Workshop Information IAEA Workshop

Size: px
Start display at page:

Download "Workshop Information IAEA Workshop"

Transcription

1 IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Overview of Deterministic Safety Analysis: Input Data, Verification & Validation, Conservative/BE Approaches (Part. 2) Lecturer Lesson IV 2_2 Workshop Information IAEA Workshop City, Country XX - XX Month, Year

2 Input Data Preparation The construction of the input data to a Safety Analysis must be subject of an adequate Quality Assurance programme. All sources of data must be referenced and documented. The whole process must be recorded and archived to allow independent checking. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 2

3 Input Data Preparation Input data to a conservative DSA: Conservative initial values of the plant variables. Conservative boundary conditions through the transient (e.g. systems and operator performances). Conservative physical models in the code. Different degrees of conservatism: Most variables are set to high values (taking account of their probability distribution functions). E.g.: average value plus two sigma, or 95 percentile Some variables can be set to extremely high values. E.g.: values established in Appendix K to 10 CFR 50, for LOCA analysis. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 3

4 Input Data Preparation Conservative assumptions made for DB analysis: Initiating event occurs at an unfavourable time. Control systems operate only if their functioning would aggravate the effects of the initiating event. No credit for mitigation. All plant systems and equipment no designed as safety grade (full QA, seismic and equipment qualification) should be assumed to fail causing the most severe effects for the PIE Worst single failure assumed in the operation of the safety groups required for the initiating event. For redundant systems it is often assumed running of minimum number of trains. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 4

5 Input Data Preparation Safety systems assumed to operate at their minimum performance levels. Structures, systems or components that do not have proven full operability during the accident should be assumed unavailable. Actions of the plant staff to prevent or mitigate the accident are only modelled when it is shown that there is sufficient time to perform them, and that procedures and training are adequate. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 5

6 Input Data Preparation DB analysis should include any failures which could occur as a consequence of the IE, including: If the IE is part of an electrical distribution system, all the equipment powered from that part will be unavailable. If the IE is an energetic event (failure of pressurised system), failure of the equipment that could be affected. Fire, floods or external events: failure of the equipment neither designed nor protected against the effects. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 6

7 Input Data Preparation For AOOs, the deterministic SA should include many of the conservative assumption of the DBA analysis, especially those related to the systems for maintaining critical safety functions. But it s not necessary to assume unavailability of all non-safety systems and equipment or no credit to mitigation by control systems, unless the PIE impose it. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 7

8 Input Data Preparation Input data to a best-estimate DSA: Plant and model parameters and variables that will participate in the uncertainty analysis: set to realistic values. But the input is not a single value, rather a probability density function (pdf). Variables and parameters that will not intervene in the uncertainty analysis will be set to conservative values. Both conservative and BE analysis need to know the probability distribution of the uncertain variables and parameters. But the knowledge must be finer for the BE approach, coarser for the conservative one. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 8

9 Verification and Validation Verification and Validation (V&V) of computer codes for safety analysis: Systematic approach for improving reliability of computer codes and reduce risk of incorrect application. Activities that can be performed in parallel with the code development process, or a posteriori. The project sponsor should determine the level and modality of V&V efforts. ANSI/ANS IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 9

10 Verification and Validation Verification: process of evaluating the products of a software development phase to provide assurance that they meet the requirements defined for them by the previous phases. Validation: process of testing a code and evaluating the results to ensure compliance with specified requirements. Testing is carried out by the code developer. Must be evaluated, supplemented or independently performed by a separate V&V team. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 10

11 Verification and Validation VALIDACIÓN REALITY MATH MODEL CODE DESIGN CODE VERIFICATION IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 11

12 Verification and Validation The code is validated when tests results are shown to meet criteria previously stated. V&V activities are performed by the code developer or by an independent V&V team. Model/user qualification is considerably simplified if the codes involved have been adequately V&V. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 12

13 Verification and Validation PARALLEL V&V Software development phases (orientative): Initiation Requirements definitions Design Coding Integration and testing Installation Operation and maintenance IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 13

14 Verification and Validation Details of the V&V process: in each phase: Results should be documented and reported. Each V&V activity should produce a report describing both the positive and negative results of the analysis or testing performed. If V&V findings require revisions to the documents and products that are being verified, the modified ones should be reverified before the next phase begins. Checklists (containing questions that must be answered) should be used in the verification process. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 14

15 Verification and Validation Example of checklist for verification IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 15

16 Verification and Validation The products generated: INITIATION PHASE Statement of the problem Management Plan, that form the basis of the development and V&V efforts of the project. Includes V&V planning: Who will perform it Level of effort Activities Responsibilities Products, schedule, reporting... IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 16

17 Verification and Validation DEFINITION PHASE: Preparation of the V&V plan, according with the Management Plan. Topics included: V&V plan description V&V approach: activities, tools, documents V&V project organization an management Verification of requirements : A document of Requirements Specification (RS) is produced, that form the foundation both for code development and V&V RS identifies inputs, outputs, interfaces, models to be used, acceptance criteria for the code, basis for verifying the code... IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 17

18 Verification and Validation RS must be verified: this has a positive impact in the improvement of software quality Development of preliminary test plans: A Test Plan specifies all activities required for program validation, including descriptions of all test cases. The software testing is carried out by: Only the developer. Developer, then evaluated by IV&V team. Developer, evaluated by IV&V team, who in addition performs a full, independent test effort. Both developer and IV&V team perform full, independent test efforts. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 18

19 Verification and Validation Verification of preliminary Test Plans, conforming to RS and V&V and Management Plans. Verification of design. DESIGN PHASE: Verification of the preliminary program documentation, to ensure that code input descriptions are sufficient to permit test planning. Update of Test Plans: additional tests may be needed. Verification of the updated Tests Plans: consistency with previous documents. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 19

20 Verification and Validation Verification of source code: CODING PHASE: Source code (list of machine-readable statements, usually in a high level language) should be a clear and correct representation of the design specification. Includes manual code inspection. Verification of the updated code documentation. Completion of final Test Plans and building of Test Data Bases: input data for each test case is generated. Verification of final Test Plans and Test Data Bases. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 20

21 Verification and Validation INTEGRATION AND TESTING PHASE: Verification of code integration: The source code together with all necessary components form an operational package. Compilation and loading generates the integrate code, which is the final product, on which Test Plans will be executed. Execution of the Test Plans - Validation: Test cases are executed, and results evaluated and compared to their expected values stated in RS. This is used to produce a total performance envelope for the code, that must meet acceptance criteria. A test report is prepared. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 21

22 Verification and Validation Verification of test results, with evaluation of the Test Report and test outputs. INSTALLATION PHASE: Verification of the installation package: The package includes installation procedures, files that must be installed, selected test case data for verifying installation. The package, once verified, may be used for backup and distribution. Verification of the final code documentation, including user manual, mathematical background, programmer manual, etc. Preparation of final V&V report, summarizing all activities. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 22

23 Verification and Validation OPERATION AND MAINTENANCE PHASE: Modifications in the operating environment, to accommodate upgrades in system software or hardware. Some test cases could be rerun. Code modifications, if errors are discovered during operation, or operating environment has changed, or requirements have been changed. When the code is modified: Test Plans should be reviewed. Selected cases rerun. Maybe new cases introduced. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 23

24 Verification and Validation IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 24

25 Verification and Validation V&V OF EXISTING CODES: Sometimes parallel V&V may be inappropriate. (e.g.: research project whose end product is the code). Then a posteriori V&V review (or Design Review ) is used. Purpose: determine whether the code produces valid response when applied to problems in some domain. Results in document V&V Review Report Phases: Preparation of V&V Review Plan Determination of Code Requirements (applications, models, numerics, valid responses,etc), which must be verified Review of code design, even verification IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 25

26 Verification and Validation Review of source code, code integration and documentation Review of code testing: adequacy of test coverage Review or test results - validation : Range of validity: determined on the basis of physical observations, analytic means, comparison with validated programs In many cases, the code being reviewed is the only tool capable of analyzing the problems of interest. Physical observations may be available only for simplified, distorted conditions, and analytic results only for trivialized cases. The validation becomes a more subjective process, dependent of judgement of V&V team V&V Review Report IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 26

27 Conservative vs. Best-estimate estimate approaches Deterministic Safety Analysis has been traditionally carried out with a conservative or pessimistic bias. As described in previous section, conservative DSA makes use of pessimistic assumptions everywhere, so that the results of the analyses are expected to be worse than realistic ones ( bounding ): Conservative initial and boundary conditions. Models in the computer codes are chosen as conservative. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 27

28 Conservative vs. Best-estimate estimate approaches Conservative DSA have been very popular, because it is relatively easy to perform. But the convenience of such an approach does not excuse the analyzer from being aware of the accuracy of the models and assumptions. A very characteristic example of conservative analysis: LOCA analysis for LWR according to section 46 and appendix K to 10 CFR 50. The conservativeness imposed by the appendix K requirements is very large, because some parameters/models are given overwhelmingly pessimistic values. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 28

29 Conservative vs. Best-estimate estimate approaches Conservatisms imposed by the Appendix K to 10 CFR 50: Stored energy: initial steady temperatures chosen so as to maximize the strored energy in the fuel. Decay heat: heat generation rate from radioactive decay are 1.2 times the 1971 ANS Standard (this is a overestimation of about five standard deviations!!!). Metal-water reaction: conservative Baker-Just model. If cladding ruptures, both inner and outer surfaces are assumed to react. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 29

30 Conservative vs. Best-estimate estimate approaches Discharge from break: critical flow is based on the conservative Moody model multiplied by discharge coefficients (from 0.6 to 1.0) that lead to the worst results. ECCS bypass: during most of the blowdown period for a PWR cold leg break, the ECCS water is assumed to be ineffective in refilling the system. No return to nucleate or transition boiling: once CHF has occurred in the blowdown period, no return to nucleate or transition boiling is allowed during blowdown; it must be postponed until the reflood period. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 30

31 Conservative vs. Best-estimate estimate approaches Film boiling correlations, chosen to underpredict data. Single failure: it is assumed that one of the ECCS components fails, and the failure leading to the highest damage is chosen. Acceptance criteria for a LOCA Analysis (after 10 CFR 50.46) Peak cladding temperature (PCT) lower than 2200 ºF. Maximum cladding oxidation lower than 0.17 times the total cladding thickness before oxidation. If cladding rupture is predicted, the inside surfaces will participate in the oxidation. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 31

32 Conservative vs. Best-estimate estimate approaches Maximum hydrogen generation resulting from the cladding oxidation: lower 0.01 times the amount that would be generated if all the cladding metal were to react. Core geometry will remain amenable to cooling. Long-term cooling. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 32

33 Conservative vs. Best-estimate estimate approaches Best-estimate or realistic DSA: Starting to develop in recent years, when the capabilities for simulating the phenomenology originated by accidents has increased. Try to unbiasedly reproduce the real plant behaviour during an accident or transient. Realistic models and assumptions. Must include an uncertainty analysis for the important results, that must be given with an error interval. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 33

34 Conservative vs. Best-estimate estimate approaches The advantages of a realistic DSA: In principle, being realistic is harder that being pessimistic. Conservative models can be simple. Robust demonstration that there are large safety margins. In both approaches you must know the accuracy of your models and assumptions. But in the BE approach you must quantify such accuracy (uncertainty study). Given an accident scenario in a plant, a conservative analysis can make use of only one or some few computer code runs. But in a BE analysis you need many computer runs, in order to carry out the uncertainty analysis. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 34

35 Conservative vs. Best-estimate estimate approaches The advantages of a realistic DSA: You look for the real performance of your plant. Conservative methodologies use to be physically unrealistic (misleading sequences of events, unrealistic time scales, missing of physical phenomena). BE calculations can provide guidance in developing accident management plans. Lower margins : safety margins adopted for a plant with a conservative approach may be unnecessarily large. BE margins may permit augment reactor power. You have a precise idea about the sensitivity of the calculations to variables and parameters. IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 35

36 Conservative vs. Best-estimate estimate approaches Best-estimate LOCA analysis: Recently developed methodologies. Makes use of realistic assumptions and codes: TRAC-P, TRAC-B, RELAP5, COBRA-TRAC, that incorporate stateof-the-art models. Must include an uncertainty analysis. Drops out the Appendix K requirements. Regulatory door open: SECY revision of 10 CFR 50 Regulatory Guide (1989) CSAU Methodology (1989) IAEA Training Course on Safety Assessment of NPPs to assist Decision Making 36

Origins of the Uncertainty and Methods. F. D Auria Università di Pisa, DIMNP - Via Diotisalvi, Pisa, Italy

Origins of the Uncertainty and Methods. F. D Auria Università di Pisa, DIMNP - Via Diotisalvi, Pisa, Italy Origins of the Uncertainty and Methods F. D Auria Università di Pisa, DIMNP - Via Diotisalvi, 2-56100 Pisa, Italy f.dauria@ing.unipi.it H. Glaeser Gesellschaft für Anlagen- und Reaktorsicherheit (GRS)

More information

A New Method Taking into Account Physical Phenomena Related to Fuel Behaviour During LOCA

A New Method Taking into Account Physical Phenomena Related to Fuel Behaviour During LOCA S. BOUTIN S. GRAFF A. BUIRON A New Method Taking into Account Physical Phenomena Related to Fuel Behaviour During LOCA Seminar 1a - Nuclear Installation Safety - Assessment AGENDA 1. Context 2. Development

More information

Applying RISMC Methods, Tools, and Data to Enhance Safety and Economics through Industry Application Demonstrations

Applying RISMC Methods, Tools, and Data to Enhance Safety and Economics through Industry Application Demonstrations Session 2-2: Economics of Plant Life Management Paper # IAEA-CN-246-149 Applying RISMC Methods, Tools, and Data to Enhance Safety and Economics through Industry Application Demonstrations Ronaldo Szilard,

More information

SAFETY GUIDES. Deterministic Safety Assessment РР - 5/2010 ÀÃÅÍÖÈß ÇÀ ßÄÐÅÍÎ ÐÅÃÓËÈÐÀÍÅ BULGARIAN NUCLEAR REGULATORY AGENCY

SAFETY GUIDES. Deterministic Safety Assessment РР - 5/2010 ÀÃÅÍÖÈß ÇÀ ßÄÐÅÍÎ ÐÅÃÓËÈÐÀÍÅ BULGARIAN NUCLEAR REGULATORY AGENCY S ON IMPLEMENTATION OF THE LEGAL REQUIREMENTS Deterministic Safety Assessment РР - 5/2010 ÀÃÅÍÖÈß ÇÀ ßÄÐÅÍÎ ÐÅÃÓËÈÐÀÍÅ BULGARIAN NUCLEAR REGULATORY AGENCY TABLE OF CONTENTS 1. GENERAL PROVISIONS...2 LEGAL

More information

Accident Sequence Analysis. Workshop Information IAEA Workshop

Accident Sequence Analysis. Workshop Information IAEA Workshop IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Accident Sequence Analysis Lecturer Lesson Lesson IV IV 3_2.2 3_2.2 Workshop Information IAEA Workshop City, XX XX - City -XX,

More information

Guidance on the Use of Deterministic and Probabilistic Criteria in Decision-making for Class I Nuclear Facilities

Guidance on the Use of Deterministic and Probabilistic Criteria in Decision-making for Class I Nuclear Facilities DRAFT Regulatory Document RD-152 Guidance on the Use of Deterministic and Probabilistic Criteria in Decision-making for Class I Nuclear Facilities Issued for Public Consultation May 2009 CNSC REGULATORY

More information

Risk-Informed Changes to the Licensing Basis - II

Risk-Informed Changes to the Licensing Basis - II Risk-Informed Changes to the Licensing Basis - II 22.39 Elements of Reactor Design, Operations, and Safety Lecture 14 Fall 2006 George E. Apostolakis Massachusetts Institute of Technology Department of

More information

Use of PSA to Support the Safety Management of Nuclear Power Plants

Use of PSA to Support the Safety Management of Nuclear Power Plants S ON IMPLEMENTATION OF THE LEGAL REQUIREMENTS Use of PSA to Support the Safety Management of Nuclear Power Plants РР - 6/2010 ÀÃÅÍÖÈß ÇÀ ßÄÐÅÍÎ ÐÅÃÓËÈÐÀÍÅ BULGARIAN NUCLEAR REGULATORY AGENCY TABLE OF CONTENTS

More information

Safety Classification of Structures, Systems and Components in Nuclear Power Plants

Safety Classification of Structures, Systems and Components in Nuclear Power Plants IAEA SAFETY STANDARDS DS367 Draft 6.1 Date: 20 November 2010 Formatted: Space Before: 0 pt, After: 0 pt, Line spacing: single Deleted: 5.10 Deleted: 1912 October Deleted: 18 for protecting people and the

More information

Stress tests specifications Proposal by the WENRA Task Force 21 April 2011

Stress tests specifications Proposal by the WENRA Task Force 21 April 2011 Stress tests specifications Proposal by the WENRA Task Force 21 April 2011 Introduction Considering the accident at the Fukushima nuclear power plant in Japan, the Council of the European Union declared

More information

Nuclear Safety Standards Committee

Nuclear Safety Standards Committee Nuclear Safety Standards Committee 41 st Meeting, IAEA 21 23 Topical June, Issues 2016 Conference in Nuclear Installation Safety Agenda item Safety Demonstration of Advanced Water Cooled NPPs Title Workshop

More information

Supporting Deterministic T-H Analyses for Level 1 PSA

Supporting Deterministic T-H Analyses for Level 1 PSA Supporting Deterministic T-H Analyses for Level 1 PSA ABSTRACT SLAVOMÍR BEBJAK VUJE, a.s. Okružná 5 918 64 Trnava, Slovakia slavomir.bebjak@vuje.sk TOMÁŠ KLIMENT VUJE, a.s. Okružná 5 918 64 Trnava, Slovakia

More information

The Analysis of TRACE/FRAPTRAN in the Fuel Rods of Maanshan PWR for LBLOCA

The Analysis of TRACE/FRAPTRAN in the Fuel Rods of Maanshan PWR for LBLOCA The Analysis of TRACE/FRAPTRAN in the Fuel Rods of Maanshan PWR for LBLOCA J. R. Wang, W. Y. Li, H. T. Lin, J. H. Yang, C. Shih, S. W. Chen Abstract Fuel rod analysis program transient (FRAPTRAN) code

More information

CNSC Fukushima Task Force Nuclear Power Plant Safety Review Criteria

CNSC Fukushima Task Force Nuclear Power Plant Safety Review Criteria CNSC Fukushima Task Force E-doc 3743877 July 2011 Executive Summary In response to the March 11, 2011 accident at the Fukushima Daiichi Nuclear Power Plant (NPP), the CNSC convened a Task Force to evaluate

More information

WENRA Reactor Safety Reference Levels. January 2008

WENRA Reactor Safety Reference Levels. January 2008 Western European Nuclear Regulators Association REACTOR HARMONIZATION WORKING GROUP WENRA Reactor Safety Reference Levels January 2008 Issue Page A: Safety Policy 2 B: Operating Organisation 3 C: Management

More information

United States Nuclear Regulatory Commission Office of Public Affairs Washington, DC Phone Fax

United States Nuclear Regulatory Commission Office of Public Affairs Washington, DC Phone Fax United States Nuclear Regulatory Commission Office of Public Affairs Washington, DC 20555 Phone 301-415-8200 Fax 301-415-2234 Internet:opa@nrc.gov No. 96-44 FOR IMMEDIATE RELEASE (Tuesday, February 27,

More information

BEPU and Safety Margins in Nuclear Reactor Safety

BEPU and Safety Margins in Nuclear Reactor Safety University of Pisa DESTEC-GRNSPG Nuclear Research Group in San Piero a Grado (Pisa) - Italy BEPU and Safety Margins in Nuclear Reactor Safety F. D Auria, N. Debrecin, H. Glaeser Int. Conf. on Topical Issues

More information

IAEA-TECDOC-1229 Regulatory review of probabilistic safety assessment (PSA) Level 2

IAEA-TECDOC-1229 Regulatory review of probabilistic safety assessment (PSA) Level 2 IAEA-TECDOC-1229 Regulatory review of probabilistic safety assessment (PSA) Level 2 Prepared jointly by the International Atomic Energy Agency and the OECD Nuclear Energy Agency July 2001 The originating

More information

Acceptance Criteria in DBA

Acceptance Criteria in DBA IAEA Safety Assessment Education and Training (SAET) Programme Joint ICTP-IAEA Essential Knowledge Workshop on Deterministic Safety Assessment and Engineering Aspects Important to Safety Acceptance Criteria

More information

WENRA Reactor Safety Reference Levels. January 2007

WENRA Reactor Safety Reference Levels. January 2007 Western European Nuclear Regulators Association REACTOR HARMONIZATION WORKING GROUP WENRA Reactor Safety Reference Levels January 2007 Issue Page A: Safety Policy 2 B: Operating Organisation 3 C: Quality

More information

IAEA-TECDOC Applications of probabilistic safety assessment (PSA) for nuclear power plants

IAEA-TECDOC Applications of probabilistic safety assessment (PSA) for nuclear power plants IAEA-TECDOC-1200 Applications of probabilistic safety assessment (PSA) for nuclear power plants February 2001 The originating Section of this publication in the IAEA was: Safety Assessment Section International

More information

Fuel Reliability (QA)

Fuel Reliability (QA) Program Description Fuel Reliability (QA) Program Overview Fuel failures and other fuel-related issues can have significant operational impacts on nuclear power plants. Failures, for example, can cost

More information

Development of a Data Standard for V&V of Software to Calculate Nuclear System Thermal-Hydraulic Behavior

Development of a Data Standard for V&V of Software to Calculate Nuclear System Thermal-Hydraulic Behavior Development of a Data Standard for V&V of Software to Calculate Nuclear System Thermal-Hydraulic Behavior www.inl.gov Richard R. Schultz & Edwin Harvego (INL) Ryan Crane (ASME) Topics addressed Development

More information

DRAFT Regulatory Document RD 337 Design of New Nuclear Power Plants Issued for Internal Review and External Stakeholder Consultation October 2007

DRAFT Regulatory Document RD 337 Design of New Nuclear Power Plants Issued for Internal Review and External Stakeholder Consultation October 2007 DRAFT Regulatory Document RD 337 Design of New Nuclear Power Plants Issued for Internal Review and External Stakeholder Consultation October 2007 Draft release date: 18/10/07 CNSC REGULATORY DOCUMENTS

More information

ENEA, Italian National Agency for New Technologies, Energy and Sustainable Economic Development Bologna, Italy

ENEA, Italian National Agency for New Technologies, Energy and Sustainable Economic Development Bologna, Italy Open issues associated with passive safety systems reliability assessment L. Burgazzi ENEA, Italian National Agency for New Technologies, Energy and Sustainable Economic Development Bologna, Italy Abstract.

More information

THE IAEA SAFETY ASSESSMENT EDUCATION AND TRAINING PROGRAMME (SAET)

THE IAEA SAFETY ASSESSMENT EDUCATION AND TRAINING PROGRAMME (SAET) THE IAEA SAFETY ASSESSMENT EDUCATION AND TRAINING PROGRAMME (SAET) The Safety Assessment Education and Training (SAET) Programme has been designed to support the Member States with development of required

More information

IAEA-TECDOC Probabilistic safety assessments of nuclear power plants for low power and shutdown modes

IAEA-TECDOC Probabilistic safety assessments of nuclear power plants for low power and shutdown modes IAEA-TECDOC-1144 Probabilistic safety assessments of nuclear power plants for low power and shutdown modes March 2000 The originating Section of this publication in the IAEA was: Safety Assessment Section

More information

Nuclear Power Plant Safety

Nuclear Power Plant Safety Nuclear Power Plant Safety by H.J.Otway In the last decade nuclear reactors have proven to be a source of electrical energy economically competitive with conventional means of power production. With the

More information

RECENT ACTIVITIES AND PLAN WITH FRAPCON/FRAPTRAN

RECENT ACTIVITIES AND PLAN WITH FRAPCON/FRAPTRAN RECENT ACTIVITIES AND PLAN WITH FRAPCON/FRAPTRAN FRAPCON/FRAPTRAN User Group Meeting 2014, Sendai, Japan, September 18, 2014 Presented by Jinzhao Zhang (jinzhao.zhang@gdfsuez.com) Co-authors: Adrien Dethioux,

More information

Joint ICTP-IAEA Essential Knowledge Workshop on Deterministic Safety Analysis and Engineering Aspects Important to Safety. Trieste,12-23 October 2015

Joint ICTP-IAEA Essential Knowledge Workshop on Deterministic Safety Analysis and Engineering Aspects Important to Safety. Trieste,12-23 October 2015 Joint ICTP- Essential Knowledge Workshop on Deterministic Safety Analysis and Engineering Aspects Important to Safety Trieste,12-23 October 2015 Safety classification of structures, systems and components

More information

IRSN views and perspectives on in-vessel melt retention strategy for severe accident mitigation

IRSN views and perspectives on in-vessel melt retention strategy for severe accident mitigation Florian Fichot Jean-Michel Bonnet Bernard Chaumont IRSN PSN-RES/SAG IRSN views and perspectives on in-vessel melt retention strategy for severe accident mitigation Outline 1. Key points for the feasibility

More information

Probabilistic Safety Assessment Safety & Regulatory Framework

Probabilistic Safety Assessment Safety & Regulatory Framework Probabilistic Safety Assessment Safety & Regulatory Framework Presentation to the CNSC August 2017 Dr. V.G. Snell 1 Purpose To summarize work done under CNSC contract 87055-16-0251: Role of the Probabilistic

More information

NATIONAL NUCLEAR REGULATOR

NATIONAL NUCLEAR REGULATOR NATIONAL NUCLEAR REGULATOR For the protection of persons, property and the environment against nuclear damage REGULATORY GUIDE Guidance on the Verification and Validation of Evaluation and Calculation

More information

GUIDELINES FOR REGULATORY REVIEW OF EOPs AND SAMGs

GUIDELINES FOR REGULATORY REVIEW OF EOPs AND SAMGs GUIDELINES FOR REGULATORY REVIEW OF EOPs AND SAMGs CNCAN, ROMANIA 2016 1 TABLE OF CONTENTS 1. INTRODUCTION 1.1. Background 1.2. Purpose and scope of the guidelines 1.3. Structure of the guidelines 1.4.

More information

Swedish Radiation Safety Authority Regulatory Code

Swedish Radiation Safety Authority Regulatory Code Swedish Radiation Safety Authority Regulatory Code ISSN 2000-0987 SSMFS 2008:17 The Swedish Radiation Safety Authority s regulations and general advice concerning the design and construction of nuclear

More information

Corium Retention Strategy on VVER under Severe Accident Conditions

Corium Retention Strategy on VVER under Severe Accident Conditions NATIONAL RESEARCH CENTRE «KURCHATOV INSTITUTE» Corium Retention Strategy on VVER under Severe Accident Conditions Yu. Zvonarev, I. Melnikov National Research Center «Kurchatov Institute», Russia, Moscow

More information

MEETING THE OBJECTIVES OF THE VIENNA DECLARATION ON NUCLEAR SAFETY: LICENSING OF NEW NUCLEAR POWER PLANTS IN PAKISTAN

MEETING THE OBJECTIVES OF THE VIENNA DECLARATION ON NUCLEAR SAFETY: LICENSING OF NEW NUCLEAR POWER PLANTS IN PAKISTAN MEETING THE OBJECTIVES OF THE VIENNA DECLARATION ON NUCLEAR SAFETY: LICENSING OF NEW NUCLEAR POWER PLANTS IN PAKISTAN N.MUGHAL Email: nasir.mughal@pnra.org F.MANSOOR J.AKHTAR Abstract In the aftermath

More information

REGULATORY GUIDE An Approach for Using Probabilistic Risk Assessment In Risk-Informed Decisions On Plant-Specific Changes to the Licensing Basis

REGULATORY GUIDE An Approach for Using Probabilistic Risk Assessment In Risk-Informed Decisions On Plant-Specific Changes to the Licensing Basis REGULATORY GUIDE 1.174 An Approach for Using... Page 1 of 38 July 1998 REGULATORY GUIDE 1.174 An Approach for Using Probabilistic Risk Assessment In Risk-Informed Decisions On Plant-Specific Changes to

More information

NUMERICAL STUDY OF IN-VESSEL CORIUM RETENTION IN BWR REACTOR

NUMERICAL STUDY OF IN-VESSEL CORIUM RETENTION IN BWR REACTOR NUMERICAL STUDY OF IN-VESSEL CORIUM RETENTION IN BWR REACTOR M. VALINČIUS Lithuanian Energy Institute Kaunas, Lithuania Email: mindaugas.valincius@lei.lt A. KALIATKA Lithuanian Energy Institute Kaunas,

More information

Pilot Study on Harmonisation of Reactor Safety in WENRA Countries. Abstract

Pilot Study on Harmonisation of Reactor Safety in WENRA Countries. Abstract Western European Nuclear Regulators Association Pilot Study on Harmonisation of Reactor Safety in WENRA Countries Abstract WENRA Working Group on Reactor Harmonisation March 2003 Table of contents 1. Background

More information

CANDU Safety #10: Design and Analysis Process F.J. Doria Atomic Energy of Canada Limited

CANDU Safety #10: Design and Analysis Process F.J. Doria Atomic Energy of Canada Limited CANDU Safety #10: Design and Analysis Process F.J. Doria Atomic Energy of Canada Limited 24-May-01 CANDU Safety - #10 - Design and Analysis Process.ppt Rev. 0 1 Overview Establishment of basic safety requirements

More information

Guidelines for the review of accident management programmes in nuclear power plants

Guidelines for the review of accident management programmes in nuclear power plants IAEA Services Series No. 9 Guidelines for the review of accident management programmes in nuclear power plants Reference document for the IAEA safety service missions on review of accident management programmes

More information

SIMULATION OF FUEL BEHAVIOURS UNDER LOCA AND RIA USING FRAPTRAN AND UNCERTAINTY ANALYSIS WITH DAKOTA

SIMULATION OF FUEL BEHAVIOURS UNDER LOCA AND RIA USING FRAPTRAN AND UNCERTAINTY ANALYSIS WITH DAKOTA SIMULATION OF FUEL BEHAVIOURS UNDER LOCA AND RIA USING FRAPTRAN AND UNCERTAINTY ANALYSIS WITH DAKOTA IAEA Technical Meeting on Modelling of Water-Cooled Fuel Including Design Basis and Severe Accidents,

More information

Instrumentation and Control to Prevent and Mitigate Severe Accident Conditions

Instrumentation and Control to Prevent and Mitigate Severe Accident Conditions Instrumentation and Control to Prevent and Mitigate Severe Accident Conditions SAMG-D Toolkit, Module 3, Chapter 3 Martin Gajdoš Nuclear Engineering, Slovenské elektrárne IAEA Workshop on the Development

More information

ACR Safety Systems Safety Support Systems Safety Assessment

ACR Safety Systems Safety Support Systems Safety Assessment ACR Safety Systems Safety Support Systems Safety Assessment By Massimo Bonechi, Safety & Licensing Manager ACR Development Project Presented to US Nuclear Regulatory Commission Office of Nuclear Reactor

More information

ABSTRACT INTRODUCTION

ABSTRACT INTRODUCTION A UK regulatory view on the analysis and design of nuclear structures subjected to dynamic and impact loadings C.M. Pratchett & A.M. Coatsworth EM Nuclear Installations Inspectorate, Health and ABSTRACT

More information

Human Reliability Analysis

Human Reliability Analysis Human Reliability Analysis Presented by: Tibor Szikszai Ri-man Consulting, Hungary t.szikszai@riman.hu Joint ICTP-IAEA Essential Knowledge Workshop on Deterministic Safety Analysis and Engineering Aspects

More information

Regulatory Guide An Approach For Plant-Specific Risk-informed Decisionmaking Inservice Inspection of Piping

Regulatory Guide An Approach For Plant-Specific Risk-informed Decisionmaking Inservice Inspection of Piping Regulatory Guide 1.178An Approach For Plant-S... Page 1 of 32 July 1998 Regulatory Guide 1.178 An Approach For Plant-Specific Risk-informed Decisionmaking Inservice Inspection of Piping Publication Information

More information

Simulation of thermal hydraulics accidental transients: evaluation of MAAP5.02 versus CATHAREv2.5

Simulation of thermal hydraulics accidental transients: evaluation of MAAP5.02 versus CATHAREv2.5 1/12 Simulation of thermal hydraulics accidental transients: evaluation of MAAP5.02 versus CATHAREv2.5 J. Bittan¹ 1) EDF R&D, Clamart (F) Summary MAAP is a deterministic code developed by EPRI that can

More information

IAEA SAFETY STANDARDS for protecting people and the environment

IAEA SAFETY STANDARDS for protecting people and the environment IAEA SAFETY STANDARDS for protecting people and the environment Step 8 First review of the draft publication by the review committees Soliciting comments by Member States SEISMIC DESIGN OF NUCLEAR INSTALLATIONS

More information

Ivica Basic and Ivan Vrbanic

Ivica Basic and Ivan Vrbanic Ivica Basic and Ivan Vrbanic OVERVIEW AND COMPARISON OF INTERNATIONAL PRACTICES CONCERNING THE REQUIREMENTS ON SINGLE FAILURE CRITERION WITH EMPHASIZE ON NEW WATER-COOLED REACTOR DESIGNS I. BASIC APoSS

More information

State of the Art and Challenges in Level-2 Probabilistic Safety Assessment for New and Channel Type Reactors in India Abstract

State of the Art and Challenges in Level-2 Probabilistic Safety Assessment for New and Channel Type Reactors in India Abstract State of the Art and Challenges in Level-2 Probabilistic Safety Assessment for New and Channel Type Reactors in India R.S. Rao, Avinash J Gaikwad, S. P. Lakshmanan Nuclear Safety Analysis Division, Atomic

More information

Arab Journal of Nuclear Science and Applications, 48(3), ( ) 2015

Arab Journal of Nuclear Science and Applications, 48(3), ( ) 2015 Specific Considerations in the Safety Assessment of Predisposal Radioactive Waste Management Facilities in Light of the Lessons Learned from the Accident at the Fukushima-Daiichi Nuclear Power Plant A.

More information

Design of Small Reactors RD-367

Design of Small Reactors RD-367 Design of Small Reactors RD-367 Design of Small Reactors Draft Regulatory Document RD-367 Published by the Canadian Nuclear Safety Commission Minister of Public Works and Government Services Canada 2010

More information

Report Regulatory Aspects of Passive Systems - A RHWG report for the attention of WENRA 01 June 2018

Report Regulatory Aspects of Passive Systems - A RHWG report for the attention of WENRA 01 June 2018 Report Regulatory Aspects of Passive Systems - A RHWG report for the attention of WENRA 01 June 2018 Table of Content - 00 Foreword 3 01 Introduction / Goal of the report 5 02 Scope of the Report 6 03

More information

PROBABILISTIC SAFETY ANALYSIS IN SAFETY MANAGEMENT OF NUCLEAR POWER PLANTS

PROBABILISTIC SAFETY ANALYSIS IN SAFETY MANAGEMENT OF NUCLEAR POWER PLANTS PROBABILISTIC SAFETY ANALYSIS IN SAFETY MANAGEMENT OF NUCLEAR POWER PLANTS 1 GENERAL 3 2 PSA DURING THE DESIGN AND CONSTRUCTION OF A NPP 3 2.1 Probabilistic design objectives 3 2.2 Design phase 4 2.3 Construction

More information

Environmental qualification and maintenance of the qualified state of equipment in operating nuclear power plant

Environmental qualification and maintenance of the qualified state of equipment in operating nuclear power plant Hungarian Atomic Energy Authority Guideline 4.13 Environmental qualification and maintenance of the qualified state of equipment in operating nuclear power plant Version number: 2. 2007 March Issued by:

More information

Compilation of recommendations and suggestions

Compilation of recommendations and suggestions Post- Fukushima accident Compilation of recommendations and suggestions Peer review of stress tests performed on European nuclear power plants 26/07/2012 Compilation of Recommendations and Suggestions

More information

IAEA-TECDOC Living probabilistic safety assessment (LPSA)

IAEA-TECDOC Living probabilistic safety assessment (LPSA) IAEA-TECDOC-1106 Living probabilistic safety assessment (LPSA) August 1999 The originating Section of this publication in the IAEA was: Safety Assessment Section International Atomic Energy Agency Wagramer

More information

AP1000 The PWR Revisited

AP1000 The PWR Revisited IAEA-CN-164-3S05 AP1000 The PWR Revisited Paolo Gaio Westinghouse Electric Company gaiop@westinghouse.com Abstract. For nearly two decades, Westinghouse has pursued an improved pressurized water reactor

More information

Safety design approach for JSFR toward the realization of GEN-IV SFR

Safety design approach for JSFR toward the realization of GEN-IV SFR Safety design approach for JSFR toward the realization of GEN-IV SFR Advanced Fast Reactor Cycle System R&D Center Japan Atomic Energy Agency (JAEA) Shigenobu KUBO Contents 1. Introduction 2. Safety design

More information

Verifying and Validating Software in a Regulated Environment

Verifying and Validating Software in a Regulated Environment Verifying and Validating Software in a Regulated Environment William J. Bryan Corporate Quality Manager ANSYS, Inc. KEYWORDS QUALITY, VERIFICATION, VALIDATION, REGULATED ABSTRACT Founded in 1970, ANSYS,

More information

CNSC Evaluation of Plant-Specific SAMG

CNSC Evaluation of Plant-Specific SAMG CNSC Evaluation of Plant-Specific SAMG Quanmin Lei IAEA Technical Meeting on Verification and Validation of SAMG Vienna, Austria December 12-14, 2016 e-docs # 5104918 nuclearsafety.gc.ca Outline Summarize

More information

9. Verification, Validation, Testing

9. Verification, Validation, Testing 9. Verification, Validation, Testing (a) Basic Notions (b) Dynamic testing. (c) Static analysis. (d) Modelling. (e) Environmental Simulation. (f) Test Strategies. (g) Tool support. (h) Independent Verification

More information

1. INTRODUCTION TO PSA. 1.1 Historical Background

1. INTRODUCTION TO PSA. 1.1 Historical Background 1. INTRODUCTION TO PSA 1.1 Historical Background Around the middle of this century, up to the 1950s, the main improvements in the reliability and safety of complex technological systems came from the application

More information

AP1000 European 15. Accident Analysis Design Control Document

AP1000 European 15. Accident Analysis Design Control Document 15.2 Decrease in Heat Removal by the Secondary System A number of transients and accidents that could result in a reduction of the capacity of the secondary system to remove heat generated in the reactor

More information

Effectiveness of External Reactor Vessel Cooling (ERVC) Strategy for APR1400 and Issues of Phenomenological Uncertainties

Effectiveness of External Reactor Vessel Cooling (ERVC) Strategy for APR1400 and Issues of Phenomenological Uncertainties Effectiveness of External Reactor Vessel Cooling (ERVC) Strategy for APR1400 and Issues of Phenomenological Uncertainties S.J. OH and H.T. KIM se_oh@khnp.co.kr and hyeong@khnp.co.kr Nuclear Environmental

More information

SEISMIC DESIGN FEATURES OF THE ACR NUCLEAR POWER PLANT

SEISMIC DESIGN FEATURES OF THE ACR NUCLEAR POWER PLANT Transactions of the 17 th International Conference on Structural Mechanics in Reactor Technology (SMiRT 17) Prague, Czech Republic, August 17 22, 2003 Paper # K01-4 SEISMIC DESIGN FEATURES OF THE ACR NUCLEAR

More information

STRESS TEST METHODOLOGY FOR NUCLEAR POWER PLANTS IN THE WAKE OF THE FUKUSHIMA ACCIDENT

STRESS TEST METHODOLOGY FOR NUCLEAR POWER PLANTS IN THE WAKE OF THE FUKUSHIMA ACCIDENT STRESS TEST METHODOLOGY FOR NUCLEAR POWER PLANTS IN THE WAKE OF THE FUKUSHIMA ACCIDENT Frank Nuzzo IAEA Nuclear Power Engineering f.nuzzo@iaea.org ENSREG High Level Requirements Following the extreme events

More information

The RETRAN-3D code is operational on PCs using the Windows and Linux operating systems.

The RETRAN-3D code is operational on PCs using the Windows and Linux operating systems. What Is RETRAN-3D RETRAN-3D is a best-estimate light water reactor and reactor systems transient thermalhydraulic analysis code. Its predecessor, RETRAN-02, was used extensively by the commercial nuclear

More information

REGULATORY GUIDE (Draft was issued as DG-1080)

REGULATORY GUIDE (Draft was issued as DG-1080) U.S. NUCLEAR REGULATORY COMMISSION Revision 3 October 2001 REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH REGULATORY GUIDE 1.149 (Draft was issued as DG-1080) NUCLEAR POWER PLANT SIMULATION FACILITIES

More information

Safety Challenges for New Nuclear Power Plants

Safety Challenges for New Nuclear Power Plants Implementing Design Extension Conditions and Fukushima Changes in the Context of SSR-2/1 Michael Case Office of Nuclear Regulatory Research United States Nuclear Regulatory Commission Outline of Presentation

More information

In Cheol BANG, Ji Hyun Kim School of Energy Engineering Ulsan National Institute of Science and Technology Republic of Korea

In Cheol BANG, Ji Hyun Kim School of Energy Engineering Ulsan National Institute of Science and Technology Republic of Korea Rod-Type Quench Performance of Nanofluids Towards Developments of Advanced PWR Nanofluids-Engineered Safety Features In Cheol BANG, Ji Hyun Kim School of Energy Engineering Ulsan National Institute of

More information

F l u i d F l o w a n d H e a t T r a n s f e r i n S t e a m G e n e r a t o r s

F l u i d F l o w a n d H e a t T r a n s f e r i n S t e a m G e n e r a t o r s Report Series - Applications TransAT for Nuclear Science & Technology F l u i d F l o w a n d H e a t T r a n s f e r i n S t e a m G e n e r a t o r s ASCOMP GmbH Edited by: Dr D. Lakehal Release Date:

More information

L11. Integration of Deterministic Safety Assessment (DSA) and PSA into a Risk-informed Decision Making Process

L11. Integration of Deterministic Safety Assessment (DSA) and PSA into a Risk-informed Decision Making Process L11. Integration of Deterministic Safety Assessment (DSA) and PSA into a Risk-informed Decision Making Process John Fraser Preston john.preston@poyry.com ANSN Regional Workshop on Integrated Deterministic

More information

TS1-5: Revision of NS-G-2.15 and Its Implementation for Verification and Validation of Severe Accident Management Guidelines

TS1-5: Revision of NS-G-2.15 and Its Implementation for Verification and Validation of Severe Accident Management Guidelines Technical Meeting on Verification and Validation of Severe Accident Management Guidelines for Nuclear Power Plants 12-14 December 2016, Vienna, Austria TS1-5: Revision of NS-G-2.15 and Its Implementation

More information

Effects of Source Term on Off-site Consequence in LOCA Sequence in a Typical PWR

Effects of Source Term on Off-site Consequence in LOCA Sequence in a Typical PWR Effects of Source Term on Off-site Consequence in LOCA Sequence in a Typical PWR Seok-Jung HAN a, Tae-Woon KIM, and Kwang-Il AHN a Korea Atomic Energy Research Institute, P.O. Box 105, Yuseong, Daejeon,

More information

Chemical Engineering 693R

Chemical Engineering 693R Chemical Engineering 693R Reactor Design and Analysis Lecture 11 Nuclear Safety Spiritual Thought 2 2 Kings 6:16 And he answered, Fear not: for they that be with us are more than they that be with them.

More information

Canadian Regulatory Perspective on Safety Challenges for New NPP

Canadian Regulatory Perspective on Safety Challenges for New NPP Canadian Regulatory Perspective on Safety Challenges for New NPP A. Viktorov, Canadian Nuclear Safety Commission IAEA Technical Meeting June 22-26, 2015 1 How this presentation works.. 1. CNSC outline

More information

BEMUSE PHASE II: COMPARISON AND ANALYSIS OF THE RESULTS REV. 1

BEMUSE PHASE II: COMPARISON AND ANALYSIS OF THE RESULTS REV. 1 DIPARTIMENTO DI INGEGNERIA MECCANICA, NUCLEARE E DELLA PRODUZIONE - UNIVERSITA' DI PISA 56100 PISA - ITALY BEMUSE PHASE II: COMPARISON AND ANALYSIS OF THE RESULTS REV. 1 A. Petruzzi, F. D Auria Workshop

More information

Fatigue Monitoring for Demonstrating Fatigue Design Basis Compliance

Fatigue Monitoring for Demonstrating Fatigue Design Basis Compliance Fatigue Monitoring for Demonstrating Fatigue Design Basis Compliance Gary L. Stevens, Arthur F. Deardorff, David A. Gerber Structural Integrity Associates 3315 Almaden Expressway, Suite 24 San Jose, CA

More information

Preliminary Lessons Learned from the Fukushima Daiichi Accident for Advanced Nuclear Power Plant Technology Development

Preliminary Lessons Learned from the Fukushima Daiichi Accident for Advanced Nuclear Power Plant Technology Development Preliminary Lessons Learned from the Fukushima Daiichi Accident for Advanced Nuclear Power Plant Technology Development A. Introduction The IAEA Report on Reactor and Spent Fuel Safety in the Light of

More information

FATIGUE MONITORING FOR DEMONSTRATING FATIGUE DESIGN BASIS COMPLIANCE

FATIGUE MONITORING FOR DEMONSTRATING FATIGUE DESIGN BASIS COMPLIANCE FATIGUE MONITORING FOR DEMONSTRATING FATIGUE DESIGN BASIS COMPLIANCE D. Gerber, G. Stevens, T. Gilman, J. Zhang Structural Integrity Associates,San Jose,USA Structural Integrity Associates,San Jose,USA

More information

Introduction to Level 2 PSA

Introduction to Level 2 PSA Introduction to Level 2 PSA Dr Charles Shepherd Chief Consultant, Corporate Risk Associates CRA PSA/HFA FORUM 13-14 September 2012, Bristol Accident sequences modelled by the PSA INITIATING EVENTS SAFETY

More information

Safety Improvement of Future Reactors by Enhancement of the Defence in Depth Principle

Safety Improvement of Future Reactors by Enhancement of the Defence in Depth Principle Safety Improvement of Future Reactors by Enhancement of the Defence in Depth Principle W. Frisch, GRS M. Simon, GRS G. Gros, IPSN F. Rollinger, IPSN 1 Elements of the defence in depth principle The defence-in-depth

More information

In Vessel Retention Strategy VVER 1000/320 VVER 2013 Conference

In Vessel Retention Strategy VVER 1000/320 VVER 2013 Conference ÚJV Řež, a. s. In Vessel Retention Strategy VVER 1000/320 VVER 2013 Conference J. Zdarek Presentation content Background of SA issues VVER 1000/320 Containment and RPV Cavity Configuration IVR Strategy

More information

Review of Probabilistic Safety Assessment as Part of the Periodic Safety Review for NPP Paks

Review of Probabilistic Safety Assessment as Part of the Periodic Safety Review for NPP Paks Review of Probabilistic Safety Assessment as Part of the Periodic Safety Review for NPP Paks Attila Bareith NUBIKI Nuclear Safety Research Institute, Budapest, Hungary Abstract: Review of plant specific

More information

Canadian Regulatory Approach for Safe Long-Term Operation of Nuclear Power Plants

Canadian Regulatory Approach for Safe Long-Term Operation of Nuclear Power Plants Canadian Regulatory Approach for Safe Long-Term Operation of Nuclear Power Plants Technical and Regulatory Issues Facing Nuclear Power Plants: Leveraging Global Experience June 1 2, 2016 Chicago, IL Dr.

More information

Enhancement of Nuclear Safety

Enhancement of Nuclear Safety Enhancement of Nuclear Safety Soon Heung Chang Handong Global University May 6, 2015 Contents 1 2 3 4 Importance of Energy Fundamentals of Nuclear Safety How to Enhance Nuclear Safety Closing Remarks 2

More information

Boiling Water Reactor Vessel and Internals Project (QA)

Boiling Water Reactor Vessel and Internals Project (QA) Boiling Water Reactor Vessel and Internals Project (QA) Program Description Program Overview As boiling water reactors have aged, various forms of operation-limiting stress corrosion cracking have appeared,

More information

Guideline - Safety demonstration of new class I nuclear installations:

Guideline - Safety demonstration of new class I nuclear installations: Class I Guidances Guideline - Safety demonstration of new class I nuclear installations: approach to Defence-in-Depth, radiological safety objectives and the application of a graded approach to external

More information

N-CORR P CD#: N-CORR Dear Mr. Dallaire,

N-CORR P CD#: N-CORR Dear Mr. Dallaire, From: FLEET Barry -NUCLEAR [mailto:barry.fleet@opg.com] Sent: Friday, November 16, 2012 9:20 AM To: Consultation; Dallaire, Mark Cc: WILLIAMS Don -DNNP; MACEACHERON R J -NUCLEAR; HARRIS Elaine -NUCLEAR;

More information

Safety margins of operating reactors

Safety margins of operating reactors IAEA-TECDOC-1332 Safety margins of operating reactors Analysis of uncertainties and implications for decision making January 2003 The originating Section of this publication in the IAEA was: Safety Assessment

More information

Controlled management of a severe accident

Controlled management of a severe accident July 2015 Considerations concerning the strategy of corium retention in the reactor vessel Foreword Third-generation nuclear reactors are characterised by consideration during design of core meltdown accidents.

More information

Introduction to the 2015 Darlington NGS Probabilistic Safety Assessment. Carlos Lorencez and Robin Manley Ontario Power Generation August 2015

Introduction to the 2015 Darlington NGS Probabilistic Safety Assessment. Carlos Lorencez and Robin Manley Ontario Power Generation August 2015 Introduction to the 2015 Darlington NGS Probabilistic Safety Assessment Carlos Lorencez and Robin Manley Ontario Power Generation August 2015 Introduction to the 2015 Darlington NGS Probabilistic Safety

More information

Regulatory Guide Monitoring the Effectiveness of Maintenance at Nuclear Power Plants

Regulatory Guide Monitoring the Effectiveness of Maintenance at Nuclear Power Plants Regulatory Guide 1.160 Revision 2 Page 1 of 14 Revision 2 March 1997 Regulatory Guide 1.160 Monitoring the Effectiveness of Maintenance at Nuclear Power Plants Publication Information (Draft issued as

More information

EPRI Utility Requirement Document

EPRI Utility Requirement Document EPRI Utility Requirement Document 11 February 2015 Sang-Baik KIM Analyst, NEA NDD Overview of URD Background and Objectives - Purpose of the URD is to present a clear, comprehensive set of design requirements

More information

DRAFT REGULATORY GUIDE

DRAFT REGULATORY GUIDE U.S. NUCLEAR REGULATORY COMMISSION April 2015 OFFICE OF NUCLEAR REGULATORY RESEARCH Division 1 DRAFT REGULATORY GUIDE DRAFT REGULATORY GUIDE DG-1322 (Proposed New Regulatory Guide) Technical Lead Steven

More information

PROPOSAL OF A GUIDE TO PERFORMANCE ASSESSMENT OF FUEL RODS FOR NUCLEAR POWER PLANTS

PROPOSAL OF A GUIDE TO PERFORMANCE ASSESSMENT OF FUEL RODS FOR NUCLEAR POWER PLANTS 2013 International Nuclear Atlantic Conference - INAC 2013 Recife, PE, Brazil, November 24-29, 2013 ASSOCIAÇÃO BRASILEIRA DE ENERGIA NUCLEAR - ABEN ISBN: 978-85-99141-05-2 PROPOSAL OF A GUIDE TO PERFORMANCE

More information

ASTEC Model Development for the Severe Accident Progression in a Generic AP1000-Like

ASTEC Model Development for the Severe Accident Progression in a Generic AP1000-Like ASTEC Model Development for the Severe Accident Progression in a Generic AP1000-Like Lucas Albright a,b, Dr. Polina Wilhelm b, Dr. Tatjana Jevremovic a,c a Nuclear Engineering Program b Helmholtz-ZentrumDresden-Rossendorf

More information