Introduction to Principles of Production Management WS 2012/2013 Chapter 14 Aggregate sales and Operations Planning Presented by Dr. Eng.

Size: px
Start display at page:

Download "Introduction to Principles of Production Management WS 2012/2013 Chapter 14 Aggregate sales and Operations Planning Presented by Dr. Eng."

Transcription

1 Introduction to Principles of Production Management WS 2012/2013 Chapter 14 Aggregate sales and Operations Planning Presented by Dr. Eng.Abed Schokry Learning Outcomes Explain business planning Explain sales and operations planning Identify different aggregate planning strategies & options for changing demand and/or capacity in aggregate plans Develop aggregate plans, calculate associated costs, and evaluate the plan in terms of operations, marketing, finance, and human resources Describe differences between aggregate plans for service and manufacturing companies ١

2 The Role of Aggregate Planning Integral to part of the business planning process Supports the strategic plan Also known as the production plan Identifies resources required for operations for the next 6-18 months Details the aggregate production rate and size of work force required Objectives Sales and Operations Planning The Aggregate Operations Plan Examples: Chase and Level strategies ٢

3 Sales and Operations Planning Activities Long-range planning Greater than one year planning horizon Usually performed in annual increments Medium-range planning Six to eighteen months Usually with weekly, monthly or quarterly increments Short-range planning One day to less than six months Usually with weekly or daily increments The Role of the Aggregate Plan ٣

4 Types of Aggregate Plans Level Aggregate Plans Maintains a constant workforce Sets capacity to accommodate average demand Often used for make-to-stock products like appliances Disadvantage-builds inventory and/or uses back orders Types of Aggregate Plans Chase Aggregate Plans Produces exactly what is needed each period Sets labor/equipment capacity to satisfy period demands Disadvantage-constantly changing short term capacity ٤

5 Types of Aggregate Plans con t Hybrid Aggregate Plans Uses a combination of options Options should be limited to facilitate execution May use a level workforce with overtime & temps May allow inventory buildup and some backordering May use short term sourcing Aggregate Planning Options Demand-based options Reactive: uses finished goods inventories and backorders for fluctuations Proactive: shifts the demand patterns to minimize fluctuations e.g. early bird dinner prices at a restaurant ٥

6 Aggregate Planning Options Capacity-based options Changes output capacity to meet demand Uses overtime, under time, subcontracting, hiring, firing, and part-timers cost and operational implications Aggregate planning Aggregate planning is the development of a long-term output and resource plan in aggregate units of measure. These typically define output levels over a planning horizon of 1 to 2 years, focusing on product families or total capacity requirements. Aggregate planning later translates into monthly or quarterly production plans, taking into account capacity limitations such as supply availability, equipment, and labor. ٦

7 Aggregate planning (cont.) Level 2 planning, or disaggregation, is the process of translating aggregate plans into short-term operational plans that provide the basis for weekly and daily schedules and detailed resource requirements. Level 3 focuses on execution, moving work from one workstation to another, assigning people to tasks, setting priorities for jobs, scheduling equipment, and controlling processes. Aggregate planning (cont.) Aggregate planning is most challenging when demand fluctuates over time. Managers have a variety of options in developing aggregate plans in the face of fluctuating demand: Demand management Production-rate changes Workforce changes Inventory smoothing Facilities, equipment, and transportation ٧

8 Disaggregating Service Plans Most service organizations do not require as many levels of intermediate planning (Level 2) as goods-producing firms. Level 1 and 2 planning are often combined in service businesses. One way to think of disaggregation in services is to go from aggregate planning (Levels 1 and 2) to front line resource (staff) capacity and scheduling decisions (Level 3). Manufacturers use and need an intermediate level of planning (Level 2), where work-in-process and subassemblies reside. Dealing with the Problem Complexity through Decomposition Aggregate Unit Demand Aggregate Planning Corporate Strategy (Plan. Hor.: 1 year, Time Unit: 1 month) Capacity and Aggregate Production Plans End Item (SKU) Demand Master Production Scheduling (Plan. Hor.: a few months, Time Unit: 1 week) Stock Keeping Units (SKU)-level Production Plans Manufacturing and Procurement lead times Part process plans Materials Requirement Planning (Plan. Hor.: a few months, Time Unit: 1 week) Component Production lots and due dates Shop floor-level Production Control (Plan. Hor.: a day or a shift, Time Unit: real-time) ٨

9 Aggregate Planning Problem Aggr. Unit, Production Reqs Corporate Strategy Aggregate Unit Demand Aggregate Unit Availability (Current Inventory Position) Aggregate Planning Aggregate Production Plan Required Production Capacity Aggregate Production Plan: Aggregate Production levels Aggregate Inventory levels Aggregate Backorder levels Production Capacity Plan: Workforce level(s) Overtime level(s) Subcontracted Quantities Figure 14.1 ٩

10 Example Aggregate Planning Variables and Revenue/Cost Implications Aggregate Planning Goals Meet demand (Sales Forecast) Use capacity efficiently Meet inventory policy Minimize cost Labor Inventory Plant & equipment Subcontract ١٠

11 Aggregate Scheduling Options - Advantages and disadvantages Option Advantage Disadvantage Some Comments Changing inventory levels Changes in human resources are gradual, not abrupt production changes Inventory holding costs; Shortages may result in lost sales Applies mainly to production, not service operations Varying workforce size by hiring or layoffs Avoids use of other alternatives Hiring, layoff, and training costs Used where size of labor pool is large Advantages and disadvantages (cont.) Option Advantage Disadvantage Some Comments Varying production rates through overtime or idle time Matches seasonal fluctuations without hiring/training Overtime premiums, tired workers, may not meet demand Allows flexibility within the aggregate plan Subcontracting costs Permits flexibility and smoothing of the firm's output Loss of quality control; reduced profits; loss of future business Applies mainly in production settings ١١

12 Advantages and disadvantages (cont.) Option Advantage Disadvantage Some Comments Using part-time workers Influencing demand Less costly and more flexible than full-time workers Tries to use excess capacity. Discounts draw new customers. High turnover/training costs; quality suffers; scheduling difficult Uncertainty in demand. Hard to match demand to supply exactly. Good for unskilled jobs in areas with large temporary labor pools Creates marketing ideas. Overbooking used in some businesses. Advantages and disadvantages (cont.) Option Advantage Disadvantage Some Comments Back ordering during highdemand periods Counterseasonal products and service mixing May avoid overtime. Keeps capacity constant Fully utilizes resources; allows stable workforce. Customer must be willing to wait, but goodwill is lost. May require skills or equipment outside a firm's areas of expertise. Many companies backlog. Risky finding products or services with opposite demand patterns. ١٢

13 The Extremes Level Strategy Production rate is constant Chase Strategy Production equals sales forecast Aggregate Planning Strategies Level scheduling strategy Produce same amount every day Keep work force level constant Vary non-work force capacity or demand options Often results in lowest production costs Chase scheduling strategy Vary the amount of production to match (chase) the sales forecast This requires changing the workforce (hiring & firing) Mixed strategy Combines 2 or more aggregate scheduling options ١٣

14 Chase Demand Strategies plan for matching output to customer demand a production control plan that attempts to match capacity to the varying levels of forecast demand. Chase demand plans require flexible working practices and place varying demands on equipment requirements. Pure chase demand plans are difficult to achieve and are most commonly found in operations where output cannot be stored or where the organization is seeking to eliminate stores of finished goods. The Trial & Error Approach to Aggregate Planning Forecast the demand for each period Determine the capacity for regular time, overtime, and subcontracting, for each period Determine the labor costs, hiring and firing costs, and inventory holding costs Consider company policies which may apply to the workers, overtime, outsourcing, or to inventory levels Develop alternative plans, and examine their total costs ١٤

15 Disaggregation in Manufacturing Materials Requirements Planning (MRP) Materials Requirements Planning (MRP) is a forward-looking, demand-based approach for planning the production of manufactured goods and ordering materials and components to minimize unnecessary inventories and reduce costs. The output of an MRP system is a schedule for obtaining raw materials and purchased parts, a detailed schedule for manufacturing and controlling inventories, and financial information that drives cash flow, budget, and financial needs. Three Major Concepts of MRP Systems 1. Dependent demand is demand that is directly related to the demand of other Stock Keeping Units (SKUs) and can be calculated without needing to be forecasted. Demand for materials needed to produce finished goods is dependent on the number of finished goods planned. 2. Time phasing: all dependent demand requirements do not need to be ordered at the same time, but rather are timephased as necessary. 3. Lot sizing is the process of determining the appropriate amount and timing of ordering to reduce costs. ١٥

16 MRP explosion MRP explosion is the process of using the logic of dependent demand to calculate the quantity and timing of orders for all subassemblies and components that go into and support the production of finished goods. Lot sizing is the process of determining the appropriate amount and timing of ordering to reduce costs. There are three common lot sizing methods for MRP: 1. Lot-for-lot (LFL) 2. Fixed order quantity (FOQ) 3. Periodic order quantity (POQ) 4. Economic Order Quantity (EOQ) Each of these is illustrated in the following examples. Sales and Operations Planning Activities Long-range planning Greater than one year planning horizon Usually performed in annual increments Medium-range planning Six to eighteen months Usually with weekly, monthly or quarterly increments Short-range planning One day to less than six months Usually with weekly or daily increments ١٦

17 The Aggregate Operations Plan Main purpose: Specify the optimal combination of production rate (units completed per unit of time) workforce level (number of workers) inventory on hand (inventory carried from previous period) Product group or broad category (Aggregation) This planning is done over an intermediate-range planning period of 3 to18 months Balancing Aggregate Demand and Aggregate Production Capacity Suppose the figure to the right represents forecast demand in units Now suppose this lower figure represents the aggregate capacity of the company to meet demand What we want to do is balance out the production rate, workforce levels, and inventory to make these figures match up Jan Feb Mar Apr May Jun Jan Feb Mar Apr May Jun ١٧

18 Required Inputs to the Production Planning System Competitors behavior External capacity Raw material availability Planning for production Market demand Economic conditions External to firm Current physical capacity Current workforce Inventory levels Activities required for production Internal to firm Aggregate Planning Examples: Unit Demand and Cost Data Suppose we have the following unit demand and cost information: Demand/mo Jan Feb Mar Apr May Jun Materials $5/unit Holding costs $1/unit per mo. Marginal cost of stockout $1.25/unit per mo. Hiring and training cost $200/worker Layoff costs $250/worker Labor hours required.15 hrs/unit Straight time labor cost $8/hour Beginning inventory 250 units Productive hours/worker/day 7.25 Paid straight hrs/day 8 ١٨

19 Cut-and-Try Example: Determining Straight Labor Costs and Output Given the demand and cost information below, what are the aggregate hours/worker/month, units/worker, and dollars/worker? Demand/mo Jan Feb Mar Apr May Jun Productive hours/worker/day 7.25 Paid straight hrs/day 8 22x8hrsx$8=$ x x0.15=48.33 & 84.33x22= Jan Feb Mar Apr May Jun Days/mo Hrs/worker/mo Units/worker $/worker $1,408 1,216 1,344 1,344 1,408 1,280 Chase Strategy /(Hiring & Firing to meet demand) Jan Days/mo 22 Hrs/worker/mo Units/worker 1, $/worker $1,408 Jan Demand 4,500 Beg. inv. 250 Net req. 4,250 Req. workers Hired Fired 3 Workforce 4 Ending inventory 0 Lets assume our current workforce is 7 workers. First, calculate net requirements for production, or =4250 units Then, calculate number of workers needed to produce the net requirements, or 4250/ =3.997 or 4 workers Finally, determine the number of workers to hire/fire. In this case we only need 4 workers, we have 7, so 3 can be fired. ١٩

20 16-39 Below are the complete calculations for the remaining months in the six month planning horizon Jan Feb Mar Apr May Jun Days/mo Hrs/worker/mo Units/worker 1, ,015 1,015 1, $/worker $1,408 1,216 1,344 1,344 1,408 1,280 Jan Feb Mar Apr May Jun Demand 4,500 5,500 7,000 10,000 8,000 6,000 Beg. inv. 250 Net req. 4,250 5,500 7,000 10,000 8,000 6,000 Req. workers Hired Fired Workforce Ending inventory Below are the complete calculations for the remaining months in the six month planning horizon with the other costs included Jan Feb Mar Apr May Jun Demand 4,500 5,500 7,000 10,000 8,000 6,000 Beg. inv. 250 Net req. 4,250 5,500 7,000 10,000 8,000 6,000 Req. workers Hired Fired Workforce Ending inventory Jan Feb Mar Apr May Jun Costs Material $21, $27, $35, $50, $40, $30, , Labor 5, , , , , , , Hiring cost , Firing cost , $260, ٢٠

21 16-41 Level Workforce Strategy (Surplus and Shortage Allowed) Lets take the same problem as before but this time use the Level Workforce strategy This time we will seek to use a workforce level of 6 workers Jan Demand 4,500 Beg. inv. 250 Net req. 4,250 Workers 6 Production 6,380 Ending inventory 2,130 Surplus 2,130 Shortage Below are the complete calculations for the remaining months in the six month planning horizon Jan Feb Mar Apr May Jun Demand 4,500 5,500 7,000 10,000 8,000 6,000 Beg. inv ,130 2,140 1,230-2,680-1,300 Net req. 4,250 3,370 4,860 8,770 10,680 7,300 Workers Production 6,380 5,510 6,090 6,090 6,380 5,800 Ending inventory 2,130 2,140 1,230-2,680-1,300-1,500 Surplus 2,130 2,140 1,230 Shortage 2,680 1,300 1,500 Note, if we recalculate this sheet with 7 workers we would have a surplus ٢١

22 Below are the complete calculations for the remaining months in the six month planning horizon with the other costs included Jan Feb Mar Apr May Jun 4,500 5,500 7,000 10,000 8,000 6, , ,910-1,620 4,250 3,370 4,860 8,770 10,680 7, ,380 5,510 6,090 6,090 6,380 5,800 2,130 2,140 1,230-2,680-1,300-1,500 2,130 2,140 1,230 2,680 1,300 1,500 Note, total costs under this strategy are less than Chase at $ Jan Feb Mar Apr May Jun $8,448 $7,296 $8,064 $8,064 $8,448 $7,680 $48, ,900 27,550 30,450 30,450 31,900 29, , ,130 2,140 1,230 5, ,350 1,625 1,875 6, $241, Labor Material Storage Stockout The IDES Sales Forecast for 2003 Quarter 1 307,200 Quarter 2 379,200 Quarter 3 360,000 Quarter 4 489,600 Total 1,536,000 Unit Sales Forecast For 2003 ٢٢

23 IDES Manufacturing Example IDES Manufacturing wants to compare the annual (year 2003) costs associated with scheduling using the following three (3) options: Option 1 Maintain a constant work force during the entire year (Level). Option 2 Maintain the present work force of 150 and use overtime and sub-contracting as needed (Mixed) Option 3 Hire/layoff (stop) workers as needed to produce the required output (Chase). IDES Cost Information Inventory Carrying Cost (per quarter) $ 0.50/unit Subcontracting cost $ 7/unit Pay rate regular time $20/hr Pay rate overtime $30/hr Labor standard per unit 0.2 hrs Cost to increase production $ 3/unit Cost to decrease production $ 2/unit IDES has 0 units in inventory Each Quarter has 60 working days At end of 2002, IDES has 150 prod. workers IDES Policy Maximum of 72,000 units/qtr produced using overtime ٢٣

24 Option 1 Constant Workforce without overtime or subcontracting First, determine the number of workers required to produce the units forecast for Ave. Prod/day = 1,536,000 = 6,400/day 240 days Then determine how many workers are needed. Workers needed = 6,400/day = units/hr X 8 hrs Option 1 Continued: Calculate Inventory Carrying Costs Qtr 6400/day Sales Forecast Inventory Change Ending Inventory 1 384, , ,800 76, , , ,800 81, , , , , , , ,600 0 Total 1,536,000 1,536, ,000 ٢٤

25 Option 1 Continued: Calculation of Annual Costs Inventory carrying cost: 264,000 units X $0.50/unit = $ 132,000 Cost to increase capacity: (384, ,000) units X $5/unit = $ 120,000 Regular time labor cost: 1,536,000 units X $4/unit = $6,144,000 Total Annual Cost for Option 1 = $6,396,000 Option 2 Present Workforce (150) using O/T & subcontracting Qtr Sales Forecast In-house Production Inv Change End Inv Units Req d O/T Out Source 1 307, , ,800 52, , ,000-19,200 33, , , , , ,000-33, ,000 72,000 24,000 Total 1,536,000 1,440, ,000 24,000 ٢٥

26 Option 2 Continued: Calculation of Annual Costs Inventory Carrying Costs 120,000 units X $.50/unit = $ 60,000 Regular time labor (150 workers) $4/unit X 1,440,000 units = $5,760,000 Overtime labor $6/unit X 72,000 units = $ 432,000 Out-sourcing $7/unit X 24,000 units = $ 168,000 Total Annual Costs for Option 2 = $6,420,000 Option 3 Vary Production (Workforce) to match Sales Forecast Qtr Sales Forecast Beginning Capacity Capacity Change Needed Cost of Capacity Change 1 307, ,000-52,800 $105, , , , , , ,200-19,200 38, , , , ,800 Total 1,536,000 $748,800 ٢٦

27 Option 3 calculation of Annual Costs (Cont.) Regular time labor costs 1,536,000 units X $4/unit = $6,144,000 Capacity Change Costs = $ 748,800 Total Annual Cost -Option 3 = $6,892,800 Annual Cost Comparison of the Aggregate Scheduling Strategies Option Annual Cost 1. Level No use of O/T or Outsourcing 2. Mixed Present work force w/ O/T & Outsourcing $6,396,000 $6,420, Chase Vary Production (workforce) $6,892,800 ٢٧

28 The IDES Sales Forecast for 2003 revised Quarter 1 388,000 Unit Sales Forecast For 2003 Quarter 2 440,000 Quarter 3 400,000 Quarter 4 500,000 Total 1,728,000 IDES Cost Information - Revised Inventory Carrying Cost (per quarter) $ 0.75/unit Subcontracting cost $ 7.50/unit Pay rate regular time $20/hr Pay rate overtime $30/hr Labor standard per unit 0.2 hrs Cost to increase production $ 1.50/unit Cost to decrease production $ 1/unit IDES has 0 units in inventory Each Quarter has 60 working days At end of 2000, IDES has 140 prod. workers IDES Policy Maximum of 78,000 units/qtr produced using overtime ٢٨

29 Capacity Requirements Planning (CRP) Capacity Requirements Planning (CRP) is the process of determining the amount of labor and machine resources required to accomplish the tasks of production on a more detailed level, taking into account all component parts and end items in the materials plan. This information is provided in a work center load report. Chapter 13 Resource Management Capacity Requirements Planning (CRP) (cont.) Basic MRP does not consider capacity limitations (assumes infinite capacity so no rescheduling, etc.), so CRP addresses this issue. ٢٩

30 Aggregate Planning for Services Most services cannot be inventoried Demand for services is difficult to predict Capacity is also difficult to predict Service capacity must be provided at the appropriate place and time Labor is usually the most constraining resource for services Copyright 2011 John Wiley & Sons, Inc (End of Chapter 14) ٣٠

Aggregate Planning (session 1,2)

Aggregate Planning (session 1,2) Aggregate Planning (session 1,2) 1 Outline The Planning Process The Nature of Aggregate Planning Aggregate Planning Strategies Capacity Options Demand Options Mixing Options to Develop a Plan Methods for

More information

Aggregate Planning and S&OP

Aggregate Planning and S&OP Aggregate Planning and S&OP 13 OUTLINE Global Company Profile: Frito-Lay The Planning Process Sales and Operations Planning The Nature of Aggregate Planning Aggregate Planning Strategies 1 OUTLINE - CONTINUED

More information

Chapter 16 Sl Sales and doperations Planning

Chapter 16 Sl Sales and doperations Planning Chapter 16 Sl Sales and doperations Planning Aggregate Planning Pure and Mixed Strategies Yield Management for Services Operations Planning Activities Long range Intermediate range Manufacturing Short

More information

Production Planning & Control BMM4823. Aggregate Planning. by Dr. Ahmad Nasser Mohd Rose

Production Planning & Control BMM4823. Aggregate Planning. by Dr. Ahmad Nasser Mohd Rose Production Planning & Control BMM4823 Aggregate Planning by Dr. Ahmad Nasser Mohd Rose nasser@ump.edu.my Chapter Description Aims To understand the importance of aggregate planning in production planning

More information

PRODUCTION PLANNING SYSTEM CHAPTER 2

PRODUCTION PLANNING SYSTEM CHAPTER 2 9 PRODUCTION PLANNING SYSTEM CHAPTER 2 ANSWERS TO PROBLEMS 2.1 Ending inventory = opening inventory + production demand = 400 + 700 900 = 200 units 2.2 Total working days = 19 + 20 + 21 = 60 Average daily

More information

Aggregate Planning. Learning Objectives. Stages of Planning. Dr. Richard Jerz

Aggregate Planning. Learning Objectives. Stages of Planning. Dr. Richard Jerz Aggregate Planning Dr. Richard Jerz 1 Learning Objectives Aggregate planning How to do aggregate planning Graphic technique for aggregate planning Mathematical techniques for aggregate planning 2 Stages

More information

AGGREGATE PLANNING (SCM) Bijay Lal Pradhan, Ph.D.

AGGREGATE PLANNING (SCM) Bijay Lal Pradhan, Ph.D. AGGREGATE PLANNING (SCM) Bijay Lal Pradhan, Ph.D. What is Aggregate Planning? DEFINITION WHAT IS AGGREGATE PLAN The aggregate production plan (APP) is a long-range materials plan. Since capacity expansion

More information

Supply Chain Decisions

Supply Chain Decisions Aggregate Planning Supply Chain Decisions Strategic Level Long Term Corporate objectives Capacity/Facilities Markets to operate Location Resources Tactical Medium Term Aggregate planning Resource allocation

More information

AGGREGATE PLANNING PROBLEMS

AGGREGATE PLANNING PROBLEMS AGGREGATE PLANNING PROBLEMS Problem 1. ABC Corporation has developed a forecast for a group of items that has the following seasonal demand pattern. Quarter Demand Cumulative Demand 1 22 22 2 17 39 3 4

More information

A typical manufacturing plant

A typical manufacturing plant CHAPTER6: PRODUCTION PLANNING & CONTROL Production planning is concerned with the determination of production, inventory, and work force levels to meet fluctuating demand A typical manufacturing plant

More information

Supply Chain Decisions

Supply Chain Decisions Aggregate Planning Supply Chain Decisions Strategic Level Long Term Corporate objectives Capacity/Facilities Markets to operate Location Resources Tactical Medium Term Aggregate planning Resource allocation

More information

Antti Salonen KPP227 KPP227 1

Antti Salonen KPP227 KPP227 1 KPP227 KPP227 1 What is Aggregate Planning? Aggregate (or intermediate-term) planning is the process of determining a company s aggregate plan = production plan. The aggregate plan specifies how the company

More information

National Institute of Technology Calicut Department of Mechanical Engineering PRODUCTION PLANNING (AGGREGATE PLANNING)

National Institute of Technology Calicut Department of Mechanical Engineering PRODUCTION PLANNING (AGGREGATE PLANNING) PRODUCTION PLANNING (AGGREGATE PLANNING) Concerned with the overall operations of an organisation over a specified time horizon Determines the efficient way of responding (allocating resources) to market

More information

Operations Management

Operations Management 12-1 Aggregate Planning Operations Management William J. Stevenson 8 th edition 12-2 Aggregate Planning CHAPTER 12 Aggregate Planning McGraw-Hill/Irwin Operations Management, Eighth Edition, by William

More information

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. 1) The ability of manufacturing to produce goods and services is called: A) production planning. B)

More information

Aggregate Planning Exercise

Aggregate Planning Exercise Aggregate Planning Exercise This exercise occurs in two parts. The first utilizes the work sheet that appears on the next page. This work sheet will be used during lecture to present the basic calculations

More information

Operations & Supply Planning

Operations & Supply Planning Operations & Supply Planning PGDM 2017-19 Sales & Operations Planning Vinay Kumar Kalakbandi Assistant Professor Operations Management Survey No. 38, Cherlaguda Village, Shamshabad Mandal, RR District,

More information

Production planning and. Unit 3

Production planning and. Unit 3 1 Production planning and scheduling Unit 3 2 Background Because the aircraft manufacturing industry is highly sensitive to fluctuating demands and to their corresponding impact on production costs, a

More information

Chapter 6 RESOURCE PLANNING SYSTEMS. Prepared by Mark A. Jacobs, PhD

Chapter 6 RESOURCE PLANNING SYSTEMS. Prepared by Mark A. Jacobs, PhD Chapter 6 RESOURCE PLANNING SYSTEMS Prepared by Mark A. Jacobs, PhD LEARNING OBJECTIVES You should be able to: Describe the hierarchical operations planning process in terms of materials planning (APP,

More information

Chapter 6 Planning and Controlling Production: Work-in-Process and Finished-Good Inventories. Omar Maguiña Rivero

Chapter 6 Planning and Controlling Production: Work-in-Process and Finished-Good Inventories. Omar Maguiña Rivero Chapter 6 Planning and Controlling Production: Work-in-Process and Finished-Good Inventories Learning Objectives At the end of the class the student will be able to: 1. Describe the production budget process

More information

LECTURE 8: MANAGING DEMAND

LECTURE 8: MANAGING DEMAND LECTURE 8: MANAGING DEMAND AND SUPPLY IN A SUPPLY CHAIN INSE 6300: Quality Assurance in Supply Chain Management 1 RESPONDING TO PREDICTABLE VARIABILITY 1. Managing Supply Process of managing production

More information

Sales and Operations Planning

Sales and Operations Planning Sales and Operations Planning Alessandro Anzalone, Ph.D. Hillsborough Community College, Brandon Campus 1. Purpose of Sales and Operation Planning 2. General Design of Sales and Operations Planning 3.

More information

Planning. Dr. Richard Jerz rjerz.com

Planning. Dr. Richard Jerz rjerz.com Planning Dr. Richard Jerz 1 Planning Horizon Aggregate planning: Intermediate range capacity planning, usually covering 2 to 12 months. Long range Short range Intermediate range Now 2 months 1 Year 2 Stages

More information

The lead-time gap. Planning Demand and Supply

The lead-time gap. Planning Demand and Supply Planning Demand and Supply The lead-time gap Reducing the gap by shortening the logistics lead time while simultaneously trying to move the order cycle closer through improved visibility of demand. Copyright

More information

Inventory & Supply Chain Management Prof. Apurva Jain

Inventory & Supply Chain Management Prof. Apurva Jain Inventory & Supply Chain Management Prof. Apurva Jain Module 2: Session 5-8 Manufacturing Planning Module 2 Learning Objectives 1. Forecasting 2. Making 3. Delivering 4. Sourcing Identify medium-term mfg./inventory

More information

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz Planning Dr. Richard Jerz 1 Planning Horizon Aggregate planning: Intermediate range capacity planning, usually covering 2 to 12 months. Long range Short range Intermediate range Now 2 months 1 Year 2 Stages

More information

Planning and Scheduling Operations in Dynamic Supply Chain

Planning and Scheduling Operations in Dynamic Supply Chain Planning and Scheduling Operations in Dynamic Supply Chain Sung Joo Bae Associate Professor Yonsei University 14 1 Supply Chain Management 14 2 Supply Chains Tier 3 Poland USA Canada Australia Malaysia

More information

Aggregate Planning. Nature of Aggregate Planning

Aggregate Planning. Nature of Aggregate Planning Aggregate Planning Nature of Aggregate Planning Costs Decision Processes Nature of Aggregate Planning Macro Planning Bypass the details of individual products No need for individual scheduling of facilities

More information

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz Planning Dr. Richard Jerz 1 Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering 2 to 12 months. Long range Short range Intermediate range Now 2 months 1 Year 2 Stages

More information

9. What are the activities within the scope of production planning? 1. Aggregate production planning

9. What are the activities within the scope of production planning? 1. Aggregate production planning UNIT-II PRODUCTION PLANNING AND CONTROL AND COMPUTERISED PROCESS PLANNING 1. Define Process Planning Process planning involves determining the sequence of processing and assembly steps that must be accomplished

More information

UNIT 11 AGGREGATE PRODUCTION PLANNING

UNIT 11 AGGREGATE PRODUCTION PLANNING UNIT 11 AGGREGATE PRODUCTION PLANNING Aggregate Production Planning Objectives Upon reading this unit you will get to know: Necessity of aggregate planning Linkage between different levels of production

More information

LOT SIZING IN MRP. Week Gross requirements Scheduled receipts Projected available balance Net Requirements

LOT SIZING IN MRP. Week Gross requirements Scheduled receipts Projected available balance Net Requirements LOT SIZING IN MRP The net data is subjected lot sizing Lot sizes developed can satisfy the net for one or more weeks The basic trade-off involves the elimination of one or more setups at the expense of

More information

LINEAR PROGRAMMING APPROACHES TO AGGREGATE PLANNING. Linear programming is suitable to determine the best aggregate plan.

LINEAR PROGRAMMING APPROACHES TO AGGREGATE PLANNING. Linear programming is suitable to determine the best aggregate plan. LINEAR PROGRAMMING APPROACHES TO AGGREGATE PLANNING Linear programming is suitable to determine the best aggregate plan. Recall that linear programming assumes all variables are continuously divisible.

More information

Optimizing Production Process through Production Planning and Inventory Management in Motorcycle Chains Manufacturer

Optimizing Production Process through Production Planning and Inventory Management in Motorcycle Chains Manufacturer ComTech: Computer, Mathematics and Engineering Applications, 9(2), December 2018, 43-50 DOI: 10.21512/comtech.v9i2.4723 P-ISSN: 2087-1244 E-ISSN: 2476-907X Optimizing Production Process through Production

More information

Introduction to Production Planning

Introduction to Production Planning Introduction to Production Planning Production Planning: what does it deal with? 2 The Production Manager question is: WHAT ( which product ), WHEN ( considered some time horizon ), HOW ( with which materials

More information

PRODUCTION PLANNING ANDCONTROL AND COMPUTER AIDED PRODUCTION PLANNING Production is a process whereby raw material is converted into semi-finished products and thereby adds to the value of utility of products,

More information

MASTER PRODUCTION SCHEDULE (MPS)

MASTER PRODUCTION SCHEDULE (MPS) MASTER PRODUCTION SCHEDULE (MPS) Anticipated build schedule for manufacturing end products (or product options) A statement of production, not a statement of market demand MPS takes into account capacity

More information

PRODUCTION PLANNING AND CONTROL

PRODUCTION PLANNING AND CONTROL 5 PRODUCTION PLANNING AND CONTROL CHAPTER OUTLINE 5.1 Introduction and Meaning 5.2 Need for Production Planning and Control 5.3 Objectives of PP & C 5.4 Phases of PP & C 5.5 Functions of PP & C 5.6 Operations

More information

IV/IV B.Tech (Mech. Engg.) 7th sem, Regular Exam, Nov Sub: OPERATIONS MANAGEMENT [14ME705/A] Scheme of valuation cum Solution set

IV/IV B.Tech (Mech. Engg.) 7th sem, Regular Exam, Nov Sub: OPERATIONS MANAGEMENT [14ME705/A] Scheme of valuation cum Solution set IV/IV B.Tech (Mech. Engg.) 7th sem, Regular Exam, Nov 2017 Sub: OPERATIONS MANAGEMENT [14ME705/A] Scheme of valuation cum Solution set 1 1 x 12 = 12 M a) Forecasts are estimates of occurrence, timing or

More information

History IE 376 PRODUCTION INFORMATION SYSTEMS. Course Notes Lecture #2.A Material Requirements Planning

History IE 376 PRODUCTION INFORMATION SYSTEMS. Course Notes Lecture #2.A Material Requirements Planning IE PRODUCTION INFORMATION SYSTEMS Course Notes Lecture #.A Material Requirements Planning IE Bilkent University Manufacturing Planning and Control System Routing file Resource planning Bills of material

More information

Optimizing Production Process through Production Planning and Inventory Management in Motorcycle Chains Manufacturer

Optimizing Production Process through Production Planning and Inventory Management in Motorcycle Chains Manufacturer ComTech: Computer, Mathematics and Engineering Applications, 9(2), December 2018, 43-50 DOI: 10.21512/comtech.v9i2.4723 P-ISSN: 2087-1244 E-ISSN: 2476-907X Optimizing Production Process through Production

More information

Manufacturing Information System & Review of Operation Management

Manufacturing Information System & Review of Operation Management .. Manufacturing Information System & Review of Operation Management Oran Kittithreerapronchai 1 1 Department of Industrial Engineering, Chulalongkorn University Bangkok 10330 THAILAND last updated: November

More information

2. What are the typical problems with Manufacturing Resources Planning (MRP)? Indicate how one can overcome each problem. 4 points

2. What are the typical problems with Manufacturing Resources Planning (MRP)? Indicate how one can overcome each problem. 4 points EXAM: PRODUCTIO MAAGEMET -- 35V6A5 Date: 12 May 2010 Part 1: Closed Book You have ± 45 minutes to answer the following questions. Write your answers short, clear and to the point (max. 8 lines per question).

More information

Forecasting Survey. How far into the future do you typically project when trying to forecast the health of your industry? less than 4 months 3%

Forecasting Survey. How far into the future do you typically project when trying to forecast the health of your industry? less than 4 months 3% Forecasting Forecasting Survey How far into the future do you typically project when trying to forecast the health of your industry? less than 4 months 3% 4-6 months 12% 7-12 months 28% > 12 months 57%

More information

Functional Area Systems Production / Operation Systems

Functional Area Systems Production / Operation Systems Functional Area Systems Production / Operation Systems Lecture Outline 5 Part 4 Instructor: Trevor Nadeau Examples: Functional Area Info Systems 2 Functional Area Information Systems 3 Computers in Manufacturing

More information

Planning for and Recruiting Human Resources

Planning for and Recruiting Human Resources fundamentals of Human Resource Management 4 th edition by R.A. Noe, J.R. Hollenbeck, B. Gerhart, and P.M. Wright CHAPTER 5 Planning for and Recruiting Human Resources McGraw-Hill/Irwin Copyright 2009 by

More information

MPR Sample Test. CPIM(Certified In Production & Inventory Management) - 1 -

MPR Sample Test. CPIM(Certified In Production & Inventory Management) - 1 - CPIM(Certified In Production & Inventory Management) MPR Sample Test. 1. Which of the following would NOT be a key operating objective? A. Inventory dollars. B. Shipment dollars. C. Factory location selection.

More information

Essence of Planning and Scheduling and Some Results. Doc Palmer, PE, MBA, CMRP

Essence of Planning and Scheduling and Some Results. Doc Palmer, PE, MBA, CMRP Essence of Planning and Scheduling and Some Results, PE, MBA, CMRP www.palmerplanning.com docpalmer@palmerplanning.com 300 CLOSED WORK ORDERS PER MONTH Mechanical Maintenance Started Weekly Scheduling

More information

MgtOp 340 Professor Munson Washington State University Sample Exam for Exam 2

MgtOp 340 Professor Munson Washington State University Sample Exam for Exam 2 MgtOp 340 Professor Munson Washington State University Sample Exam for Exam 2 Multiple Choice 1. Suppose that the annual EOQ cost (setup plus inventory holding) for a product stored in a warehouse is $10,000.

More information

Operation Management QUESTION BANK

Operation Management QUESTION BANK 1. Explain forecasting methods 2. Explain classification of inventory Operation Management QUESTION BANK 3. Calculate a and b constants for the given no of births in previous years and cycles so Year 1

More information

There are three options available for coping with variations in demand:

There are three options available for coping with variations in demand: Module 3E10 Operations management for Engineers - Crib 1 (a) Define the theoretical capacity of a manufacturing line. Explain why the actual capacity of a manufacturing line is often different from its

More information

Chapter 6 Resource Planning Systems

Chapter 6 Resource Planning Systems Chapter 6 Resource Planning Systems TRUE/FALSE 1. The resource and operations planning done by operations managers is intended to balance capacity and output. 2. MRP is the production planning system intended

More information

Inventory Control. Inventory. Inventories in a manufacturing plant. Why inventory? Reasons for holding Raw Materials. Reasons for holding WIP

Inventory Control. Inventory. Inventories in a manufacturing plant. Why inventory? Reasons for holding Raw Materials. Reasons for holding WIP Inventory Control Inventory the oldest result of the scientific management efforts inventory plays a key role in the logistical behavior of virtually all manufacturing systems the classical inventory results

More information

Business Systems Operations Management

Business Systems Operations Management Business Systems Operations Management Facilitator: Dr. Jonathan Farrell 1 This Evening s s Program Capacity Planning & Control Aggregate Planning Capacity versus Demand The Planning Process Managing Capacity

More information

Material Resources Planning

Material Resources Planning Operations and Supply Planning PGDM 2018-20 Material Resources Planning Vinay Kumar Kalakbandi Assistant Professor Operations Management 170 Introduction Computerised information system Aids in planning

More information

Leading KPIs of Positive Financial Performance. Presented by: Hugh Shaw, Ventera Corporation Bill Riviere, Unanet

Leading KPIs of Positive Financial Performance. Presented by: Hugh Shaw, Ventera Corporation Bill Riviere, Unanet Leading KPIs of Positive Financial Performance Presented by: Hugh Shaw, Ventera Corporation Bill Riviere, Unanet Introduction Hugh Shaw (Ventera Corporation) Bill Riviere (Unanet) 2 KPI Introduction Monitoring

More information

7/14/2010. Copyright 2010 Pearson Education, Inc. Publishing as Prentice Hall.

7/14/2010. Copyright 2010 Pearson Education, Inc. Publishing as Prentice Hall. 15 Resource Planning PowerPoint Slides by Jeff Heyl For Operations Management, 9e by Krajewski/Ritzman/Malhotra 21 Pearson Education 15 1 Resource Planning At the heart of any organization Starts t with

More information

Material Requirements Planning (MRP) and ERP 14. Outline

Material Requirements Planning (MRP) and ERP 14. Outline Material Requirements Planning (MRP) and ERP 14 1 Outline Global Company Profile: Wheeled Coach Dependent Demand Dependent Inventory Model Requirements MRP Structure MRP Management 2 1 Outline - Continued

More information

Project and Production Management Prof. Arun Kanda Department of Mechanical Engineering Indian Institute of Technology, Delhi

Project and Production Management Prof. Arun Kanda Department of Mechanical Engineering Indian Institute of Technology, Delhi Project and Production Management Prof. Arun Kanda Department of Mechanical Engineering Indian Institute of Technology, Delhi Lecture - 36 Aggregate Production Planning: Basic Concepts In the last two

More information

SI403 Riset Operasi Suryo Widiantoro, MMSI, M.Com(IS)

SI403 Riset Operasi Suryo Widiantoro, MMSI, M.Com(IS) SI403 Riset Operasi Suryo Widiantoro, MMSI, M.Com(IS) Mahasiswa mampu melakukan perencanaan untuk memastikan kelancaran operasi rantai pasok 1. Manajemen persediaan dalam organisasi 2. Persediaan dan rantai

More information

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras Module - 01 Lecture - 08 Aggregate Planning, Quadratic Model, Demand and

More information

Aggregate Planning and Master Scheduling

Aggregate Planning and Master Scheduling Operations Strategy C h a p t e r 7 Aggregate Planning and Master Scheduling L E A R N I N G O B J E C T I V E S After reading this chapter, you will be able to: LO 7.1 Explain what aggregate planning

More information

Chapter 12. The Material Flow Cycle. The Material Flow Cycle ٠٣/٠٥/١٤٣٠. Inventory System Defined. Inventory Basics. Purposes of Inventory

Chapter 12. The Material Flow Cycle. The Material Flow Cycle ٠٣/٠٥/١٤٣٠. Inventory System Defined. Inventory Basics. Purposes of Inventory Chapter 12 Inventory Management The Material Flow Cycle ١ ٢ Input The Material Flow Cycle Other Wait Move Cycle Queue Setup Run Output 1 Run time: Job is at machine and being worked on 2 Setup time: Job

More information

Mid-Term Examination. Suggested Solution to ECLT 5940 Supply Chain Management. Time: 7:00 9:45 PM

Mid-Term Examination. Suggested Solution to ECLT 5940 Supply Chain Management. Time: 7:00 9:45 PM Mid-Term Examination Suggested Solution to ECLT 5940 Supply Chain Management Time: 7:00 9:45 PM 1. This is an open-book/note examination. 2. One cannot lend books/notes to others. 3. There are totally

More information

Chapter 12. Enterprise Resource Planning

Chapter 12. Enterprise Resource Planning Chapter 12 Enterprise Resource Planning Enterprise Resource Planning (ERP) Organizes and manages a company s business processes by sharing information across functional areas Connects with supply-chain

More information

Inventory/ Material Management

Inventory/ Material Management 11-1 Inventory Management HAPTER 7 Inventory/ Material Management Prepared by Şevkinaz Gümüşoğlu using different references about POM McGraw-Hill/Irwin Operations Management, Eighth Edition, by William

More information

Materials and Resource Requirements Planning

Materials and Resource Requirements Planning CHAPTER FIFTEEN Materials and Resource Requirements Planning McGraw-Hill/Irwin Copyright 2011 by the McGraw-Hill Companies, Inc. All rights reserved. Where We Are Now Relationships Sustainability Globalization

More information

CAD/CAM CHAPTER ONE INTRODUCTION. Dr. Ibrahim Naimi

CAD/CAM CHAPTER ONE INTRODUCTION. Dr. Ibrahim Naimi CAD/CAM CHAPTER ONE INTRODUCTION Dr. Ibrahim Naimi Production System Facilities The facilities in the production system are the factory, production machines and tooling, material handling equipment,

More information

7/8/2017 CAD/CAM. Dr. Ibrahim Al-Naimi. Chapter one. Introduction

7/8/2017 CAD/CAM. Dr. Ibrahim Al-Naimi. Chapter one. Introduction CAD/CAM Dr. Ibrahim Al-Naimi Chapter one Introduction 1 2 3 Production System Facilities The facilities in the production system are the factory, production machines and tooling, material handling equipment,

More information

02/10/2016. Functional Area Systems Production / Operation Systems. Examples: Functional Area Info Systems. Functional Area Information Systems

02/10/2016. Functional Area Systems Production / Operation Systems. Examples: Functional Area Info Systems. Functional Area Information Systems ACS-1803 Introduction to Information Systems Instructor: Kerry Augustine Functional Area Systems Production / Operation Systems Lecture Outline 5, Part 4 ACS-1803 Introduction to Information Systems Examples:

More information

How much money can you add to the bottom line with good inventory management?

How much money can you add to the bottom line with good inventory management? Inventory Management Key Concepts: Inventory are those stocks or items used to support production (raw materials and work-in-process items), supporting activities (maintenance, repair, and operating supplies),

More information

PRODUCTION SCHEDULING PART-A

PRODUCTION SCHEDULING PART-A PRODUCTION SCHEDULING PART-A 1. List out any five priority sequencing rules. (Nov-2017) First come, first served (FCFS) Last come, first served (LCFS) Earliest due date (EDD) Shortest processing time (SPT)

More information

SUPPLY CHAIN EXCELLENCE IN WIDEX. June 2016

SUPPLY CHAIN EXCELLENCE IN WIDEX. June 2016 SUPPLY CHAIN EXCELLENCE IN WIDEX June 2016 AGENDA 1. Presentation of Widex 2. The first year Creating a solid base 3. The second year Stabilizing the performance 4. The next steps Unleashing the competitive

More information

Inventory Management

Inventory Management Inventory Management SCM301.004 Sourish Sarkar Doctoral Candidate, Grado Dept. of Industrial & Systems Engineering Virginia Polytechnic Institute and State University Penn State Erie, The Behrend College

More information

Visual Planner. Production Planning and Scheduling Solution for Exact Macola Progression and ES

Visual Planner. Production Planning and Scheduling Solution for Exact Macola Progression and ES Visual Planner Production Planning and Scheduling Solution for Exact Macola Progression and ES Today s Business Challenges Keeping direct material costs down Difficulty accurately assessing capacity and

More information

Capacity Planning. Determinants of Effective Capacity

Capacity Planning. Determinants of Effective Capacity Capacity Planning Definition of Capacity Capacity is the limiting capability of a productive unit to produce within a stated time period, normally expressed in terms of output units per unit of time. Capacity

More information

Innovative Labor Procurement:

Innovative Labor Procurement: Innovative Labor Procurement: Blending a Contingent and Contract Workforce BD Biosciences Jim Macon Logistics Manager Canon Business Process Services Jack Losh Regional Account Manager Ted Ardelean Director,

More information

Human Resource Management

Human Resource Management Paper: 1 Module: 5 Principal Investigator Co-Principal Investigator Paper Coordinator Content Writer Prof. S P Bansal Vice Chancellor Maharaja Agrasen University, Baddi Prof YoginderVerma Pro Vice Chancellor

More information

Sales and Operations Planning Overview

Sales and Operations Planning Overview Sales and Operations Planning Overview J. E. Boyer Company, Inc. John E. Boyer, Jr., President Copyright 2009 by J. E. Boyer Company, Inc. No portion of this article may be reproduced in whole or in part

More information

MRP I SYSTEMS AND MRP II SYSTEMS

MRP I SYSTEMS AND MRP II SYSTEMS MRP I SYSTEMS AND MRP II SYSTEMS 2.PLANNING THE MANUFACTURING RESOURCES. MRP II SYSTEMS At the end of the 70s, the computing systems based on the idea that as it is possible to use computing systems to

More information

Maintenance Planning Principles

Maintenance Planning Principles Maintenance Planning Principles Increase Your Workforce without Hiring R. D. (Doc) Palmer, PE, MBA, CMRP Richard Palmer & Associates McGraw-Hill s Maintenance Planning and Scheduling Handbook Case Study:

More information

KEY ISSUES in Advanced Operations Management. Timo Seppälä

KEY ISSUES in Advanced Operations Management. Timo Seppälä KEY ISSUES in Advanced Operations Management Timo Seppälä Production as a value creation process Operations system forms the transformation process between the inputs and the outputs of a manufacturing

More information

PLANNING FOR PRODUCTION

PLANNING FOR PRODUCTION PLANNING FOR PRODUCTION Forecasting Forecasting is the first major activity in the planning, involving careful study of past data and present scenario to estimate the occurence, timing or magnitude of

More information

Product, Service & Process Design

Product, Service & Process Design Strategies for new product introduction market pull we make what we can sell example: food industry technology push we sell what we can make example: electronics inter-functional view example: personal

More information

Structured System Analysis Methodology for Developing a Production Planning Model

Structured System Analysis Methodology for Developing a Production Planning Model Structured System Analysis Methodology for Developing a Production Planning Model Mootaz M. Ghazy, Khaled S. El-Kilany, and M. Nashaat Fors Abstract Aggregate Production Planning (APP) is a medium term

More information

Relevant Costs for Decision Making

Relevant Costs for Decision Making Relevant Costs for Decision Making Chapter Thirteen 13-2 Learning Objective 1 Identify relevant and irrelevant costs and benefits in a decision. 13-3 Cost Concepts for Decision Making A relevant cost is

More information

Planning Production Capacity Optimisation with Rough Cut Capacity Planning

Planning Production Capacity Optimisation with Rough Cut Capacity Planning SOCIAL SCIENCES & HUMANITIES Journal homepage: http://www.pertanika.upm.edu.my/ Planning Production Capacity Optimisation with Rough Cut Capacity Planning Sarjono, H.*, Kusuma, V., Hamali, S. and Mulyono

More information

MGT613 POMA A Lot of Solved MCQs

MGT613 POMA A Lot of Solved MCQs QUIZ NO 5 Question # 10 of 10 ( Start time: 08:31:55 PM ) Total Marks: 1 Which one of the following is NOT a business application of forecasting? Budgeting Capacity planning Inventory management Quality

More information

Administration Division Public Works Department Anchorage: Performance. Value. Results.

Administration Division Public Works Department Anchorage: Performance. Value. Results. Administration Division Anchorage: Performance. Value. Results. Mission Provide administrative, budgetary, fiscal, and personnel support to ensure departmental compliance with Municipal policies and procedures,

More information

2 Recently, there has been a decline in the interest in operations management.

2 Recently, there has been a decline in the interest in operations management. 1 Historically in most manufacturing organizations, operations was viewed as an internal function that is buffered from the external environment. ) True ) False 2 Recently, there has been a decline in

More information

FAQ: Operations and Forecasting

FAQ: Operations and Forecasting Question 1: Why is accurate forecasting vital to operations management? Answer 1: The following are three key areas that rely on accurate forecasts in operations management (Gaither & Frazier, 2002): Facility

More information

Supply Chain Inventory Management Chapter 9. Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall 09-01

Supply Chain Inventory Management Chapter 9. Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall 09-01 Supply Chain Inventory Management Chapter 9 09-01 What is a Inventory Management? Inventory Management The planning and controlling of inventories in order to meet the competitive priorities of the organization.

More information

Financial Results for

Financial Results for OUTSOURCING Inc. (Securities Code: 2427/TSE 1st Section) Financial Results for the 3 rd Quarter of Fiscal Year Ending December 31, 2015 November 2015 Contents P. 2 P. 8 P. 11 P. 23 P. 25 P. 30 Consolidated

More information

OPERATIONS RESEARCH. Inventory Theory

OPERATIONS RESEARCH. Inventory Theory OPERATIONS RESEARCH Chapter 5 Inventory Theory Prof. Bibhas C. Giri Department of Mathematics Jadavpur University Kolkata, India Email: bcgiri.jumath@gmail.com MODULE - 1: Economic Order Quantity and EOQ

More information

Optimal Production Planning in Wiring Harness Assembling Process Using Mixed Integer Linear Programming

Optimal Production Planning in Wiring Harness Assembling Process Using Mixed Integer Linear Programming Optimal Production Planning in Wiring Harness Assembling Process Using Mixed Integer Linear Programming Donatus Feriyanto Simamora Magister Management Technology Program Institut Teknologi Sepuluh Nopember

More information

INVENTORY MANAGEMENT

INVENTORY MANAGEMENT INVENTORY MANAGEMENT Professor Robert Saltzman Operations Analysis Inventory What is it? Idle goods, waiting to be used or sold Inventory can take many forms: Finished Goods: Food, clothes, cars, electronics,

More information

UNIT 03 HUMAN RESOURCE PLANNING

UNIT 03 HUMAN RESOURCE PLANNING UNIT 03 HUMAN RESOURCE PLANNING NGÔ QUÝ NHÂM WHAT DO I NEED TO KNOW? 1. Discuss Strategic HRM and the linkage between organizational strategy and HRM activities. 2. Discuss how to plan for human resources

More information

Slide Chapter 11 Capacity management

Slide Chapter 11 Capacity management Slide 11.1 Chapter 11 Capacity management Slide 11.2 Capacity management Direct Design Operations management Develop Capacity management Deliver The market requires the availability of products and services

More information

INVENTORY AND ECONOMIC ORDER QUANTITY MODELS

INVENTORY AND ECONOMIC ORDER QUANTITY MODELS INVENTORY AND ECONOMIC ORDER QUANTITY MODELS Types of Demand Retailers and distributors must manage independent demand items-that is, items for which demand is influenced by market conditions and isn t

More information

Yuji Yamamoto PPU411. Today s topic

Yuji Yamamoto PPU411. Today s topic Yuji Yamamoto PPU411 Today s topic What is operations planning and scheduling? How to cope with mismatch between demand and supply? Production planning Scheduling Job shop scheduling theories 1 Production

More information