1 NIHR Local Clinical Research Networks Annual Plans Guidance WORKING DRAFT Version 0.4

2 WORKING DRAFT v0.4 Document Control This document is updated and issued annually by the national CRN Coordinating Centre. Readers should ensure that the latest version is being viewed. Document Information Document Title NIHR Local Clinical Research Networks : Annual Plans : Guidance Effective Date 1 April 2014 to 31 March 2015

3 WORKING DRAFT v0.4 Contents 1. Background 4 2. LCRN Annual Plan overview 4 3. Local performance management and local goals 6 4. LCRN reporting and progress review meetings 6 5. Structure of the LCRN Annual Plan Host Organisation Accountable Officer Sign-off Submission of plans Queries 12 Appendices Appendix 1 Indicative template for LCRN infrastructure arrangements: Progress and Plans against the POFs and the LCRN Development and Improvement Objective Appendix 2 Indicative template for LCRN local plans and goals in support of NIHR CRN HLOs Appendix 3 Indicative template for LCRN plans against Objectives relating to cross-cutting activities Appendix 4 Indicative template for LCRN plans against the Objectives for Clinical Research Specialties for

4 LCRN Annual Plan Guidance WORKING DRAFT v Background 1.1. This working draft of the LCRN Annual Plan Guidance has been prepared in advance of final publication of the NIHR CRN Performance and Operating Frameworks and is based on NIHR CRN Performance and Operating Frameworks Working Draft Version 0.5, which is currently with the Department of Health, and therefore the content of this guidance may be subject to change The NIHR Clinical Research Network is the clinical research delivery arm of the NHS in England, tasked with supporting the rapid set-up and effective conduct of studies so that researchers can gather the robust evidence needed to improve treatments for NHS patients The NIHR Clinical Research Network has national leadership and management from the CRN national Coordinating Centre, and is embedded in the NHS through 15 Local Clinical Research Networks (LCRNs) CRNs provide and organise the NHS Support resources for NIHR CRN Portfolio studies, drive clinical research delivery performance, and champion the role of clinical research in the NHS in the region at every level The NIHR CRN Performance and Operating Frameworks Working Draft Version 0.5 set out the operational framework for LCRNs and the national Performance Framework that LCRN performance will be measured against, including the NIHR CRN High Level Objectives and Objectives relating to cross-cutting activities. As the Performance Framework indicates, additional objectives relating to Clinical Research Specialties and LCRN development and improvement will be set on an annual basis as part of the LCRN annual planning process. Objectives for Clinical Research Specialties for will be communicated once these are finalised. For there is a single LCRN development and improvement objective: to complete the establishment of the LCRN hosting, governance and management arrangements to ensure that the LCRN is able to effectively deliver its activities and that the terms of the Host contract are fulfilled Within their Annual Plans LCRNs are expected to set out their planned local goals for each CRN objective, for review and agreement by the national CRN Coordinating Centre. 2. LCRN Annual Plan overview represents a transitional year for the CRN. It is acknowledged that while the LCRN structure will be operational from 1 April 2014, some arrangements may be interim and will be finalised in-year in The Annual Planning process and the structure and content requested in LCRN Annual Plans for reflects this situation, takes a light touch approach where possible, and includes: a streamlined local reporting exercise to capture and enable incorporation of intelligence on research delivery performance in the first half of , and strengths, weaknesses, priorities and good practice from local research network arrangements, to strengthen and inform planning for ; 4

5 LCRN Annual Plan Guidance WORKING DRAFT v0.4 building on the LCRN Transition Plan, a section to provide assurance of progress made in developing and implementing the new LCRN infrastructure and working arrangements, and plans for further development and embedding of these arrangements in ; a section setting out plans for for improving performance in research delivery; 2.2. It is anticipated that the format and requested content of LCRN Annual Plans will evolve over time The LCRN Annual Financial Plan forms part of the LCRN Annual Plan; however it will be submitted separately to the main LCRN Annual Plan and specific additional guidance will be issued for the Financial Plan The LCRN Annual Plan provides an opportunity to set out the specific activities and strategic initiatives the LCRN will undertake during to support achievement of the NIHR CRN performance objectives as set out in the NIHR CRN Performance and Operating Frameworks - Working Draft Version The LCRN Annual Plan is separate to, and distinct from, the LCRN Transition Plan which set out the local plans for transition from existing Clinical Research Network structures into the new LCRN structure in the year The LCRN Annual Plan requires the LCRN to set out robust local plans for developing and embedding the LCRN infrastructure, and the LCRN s priorities and strategic direction in relation to the delivery of the NIHR Clinical Research Network Portfolio of studies and associated local goals. Plans should be developed with close reference to, and must be in line with, the NIHR CRN Performance and Operating Frameworks Final funding allocations will be confirmed and notified to LCRN Host organisations, in early 2014, dependent on confirmation of allocations by the Department of Health. The Annual Plan will therefore need to be initially developed with reference to the LCRN indicative budget allocation LCRN Annual Plans should build on LCRN Transition Plans, and interim LCRN structures and operating arrangements. Plans should take account of the opportunities and any identified challenges presented by the new LCRN structures, and should be collaboratively developed through consultation and discussion with Partner Organisations, the local Clinical Research Leadership Group, and other local stakeholders. The LCRN Partnership Group is expected to be active in helping develop and scrutinising the LCRN Annual Plan, including the financial plan Preparation and submission of the LCRN Annual Plan is the responsibility of the LCRN Host Organisation. The expectation is that Local Transition Facilitation Leads (LTFLs) will facilitate collaborative development of plans but will not be responsible for writing the LCRN Annual Plan as part of their LTFL role. 5

6 LCRN Annual Plan Guidance WORKING DRAFT v As discussed at the Host meeting on 27 November 2013, a suite of LCRN Guidance is under development to provide additional information in support of the NIHR CRN Performance and Operating Frameworks to assist Host organisations in delivering the Host contract. The LCRN Guidance may also be useful in relation to the LCRN Annual Planning process, and will be provided in January Local performance management and local goals 3.1. LCRNs are expected to proactively manage performance locally as set out in the NIHR CRN Performance and Operating Frameworks, with clearly defined routes of support and escalation The CRN Performance Framework (Part A of the CRN NIHR CRN Performance and Operating Frameworks - Working Draft Version 0.5 Frameworks) and use of performance objectives, measures and national and local goals (where applicable) are intended to be instructive and provide a platform for discussion between the LCRN Host Organisation, Partner organisations and other stakeholders, in relation to local research ambition and delivery, and associated resource requirements. The underlying aim in setting any local goals is to increase access to high quality studies for NHS patients and to ensure that the NHS is the global partner of choice for the life sciences industry; local goals for patient recruitment in particular can only be set by the NHS partners, supported by the LCRN Leadership Team and management staff, and should be ambitious. 4. LCRN reporting and progress review meetings 4.1. LCRNs will be expected to report on progress against their plans and will be required to submit quarterly financial reports and an annual report to the NIHR CRN Coordinating Centre. Further guidance regarding the requirements of these reports will be issued in due course by the NIHR CRN Coordinating Centre Progress Review meetings between the NIHR CRN Coordinating Centre and the LCRN leadership and senior management team will be arranged within These meetings will provide the opportunity to discuss performance and the successes and challenges of LCRNs. In addition, a national review of Clinical Research Specialty performance will be conducted annually by the CRN Coordinating Centre The timing and format of these meetings will be confirmed at a later date and will be arranged in consultation with LCRNs and national Clinical Research Specialty Leads. 6

7 LCRN Annual Plan Guidance WORKING DRAFT v Structure of the LCRN Annual Plan LCRN Annual Plans for should follow the structure outlined below: Coversheet (template provided) Section A Review of performance and local intelligence gathering Section B Development and embedding of LCRN infrastructure: LCRN Development and Improvement Objective Section C LCRN plans for for research delivery against the CRN HLOs, objectives for cross-cutting functions and Clinical Research Specialty objectives 5.2. For the Coordinating Centre is requesting minimal narrative content in LCRN Annual Plans, which will instead be based predominantly around a series of templates, and LCRNs are encouraged to use bullet points and provide information succinctly wherever possible. This does not preclude LCRNs from having their own supplementary documents for local engagement purposes. Further details of expectations and information requested in the various sections are outlined below. Coversheet 5.3. The coversheet provides an at a glance guide to the composition of the LCRN and should be at the front of the plan. Individual LCRN coversheet templates have been pre-populated, as far as possible, and provided to LCRN Host Organisations along with this document. The coversheet of the LCRN Annual Plan must be signed by the Host Accountable Officer prior to submission, to confirm Host Organisation Board sign-off of the Annual Plan. Section A: Review of performance and local intelligence gathering 5.4. It is critical that planning for is informed by a review of performance by the existing networks and organisations that will transition to the new LCRN. For this reason, the annual reports of the current 102 LRNs will be brought within the annual planning for the 15 LCRNs Section A of the LCRN Annual Plan should incorporate a local intelligence report, capturing a review of activity and performance in the first 6 months of , and local priorities and good practice from existing local Network structures ( ) to inform the LCRN s plans for The report should be based upon verified mid-year data a (from the Quarter 2 data-cut) to be provided by the CRN Coordinating Centre, and forecast Year End performance, and no further documentation to this end will be required from current local research networks at the end of , except for year-end finance reports. Please note that: current local research network Host Organisation finance contacts have recently been contacted by the CRN CC Finance Team regarding their responsibilities in relation to year end financial reporting. 7

8 LCRN Annual Plan Guidance WORKING DRAFT v It is intended that the local intelligence report will formally and briefly capture, and enable sharing of, achievements and challenges in the LCRN geography to date, and will support and promote a collaborative approach to planning. It is acknowledged that considerable dialogue and planning is already underway; this process serves to formally document and support this work rather than duplicating it It is anticipated that Local Transition Facilitation Leads may facilitate coordination of intelligence gathering; however the exercise is envisaged as a collaborative effort involving input from current LRN leadership. Where current networks map to more than one LCRN, the report is expected to cover only the perspective of NHS organisations that will form part of each LCRN and this may require that some Local Research Network Managers provide input to more than one LCRN intelligence report. a Indicative data to be provided by the CRN Coordinating Centre for (Q1 and Q2) 5.8. The following mid-year verified data will be provided to Host organisations by early January 2014: LCRN recruitment and number of studies open in Q1 and Q2 of (all Clinical Research Specialties combined) with a breakdown of commercial/noncommercial studies and recruitment, plus recruitment and number of studies for studies which are current and in follow-up. Plus comparative data for and The above data broken down by Clinical Research Specialty Host organisations will also be provided separately in mid-january 2014 with: LCRN recruitment and number of studies open in Q1 and Q2 of (all Clinical Research Specialties combined) with a breakdown of commercial/noncommercial studies and recruitment, plus recruitment and number of studies for studies which are current and in follow-up, broken down by NHS Trust organisations within the LCRN footprint. Plus comparative data for and Note: for this exercise, Primary Care recruitment data will be provided at LCRN level only and not by provider. To support more detailed analysis and planning, an Excel spreadsheet/pivot table containing recruitment data for Q1 and Q2 of and data for and ordered by: o the 6 divisions o the 12 themes o the 30 SGs o by LCRN(s) o by trust o by site o by financial year o by month o by design type (Interventional/Observational/Both/Not Specified) o by commercial/non-commercial o by study 8

9 LCRN Annual Plan Guidance WORKING DRAFT v0.4 o by active status (open, closed in follow-up, closed follow-up complete - alone and any combination) o by CI led studies within LCRN Current LRN managers within LCRN geographies will have intelligence on forecast recruitment data for the full year. Also, Host Organisations and LTFLs have previously been provided with details of the local workforce composition and Local Research Network Annual Financial Plans and Mid-year data. In addition, LCRNS are asked to draw on the collective local intelligence at Clinical Research Specialty/Division and Trust level when reviewing performance in and in planning for The local intelligence report is expected to consist of a very brief commentary (limited to several paragraphs) against the data provided and other local intelligence, collated from current networks whose member organisations will form part of the LCRN, outlining: successes in current challenges, risks and mitigating actions priorities and opportunities for Section B: Development and embedding of LCRN infrastructure: LCRN Development and Improvement Objective(s) 5.12.Section B of the LCRN Annual Plan centres on the LCRN Development and Improvement Objective for : to complete the establishment of the LCRN hosting, governance and management arrangements to ensure that the LCRN is able to effectively deliver its activities and that the terms of the Host contract are fulfilled This section of the plan provides an opportunity for the LCRN to provide assurances and outline plans relating to the development and embedding of LCRN infrastructure arrangements and ways of working, in line with the principles and requirements set out in Part B of the NIHR CRN Performance and Operating Frameworks - Working Draft Version 0.5. This section of the plan should consist of a completed version of the template to be provided to Host Organisations in early January 2014; for indicative template see Appendix 2. LCRNs are asked to indicate a Green/Amber/Red status for each area in the fifth column of the table. For areas rated Amber or Red, please provide a brief commentary in the LCRN Commentary column of the template. LCRNs are also asked to provide the information indicated in the Additional Information Required column in the LCRN Commentary column of the template. The Additional Information Required column includes a number of requests for the provision of details of lead individuals for a range of functions; the CRN Coordinating Centre will provide an additional template in early January to be used for provision of this information. 9

10 LCRN Annual Plan Guidance WORKING DRAFT v It is acknowledged that dependent on progress, some of the items of assurance requested in the template may already have been provided to the CRN Coordinating Centre in the LCRN s Transition Plan; where this applies the information need not to be provided again but instead a reference to the relevant section of the LCRN Transition Plan may be entered. Section C: LCRN plans for research delivery against the CRN HLOs, Objectives for cross-cutting functions, and Clinical Research Specialty Objectives Plans for delivery against CRN High Level Objectives 5.15.The NIHR CRN High Level Objectives (HLOs) are the national, overarching objectives for Clinical Research Network research delivery, and are set out in Table 1 of the CRN NIHR CRN Performance and Operating Frameworks - Working Draft Version This section of the LCRN Annual Plan should be presented in table format using the template to be provided to Host Organisations in early January 2014; for indicative template see Appendix 4. LCRNs are asked to outline succinctly the key activities/actions the LCRN plans to undertake in , to build upon current performance levels, and to capitalise on opportunities arising from the new LCRN configuration, and towards achievement of the NIHR CRN HLOs. Please also provide associated milestones/ outcome(s) once complete, timescales for the actions and leads for the actions. Please keep text to a minimum; the use of bullet points is encouraged LCRNs are encouraged to ensure that plans presented in this section are informed by and build on local performance, successes, challenges and priorities collated and captured in the performance review exercise presented in Section A of the LCRN Annual Plan (see section 5.2) The HLOs have national reach, and it is expected that the Host Organisation will evaluate and report on local contributions to these national performance metrics. In addition to submission of Appendix 3, LCRN Host Organisations are requested to agree appropriate supplementary local recruitment goals for HLO1, as outlined below. Agreeing local recruitment goals 5.19.Planning and agreeing measurable local recruitment goals is the responsibility of the LCRN Host Organisation and it is essential that LCRN Hosts engage with Partner Organisations, existing clinical network managers, local Clinical Research Leads and other stakeholders, as part of the annual planning process, to agree local goals and resources required to support their achievement LCRNs are asked to provide local goals for for: Overall annual recruitment by the LCRN Annual recruitment for each Clinical Research Specialty at local network level 10

11 LCRN Annual Plan Guidance WORKING DRAFT v The CRN Coordinating Centre is still considering the question of whether we require Host Organisations to provide total annual recruitment goals for each LCRN Partner Organisation, and we will clarify this issue as soon as possible Local goals should be recorded where noted within the relevant templates (see indicative templates in Appendices 2 and 4) It is noted that the timing of annual planning requires LCRNs to submit their local recruitment goals for the following year, prior to the existing operational year being completed and significantly in advance of recruitment figures being verified in the final data cut for (25 April 2014). Therefore LCRNs will be required to submit provisional goals as part of the LCRN Annual Plan Following publication of verified annual recruitment data, LCRNs will have until the end of April 2014 to notify the CRN Coordinating Centre whether they wish to make substantial amendments to their local goals. If there are no substantial amendments, the provisional goals will be accepted and verified according to the final recruitment figures, as per the final data cut on 25 April The intention is that the accuracy of predictions against actual recruitment will be reviewed at a national level, with the expectation of spreading successful methodology and learning to other regions/clinical Research Specialties over time, as LCRN structures embed and develop. Plans against the Objectives relating to cross-cutting activities 5.26.Objectives relating to cross-cutting activities to support research delivery are set out in Table 2 of the CRN NIHR CRN Performance and Operating Frameworks - Working Draft Version 0.5 and are grouped into five domains, based upon established balanced scorecard methodology: Customer Financial Internal business processes Learning and development Promoting research participation and culture 5.27.LCRNs are asked to identify plans for addressing the objectives for cross-cutting activities, and associated timescales and leads, by completing the template to be provided in early January 2014; an indicative template is presented in Appendix As noted above, LCRNs are encouraged to ensure that plans presented in this section are informed by and build on local performance, successes, challenges and priorities, collated and captured in the performance review exercise, presented in Section A of the LCRN Annual Plan (see section 5.2). 11

12 LCRN Annual Plan Guidance WORKING DRAFT v Findings from reviews undertaken by CLRNs in into the service provided to research stakeholders may also be pertinent and will be made available via LTFLs in early January Local goals and plans for delivery against Objectives for Clinical Research Specialties 5.30.From April 2014, the NIHR CRN will move to a framework of 30 Clinical Research Specialties for the purposes of engagement with clinical research communities and to support performance management of the NIHR CRN research portfolio In this section of the Annual Plan, LCRNs are asked to identify local goals and planned activities against the national Clinical Research Specialty Objectives, using the template to be provided by the national CRN Coordinating Centre in January; an indicative template is provided in Appendix Again, LCRNs are encouraged to ensure that plans presented in this section are informed by and build on local performance, successes in and any challenges and priorities captured as part of the performance review, presented in Section A of the LCRN Annual Plan Local plans to support the NIHR priority area of dementia 5.33.The LCRN Annual Plan should set out how the LCRN will deliver on this priority. LCRNs will ensure that plans presented in this section support and build on the NIHR CRN's existing initiatives relating to the Prime Minister's challenge on dementia. LCRNs are required to work with CRN Coordinating Centre to support development of their plans The Department of Health is funding the development of a nationally consistent consent-for-approach system to support recruitment to dementia studies, and the creation of a new IT system to support delivery. The system will be developed and implemented through the RAFT project in partnership with the Alzheimer s Society and Alzheimer s Research UK across England throughout Implementation in the local NHS has two key use cases: (A) use of system by the LCRN to support recruitment to studies, and (B) use of the system by local dementia services as a means of collecting and recording service users consentfor-approach about research, which will enable dementia services to meet the research criteria for accreditation to the Royal College of Psychiatrists Memory Service National Accreditation Programme (RC Psych MSNAP). The deadline for implementation across England of use case (A) is December The implementation of use case (B) is expected to proceed over a longer time period LCRN Annual Plans should include provision to: Project manage and lead the local the implementation in dementia services across the LCRN of business processes to enable the use of the RAFT system to recruit people to dementia studies Identify studies appropriate for inclusion in the RAFT system during Engage local PIs and trusts in the implementation and use of the RAFT system 12

13 LCRN Annual Plan Guidance Identify local research support staff who will use the system to support recruitment to dementia studies, and support their training on the RAFT system Engage with and identify NHS dementia services wanting to implement the RAFT system as a local consent-for-approach system in and support them to implement it, making promotion of the system a normal element of the care pathway 6. Host Organisation Accountable Officer Sign-off 6.1. The LCRN Annual Plan must be agreed by the LCRN Partnership Group and formally approved by the Host Organisation Board prior to submission to the national CRN Coordinating Centre. The coversheet of the LCRN Annual Plan must be signed by the Host Accountable Officer prior to submission, to confirm Host Organisation Board sign-off of the plan. 7. Submission of plans 7.1. Annual Plans should be submitted by 5pm on Monday 24 February 2014 to the CRN Coordinating Centre Planning and Reporting Team, by to NIHRCRN.PlanningReporting@nihr.ac.uk. 8. Queries 8.1. Please direct any queries about this guidance document or the LCRN Annual Planning process to the Transition Programme Team in the first instance, by to NIHRCRN.TransitionProgramme@nihr.ac.uk. 13

14 WORKING DRAFT v0.4 Appendix 1 Indicative template for LCRN infrastructure arrangements: Progress and Plans against the POFs and the LCRN Development and Improvement Objective Area of LCRN Operating Framework LCRN Governance Leadership Team Management arrangements Research Delivery Patient, Carer and Public Aspects of Assurance or LCRN Milestones Host Organisation sign-off of LCRN Governance Arrangements POFs Ref Additional Information Required LCRN RAG** status 2.4 Provide RAG status and commentary if applicable Please select Green, Amber or Red rating to indicate current status Nominated Executive Director identified 2.6, 2.7 Provide RAG status and commentary if applicable Scheme of delegation and Host Board controls 2.8 Provide RAG status and commentary if applicable and assurances established Assurance Framework & Risk Management 2.12, Provide RAG status and commentary if applicable System developed 2.13 Business continuity arrangements are in place for the LCRN in the event of a pandemic or other emergency 2.14 Provide RAG status and commentary if applicable Plans in place for inclusion of LCRN activity in the local internal audit programme of work Implement and maintain a documented LCRN escalation process LCRN Partnership Group Provide RAG status and commentary if applicable 2.17 Provide RAG status and commentary if applicable Provide the name, job title and organisation of the Chair. Provide a copy of Terms of Reference and list of members (name, job title and organisation) Appointment of LCRN Leadership Team, including as a minimum; the nominated executive director; the LCRN Clinical Director; and LCRN Chief Operating Officer 3.1 Provide RAG status and commentary if applicable Clinical Research Specialties 4.5- Provide a list of names of local Clinical Research 4.10 Specialty Leads and their clinical profession Research Delivery Divisions Provide the names of the individuals appointed as 4.18 LCRN Research Delivery Manager for Divisions 1-6 Research Delivery Cross-Cutting Team Provide RAG status and commentary if applicable 4.23 LCRN Support Team 4.24, Provide RAG status and commentary if applicable 4.25 LCRN Executive Group 4.30 Provide details of the membership of the LCRN Executive Group Clinical Research Leadership Group 4.31 Provide details of the membership of the Clinical Research Leadership Group Operational Management Group 4.32, Provide confirmation the Group has been established 4.33 in accordance with the provided TOR All LCRN organisations adhere to specified national systems, Standard Operating Procedures and operating manuals in respect of research delivery. The Host Organisation ensures that the LCRN management team provides excellent study performance management in order that all NIHR CRN Portfolio studies recruit to agreed timelines and targets Promotion of research opportunities in line with the NHS Constitution for England, including Provide confirmation the LCRN has an engagement and communication strategy in place for stakeholders involved in the research delivery and governance pathway Provide a brief outline of local plans for implementation, delivery and oversight of research management and governance services by the LCRN Provide the name of the appointed Industry Operations Manager Provide confirmation that a PCPIE workplan is in place Provide the name of the senior leader with identified LCRN Commentary In this column please add brief comments if the RAG rating is Red or Amber.

15 Involvement and Engagement (PCPIE) Continuous Improvement Workforce Development Corporate Support Services Information Systems Communications Information Governance informing patients about research conducted within the LCRN and actively involving and engaging patients, carers and the public in research Promoting and sustaining a culture of innovation and continuous improvement across all areas of LCRN activity to optimise performance Workforce development plan developed in partnership with relevant stakeholders and other local learning providers Provision of management processes or support services identified as necessary within the Host Organisation to enable effective running of the LCRN Appropriate, reliable and well maintained information systems and services are in place and fully operational Dedicated communications function and delivery plans in place, and budget line identified Promote and enable good Information Governance (IG) relating to all areas of LCRN activity WORKING DRAFT v0.4 responsibility for PCPIE within the LCRN Provide the name of the senior leader with identified responsibility for continuous improvement within the LCRN Provide confirmation that a workforce development plan is in place 7.3 Provide the name of the senior leader with identified responsibility for LCRN workforce development Provide confirmation all specified Corporate Support Services are in place Provide the name of the identified lead for the Business Intelligence function Confirm LPMS systems are in place as required Confirm arrangements are in place for provision of an LCRN Service Desk function and provide contact details 12.1 Confirm a dedicated communications function is in place 12.2 Confirm a communications work programme is in place 12.3 Confirm the LCRN is operating in compliance with brand guidelines Confirm a process is in place for timely reporting to the CRN Coordinating Centre of all information governance incidents arising from LCRN funded activities Provide baseline (2013) IG toolkit scores for the LCRN Host Organisation and Partner Organisations, and confirmation of attainment of Level 2 or above on all requirements or any exceptions that arise from or impact on LCRN funded activities Provide the name of the individual with specialist IG knowledge identified to respond to IG queries relating to LCRN funded activities ** RAG status guidance for LCRN self-assessment Arrangements in place Arrangements not yet in place but plans developed and on schedule Plans not agreed/implementation significantly delayed/behind schedule 15

16 WORKING DRAFT v0.4 Appendix 2 Indicative template for LCRN local plans and goals in support of NIHR CRN HLOs Objective Measure Target LCRN Goal/Target LCRN actions/activities for Milestones and outcome(s) once actions complete Timescale Lead 1 Increase the number of participants recruited into NIHR CRN Portfolio studies Number of participants recruited in a reporting year into NIHR CRN Portfolio studies 650,000 Enter the overall LCRN goal for recruitment Please enter as appropriate; the number of lines shown is an example not an expectation Please enter as appropriate Please outline timescale for actions Please identify who is responsible for the action(s) outlined 2 Increase the proportion of studies in the NIHR CRN Portfolio delivering to recruitment target and time A: Proportion of commercial contract studies achieving or surpassing their recruitment target during their planned recruitment period, at confirmed Network sites 80% 80% B: Proportion of non-commercial studies managed by Registered CTUs achieving or surpassing their recruitment target during their planned recruitment period 80% 80% C: Proportion of non-commercial studies not managed by Registered CTUs achieving or surpassing their recruitment target during their planned recruitment period 80% 80% 3 Maintain the percentage of commercial contract studies delivered through the NIHR CRN Number of commercial contract studies on the NIHR CRN Portfolio as a percentage of the total commercial MHRA CTA approvals for Phase II IV studies, on an annual basis 75% n/a 4 Reduce the time taken to achieve NHS Permission through CSP for NIHR studies Proportion of studies obtaining NHS Permission within 40 calendar days (from receipt of a valid complete application) 80% 80% 5 Reduce the time taken to recruit first participant into NIHR CRN Portfolio studies A: Proportion of commercial contract studies achieving first participant recruited within 30 calendar days of NHS Permission being issued or First Network Site Initiation Visit, at confirmed Network sites 80% 80% B: Proportion of non-commercial studies managed by Registered CTUs achieving first participant recruited within 30 calendar days of NHS Permission being issued 80% 80% C: Proportion of non-commercial studies not managed by Registered CTUs achieving first participant recruited 80% 80%

17 WORKING DRAFT v0.4 Objective Measure Target LCRN Goal/Target LCRN actions/activities for Milestones and outcome(s) once actions complete Timescale Lead within 30 calendar days of NHS Permission being issued 6 Increase NHS Trusts participation in NIHR CRN Portfolio Studies A: Proportion of NHS Trusts recruiting each year into NIHR CRN Portfolio studies 98% 98% B: Proportion of NHS Trusts recruiting each year into NIHR CRN Portfolio commercial contract studies 70% 70% C:Primary Care Related Metric to be agreed Tbc Tbc 17

18 WORKING DRAFT v0.4 Appendix 3 Indicative template for LCRN plans against the Objectives relating to cross-cutting activities Domain Objective Measure Target Planned LCRN actions in Timescale Lead 1 Customer Deliver a responsive and flexible service that meets the needs of the NIHR CRNs customers and stakeholders 2 Financial Deliver robust financial management using appropriate tools and guidance A: LCRN Host organisation s performance as a Host (annual survey of all LCRN partners) B: Satisfaction of participants in LCRN portfolio studies (annual survey) C: Satisfaction of patients / carers / others actively involved in supporting delivery of LCRN studies (annual survey) D: Impact of patients, carers and public actively involved in supporting delivery of NIHR CRN portfolio studies (annual assessment) E: Stakeholder understanding and perception of LCRN role (annual survey) A: Percentage variance (allocation vs expenditure) quarterly and year-end - This will be coordinated nationally and therefore no information is required as part of LCRN Annual Plans - Please outline key actions Please outline timescale for actions % Please identify who is responsible for the action(s) outlined 3 Internal Business Processes Deliver and report accurate data in a timely and efficient manner B: Percentage of financial returns completed on time 100% Percentage of LCRN data uploaded within agreed reporting timescales 97% 4 Learning and Growth Develop a flexible workforce to deliver the NIHR CRN portfolio of studies A: Proportion of LCRN-funded staff with Personal Development Reviews 100% B: Proportion of completed inductions for new starters 100% C: Proportion of CRN-funded staff with documented supervisory arrangements including appropriate professional accountability for clinical staff D: Profile of NIHR CRN funded staff relating to workforce data (annual survey) E: Number of actively involved patients, carers and the public accessing learning and development resources 100% Promoting Research Participation and Culture All providers increase recruitment into clinical research A: Proportion of LCRN Partners that have increased recruitment 80% B: Proportion of LCRN Partners reporting their own research KPIs to their organisation s Board 100%

19 WORKING DRAFT v0.4 Appendix 4 Indicative template for LCRN plans against the Objectives for Clinical Research Specialties for Clinical Research Specialty Objective Measure Target LCRN goal for number of participants/patients with a diagnosis to be recruited in To be confirmed To be confirmed To be confirmed To be confirmed To be completed at a local level LCRN actions/activities to achieve objective To be completed at a local level Milestones/timescale To be completed at a local level 19

20 WORKING DRAFT v0.4 Appendix 5 Indicative template for LCRN plans to support delivery of dementia initiatives Deliverable Planned LCRN actions in Milestones and outcomes once actions completed Timescale Lead Project manage and lead the local the implementation in dementia services across the LCRN of business processes to enable the use of the RAFT system to recruit people to dementia studies Identify studies appropriate for inclusion in the RAFT system Engage local PIs and trusts in the implementation and use of the RAFT system Identify local research support staff who will use the system to support recruitment to dementia studies, and support their training on the RAFT system Identify dementia services wanting to implement the RAFT system as a local consent-for-approach system and support them to implement it (Enter additional LCRN deliverables as appropriate) 20

Update on the Transition of the NIHR Clinical Research Network

Update on the Transition of the NIHR Clinical Research Network Delivering clinical research to make patients, and the NHS, better Update on the Transition of the NIHR Clinical Research Network nihrcrn.transitionprogramme@nihr.ac.uk Why Change? The benefits What s

More information

NIHR CRN High Level Objectives Quarterly Performance Report. Quarter /16

NIHR CRN High Level Objectives Quarterly Performance Report. Quarter /16 NIHR CRN High Level Objectives Quarterly Performance Report 2015/16 Public Version: Version 1 23 February 2016 1 Preface Scope of the NIHR CRN HLOs Quarterly Performance Summary Report This document sets

More information

NIHR CRN Quarterly Performance Report Quarter /18

NIHR CRN Quarterly Performance Report Quarter /18 NIHR CRN Quarterly Performance Report Quarter 3 2017/18 Public Version: Version 1.0 1 March 2018 Delivering research to make patients, and the NHS, better This document sets out the metrics and commentary

More information

NIHR CRN High Level Objectives Year End Performance Report /18

NIHR CRN High Level Objectives Year End Performance Report /18 NIHR CRN High Level Objectives Year End Performance Report - 2017/18 Public version: Version 1.0 23 July 2018 Delivering research to make patients, and the NHS, better Preface Scope of NIHR HLOs Annual

More information

Meeting Date 15 March 2018 Agenda Item 2b

Meeting Date 15 March 2018 Agenda Item 2b Meeting Date 15 March 2018 Agenda Item 2b Report Title Stocktake Report Author Pam Wenger, Report Sponsor Pam Wenger, Presented by Pam Wenger, Freedom of Open Information Purpose of the Report The purpose

More information

EDGE. Frequently Asked Questions. Clinical Research Network North Thames. August 2016/ Ziya Adnan, Business Intelligence Manager

EDGE. Frequently Asked Questions. Clinical Research Network North Thames. August 2016/ Ziya Adnan, Business Intelligence Manager EDGE Frequently Asked Questions August 2016/ Ziya Adnan, Business Intelligence Manager Delivering research to make patients, and the NHS, better Contents What is EDGE?... 3 What are the benefits of using

More information

Trust Board Meeting in Public: Wednesday 9 September 2015 TB

Trust Board Meeting in Public: Wednesday 9 September 2015 TB Trust Board Meeting in Public: Wednesday 9 September 2015 TB2015.117 Title NIHR Clinical Research Network [CRN]: Thames Valley and South Midlands Quarterly Report Status History For approval The OUH Trust

More information

STRATEGIC PLANNING AND STRATEGIC CHANGE REPORT. Director of Planning and Performance. Director of Planning and Performance

STRATEGIC PLANNING AND STRATEGIC CHANGE REPORT. Director of Planning and Performance. Director of Planning and Performance BOARD 9 DECEMBER 2015 AGENDA ITEM 3.3 STRATEGIC PLANNING AND STRATEGIC CHANGE REPORT of Director of Planning and Performance Paper prepared by Director of Planning and Performance Purpose of Paper Action/Decision

More information

RESEARCH SUPPORT SERVICES FRAMEWORK. Streamlining the management and governance of R&D studies in the NHS

RESEARCH SUPPORT SERVICES FRAMEWORK. Streamlining the management and governance of R&D studies in the NHS RESEARCH SUPPORT SERVICES FRAMEWORK Streamlining the management and governance of R&D studies in the NHS Page 1 of 22 Contents 1. INTRODUCTION... 3 How to use this document... 3 Background... 4 Purpose

More information

Belfast Health and Social Care Trust (BHSCT) Personal and Public Involvement (PPI) Monitoring Report September 2017

Belfast Health and Social Care Trust (BHSCT) Personal and Public Involvement (PPI) Monitoring Report September 2017 Belfast Health and Social Care Trust (BHSCT) Personal and Public Involvement (PPI) Monitoring Report September 2017 Prepared by Martin Quinn and Claire Fordyce, PHA 1 Contents Introduction...... 3 Rationale

More information

Board Assurance and Escalation Framework

Board Assurance and Escalation Framework Lincolnshire Partnership NHS Foundation Trust (LPFT) Board Assurance and Escalation Framework DOCUMENT VERSION CONTROL Document Type and Title: Policy No 5a. with effect from 2/11/15 (former corporate

More information

CCG CO 22 Project Management Policy

CCG CO 22 Project Management Policy Corporate CCG CO 22 Project Management Policy Version Number Date Issued Review Date V1.1 25/02/2016 25/02/2018 Prepared By: Head of Programme Management Office (PMO), NTCCG Consultation Process: Transformation

More information

Trust Board Meeting: Wednesday 8 July 2015 TB

Trust Board Meeting: Wednesday 8 July 2015 TB Trust Board Meeting: Wednesday 8 July 2015 Title NIHR Reporting of R&D Metrics Status History A paper for information The Trust Management Executive received an update on the performance of the Trust with

More information

BOARD OF DIRECTORS: 1 st June 2018 AGENDA ITEM: 5.1 SUBJECT: Performance Management & Accountability Framework Rebecca Brown Chief Operating Officer

BOARD OF DIRECTORS: 1 st June 2018 AGENDA ITEM: 5.1 SUBJECT: Performance Management & Accountability Framework Rebecca Brown Chief Operating Officer BOARD OF DIRECTORS: 1 st June 2018 AGENDA ITEM: 5.1 SUBJECT: RESPONSIBLE DIRECTOR: AUTHOR: Performance Management & Accountability Framework Rebecca Brown Chief Operating Officer Rebecca Brown Chief Operating

More information

Annual Audit Letter. The Whittington Hospital NHS Trust Audit

Annual Audit Letter. The Whittington Hospital NHS Trust Audit Annual Audit Letter The Whittington Hospital NHS Trust Audit 2008-2009 Contents Key messages Statement on internal control 5 Use of resources 6 Closing remarks 7 Appendix 1 ALE key findings and conclusions

More information

A Quality Assurance Framework for Knowledge Services Supporting NHSScotland

A Quality Assurance Framework for Knowledge Services Supporting NHSScotland Knowledge Services B. Resources A1. Analysis Staff E. Enabling A3.1 Monitoring Leadership A3. Measurable impact on health service Innovation and Planning C. User Support A Quality Assurance Framework for

More information

Medicines for Children Research Network. Consumer Strategy

Medicines for Children Research Network. Consumer Strategy Medicines for Children Research Network Consumer Strategy 2012-2015 NIHR-MCRN Strategy for Consumer Involvement 2012-2015 1. Introduction and background Consumer involvement is a central thread running

More information

Southern Health and Social Care Trust (SHSCT) Personal and Public Involvement (PPI) Monitoring Report September 2017

Southern Health and Social Care Trust (SHSCT) Personal and Public Involvement (PPI) Monitoring Report September 2017 Southern Health and Social Care Trust (SHSCT) Personal and Public Involvement (PPI) Monitoring Report September 2017 Prepared by Martin Quinn and Claire Fordyce, PHA 1 Contents Introduction...... 3 Rationale

More information

PERFORMANCE IN INITIATING AND DELIVERING CLINICAL RESEARCH INFORMATION SUBMISSION GUIDELINES

PERFORMANCE IN INITIATING AND DELIVERING CLINICAL RESEARCH INFORMATION SUBMISSION GUIDELINES PERFORMANCE IN INITIATING AND DELIVERING CLINICAL RESEARCH INFORMATION SUBMISSION GUIDELINES Version Control Item 19 Items 25, 26 Item 29 Update to the Publication requirements Update of Submission Timetable

More information

LEGAL AID BOARD BOARD EVALUATION FINAL REPORT

LEGAL AID BOARD BOARD EVALUATION FINAL REPORT LEGAL AID BOARD BOARD EVALUATION FINAL REPORT May 2018 Governance Advisory Services Ireland Limited, 32 Leeson Street Lower, Dublin 2, Ireland. Telephone: +353 (0)1 639 2928, Email: info@governanceireland.ie,

More information

Policy and Procedure for the production of the Joint Strategic Needs Assessment ( end to end process guidance)

Policy and Procedure for the production of the Joint Strategic Needs Assessment ( end to end process guidance) Policy and Procedure for the production of the Joint Strategic Needs Assessment ( end to end process guidance) Version 4.0 (published) Updated September 2017 JSNA -Procedural Guidance_v4_250917 Document

More information

Supporting and applying research in the NHS. 1. Overview

Supporting and applying research in the NHS. 1. Overview Supporting and applying research in the NHS 1. Overview Improving commercial research set-up Recap of ongoing activities NHS England and the National Institute for Health Research (NIHR) have published

More information

Meeting Date 15 March 2018 Agenda Item 2d

Meeting Date 15 March 2018 Agenda Item 2d Meeting Date 15 March 2018 Agenda Item 2d Report Title Board Assurance Framework (BAF) Report Author Pam Wenger, Corporate Governance Report Sponsor Pam Wenger, Corporate Governance Presented by Pam Wenger,

More information

NHS R&D Forum Response CRN Study Support Service Effective Study Start-Up SOP. Version Consultation Draft, 15 JUNE 2015

NHS R&D Forum Response CRN Study Support Service Effective Study Start-Up SOP. Version Consultation Draft, 15 JUNE 2015 NHS R&D Forum Response CRN Study Support Service Effective Study Start-Up SOP. Version Consultation Draft, 15 JUNE 2015 FINAL Version 1.0, July 22nd 2015 1. Introduction and Method The Forum working groups

More information

CCG CO 22 Project Management Policy

CCG CO 22 Project Management Policy Corporate CCG CO 22 Project Management Policy Version Number Date Issued Review Date V2.0 20/05/2016 20/05/2018 Prepared By: Head of Programme Management Office (PMO), NTCCG Consultation Process: Transformation

More information

INFORMATION GOVERNANCE STRATEGY AND STRATEGIC VISION

INFORMATION GOVERNANCE STRATEGY AND STRATEGIC VISION INFORMATION GOVERNANCE STRATEGY AND STRATEGIC VISION Policy approved by: Joint Audit and Governance Committee Date: December 2016 Next Review Date: October 2018 Version: 2.0 Information Governance Strategy

More information

ACTIVITY WORK PLAN CONTENTS

ACTIVITY WORK PLAN CONTENTS ACTIVITY WORK PLAN Activity Program Organisation Activity Plan Timeframe Strengthening the capacity, efficiency and effectiveness of Clinical Trials Networks through the Australian Clinical Trials Alliance

More information

Externally Facilitated Board Effectiveness Review

Externally Facilitated Board Effectiveness Review Draft issued: 16 March 2017 2 nd Draft issued: 20 March 2017 Final issued: 20 March 2017 CONTENT Page No. Section 1 Background 1 Section 2 Scope, Objectives and Overall Findings 1-2 Section 3 Audit Approach

More information

Research & Development (R&D) Strategy 2012 to 2016 Sustaining Growth

Research & Development (R&D) Strategy 2012 to 2016 Sustaining Growth Research & Development (R&D) Strategy 2012 to 2016 Sustaining Growth Document Status Version: 1.0 Approved DOCUMENT CHANGE HISTORY Initiated by Date Author Clinical Development & Effectiveness (CDE) First

More information

NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING ORGANISATIONAL DEVELOPMENT FRAMEWORK UPDATE 2018/2019

NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING ORGANISATIONAL DEVELOPMENT FRAMEWORK UPDATE 2018/2019 NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING ORGANISATIONAL DEVELOPMENT FRAMEWORK UPDATE 2018/2019 Date of the meeting 14/11/2018 Author Sponsoring Board member Purpose of Report Recommendation

More information

NHS DORSET CCG CLINICAL SERVICES REVIEW SPECIFICATION

NHS DORSET CCG CLINICAL SERVICES REVIEW SPECIFICATION NHS DORSET CCG CLINICAL SERVICES REVIEW SPECIFICATION 1. REQUIREMENTS OVERVIEW 1.1 NHS Dorset Clinical Commissioning Group (CCG) is seeking a provider partner to better understand the enduring care needs

More information

NOT PROTECTIVELY MARKED. Item Number 5.10 Gary Devlin, Partner, Scott- Moncrieff Recommendation to Members Members are requested to note the report.

NOT PROTECTIVELY MARKED. Item Number 5.10 Gary Devlin, Partner, Scott- Moncrieff Recommendation to Members Members are requested to note the report. NOT PROTECTIVELY MARKED Meeting Audit Committee Date 24 July 2018 Location Pacific Quay, Glasgow Title of Paper Internal Audit Annual Report Item Number 5.10 Presented By Gary Devlin, Partner, Scott- Moncrieff

More information

Agenda Item 8. Page 31

Agenda Item 8. Page 31 Agenda Item 8 Proposed Governance Arrangements for Joint Commissioning of Health and Social Care between Lincolnshire County Council, the Four Lincolnshire Clinical Commissioning Groups and the Local Area

More information

Report Title: Trust Board Assurance Committees, Quality Assurance Framework and Assurance Mapping

Report Title: Trust Board Assurance Committees, Quality Assurance Framework and Assurance Mapping Summary Report Trust Board Meeting Date: 27 th March 2013 (Part 1) Report Title: Trust Board Assurance s, Quality Assurance Framework and Assurance Mapping Agenda Item: 09 Enclosures: Sponsor; Medical

More information

Policy:E7. Escalation Policy N/A. Appended below at Appendix B. Version: E7/01

Policy:E7. Escalation Policy N/A. Appended below at Appendix B. Version: E7/01 Policy:E7 Escalation Policy Version: E7/01 Ratified by: Trust Management Team Date ratified: 11 th September 2013 Title of Author: Board Secretary & Head of Governance Title of responsible Director Medical

More information

CQC Strategic and High level Risk Register

CQC Strategic and High level Risk Register Impact and quality R1 We do not have impact in encouraging improvement innovation and sustainability in care resulting in loss of confidence in CQC (significantly this risk could materialise because financial

More information

Risk Management and Assurance Strategy

Risk Management and Assurance Strategy Risk Management and Assurance Strategy Version 5.0 Policy number ULHT-MD-GOV-RM-STRAT Document author(s) Head of 2021 Programme Contributor(s) Approved by Policy Approval Group Date approved Date Published

More information

RISK MANAGEMENT STRATEGY

RISK MANAGEMENT STRATEGY Agenda Item No: 15 RISK MANAGEMENT STRATEGY PURPOSE: The Risk Management Strategy has been updated to reflect the revised approach to the Corporate Risk Register and Board Assurance Framework and to reflect

More information

Procurement Systems Report

Procurement Systems Report Procurement Systems Report Internal Audit Final Follow-up Report March 2017 1 Contents 1. Background page 3 2. Purpose of this report - page 3 3. Executive Summary page 4 4. Summary of Findings page 5

More information

The Integrated Support and Assurance Process (ISAP): detailed guidance on assuring novel and complex contracts

The Integrated Support and Assurance Process (ISAP): detailed guidance on assuring novel and complex contracts The Integrated Support and Assurance Process (ISAP): detailed guidance on assuring novel and complex contracts Part C: Guidance for NHS trusts and NHS foundation trusts Published by NHS England and NHS

More information

The Kirkup report. Governance Project Mary Aubrey, Director of Governance May 2015

The Kirkup report. Governance Project Mary Aubrey, Director of Governance May 2015 The Kirkup report Governance Project Mary Aubrey, Director of Governance May 2015 The Governance Project group The Governance Project group Communication plan PLANNING PHASE Meetings held with the Heads

More information

BUSINESS PLAN

BUSINESS PLAN BUSINESS PLAN 2018-19 1 Putting Standards at the heart of Social Work and Social Care practice and education and training. 2 Regulating the Workforce and Social Work Education and Training to establish

More information

West Kent Clinical Commissioning Group

West Kent Clinical Commissioning Group West Kent Clinical Commissioning Group Information Governance Strategy 2017-18 Release: Final Approved Date: 27/10/2016 Author: Jamie Sheldrake Senior Associate - Information Governance Owner: SOUTH EAST

More information

Environment and resource efficiency Strategy and action plan 2016/17

Environment and resource efficiency Strategy and action plan 2016/17 Environment and resource efficiency Strategy and action plan 2016/17 Date: 27 June 2016 Version number: v1 Owner: David Jukes Approval route: NHSBSA Leadership Team Approval status: Approved 1. Introduction

More information

Setting up new studies where NBT are sponsor

Setting up new studies where NBT are sponsor Setting up new studies where NBT are sponsor Task Why Task Should Happen When Task Should Happen Who Should Complete Task How Task is Completed TASK 1: Apply for confirmation that NBT can sponsor the study

More information

Development and Management of Procedural Documents Policy

Development and Management of Procedural Documents Policy Development and Management of Procedural Documents Policy The 5 key messages the reader should note about this document are: 1. Procedural Documents are important within any organisation. They are an essential

More information

WELSH HEALTH CIRCULAR

WELSH HEALTH CIRCULAR WHC (2005) 097 WELSH HEALTH CIRCULAR Parc Cathays Caerdydd CF10 3NQ Cathays Park Cardiff CF10 3NQ Issue Date: 22 December 2005 Status: FOR ACTION Title: The Introduction of the Delivery and Support Unit

More information

CENTRAL MANCHESTER UNIVERSITY HOSPITALS NHS FOUNDATION TRUST. Board of Directors Monday 14 th November Workforce Performance Mid-Year Report

CENTRAL MANCHESTER UNIVERSITY HOSPITALS NHS FOUNDATION TRUST. Board of Directors Monday 14 th November Workforce Performance Mid-Year Report CENTRAL MANCHESTER UNIVERSITY HOSPITALS NHS FOUNDATION TRUST Board of Directors Monday 14 th November 2016 Workforce Performance Mid-Year Report Purpose of Report To provide the Board of Directors with

More information

Open Information Purpose of the Report

Open Information Purpose of the Report Meeting Date 15 March 2018 Agenda Item 2c Report Title Financial Governance Review Report Author Liz Stauber, Committee Services Manager Report Sponsor Pam Wenger, Director of Corporate Governance Presented

More information

HRA Approval in Primary Care Settings Principles of Study Set-Up

HRA Approval in Primary Care Settings Principles of Study Set-Up HRA Approval in Primary Care Settings: Principles of Study Set-Up Document Title: HRA Approval in Primary Care Settings Principles of Study Set-Up Version Number: 2.0 Issue Date: 09 March 2017 Author:

More information

Report by Linda Kirkland and Gill Keel on behalf of Anne Gent, Director of Human Resources

Report by Linda Kirkland and Gill Keel on behalf of Anne Gent, Director of Human Resources Highland NHS Board 7 June 2011 Item 5.2 SERVICE REDESIGN PROCESS Report by Linda Kirkland and Gill Keel on behalf of Anne Gent, Director of Human Resources The Board is asked to: Approve the proposal to

More information

ASSURANCE FRAMEWORK. A framework to assure the Board that it is delivering the best possible service for its citizens SEPTEMBER 2010.

ASSURANCE FRAMEWORK. A framework to assure the Board that it is delivering the best possible service for its citizens SEPTEMBER 2010. ASSURANCE FRAMEWORK A framework to assure the Board that it is delivering the best possible service for its citizens SEPTEMBER 2010 V3 Draft 1 SECTION NO. ASSURANCE FRAMEWORK CONTENTS 1. INTRODUCTION 3

More information

British Gas Report to Ofgem in response to Ofgem s open letter on Supplier Complaints Handling dated 26th September 2014

British Gas Report to Ofgem in response to Ofgem s open letter on Supplier Complaints Handling dated 26th September 2014 British Gas Report to Ofgem in response to Ofgem s open letter on Supplier Complaints Handling dated 26th September 2014 britishgas.co.uk 1. Introduction from Ian Peters Managing Director British Gas One

More information

Disinvestment and Decommissioning Policy

Disinvestment and Decommissioning Policy Enclosure 4 Disinvestment and Decommissioning Policy Version Final Date 22 August 2016 Approved by Sarah Laing GB Review Date August 2017 A Clinical Lead Author Dr H Vitarana Denise Perry 1 Purpose The

More information

NATIONAL INSTITUTE FOR HEALTH AND CARE EXCELLENCE. Health and Social Care Directorate. Indicator Process Guide. Published December 2017

NATIONAL INSTITUTE FOR HEALTH AND CARE EXCELLENCE. Health and Social Care Directorate. Indicator Process Guide. Published December 2017 NATIONAL INSTITUTE FOR HEALTH AND CARE EXCELLENCE Health and Social Care Directorate Indicator Process Guide Published December 2017 Please note that this is an interim factual update to the NICE Indicator

More information

Version 2.5 (Final) Alliance Agreement for Berkshire West Integrated Care System. Alliance Agreement for Berkshire West Integrated Care System

Version 2.5 (Final) Alliance Agreement for Berkshire West Integrated Care System. Alliance Agreement for Berkshire West Integrated Care System Alliance Agreement for Berkshire West Integrated Care System Version 2.5 (Final) Dated : 05/09/2018 Berkshire West CCG Royal Berkshire NHS Foundation Trust Berkshire Healthcare NHS Foundation Trust 1 2

More information

Board Self-Assessment: Results Report

Board Self-Assessment: Results Report Board Self-Assessment: Results Report Contents 1. Introduction... 2 2. Summary of Board Responses... 2 3. Other evidence... 2 4. Proposed Action Plan for 2016/17... 7 5. Conclusion... 8 Amber- Partially

More information

Appendix: 4.3b APPENDIX D TO THE SERVICE LEVEL AGREEMENT BETWEEN NEL CSU AND ISLINGTON CCG. SLA Performance Measures. Core Services. March 2013 (v5.

Appendix: 4.3b APPENDIX D TO THE SERVICE LEVEL AGREEMENT BETWEEN NEL CSU AND ISLINGTON CCG. SLA Performance Measures. Core Services. March 2013 (v5. Appendix: 4.3b APPENDIX D TO THE SERVICE LEVEL AGREEMENT BETWEEN NEL CSU AND ISLINGTON CCG SLA Performance Measures Core Services March 2013 (v5.0) Overview These KPIs have been co-designed by the CSU

More information

Board of Directors Audit Committee

Board of Directors Audit Committee Board of Directors Audit Committee Terms of Reference (version 4) (as adopted 22 February 2007 and amended 18 September 2014, 19 November 2015 and January 2017) Reference to the Committee shall mean the

More information

Planning Responsibly in Medical Education. Interim PRIME Capacity Guide for Health Services

Planning Responsibly in Medical Education. Interim PRIME Capacity Guide for Health Services Interim PRIME Capacity Guide for Health Services 2017 Contents... 1 Interim PRIME Capacity Guide for health services... 1 DRAFT Last updated 20 June 2017... 1 Contents... 2 The RACP... 4 The Interim PRIME

More information

Risk Management Strategy Review. Deloitte recommendations and Implementation Plan

Risk Management Strategy Review. Deloitte recommendations and Implementation Plan Risk Management Strategy Review Deloitte recommendations and Implementation Plan 1. Purpose 1.1. This paper provides the results of the annual review of the current Risk Management Strategy. The results

More information

TRUST BOARD HIGHLIGHT REPORT FROM THE CHAIR OF THE AUDIT COMMITTEE

TRUST BOARD HIGHLIGHT REPORT FROM THE CHAIR OF THE AUDIT COMMITTEE TRUST BOARD HIGHLIGHT REPORT FROM THE CHAIR OF THE AUDIT COMMITTEE Meeting Date: 30 th November 2017 Author: Sponsoring Executive Director: Report Presented by: Claire Bowden, Interim Deputy Director of

More information

Reading outcomes framework toolkit piloting: Invitation to Tender

Reading outcomes framework toolkit piloting: Invitation to Tender Reading outcomes framework toolkit piloting: Invitation to Tender Introduction The Reading Agency is a leading charity that inspires people of all ages and all backgrounds to read for pleasure and empowerment.

More information

Ayrshire and Arran NHS Board

Ayrshire and Arran NHS Board Paper No 26 Ayrshire and Arran NHS Board Monday 29 August 2016 Transformational Change Governance Arrangements Author: Vicki Campbell, Corporate Business Manager Sponsoring Director: John Burns, Chief

More information

Royal National Orthopaedic Hospital Trust (RNOH)

Royal National Orthopaedic Hospital Trust (RNOH) Royal National Orthopaedic Hospital Trust (RNOH) BGM Submission Document [Insert date of BGM submission] [Insert planned date to enter DH process as per TFA] 43 Contents Page Board context 45 Summary results

More information

Sustainability and transformation partnerships

Sustainability and transformation partnerships HFMA briefing Sustainability and transformation partnerships Developing robust governance arrangements Introduction The issue of governance in relation to sustainability and transformation partnerships

More information

Roles and Responsibilities

Roles and Responsibilities Growth Deal Programme Roles and Responsibilities Appendix 17 The Programme Management Office A dedicated PMO has been established within Black Country Consortium Ltd to support all aspects of Black Country

More information

Quality Improvement and Performance Framework

Quality Improvement and Performance Framework Health Education East of England Quality Improvement and Performance Framework Education Providers Developing people for health and healthcare www.hee.nhs.uk hee.enquiries@nhs.net @NHS_HealthEdEng Contents

More information

King lll Principle Comments on application in 2013 Reference in 2013 Integrated Report

King lll Principle Comments on application in 2013 Reference in 2013 Integrated Report Application of King III Principles 2013 This document has been prepared in terms of the JSE Listings Requirements and sets out the application of King III principles by the Clicks Group. The following

More information

Roles and Responsibilities

Roles and Responsibilities Local Growth Deal Programme Roles and Responsibilities The Programme Management Office () A dedicated has been established within Black Country Consortium (BCC) Ltd to support all aspects of Black Country

More information

NHS BARNSLEY CCG DATA QUALITY POLICY SEPTEMBER 2016

NHS BARNSLEY CCG DATA QUALITY POLICY SEPTEMBER 2016 Putting Barnsley People First NHS BARNSLEY CCG DATA QUALITY POLICY SEPTEMBER 2016 Version: 1.0 Approved By: Governing Body Date Approved: 8 September 2016 Name of originator / author: Name of responsible

More information

Report to the Board of Directors. Annual Self-Certifications Statements for South Tyneside NHS Foundation Trust

Report to the Board of Directors. Annual Self-Certifications Statements for South Tyneside NHS Foundation Trust Report to the Board of Directors Annual Self-Certifications Statements for South Tyneside NHS Foundation Trust To comply with the governance conditions of their NHS Provider Licence, NHS Foundation Trusts

More information

Trust Board Meeting. 2 July 2015

Trust Board Meeting. 2 July 2015 Trust Board Meeting 2 July Paper Reference: TB(15-16) 99 Report Title: Executive Summary: Action Required: Link to Strategic Objectives: Risks: Quality Impact: Resource Implications: Legal/Regulatory Implications:

More information

OFFICIAL. Date 18 April 2018 Pacific Quay, Glasgow General Data Protection Regulation (GDPR) Police Scotland Preparedness Item Number 11.

OFFICIAL. Date 18 April 2018 Pacific Quay, Glasgow General Data Protection Regulation (GDPR) Police Scotland Preparedness Item Number 11. Meeting Date Location Pacific Quay, Glasgow Title of Paper General Data Protection Regulation (GDPR) Police Scotland Preparedness Item Number 11.2 Presented By ACC Alan Speirs Recommendation to Members

More information

GREATER MANCHESTER HEALTH AND SOCIAL CARE PARTNERSHIP STRATEGIC PARTNERSHIP BOARD

GREATER MANCHESTER HEALTH AND SOCIAL CARE PARTNERSHIP STRATEGIC PARTNERSHIP BOARD NHS Bury CCG Governing Body Paper 6 appendix 6a 5ci GREATER MANCHESTER HEALTH AND SOCIAL CARE PARTNERSHIP STRATEGIC PARTNERSHIP BOARD Date: 29 April 2016 Subject: The Transformation Fund Report of: Katy

More information

Balanced Scorecard Review Project Proposed measures, format and process

Balanced Scorecard Review Project Proposed measures, format and process Item 14 Council 05 October 2016 Balanced Scorecard Review Project Proposed measures, format and process Purpose of paper Action Corporate Strategy 2016-19 Business Plan 2016 Decision Trail To present to

More information

Board of Directors Meeting Report 5 September Agenda item 70/17

Board of Directors Meeting Report 5 September Agenda item 70/17 Board of Directors Meeting Report 5 September 2017 Agenda item 70/17 Title Sponsoring Director Author(s) Procurement Transformation Plan James O Sullivan Tracey Leforte Purpose To seek board approval Executive

More information

King lll Principle Comments on application in 2016 Reference Chapter 1: Ethical leadership and corporate citizenship Principle 1.

King lll Principle Comments on application in 2016 Reference Chapter 1: Ethical leadership and corporate citizenship Principle 1. Clicks Group Application of King III Principles 2016 APPLICATION OF King III PrincipleS 2016 This document has been prepared in terms of the JSE Listings Requirements and sets out the application of King

More information

Service User & Carer Involvement Plan

Service User & Carer Involvement Plan Service User & Carer Plan March 2018 Authored by South West London St George s Mental Health Trust s service users and carers Authors Authored by South West London St George s Mental Health Trust s service

More information

Research Governance Policy and Procedure

Research Governance Policy and Procedure Research Governance Policy and Procedure Version: 5 Name of originator/author: Name of executive lead: Date ratified: Review date: APPLICABLE TO: All staff. EXECUTIVE SUMMARY Dr Lisa Austin- University

More information

The Gateshead Housing Company

The Gateshead Housing Company The Gateshead Housing Company Working with the community to provide excellent homes and housing services. Updated Value For Money Strategy and Three Year Programme 23 rd April 2008 Copyright.. 2008 All

More information

JOB DESCRIPTION 1. GENERAL INFORMATION. Project Manager Pathway Group specific

JOB DESCRIPTION 1. GENERAL INFORMATION. Project Manager Pathway Group specific JOB DECRIPTION 1. GENERAL INFORMATION Job Title: Grade: alary: Hours: Contract: Terms & Conditions: Hosted by: Responsible to: Accountable to: Responsible for: Project Manager Pathway Group specific 8b

More information

Job description and person specification

Job description and person specification Job description and person specification Position Job title Delivery Field Work Support Directorate Operations & Information Pay band AFC Band 8a Responsible to Delivery Partner(s) in local geography Salary

More information

RESEARCH AUDIT Standard Operating Procedure

RESEARCH AUDIT Standard Operating Procedure Reference Number: UHB 236 Version Number: 2 Date of Next Review: 17 th Oct 2020 Previous Trust/LHB Reference Number: N/A RESEARCH AUDIT Standard Operating Procedure Introduction and Aim As a legal Sponsor

More information

Quality Assurance and Improvement Framework

Quality Assurance and Improvement Framework Quality Assurance and Improvement Framework For Modern Apprenticeships and Employability Quality Standards and Assessment Guidance April 2018 Index Page Introduction 3 Principles and purpose of the Quality

More information

United Lincolnshire Hospitals NHS Trust. Governance Statement 2015/16. Scope of responsibility. The governance framework of the organisation

United Lincolnshire Hospitals NHS Trust. Governance Statement 2015/16. Scope of responsibility. The governance framework of the organisation United Lincolnshire Hospitals NHS Trust Governance Statement 2015/16 Scope of responsibility As Accountable Officer, and Chief Executive of this Board, I have responsibility for maintaining a sound system

More information

Planning, Reporting and Regulatory Framework

Planning, Reporting and Regulatory Framework Planning, Reporting and Regulatory Framework Strategic Business Plan 9 February 2018 Planning, Reporting and Regulatory Framework This document describes the key elements and methods of working in our

More information

Identification and Prioritisation of NHS England Policy Research Needs

Identification and Prioritisation of NHS England Policy Research Needs Identification and Prioritisation of NHS England Policy Research Needs Identification and Prioritisation of NHS England Policy Research Needs First published: June 2013 Updated: July 2014 Prepared by:

More information

The Royal Wolverhampton NHS Trust

The Royal Wolverhampton NHS Trust The Royal Wolverhampton NHS Trust Trust Board Report Meeting Date: 30 th March 2016 Title: Clinical Research Network: West Midlands (CRN: WM) Executive Summary: RWT as Host for the National Institute for

More information

Management Board Terms of Reference

Management Board Terms of Reference Management Board Terms of Reference 1. Constitution This Board is established by Board of Directors as the senior operational board of the Royal United Hospitals Bath NHS Foundation Trust. 2. Terms of

More information

Research Study Amendments

Research Study Amendments REFERENCE: VERSION NUMBER: 3.2 EFFECTIVE DATE: 05-02-18 REVIEW DATE: 05-02-20 AUTHOR: Clinical Trials Manager; Clinical Trials Officer REVIEWED BY: R&I Senior Team APPROVED BY: Deputy Director of Research

More information

Aberdeen City Health and Social Care Partnership. Strategic Risk Register 2017/18 Approved at Audit & Performance Committee

Aberdeen City Health and Social Care Partnership. Strategic Risk Register 2017/18 Approved at Audit & Performance Committee Aberdeen City Health and Social Care Partnership Strategic Risk Register 2017/18 Approved at Audit & Performance Committee 02.03.2018 Risk Rating Low Medium High Very High Risk Movement Decrease No Change

More information

Strategic Objectives and Organisational Behaviours Report for the AWP NHS Trust Board Meeting Time: 12:00

Strategic Objectives and Organisational Behaviours Report for the AWP NHS Trust Board Meeting Time: 12:00 Meeting Date: 2012-07-25 Strategic Objectives and Organisational Behaviours Report for the AWP NHS Trust Board Meeting Time: 12:00 Agenda Item: 15 Serial: 12.0635 This Report is presented by the Chief

More information

BARNSLEY METROPOLITAN BOROUGH COUNCIL

BARNSLEY METROPOLITAN BOROUGH COUNCIL BARNSLEY METROPOLITAN BOROUGH COUNCIL Audit Committee 23rd March 2016 ANNUAL GOVERNANCE REVIEW PROCESS 2015/16 1. Purpose of Report Report of the Service Director Finance 1.1 The purpose of this report

More information

Hours of Work: 37.5 hours per week (part time hours negotiable)

Hours of Work: 37.5 hours per week (part time hours negotiable) JOB DESCRIPTION Post Title: Head of Performance Assurance Location: NHS Oldham CCG Headquarters (Ellen House) Salary/Grade: Band 8c Hours of Work: 37.5 hours per week (part time hours negotiable) Type

More information

Business plan

Business plan Business plan 2017-20 The text of this document (but not the logo and branding) may be reproduced free of charge in any format or medium, as long as it is reproduced accurately and not in a misleading

More information

Standard Operating Procedure (SOP) for the Development, Management & Control of Research-Related SOPs

Standard Operating Procedure (SOP) for the Development, Management & Control of Research-Related SOPs Standard Operating Procedure (SOP) for the Development, Management & Control of Research-Related SOPs For Completion by SOP Author Reference Number Version Document Author(s) Document Reviewer(s) PHT/RDSOP/001

More information

HUMAN RESOURCES POLICY Draft 3

HUMAN RESOURCES POLICY Draft 3 1.0 INTRODUCTION HUMAN RESOURCES POLICY Draft 3 The aim of NHS Rotherham Clinical Commissioning Group s (RCCG) Human Resources Strategy is to ensure best practice in the management and development of all

More information

Auditing data protection

Auditing data protection Data protection Auditing data protection a guide to ICO data protection audits 1 Contents Executive summary 3 1. Audit programme development 5 Audit planning and risk assessment 2. Audit approach 6 Gathering

More information

GREATER MANCHESTER HEALTH AND SOCIAL CARE STRATEGIC PARTNERSHIP BOARD EXECUTIVE. Establishing Leadership and Accountability in Shadow Form

GREATER MANCHESTER HEALTH AND SOCIAL CARE STRATEGIC PARTNERSHIP BOARD EXECUTIVE. Establishing Leadership and Accountability in Shadow Form 5a GREATER MANCHESTER HEALTH AND SOCIAL CARE STRATEGIC PARTNERSHIP BOARD EXECUTIVE Date: 13 th November 2015 Subject: Report of: Establishing Leadership and Accountability in Shadow Form Liz Treacy PURPOSE

More information