1 Kirk W Buffington, CPFIM, CPPO, C.P.M.,

2 An Overview We will be talking about: The elements of the RFP process Factors determining the selection of the procurement method The elements of risk and how they apply to the RFP process Comparisons of procurement methods

3 Developing and Managing RFPs What will we be doing? Why is this important?

4 Public Procurement Concepts Full & Open Competition Two or more independent firms, bidding independently Not subsidiaries Independent bidding Lots of potential suppliers

5 Public Procurement Concepts Signs of collusion Bids that are received within minutes Identical irregularities (or seasoned bidder makes an amateur mistake) Bidders that normally submit do not

6 Public Procurement Concepts Responsive a proposer who submits a proposal which conforms in all material respects to the requirements stated in the RFP. Determination takes place at time of proposal evaluation

7 Public Procurement Concepts Responsible A responsible proposer has the capability in all respects to perform the contract

8 Public Procurement Concepts Responsible (continued) Includes Experience Integrity Reliability Capacity Facilities & Equipment Financial resources Management capability

9 Public Procurement Concepts Level Playing Field All proposers have equal information and access to the RFP process Information to one information to all Unfair advantage Inside information Pre-selection of successful proposer Handling of inquiries/questions No political influence on the RFP process

10 Public Procurement Concepts Established Procedures Well-written and accessible policies and procedures consistently applied Established protest guidelines Easy bidder registration Established protest procedure

11 Factors Determining the Procurement Method Types of goods and services Market uncertainty and risk Contracting methods Request for Information (RFI) results Limited competition procurement Requirements not clearly known, qualitative Requirements clearly known, quantitative Pg

12 How Procurement Goals Affect Procurement Method Selection Cost Quality Timeliness Accomplishing social and economic objectives Maximizing competition Maintaining integrity and transparency Pgs

13 Identifying and Minimizing Risk Complexity or procured good or service Urgency of requirement Period of performance or length of production run Size of procurement Pgs

14 Types of Risk Proposal risk Price risk Schedule risk Performance risk Contractual risk Surety / liability risk Pg. 25

15 Introducing the RFP Process What goes into the appropriations process? Should the process begin before funding is available? How long will the RFP process take from inception to completion?

16 The RFP Acquisition Process The Big Picture Pre-Award Solicitation & Award Post Award Three Phases 1. Pre-award (planning) 2. Solicitation & award 3. Post award (contract administration) Pgs. 8-10

17 The RFP Process Evaluation Action Plan Extent of Competition Requisition & Funding Solicitation Market Research RFP Document

18 RFP Process Some factors cannot be objectively measured & depend on judgment that may be challenged. It is important that the RFP process is documented, communicated to the proponents, & followed to the letter.

19 Phase 1: Action Plan Who s on the team? Role of end users Consulting requirements? Logistics? Feasible schedule? Pgs

20 Phase 2: Prepare and Process the Purchase Request Purpose of the PR? Information on the PR? Why? How is a PR processed? Pgs

21 Phase 2: Funding A contract award is a fund obligation How are funds appropriated? How long does funding last? What if funds are inadequate? How can a PR be processed without appropriate funds? Pg. 35

22 Phase 4: Developing the RFP Document Preparing Specifications (Specs) or Scope of Work (SOW) Identifies minimum requirements Allows maximum competition Identifies testing methods Contributes to best value Revealing budgetary figures Pros Cons Pgs

23 Phase 5: Solicitation Approval levels Public notice Electronic solicitation web sites Other methods of publicizing Distributing the solicitation Pre-award inquiries Pre-proposal conference Amendments/ addenda Pgs

24 Phase 5: Solicitation (cont d) Additional solicitation provisions: Socio-economic Considerations and Conditions Set-Asides Preference Goals Pgs

25 Phase 6: Extent of Competition Sources What should you do if there are not enough sources? What should you do if the number of sources are unclear? What should you do if the there are enough sources? Pg. 50 If there appear to be enough sources, it is time to examine the qualified source/bidders list.

26 Phase 6: Extent of Competition (cont d) Agency specific Open to all vendors Few restrictions Time consuming to manage Open to all vendors Few restrictions Pgs

27 Phase 7: Evaluation Guiding principals Integrity Client service Socioeconomic objectives Competition Equal treatment Accountability Pg. 56

28 Phase 7: Evaluation (cont d) Establishing evaluation criteria Offeror selection methods Dealing with mistakes Identifying potential mistakes prior to award Resolving mistakes Pgs

29 Developing the RFP Document We will discuss: Basic elements of an RFP Instructions for proposal submittal Types of specifications Writing specifications Scope of Work contrasted with Statement of Work

30 Developing the RFP Document The quality of response received from the RFP is directly related to the quality and completeness of the RFP document particularly the Scope of Work. Khi V. Thai, Ph.D. Pg

31 What should be included in an RFP?

32 Basic Elements of RFP Document Cover page Table of contents Purpose Objective Existing environment Inquires Method of selection Pre-proposal conference Determination of responsibility Projected timetable Statement of work Pgs Constraints to the successful offeror Successful offeror s personnel requirements Responsibilities of the jurisdiction Contractor s reporting requirements 32

33 Restrictive Specifications What constitutes a restrictive specification? What problems do restrictive specifications create? Are restrictive specifications ever justified? Pgs

34 Writing Specifications Appropriate Use of Words Requirements Non-Mandatory Provisions shall, must, will should, may Pg

35 Scope of Work (SOW) A written description of the contractual requirements for materials and services contained within a Request for Proposal. The SOW can be compared to the specifications contained within an Invitation to Tender. NIGP

36 Critical Ingredients of SOW Consistent, Simple and Exact Easy to read and understand Easy to revise Formatted with good direction Common among agencies departments, divisions, etc. Categorized, and Organized with a good numbering system Pg

37 Scope of Work The most important section of the document. Pg

38 A good SOW: Scope of Work Identifies minimum requirements Allows for maximum competition Identifies the test methods to be used to verify compliance with the requirements Contributes to obtaining the best value

39 Pg. 97 Receipt of the Proposals

40 Proposal-Handling Process Guidelines for RFP Opening Procedures for receipt Time-stamp proposals Record in log Secure unopened until closing/opening Provide information to jurisdiction employees only on an as-needed basis what does FL law allow Pg

41 Safeguarding Confidential Information General confidential information about the proposals Offerors proprietary information Pgs

42 The Evaluation Process and Selection of the Right Offeror We will discuss: The evaluation committee The evaluation process Selecting the right/best-value offer

43 The RFP Evaluation Committee Who? How Many? Chairperson? Roles and Responsibilities Sample Guidelines Receives instructions /training Pgs

44 Evaluation Committee Roles Committee Chairperson -Procurement Secretary Committee members Contractors/Consultants Pg

45 Evaluation Committee Rules of Conduct Maintain confidentiality of proposals Does not discuss committee actions outside of committee Individually read and score all proposals Attends all committee meetings Is included in all committee votes Attends committee training Pgs

46 Do Not Evaluation Committee Rules of Conduct (cont) Favor one offeror over another Reveal any offeror s technical solution Reveal any offeror s price without offeror s permission Reveal names of individuals references Furnish source selection information Pgs

47 What Happens at the First Evaluation Committee Meeting? Committee guidelines are reviewed Committee sets schedule of future meetings Each Member receives: Pgs Copy of each proposal Copy of evaluation criteria Copy of guidelines/procedures Copies of score sheet templates 47

48 Steps in the Evaluation Process Mandatory requirements Discussions for clarification Preliminary evaluation of proposals Tentative cost evaluation Discussions with responsible offerors for BAFOs Pg. 109

49 What Does the Evaluation Committee Look At? Responsiveness Technical Cost Past performance Pgs

50 Determination of Responsiveness What is a non-responsive response? Pg

51 A non-responsive response might be... Substituting of standard terms and conditions Qualification of offer All-or-none offer Inability to respond to delivery schedules Price qualification Offer contingent on receipt of other awards Failure to provide required bonds or insurance

52 Examples of Non- Responsiveness Fail to meet required delivery Substitute own terms and conditions Qualify their offer Fail to conform to required delivery schedule Make bid contingent upon receipt of other awards Failure to meet specifications Limit the rights of the government Failure to provide any required forms Fail to conform to the proposal submittal requirements Pg

53 Handling of Non-Responsive Proposals Do not score Do not open cost proposal Do not recommend for award 53

54 Minor Irregularities May Be Minor Irregularities Waived Failure to provide requested samples Failure to return proper number of RFP s Failure to return proper number of Addendum (providing that the proposer was aware and proposal was submitted in accordance) Failure to sign proposal when evidence clearly show intent Failure to provide insurance certificates

55 More Examples Of Minor Irregularities That May Be Allowed Failure to provide required information regarding the firms qualifications Failure to provide complete descriptive information on the products/services offered Failure to provide required insurance/bonding forms Failure to provide references as required Failure to provide required copies of the proposal Pg

56 Evaluation Committee Committee Functions Apply evaluation criteria Evaluate Proposals individually and/or discuss Rank and/or develop short list Interview/obtain clarification and negotiate finalize contract terms with selected vendor Recommend award 56

57 MANDATORY REQUIREMENTS Are they really mandatory? Pgs

58 Mandatory Requirements Mandatory criteria Desirable vs. Mandatory Eliminating a proposal Pgs

59 Evaluation Methodologies and Scoring We will discuss: Technical proposals Determining responsibility Verbal and numerical evaluations Price and cost analysis Value analysis Creating the short list Best and Final Offer (BAFO)

60 Evaluation Methodology RFP Always a team effort by the evaluation committee Vendors are compared to the spec, and are scored comparison to each other 60

61 Numerical Methods of Evaluating Proposals Numerical Systems Points are assigned to factors or subfactors More points to more important factors Two Types Fixed weight methods Variable weight method Pg

62 Numerical Methods of Evaluating Fixed Weights Proposals Most commonly used Numerical weights assigned based on distribution Example: 5 criteria = 20% each Pg

63 Numerical Methods of Evaluating Proposals (cont d) Variable Weights Used when different criteria have different value in selection Example: Selection criteria states that approach is more important than Schedule, while schedule is more important than cost Pg

64 Numerical Evaluation Methodologies Dollar ($) Per Point Method Firm #1 received 500 points (committee average) with a proposal price at $500,000, their cost per point is $1,000 ($500,000/500) Firm #2 receives 700 points (committee average) with a proposal price at $650,000, their cost per point is $ ($650,000/700) Therefore firm #2 is the best value Pgs

65 Numerical Evaluation Reward Low Price Methodologies Firm #1-$200,000, Firm #2-$400,000, Firm #3-$500,000 Firm #1-max points of 20 Firm #2 $200,000/$400,000 or 50% of the max 20 points (=10 points) Firm #3 $200,000/$500,000 or 40% of the max 20 points (=8 points) Pg

66 Scoring and Award 66

67 Developing Score Sheets Match the complexity of the score sheet to the procurement Examples Pgs

68 Simple Score Sheet Evaluation Criteria Weight Company A Company B Company C Company D Approach Management Key Personnel Financial Past Performance Totals

69 Complex Score Sheet Eval Criteria Weight Company A Company B Company C Company D Approach Task 1 Task 2 Task 3 Management Task 1 Task 2 69

70 Determining Award Best Value Weighted technical evaluation factors are used Provides most flexibility in selecting best solution for the agency Used where technical expertise of contractor will be important Pg

71 Conducting Interviews/Discussions Interview everyone on short list Develop standardized set of questions Record answers Reconvene Selection Committee Pg. 148 Discuss Rescore 71

72 Best and Final Offers After all proposals are reviewed After short list is developed Allows a price change after proposal receipt Not used anymore in federal sector Pgs

73 Improper Discussions with Offerors 73

74 Protests, Claims and Disputes Protest and Dispute Procedures: established to address grievances should be simple straightforward fast inexpensive 74

75 Protests, Claims and Disputes Four major requirements in dealing with protests 1.Start with a solid foundation promote fair and open competition 2.Go the extra mile promote excellence 3.When best efforts fail handle protests more efficiently 4.The best defense know the law Lastly Procurement official issues the Notice to Proceed and the job of Contract Administration begins Pgs

76 Keys to RFP Success: Lessons Learned Have written RFP procedures Begin planning early Have a plan (Acquisition Plan) Use cross functional RFP team Develop written Evaluation Committee Guidelines Evaluation Committee training Control the process Control communications Maintain a level playing field 76

77 Questions?

Chapter 15. Competitive Negotiation: Evaluating Proposals

Chapter 15. Competitive Negotiation: Evaluating Proposals Chapter 15. Competitive Negotiation: Evaluating Proposals Summary This chapter describes the steps to be taken in order to properly evaluate each proposal received in response to an RFP. Essential Information

More information

Chapter 6. Competitive Sealed Bidding: Elements of an Invitation for Bids

Chapter 6. Competitive Sealed Bidding: Elements of an Invitation for Bids Chapter 6. Competitive Sealed Bidding: Elements of an Invitation for Bids Summary This chapter identifies the minimum elements of an invitation for bids when procuring goods or services using the competitive

More information

Evaluating Request for Proposal (RFP) Responses. Presented By: Department of General Services Bureau of Procurement

Evaluating Request for Proposal (RFP) Responses. Presented By: Department of General Services Bureau of Procurement Evaluating Request for Proposal (RFP) Responses Presented By: Department of General Services Bureau of Procurement Rev. June, 2014 Agenda What is a Request for Proposal (RFP)? Evaluator Roles & Responsibilities

More information

Anticipated Completion Date and Contact. No. Finding Recommendations Previous Management Response(s) Status Update. Page 1 of 9

Anticipated Completion Date and Contact. No. Finding Recommendations Previous Management Response(s) Status Update. Page 1 of 9 1 The person serving as Contract Manager for AHCA RFP 008-11/12 was not an Agency Certified Contract Manager, as required by Agency policy. Although this person received contract manager training conducted

More information

Request for Qualifications

Request for Qualifications Request for Qualifications Professional Services Advanced Metering Infrastructure July 5, 2016 West Memphis Utility Commission Post Office Box 1868 West Memphis, AR 72301 Sealed Statements of Qualifications

More information

PROCUREMENT CODE ARTICLE 5 GOODS AND SERVICES

PROCUREMENT CODE ARTICLE 5 GOODS AND SERVICES PROCUREMENT CODE ARTICLE 5 GOODS AND SERVICES Part A Methods of Source Selection 5-101 Methods of Source Selection. Contracts for goods and services shall be awarded following one of the following procurement

More information

As a state agency, the College administration is required to develop procedures for Construction Manager selection.

As a state agency, the College administration is required to develop procedures for Construction Manager selection. COLLEGE of CENTRAL FLORIDA ADMINISTRATIVE PROCEDURE Title: Construction Management Selection Process Page 1 of 2 Implementing Procedure For F.S. 1013.45 Date Approved: 09/11/02 Division: Administration

More information

Request For Proposal Procedures

Request For Proposal Procedures PROCUREMENT SERVICES OFFICE Request For Proposal Procedures SECTION 1: OVERVIEW 1.1 What is a Request for Proposal (RFP)? A RFP is a method of solicitation used when, it has been determined that giving

More information

Review of FMMIS and DSS Assessment Project Procurement Divisions of Operations and Medicaid

Review of FMMIS and DSS Assessment Project Procurement Divisions of Operations and Medicaid Report No. 13-08 February 2013 Office of the Inspector General Bureau of Internal Audit Review of FMMIS and DSS Assessment Project Procurement Divisions of Operations and Medicaid Executive Summary At

More information

PURCHASING AND PROCUREMENT OVERVIEW

PURCHASING AND PROCUREMENT OVERVIEW Purchasing and Procurement Overview AASBO Certificate Program September 2018 David Smith Executive Director david@aasbo.com 256 585 1511 PURCHASING AND PROCUREMENT OVERVIEW Contract Procurement Law Understanding

More information

REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES CLEARWATER PUBLIC SCHOOLS EWING PUBLIC SCHOOLS NELIGH-OAKDALE PUBLIC SCHOOLS

REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES CLEARWATER PUBLIC SCHOOLS EWING PUBLIC SCHOOLS NELIGH-OAKDALE PUBLIC SCHOOLS REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES CLEARWATER PUBLIC SCHOOLS EWING PUBLIC SCHOOLS NELIGH-OAKDALE PUBLIC SCHOOLS 1. REQUEST FOR PROPOSALS. Clearwater Public Schools, Ewing Public Schools,

More information

Terms and Definitions Commonly Used in Technical Proposals

Terms and Definitions Commonly Used in Technical Proposals Terms and Definitions Commonly Used in Technical Proposals Note: Terms and definitions provided reflect commonly used terminology for software procurement and may not reflect the terminology utilized by

More information

Procurement Code Changes Highlights 2017

Procurement Code Changes Highlights 2017 Procurement Code Changes Highlights 2017 Purpose of Chapter (Utah Procurement Code) Utah Code 63G-6a-102 (1) To ensure transparency in the public procurement process; (2) To ensure the fair and equitable

More information

Advanced Topics for RFP Procurements

Advanced Topics for RFP Procurements Office of Operations 2013 Fall Conference November 6-7 Back to Basics Advanced Topics for RFP Procurements Priscilla Cassidy, Kathyann Heffernan and Jenny Reyes New York State Office of the State Comptroller

More information

Anticipated Completion Date and Contact. No. Finding Recommendations Previous Management Response(s) Status Update. Page 1 of 6

Anticipated Completion Date and Contact. No. Finding Recommendations Previous Management Response(s) Status Update. Page 1 of 6 1 The person serving as Contract Manager for AHCA RFP 008-11/12 was not an Agency Certified Contract Manager, as required by Agency policy. Although this person received contract manager training conducted

More information

INSTRUCTIONS TO BIDDERS

INSTRUCTIONS TO BIDDERS INSTRUCTIONS TO BIDDERS CONTENTS I. Bid Documents II. Ethical Business Practices III. Contractor Qualifications IV. Performance and Quality Standards V. Bid Evaluation VI. Contract Award VII. Work Operations

More information

Amity School District 4J

Amity School District 4J Amity School District 4J Code: DJCA-AR Adopted: 10/11/00 Revised/Readopted: 06/22/05 Personal Services Contracts I. Personal Services Contracts Defined A. Personal services contracts include, but are not

More information

REQUEST FOR PROPOSALS: CEO COMPENSATION AND EVALUATION SERVICES. Issue Date: April 30, Due Date: June 6, 2014

REQUEST FOR PROPOSALS: CEO COMPENSATION AND EVALUATION SERVICES. Issue Date: April 30, Due Date: June 6, 2014 REQUEST FOR PROPOSALS: CEO COMPENSATION AND EVALUATION SERVICES Issue Date: April 30, 2014 Due Date: June 6, 2014 In order to be considered, proposals must be signed and returned via email to rwhitmore@wested.org

More information

REQUIREMENTS FOR PROCUREMENT BY THE COLORADO DEPARTMENT OF TRANSPORTATION OF DESIGN-BUILD CONTRACTS FOR TRANSPORTATION PROJECTS

REQUIREMENTS FOR PROCUREMENT BY THE COLORADO DEPARTMENT OF TRANSPORTATION OF DESIGN-BUILD CONTRACTS FOR TRANSPORTATION PROJECTS DEPARTMENT OF TRANSPORTATION Transportation Commission and Office of Transportation Safety REQUIREMENTS FOR PROCUREMENT BY THE COLORADO DEPARTMENT OF TRANSPORTATION OF DESIGN-BUILD CONTRACTS FOR TRANSPORTATION

More information

ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project PW

ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project PW January 31, 2018 To Whom It May Concern: I. INSTRUCTIONS ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project 18-0018PW A. The following additions, deletions, revisions, and/or

More information

REGISTRATION FOR SUPPLY, DELIVERY, INSTALLATION, REPAIR AND MAINTENANCE OF AIR CONDITIONERS SERVICE PROVIDERS

REGISTRATION FOR SUPPLY, DELIVERY, INSTALLATION, REPAIR AND MAINTENANCE OF AIR CONDITIONERS SERVICE PROVIDERS UNIVERSITY OF EMBU REGISTRATION FOR SUPPLY, DELIVERY, INSTALLATION, REPAIR AND MAINTENANCE OF AIR CONDITIONERS SERVICE PROVIDERS UoEm/04/2017-2019 CLOSING DATE: APRIL 18TH 2017 AT 11.00 AM Table of Contents

More information

EXHIBIT A. 1) General:

EXHIBIT A. 1) General: 1) General: EXHIBIT A FINDINGS OF FACT FOR EXEMPTION FROM COMPETITIVE BIDDING AND USE OF THE CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) METHOD OF CONTRACTING FOR TILLAMOOK PUD OPERATIONS CENTER AND

More information

BASIC HOST COUNTRY CONSTRUCTION CONTRACTING FOR DEVELOPMENT PROFESSIONALS: A PRIMER

BASIC HOST COUNTRY CONSTRUCTION CONTRACTING FOR DEVELOPMENT PROFESSIONALS: A PRIMER BASIC HOST COUNTRY CONSTRUCTION CONTRACTING FOR DEVELOPMENT PROFESSIONALS: A PRIMER January 2012 This Primer was produced for the United States Agency for International Development (USAID). It was prepared

More information

SECTION BID FORM

SECTION BID FORM Attachment 1 Contract 13 Addendum 3 ARTICLE 1 BID RECIPIENT 1.01 This Bid is submitted to: SECTION 00300 BID FORM CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 13 City of Cape Coral,

More information

REQUEST FOR PROPOSALS AND STATEMENT OF QUALIFICATIONS IMPACT FEE STUDY

REQUEST FOR PROPOSALS AND STATEMENT OF QUALIFICATIONS IMPACT FEE STUDY REQUEST FOR PROPOSALS AND STATEMENT OF QUALIFICATIONS IMPACT FEE STUDY June 1, 2018 The City of Rhome is now accepting sealed Request for Proposals and Statement of Qualifications (RFQ) for New Water &

More information

REQUEST FOR PROPOSALS. Construction Manager CM Services Pre-Construction and Construction Services

REQUEST FOR PROPOSALS. Construction Manager CM Services Pre-Construction and Construction Services REQUEST FOR PROPOSALS Construction Manager CM Services Pre-Construction and Construction Services Big Sky Fire Department Station 1 Project Big Sky Fire District OWNER Big Sky, Montana November 2016 Request

More information

Procurement Requirements under the Uniform Administrative Guidance

Procurement Requirements under the Uniform Administrative Guidance Procurement Requirements under the Uniform Administrative Guidance Purpose: This Technical Assistance Guide has been developed to assist Local Workforce Development Areas (LWDAs) in making informed decisions

More information

Invitation to Negotiate

Invitation to Negotiate Invitation to Negotiate Programming, Design, and Consulting Services Lisa Daws 4/3/2012 CLERKS OF COURT OPERATIONS CORPORATION Table of Contents Agency Background... 3 Statement of Purpose... 3 Scope of

More information

University of Kansas Procurement Services

University of Kansas Procurement Services University of Kansas Procurement Services PURCHASING PROCEDURES MANUAL 1 Contents 1.0 DEPARTMENTAL PURCHASING AUTHORITY... 4 1.1 Introduction... 4 1.2 Use of Mandatory Contracts and Preferred Agreements...

More information

REQUEST FOR PROPOSAL (RFP) LEGAL SERVICES. Submission Date: November 28, :00 p.m.

REQUEST FOR PROPOSAL (RFP) LEGAL SERVICES. Submission Date: November 28, :00 p.m. COLTS NECK TOWNSHIP BOARD OF EDUCATION 70 CONOVER ROAD, COLTS NECK, NJ 07722 REQUEST FOR PROPOSAL (RFP) LEGAL SERVICES Submission Date: November 28, 2017 4:00 p.m. The Colts Neck Township School District

More information

Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION

Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION May 19, 2015 The Addison Public Library invites you to submit a reply to this Request for

More information

MASSACHUSETTS STATE COLLEGE BUILDING AUTHORITY REQUEST FOR QUALIFICATIONS TRADE CONTRACTOR SERVICES PART I PROJECT INFORMATION AND DESCRIPTION OF WORK

MASSACHUSETTS STATE COLLEGE BUILDING AUTHORITY REQUEST FOR QUALIFICATIONS TRADE CONTRACTOR SERVICES PART I PROJECT INFORMATION AND DESCRIPTION OF WORK MASSACHUSETTS STATE COLLEGE BUILDING AUTHORITY REQUEST FOR QUALIFICATIONS TRADE CONTRACTOR SERVICES PART I PROJECT INFORMATION AND DESCRIPTION OF WORK DATE ISSUED: January 10, 2018 DEADLINE FOR WRITTEN

More information

Commonwealth of Virginia

Commonwealth of Virginia Commonwealth of Virginia Alternative Project Delivery Division April 2017 Virginia Department of Transportation TABLE OF CONTENTS INTRODUCTION... 2 1.0 DEFINITIONS... 3 2.0 PRELIMINARY PROJECT SELECTION...

More information

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES Section I Application (These procedures do not apply to Design-Build Contracts.)

More information

PURCHASING BUT DIDN T KNOW TO ASK

PURCHASING BUT DIDN T KNOW TO ASK EVERYTHING YOU WANTED TO KNOW ABOUT PURCHASING BUT DIDN T KNOW TO ASK Presenters Karl H. Kuespert, C.P.M. Director, Purchasing Department Franklin County Agenda Purchases under $50,000 Direct Purchases

More information

HOW TO DO BUSINESS WITH NAPA VALLEY COMMUNITY COLLEGE DISTRICT

HOW TO DO BUSINESS WITH NAPA VALLEY COMMUNITY COLLEGE DISTRICT HOW TO DO BUSINESS WITH NAPA VALLEY COMMUNITY COLLEGE DISTRICT A Complete Vendor Guide This Vendor Guide is designed specifically for our supplier community as a reference tool. The information provided

More information

Rev. July Department of General Services Bureau of Procurement

Rev. July Department of General Services Bureau of Procurement Rev. July 2014 Department of General Services Bureau of Procurement This course is presented on a series of slides. Navigate through the slides by selecting the NEXT or PREVIOUS button. Previous Next You

More information

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility RFP Components CLIENT: TradePort International Corporation, Operators of John C. Munro

More information

Bidding Conditions. March 22, (Project# 0192) at the. Fresno Chaffee Zoo. Project : Warthog Exhibit. Located at. 894 West Belmont Avenue

Bidding Conditions. March 22, (Project# 0192) at the. Fresno Chaffee Zoo. Project : Warthog Exhibit. Located at. 894 West Belmont Avenue Bidding Conditions March 22, 2018 (Project# 0192) at the Fresno Chaffee Zoo Project : Warthog Exhibit Located at 894 West Belmont Avenue Fresno, CA 93728 Page 1 of 8 DEFINITIONS Addendum - A document issued

More information

How To Do Business with the Ontario Government. Supply Chain Management, Ontario Shared Services Ministry of Government Services January 2010

How To Do Business with the Ontario Government. Supply Chain Management, Ontario Shared Services Ministry of Government Services January 2010 How To Do Business with the Ontario Government Supply Chain Management, Ontario Shared Services Ministry of Government Services January 2010 1 Agenda To maximize your chances of being successful in obtaining

More information

The Home Depot U.S.A., Inc. Instructions to Bidders

The Home Depot U.S.A., Inc. Instructions to Bidders The Home Depot U.S.A., Inc. Instructions to Bidders Home Depot Page 1 of 5 Article 1 Definitions 1.1 Bidding Documents include the Bidding Requirements and the proposed Contract Documents. The Bidding

More information

CONSTRUCTION DOCUMENTS Part 1

CONSTRUCTION DOCUMENTS Part 1 Audio Presentation Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT) Preparatory Course 2011 The Construction Specifications Institute www.csinet.org

More information

Dates/Times: p.m. Pacific Time.

Dates/Times: p.m. Pacific Time. Notice - Request for Qualifications (RFQ) For Corrosion Engineering and Investigations For The "E" Street Reservoir Cover Repainting For The City of Port Angeles 06-12-12 The City of Port Angeles, Washington,

More information

INVITATION FOR BIDS (IFB)

INVITATION FOR BIDS (IFB) P a g e 1 INVITATION FOR BIDS (IFB) Summer Camp T-Shirts IFB #: 17-004 Deadline for Responses: 2:00 PM 04/13/2017 Children s Services Council of Palm Beach County (CSC) 2300 High Ridge Road Boynton Beach,

More information

CONSTRUCTION MANAGEMENT SERVICES

CONSTRUCTION MANAGEMENT SERVICES DrAFTDRAFTdd EXHIBIT 1 CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR QUALIFICATIONS () SELECTION PROCESS School District of Lee County, Florida TABLE OF CONTENTS 1. INTRODUCTION 1 Lobbying 2 2. REQUEST

More information

Mandatory Requirements

Mandatory Requirements RFP Evaluations Considering Various Methodologies Angela Mastandrea, CPPO, CIM Mandatory Requirements Mandatory (definition) means permitting no option; not to be disregarded or modified There are two

More information

Request for Qualifications Statements

Request for Qualifications Statements Request for Qualifications Statements BND WATER DISTRIBUTION AND WASTEWATER TREATMENT ENGINEERING STATEMENTS ENGINEERING DESIGN SERVICES FOR BND WATER DISTRIBUTION AND WASTEWATER TREATMENT The Brownsville

More information

08/09 RIGHT OF WAY AND UTILITIES DIVISION PROCEDURES FOR THE PROCUREMENT OF RIGHT OF WAY ACQUISITION CONSULTANTS

08/09 RIGHT OF WAY AND UTILITIES DIVISION PROCEDURES FOR THE PROCUREMENT OF RIGHT OF WAY ACQUISITION CONSULTANTS 08/09 RIGHT OF WAY AND UTILITIES DIVISION PROCEDURES FOR THE PROCUREMENT OF RIGHT OF WAY ACQUISITION CONSULTANTS RIGHT OF WAY AND UTILITIES DIVISION PROCEDURES FOR THE PROCUREMENT OF RIGHT OF WAY ACQUISITION

More information

REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES. Issuance Date November 27, 2017

REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES. Issuance Date November 27, 2017 REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES Issuance Date November 27, 2017 Submittal Deadline January 8, 2018 Page Is Blank For Photocopying MARIN LAFCO 2 TABLE OF CONTENTS Section Page Number I.

More information

City of Dawson Creek Request for Proposals No

City of Dawson Creek Request for Proposals No City of Dawson Creek Request for Proposals No. 2011-29 SANITARY SEWER MASTER PLAN The City of Dawson Creek is requesting proposals for the creation of a Sanitary Sewer Master Plan. All contract documents

More information

New York City Transit (NYCT) DATE: July 19, 2018 CONSTRUCTION/ARCHITECTURAL & ENGINEERING CONTRACT SOLICITATION NOTICE/PROJECT OVERVIEW MTA-NYCT IS NOW ADVERTISING FOR THE FOLLOWING: SSE #: 0000226381

More information

October 1, Nova Scotia Procurement Protocols

October 1, Nova Scotia Procurement Protocols October 1, 2016 Nova Scotia Procurement Protocols TABLE OF CONTENTS 1 Procurement Project Planning Protocol... 2 2 Format Selection Protocol... 7 3 Document Drafting Protocol... 11 4 Invitational Competition

More information

The Devil is in the Details!

The Devil is in the Details! The Devil is in the Details! Presentation to: Sherwood Park & District Chamber of Commerce June 5, 2018 Agenda Welcome Types of RFx documents Mandatory requirements What not to do Preparing your best RFx

More information

MARYLAND STADIUM AUTHORITY

MARYLAND STADIUM AUTHORITY MARYLAND STADIUM AUTHORITY REQUEST FOR QUALIFICATIONS (RFQ) GENERAL CONTRACTOR RENOVATIONS TO OPERATIONS OFFICE M&T BANK STADIUM MSA Project No. 19-013 ISSUE DATE: October 9, 2018 MARYLAND STADIUM AUTHORITY

More information

How to Do Business with the Ontario Government

How to Do Business with the Ontario Government How to Do Business with the Ontario Government Ministry of Government Services Landscape Ontario Congress 2012 Agenda To maximize your chances of being successful in obtaining business with the Ontario

More information

COMMUNITY LIVING BRANT POLICY AND PROCEDURE MANUAL

COMMUNITY LIVING BRANT POLICY AND PROCEDURE MANUAL PAGE 1 of 7 FILE UNDER SECTION: 4 EFFECTIVE DATE: January 2012 REVISION DATE: APPROVAL DATE: January 2012 POLICY: This Policy includes the requirements that are set out in the Broader Public Sector (BPS)

More information

PHARMACY BENEFIT MANAGEMENT (PBM) SERVICES

PHARMACY BENEFIT MANAGEMENT (PBM) SERVICES STATE OF ALASKA Department of Administration Division of Retirement and Benefits PHARMACY BENEFIT MANAGEMENT (PBM) SERVICES RFP 180000053 Amendment #1 February 9, 2018 This amendment is being issued to

More information

Best Value Procurement

Best Value Procurement Best Value Procurement Big Picture, Big Impact Thursday, September 13, 2018 By: Jan Siderius First 10 career years Medical Device Industry Avoid Purchasing! Delays Introduce competition Price pressure

More information

Invitation for Bid - Standard Office Furniture / Task Chair

Invitation for Bid - Standard Office Furniture / Task Chair Invitation for Bid - Bid#2016-09-001 Instructions to Bidders 1. General Information Rice University is issuing this Invitation for Bid (IFB) for the procurement of goods and/or trade services as described

More information

Request for Proposal (RFP) Medical and Dental Supplies RFP No MD-S ADDENDUM NO. 1. July 12, 2016

Request for Proposal (RFP) Medical and Dental Supplies RFP No MD-S ADDENDUM NO. 1. July 12, 2016 Request for Proposal (RFP) ADDENDUM NO. 1 July 12, 2016 Contained herein are the answers to the questions submitted to the Department of Management Services (Department). The Department hereby amends as

More information

Version 1.0. The Contract Management Standard Final Edition. Version 1.0

Version 1.0. The Contract Management Standard Final Edition. Version 1.0 The Management Standard Final Edition 1 Purpose of the Management Standard The purpose of the Management Standard is to describe the nature of contract management in terms of the contract management processes

More information

North American Development Bank. Engagement of Consultants

North American Development Bank. Engagement of Consultants North American Development Bank Engagement of Consultants ENGAGEMENT OF CONSULTANTS This Note has been prepared by the North American Development Bank (the Bank) to assist staff and borrowers in the implementation

More information

State of Florida Department of Children and Families

State of Florida Department of Children and Families State of Florida Department of Children and Families Rick Scott Governor Rebecca Kapusta Interim Secretary ADDENDUM #3 to the following Invitation to Negotiate (ITN): Advertisement Number: Section 5.3.1,

More information

REQUEST FOR STATEMENTS OF QUALIFICATIONS FOR REAL ESTATE BROKERAGE SERVICES FOR THE CITY OF TOLLESON

REQUEST FOR STATEMENTS OF QUALIFICATIONS FOR REAL ESTATE BROKERAGE SERVICES FOR THE CITY OF TOLLESON REQUEST FOR STATEMENTS OF QUALIFICATIONS FOR FOR THE CITY OF TOLLESON City of Tolleson 9555 West Van Buren Street Tolleson, Arizona 85353 SOLICITATION INFORMATION AND SELECTION SCHEDULE Solicitation Number:

More information

Competitive Procurement Evaluation Process Audit

Competitive Procurement Evaluation Process Audit 1200, Scotia Place, Tower 1 10060 Jasper Avenue Edmonton, Alberta T5J 3R8 edmonton.ca/auditor Competitive Procurement Evaluation Process Audit August 28, 2017 City of Edmonton 16417 Procurement Evaluation

More information

QUALIFICATION MATRIX ADDENDUM:

QUALIFICATION MATRIX ADDENDUM: QUALIFICATION MATRIX ADDENDUM: The following are just some examples of typical Responsible-in-Charge (RIC) functions for each of the fifteen specific areas identified in the experience matrix, Section

More information

Request for Proposal For: 2018 American Bar Association Temporary Services

Request for Proposal For: 2018 American Bar Association Temporary Services Table of Contents Bid Timetable [2] 1.0 General Bid Information [3] 2.0 Proposal Requirements [5] 3.0 Criteria for Selection [7] 4.0 Specifications and Work Statement [7] Appendix A: Bidder Response Sheet

More information

Version 1.0. The Contract Management Standard Final Edition. Version 1.0

Version 1.0. The Contract Management Standard Final Edition. Version 1.0 The Management Standard Final Edition 1 Purpose of the Management Standard The purpose of the Management Standard is to describe the nature of contract management in terms of the contract management processes

More information

MARYLAND STADIUM AUTHORITY

MARYLAND STADIUM AUTHORITY MARYLAND STADIUM AUTHORITY REQUEST FOR QUALIFICATIONS (RFQ) DESIGN CONSULTANT FOR EXPANSION JOINT REPLACEMENT Small Business Reserve Procurement M&T BANK STADIUM MSA Project No. 19-021 ISSUE DATE: October

More information

MARYLAND STADIUM AUTHORITY

MARYLAND STADIUM AUTHORITY MARYLAND STADIUM AUTHORITY REQUEST FOR QUALIFICATIONS Warehouse at Camden Yards General Contractor for Warehouse Elevator Modernization Project MSA Project No. 18-061 ISSUE DATE: March 7, 2018 Contents

More information

HOUSING AUTHORITY OF THE CITY OF BOULDER (dba Boulder Housing Partners)

HOUSING AUTHORITY OF THE CITY OF BOULDER (dba Boulder Housing Partners) HOUSING AUTHORITY OF THE CITY OF BOULDER (dba Boulder Housing Partners) SOLICITATION TYPE: DESCRIPTION: Request For Proposals Paperless Invoice Automation Software ISSUE DATE: 04/03/2018 DUE DATE: 04/20/2018

More information

ELEVATING OUR PROFESIONALISM

ELEVATING OUR PROFESIONALISM ELEVATING OUR PROFESIONALISM 48 th Annual Conference May 17-20, 2015 Orlando, Florida Invitation to Negotiate Warren Geltch, MBA, C.P.M., CPPO, CPCM 1 Wendy Geltch, C.P.M., CPPO, CPPB, A.P.P., FCCM, FCPM,

More information

Chapter 4 State Requirements for Educational Facilities Section 4.1

Chapter 4 State Requirements for Educational Facilities Section 4.1 providential cause, other impending danger to life safety, or pursuant to Section 1013.46(1)(b), F.S., the board can declare an emergency, can negotiate a contract with a design-build firm, design professional,

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES OCTOBER 09, 2014 EAST BAY REGIONAL PARK DISTRICT Atlas Road Extension Improvements POINT PINOLE REGIONAL SHORELINE PROPOSALS DUE: 2:00PM, NOVEMBER

More information

Procurement Presentation to the Financial Management Institute of Canada

Procurement Presentation to the Financial Management Institute of Canada Procurement Presentation to the Financial Management Institute of Canada Bid Evaluation Methodologies By: James Steedman Senior Procurement and Contracting Officer, Treasury Board Secretariat November

More information

ADDENDUM NO. 1 Kansas City Area Transportation Authority 1350 E. 17 th Street Kansas City, Missouri 64108

ADDENDUM NO. 1 Kansas City Area Transportation Authority 1350 E. 17 th Street Kansas City, Missouri 64108 ADDENDUM NO. 1 Kansas City Area Transportation Authority 1350 E. 17 th Street Kansas City, Missouri 64108 REQUEST FOR PROPOSAL (RFP) 18-4016-28A TEMPORARY STAFFING AGENCY SERVICES Issue Date: December

More information

I. Procurement. Procurement Authority. Ethical Conduct, Conflict of Interest. DU Procurement Policy

I. Procurement. Procurement Authority. Ethical Conduct, Conflict of Interest. DU Procurement Policy I. Procurement Procurement of goods and services for the university must be conducted in an open and competitive environment to ensure that prices paid are fair and reasonable. Purchasing activities are

More information

EXHIBIT 6 Preconstruction Work

EXHIBIT 6 Preconstruction Work EXHIBIT 6 Preconstruction Work The following tasks shall be accomplished by the CM/GC as part of its obligations during the preconstruction phase. The work is to be coordinated with the services requirements

More information

Bidding Conditions Attachment C

Bidding Conditions Attachment C Bidding Conditions Attachment C REV Date: November 9, 2018 Project Name (Permit Nos. xxx) at the Fresno Chaffee Zoo Project No. xxxx Located at 894 West Belmont Avenue Fresno, CA 93728 Page 1 of 8 DEFINITIONS

More information

AGENDA. PRE-BID / SITE VISIT MEETING Tuesday, August 7, 2018, 9:00 am

AGENDA. PRE-BID / SITE VISIT MEETING Tuesday, August 7, 2018, 9:00 am AGENDA PRE-BID / SITE VISIT MEETING Tuesday, August 7, 2018, 9:00 am Project #217090 & 218041 Britt Place Washout / Precinct Road Washout CBJTC, Starke, FL 1. SIGN-IN OF ALL ATTENDEES: 2. INTRODUCTIONS:

More information

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Harshman Demolition Response Deadline 3/28/18

More information

Procurement 101. Tom Blaine Senior Research Associate, Public Procurement Research Center NASPO Honorary Member CPPO, FCPM, FCPA

Procurement 101. Tom Blaine Senior Research Associate, Public Procurement Research Center NASPO Honorary Member CPPO, FCPM, FCPA Procurement 101 Monica Wilkes NASPO Honorary Member and Procurement Consultant CPPO, CPPB Universal Public Procurement Certification Council (UPPCC) Board of Directors Tom Blaine Senior Research Associate,

More information

CHAPTER 16 REQUEST FOR PROPOSAL (RFP)/DIRECT NEGOTIATION

CHAPTER 16 REQUEST FOR PROPOSAL (RFP)/DIRECT NEGOTIATION 16-1 PURPOSE CHAPTER 16 REQUEST FOR PROPOSAL (RFP)/DIRECT NEGOTIATION The purpose of this chapter is to establish procedures for procuring complex goods, professional and non-professional services expected

More information

BID No: 04/17 REQUEST FOR PROPOSALS FOR TRAVEL MANAGEMENT SERVICES FOR THE GENERAL SECRETARIAT OF THE ORGANIZATION OF AMERICAN STATES

BID No: 04/17 REQUEST FOR PROPOSALS FOR TRAVEL MANAGEMENT SERVICES FOR THE GENERAL SECRETARIAT OF THE ORGANIZATION OF AMERICAN STATES BID No: 04/17 REQUEST FOR PROPOSALS FOR TRAVEL MANAGEMENT SERVICES FOR THE GENERAL SECRETARIAT OF THE ORGANIZATION OF AMERICAN STATES SECRETARIAT OF ADMINISTRATION AND FINANCE (SAF) GENERAL SECRETARIAT

More information

Town of Burlington, MA Request for Qualifications Owner s Project Manager (OPM) Services for the Design and Construction of DPW Facilities

Town of Burlington, MA Request for Qualifications Owner s Project Manager (OPM) Services for the Design and Construction of DPW Facilities Town of Burlington, MA Request for Qualifications Owner s Project Manager (OPM) Services for the Design and Construction of In accordance with Massachusetts General Laws, Chapter 149, Sec. 44A½, the Town

More information

Edmore School District Policies

Edmore School District Policies Recommended FOOD SERVICE PROCUREMENT POLICY Descriptor Code: HCAF The District shall adhere to the most restrictive of federal, state, and school district standards (see HCAA-E) for the procurement of

More information

Document B252TM 2007

Document B252TM 2007 Document B252TM 2007 Standard Form of Architect s Services: Architectural Interior Design for the following PROJECT: (Name and location or address) This document has important legal consequences. Consultation

More information

EVALUATION COMMITTEE INSTRUCTIONS

EVALUATION COMMITTEE INSTRUCTIONS EVALUATION COMMITTEE INSTRUCTIONS This is the first meeting of the evaluation committee for RFP # PVS 2016. At this meeting, I shall distribute the original solicitation, the Offeror s proposals, team

More information

Procurement Policies and Procedures

Procurement Policies and Procedures Center for Economic and Social Development Procurement Policies and Procedures 1. Purpose of procurement standards. The purpose of these standards is to establish procedures for the Center for Economic

More information

January 22, Table of Contents

January 22, Table of Contents January 22, 2014 PROCEDURES SINGLE SELECTION PROCUREMENT OF DESIGN AND CONSTRUCTION MANAGEMENT SERVICES (Section 30 of Chapter 193 of the Acts of 2004) Table of Contents 1.0 Introduction...3 1.1 Purpose

More information

ENGINEERING SERVICES Phase III Construction Engineering Services for the Benedictine Parkway Improvement Project

ENGINEERING SERVICES Phase III Construction Engineering Services for the Benedictine Parkway Improvement Project VILLAGE OF LISLE REQUEST FOR QUALIFICATIONS ( RFQ ) #1267 ENGINEERING SERVICES Phase III Construction Engineering Services for the Benedictine Parkway Improvement Project DUE BY: FEBRUARY 5, 2018 @ 11:00

More information

CONSTRUCTION MANAGEMENT SERVICES

CONSTRUCTION MANAGEMENT SERVICES DrAFTDRAFTdd EXHIBIT 1 CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR QUALIFICATIONS (RFQ) SELECTION PROCESS School District of Lee County, Florida TABLE OF CONTENTS 1. INTRODUCTION 1 Lobbying 2 2. 3 A.

More information

Procurement and Contract Negotiations. Special presentation for: 2017 APICS Supply Chain Summit October 19, 2017 Vancouver, BC

Procurement and Contract Negotiations. Special presentation for: 2017 APICS Supply Chain Summit October 19, 2017 Vancouver, BC Procurement and Contract Negotiations Special presentation for: 2017 APICS Supply Chain Summit October 19, 2017 Vancouver, BC Facilitator Introduction Maureen A. Sullivan, BA, LLB Owner and President of

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September

More information

PLANNING AND EVALUATION PRELIMINARY DESIGN

PLANNING AND EVALUATION PRELIMINARY DESIGN PLANNING AND EVALUATION Project Initiation Discuss and refine client requirements Project brief, Schedule, Budget Confirm client's space needs and program Establish scope of work Obtain client-supplied

More information

Position Number Community Division/Region

Position Number Community Division/Region IDENTIFICATION Department Position Title Infrastructure Senior Procurement Specialist Position Number Community Division/Region 33-14016 Yellowknife Procurement Shared Services PURPOSE OF THE POSITION

More information

Effective Date: January, 2007 Last Reviewed Date: September, 2016 Last Revised Date: October, 2016 Next Review Date: April 2018

Effective Date: January, 2007 Last Reviewed Date: September, 2016 Last Revised Date: October, 2016 Next Review Date: April 2018 Section: Finance and Administration Number: 12.20.PP.v7 Subject: Goods and Services Procurement (including consulting services) Policy and Procedure Associated Document Form Number: 12.20.F Effective Date:

More information

WUPRPM Regulations and Procedures Effective: November 11, 2005 R. Purchasing and Financial Obligations Revision Date: July 1, 2015.

WUPRPM Regulations and Procedures Effective: November 11, 2005 R. Purchasing and Financial Obligations Revision Date: July 1, 2015. Table of Contents 1. Purpose... 3 2. Definitions... 3 3. Limits and Thresholds... 4 4. Competitive Bidding... 4 5. Request for Quotation/Request for Proposal... 5 6. Bid Information... 5 7. Bid Bonds...

More information

Complying with Ohio s. Qualifications-Based Selection Law. (Ohio Revised Code ) A Guide for Public Authorities

Complying with Ohio s. Qualifications-Based Selection Law. (Ohio Revised Code ) A Guide for Public Authorities Complying with Ohio s Qualifications-Based Selection Law for Professional Engineers, Architects & Surveyors (Ohio Revised Code 153.65-.73) A Guide for Public Authorities American Council of Engineering

More information

REQUEST FOR QUALIFICATIONS CITY ENGINEERING SERVICES

REQUEST FOR QUALIFICATIONS CITY ENGINEERING SERVICES REQUEST FOR QUALIFICATIONS CITY ENGINEERING SERVICES QUALIFICATION SUBMITTAL DATE: Monday, February 18, 2019 RFQ Number 2019-01 City of McLendon-Chisholm 1371 W. FM 550 McLendon-Chisolm, Texas 75032 972-524-2077

More information