CMMI Project Management Refresher Training
|
|
- Gloria Harrison
- 6 years ago
- Views:
Transcription
1 CMMI Project Management Refresher Training Classifica(on 2: Foxhole Technology Employees Only RMD 032 Project Management Refresher Training Course September 21, 2017 Version 1.0
2 The Process Approach The Triad Reference Model Can Technology work well without People? And anymore, can People work well without Technology? Process It takes a Process to bring technology and people together to achieve anything Technology People The major determinant of cost and schedule - Quality - is reflected in the Triad Reference Model Process, Technology, and People Working Together to Achieve Quality. 1
3 The Premise of Process Management The quality of a product (or service ) is dictated by the quality of the processes used to acquire, develop, and maintain it. Improvement focuses on fixing the processes, and then examining the impact on the product. Institutionalized processes remain long after the people who defined them are gone. The collection and analysis of data should be used continuously in a continuous manner to improve performance. Well known Process Initiatives applied to manufacturing and systems engineering include: CMMI * ISO 9000 * Six Sigma 2
4 Motivations for Repeatable Processes Defined processes can promote use of technology and people to their best advantage. Disciplined use of processes facilitates evaluation, analysis, and improvement. Processes provide ways to work smarter, as opposed to harder. The promise behind a set of repeatable processes: If people leave or technology changes, the organization should be able to continue moving forward with minimal disruption. 3
5 Foxhole s CMMI Methodology Foxhole Capability Maturity Model Integrated (CMMI) Process Model 4
6 Why CMMI at Foxhole? To develop a consistent way of delivering our services across projects To realize greater efficiencies, improve quality, and ultimately reduce cost of services To use as a market differentiator Implementing a quality management structure is the right thing to do in an IT service delivery organization. 5
7 The Five Levels of CMMI Process Maturity To Quality and Productivity Level 5 Optimizing Level 4 Quantitatively Managed From Risk & Rework Level 1 Initial Level 2 Managed Level 3 Defined Foxhole attained CMMI Level 2 Appraisal in Services and CMMI Level 3 Appraisal in Development in 2015 Re-Appraisal for both takes place in
8 CMMI Maturity Level 2 Requires 8 Process Areas Think of these processes in terms of how the project is managed, making sure that the delivered product (services) meets Foxhole s desired quality of management, and that the project has a firm foundation from which it can work effectively every day Work Planning * Service Delivery * Work Monitoring & Control * Requirements Management * Supplier Agreement Management Project Management Process and Product Quality Assurance * Measurement & Analysis Quality Management Configuration Management Technical Management 7
9 CMMI Process Areas: Work Planning Process Area 1 Work Planning Purpose: Establish and maintain plans that define work activities Specific Goal 1: Establish estimates Specific Goal 2: Develop a work plan Specific Goal 3: Obtain commitment to the plan 8
10 Work Planning Project Management Plan Table of Contents 1. Introduction 1. Project Overview 2. Project Scope 1. Period of Performance 2. Approach Methodology 3. Major Deliverables 4. Project Constraints 5. Out of Scope Items 6. Planning Assumptions 7. Project Milestones 3. Project Organization 1. Stakeholder Analysis 2. Project Team Roles and Responsibilities 4. Organization Chart 1. Budget Plan 2. Work Breakdown Schedule 3. Project Schedule 4. Basis of Estimates Every Foxhole Prime project will have a Project Plan, or a TOMP, in place. WHY? Because if Harry, the PM on the project, gets run over by a big truck, Foxhole has a responsibility to its customer to maintain the project, and reduce the down time that a new PM will have trying to get the project back up to speed 5 Project Monitoring and Control 1. Meetings 2. Project Status Report 6 Supporting Plans 1 Stakeholder Communications Plan 2 Facilities Resources Plan 3 Configuration Management Plan 4 Staffing Plan 5 Quality Assurance Plan 6 Process Audit Plan 7 Training Plan 8 Measurement & Analysis Plan 9 Risk Management Plan 10 Security Plan 11 Sub-Contractor Supplier Plan 12 Lessons Learned Plan 7 Other Plans (if applicable) 1 Product Procurement Plan 2 Transition Plan 3 OCI Plan 9
11 CMMI Process Area Work Monitoring & Control Process Area 2 Work Monitoring and Control Purpose: Provide understanding of the ongoing work so that appropriate corrective action can be taken when the performance deviates significantly from the plan. Specific Goal 1: Monitor work against plan Specific Goal 2: Manage corrective action to closure 10
12 Work Monitoring & Control Risk Log This document is maintained on a regular basis within Foxhole s Monthly Deep Dive Project Status Report 11
13 CMMI Process Area Service Delivery Process Area 3 Service Delivery Purpose: Deliver service in accordance with service agreements. Specific Goal 1: Establish service agreements Specific Goal 2: Prepare for Service Delivery Specific Goal 3: Deliver service 12
14 Service Delivery Major Deliverables by LifeCycle INITIATION PLANNING EXECUTION & CONTROL CLOSING Signed Contract WBS Monthly Deep Dive Report Customer Survey Signed Subcontract NDA, TA, Sub-K Stakeholder- Communications Plan Staffing Plan Project Schedule Program Review Subcontractor Evaluation Configuration Management Plan Final PMP Approval by Customer and Foxhole Risk-Issues-Action Plan Customer Survey Customer Sign-Off of Deliverables Final Audit Report Project Site Established on SP2010 Measurement & Analysis Plan Lessons Learned Report Draft PMP Security Plan Periodic Audit Report(s) Project Kickoff Briefing Foxhole Training Plan Customer Project Status Reports Client Kickoff Briefing Facilities-Resource Plan Requirements Change Control Requests Customer Approval of Contract Requirements Initial Contract Process Audit Report Project Meeting Minutes Sub-Contractor Mid- Contract Evaluations This list highlights the deliverables required by Foxhole during each phase; these are in addition to any defined client deliverables. 13
15 CMMI Process Area Requirements Management Process Area 4 Requirements Management Purpose: Manage the requirements of the project s products and product components; identify inconsistencies between those requirements and the project s plans and work products. Specific Goal 1: Manage requirements 14
16 Requirements Management Traceability Matrix Requirements Traceability Matrix Baseline Tracking Log Baseline Tracking Log How does Foxhole manage customer requirements? Requirements Traceability Matrix 15
17 CMMI Process Area Sub-Contractor Agreement Management Process Area 5 Sub-Contractor Agreement Management Purpose: Manage the acquisition of products and services from suppliers. Specific Goal 1: Establish supplier agreements Specific Goal 2: Satisfy supplier agreements So Process makes Foxhole add quality partners to our projects asking the right questions: What value does each partner bring to the table? What role will each play in the proposal process, and in the awarded contract? 16
18 CMMI Process Area Sub-Contractor Agreement Form Supplier Sub-Contractor Expectations Strong Business Relationship between the Prime (Foxhole) and the Sub-Contractor ; Interactive Management Relations between the companies ; Adherence to the Timeline of the Project Schedule ; Responsibility toward Cost Management The Highest Degree of Quality Performance ; The Attributes of a Project Team Player ; Timeliness of Deliveries ; Cooperation in Meeting Mission Objectives ; Willingness to Go Above and Beyond when Needed to Meet Mission Objectives ; Raising Issues and Resolutions in a Timely Manner ; Presentation of the Foxhole Image Upholding our Values and Supporting the Team Sub-Contractor Agreement Form Instructions: Identify a listing of potential sub-contractors to fill the requirement. Include Contact Information Company Name Address Telephone Instructions: Please describe the strengths and weaknesses of potential sub-contractors, including any Past Performance on a previous Foxhole Prime Project. Company Strengths Weaknesses 17
19 CMMI Process Area Process & Product Quality Assurance Process Area 6 Process & Product Quality Assurance Purpose: Provide staff and management with objective insight into processes and associated work products. Specific Goal 1: Objectively evaluate processes and work products Specific Goal 2: Provide objective insight Process is as much about Foxhole s relationship with our contract customer, and how we are performing for them, as it is about Foxhole s internal process performance as a company Process Quality Assurance measures Foxhole s internally managed CMMI Level 2 Services and Level 3 Development process areas for completeness against CMMI process requirements. 18
20 CMMI Process Area Audit Process Steps PPQA reviews artifact PPQA interviews project staff PPQA completes checklist and identifies required corrective actions PPQA provides feedback to project team and management 19
21 CMMI Process Area Measurement & Analysis Process Area 7 Measurement & Analysis Purpose: Develop and sustain a measurement capability that is used to support management information needs. Specific Goal 1: Align measurement and analysis activities Specific Goal 2: Provide measurement results This process area measures how Foxhole is performing internally on a Prime Contract against Foxhole s established performance standards or metrics 20
22 CMMI Process Area Measurement & Analysis Metrics 21
23 CMMI Process Area Configuration Management Process Area 8 Configuration Management Purpose: Establish and maintain the integrity of work products using configuration identification, configuration control, configuration status accounting, and configuration audits. For all Prime contracts, project artifacts are documented, approved and baselined, and changed as may be necessary through a controlled process effort. Specific Goal 1: Establish baselines Specific Goal 2: Track and control changes Specific Goal 3: Establish integrity All project documents are identified and stored on the designated project portal site, or, as may be required, on a customer project site. 22
24 ISO 9001:2008 and CMMI Final Thoughts Foxhole s goal is to mature our Level 2 CMMI Services and Level 3 CMMI Development Appraisals, which we believe better prepares for our company s growth into Large Business status, and also beats those competitors who do not have an everyday, working process methodology. Currently, we are evaluating increasing our Services Appraisal to Level 3 status in Thanks for being a part of our future. 23
25 Thank You Proceed to the Evaluation Section of this FormSite Presentation to Evaluate This Training Deck. This Process program deck is a required training exercise for con8nued approval of CMMI Appraisals and ISO 9001 Cer8fica8ons. Thanks for par8cipa8ng! 24
This resource is associated with the following paper: Assessing the maturity of software testing services using CMMI-SVC: an industrial case study
RESOURCE: MATURITY LEVELS OF THE CUSTOMIZED CMMI-SVC FOR TESTING SERVICES AND THEIR PROCESS AREAS This resource is associated with the following paper: Assessing the maturity of software testing services
More informationQuality Management System (QMS) Refresher Training
Quality Management System (QMS) Refresher Training Classifica(on 2: Foxhole Technology Employees Only RMD 022 QMS Refresher Training Course September 21, 2017 Version 1.0 The Resource Approach The Triad
More informationCMMI for Services Quick Reference
CAPACITY AND AVAILABILITY MANAGEMENT PROJECT & WORK MGMT (ML3) The purpose of Capacity and Availability Management (CAM) is to ensure effective service system performance and ensure that resources are
More informationPART THREE: Work Plan and IV&V Methodology (RFP 5.3.3)
PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3) 3.1 IV&V Methodology and Work Plan 3.1.1 NTT DATA IV&V Framework We believe that successful IV&V is more than just verification that the processes
More informationCMMI for Acquisition Quick Reference
AGREEMENT MANAGEMENT PROJECT MANAGEMENT (ML2) The purpose of Agreement Management (AM) is to ensure that the supplier and the acquirer perform according to the terms of the supplier agreement. SG 1 The
More informationDORNERWORKS QUALITY SYSTEM
DORNERWORKS QUALITY SYSTEM ALIGNMENT WITH CMMI INTRODUCTION Since its beginning, DornerWorks has had quality as one of our main goals. We have delivered solutions for over a dozen aircraft, including several
More informationCMMI-DEV V1.3 CMMI for Development Version 1.3 Quick Reference Guide
processlabs CMMI-DEV V1.3 CMMI for Development Version 1.3 Quick Reference Guide CMMI-DEV V1.3 Process Areas Alphabetically by Process Area Acronym processlabs CAR - Causal Analysis and Resolution...
More informationInternational Diploma in Project Management. (Level 4) Course Structure & Contents
Brentwood Open Learning College (Level 4) Page 1 Unit 1 Overview of Project Management The unit 1 covers the following topics: What is A Project? What is Project Management? Project Constraints Tools and
More informationUSING PILOTS TO ASSESS THE VALUE AND APPROACH OF CMMI IMPLEMENTATION. Goddard Space Flight Center (GSFC)
USING PILOTS TO ASSESS THE VALUE AND APPROACH OF CMMI IMPLEMENTATION Goddard Space Flight Center (GSFC) Sally Godfrey, James Andary, Linda Rosenberg SEPG 2003 2/03 Slide 1 Agenda! Background " NASA Improvement
More informationManaging a Project and Keeping Sane While Wrestling Elegantly With PMBOK, Scrum and CMMI (Together or Any Combination)
Managing a Project and Keeping Sane While Wrestling Elegantly With PMBOK, Scrum and CMMI (Together or Any Combination) Neil Potter The Process Group neil@processgroup.com 1 Agenda Summary of PMBOK, CMMI
More informationPART THREE - WORK PLAN AND IV&V METHODOLOGY WORK PLAN. FL IT IV&V Work Plan
WORK PLAN FL IT IV&V Work Plan PART THREE - WORK PLAN AND IV&V METHODOLOGY ID Task Name Duration 1 FL IT IV&V Project Work Plan 261 days 2 DDI / SI Contract Award 0 days 3 Project Initiation and Planning
More informationSummary of 47 project management processes (PMBOK Guide, 5 th edition, 2013)
Summary of 47 project management processes (PMBOK Guide, 5 th edition, 2013) Integration Management: processes & activities needed to properly coordinate all aspects of the project to meet stakeholder
More information3 PART THREE: WORK PLAN AND IV&V METHODOLOGY (SECTION 5.3.3)
3 PART THREE: WORK PLAN AND IV&V METHODOLOGY (SECTION 5.3.3) Emagine IT s approach to Independent Verification and Validation (IV&V) has been shaped over the years by hands-on experience and contributions
More informationPROCESS TRAINING. DIR PM Lite 2.0 Process Training v2.0 1
PROCESS TRAINING 1 PM Lite (Project Management Lite) is a project management process made up of tools, templates, and best practices that empowers its users to be more efficient and effective in project
More informationThe 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th
The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th www.pmlead.net PMI, PMP, CAPM and PMBOK Guide are trademarks of the Project Management Institute, Inc. PMI has not endorsed and did not
More informationCERT Resilience Management Model, Version 1.2
CERT Resilience Management Model, Organizational Process Focus (OPF) Richard A. Caralli Julia H. Allen David W. White Lisa R. Young Nader Mehravari Pamela D. Curtis February 2016 CERT Program Unlimited
More informationWORK PLAN AND IV&V METHODOLOGY Information Technology - Independent Verification and Validation RFP No IVV-B
1. Work Plan & IV&V Methodology 1.1 Compass Solutions IV&V Approach The Compass Solutions Independent Verification and Validation approach is based on the Enterprise Performance Life Cycle (EPLC) framework
More informationCMMI-SVC V1.3 CMMI for Services Version 1.3 Quick Reference Guide
processlabs CMMI-SVC V1.3 CMMI for Services Version 1.3 Quick Reference Guide CMMI-SVC V1.3 Process Areas Alphabetically by Process Area Acronym processlabs CAM - Capacity and Availability Management...
More informationProgram Lifecycle Methodology Version 1.7
Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated
More informationCMMI for Technical Staff
CMMI for Technical Staff SES CMMI Training Series April 7, 2009 Audio Conference #: Dial - 1-877-760-2042 Pass code - 147272 SM SEI and CMM Integration are service marks of Carnegie Mellon University CMM
More informationRational Software White Paper TP 174
Reaching CMM Levels 2 and 3 with the Rational Unified Process Rational Software White Paper TP 174 Table of Contents Abstract... 1 Introduction... 1 Level 2, Repeatable... 2 Requirements Management...
More informationAppendix. Process Inputs and Outputs
3601cA.fm Page 493 Wednesday, October 26, 2005 12:47 AM Appendix A Process and Throughout this book, PMP: Management Professional Study Guide, 3rd Edition, I ve discussed the inputs and outputs to the
More informationLCS International, Inc. PMP Review. Chapter 3 Developing the Project Scope Statement. Presented by David J. Lanners, MBA, PMP
PMP Review Chapter 3 Developing the Project Scope Statement Presented by David J. Lanners, MBA, PMP These slides are intended to be used only in settings where each viewer has an original copy of the Sybex
More informationIntegration Knowledge Area
Integration Knowledge Area Develop Project Charter Project statement of work Expert judgment Project charter Business case Contract (if third party project) EEF: government/industry standards, organizational
More informationQuality Assurance / Quality Control Plan
Quality Assurance / Quality Control Plan Table of Contents MANAGEMENT APPROACH... 3 SUBCONTRACT MANAGEMENT... 3 QUALITY MANAGEMENT APPROACH... 3 METHODOLOGY... 4 CONCEPT OF OPERATIONS... 5 QUALITY MANAGEMENT
More informationInitiation Group Process. Planning Group Process
Initiation Group Process Develop Project Charter Project statement of work Expert judgment Project charter Business case Contract (if third party project) EEF: government/industry standards, organizational
More information1.0 PART THREE: Work Plan and IV&V Methodology
1.0 PART THREE: Work Plan and IV&V Methodology 1.1 Multi-Faceted IV&V Methodology Large, complex projects demand attentive and experienced IV&V and project management support to meet expectations. Monitoring
More informationProposed Approach to Heterogeneous CMMI. Appraisals. Joseph V. Vandeville. 14 November 2007
Proposed Approach to Heterogeneous CMMI Appraisals 14 November 2007 Joseph V. Vandeville Northrop Grumman Corporation Andy Felschow The Process Company, LLC Topics What is a heterogeneous appraisal What
More informationProject Management Framework with reference to PMBOK (PMI) July 01, 2009
Project Management Framework with reference to PMBOK (PMI) July 01, 2009 Introduction Context Agenda Introduction to Methodologies What is a Methodology? Benefits of an Effective Methodology Methodology
More informationProject Management Institute (PMI) Practice Standard for Configuration Management
Project Configuration Management Project Management Institute (PMI) Practice Standard for Configuration Management Project Configuration Management What we will cover: Introduction Relationship with other
More information<Project Name> Software Development Plan. Version <1.0>
1 z 8 2007-02-26 15:48 Software Development Plan Version [Note: The following template is provided for use with the Rational Unified Process. Text enclosed in square brackets and displayed
More informationProject Management Professionals
A COLLECTION OF INTERVIEW QUESTIONS FOR Project Management Professionals When interviewing a Project Manager, it s important to set up the discussion for the first couple of minutes in an open dialogue.
More informationSuccessful Project Management. Overview Houston Community College Fall, 2017
Successful Project Management Overview Houston Community College Fall, 2017 Agenda Introduction Project Management Processes What Is a Process? Inputs, Tools and Techniques, Outputs Process Groups Overview
More informationUsing Lean Six Sigma to Accelerate CMMI Implementation
Using Lean Six Sigma to Accelerate CMMI Implementation Briefers: Diane A. Glaser Michael D. Barnett US Army CECOM LCMC SEC CMMI Coordinator Communication Software ASQ SSGB Engineering Support Division
More informationIntegrated Class C Process Appraisals (ICPA)
Integrated Class C Process Appraisals (ICPA) Kent S. McClurg Raytheon Company Garland, TX 972 205-7415 Kent_S_McClurg@raytheon.com Suzanne N. Delcambre Raytheon Company Garland, TX 972 205-7967 Suzanne_N_Delcambre@raytheon.com
More informationLCS International, Inc. PMP Review. Chapter 7 Planning Project Resources. Presented by David J. Lanners, MBA, PMP
PMP Review Chapter 7 Planning Project Resources Presented by David J. Lanners, MBA, PMP These slides are intended to be used only in settings where each viewer has an original copy of the Sybex PMP Study
More informationSoftware Project & Risk Management Courses Offered by The Westfall Team
Software Project & Risk Management is a 5-day course designed to provide a knowledge base and practical skills for anyone interested in implementing or improving Software Project and Risk Management techniques
More informationObjective Demonstration of Process Maturity Through Measures
Objective Demonstration of Process Maturity Through Measures 2000 PSM Users Group Conference Vail, Colorado 24-28 July 2000 Presented By: Perry R. DeWeese Lockheed Martin 7 July 2000 1 Agenda: Concept
More informationProject Management Process Groups. PMP Study Group Based on the PMBOK Guide 4 th Edition
Project Management Process Groups PMP Study Group Based on the PMBOK Guide 4 th Edition Introduction PM Process Groups In order for a project to be successful, the project team must: Select appropriate
More informationProject Management Auditing Guide
Project Management Auditing Guide Index Page 1.0 Objective 4 2.0 Risks 4 3.0 Safeguards and Controls 3.1.Project Characteristics 4 3.2.Quality in Project Management Process 4 3.3.Strategic Processes 5
More informationPart Work plan and IV&V methodology
Part 3 4.4.3 Work plan IV&V methodology EY s IV&V methodology is an explicit risk quantitative process that proactively identifies the interrelationship of factors conditions that could impede the success
More informationCopyright 2013 Pearson Education, Inc. Publishing as Prentice Hall 5-1
Copyright 2013 Pearson Education, Inc. Publishing as Prentice Hall -1 Learning objectives Manage the planning process of a project Understand the work breakdown structure of a project Understand different
More informationIntegration Mgmt / Initiating Process Group 4.1 Develop Project Charter
1 Mgmt / Initiating Process Group 4.1 Develop Project Charter Project statement of work Business Case Contract Enterprise environmental factors Project charter Expert judgement 26/02/2013 18:22:56 1 2
More informationDo not open this paper until instructed by the invigilator. Please note: This question paper must not be removed from the examination room.
APM Project Fundamentals Qualification Examination paper Candidate Number Date Location Examination Paper Sample Paper v1.4 General Notes Time allowed 1 hour. Answer all 60 multiple choice questions Use
More informationBiometrics Enterprise Architecture Systems Engineering Management Plan (BMEA SEMP)
Biometrics Enterprise Architecture Systems Engineering Management Plan (BMEA SEMP) Version 1.0 Prepared by: Date: November 24, 2009 Revision History Purpose Revision Date Level 11/17/2009 First Draft 1.0
More informationITBraindumps. Latest IT Braindumps study guide
ITBraindumps http://www.itbraindumps.com Latest IT Braindumps study guide Exam : PK0-004 Title : CompTIA Project+ Exam Vendor : CompTIA Version : DEMO Get Latest & Valid PK0-004 Exam's Question and Answers
More informationBuy:
Chapter-1.0 CONTENTS OF CMMI MATURITY LEVEL 3 DOCUMENT KIT (More than 160 document files) A. The Total Editable Document kit has 8 main directories as below in word/excel. CMMI-V1.3 Maturity Level 3 (Dev)
More informationTamara Buckman Director, Business Winning. Brad Douglas EVP Global Strategy. David Bol SVP, Business Winning. 1 certification CEU.
Tamara Buckman Director, Business Winning 1 certification CEU www.shipleywins.com David Bol SVP, Business Winning Brad Douglas EVP Global Strategy Poll: What are your top 2 proposal management challenges?
More informationThe Agile PMP Teaching an Old Dog New Tricks
The Agile PMP Teaching an Old Dog New Tricks Why are we here today? What is Project Management? When will the project be done? How much will it cost? Do we all agree on what done looks like? What are the
More informationProject Management for the Supply Professional
Project Management for the Supply Professional Dr. Rene G. Rendon, CPSM, C.P.M., CPCM, PMP U. S. Naval Postgraduate School (831) 656-3464 rgrendon@nps.edu 95 th Annual International Supply Management Conference,
More informationAgricultural Projects
Development and Management of Agricultural Projects Introduction Communicate Product Quality and Risk Developing a Project Ten (10) Steps To Creating a Project Plan March 11 th 2017 Facilitated by Arnold
More informationCENTRE (Common Enterprise Resource)
CENTRE (Common Enterprise Resource) Systems and Software Engineering Platform designed for CMMI compliance Capability Maturity Model Integration (CMMI) is a process improvement approach that provides organizations
More informationMalay (Rumi, Roman script)
Hai Malay (Rumi, Roman script) Project Management Process Groups Project Integration Management Initiating Planning Executing Scope Monitoring & Controlling Closing Knowledge Areas Time Cost Quality Human
More informationContents. Preface. Acknowledgments. Tables and Figures
Contents Preface Acknowledgments Tables and Figures xi xiii xv 1 Introduction and Overview 1 Introduction 1 What Are the CMM and CMMI? 2 What the CMM and CMMI Are Not 2 What Are Standards? 3 IEEE Software
More informationHow to Kick Start a Process Improvement Project to Achieve a CMMI Rating Brenda F. Hall Computer Sciences Corporation (CSC)
NDIA 7 th Annual CMMI Technology Conference and Users Group November 2007 How to Kick Start a Process Improvement Project to Achieve a CMMI Rating Brenda F. Hall Computer Sciences Corporation (CSC) Process
More informationBraindumpsVCE. Best vce braindumps-exam vce pdf free download
BraindumpsVCE http://www.braindumpsvce.com Best vce braindumps-exam vce pdf free download Exam : PK0-004 Title : CompTIA Project+ Exam Vendor : CompTIA Version : DEMO Get Latest & Valid PK0-004 Exam's
More informationCompiled by Rajan Humagai
Compiled by Rajan Humagai www.pavementengineering.com.au Project Processes Inputs, Tools & Techniques and Outputs. (Based on PMBOK 5 th Edition) 1. Project Integration 1. Develop 1. Project Statement Of
More informationProject Execution Plan For
Project Execution Plan For [Insert Name Here] Project Document Revision History Revision Date Project Manager Project Sponsor Page 1 of 24 About This Project Execution Plan Template: This template is intended
More informationI Have Had My CMMI Appraisal What Do I Do Now? How to Establish a Process Improvement WBS
I Have Had My CMMI Appraisal What Do I Do Now? How to Establish a Process Improvement WBS Aldo Dagnino Director of Manufacturing Solutions Agenda Introduction Work Breakdown Structure Characteristics Work
More informationNinth Edition. Rita Mulcahy, PMP, etai. Rita Mulcahy s. Inside this book:
Rita s Course in a Book for Passing the Project Management Professional (PMP) Exam Rita Mulcahy s Ninth Edition Inside this book: Tricks of the Trade What you really need to know to pass the exam Straightforward
More informationProject Management Framework
Project Management Framework What s Project? - Why Project? What s Project Management? - Why Project Management? What s Project Management Professionals? - Why Project Management Professionals? Project
More informationGetting from Here (SW-CMM) to There (CMMI) in a Large Organization
Getting from Here (SW-CMM) to There (CMMI) in a Large Organization 4 th Annual CMMI Technology Conference and User Group Presenter: Cheryl Brickey brickey@us.ibm.com Agenda Organization Overview Worldwide
More informationGetting from Here (SW-CMM) to There (CMMI) in a Large Organization
Getting from Here (SW-CMM) to There (CMMI) in a Large Organization SEPG 2004 Presenter: Cheryl Brickey brickey@us.ibm.com Agenda Organization Overview Worldwide policy and management Standard Framework
More information6. Capability Maturity Method (CMM)
WAT IS TE C? 6. aturity ethod (C) Concept: The application of process management and quality improvement concepts to software development and maintenance odel: A model for organizational improvement Guidelines:
More informationADNET LEAN SIX SIGMA WHITE PAPER
ADNET LEAN SIX SIGMA WHITE PAPER Adnet's Lean Six Sigma program enables your organization to increase performance, eliminate waste and satisfy customers by streamlining operations, improving quality and
More informationUSAF Software Technology Support Center (STSC) STSC SPI Help Desk COM , DSN
This mapping was performed by the For all your Software Improvement (SPI) needs call the USAF Software Technology Support Center (STSC) STSC SPI Help Desk COM 801.777.7214, DSN 777.7214 E-mail: larry.w.smith@hill.af.mil
More informationThis chapter illustrates the evolutionary differences between
CHAPTER 6 Contents An integrated approach Two representations CMMI process area contents Process area upgrades and additions Project management concepts process areas Project Monitoring and Control Engineering
More informationCOPYRIGHTED MATERIAL 1 MANAGING THE STRATEGIC PLANNING PROCESS PURPOSE. Chapter Content
1 MANAGING THE STRATEGIC PLANNING PROCESS PURPOSE To establish and manage the process for setting vision, strategy, and direction in order to be an upper-quartile company. To ensure that this is reflected
More informationA Real-Life Example of Appraising and Interpreting CMMI Services Maturity Level 2
A Real-Life Example of Appraising and Interpreting CMMI Services Maturity Level 2 Neil Potter The Process Group help@processgroup.com www.processgroup.com SM CMM Integration, IDEAL, and SCAMPI are service
More informationProject Management Professional (PMP)
Project Management Professional (PMP) E X A M I N AT I O N CO N T E N T O U T L I N E Project Management Institute Project Management Professional (PMP) Examination Content Outline June 2015 Published
More informationSWEN 256 Software Process & Project Management
SWEN 256 Software Process & Project Management Understanding existing processes Introducing process changes to achieve organisational objectives which are usually focused on quality improvement, cost reduction
More informationProject Management Advisory Board Deep Dive Study of Program Management
Project Management Advisory Board Deep Dive Study of Program Management Purpose The purpose of this study is twofold: 1. Understand how Saint Louis companies are managing programs 2. Study the maturity
More informationComparing Scrum And CMMI
Comparing Scrum And CMMI How Can They Work Together Neil Potter The Process Group help@processgroup.com www.processgroup.com Version 1.0 1 Agenda Definition of Scrum Agile Principles Definition of CMMI
More informationConstruction Project Management Training Curriculum Integration Map
Construction Project Management Training Curriculum Integration Map Value of the Project Management is being recognized all over the world. Most businesses manage their business by successfully implementing
More informationKnowledge Areas According to the PMBOK edition 5. Chapter 4 - Integration
Knowledge Areas According to the PMBOK edition 5 Chapter 4 - Integration 4.1 - Develop Project Charter Process Project statement of work Expert Judgment Project charter Business case Facilitation techniques
More informationNEW HORIZONS ONLINE LIVE. Certified Associate of Project Management (CAPM ) PMBOK Guide, 5th Edition DAY 3
NEW HORIZONS ONLINE LIVE Certified Associate of Project Management (CAPM ) PMBOK Guide, 5th Edition DAY 3 Plan Quality Management 1. Project mgt. 2. Stakeholder register 3. Risk register 4. Requirements
More informationREQUIREMENTS DOCUMENTATION
REQUIREMENTS DOCUMENTATION Project Title: Date Prepared: Stakeholder Requirement Category Priority Acceptance Criteria REQUIREMENTS DOCUMENTATION Project Title: Date Prepared: Stakeholder Requirement Category
More informationUnemployment Compensation Project Independent Verification and Validation Monthly Assessment Report Summary. period ending 29 October 2010
Unemployment Compensation Project Independent Verification and Validation Monthly Assessment Report Summary period ending 29 October 2010 Topics for discussion General IV&V overview Overall risk state
More informationCMMI Conference November 2006 Denver, Colorado
Why Do You Need a Maturity Level 5 Supplier? CMMI Conference November 2006 Denver, Colorado Welcome Why Do You Need an ML 5 Supplier - 2 WelKom Huan Yín Bienvenido Bienvenue Wilkommen ЌАΛΟΣ ΟΡΙΣΑΤΕ Välkommen
More informationManaging Information System Projects. Railway Staff College, Vadodara November 2011
Managing Information System Projects Railway Staff College, Vadodara November 2011 Importance of Project Management in IS 1995 survey in USA (Standish group Chaos survey 31% of IT projects cancelled before
More informationChapter 6. Software Quality Management & Estimation
Chapter 6 Software Quality Management & Estimation What is Quality Management Also called software quality assurance (SQA) s/w quality:- It is defined as the degree to which a system, components, or process
More informationIntegrated Methodology Deliverable Descriptions
Integrated Methodology Deliverable Descriptions Copyright 2013, QAIassist C2013 This publication may not be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic,
More informationCMMI and FPA. the link and benefit of using FPA when rolling out CMMI. Christine Green IFPUG - Certified Function Point Specialist EDS
CMMI and FPA the link and benefit of using FPA when rolling out CMMI Christine Green IFPUG - Certified Function Point Specialist EDS and the EDS logo are registered trademarks of Electronic Data Systems
More informationProject Manager s Roadmap We re all smarter together
Version 7.0a Project Manager s Roadmap We re all smarter together Think Top Down! Methodology Checklists Define Plan Execute Close Conflict Resolution Modes Contract Outsource Management Mentoring References
More informationPMP. Processexam.com. PMI Project Management Professional. Exam Summary Syllabus Questions
PMP PMI Project Management Professional Processexam.com Exam Summary Syllabus Questions Table of Contents Keys to success in PMP Exam on PMI Project Management Professional... 2 PMI PMP Certification Details:...
More information<PROJECT NAME> PROJECT MANAGEMENT PLAN
PROJECT MANAGEMENT PLAN Version VERSION HISTORY [Provide information on how the development and distribution of the Project Management Plan was controlled and tracked.
More informationPRINCESS NOURA UNIVESRSITY. Project Management BUS 302. Reem Al-Qahtani
PRINCESS NOURA UNIVESRSITY Project BUS 302 Reem Al-Qahtani This is only for helping reading the PMBOK it has our notes for focusing on the book Project Framework What is PMBOK? o PMBOK= Project Body of
More informationGary Natwick Harris Corporation
Automated Monitoring of Compliance Gary Natwick Harris Corporation Gary Natwick - 1 Government Communications Systems Division DoD Programs Strategic Management and Business Development CMMI Technology
More informationUsing Pilots to Assess the Value and Approach of CMMI Implementation
Using Pilots to Assess the Value and Approach of CMMI Implementation Godfrey, S., Andary, J., Rosenberg, L. NASA Goddard Space Flight Center, Greenbelt, Maryland, USA, 20771 Sara.H.Godfrey.1@gsfc.nasa.gov
More informationProject vs Operation. Project Constraints. Pankaj Sharma, Pankaj Sharma,
Project vs Operation PROJECTS OPERATIONS Temporary Ongoing Unique Repetitive Closes after attaining the objectives Objective is to sustain business Prototyping the new car model Assembly line production
More informationObjectives of Project Management Framework. What are the Characteristics Of Project. Activities involved Project Management
PMP Training Training Topics Chapter 1 Introduction to PMP Objectives of PMP Requirements for PMP Exam About PMP Exam PMP Exam Syllabus Chapter 2 Objectives of Project Management Framework What is Project
More informationSystems Engineering, Program Management conjoined Disciplines over the Project Life Cycle
s Engineering, Program Management conjoined Disciplines over the Project Life Cycle NDIA 8th Annual s Engineering Conference William Lyders October 2005 1 Agenda Understand the SE & PM Relationship, Roles,
More informationConnoisseur Solutions Project Procurement Management
Project Procurement Management Project Procurement Management Processes necessary to purchase or acquire products, services or results needed from outside the project team. Procurement Management Processes
More informationTop 10 Signs You're Ready (or Not)
Top 10 Signs You're Ready (or Not) For an Appraisal Gary Natwick Harris Corporation Gary Natwick - 1 Government Communications Systems Division DoD s Strategic and Business Development CMMI Technology
More informationMethods of IT Project Management
Methods of IT Project Management Second Edition by Jeffrey L. Brewer, PMP and Kevin C. Dittman Purdue University Press West Lafayette, Indiana CONTENTS About the Authors v Preface xix PART 1 Project Management
More informationProject Planning and Management (PPM) V2.0. WBS Dictionary
Project Planning and Management (PPM) V2.0 WBS Dictionary Software as a Service (SaaS) Version 1.0 August 2014 1 Table of Contents PPM V2.0 Work Breakdown Structure (WBS) Dictionary 1 Project Type: Software
More informationProject Stakeholder Management
Jambo (Swahili) Project Management Process Groups Project 4. Integration Management Initiating Planning Executing 5. Scope Monitoring & Controlling Closing Knowledge Areas 6. Time 7. Cost 8. Quality 9.
More informationQuality Management_200_Quality Product Review Procedure
Quality Management_200_Quality Product Review Procedure Last Updated: 05/15/2017 Audience: CWDS Service Teams, PMO Frequency: As needed After reading this procedure, the audience will be able to understand
More informationDoes This Come With Instructions?
Does This Come With Instructions? Creating A Manual for Your Organization s Project Culture Russell Rivenbark M.P.M. RCDD, PMP New Hanover County Schools First, have a definite, clear practical ideal;
More information