1 Resource Adequacy Straw Proposal for addressing Seasonality July 31, 2015 MISO Staff

2 Executive Summary MISO appreciates the stakeholder feedback it received in response to its Issues Statement on Facilitating Resource Adequacy in the MISO Region in March 2015 and subsequent discussions. As a result of the feedback it received MISO prioritized three key issues to focus future efforts Seasonality, Locational Considerations and Generation Interconnection Queue. This paper will discuss straw proposals to the address the Seasonality needs in the current design. Seasonality MISO s current processes do not explicitly ensure transparency of resource adequacy across all seasons and do not provide desired flexibility to market participants to match resources to load. In addition, stakeholders expressed an interest in a less than annual requirement to account for the seasonal diversity thus providing additional flexibility to meet load and reserve obligations. To address these issues, MISO proposes adding the following elements to its current design for implementation by April 1, 2017 for the resource planning year Seasonal auction intended to address flexibility needs Seasonal resource accreditation intended to assure resource transparency Seasonal requirements (reserve margins) intended to account for the seasonal diversity of resources and load MISO will work with stakeholders over the next five months to define these elements further leading to an initial conceptual design and tariff filing by the end of Additional detailed design filings will be evaluated jointly with stakeholders to provide a transparent design process. 1

3 Background The MISO region benefits from participating in a resource adequacy mutual insurance pool. MISO s individual Load Serving Entities ( LSEs ) receive a significant reduction in the capacity they need to meet their Load Obligation plus Planning Reserves reducing the reserve requirement from around 18% to about 15%, which translates into about $2 billion per year in benefit. Membership responsibilities and obligations of this pool are governed by MISO s annual summer-oriented Resource Adequacy Requirements ( RARs ). These requirements were designed for a summer-peaking system use and may not ensure transparency and reliability in the winter and shoulder-season months as the resource landscape changes 1 due to shifts in economics and regulations. Moreover, as reserve margins continue to shrink, appropriate risk alignment with respect to mutual insurance pool membership obligations and benefits will become increasingly challenging. In the MISO region, markets have been developed to support reliable grid operation as efficiently as possible, while aligning obligations and assumed risks with benefits in an impartial manner. For Resource Adequacy, this translates into RARs that enable LSEs efficient decisions today and support their efforts in the future. MISO proposes to enhance its RARs to address reliability and risk alignment concerns presented by the changing landscape. In doing so, MISO will also recognize that LSEs and States will require flexibility in demonstrating Resource Adequacy in all seasons. Issues driving seasonality Current RARs are summer focused, which do not explicitly ensure the MISO region is resource adequate throughout the Planning Year and do not provide sufficient flexibility to allow the efficient use of resources to meet seasonal demand and risk profiles. After the winter of 2014, MISO staff and stakeholders began to evaluate seasonality s impact on resource adequacy. This effort led to the development of indicative analysis (see Figure 1 below) of the impact that seasonal risks and opportunities have on a summer focused approach to Resource Adequacy. In an extreme case, resources procured through the current summer focused RARs may not be enough to serve peak demand during the winter, depending on resource availability and performance within the footprint. MISO staff considered parameters of additional design criteria that could ensure MISO s RARs facilitate achieving resource adequacy for each season in the Planning Year. With fewer resources expected to be available, an improved RAR construct should provide LSEs additional flexibility to accredit resources throughout the Planning Year. This could be achieved, for example, by allowing new generators and retirements to be reflected during the Planning Year. LSEs also could be provided additional flexibility to enter and terminate PPAs at will during the Planning Year. Both of these options would help increase utilization of resources. There are three core elements for improved design to mitigate the issues driving seasonality: flexibility, reliability, and efficiency. 1 The electric industry is going through resource portfolio changes and a reduction in overall reserve margins due in large measure to retirements of coal-based generation resources that are being replaced in part by generation fueled by natural gas and renewables. 2

4 Flexibility New Exit and Entry The current RARs do not provide sufficient flexibility for LSEs to navigate the changing landscape. For example, today s annual RARs require Market Participants ( MPs ) to replace a resource that retires in the middle of a Planning Year, even though the resource may not be needed to maintain reliability in nonsummer months. Further, if seasonal resources were recognized, there would be opportunities to efficiently replace the resource should it be required for reliability. Concern regarding this inflexibility is evidenced by the numerous requests by LSEs for FERC Waivers for Planning Year mid-year retirements. In addition to this resource replacement concern, there currently is a potential barrier to new entry when new resources come into service mid-planning Year, since they are not able to participate in the auction although they would likely be able to contribute towards achieving resource adequacy. Commercial Relationships The current RAR construct recognizes power purchase agreements ( PPAs ) and qualifies resources with respect to the summer months, while ignoring commercial arrangements that may be in effect for other periods during the year. This may limit LSEs flexibility with respect to entering into certain commercial relationships. For example, LSEs desire the flexibility to use PPAs that begin or expire mid-planning Year. LSEs also would like to have the option to enter into agreements to leverage non-summer Behind the Meter Generation, Interruptible and Direct Load Control, Energy Efficiency, and/or partial year off-system purchases. Policy, Regulatory, and Economic Uncertainty LSEs desire a more complete set of dynamic RARs to efficiently navigate unforeseen challenges in the future. A more dynamic set would provide both LSEs and MISO more options to accommodate change (i.e. increased solar penetration, changing economics, new regulatory requirements, increased penetration of distribution level resources). This would in turn reduce the likelihood of future radical changes to the RARs and, as a result, mitigate the risks of not achieving Resource Adequacy ( RA ) or not doing so in an efficient fashion. 3

5 Reliability A summer-oriented RARs construct does not explicitly ensure reliability or transparency in all seasons. Currently, MISO s Resource Adequacy construct operates in an uncertain environment in the non-summer months when MISO should be operating in an environment of measured risk 2. Uncertainty on the supply side stems in part from variations in resource availability 3. For example, some gas-fired resources are not winterized and therefore are not available to MISO to manage RA needs during all seasons. Moreover, other resources may not be available to MISO to manage RA needs during the nonsummer seasons due to inflexible operating parameters 4 resulting from not being staffed or environmental restrictions. Similarly, uncertainty arises from demand side fluctuations. For example, weather variations not captured by summer-oriented load forecast uncertainty may present significant challenges 5. MISO has identified the following factors that are not adequately accounted for in the current RARs: Seasonal Risks Driving Reliability Uncertainty: Resource performance correlation with ambient air temperature/time Variance of resource availability throughout the year Seasonal support from neighboring systems Seasonal variations in load forecast uncertainty Accuracy of load shape System topology changes Seasonal energy flows and transfer limits An extreme outcome of the seasonal risks identified above is summarized in the indicative waterfall chart that follows which was in part based on information obtained from the 2014 winter. The chart in Figure 1 illustrates how a summer-based reliability requirement may not achieve Resource Adequacy in an extreme winter scenario as a result of these identified risks. This scenario reflects a future in which historical surplus is depleted and only those resources that are committed towards meeting RAR are available to meet RA needs. The left side of the chart shows winter reserve margins after applying seasonal resource availability, with normal accounting of expected forced outage rates. It indicates a large seasonal reserve margin and suggests no cause for concern. However, this simple approach does not consider the coincident nature of winter availabilities and winter peak loads. The right side of the chart shows an extreme winter scenario where no LMRs are available in winter and where forced, planned, and maintenance outage rates reflect what was observed during the height of the 2014 winter. It also speculates that additional capacity not 2 Risk is defined as not knowing what the future holds but knowing the set of future outcomes and the odds of attaining each one (e.g., the odds of throwing a fair die and landing on 4 is 1/6). Uncertainty is defined as not knowing what the future holds but knowing the set of future outcomes and not knowing the odds of attaining any future state (e.g., the odds of throwing a loaded die and landing on a 4 is unknown a priori) 3 Resource availability refers to the accessibility of a resource by the system operator to meet resource adequacy needs. For example, CTs that have not been winterized are not available during the winter. Resource performance relates to the ability of a resource to contribute towards resource adequacy when it is available. For example, a non-wintered CT is available in the summer, but may have performance problems due to mechanical issues that force it offline. 4 Under current RARs, Capacity Resources that have radically inflexible offer parameters such as startup and notification times that equal or exceed 7 days are accredited the same as those that are highly flexible. 5 Summer oriented load forecast uncertainty does not reflect the impact of a prolonged summer or winter. Prolonged peak seasons have a compressing effect on maintenance seasons. This results in limited supply that is available to MISO to manage RA. 4

6 tested during the 2014 winter is unavailable in cold weather as a result of insufficient firm fuel supply. If supply availability reflected these worst case assumptions, MISO would experience a supply shortfall. As stated, the scenario outlined in the waterfall chart is extreme, however its probability is unknown and thus MISO is operating is an environment of uncertainty. Currently, MISO assumes a negligible Loss of Load Expectation ( LOLE ) in non-summer months. However, given the indicative analysis above, this assumption should be validated through the consideration of appropriate seasonal inputs. Figure 1: Indicative Analysis of a Summer-Based Reliability Standard Efficiency MISO uses markets as a vehicle to help achieve reliability, thus the success of both the reliability and markets objectives are strongly interdependent. Markets should support reliable grid operation in an efficient and transparent manner. Efficient markets do so by appropriately aligning participant obligations with benefits and providing flexibility to MPs. MISO s current Resource Adequacy construct does not explicitly ensure reliable grid operation in all periods of the year nor does it do so in the most efficient manner, as illustrated in Figure 2 below. For example, nothing in the current requirements inhibits an MP from using summer only Load Modifying Resources ( LMRs ) entirely to satisfy its annual resource requirements (some LSEs do this today). This may be acceptable as long as only some LSEs do this and the focus on LOLE lies in the summer months. With some 10,000 MW of current LMRs clearing in the Planning Resource Auction ( PRA ) and more expected to clear in the future as generation reserves erode, widespread use of LMRs for capacity needs could cause MISO to regularly be in emergency situations even in non-summer months because these resources can only be called upon in emergencies. This also could present a reliability issue given that LMRs are only required to be operable in the summer. Further, MPs using LMRs to meet their capacity obligation receive the benefits of the mutual insurance pool throughout the year while incurring obligations 5

7 only in the summer. A resource adequacy construct that explicitly accounts for seasonal issues will allow the market to determine the value of LMRs. Additionally, the mutual insurance pool represented through the existing RARs does not appropriately align participant benefits and obligations associated with seasonal resource performance and availability. For example, Capacity Resources (~130,000 MW) that clear in the PRA must offer energy in the day-ahead market every hour of the year. This full year must offer requirement based on summer peak is not the most efficient use of resources that are not needed during the shoulder months. In addition, a more efficient construct could allow diversity contracts, and non-summer resources to qualify in meeting seasonal resource requirements. A better alignment of benefits and obligations is desired to reflect seasonal resource performance and availability. As illustrated in Figure 2, annual commitment based on summer peak is likely inefficient. The horizontal line at the top of the chart represents the amount of resources committed based on the current summer-oriented RARs. The area below the line highlighted in red represents resources that may not be needed throughout the year to maintain reliability. Figure2: Indicative Inefficient Resource Commitment Annual PRMR 6

8 Stakeholder feedback MISO presented proposal questions at its June Resource Adequacy Policy Forum for Stakeholder review and requested feedback, by sector, to help guide MISO s development of a proposal. MISO received comments from all sectors regarding suggested Seasonal construct design elements and relative priority. Sector comments were concentrated into the following four areas: Consideration for forward looking capacity market Seasonal resource accreditation and requirement Number of distinct assessments and timing of auction administration Desire for actionable price signals The majority of sectors supported MISO s recommendation to explore a seasonal construct. IPPs, Power Marketers, and Retail Choice companies 6 did not feel that a seasonal construct would provide meaningful improvement to MISO s capacity process and instead argued that MISO should focus on a forward looking, multi-year capacity market structure that sends appropriate price signals. For the sectors that supported a recommendation to explore a seasonal construct, MISO received consistent suggestions regarding the need to for RARs to capture the seasonal differences in input data and additional flexibility in rules to recognize changes in resource mix or commercial arrangements during the Planning Year. Specifically, these commenters recommended that MISO reflect seasonal differences in resource capacity, such as non-summer wind patterns. They also recommended that MISO consider seasonal variations around anticipated transmission system conditions, such as load forecast and topology. Sectors also desired additional flexibility to reflect changes in resource availability and with effective dates for Power Purchase Agreements. Capturing seasonal differences of input data can allow MISO to assess resource adequacy throughout the planning year with more precision. Sector comments support our recommendation outlined in the Reliability and Flexibility section of the whitepaper. There was also broad sector support to adopt a process that would clear seasonal auctions within the Planning Year that would address, at a minimum, separate assessments for Summer and Winter. A minority of sectors recommended that MISO explore further granularity by also including separate assessments for the Fall and Spring periods. Regardless of the number of separate assessments within the Planning Year, the majority of sectors recommended MISO continue to administer its auction process once per year to minimize administrative burden on LSE staff. Finally, stakeholders indicated that seasonal outcomes should produce actionable price signals reflective of level of reliability achieved. This implies that any methodology have design criteria that is principled with clarity about when design changes may be required. 6 Retail Choice companies are Ameren and Noble Solutions (Illinois) 7

9 Design Objectives MISO proposes measuring the solution alternatives against a common set of criteria. Proposed objectives are broken down into design criteria and external considerations Design Criteria Reliability Flexibility Efficiency Transparency External Considerations Stakeholder Voices Process Clarity Design Criteria Flexibility LSEs must have flexibility to follow the system load profile with the appropriate resource mix, including the use of baseload resources to cover their customers demand throughout the year, and seasonal resources to fill in additional needs. This flexibility will enable resources to be committed only when they are needed, and allow retirements to transpire seamlessly. Further, the design should support the traditional resource planning obligations of LSEs, and their desire to reflect the diverse set of annual and seasonal resources they will use to achieve Resource Adequacy. Stakeholders across sectors strongly supported these criteria in establishing a seasonal construct, with some sectors citing this as the primary consideration. In particular, stakeholders were very invested in options to replace capacity and accredit capacity at its appropriate seasonal peak. Reliability The reliability of resources throughout the year is a core feature that must be maintained or improved with the new design. MISO must explicitly provide resource assurance across all seasons through the establishment of seasonal reserve requirements. These requirements need to acknowledge seasonal differences in demand and supply to ensure reliability and transparency is achieved during all seasons. Stakeholders across sectors strongly supported these criteria in establishing a seasonal construct, with some sectors citing this as the primary consideration. Efficiency Any solution should result in better economic use of regional resources. Resource Adequacy Requirements should qualify and require only the resources needed for a specific season; resources designated for summer may not be needed for winter. Additionally, the design should better consider the relative merits of resource classes (i.e., Load Modifying Resources vs Generators). For example, it is neither a reliable or most efficient outcome if all the Planning Reserve Margin Requirement (PRMR) in a Local Resource Zone (LRZ) is met using Load Modifying Resources only. 8

10 Stakeholders across sectors strongly supported these criteria in establishing a seasonal construct, with some sectors citing this as the primary consideration. In particular, stakeholders were very interested in only procuring resources as needed. Transparency MISO must provide adequate transparency into non-summer resource adequacy to allow for seasonal risk assessment and facilitate discussions between LSEs and States. This transparency should provide clarity on the relative risks due to variations in capacity, load, and transmission limitations throughout the year. External Considerations Stakeholder Voices The solution must be flexible enough to accommodate varying regulatory frameworks within the MISO region. The current construct includes jurisdictional areas under traditional regulated resource planning and retail choice areas. New proposals should maintain or improve alignment of process to accommodate both jurisdictional frameworks. Process Clarity Proposal design and evaluation criteria need to be simple enough to effectively communicate changes being made along with ongoing business practices and outcomes with correct decision makers at each stakeholder organization. 9

11 Solution Alternatives To address the issues identified above, MISO must modify its processes to transform uncertainty into measured risks. This transformation to understanding seasonal risks will enable MISO and its Stakeholders to harness the flexibility that seasonality presents, while enhancing system reliability through mechanisms that support grid reliability and providing appropriate transparency and risk alignment. Figure 2: Removing Uncertainty Will Ultimately Drive Efficiency, Appropriate Risk Alignment and Reliability LOLE studies and PRA processes do not appropriately evaluate nonsummer Uncertainty Measured Risks Measure risks in nonsummer through LOLE and Resource accreditation changes Provide flexibility Enhance reliability Ensure efficiency and appropriate risk alignment Enhancements Alternatives considered are focused towards Adjust resource requirements to appropriately match the load duration curve, with requirements that are higher in summer months, potentially lower in shoulder periods, and somewhere in the middle in winter months, and Create resource accreditation processes that appropriately reflect a resource s seasonal ability to contribute towards achieving resource adequacy on a seasonal basis 7. 7 For example, capacity credits for wind resources will be higher in the winter than the summer. 10

12 Alternative 1 - Seasonal Auctions In a seasonal auction construct, MISO would execute multiple seasonal auctions per year. These auctions would produce seasonal Auction Clearing Prices reflecting the value of a resource being able to contribute to the Resource Adequacy needs for that season. Alternative 2 - Annual Auction with Seasonal Constraints Under an enhanced annual construct, MISO would continue to execute one auction per year; however, it would include additional constraints. For example, one constraint would be an upper limit on the quantity of summer-only resources that can be used to meet the region s PRMR, in accordance with the increased load forecast for the summer period. This auction would produce potentially varying Auction Clearing Prices within the same zone, if the constraints bind, reflecting the value of a resource being able to contribute to seasonal Resource Adequacy needs. Alternative 3 - Seasonal After-the-Fact MW Accounting Under this option MISO would eliminate the auction process from its RARs. This would result in a MW accounting mechanism similar to the Fixed Resource Adequacy Plan (FRAP). LSEs would simply align their Load Obligation with approved planning resources by season. MISO would determine if each LSE had enough capacity to meet each seasonal PRMR. Should there be an identified deficiency; MISO would administer a penalty charge. Alternative 4 - Status Quo MISO evaluated each solution against the current RAR. While status quo was not considered as an effective solution, it provided a baseline upon which to judge other options. Other Considerations MISO acknowledges that energy market reforms and/or additional capacity performance incentives (e.g. Pay-for-Performance) may contribute to reliability and better risk alignment. However, given that both of these efforts can complement one or more of the identified solutions staff chose not to identify them as solutions to the seasonal issues, in and of themselves. Specifically, energy market reforms were not independently considered given they are ongoing regardless of the changes to be made in the Resource Adequacy construct. Likewise, development of new capacity performance incentives are also absent from this evaluation due to lack of evidence that current tools cannot be effective and the unproven effectiveness of such mechanisms. Therefore, for the MISO region, enhancing its Resource Adequacy Requirements as described below is the most appropriate framework from which to begin working towards achieving these objectives while providing transparency and awareness. MISO also considered more prescriptive approaches to addressing the defined concerns. One example of this approach would be to establish specific capacity characteristics that are deemed essential for meeting specific reliability needs such as firm fuel or flexibility. However, these approaches carry risks, including the risk of setting more stringent requirements than necessary and mischaracterizing resources in accounting for which resources meet the established reliability needs. An example of mischaracterizing a resource would be improperly concluding that a fuel delivery contract constituted firm delivery when it did not. For these reasons, MISO determined that a prescriptive approach is currently not a viable solution. 11

13 MISO Recommendation Only two solutions offer an appropriate match to the design criteria as a whole (indicated by green). Both options - Seasonal Auctions and Annual Auction with Seasonal Constraints are seasonal extensions of the current design. It should be noted that transitioning to a seasonal construct is a 2014 IMM State of the Market Recommendation (Potomac Economics, 2014). Both solution options offer Planning Reserve Margins that are appropriate for the season along with seasonal resource accreditation. The Seasonal Auctions option is the preliminary recommendation of MISO staff. This option is preferred as it offers increased flexibility and process clarity over its annual counterpart. These added benefits arise from separate and distinct seasonal auctions occurring through the year. Multiple auctions during the Planning Year will provide additional options for resources to opt in or out of the construct. These separate auctions will also increase process clarity. Each auction would result in a single Auction Clearing Price representing the seasonal value of Planning Resources. This approach aligns with our current auction process and would enable MISO to build on its current efforts to explain the auction process to its vast array of stakeholders. Conversely, an annual auction with seasonal constraints may produce up to four different prices based on an auction process that has multiple seasonal constraints, adding to the complexity of the single auction. If the constraints do not bind, then this approach would create a single price across all seasons. This effect is no different than what occurs in today s energy market; when no congestion occurs, a single system wide energy price is established (ignoring losses). 12

14 Attachment A Evaluation of Solution Options 13

15 Evaluation of Solutions Options A high-level evaluation of the solution options against these considerations is below, with the solutions being rated as either inadequate (red), limited (yellow), or appropriate (green) against each design criteria and external consideration. For completeness and transparency, the status quo set of RARs has also been included in this matrix. This evaluation does not convey a ranking/priority on considerations, nor is it intended to capture the entirety of the evaluation effort, which will include additional stakeholder input. Figure 4: High Level Decision Matrix Status Quo Solution Design Criteria Transparency Reliability Flexibility Efficiency External Considerations Process Clarity Stakeholder Voices Seasonal After-the- Fact MW Accounting Seasonal Auction Annual Auction with Seasonal Constraints Key: Inadequate Limited Appropriate Decision Matrix Explained Transparency Do MISO resource adequacy processes provide stakeholders the tools and information they need to efficiently demonstrate resource adequacy throughout all season? MISO s RAR processes, including the LOLE studies, PRA, and OMS MISO survey, provide transparency in summer months, where risk has historically been located. This provides a limited response to transparency considerations under a status quo solution. The Seasonal After-the-Fact MW accounting solution is weaker in this regard, as it provides limited forward visibility, although the transparency across seasons would be improved. However, the lagging nature of this indicator leads to an inadequate rating on transparency. 14

16 A seasonal evaluation, whether conducted through a single auction or through multiple auctions, provides increased transparency in non-summer months and provides the same forward visibility as current processes, leading to an advantage to a seasonal auction or an annual auction with seasonal constraints this criterion. Reliability How well would the proposal ensure reliability across all seasons? All proposed solutions provide reliability; the main variation between the solutions rests upon how well the solutions address non-summer reliability risk. The current construct provides limited insight into non-summer season risk, leading to a limited rating. Additionally, the Seasonal After-the-Fact MW Accounting method, due to its lagging indicator, could cause unforeseen reliability issues, leading to a limited rating. The seasonal auctions would be designed to maintain current levels of reliability in summer months and also to provide explicit reliability in non-summer months, which lead to an appropriate rating. Flexibility How much flexibility would be provided for LSEs to align resources with seasonal capacity differences with seasonal demand variation? The current construct was rated very poorly on the flexibility provided, as evidenced by MISO staff analysis, stakeholder comments and requested waivers. This led to an inadequate rating The MW accounting method could be designed to provide additional flexibility, but it lacks the optionality of a residual auction and the flexibility of a mutual insurance pool approach to resource adequacy. This provides a limited response to flexibility concerns. Both seasonal constructs would be designed to increase flexibility. However, there is some risk around new capacity exit and entry, especially if such changes do not align with the start of a season. Either seasonal construct could be designed to accommodate this concern, but the potential of holding separate seasonal auctions throughout the year could allow for fresher data to be used and limits new entry/exit concerns. This leads to an appropriate rating for a seasonal auction and a limited rating for an annual auction with seasonal constraints. It should be noted that this rating assumed seasonal auctions would occur throughout the year, and stakeholder feedback recommending that auctions be conducted either simultaneously or within a short period of time would eliminate this difference in rating between the seasonal auction or the annual auction with seasonal constraints. 15

17 Efficiency How well does the proposal align risk with benefits, to incent efficient behavior? Stakeholders and MISO staff have both identified limitations in the efficiency of the current PRA, resulting in a misalignment of risks incurred and benefits received in the auction (such as with LMRs as discussed previously). This lead to an inadequate rating for the status quo construct under this criterion. Also, a Seasonal After-the-Fact MW accounting method incentivizes LSEs to hold extra resources to account for non-weather adjusted peaks, reducing the efficiency of the solution and leading to an inadequate rating. Both the seasonal auctions would be designed to allow for increased efficiency as discussed previously, better aligning risks and benefits through recognizing variations in requirements throughout the year and appropriately assessing the value of seasonal resources such as intermittent and LMRs, causing these solutions to receive ratings of appropriate. Process Clarity Is the proposed process understandable? Our current auction is complex, but stakeholders have built an appropriate understanding of the processes. A Seasonal After-the-Fact MW accounting methodology is less complicated than our previous construct. This solution was rated as appropriate under this criterion due to this low learning curve and simplicity. Multiple seasonal auctions allow for more simplicity in regards to single price signals, with each auction resulting in one price. Additionally this auction format requires similar data entry from stakeholders as today, leading to an appropriate rating. Conversely, a single annual auction is more complicated than the current construct, as it would have additional data requirements to reflect seasonal concerns and could produce multiple price signals. This leads to a limited alignment of an annual auction with seasonal constraints to the process transparency. Stakeholder Voices Does the proposal align with stakeholder needs / wants? As mentioned previously, stakeholders and MISO staff have identified multiple areas for improvement in the current process, leading to an inadequate rating to the status quo. Although this concept has not been thoroughly discussed in recent stakeholder forums, MISO believes that the MW accounting methodology would not be viewed favorably by stakeholders due to its high cost and incentive to over commit generation. Both a single seasonal auction and multiple seasonal auctions had strong, although not universal, support from stakeholders, leading to appropriate ratings. It should also be noted that stakeholders generally preferred a single data submission, regardless of the actual clearing process used in the auction. This could lead to a single annual auction, although stakeholders indicated comfort with multiple auctions being performed sequentially within the span of a few months. 16

18 Assessing Preferred Option against Benefits of Annual Construct For three years starting in 2009, MISO administered a monthly set of RARs. Starting in 2008, FERC issued a number of orders requiring MISO to make compliance filings to primarily address 1) implementation of mechanisms for locational capacity 2) development of a permanent solution to ensure deliverability of Load Modifying Resources. As a result, MISO commenced an extensive stakeholder process in 2010 to develop innovative and effective new tools that were to be consistent with the FERC orders. This process resulted in transitioning from a monthly to an annual process starting in the Planning Year. The transition during the compliance period yielded a number of benefits including: Lower administrative costs when compared to monthly or seasonal compliance periods (MISO, 2010). Aligning compliance period with the term of the summer oriented LOLE analysis. (Testimony Filing to Enhance RAR By Incorporating Locational Capacity Market Mechanisms;, 2011). Establishment of a forward capacity procurement and planning requirements which provide economic signals regarding optimal location for construction of planning resources that will be required in future years (Affidavit of Kevin Larson on Behalf of Midwest Indpendent Transmission System Operator, INC, 2010). As MISO and stakeholders evaluate potential RAR enhancement options, it will weigh them against the administrative benefits identified at the time the transition from a monthly to an annual commitment period took place. For example, the preferred option proposes to execute more than one auction per year. While executing 2 or even 4 auctions a year is less than 12, the added administrative cost does merit additional consideration when weighted against the benefit. For example, MISO staff s preliminary assessment is that the benefit of additional auctions is greater in the face of retirements and new resources coming online. With regard to the alignment with the LOLE Studies and forward procurement, MISO staff envisions implementation options that still maintain this benefit by continuing to align the studies with the commitment period. Similarly, the preferred option may be implemented in a fashion that maintains the forward commitment period enjoyed by the annual construct. Pricing Impacts One of the key functions of any RTO is to facilitate the availability of adequate resources to reliably meet the demands ( load ) in their region. Reliability has to do with having the right amount of capacity, with the right characteristics, at the right locations, at the right times, at prices consumers are willing to pay. A logical next step in preserving an appropriate level of RAR is to establish seasonal requirements (i.e., at the right times) to encourage the proper mixture of Planning Resources to be available in the right locations in the MISO Region during the right seasons, in the most economic and efficient manner. The seasonal auctions will establish transparent Auction Clearing Prices ( ACP ) by season. These seasonal prices will reflect the value of incremental capacity necessary to meet the reliability standard established by MISO. These seasonal prices will reflect the supply and demand balance for each season and will capture the going forward capacity costs plus the opportunity costs for all cleared assets. Capacity owners will have to decide how to reflect fuel procurement and assurance issues in their offers on a seasonal basis 8. LSEs can choose to use these ACPs as they see fit, opting out entirely, as guidance for negotiating PPAs, or participating directly in the PRA as buyer or seller. On the one hand, seasonal auctions have the potential to induce additional supply that can only meet requirements during some 8 Please note that MISO continues to evaluate fuel assurance risk and future needs, whether addressed in future RA evaluations or market designs and this evaluation will continue to be in scope as the seasonal approach is advanced 17

19 seasons, thus driving ACPs lower for the benefits of end-use customers. On the other, a more explicit recognition of seasonal risk in the MISO footprint from a more accurate representation of seasonal demand and seasonal demand uncertainty, to resource accreditation that varies by season, can drive ACPs higher reflecting the value of credible, deliverable MWs in certain seasons. Regardless of the direction that seasonal ACPs move or the number of seasons, seasonal auctions that address identifiable risks that vary by season will more appropriately place a value on MWs available in season, promoting economically efficient resource procurement that achieves the reliability standard of 0.1 day/year LOLE across all seasons. MISO s proposed seasonal RAR enhancements have been tailored to meet the needs of the MISO Region and are therefore different than other RTO resource adequacy constructs implemented elsewhere. The seasonal RAR enhancements contain both an explicit Self-Scheduling and Opt Out (FRAP) option, so that LSEs can take steps to avoid or minimize any financial consequence of participating in the PRA. These concepts will protect LSEs that, for example, have engaged in state IRP and have acquired adequate seasonal Planning Resources to serve their Load, from being subject to any financial consequence of the PRA. At the same time, the seasonal RAR enhancements will establish an effective and transparent Auction Clearing Price for each of the Local Resource Zones by season. The proposed seasonal RAR enhancements modifications will continue to promote the ability of MPs to bilaterally contract for Zonal Resource Credits. 1 Please note that MISO continues to evaluate fuel assurance risk and future needs, whether addressed in future RA evaluations or market designs and this evaluation will continue to be in scope as the seasonal approach is advanced 18

20 Attachment B Timeline and Next Steps 19

21 Timelines and Next Steps MISO s goal is to implement a seasonal solution in the Planning Resource Auction. This requires an aggressive timeline to complete process changes prior to the start of Loss of Load Expectation studies, which will begin in June Timelines laying out the solution design and implementation phase to meet this goal are below. Figure 5: Solution Design and Tariff Filings Timeline August: Conceptual Design Discussion October Workshop 2: Seasonal implementation December: Conceptual Tariff Filing June: Detailed LOLE processes documented September Workshop 1: Definition of risks and seasons November Workshop 3: Wrap up and Tariff review February/ March: Additional Tariff Filings* September: Detailed Auction mechanics documented Figure 6: Implementation Timeline February: Winter capacity data submitted* October: Updated auction tool live April: First seasonal auction June: LOLE studies begin November: Generator and load data submissions due June: Planning Year begins * If required 20

LOLE is expressed as hours per year with the usual target criteria being (0.1 days/year) or 1- day in 10-years MISO Tariff: Module E-1 - The

LOLE is expressed as hours per year with the usual target criteria being (0.1 days/year) or 1- day in 10-years MISO Tariff: Module E-1 - The 1 2 3 4 LOLE is expressed as hours per year with the usual target criteria being (0.1 days/year) or 1- day in 10-years MISO Tariff: Module E-1 - The Transmission Provider will calculate and post the Planning

More information

Load Modifying Resources. Capacity Instruments affecting Resource Availability and Need

Load Modifying Resources. Capacity Instruments affecting Resource Availability and Need Capacity Instruments affecting Resource Availability and Need May 25, 2018 Purpose Statement Review the participation and historic performance of Load Modifying Resources (LMRs) in MISO s Capacity and

More information

Resource Availability and Need

Resource Availability and Need Resource Availability and Need Issues Statement Whitepaper March 30, 2018 Table of Contents 1. Executive Summary... 2 2. Aging and Retirement of the Portfolio s Generating Units... 5 2.1. Retirements reduce

More information

Contents. DRAFT Capacity Deliverability Fact Finding Summary Report

Contents. DRAFT Capacity Deliverability Fact Finding Summary Report DRAFT Capacity Deliverability Fact Finding Summary Report Contents 1 Background... 3 2 Overview of findings... 5 2.1 Implement methods for setting limits that respect the physical topology of the system

More information

Capacity Performance FAQ Response

Capacity Performance FAQ Response PJM Interconnection September 15, 2014 This page is intentionally left blank. PJM 2014 www.pjm.com 2 P age Contents FAQ Response Introduction... 4 Capacity Products... 4 Methodology for Establishing Maximum

More information

Capacity Accreditation and External Resource Zones 06/30/2016

Capacity Accreditation and External Resource Zones 06/30/2016 Capacity Accreditation and External Resource Zones 06/30/2016 Overview MISO requested guidance on areas that require additional discussion and resolution in the seasonal / locational proposal In the last

More information

Regional Resource Adequacy Stakeholder Meeting on Straw Proposal

Regional Resource Adequacy Stakeholder Meeting on Straw Proposal Regional Resource Adequacy Stakeholder Meeting on Straw Proposal Folsom, CA March 2, 2016 Chris Devon Senior Infrastructure Policy Developer Acronyms BAA Balancing Authority Area CEC California Energy

More information

Midwest ISO Resource Adequacy Overview ATC Network Customer Meeting. Kevin Larson Sr. Manager Resource Adequacy October 20, 2010

Midwest ISO Resource Adequacy Overview ATC Network Customer Meeting. Kevin Larson Sr. Manager Resource Adequacy October 20, 2010 Midwest ISO Resource Adequacy Overview ATC Network Customer Meeting Kevin Larson Sr. Manager Resource Adequacy October 20, 2010 Agenda Role of Resource Adequacy Planning Reserve Margin Requirements LSE

More information

Ensuring Resource Availability meets Need (RAN) in MISO. MRO Spring Reliability Conference May 23, 2018 Kevin Vannoy, Director Market Design

Ensuring Resource Availability meets Need (RAN) in MISO. MRO Spring Reliability Conference May 23, 2018 Kevin Vannoy, Director Market Design Ensuring Resource Availability meets Need (RAN) in MISO MRO Spring Reliability Conference May 23, 2018 Kevin Vannoy, Director Market Design Purpose & Key Takeaways Purpose: Discuss MISO s Resource Availability

More information

Reliability Pricing Model (RPM) DRAFT Business Rules

Reliability Pricing Model (RPM) DRAFT Business Rules Definition and Purpose of Reliability Pricing Model (RPM) 1. The purpose of the RPM is to develop a long term pricing signal for capacity resources and LSE obligations that is consistent with the PJM Regional

More information

Expanding Capacity Eligibility

Expanding Capacity Eligibility Expanding Capacity Eligibility Zachary T. Smith Manager, Capacity Market Design ICAPWG/MIWG March 7 th, 2019 Agenda Background Installed Capacity Supplier Payment Structure Peak Load Windows Counting MWs

More information

The Year to Date in PJM: Operations and Markets

The Year to Date in PJM: Operations and Markets The Year to Date in PJM: Operations and Markets Kerry Stroup Manager, State Government Policy PJM Interconnection OMA Energy Committee July 30, 2014 OMA Energy Committee Presentation Outline PJM s mission:

More information

Generation Capacity Mechanisms and Resource Adequacy Planning

Generation Capacity Mechanisms and Resource Adequacy Planning Generation Capacity Mechanisms and Resource Adequacy Planning Jennifer Heintz Public Service Commission of the State of Missouri February 7, 2013 Abu Dhabi, UAE Electricity Markets in the U.S. and Canada

More information

From: Keith Casey, Vice President, Market and Infrastructure Development

From: Keith Casey, Vice President, Market and Infrastructure Development California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market and Infrastructure Development Date: August 18, 2011 Re: Briefing on Renewable

More information

ATTACHMENT DD. Reliability Pricing Model

ATTACHMENT DD. Reliability Pricing Model OF NEW SERVICE REQUESTS; R - OATT ATTACHMENT DD ATTACHMENT DD Reliability Pricing Model References to section numbers in this Attachment DD refer to sections of this Attachment DD, unless otherwise specified.

More information

Summary of 2016 MISO State of the Market Report

Summary of 2016 MISO State of the Market Report Summary of 2016 MISO State of the Market Report Presented to: MISO Board Markets Committee David B. Patton, Ph.D. MISO Independent Market Monitor July 20, 2017 Introduction As the Independent Market Monitor

More information

NYISO Management Response to FTI Consulting Report Evaluation of the New York Capacity Market

NYISO Management Response to FTI Consulting Report Evaluation of the New York Capacity Market NYISO Management Response to FTI Consulting Report Evaluation of the New York Capacity Market March 2013 Evaluation of the New York Capacity Market Introduction In an effort to evaluate and, where appropriate,

More information

Briefing on How Resource Adequacy Works in ISO s Current Balancing Authority Area

Briefing on How Resource Adequacy Works in ISO s Current Balancing Authority Area Briefing on How Resource Adequacy Works in ISO s Current Balancing Authority Area Regional Resource Adequacy Meeting December 16, 2015 Salt Lake City, Utah Keith Johnson Manager, Infrastructure Policy

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Electric Storage Participation in Markets Operated by Regional Transmission Operators and Independent System Operators Docket Nos.

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION TRACK 2 TESTIMONY

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION TRACK 2 TESTIMONY BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Order Instituting Rulemaking to Oversee the Resource Adequacy Program, Consider Program Refinements, and Establish Annual Local and Flexible

More information

Impacts from Peak Load Reductions in Markets and Long-Range Planning

Impacts from Peak Load Reductions in Markets and Long-Range Planning JUNE 21, 2016 BOSTON, MA Impacts from Peak Load Reductions in Markets and Long-Range Planning MA Energy Efficiency Advisory Council Eric Winkler, Ph.D. TECHNICAL MANAGER, SYSTEM PLANNING Overview of Presentation

More information

RDRP Stakeholder Initiative

RDRP Stakeholder Initiative Reliability Demand Response Product RDRP Stakeholder Initiative Draft Final Proposal Review Stakeholder Conference Call September 13, 2010 Reliability Demand Response Product (RDRP) 1 2 3 We are here Project

More information

Reliability Demand Response Product

Reliability Demand Response Product Reliability Demand Response Product CAISO Response to Stakeholder Comments on the RDRP Straw Proposal Prepared for The Reliability Demand Response Product Stakeholder Initiative September 1, 2010 Comments

More information

August 15, Mary Jo Kunkle Executive Secretary Michigan Public Service Commission 7109 West Saginaw Highway Lansing, Michigan, 48917

August 15, Mary Jo Kunkle Executive Secretary Michigan Public Service Commission 7109 West Saginaw Highway Lansing, Michigan, 48917 Melissa Seymour Regional Executive Central Region Direct Dial: 317-249-5709 Email: mseymour@misoenergy.org Mary Jo Kunkle Executive Secretary Michigan Public Service Commission 7109 West Saginaw Highway

More information

Roadmaps for Demand Response & Storage

Roadmaps for Demand Response & Storage 1 Roadmaps for Demand Response & Storage Jim Price, California ISO Senior Advisor, Market Development & Analysis jprice@caiso.com PSERC Summer Planning Workshop Market Stem July 15, 2015 CAISO markets

More information

Commitment Cost Enhancements Phase 3 Action Plan

Commitment Cost Enhancements Phase 3 Action Plan Commitment Cost Enhancements Phase 3 Action Plan November 10, 2017 Table of Contents 1. Executive Summary... 3 2. Background... 3 3. Stakeholder Engagement... 6 4. Summary of Stakeholder Comments... 6

More information

Advancing Renewable Alternatives

Advancing Renewable Alternatives Advancing Renewable Alternatives FERC/RTO Training Session Institute for Policy Integrity New York University School of Law June 15, 2011 Abigail Krich President, Boreas Renewables About Boreas Renewables

More information

CHAPTER 6 - Load Forecast & Resource Plan

CHAPTER 6 - Load Forecast & Resource Plan CHAPTER 6 - Load Forecast & Resource Plan Introduction This Chapter describes the electric resource portfolio that may be acquired to meet the energy requirements of MBCP customers. The following overarching

More information

Competitive Markets 1

Competitive Markets 1 Competitive Markets 1 Why Regulation? Electric service has historically been considered a monopoly service The provision of electric service traditionally required huge investments in infrastructure Electricity

More information

Energy Storage and Distributed Energy Resources Phase 4 (ESDER 4) Issue Paper and Stakeholder Working Group Meeting

Energy Storage and Distributed Energy Resources Phase 4 (ESDER 4) Issue Paper and Stakeholder Working Group Meeting Energy Storage and Distributed Energy Resources Phase 4 (ESDER 4) Issue Paper and Stakeholder Working Group Meeting Comments by Department of Market Monitoring April 2, 2019 Summary DMM appreciates the

More information

MISO-PJM Joint and Common Market Drill Down Report

MISO-PJM Joint and Common Market Drill Down Report MISO-PJM Joint and Common Market Drill Down Report February 28, 2017 The purpose of this document is to provide a brief description of each component listed on the Joint and Common Market (JCM) Work Plan

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Order Instituting Rulemaking to Oversee ) the Resource Adequacy Program, Consider ) Program Refinements, and Establish Annual ) Rulemaking

More information

STATE OF ILLINOIS ILLINOIS COMMERCE COMMISSION

STATE OF ILLINOIS ILLINOIS COMMERCE COMMISSION STATE OF ILLINOIS ILLINOIS COMMERCE COMMISSION Rock Island Clean Line LLC ) ) Petition for an Order granting Rock Island ) Clean Line a Certificate of Public Convenience ) and Necessity pursuant to Section

More information

Stakeholder Communication. Inputs, Assumptions, and Preliminary Assessment. Base Model. Needs, Solutions, Sensitivity: Yr 5

Stakeholder Communication. Inputs, Assumptions, and Preliminary Assessment. Base Model. Needs, Solutions, Sensitivity: Yr 5 Methodology and Assumptions 1.1 Overview These sections describe the process we used to perform a network assessment of the ATC transmission system. The description includes study assumptions, methods

More information

Filing to Enhance LMR Participation in MISO Markets Docket No. ER

Filing to Enhance LMR Participation in MISO Markets Docket No. ER Jacob T. Krouse Managing Sr. Corporate Counsel Direct Dial: -- E-mail: jkrouse@misoenergy.org December, 0 VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission

More information

Draft Whitepaper to Platte River Board of Directors

Draft Whitepaper to Platte River Board of Directors Draft Whitepaper to Platte River Board of Directors Report on Organized Power Markets RTOs and ISOs Presented for the October 2016 Board Meeting Overview This report on the potential formation of a regional

More information

Midwest ISO TDU Sector October 2010 Midwest ISO Advisory Committee Hot Topic Adequate Price Signals

Midwest ISO TDU Sector October 2010 Midwest ISO Advisory Committee Hot Topic Adequate Price Signals Midwest ISO TDU Sector October 2010 Midwest ISO Advisory Committee Hot Topic Adequate Price Signals October 13, 2010 The Municipal, Cooperative and Transmission Dependent Utilities (TDUs) welcome the opportunity

More information

Appendix 1 PRELIMINARY DELIVERABILITY BASELINE ANALYSIS STUDY REPORT

Appendix 1 PRELIMINARY DELIVERABILITY BASELINE ANALYSIS STUDY REPORT Generation and Import Deliverability to the Aggregate of Load (Baseline) Study Methodology Executive Summary Deliverability is an essential element of any resource adequacy requirement. Specifically, Load

More information

COMMENTS OF THE PJM INDUSTRIAL CUSTOMER COALITION ON PJM'S CAPACITY PERFORMANCE PROPOSAL. September 17, 2014

COMMENTS OF THE PJM INDUSTRIAL CUSTOMER COALITION ON PJM'S CAPACITY PERFORMANCE PROPOSAL. September 17, 2014 COMMENTS OF THE PJM INDUSTRIAL CUSTOMER COALITION ON PJM'S CAPACITY PERFORMANCE PROPOSAL September 17, 2014 The PJM Industrial Customer Coalition ("PJMICC") appreciates the opportunity to submit these

More information

Capacity Performance Proposal. Summary of Key Design Elements

Capacity Performance Proposal. Summary of Key Design Elements December 3, 2014 This page is intentionally left blank. PJM 2014 1 P a g e Capacity Product Synopsis PJM Interconnection is proposing a single capacity product called Capacity Performance, similar to the

More information

Outage Coordination Training MISO Training

Outage Coordination Training MISO Training MISO Last material update: 05/19/2015 Course Content and Disclaimer 2 1 2 3 4 Course Description This course will review MISO's outage study processes and the coordination opportunities with TOs and MPs.

More information

Business Practice Manual RESOURCE ADEQUACY Planning Years 2013 and beyond

Business Practice Manual RESOURCE ADEQUACY Planning Years 2013 and beyond 0 Manual No. 011 RESOURCE ADEQUACY Planning Years 2013 and beyond 0 Disclaimer This document is prepared for informational purposes only to support the development application of enhancements to MISO s

More information

PJM Manual 14A: New Services Request Process Revision: 20 Effective Date: October 1, Prepared by Interconnection Planning Department

PJM Manual 14A: New Services Request Process Revision: 20 Effective Date: October 1, Prepared by Interconnection Planning Department PJM Manual 14A: New Services Request Process Revision: 20 Effective Date: October 1, 2017 Prepared by Interconnection Planning Department PJM 2017 Table of Contents Table of Contents Table of Exhibits...7

More information

Flexible Resource Adequacy Criteria and Must-Offer Obligation

Flexible Resource Adequacy Criteria and Must-Offer Obligation Flexible Resource Adequacy Criteria and Must-Offer Obligation Market and Infrastructure Policy Draft Final Proposal February 7, 2014 M&IP / KMeeusen page 1 Draft Final Proposal Table of Contents 1 Introduction...

More information

2016 Probabilistic Assessment. December 5, 2016 Southwest Power Pool

2016 Probabilistic Assessment. December 5, 2016 Southwest Power Pool 2016 Probabilistic Assessment December 5, 2016 Southwest Power Pool Table of Contents 1. Summary...2 a. SPP Planning Coordinator Footprint...2 b. Seasonal Capacity Totals... Error! Bookmark not defined.

More information

2018 Draft Policy Initiatives Roadmap. Market and Infrastructure Policy December 7, 2017

2018 Draft Policy Initiatives Roadmap. Market and Infrastructure Policy December 7, 2017 2018 Draft Policy Initiatives Roadmap Market and Infrastructure Policy December 7, 2017 Primary drivers of proposed three-year roadmap Recent grid operations challenges pointing to need for day-ahead market

More information

For purposes of this response, "State Regulators" and "state(s)" shall include the Council of the City of New Orleans.

For purposes of this response, State Regulators and state(s) shall include the Council of the City of New Orleans. Organization of MISO States Hot Topic Response Distributed Energy Resources September 2017 Introduction The growing amount of Distributed Energy Resources (DERs) driven by customer preferences and increasingly

More information

Wholesale Electricity Markets. New England Independent System Operator. Commissioner Mark Vannoy Maine Public Utilities Commission

Wholesale Electricity Markets. New England Independent System Operator. Commissioner Mark Vannoy Maine Public Utilities Commission Wholesale Electricity Markets and New England Independent System Operator Commissioner Mark Vannoy Maine Public Utilities Commission March 26, 2014 Overview and Background 2 Wholesale Electricity Markets

More information

American Municipal Power Proposal to the Capacity Construct/Public Power Senior Task Force Executive Summary

American Municipal Power Proposal to the Capacity Construct/Public Power Senior Task Force Executive Summary American Municipal Power Proposal to the Capacity Construct/Public Power Senior Task Force Executive Summary I. Introduction The genesis of the AMP proposal was in part due to AMP s strong belief that

More information

LOLE Fundamentals Loss of Load Expectation (LOLE) Fundamentals

LOLE Fundamentals Loss of Load Expectation (LOLE) Fundamentals Loss of Load Expectation (LOLE) Fundamentals March 13, 2014 Last material update: 03/12/2014 LOLE Agenda 2 Loss of Load Expectation (LOLE) Fundamentals Sections LOLE Background LOLE Study Connections to

More information

Reliability Services Initiative Phase 2: Draft Final Proposal

Reliability Services Initiative Phase 2: Draft Final Proposal Reliability Services Initiative Phase 2: Draft Final Proposal January 26, 2016 CAISO/M&IP/IP/KMeeusen 1 Table of Contents 1. Executive summary... 4 2. Changes to proposal and stakeholder comments... 5

More information

Stakeholder Comments Template. RA Enhancements

Stakeholder Comments Template. RA Enhancements Stakeholder Comments Template RA Enhancements This template has been created for submission of stakeholder comments on the RA Enhancements Issue Paper that was published on October 22, 2018. The Issue

More information

Calculation of Demand Curve Parameters

Calculation of Demand Curve Parameters Calculation of Demand Curve Parameters Rationale 4.1 Resource adequacy standard 4.1.1 The resource adequacy standard announced by the Government of Alberta prescribes a minimum level of reliability as

More information

All Source Request for Proposals Interim Summary

All Source Request for Proposals Interim Summary All Source Request for Proposals Interim Summary Introduction and Request for Proposal Overview Northern Indiana Public Service Company ( NIPSCO ) does business in the State of Indiana as a regulated public

More information

Analysis of the 2020/2021 RPM Base Residual Auction

Analysis of the 2020/2021 RPM Base Residual Auction Analysis of the 2020/2021 RPM Base Residual Auction The Independent Market Monitor for PJM November 17, 2017 Monitoring Analytics 2017 www.monitoringanalytics.com Introduction This report, prepared by

More information

Stakeholder Comments Template

Stakeholder Comments Template Stakeholder Comments Template Submitted by Company Date Submitted Dan Williams Portland General Electric May 22, 2018 dan.williams@pgn.com PGE Interest in FRAC-MOO-2 While PGE is not subject to the CPUC/ISO

More information

Design Alternatives Sheet (DAS) 18 Physical Bilateral Procurement

Design Alternatives Sheet (DAS) 18 Physical Bilateral Procurement Design Alternatives Sheet (DAS) 18 Physical Bilateral Procurement Introduction The subject matter discussed within this document forms part of the process for developing a Capacity Market design for Alberta.

More information

ISO New England s Operational Fuel-Security Analysis Shows Growing Fuel-Security Risk

ISO New England s Operational Fuel-Security Analysis Shows Growing Fuel-Security Risk M A R C H 1 6, 2 0 1 8 B O S T O N, M A ISO New England s Operational Fuel-Security Analysis Shows Growing Fuel-Security Risk Restructuring Roundtable Gordon van Welie P R E S I D E N T & C E O KEY MESSAGES

More information

Design Considerations for an Alberta Capacity Market

Design Considerations for an Alberta Capacity Market Design Considerations for an Alberta Capacity Market Monitoring Analytics September 21, 2016 Monitoring Analytics 2016 www.monitoringanalytics.com This page intentionally left blank. Monitoring Analytics

More information

First Solar Proposal Integration of Transmission Planning Process and Generation Interconnection Procedures (TPP-GIP Integration)

First Solar Proposal Integration of Transmission Planning Process and Generation Interconnection Procedures (TPP-GIP Integration) First Solar Proposal Integration of Transmission Planning Process and Generation Interconnection Procedures (TPP-GIP Integration) Introduction The CAISO s Revised Straw Proposal of September 12, 2011 is

More information

Integrated Resource Plan NOVEMBER EXECUTIVE SUMMARY

Integrated Resource Plan NOVEMBER EXECUTIVE SUMMARY Integrated Resource Plan NOVEMBER 2016 - EXECUTIVE SUMMARY Our goal is to be our customers trusted energy partner, meeting their need for safe, reliable, affordable electricity at home and in their businesses

More information

NYISO s Integrating Public Policy Project

NYISO s Integrating Public Policy Project NYISO s Integrating Public Policy Project Phase 2: Study Description and Assumption Review Dr. Nicole Bouchez & Mike Swider MIWG Krey Blvd, Rensselaer February 16, 2017 2000-2017 New York Independent System

More information

Entergy Arkansas, Inc Integrated Resource Plan. Follow-Up Materials June 18, 2018 entergy-arkansas.com/irp

Entergy Arkansas, Inc Integrated Resource Plan. Follow-Up Materials June 18, 2018 entergy-arkansas.com/irp Entergy Arkansas, Inc. 2018 Integrated Resource Plan Follow-Up Materials June 18, 2018 entergy-arkansas.com/irp Follow-up Materials to the 2018 IRP Stakeholder Meeting The following information is provided

More information

MISO Energy Storage Study DRAFT Scope

MISO Energy Storage Study DRAFT Scope MISO Energy Storage Study DRAFT Scope MISO Energy Storage Study DRAFT Scope July 19, 2011 MISO Page 1 Table of Contents 1. Introduction... 3 2. Study Objectives... 3 3. Study Drivers... 4 4. Study Description...

More information

Competitive Markets. Facilitated Dialogue: Market Restructuring & Renewable Energy. June 10-12, 2013 Mexico City, Mexico. Hisham Choueiki, Ph.D., P.E.

Competitive Markets. Facilitated Dialogue: Market Restructuring & Renewable Energy. June 10-12, 2013 Mexico City, Mexico. Hisham Choueiki, Ph.D., P.E. Competitive Markets Facilitated Dialogue: Market Restructuring & Renewable Energy June 10-12, 2013 Mexico City, Mexico Hisham Choueiki, Ph.D., P.E. Department of Energy and Environment Public Utilities

More information

CURRENT FEDERAL AND REGIONAL ELECTRIC POLICY ISSUES FOR THE ILLINOIS COMMERCE COMMISSION

CURRENT FEDERAL AND REGIONAL ELECTRIC POLICY ISSUES FOR THE ILLINOIS COMMERCE COMMISSION CURRENT FEDERAL AND REGIONAL ELECTRIC POLICY ISSUES FOR THE ILLINOIS COMMERCE COMMISSION Randy Rismiller Manager, Federal Energy Program Illinois Commerce Commission 1 THE FEDERAL ENERGY REGULATORY COMMISSION

More information

MISO-PJM Joint and Common Market Drill Down Report

MISO-PJM Joint and Common Market Drill Down Report MISO-PJM Joint and Common Market Drill Down Report August 22, 2017 The purpose of this document is to provide a brief description of each component listed on the Joint and Common Market (JCM) Work Plan

More information

Capacity Market. Overview. RPM Capacity Market. Market Design

Capacity Market. Overview. RPM Capacity Market. Market Design Section 5 Capacity Capacity Market Each organization serving PJM load must meet its capacity obligations through the PJM Capacity Market, where load serving entities (LSEs) must pay the locational capacity

More information

LOAD SERVING ENTITIES PJM REGION

LOAD SERVING ENTITIES PJM REGION Intra-PJM Tariffs --> RELIABILITY ASSURANCE AGREEMENT PJM Interconnection, L.L.C. Rate Schedule FERC No. 44 RELIABILITY ASSURANCE AGREEMENT Among LOAD SERVING ENTITIES in the PJM REGION Effective Date:

More information

ISO-NE FCM Capacity Market Design Scott M. Harvey. October 9, 2007

ISO-NE FCM Capacity Market Design Scott M. Harvey. October 9, 2007 ISO-NE FCM Capacity Market Design Scott M. Harvey October 9, 2007 Summary The ISO-NE FCM capacity market design embodies many improvements over the prior ISO-NE capacity market. Five of these improvements

More information

ERCOT Public LTRA Probabilistic Reliability Assessment. Final Report

ERCOT Public LTRA Probabilistic Reliability Assessment. Final Report ERCOT Public 2016 LTRA Probabilistic Reliability Assessment Final Report November 21, 2016 Contents Summary... 1 Software Model Description... 3 Demand Modeling... 3 Controllable Capacity Demand Response

More information

Gas-Electric Infrastructure Challenges. WPUI Gas Program September 17, September 13, 2012 Madison, WI

Gas-Electric Infrastructure Challenges. WPUI Gas Program September 17, September 13, 2012 Madison, WI Gas-Electric Infrastructure Challenges WPUI Gas Program September 17, 2012 MISO EPA/Gas related efforts - Timeline EPA Rules & Regulations MISO EPA Impact Study, Oct 2011 Gas Consultant Phase 1 Study,

More information

Stakeholder Comments Template. RA Enhancements

Stakeholder Comments Template. RA Enhancements Stakeholder Comments Template RA Enhancements This template has been created for submission of stakeholder comments on the RA Enhancements Issue Paper that was published on October 22, 2018. The Issue

More information

Mountain West Transmission Group Frequently Asked Questions Updated through September of 2017

Mountain West Transmission Group Frequently Asked Questions Updated through September of 2017 Mountain West Transmission Group Frequently Asked Questions Updated through September of 2017 This FAQ document was first provided in 2016 and has periodically been updated since that time. The document

More information

Wind Update. Renewable Energy Integration Lessons Learned. March 28, 2012

Wind Update. Renewable Energy Integration Lessons Learned. March 28, 2012 Wind Update Renewable Energy Integration Lessons Learned March 28, 212 Contents Summary Review of Historical Wind Growth and Output Impact of Wind on Operations Wind Curtailments Dispatchable Intermittent

More information

JCM Drill Down Report -- Draft. March 21, 2014

JCM Drill Down Report -- Draft. March 21, 2014 JCM Drill Down Report -- Draft March 21, 2014 The purpose of this document is to provide a brief description of each component listed on the JCM Work Plan Timeline compiled by PJM and MISO. This Drill

More information

Stakeholder Comments Template

Stakeholder Comments Template Stakeholder Comments Template Submitted by Company Date Submitted Mona Tierney-Lloyd Mtierney-lloyd@enernoc.com (415)238-3788 EnerNOC, Inc. July 25, 2013 Please use this template to provide your comments

More information

DEVELOPMENTS IN WESTERN MARKETS: RENEWABLES AND EXPANSION OF ORGANIZED MARKETS IN THE WEST

DEVELOPMENTS IN WESTERN MARKETS: RENEWABLES AND EXPANSION OF ORGANIZED MARKETS IN THE WEST DEVELOPMENTS IN WESTERN MARKETS: RENEWABLES AND EXPANSION OF ORGANIZED MARKETS IN THE WEST Power Regulatory Webinar Series Deanna E. King Stephen J. Hug September 28, 2016 CURRENT DEVELOPMENTS IN WESTERN

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA COMMENTS OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA COMMENTS OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application of Pacific Gas and Electric Company (U39E) for Approval of Demand Response Programs, Pilots and Budgets for Program Years 2018-2022.

More information

From Restructuring to Decarbonization: Operational and Market-Design Challenges in New England

From Restructuring to Decarbonization: Operational and Market-Design Challenges in New England SEPTEMBER 25, 2018 WASHINGTON, DC From Restructuring to Decarbonization: Operational and Market-Design Challenges in New England USAEE/IAEE North American Conference Evolving Energy Realities Gordon van

More information

Transmission Expansion Advisory Committee

Transmission Expansion Advisory Committee Transmission Expansion Advisory Committee EPA's Clean Power Plan PJM Modeling Approach and Deliverables PJM Interconnection December 3, 2015 www.pjm.com Clean Power Plan Analysis Overview What is it? US

More information

Zero Net Carbon Portfolio Analysis

Zero Net Carbon Portfolio Analysis Zero Net Carbon Portfolio Analysis Prepared for: Platte River Power Authority December 12, 2017 www.paceglobal.com Agenda Background Methodology Assumptions Cases Findings and Recommendations Page 2 Background

More information

Alberta Capacity Market

Alberta Capacity Market Alberta Capacity Market Comprehensive Market Design (CMD 1) Design Proposal Document Section 1: Overview of the Alberta Capacity Market Prepared by: Alberta Electric System Operator Date: January 26, 2018

More information

AESO Stakeholder Update on Mothball Outages. July 25, 2016

AESO Stakeholder Update on Mothball Outages. July 25, 2016 AESO Stakeholder Update on Mothball Outages July 25, 2016 Agenda 1. Background Issues Rationale 2. Mothball Rule Definition of Mothball Outage Overview of Section 306.7 3. Mothball Outages in the Market

More information

JCM Drill Down Report. May 27, 2015

JCM Drill Down Report. May 27, 2015 JCM Drill Down Report May 27, 2015 The purpose of this document is to provide a brief description of each component listed on the JCM Work Plan Timeline compiled by PJM and MISO. This Drill Down Report

More information

PJM Manual 18: PJM Capacity Market Revision: 38 Effective Date: July 27, Prepared by Capacity Market Operations

PJM Manual 18: PJM Capacity Market Revision: 38 Effective Date: July 27, Prepared by Capacity Market Operations PJM Manual 18: PJM Capacity Market Revision: 38 Effective Date: July 27, 2017 Prepared by Capacity Market Operations PJM 2017 Table of Contents Table of Contents Table of Exhibits...9 Approval...10 Current

More information

Capacity Performance Training. March 16, 2015

Capacity Performance Training. March 16, 2015 Capacity Performance Training March 16, 2015 Training Objectives Provide Capacity Market Sellers with information necessary to participate in the Reliability Pricing Model (RPM) under a Capacity Performance

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. SOUTHWEST POWER POOL, INC.'s REPORT REGARDING FUEL ASSURANCE ISSUES

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. SOUTHWEST POWER POOL, INC.'s REPORT REGARDING FUEL ASSURANCE ISSUES UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Centralized Capacity Markets in Regional Transmission Organizations and Independent System Operators Winter 2013-2014 Operations

More information

CAISO Generator Deliverability Assessment Methodology. On-Peak Deliverability Assessment Methodology (for Resource Adequacy Purposes)

CAISO Generator Deliverability Assessment Methodology. On-Peak Deliverability Assessment Methodology (for Resource Adequacy Purposes) Background On-Peak Deliverability Assessment Methodology (for Resource Adequacy Purposes) The CAISO s deliverability study methodology for resource adequacy purposes was discussed extensively in the CPUC

More information

Wabash Valley Power 2017 Integrated Resource Plan

Wabash Valley Power 2017 Integrated Resource Plan Wabash Valley Power 2017 Integrated Resource Plan Executive Summary January 2018 Wabash Valley Power 722 North High School Road Indianapolis Indiana 46214 www.wvpa.com What is an Integrated Resource Plan

More information

PJM Manual 18: PJM Capacity Market. Revision: 287 Effective Date: January 22, Prepared by PJM Capacity Market Operations

PJM Manual 18: PJM Capacity Market. Revision: 287 Effective Date: January 22, Prepared by PJM Capacity Market Operations Style Definition: PJM_Normal PJM Manual 18: PJM Capacity Market Revision: 287 Effective Date: January 22, 2015 Prepared by PJM Capacity Market Operations PJM 2015 PJM 2015 i PJM Manual 18: PJM Capacity

More information

Subject: Regional Resource Adequacy Initiative

Subject: Regional Resource Adequacy Initiative Subject: Regional Resource Adequacy Initiative Submitted by Company Date Submitted Simone Brant, 415-703-5239 Jaime Rose Gannon Candace Morey CPUC October 27, 2016 The CPUC Staff appreciate the opportunity

More information

Overview. Net Revenue

Overview. Net Revenue 2009 Quarterly State of the Market Report for PJM: January through June Section 3 Energy Market, Part 2 The Market Monitoring Unit (MMU) analyzed measures of PJM Energy Market structure, participant conduct

More information

NPCC 2009 New England Interim Review of Resource Adequacy. NPCC 2009 New England Annual Interim Review of Resource Adequacy

NPCC 2009 New England Interim Review of Resource Adequacy. NPCC 2009 New England Annual Interim Review of Resource Adequacy NPCC 2009 New England Annual Interim Review of Resource Adequacy ISO New England Inc. October, 2009 Approved by RCC on November 18, 2009 1 1.0 EXECUTIVE SUMMARY This report is ISO New England s (ISO-NE)

More information

Flexible Resource Adequacy Criteria and Must-Offer Obligation

Flexible Resource Adequacy Criteria and Must-Offer Obligation Flexible Resource Adequacy Criteria and Must-Offer Obligation February 13, 2014 Karl Meeusen, Ph.D. Market Design and Regulatory Policy Lead Stakeholder Meeting Agenda 2/13/14 Time Topic Presenter 12:30

More information

ITP Year 20 Assessment Scope

ITP Year 20 Assessment Scope ITP 20 Year Scope 1 ITP Year 20 Assessment Scope January 6, 2010 Approved by TWG January 5, 2010 Endsored by ESWG January 5, 2010 Table of Contents Overview... 4 Objective... 4 Modeling... 5 1. Economic...

More information

Business Practice Manual for The Transmission Planning Process

Business Practice Manual for The Transmission Planning Process Business Practice Manual for The Transmission Planning Process Posted: June 2, 2015 Intentionally left blank TABLE OF CONTENTS 1. Introduction... 9 1.1. Purpose of California ISO Business Practice Manuals...

More information

Business Practice Manual for Reliability Requirements. Version 34

Business Practice Manual for Reliability Requirements. Version 34 Business Practice Manual for Reliability Requirements Version 34 Last Revised: January 1, 2009July 28, 2010 Approval History Approval Date: 3/27/09 Effective Date: 3/31/09 BPM Owner: Chetty Mamandur BPM

More information

Electric Storage as a Transmission Solution in the MTEP Reliability Planning Process. Planning Advisory Committee September 26, 2018

Electric Storage as a Transmission Solution in the MTEP Reliability Planning Process. Planning Advisory Committee September 26, 2018 Electric Storage as a Transmission Solution in the MTEP Reliability Planning Process Planning Advisory Committee September 26, 2018 Discussion Today Discuss Stakeholder response to MISO proposed process

More information

Energy Markets - The Basics

Energy Markets - The Basics Disclaimer This training presentation is provided as a reference for preparing for the PJM Certification Exam. Note that the following information may not reflect current PJM rules and operating procedures.