAN STATUS TESIS υ JUDUL : DEVELOPMENT OF CIVIL AND STRUCTURAL CONSULTANT S PERFORMANCE EVALUATION SESI PENGAJIAN: 2005 / 2006 Saya JAYASELVI

More information

TYRE TRADING MANAGEMENT SYSTEM KHOR SHUIN CHIN UNIVERSITI TEKNIKAL MALAYSIA MELAKA

TYRE TRADING MANAGEMENT SYSTEM KHOR SHUIN CHIN UNIVERSITI TEKNIKAL MALAYSIA MELAKA TYRE TRADING MANAGEMENT SYSTEM KHOR SHUIN CHIN UNIVERSITI TEKNIKAL MALAYSIA MELAKA BORANG PENGESAHAN STATUS TESIS JUDUL : TYRE TRADING MANAGEMENT SYSTEM SESI PENGAJIAN : 2012/2013 Saya KHOR SHUIN CHIN

More information

WASTE THERMAL HEAT PUMP

WASTE THERMAL HEAT PUMP WASTE THERMAL HEAT PUMP Nicholas Han Tin Huat Bachelor of Engineering with Honours (Mechanical and Manufacturing Engineering) 2010 UNIVERSITI MALAYSIA SARAWAK R13a Judul: WASTE THERMAL HEAT PUMP BORANG

More information

BORANG PENGESAHAN STATUS TESIS*

BORANG PENGESAHAN STATUS TESIS* BORANG PENGESAHAN STATUS TESIS* JUDUL: e-car UTeM SESI PENGAJIAN: 2-2012 I 2013 Saya NORAZLINDA BINTI IBRAHIM mengaku membenarkan tesis Projek Sarjana Muda ini disimpan di Perpustakaan Fakulti Teknologi

More information

BORANG PENGESAHAN STATUS THESIS JUDUL: PAYROLL SYSTEM LIM KOK YONG (HURUF BESAR)

BORANG PENGESAHAN STATUS THESIS JUDUL: PAYROLL SYSTEM LIM KOK YONG (HURUF BESAR) BORANG PENGESAHAN STATUS THESIS JUDUL: PAYROLL SYSTEM SESI PENGAJIAN: 2007 Saya LIM KOK YONG (HURUF BESAR) mengaku membenarkan tesis (PSM/Sarjana/Doktor Falsafah) ini disimpan di Perpustakaan Fakulti Teknologi

More information

Faculty of Engineering

Faculty of Engineering Faculty of Engineering WATER PIPING AND DRAINAGE SYSTEM IN A BUILDING Domincie Anak Winston Bale Bachelor of Engineering with Honours (Civil Engineering) 2006 UNIVERSITI MALAYSIA SARAWAK BORANG PENGESAHAN

More information

Quality Improvement Using Classical Method Concept in Injection Molding Manufacturing

Quality Improvement Using Classical Method Concept in Injection Molding Manufacturing UNIVERSITI TEKNIKAL MALAYSIA MELAKA Quality Improvement Using Classical Method Concept in Injection Molding Manufacturing Thesis submitted in accordance with the partial requirement of the Universiti Teknikal

More information

Faculty of Engineering

Faculty of Engineering Faculty of Engineering MODIFICATION AND FABRICATION OF A HYBRID SOLAR PELTIER- ADSORPTION COOLER Tie Soon Hieng Bachelor of Engineering with Honours (Mechanical and Manufacturing Engineering) 2008 UNIVERSITI

More information

Faculty of Engineering ANALYSIS OF WOOD WASTE COMPOSITE. Omar Qaiyum Bin Sulaiman

Faculty of Engineering ANALYSIS OF WOOD WASTE COMPOSITE. Omar Qaiyum Bin Sulaiman Faculty of Engineering ANALYSIS OF WOOD WASTE COMPOSITE Omar Qaiyum Bin Sulaiman Bachelor of Engineering with Honours (Mechanical and Manufacturing Engineering) 2008 UNIVERSITI MALAYSIA SARAWAK BORANG

More information

Faculty of Engineering

Faculty of Engineering Faculty of Engineering BACKWATER EFFECT AT SUNGAI MAONG KIRI Basil Anak Benjamin Bachelor of Engineering with Honours (Civil Engineering) 2008 UNIVERSITI MALAYSIA SARAWAK BORANG PENGESAHAN STATUS TESIS

More information

EXPERIMENTAL STUDIES ON BIOMASS COMBUSTION TO PRODUCE ENERGY. Ramie Punas

EXPERIMENTAL STUDIES ON BIOMASS COMBUSTION TO PRODUCE ENERGY. Ramie Punas EXPERIMENTAL STUDIES ON BIOMASS COMBUSTION TO PRODUCE ENERGY Ramie Punas Bachelor of Engineering with Honours (Mechanical Engineering and Manufacturing System) 2005 UNIVERSITI MALAYSIA SARAWAK R13a BORANG

More information

GROCERY SALES AND STOCKS MANAGEMENT SYSTEM (GSSMS) HWA CHEN ANN UNIVERSITI TEKNIKAL MALAYSIA MELAKA

GROCERY SALES AND STOCKS MANAGEMENT SYSTEM (GSSMS) HWA CHEN ANN UNIVERSITI TEKNIKAL MALAYSIA MELAKA GROCERY SALES AND STOCKS MANAGEMENT SYSTEM (GSSMS) HWA CHEN ANN UNIVERSITI TEKNIKAL MALAYSIA MELAKA BORANG PENGESAHAN STATUS TESIS JUDUL: GROCERY SALES AND STOCKS MANAGEMENT SYSTEM (GSSMS) SESI PENGAJIAN:

More information

UNIVERSITI TEKNIKAL MALAYSIA MELAKA DESIGN IMPROVEMENT ON SUPPORT SYSTEM FOR RESIN BASED 3D PRINTER

UNIVERSITI TEKNIKAL MALAYSIA MELAKA DESIGN IMPROVEMENT ON SUPPORT SYSTEM FOR RESIN BASED 3D PRINTER UNIVERSITI TEKNIKAL MALAYSIA MELAKA DESIGN IMPROVEMENT ON SUPPORT SYSTEM FOR RESIN BASED 3D PRINTER This report submitted accordance with requirement of the Universiti Teknikal Malaysia Melaka (UTeM) for

More information

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA UNIVERSITI TEKNIKAL MALAYSIA MELAKA EVALUATION OF CMM S UNCERTAINTY BY USING EXCEL This report submitted in accordance with requirement of the Universiti Teknikal Malaysia Melaka (UTeM) for the Bachelor

More information

EVALUATION OF NATURAL FIBER COMPOSITE MATERIALS CHARACTERISTIC BY USING FINITE ELEMENT

EVALUATION OF NATURAL FIBER COMPOSITE MATERIALS CHARACTERISTIC BY USING FINITE ELEMENT EVALUATION OF NATURAL FIBER COMPOSITE MATERIALS CHARACTERISTIC BY USING FINITE ELEMENT ANALYSIS Thian Chee Lip TA 418.9 C6 T422 Bachelor of Engineering with Honours (Mechanical and Manufacturing System

More information

PROPERTIES OF POLYSTYRENE CONCRETE BRICKS WITH SILICA FUME. John Kho Han Shyan

PROPERTIES OF POLYSTYRENE CONCRETE BRICKS WITH SILICA FUME. John Kho Han Shyan PROPERTIES OF POLYSTYRENE CONCRETE BRICKS WITH SILICA FUME John Kho Han Shyan A thesis submitted in partial fulfilment of the requirements for the award of the degree of Bachelor of Engineering with Honours

More information

Faculty of Engineering

Faculty of Engineering Faculty of Engineering THE EVALUATION OF MARSHALL PROPERTIES OF OIL PALM FLY ASH (OPFASH) AS A FILLER MATERIAL IN ACW 20 HOT MIX ASPHALT (HMA) HENRIETTA RAMUS ANAK HENRY MAKIM Bachelor of Engineering with

More information

UNIVERSITI MALAYSIA SARAWAK BORANG PENYERAHAN STATUS TESIS SRI RUM1 ANANDA MELANOS B. BASRI (HURUF BESAR)

UNIVERSITI MALAYSIA SARAWAK BORANG PENYERAHAN STATUS TESIS SRI RUM1 ANANDA MELANOS B. BASRI (HURUF BESAR) p~ UNIVERSITI MALAYSIA SARAWAK BORANG PENYERAHAN STATUS TESIS Judul: THE EFFECT OF DIFFERENT PITCH OF THE ROOF FOR VENTILATION Sesi Pengajian: 2004-2005 Saya SRI RUM1 ANANDA MELANOS B. BASRI (HURUF BESAR)

More information

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA UTeM Library (Pind.1/2010) UNIVERSITI TEKNIKAL MALAYSIA MELAKA BORANG PENGESAHAN STATUS TESIS* JUDUL: A study on the Impact of injection Molding Parameters on The Plastic Product Dimensional Stability.

More information

PROPERTIES OF POLYSTYRENE CONCRETE BRICKS WITH SAWDUST ASH. Mcfarlane Chua Kang Wei

PROPERTIES OF POLYSTYRENE CONCRETE BRICKS WITH SAWDUST ASH. Mcfarlane Chua Kang Wei PROPERTIES OF POLYSTYRENE CONCRETE BRICKS WITH SAWDUST ASH Mcfarlane Chua Kang Wei Bachelor of Engineering with Honours (Civil Engineering) 2009 UNIVERSITI MALAYSIA SARAWAK R13a BORANG PENGESAHAN STATUS

More information

Faculty of Engineering

Faculty of Engineering Faculty of Engineering PARAMETRIC STUDY OF RETAINING WALL USING PLAXIS Maqueline Cyndi Anak Nap Bachelor of Engineering with Honours (Civil Engineering) 2010 UNIVERSITI MALAYSIA SARAWAK R13a BORANG PENGESAHAN

More information

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA UNIVERSITI TEKNIKAL MALAYSIA MELAKA THE OPTIMIZATION OF FRICTION STIR WELDING PARAMETER FOR ALUMINIUM 5052 BY USING FULL FACTORIAL DESIGN This report is submitted in accordance with the requirement of

More information

vnim (") Faculty of Cognitive Sciences and Human Development

vnim () Faculty of Cognitive Sciences and Human Development (") vnim Faculty of Cognitive Sciences and Human Development CENTRAL AND PERIPHERAL ROUTES IN MULTIMEDIA APPLICATIONS: CASE STUDY IN PROMOTING COGNITIVE SCIENCE PROGRAM Nelson A. Sitabal WWA QA 76.575

More information

UNIVERSITI TEKNOLOGI MALAYSIA BORANG PENGESAHAN STATUS TESIS υ

UNIVERSITI TEKNOLOGI MALAYSIA BORANG PENGESAHAN STATUS TESIS υ UNIVERSITI TEKNOLOGI MALAYSIA BORANG PENGESAHAN STATUS TESIS υ PSZ 19 : 16 (Pind. 1997) JUDUL : A CASE STUDY ON CONCRETE PROBLEMS IN UTM SESI PENGAJIAN : 2005/2006 Saya ABDUL AZIZ JULKARNAIN (HURUF BESAR)

More information

PROPERTIES OF PEPPER WASTE BRICKS HOLSON YU SHEN

PROPERTIES OF PEPPER WASTE BRICKS HOLSON YU SHEN PROPERTIES OF PEPPER WASTE BRICKS HOLSON YU SHEN Thesis is submitted to Faculty of Engineering, Universiti Malaysia Sarawak as a partial fulfilment of the requirements for the Degree of Bachelor of Engineering

More information

UNIVERSITI TEKNIKAL MALAYSIA, MELAKA DEVELOPMENT OF MATERIAL REQUIREMENT PLANNING, A CASE STUDY IN METAL INDUSTRY

UNIVERSITI TEKNIKAL MALAYSIA, MELAKA DEVELOPMENT OF MATERIAL REQUIREMENT PLANNING, A CASE STUDY IN METAL INDUSTRY UNIVERSITI TEKNIKAL MALAYSIA, MELAKA DEVELOPMENT OF MATERIAL REQUIREMENT PLANNING, A CASE STUDY IN METAL INDUSTRY This report submitted in accordance of with the requirement of the Universiti Teknikal

More information

Faculty of Engineering

Faculty of Engineering Faculty of Engineering DESIGN OF THE MICRO HYDRO POWER RESERVOIR AT KPG SEMULONG ULU Lau Sie Huang Bachelor of Engineering with Honours (Civil Engineering) 2010 UNIVERSITI MALAYSIA SARAWAK BORANG PENGESAHAN

More information

Reverse Engineering of A Pharmaceutical Bottlepack Cap By Plastic Injection Mould

Reverse Engineering of A Pharmaceutical Bottlepack Cap By Plastic Injection Mould UNIVERSITI TEKNIKAL MALAYSIA MELAKA Reverse Engineering of A Pharmaceutical Bottlepack Cap By Plastic Injection Mould Thesis submitted in accordance with the partial requirements of Universiti Teknikal

More information

Design Development of a Pallet Stacker through Integration of Ergonomic Assessment and Quality Function Deployment (QFD) at Machine Shop in UTeM

Design Development of a Pallet Stacker through Integration of Ergonomic Assessment and Quality Function Deployment (QFD) at Machine Shop in UTeM UNIVERSITI TEKNIKAL MALAYSIA MELAKA Design Development of a Pallet Stacker through Integration of Ergonomic Assessment and Quality Function Deployment (QFD) at Machine Shop in UTeM Report submitted in

More information

ASSET TRACKING SYSTEM (ATS) LAU SIEW JOO

ASSET TRACKING SYSTEM (ATS) LAU SIEW JOO i ASSET TRACKING SYSTEM (ATS) LAU SIEW JOO This report is submitted in partial fulfillment of the requirements for the award of Bachelor Of Electronic Engineering (Computer Engineering) With Honors Faculty

More information

Faculty of Engineering

Faculty of Engineering Faculty of Engineering EFFECT OF COMPACTION ENERGY ON ENGINEERING CHARACTERISTIC OF COMPACTED SOIL Muhammad Ikram Bin Uzir Abdul Wahab Bachelor of Engineering with Honours (Civil Engineering) 2010 UNIVERSITI

More information

UNIVERSITI TEKNIKAL MALAYSIA MELAKA CONCEPT, DESIGN AND IMPLEMENTATION OF SOLAR POWERED SMART WASTE BIN MANAGEMENT SYSTEM WITH ODOR SENSE

UNIVERSITI TEKNIKAL MALAYSIA MELAKA CONCEPT, DESIGN AND IMPLEMENTATION OF SOLAR POWERED SMART WASTE BIN MANAGEMENT SYSTEM WITH ODOR SENSE UNIVERSITI TEKNIKAL MALAYSIA MELAKA CONCEPT, DESIGN AND IMPLEMENTATION OF SOLAR POWERED SMART WASTE BIN MANAGEMENT SYSTEM WITH ODOR SENSE This report submitted in accordance with requirement of the Universiti

More information

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA UNIVERSITI TEKNIKAL MALAYSIA MELAKA A STUDY ON DECISION SCENARIO OF TURNAROUND DAYS OF PREVENTIVE MAINTENANCE This report submitted in accordance with requirement of the Universiti Teknikal Malaysia Melaka

More information

EXPERIMENTAL STUDY ON THE HIGH STRENGTH CONCRETE WITH DIFFERENT FINE AGGREGATE NORIDHAM BIN MOHAMAD

EXPERIMENTAL STUDY ON THE HIGH STRENGTH CONCRETE WITH DIFFERENT FINE AGGREGATE NORIDHAM BIN MOHAMAD Faculty of Engineering EXPERIMENTAL STUDY ON THE HIGH STRENGTH CONCRETE WITH DIFFERENT FINE AGGREGATE NORIDHAM BIN MOHAMAD Bachelor of Engineering with Honours (Civil Engineering) 2005 EXPERIMENTAL STUDY

More information

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA UNIVERSITI TEKNIKAL MALAYSIA MELAKA Electrical Discharge Machining Of AISI 304 Stainless Steel Using Mixture of Deionized Water And Carbon Nanofiber With Surfactant This report submitted in accordance

More information

0708-F-037 EFFECT TYPES OF COOLANT ON TOOL WEAR AND SURFACE ROUGHNESS LOH CHOON LEE UNIVERSITI MALAYSIA PAHANG

0708-F-037 EFFECT TYPES OF COOLANT ON TOOL WEAR AND SURFACE ROUGHNESS LOH CHOON LEE UNIVERSITI MALAYSIA PAHANG 0708-F-037 EFFECT TYPES OF COOLANT ON TOOL WEAR AND SURFACE ROUGHNESS LOH CHOON LEE UNIVERSITI MALAYSIA PAHANG UNIVERSITI MALAYSIA PAHANG BORANG PENGESAHAN STATUS TESIS JUDUL: EFFECT TYPES OF COOLANT ON

More information

PRODUCTIVITY IMPROVEMENT IN MANUFACTURING INDUSTRY

PRODUCTIVITY IMPROVEMENT IN MANUFACTURING INDUSTRY PRODUCTIVITY IMPROVEMENT IN MANUFACTURING INDUSTRY HALIS BINTI HANIFI B050810052 UNIVERSITI TEKNIKAL MALAYSIA MELAKA 2012 UNIVERSITI TEKNIKAL MALAYSIA MELAKA PRODUCTIVITY IMPROVEMENT IN MANUFACTURING INDUSTRY

More information

RECOVERY OF HEAD OFFICE OVERHEADS DUE TO PROLONGATION OF TIME RAMLI BIN ISMAIL

RECOVERY OF HEAD OFFICE OVERHEADS DUE TO PROLONGATION OF TIME RAMLI BIN ISMAIL RECOVERY OF HEAD OFFICE OVERHEADS DUE TO PROLONGATION OF TIME RAMLI BIN ISMAIL A project report submitted in partial fulfilment of the requirements for the award of the degree of Master of Science (Construction

More information

BORANG PENGESAHAN STATUS TESIS?

BORANG PENGESAHAN STATUS TESIS? PSZ 19:16 (Pind. 1/97) UNIVERSITI TEKNOLOGI MALAYSIA BORANG PENGESAHAN STATUS TESIS? JUDUL: EARTHQUAKE ANALYSIS OF IBS FOR SINGLE STOREY HOUSING SESI PENGAJIAN: 2006 / 2007 Saya SITI RADIAH BINTI YUNUS

More information

Fabrication of Polymer Composites for Use as Jigs and Racks

Fabrication of Polymer Composites for Use as Jigs and Racks UNIVERSITI TEKNIKAL MALAYSIA MELAKA Fabrication of Polymer Composites for Use as Jigs and Racks Report submitted in accordance with partial requirements of the Universiti Teknikal Malaysia Melaka for the

More information

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA UNIVERSITI TEKNIKAL MALAYSIA MELAKA THE EVALUATION OF NON-STOCHASTIC LATTICE STRUCTURES ON DROP TEST APPLICATION This report submitted in accordance with requirement of the Universiti Teknikal Malaysia

More information

UNIVERSITI TEKNIKAL MALAYSIA MELAKA OCCUPATIONAL SAFETY HEALTH: IDENTIFICATION OF POTENTIAL RISKS IN FURNITURE INDUSTRY

UNIVERSITI TEKNIKAL MALAYSIA MELAKA OCCUPATIONAL SAFETY HEALTH: IDENTIFICATION OF POTENTIAL RISKS IN FURNITURE INDUSTRY UNIVERSITI TEKNIKAL MALAYSIA MELAKA OCCUPATIONAL SAFETY HEALTH: IDENTIFICATION OF POTENTIAL RISKS IN FURNITURE INDUSTRY Thesis submitted in accordance with the requirements of Universiti Teknikal Malaysia

More information

DEVELOPMENT OF MIXED MATRIX SULFONATED POLYSULFONE AND POLYETHERSULFONE FOR PROTON EXCHANGE MEMBRANE FUEL CELL APPLICATION

DEVELOPMENT OF MIXED MATRIX SULFONATED POLYSULFONE AND POLYETHERSULFONE FOR PROTON EXCHANGE MEMBRANE FUEL CELL APPLICATION i DEVELOPMENT OF MIXED MATRIX SULFONATED POLYSULFONE AND POLYETHERSULFONE FOR PROTON EXCHANGE MEMBRANE FUEL CELL APPLICATION MOHD SHAMIM WALIYUDDIN B ROSMAN A thesis submitted in fulfillment of the requirement

More information

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA UNIVERSITI TEKNIKAL MALAYSIA MELAKA COST OF OWNERSHIP FOR EFFICIENCY LIGHTING ANALYSIS This report submitted in accordance with requirement of the Universiti Teknikal Malaysia Melaka (UTeM) for the Bachelor

More information

BORANG PENGESAHAN STATUS TESIS

BORANG PENGESAHAN STATUS TESIS 1 UNIVERSITI TEKNOLOGI MALAYSIA PSZ 19:16 (Pind.1/97) BORANG PENGESAHAN STATUS TESIS JUDUL: THE PRIVATIZATION PROJECTS IMPLEMENTED BY MINISTRY OF DEFENCE SESI PENGAJIAN: 2006/2007 Saya ABDUL RAHMAN BIN

More information

BORANG PENGESAHAN STATUS TESIS

BORANG PENGESAHAN STATUS TESIS BORANG PENGESAHAN STATUS TESIS JUD UL: WEIGHT MANAGEMENT APPLICATION WITH NOTIFICATION AGENT SESI PENGAJIAN: 2013/2014 Saya ELAINE CHEONG HUI MING mengaku membenarkan tesis Projek Sarjana Muda ini disimpan

More information

I OF BYE: SOLUTION CONTAINING M

I OF BYE: SOLUTION CONTAINING M I OF BYE: SOLUTION CONTAINING M ORANGE 7 BY ELECTRICITY :! 2 :««>:- (.?; 5 Iv. nt W; UAH #? >»ip VI I?aJ T!IV M M 0 U ft l if.-' ;..! ', "i ' i fi VQf f, whl.n t ACID 30000001866662 PSZ 19:16 (Pind. 1/97)

More information

PIVOTAL FACTORS INFLUENCING THE PERFORMANCE OF CONSTRUCTION PROJECTS IN MOGADISHU CITY, SOMALIA ABDI AZIZ AHMED ABTIDON UNIVERSITI TEKNOLOGI MALAYSIA

PIVOTAL FACTORS INFLUENCING THE PERFORMANCE OF CONSTRUCTION PROJECTS IN MOGADISHU CITY, SOMALIA ABDI AZIZ AHMED ABTIDON UNIVERSITI TEKNOLOGI MALAYSIA 1 PIVOTAL FACTORS INFLUENCING THE PERFORMANCE OF CONSTRUCTION PROJECTS IN MOGADISHU CITY, SOMALIA ABDI AZIZ AHMED ABTIDON UNIVERSITI TEKNOLOGI MALAYSIA 4 PIVOTAL FACTORS INFLUENCING THE PERFORMANCE OF

More information

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA UNIVERSITI TEKNIKAL MALAYSIA MELAKA CONVOLUTION DESIGN PROFILE TOWARD KANSEI ENGINEERING This report submitted in accordance with requirement of the Universiti Teknikal Malaysia Melaka (UTeM) for the Bachelor

More information

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA UNIVERSITI TEKNIKAL MALAYSIA MELAKA STUDY ON DEEP CAVITY MACHINING USING EDM DIE SINKING This report submitted in accordance with requirement of the Universiti Teknikal Malaysia Melaka (UTeM) for the Bachelor

More information

DEVELOPMENT OF CONCEPTUAL JIG AND FIXTURE FOR THE TIE PLATE USING INTEGRATED FMEA AND AHP APPROACH

DEVELOPMENT OF CONCEPTUAL JIG AND FIXTURE FOR THE TIE PLATE USING INTEGRATED FMEA AND AHP APPROACH DEVELOPMENT OF CONCEPTUAL JIG AND FIXTURE FOR THE TIE PLATE USING INTEGRATED FMEA AND AHP APPROACH EZRA BIN ABDUL MUTALIB B051110337 UNIVERSITI TEKNIKAL MALAYSIA MELAKA 2015 B051110337 BACHELOR OF MANUFACTURING

More information

RFID BASED AIRPORT LUGGAGE SECURITY SYSTEM ZAINIE BINTI ZAINUDIN. This Report Is Submitted In Partial Fulfilment Of Requirements For The Bachelor

RFID BASED AIRPORT LUGGAGE SECURITY SYSTEM ZAINIE BINTI ZAINUDIN. This Report Is Submitted In Partial Fulfilment Of Requirements For The Bachelor RFID BASED AIRPORT LUGGAGE SECURITY SYSTEM ZAINIE BINTI ZAINUDIN This Report Is Submitted In Partial Fulfilment Of Requirements For The Bachelor Degree of Electronic Engineering (Telecommunication Electronics)

More information

SMART CARE PLANT NOTIFICATION MOHAMAD FATHIN BIN ISMAIL

SMART CARE PLANT NOTIFICATION MOHAMAD FATHIN BIN ISMAIL i SMART CARE PLANT NOTIFICATION MOHAMAD FATHIN BIN ISMAIL This Report Is Submitted In Partial Fulfillment Of Requirement For The Bachelor Degree of Electronic Engineering (Industrial Electronic) Fakulti

More information

Faculty of Engineering

Faculty of Engineering Faculty of Engineering ENGINEERING PROPERTIES OF RESIDUAL SOILS Anuar Bin Ibrahim Bachelor of Engineering with Honours (Civil Engineering) 2010 UNIVERSITI MALAYSIA SARAWAK BORANG PENGESAHAN STATUS TESIS

More information

METHODS OF CONSTRUCTION OF MODERN HOUSE EMPHASIZING ON BUILDING THERMAL PERFORMANCE PRISCILLINA ANAK PETRUS IGAT

METHODS OF CONSTRUCTION OF MODERN HOUSE EMPHASIZING ON BUILDING THERMAL PERFORMANCE PRISCILLINA ANAK PETRUS IGAT METHODS OF CONSTRUCTION OF MODERN HOUSE EMPHASIZING ON BUILDING THERMAL PERFORMANCE PRISCILLINA ANAK PETURS @ PETRUS IGAT This project is submitted in partial fulfillment of The requirements for the degree

More information

STAMPING OIL CONDITIONING MONITORING AT MIYAZU USING FT-IR: WATER PEAK MONITORING FOR LINE J

STAMPING OIL CONDITIONING MONITORING AT MIYAZU USING FT-IR: WATER PEAK MONITORING FOR LINE J STAMPING OIL CONDITIONING MONITORING AT MIYAZU USING FT-IR: WATER PEAK MONITORING FOR LINE J IZZAD JAUHARI B SARLAN UNIVERSITI TEKNIKAL MALAYSIA MELAKA UNIVERSITI TEKNIKAL MALAYSIA MELAKA STAMPING OIL

More information

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA UNIVERSITI TEKNIKAL MALAYSIA MELAKA DESIGN AND ANALYSIS OF RESIN TRANSFER MOULD FOR COMPOSITE PART This report submitted in accordance with the requirement of the Universiti Teknikal Malaysia Melaka (UTeM)

More information

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

UNIVERSITI TEKNIKAL MALAYSIA MELAKA UNIVERSITI TEKNIKAL MALAYSIA MELAKA CUSTOMER-PRODUCT ATTRIBUTE IDENTIFICATION USING CORRELATION RELATIONSHIP FOR EFFICIENT PRODUCT CUSTOMIZATION DEVELOPMENT This report submitted in accordance with requirement

More information

BORANG PENGESAHAN STATUS TESIS*

BORANG PENGESAHAN STATUS TESIS* BORANG PENGESAHAN STATUS TESIS* JUDUL: SOFTWARE SYSTEM FOR MOULD MANUFACTURING WITH MOBiLE TECHNOLOGY SESI PENGAJLAN: 2006/2007 Saya SHARMTNI AlP MOHAN mengaku memberikan tesis (PSM/Sarjana/Doktor Falsafah)

More information

DESIGN & DEVELOPMENT OF ELECTRICAL HARVESTING ENERGY DEVICE FROM NATURAL SOURCE (WIND ENRGY) ONG LE WANG

DESIGN & DEVELOPMENT OF ELECTRICAL HARVESTING ENERGY DEVICE FROM NATURAL SOURCE (WIND ENRGY) ONG LE WANG i DESIGN & DEVELOPMENT OF ELECTRICAL HARVESTING ENERGY DEVICE FROM NATURAL SOURCE (WIND ENRGY) ONG LE WANG This Report Is Submitted In Partial Fulfillment of Requirements For The Bachelor Degree Of Electronic

More information

BEST ENDEAVOURS FOR GRANTING AN EXTENSION OF TIME IN CONSTRUCTION CONTRACT NUR FARAH FARHANA BINTI RASID UNIVERSITI TEKNOLOGI MALAYSIA

BEST ENDEAVOURS FOR GRANTING AN EXTENSION OF TIME IN CONSTRUCTION CONTRACT NUR FARAH FARHANA BINTI RASID UNIVERSITI TEKNOLOGI MALAYSIA BEST ENDEAVOURS FOR GRANTING AN EXTENSION OF TIME IN CONSTRUCTION CONTRACT NUR FARAH FARHANA BINTI RASID UNIVERSITI TEKNOLOGI MALAYSIA DEDICATION For my beloved father, mum, sisters and brother Rasid Sadiran

More information