1 INTRODUCTION TO PROCUREMENT AT THE LSE 1

2 THE LSE PROCUREMENT TEAM The LSE has four full time Procurement professionals based in the Finance Division on the 5th Floor of the Library. We are here to assist you, so please come and see us, phone us, or us if you need help! Glen Humbles Head of Procurement Sarah Hadland Deputy Head of Procurement Ext: Ext: 6635 Daniel Bullimore Senior Procurement Advisor Dee Cordwell Procurement Advisor Ext: Ext:

3 PURCHASING GOODS AND SERVICES First things first... do you need to buy? Any items brought into the School s premises will at some stage have to be disposed of thereby adding to the tonnes of waste that LSE sends to landfill. Please consider whether you could repair or refurbish the old item instead of purchasing a new one, loan, and lease or buy it from someone else/another department at LSE. Secondly and rather importantly... Before making a purchase you need to address the following: Do you have approved funds? The authority to do so for example you need to be a budget controller or have delegated authority and the proposed expenditure is suitable for that budget code. If you need further help, budget queries should be raised with the Finance Divisions Management Accounting team. If the expenditure is related to a research contract, please contact the Research finance team as additional contractual conditions may apply. Make sure that the item or service you are about to buy is appropriate expenditure for the School to make for example, LSE will not pay travel costs from home to work. Do you have a clear specification of what you want to buy? Pay heed to the LSE s Environmental Policy 3

4 WHO TO BUY FROM? Our database of registered and approved suppliers can be searched by name or product. It can be used to identify suitable suppliers, but all new requirements should follow the competition guidelines (detailed on page 5). It is not appropriate to award a contract on a sole source basis unless your requirement is covered by an existing framework agreement, or under 8k. For further information on preferred suppliers, contact the procurement team. o Approved Suppliers Search This is a live up to date database and you can search by name or product to find a suitable supplier. The list also contains the LSE s advantageous supplier agreements of which there is a wide ranging list. LSE is a member of the London Universities Purchasing Consortium, who work not only on our behalf, but also for the other major Universities in London in getting good deals for common goods and services such as IT, travel, furniture, stationery, water coolers, telephony. LSE can also utilise the advantageous UK Government agreements. You are obliged under the School s Regulations to use these agreements and the list of approved suppliers will show where there is a relevant framework agreement. 4

5 How do I decide on the level of competition required? The level of competition required is based on the contract value (contract life, not annual cost). A single source purchase is acceptable for a contract below the threshold of 8K excluding VAT. The following thresholds apply to all contracts with a value of 8k or over: From 8k up to 49,999 at least 3 quotes 50k and over at least 4 tenders Request quotes (include LSE terms and conditions with request) and keep copies for audit purposes. Will need to go through a more formal sealed bid tender process and must be referred to the Procurement Team. The tendering process will be via the LSE s e-tendering system (Bravo) If for any reason you cannot obtain the required number of quotations (i.e. there is only one company that can provide it), you will need to discuss this with the Procurement Team. You will need to request approval from the Finance Director before contract award. For contracts of 50k and over, you should contact Procurement as soon as the requirement is identified, so that advice on the procurement process, timescales, LSE documentation, and terms and conditions can be provided. Using new suppliers If you cannot find an already approved supplier to meet your needs and you wish to use a new unapproved company not set up on APTOS, you must complete a new supplier set up form. You should also ask the supplier to provide their BACS details on headed paper or via and supply this along with the form. When you are going to spend less than 8k with a supplier, you can send the new supplier set-up form directly to payment.queries@lse.ac.uk. If you are going to spend 8k or more, you must send the form to procurement@lse.ac.uk. If you use an unapproved supplier without prior approval, any subsequent invoices sent to Finance for payment will be held back and not be paid until this new supplier set up form is completed and returned which the budget holder needs to sign. If the spend is over 8k, evidence of alternative quotations sought must be stated. 5

6 Checking bona fides If you use a new supplier not set up on APTOS, you must assure yourself that any prospective company is legitimate and fit to do business with LSE. As part of the final approval process before the supplier is set up on APTOS, the Procurement Team will verify: Their company registration number you can check their Companies House record yourself online at their Web Check service. Their VAT number Payment terms we pay 30 days nett, if the company is asking for an advance and/or immediate payment, this may indicate that they are in financial difficulties. A full company financial report can be undertaken by the Procurement Team which is free of charge please request this by contacting procurement@lse.ac.uk Contract award Normally a contract would be awarded to the tenderer submitting the lowest price, although quality criteria will also be significant. Tenders or quotes other than the lowest price are to be accepted only on the written authority of the School Secretary via Procurement. LSE standard terms and conditions should be issued with all requests for quotes. They can be downloaded from the Procurement website. If other Terms and Conditions are put forward by the supplier, please contact the Procurement Team. Please ensure that the supplier is aware and accepts that they will only be paid within 30 days nett. 6

7 Who can sign contracts? Budget controllers should sign standard (LSE or approved framework terms) contracts with a value below 100k. All non-standard or supplier generated contracts should be, in the first instance referred to the Purchasing Section and must be signed by the School Secretary. All contracts of 100k and above must be signed by the School Secretary. Invoice Payment The authorisation and payment of invoices is covered in the Accounts Payable User Guide. Please note that the School s payment terms are Net Monthly, i.e. LSE shall pay the invoiced amounts no later than the end of the calendar month following the calendar month in which delivery was made and receipt of a correct invoice submitted by the Supplier whichever shall happen last. Examples: Goods Delivered or Services Rendered Invoice Submitted Payment Due by (latest date) 3 April 27 April 31 May 28 April 30 April 31 May 28 April 2 May 30 June 7

8 SPECIALIST CONTRACTS This is a list of pre-tendered contracts you should draw upon. TRAVEL LSE s preferred Travel Management Company is Diversity Travel. For more details on travel and hotels please see the Travel page on the Procurement website. IT PURCHASES All IT purchases must be made in accordance with Procedure PR12 of the Financial Regulations: IT Purchases. An IT purchase is defined as being any piece of IT equipment forming part of the School s infrastructure, including equipment installed into lecture theatres and teaching classrooms; all desktop and laptop PCs; printers; scanners; all mobile devices, including fixed and mobile telephones; all software, and any other device or peripheral costing more than 200. IMT Services (or your local support team in the Library or Research Labs) will help you (and must be contacted) in order to procure anything IT related. You should contact your IMT support team in the first instance. Some purchases might require a business case to be approved before a purchase order can be raised. If you attempt to purchase anything IMT-related outside of this procedure then you risk having the expense claim or invoice being rejected by Finance. Any IT equipment purchased must be asset tagged in order to comply with the Financial Regulations. IT Services would normally do this as part of the procurement process. All equipment will also be subject to an annual check. Software Computer software differs from the procurement of other goods and services in that the purchase typically only results in a right to use the software rather than outright ownership. There is further advice available in the Software Guide on the Procurement website. Mobile Devices IT Services has published policy and guidance on the use of mobile devices at the School. When procuring a mobile device, IT Services will now show the total cost of ownership of the device over the duration of any mobile telephony contract (for voice and/or data) that might apply. Budget holder approval must be sought before any device is ordered. You should not attempt to buy a mobile device or a mobile voice/data plan yourself, as this may be in breach of the terms of use, and render you liable for income tax as a benefit in kind. 8

9 FACILITIES MANAGEMENT Stationery The School s approved stationery supplier is Office Depot. There should be an approved person within your department who is authorised to raise orders on Office Depot. Please contact Estates at: ( Estates-Help-Desk@lse.ac.uk ) if there is no authorised person in your area. Building and decorating services Refer to Estates Division via Estates-Help-Desk@lse.ac.uk Cleaning The Estates Division manages the School s cleaning contracts. Please contact Estates.FM@lse.ac.uk Drinking Water LSE has a water cooler contract with Cooleraid. For more information, please contact procurement@lse.ac.uk. If you wish to install a plumbed in water purifying system, please discuss with the Estates Division first via Estates-Help-Desk@lse.ac.uk Office furniture Furniture is provided by the Supplies Section of the Estates Division but may need to be paid for from within your own budget. Please contact Estates-Help-Desk@lse.ac.uk White Goods & Electrical items LSE has a contract with Stearn Electric. For quotations, please contact london.south@stearn.co.uk. If you are buying new white goods and electrical items, please advise Estates (Estates-Help-Desk@lse.ac.uk) as they may require PAT testing. LEGAL SERVICES The School s main legal service provider is Pinsent Masons. A request for legal advice may only be made by Authorised Heads of Division and a few other key School Officers on behalf of the School. Please use the link below for further advice: Legal Services BANKING AND ONLINE PAYMENT SERVICES All arrangements with the School s bankers concerning the School s bank accounts and the issue of cheques are the responsibilities of the Finance Division. No other department or section can operate a bank account for activities related to the School/Department and no cheques or financial instruments made payable to the School can be endorsed and credited to any other account. The opening of any new bank accounts for the School or its subsidiaries requires the authorisation of Council on the recommendation of the Chief Financial Officer. 9

10 INSURANCE Please use the following link for advice on Insurance Services at the LSE CATERING Organisational Units of the School may choose to have informal hospitality provided by: the School s LSE Catering Services (LSECS), the Student Union s catering service (SU) or Sands (or other external caterers as revised from time to time), who have been formally appointed by the School to provide services where/when LSECS are unable to do so. The following link provides further advice on LSE Catering TEMPORARY STAFF The approved supplier for recruiting temporary office staff is Adecco (formerly Spring) (other than certain specialist areas). All temporary staff bookings must be made through HR recruitment. Please use the following link for advice on the Temporary Recruitment process PRINTING Please ask the LSE s Reprographics Department for a quote for work to ensure you obtain value for money. Repro.Admin@lse.ac.uk LSE DESIGN UNIT The Design Unit are able to work on a wide variety of materials from Annual Reports and the School s prospectus to detailed cartographic work and the design of exhibitions/displays. Please contact them at designunit@lse.ac.uk for quotations. 10

11 FREQUENTLY ASKED QUESTIONS 1. LSE Company registration number and VAT The LSE s UK company registration number is The LSE s VAT registration no. is GB For contracts the styling should be: LONDON SCHOOL OF ECONOMICS AND POLITICAL SCIENCE (company number ) whose principal place of business is at Houghton Street, London WC2A 2AE ( LSE ). 2. Self-employed (Schedule D) The HR Division are responsible for determining employment status and giving approval for selfemployed contractors (also known as Schedule D ). The decision to be treated as self-employed is not a matter of choice and HR will ascertain whether a contractor can legitimately be paid as selfemployed in accordance with the HMRC rules. The following link provides additional advice Schedule D 3. The supplier is asking me for a purchase order number The supplier s quotation can be accepted on LSE headed paper. A suggested response letter is provided in this response link. 4. What s the difference between a quote and tender? A quote or quotation is a simple and quick request for pricing from a supplier used for contracts with a value below 50k. You should always retain copies of quotes as an audit trail of the decision making process. Tendering is more complex and a longer process, with suppliers being invited to provide sealed bids, which are opened at a specified time. This process is compulsory for all contracts of 50k and above and must be undertaken by the Procurement Team via the LSE s e-tendering system (Bravo). 5. Can I accept gifts/hospitality from suppliers? Only items of low intrinsic value such as pens, mugs, calendars, diaries etc. All offers from suppliers must be noted and these records open to inspection by the internal Auditor if requested. Further advice is provided under the following link: Gifts & Hospitality 6. What are EU Tendering regulations (OJEU)? More properly they are the Public Contracts Regulations 2006 an EU wide Directive about the spending of large sums of public money. Public sector organisations are required to follow specific procurement routes for certain goods and services which exceed 172,514k ex VAT (or 4.3m for building work) with requirements advertised and tendered through the Official Journal of the European Union (OJEU). 11

12 Fortunately, due to the way the LSE is funded, we can choose whether we wish to follow the OJEU process and the preferred route would be a procurement outside of the OJEU process. However, it could be used to source suppliers for an unknown supply market, but the requirement should be discussed with the Head of Procurement in advance. There are risks in using the OJEU process, such as: longer timescales and a greater risk of legal challenge from suppliers on the procurement process. 7. Why can t I buy store shop furniture? We already have supply arrangements for office furniture with specialist companies which come with better warranty terms than high street stores, deliver to site, and are designed and made to more stringent standards suitable to the office environment. 8. Can I have a School provided Mobile phone? The School can provide a range of mobile devices including mobile telephones to suit most requirements. You should contact either your IT support team or the Telecoms team in IT Services (telecoms@lse.ac.uk) for help and advice. 9. The supplier wants payment upfront before they will start work/despatch the goods we need We do not pay suppliers for work that has not been done or goods that have not been delivered. If we do make a pre-payment and the company subsequently goes into liquidation, the School cannot get that money back. If suppliers need to buy a large amount of materials for the work or pay their sub-contractors significant sums of money, we would insist on certain precautions being undertaken. Please consult the Procurement Team in these instances before any commitments are made. 10. The supplier won t invoice us but wants a cheque instead We prefer invoices to be sent to us for payment; however, in certain cases cheques can be raised. Please contact Stuart Sharkey in Accounts Payable s.sharkey@lse.ac.uk 11. A supplier has asked the LSE to provide trade references Instead of this, we can send them a copy of our latest Annual Accounts to prove we are financially stable. A copy of the Accounts can be found on the Finance Division web pages. 12

13 APPENDIX A Checklist for Green Procurement Consideration Could I repair or refurbish the old item instead of purchasing a new one? Can I loan, lease or buy it from someone else/another department at LSE? Does the product make efficient use of resources? Does the product use energy, fuel or water more efficiently or uses less paper, ink, light or other resources? Does the product have minimal content and use of toxic substances in production and final product? Is the product reusable or durable, have a long economically useful life and/or can be economically repaired or upgraded, compared to alternatives? Is the product recyclable (and do local facilities exist that are capable of recycling the product at the end of its useful life)? Is the product biodegradable (will it take a long time to decompose in landfill)? Does the product contain recycled material? Do we really need to buy a virgin product when the recycled version is of the same quality? Is the product purchased from local supplier, which minimizes the ecological footprint, such as transportation and packaging cost? Can the additional cost accounted for improved quality be reimbursed in lower operating costs over five years? Does the supplier have ISO 14001, another Environmental Management Standard or other Eco-Label that meets certain standards? 13

1.3 If further guidance is required staff should contact the Head of Strategic Procurement.

1.3 If further guidance is required staff should contact the Head of Strategic Procurement. Procurement Policy 1. Introduction 1.1 The University has a devolved procurement structure and this document is intended to give clear guidance to staff in teaching and central service departments who

More information

Brooke Weston Trust. Trust Handbook: Policies and Procedures. Procurement Policy. Associated Policies Charging and Remissions

Brooke Weston Trust. Trust Handbook: Policies and Procedures. Procurement Policy. Associated Policies Charging and Remissions Title Procurement Policy Associated Policies Charging and Remissions REVIEWED: NEXT REVIEW: 1. Policy statement 1.1 This policy (Policy) sets out the rules by which The Brooke Weston Trust (the Trust)

More information

Hastings Academies Trust Standard Procurement Procedures

Hastings Academies Trust Standard Procurement Procedures 1. Overview The Standard Procurement Procedures support the Trust s Financial Regulations and reflect the requirements of the EFA as set out in the Academies Handbook. The requirements of the Academies

More information

Procurement Policy. Department Owner. Finance & Resources (National) Section Owner. Procurement. Approver. E-ACT Audit & Risk Committee

Procurement Policy. Department Owner. Finance & Resources (National) Section Owner. Procurement. Approver. E-ACT Audit & Risk Committee Procurement Policy Department Owner Section Owner Approver Finance & Resources (National) Procurement E-ACT Audit & Risk Committee Date Approved July 2015 Review Date July 2017 E-ACT Procurement Guidelines

More information

List of Financial Regulations

List of Financial Regulations HEPTONSTALL PARISH COUNCIL FINANCIAL REGULATIONS List of Financial Regulations 1. General 25 2. Annual Estimates 25 3. Budgetary Controls 25 4. Accounting and Audit 26 5. Banking Arrangements and Cheques

More information

Contract Management arrangements - Procurement Policy update

Contract Management arrangements - Procurement Policy update Agenda item: 13 Report title: Report by: Action: Contract Management arrangements - Procurement Policy update Gordon Duffus, Head of Procurement, Resources and Quality Assurance, gordon.duffus@gmc-uk.org,

More information

MG ALBA PROCUREMENT POLICY AND SCHEME OF TENDERING

MG ALBA PROCUREMENT POLICY AND SCHEME OF TENDERING MG ALBA PROCUREMENT POLICY AND SCHEME OF TENDERING 1 PROCUREMENT POLICY 1 Purpose and Compliance 1.1 The purpose of this Procurement Policy and Scheme of Tendering is to set clear rules for the procurement

More information

SCHEME OF DELEGATION

SCHEME OF DELEGATION SCHEME OF DELEGATION 1. Financial Powers and Duties Reserved for the Board of Trustees 2. Financial Powers and Duties Delegated to the Resources Committee 3. Financial Powers and Duties Delegated to the

More information

Procurement Policy. Education is for improving lives and for leaving your community and world better than you found it.

Procurement Policy. Education is for improving lives and for leaving your community and world better than you found it. Procurement Policy Education is for improving lives and for leaving your community and world better than you found it. Review date: April 2020 Page 1 of 13 Contents 1. Introduction... 3 2. Principles...

More information

HOW TO DO BUSINESS WITH BANGOR UNIVERSITY A GUIDE FOR SUPPLIERS

HOW TO DO BUSINESS WITH BANGOR UNIVERSITY A GUIDE FOR SUPPLIERS HOW TO DO BUSINESS WITH BANGOR UNIVERSITY A GUIDE FOR SUPPLIERS Produced by Bangor University s Corporate Procurement Team July 2016 Version 1.0 CONTENT About this Guide.. 3 Background.. 4 The Procurement

More information

UNIVERSITY OF SUNDERLAND STANDING ORDERS TENDERING AND CONTRACT PROCEDURES

UNIVERSITY OF SUNDERLAND STANDING ORDERS TENDERING AND CONTRACT PROCEDURES UNIVERSITY OF SUNDERLAND STANDING ORDERS TENDERING AND CONTRACT PROCEDURES Finance and Development Committee Revised February 2010 UNIVERSITY OF SUNDERLAND STANDING ORDERS ON TENDERING AND CONTRACT PROCEDURES

More information

PROCUREMENT AND TENDERING PROCEDURES POLICY 2018

PROCUREMENT AND TENDERING PROCEDURES POLICY 2018 PROCUREMENT AND TENDERING PROCEDURES POLICY 2018 1. Purpose of Document This document has been produced to help define and explain each individual s responsibilities in relation to Weymouth BID s procurement

More information

Procurement Policies & Procedures

Procurement Policies & Procedures Procurement Policies & Procedures 1. Procurement Policy 1.1 Purpose This procurement policy is designed to support the college s procurement strategy. It is supported by senior management and the Board

More information

PROCUREMENT POLICY. Director of Finance Head of Financial Services. The Intranet version of this document is the only version that is maintained.

PROCUREMENT POLICY. Director of Finance Head of Financial Services. The Intranet version of this document is the only version that is maintained. PROCUREMENT POLICY Document Summary To ensure the Trust s approach to Purchasing, Supply and Distribution provides the maximum benefit in both cost and service to the Trust. DOCUMENT NUMBER POL/002/043

More information

EYNSFORD PARISH COUNCIL

EYNSFORD PARISH COUNCIL EYNSFORD PARISH COUNCIL FINANCIAL REGULATIONS These Financial Regulations were adopted by the Council at its Meeting held on 20 September 2007, last amended on 20 th July 2017. 1. GENERAL 1.1 These financial

More information

Human Resources Policies and Procedures

Human Resources Policies and Procedures Human Resources Policies and Procedures Removal Expenses and Relocation Support Policy & Procedure UCD/HRO/Removals/017 1 Policy Title UCD/HRO/Removals/017 NHSBT Removal Expenses and Relocation Support

More information

Procurement Procedure. (Standard Operating Procedure)

Procurement Procedure. (Standard Operating Procedure) Procedure (Standard Operating Procedure) Procedure Policy : Executive Summary: Policy The Procedure provides guidance on the appropriate procurement process to all Trust Staff and Budget Holders involved

More information

MSP 50 CONTROL OF CONTRACTORS

MSP 50 CONTROL OF CONTRACTORS CONTROL OF CONTRACTORS AUTHORISED BY: PURCHASING MANAGER DATE: 14/03/2011 THIS DOCUMENT WILL FORM PART OF THE PRE-TENDER, TENDER AND CONTRACT PROCESSES FOR EACH CONTRACT AND AS SUCH SHALL BE REQUIRED TO

More information

PURCHASING AND OUTGOING PAYMENTS PROCEDURES

PURCHASING AND OUTGOING PAYMENTS PROCEDURES PURCHASING AND OUTGOING PAYMENTS PROCEDURES PREAMBLE DEFINITIONS PART 1. DECISION TO PURCHASE 1. Application of Purchasing and Outgoing Payment Procedures 1.1. Goods and services 1.2. Payments that are

More information

National Assembly for Wales Election May 2016: Political parties

National Assembly for Wales Election May 2016: Political parties Situations and procedures National Assembly for Wales Election May 2016: Political parties This document is for political parties campaigning at the National Assembly for Wales election in 2016 Contents:

More information

Procurement Strategy period September 2012 September 2014

Procurement Strategy period September 2012 September 2014 National Library of Scotland Procurement Strategy period September 2012 September 2014 Aims This document aims to identify NLS strategy for the development and continued improvement of procurement systems,

More information

Procurement Strategy Approved: 7 December 2016 Review Date: March 2018

Procurement Strategy Approved: 7 December 2016 Review Date: March 2018 Procurement Strategy Approved: 7 December 2016 Review Date: March 2018 If you have difficulty with sight, or if you require a translated copy of this policy, we would be pleased to provide the information

More information

PLEASE ASK A MEMBER OF STAFF IF YOU WOULD LIKE A VERSION IN A DIFFERENT FORMAT

PLEASE ASK A MEMBER OF STAFF IF YOU WOULD LIKE A VERSION IN A DIFFERENT FORMAT Procurement Policy AS WITH ALL OF THE ASSOCIATION S POLICIES & PROCEDURES, THIS DOCUMENT, IN FULL AND IN PART, IS AVAILABLE IN SUMMARY, ON TAPE, IN BRAILLE, AND IN TRANSLATION INTO MOST OTHER LANGUAGES.

More information

Scheme of Delegation

Scheme of Delegation Purpose: Scheme of Delegation The Academy Trust is responsible for the financial management of the Manor Learning Trust to ensure the best possible education for its students. In order to allow Manor School

More information

Tendering Process Information Document for Chester Beatty Library

Tendering Process Information Document for Chester Beatty Library Tendering Process Information Document for Chester Beatty Library In order to ensure that all purchases are carried out in accordance with current legislation regarding the awarding of contracts by public

More information

Glasgow Life Procurement Annual Report

Glasgow Life Procurement Annual Report 1 Glasgow Life Procurement Annual Report 2016-2017 1. Introduction This Annual Report provides an account of Glasgow Life s procurement activity for 2016/17. 2. Background and key statistics The Scottish

More information

European Maritime and Fisheries Fund Competitive Tendering and Public Procurement. Technical Guidance Notes

European Maritime and Fisheries Fund Competitive Tendering and Public Procurement. Technical Guidance Notes Welsh Government Rural Communities Rural Development Programme 2014-2020 European Maritime and Fisheries Fund 2014-2020 Competitive Tendering and Public Procurement Technical Guidance Notes Crown Copyright

More information

11 AC Procurement and Management of Consultants

11 AC Procurement and Management of Consultants 11 AC Procurement and Management of Consultants Policy number: 11 AC Version 5.0 Approved by Name of author/originator Owner (director) Governing Body Date of approval July 2017 Date of last review June

More information

PROCUREMENT PROCEDURES

PROCUREMENT PROCEDURES PROCUREMENT PROCEDURES DECEMBER 2016 1.0 Introduction. 1.1 Bangor University buys a wide range of works, services, goods and utilities, with expenditure ranging from large construction and refurbishment

More information

Competitive Tendering Policy. Pate s Grammar School

Competitive Tendering Policy. Pate s Grammar School Competitive Tendering Policy Pate s Grammar School Approved by: Finance & Facilities Committee Date: May 2018 Last reviewed: May 2018 Next review due by: May 2020 Contents 1. Aims... 1 2. Legislation and

More information

HEFCW Procurement Policy. Overview

HEFCW Procurement Policy. Overview HEFCW Procurement Policy Overview 1. The procurement function of the Higher Education Funding Council for Wales (HEFCW) will provide professional, qualified, procurement expertise to its Management Board

More information

Procurement Policy. Policy Valid From 2 February Last Review date

Procurement Policy. Policy Valid From 2 February Last Review date Procurement Policy Policy Valid From 2 February 2016 Last Review date Next Review Date 2 February 2019 Contents Policy Statement Definition Commitment Appendix 1 Procurement Thresholds & Timescales 1 Policy

More information

Venn Academy Trust. Scheme of Delegation 2017/18. Date of Approval. Shadow Board Shadow Board June 2016

Venn Academy Trust. Scheme of Delegation 2017/18. Date of Approval. Shadow Board Shadow Board June 2016 Venn Academy Trust Scheme of Delegation 2017/18 Reviewed By Approved By Date of Approval Version Approved Next Review Date Shadow Board Shadow Board 20.7.15 1.1 June 2016 Executive HT Board 20.10.15 1.2

More information

APPLICATION PACK FOR THE ECOLABEL

APPLICATION PACK FOR THE ECOLABEL APPLICATION PACK FOR THE ECOLABEL PART 1: Guidance notes ISSUED BY: Insert name of Competent Body and contact details (address, telephone and fax numbers, Email address) Date of issue: Page 1 of 12 Introduction

More information

PURCHASING PROCEDURE GUIDE

PURCHASING PROCEDURE GUIDE PURCHASING PROCEDURE GUIDE As a publicly funded educational institution Arizona Western College is subject to public purchasing laws and regulations including State Statutes, District Governing Board policies,

More information

FINANCIAL GUIDELINES FOR PRINCIPAL INVESTIGATORS OF RESEARCH PROJECTS FUNDED BY THE EUROPEAN COMMISSION

FINANCIAL GUIDELINES FOR PRINCIPAL INVESTIGATORS OF RESEARCH PROJECTS FUNDED BY THE EUROPEAN COMMISSION FINANCIAL GUIDELINES FOR PRINCIPAL INVESTIGATORS OF RESEARCH PROJECTS FUNDED BY THE EUROPEAN COMMISSION UCD Research Finance Office August 2018 1. Personnel Timesheets are required for all research funded

More information

Boleyn Trust. Procurement Policy and Processing Procedures

Boleyn Trust. Procurement Policy and Processing Procedures Procurement Policy and Processing Procedures Adopted: Adopted from the Tollgate Procurement Policy and Processing Procedures Feb 2016 Approved by FARM Committee: Review Date: January 2018 Contents Purpose

More information

PROCUREMENT POLICY. Policy Owner. Procurement Advisor Department

PROCUREMENT POLICY. Policy Owner. Procurement Advisor Department PROCUREMENT POLICY Policy Owner Procurement Advisor Department Governance & Corporate Performance Creation Date 23/04/2012 Revision Date 19/06/2017 TABLE OF CONTENTS PURPOSE... 1 SCOPE... 1 DEFINITIONS...

More information

Annual Procurement Report 2016/17

Annual Procurement Report 2016/17 Annual Procurement Report 2016/17 Publication date: 12 September 2017 Publication code (leave blank Comms will complete this) Page 1 of 15 Annual Procurement Report 2016/17 Prepared by: Gillian Berry,

More information

Procurement Policy. November Also available in large print (16pt) and electronic format. Ask Student Services for details.

Procurement Policy. November Also available in large print (16pt) and electronic format. Ask Student Services for details. Procurement Policy November 2016 Also available in large print (16pt) and electronic format. Ask Student Services for details. www.perth.uhi.ac.uk Perth College is a registered Scottish charity, number

More information

Parliamentary Procurement Rules

Parliamentary Procurement Rules Parliamentary Procurement Rules Document Revision History and Key Facts Version Issue date Policy owner Date of next review Comments/ brief description of main changes in this revision 001 01/01/15 PPCS

More information

Central Bank of Ireland

Central Bank of Ireland Central Bank of Ireland Corporate Procurement Policy 13 February 2017 Page 1 of 10 Change Log Policy Owner and Review Process This owner of the Procurement Policy is the Central Bank Commission. Responsibility

More information

Introduction 1. This Scheme of Delegated Legal Authority ( the Scheme ) sets out the authority that Council has delegated to:

Introduction 1. This Scheme of Delegated Legal Authority ( the Scheme ) sets out the authority that Council has delegated to: SCHEME OF DELEGATED LEGAL AUTHORITY Introduction 1. This Scheme of Delegated Legal Authority ( the Scheme ) sets out the authority that Council has delegated to: 1.1. Senior members of the School to delegate

More information

Procurement Policy & Procedures

Procurement Policy & Procedures Procurement Policy & Procedures 1 Introduction 2 Objectives 3 Organisation 4 Authority 5 Procurement Procedures 6 EU Procurement Regulations 7 General Principles of Procurement 8 Reporting & Information

More information

PROCUREMENT POLICY. Revision Revision Date Owner Reference Comment 00 September Procurement

PROCUREMENT POLICY. Revision Revision Date Owner Reference Comment 00 September Procurement PROCUREMENT POLICY Revision Revision Date Owner Reference Comment 00 September 2011 Procurement FIN-POL-003 Format Revised / Bribery Act 01 January 2012 Procurement FIN-POL-003 OJEU / DCMS amends / change

More information

GLOSSARY C O N T E N T S PAGE. Group Procurement Strategy

GLOSSARY C O N T E N T S PAGE. Group Procurement Strategy C O N T E N T S PAGE 1 Executive Summary 3 2 Scope of this Strategy 3 3 Procurement Principles 4 4 Route To Market 6 5 Procurement Governance 8 6 Procurement Plan 2018/19 8 GLOSSARY EU European Union ICT

More information

Advice Skills Academy. Learning Tender Brief & Response. Guidance and Tender document. Deadline for responses: 12 noon Wednesday 10 April 2019

Advice Skills Academy. Learning Tender Brief & Response. Guidance and Tender document. Deadline for responses: 12 noon Wednesday 10 April 2019 Advice Skills Academy Learning Tender Brief & Response Guidance and Tender document Deadline for responses: 12 noon Wednesday 10 April 2019 The Women s Organisation are Delivery Partner for the Advice

More information

Our Mission Statement: dedicated to the success of our people and places.

Our Mission Statement: dedicated to the success of our people and places. Procurement Information Sheet Welcome to our procurement information sheet also referred to as the Buyer Profile. This document offers organisations and individuals who are interested in working with whg

More information

Humber Education Trust. Procurement Policy

Humber Education Trust. Procurement Policy Humber Education Trust Created By: Approved By: Adnan Bashir Bramhope Associates Limited Version: 1.1 Created on: 31 January 2017 Amended on: Next review date: Contents Policy Statement Page 3 Policy Scope

More information

Competitive Tendering and Procurement Policy

Competitive Tendering and Procurement Policy Competitive Tendering and Procurement Policy STATUS: Required by Academies Financial Handbook DATE ISSUED: February 2018 REVIEW DATE: February 2020 APPROVED BY: APPROVAL DATE: Board of Trustees 21 February

More information

PRE-QUALIFICATION OF SUPPLIERS OF GOODS AND SERVICES FOR THE 2017/18 FINANCIAL YEAR

PRE-QUALIFICATION OF SUPPLIERS OF GOODS AND SERVICES FOR THE 2017/18 FINANCIAL YEAR PRE-QUALIFICATION OF SUPPLIERS OF GOODS AND SERVICES FOR THE 2017/18 FINANCIAL YEAR CATEGORY NUMBER CLOSING DATE AND TIME 9 TH DECEMBER 2016 12:00 pm 1 Table of Contents PART A GENERAL INFORMATION AND

More information

Parliamentary Procurement Rules

Parliamentary Procurement Rules Parliamentary Procurement Rules Document Revision History and Key Facts Version Issue date Policy owner Date of next review Comments/ brief description of main changes in this revision 001 01/01/15 PPCS

More information

LCFT High Value Orders (Including Breach and Waiver) Procedure. Issued: November 2011

LCFT High Value Orders (Including Breach and Waiver) Procedure. Issued: November 2011 LCFT High Value Orders (Including Breach and Waiver) Procedure Issued: November 2011 Document revision control LCFT High Value Orders (Including Breach and Waiver) Procedure Version Author/editor Notes

More information

Annual Procurement Report 2017/18. Prepared by: Gillian Berry, Senior Accountant Contact:

Annual Procurement Report 2017/18. Prepared by: Gillian Berry, Senior Accountant Contact: Annual Procurement Report 2017/18 Prepared by: Gillian Berry, Senior Accountant Contact: 01382 207140 Approved by: Board: 18 December 2018 1 Contents 1.0 Introduction 1.1 About the Care Inspectorate 2.0

More information

An Introduction to Milton Keynes Council Procurement

An Introduction to Milton Keynes Council Procurement An Introduction to Milton Keynes Council Procurement An Introduction to Milton Keynes Council Procurement v1 October 2014 1 Milton Keynes Council Procurement Introduction Milton Keynes Council (the Council)

More information

Competitive Tendering & Procurement Policy

Competitive Tendering & Procurement Policy Competitive Tendering & Procurement Policy Date Published 1 st June 2016 Version 1 Approved Date 9 th June 2016 Review Cycle Annually Review Date June 2017 Learning together; to be the best we can be 1.

More information

Procurement Policy 2009

Procurement Policy 2009 Procurement Policy 2009 Introduction Valid From: December 2009 Valid To: December 2011 Version 1.0 Our regulators define procurement in the context of property development, regeneration and maintenance

More information

Purchasing Goods and Services and Accounts Payable Financial Procedure ME CCG Policy Reference: MECCG120

Purchasing Goods and Services and Accounts Payable Financial Procedure ME CCG Policy Reference: MECCG120 Purchasing Goods and Services and Accounts Payable Financial Procedure ME CCG Policy Reference: MECCG120 Target Audience Brief Description (max 50 words) Action Required All CCG Managers and Directors

More information

Funding to pay for the learning and development of personal assistants (PAs) and individual employers (IEs)

Funding to pay for the learning and development of personal assistants (PAs) and individual employers (IEs) Skills for Care Grant application (ULO) Funding to pay for the learning and development of personal assistants (PAs) and individual employers (IEs) 2019-20 Organisation name Name of the lead organisation

More information

Commissioning and Procurement Toolkit

Commissioning and Procurement Toolkit Commissioning and Procurement Toolkit A Resource for the Voluntary and Community Sector and Social Enterprises January 2016 Commissioning and Procurement Toolkit With government increasingly funding the

More information

Validation Guidance Pack External Assessors

Validation Guidance Pack External Assessors Validation Guidance Pack External Assessors Validation University of the Arts London Contents 1.0Briefing and Guidance for External Assessors... 2 1.1 The role of the External Assessor... 2 1.2 Guidance

More information

Name Title / Responsibility Date Version. Approvals: Staff Side and the Remuneration Committee have approved this document.

Name Title / Responsibility Date Version. Approvals: Staff Side and the Remuneration Committee have approved this document. NHS Commissioning Board DOCUMENT STATUS: Version 1.1 DOCUMENT RATIFIED BY: DATE ISSUED: 2012 DATE TO BE April 2013 REVIEWED: Amendment History: NHS Commissioning Board: Version Date Amendment History Relocation

More information

Digital Fuel Flow Meter

Digital Fuel Flow Meter INVITATION FOR TENDER FOR SUPPLY OF EQUIPMENT Sealed tender offers are invited in two separate sealed covers (Technical and Commercial offers) from eligible manufacturers/suppliers or their direct Indian

More information

Public Procurement Guidelines for LEADER Funding Applicants

Public Procurement Guidelines for LEADER Funding Applicants Public Procurement Guidelines for LEADER Funding Applicants Disclaimer: This Guidance Note is issued without liability and is for general information purposes only. County Wicklow Partnership accept no

More information

Filey Town Council Council Offices 52A Queen Street Filey North Yorkshire YO14 9HE TEL:

Filey Town Council Council Offices 52A Queen Street Filey North Yorkshire YO14 9HE TEL: JOB DESCRIPTION TOWN CLERK/RESPONSIBLE FINANCIAL OFFICER The Town Clerk will be the Proper Officer of the Council and as such is under a statutory duty to carry out all the functions, and in particular

More information

KENYA LITERATURE BUREAU PRE-QUALIFICATON/ REGISTRATION OF SUPPLIERS FOR GOODS, WORKS AND SERVICES FINANCIAL YEAR PREQUALIFICATION NO:

KENYA LITERATURE BUREAU PRE-QUALIFICATON/ REGISTRATION OF SUPPLIERS FOR GOODS, WORKS AND SERVICES FINANCIAL YEAR PREQUALIFICATION NO: KENYA LITERATURE BUREAU PRE-QUALIFICATON/ REGISTRATION OF SUPPLIERS FOR GOODS, WORKS AND SERVICES FINANCIAL YEAR 2018-2020. PREQUALIFICATION NO: PREQUALIFICATION NAME: CLOSING DATE: 3/05/2018 TENDER NOTICE

More information

Trailblazer Apprenticeship Funding 2014 to 2015 Requirements for Employers

Trailblazer Apprenticeship Funding 2014 to 2015 Requirements for Employers Trailblazer Apprenticeship Funding 2014 to 2015 Requirements for Employers Version 2 This document sets out the requirements for employers who would like to find out about funding for Trailblazer apprenticeship

More information

A simple Procurement Process Flow diagram is shown in Appendix 1 and should be considered when carrying out spend.

A simple Procurement Process Flow diagram is shown in Appendix 1 and should be considered when carrying out spend. Scottish Canals Procurement Policy Introduction The Scottish Canals Procurement Policy supports the Scottish Canals Procurement Strategy and sets out the method of delivery of the day-to-day procurement

More information

MOVE PLANNING CHECKLIST

MOVE PLANNING CHECKLIST MOVE PLANNG CHECKLIST PRELIMARY Finalize Lease for new location Notify present Landlord of termination date Advise staff of date and location of move Engage designer for new premises (if required) Create

More information

The Hyde Group Metering & Billing Framework Agreement

The Hyde Group Metering & Billing Framework Agreement The Hyde Group Metering & Billing Framework Agreement User Guide Framework Scope: Lot 1: Credit Metering and Billing Services Lot 2: Pre-Payment Metering and Billing Services Contract Notice Number in

More information

Payroll Policy. Purpose of Policy. The policy is to cover the administration of the payroll service. Overview

Payroll Policy. Purpose of Policy. The policy is to cover the administration of the payroll service. Overview Purpose of Policy Overview Scope: Mandatory Policy The policy is to cover the administration of the payroll service The policy covers the range of services provided by payroll, the legislative requirements

More information

Procurement Process: General Requirements

Procurement Process: General Requirements Procurement Process: General Requirements The University has a legal requirement to comply with EU Procurement Directives, which govern the way in which public sector procurement is conducted for contracts

More information

Estates, Facilities & Professional Services. Transactional Finance, Accountancy & Transactional Procurement Services Framework User Guide

Estates, Facilities & Professional Services. Transactional Finance, Accountancy & Transactional Procurement Services Framework User Guide . Estates, Facilities & Professional Services Transactional Finance, Accountancy & Transactional Procurement Services Framework Framework Reference Number: LPP/2013/00002 April 2015 2 Version Control Contributor(s)

More information

STAKEHOLDER Responsibilities ACCOUNTABLE TO...

STAKEHOLDER Responsibilities ACCOUNTABLE TO... Governance Trustees Trustees set the values and strategic direction and policies of the Trust. Trustees determine the governance structures for the Trust, approve the Scheme of Delegation and Risk Register.

More information

Delegation of Authority

Delegation of Authority Delegation of Authority Version 7.4 September 2014 1. Background 2 2. Making Payments 4 3. Delegated function 1: Operating expenditure 5 4. Delegated function 2: Capital expenditure 8 5. Delegated function

More information

London Borough of Newham E-Auction Case Study

London Borough of Newham E-Auction Case Study London Borough of Newham E-Auction Case Study Target Audience Local Authorities Title: Identification: Version: Collaborative E-Auction Case Study Draft Date of Issue: July 2005 Current Status: Prepared

More information

Author(s): Procurement Manager & Head of Corporate Services Procurement and Contract Rules

Author(s): Procurement Manager & Head of Corporate Services Procurement and Contract Rules Author(s): Procurement Manager & Head of Corporate Services Procurement and Contract Rules Approved by: Audit & Ethics Committee Date: 23 February 2018 Next Review: vember 2019 1 Contents 1. Introduction...

More information

SCHOOL EQUIPMENT PRODUCTION UNIT

SCHOOL EQUIPMENT PRODUCTION UNIT SCHOOL EQUIPMENT PRODUCTION UNIT UPDATE OF THE REGISTER OF SUPPLIERS TENDER NO: SEPU/PQ/2016-2017 SUPPLY/PROVISION OF GOODS AND SERVICES FOR 2016-2017 CATEGORY APPLIED FOR DATE OF NOTICE: WEDNESDAY 4 th

More information

Quotation Procedure TRIM: D12/85125P

Quotation Procedure TRIM: D12/85125P Quotation Procedure TRIM: D12/85125P INTRODUCTION This procedure supports the University's Procurement Policy and outlines the process for the procurement of all goods and services for the University of

More information

PROCUREMENT / ON POINT

PROCUREMENT / ON POINT Office of Procurement and Contracts / P lease share this issue of the Procurement & Contracts newsletter with anyone in your department who would or could consider or think about obligating the university:

More information

Roles and Responsibilities

Roles and Responsibilities Growth Deal Programme Roles and Responsibilities Appendix 17 The Programme Management Office A dedicated PMO has been established within Black Country Consortium Ltd to support all aspects of Black Country

More information

Understanding of Local Procurement for gaining accreditation

Understanding of Local Procurement for gaining accreditation Understanding of Local Procurement for gaining accreditation Specification This specification consists of the interpretation, four parts and two appendices. It details the requirements of Support Training

More information

ACADEMY OF NATURAL SCIENCES PURCHASING AND PROCUREMENT POLICY

ACADEMY OF NATURAL SCIENCES PURCHASING AND PROCUREMENT POLICY ACADEMY OF NATURAL SCIENCES PURCHASING AND PROCUREMENT POLICY Academy of Natural Sciences Purchasing Policy Overview This policy framework is intended to provide for the procurement of goods and services

More information

APPOINTMENT OF CHAIR AND BOARD MEMBERS FOR CHESHIRE AND WARRINGTON LOCAL ENTERPRISE PARTNERSHIP

APPOINTMENT OF CHAIR AND BOARD MEMBERS FOR CHESHIRE AND WARRINGTON LOCAL ENTERPRISE PARTNERSHIP APPOINTMENT OF CHAIR AND BOARD MEMBERS FOR CHESHIRE AND WARRINGTON LOCAL ENTERPRISE PARTNERSHIP December 2016 Introduction Background and Summary of Requirements 1. The Cheshire and Warrington Local Enterprise

More information

POLICY MANUAL ROSSBURN MUNICIPALITY MUNICIPAL TENDERING AND PROCUREMENT POLICY

POLICY MANUAL ROSSBURN MUNICIPALITY MUNICIPAL TENDERING AND PROCUREMENT POLICY Purpose: To clearly define the tendering and purchasing standards of the Rossburn Municipality and to provide guidance to municipal employees, by means of a comprehensive tendering and purchasing policy

More information

Anti-Bribery Policy. for you for your community not for profit. Date: Head of HR. Author:

Anti-Bribery Policy. for you for your community not for profit. Date: Head of HR. Author: Anti-Bribery Policy Date: Author: 11.07.17 Head of HR for you for your community not for profit Control box : Document owner: Reviewed by: Claire Knight Claire Knight Approved by and date: Head of HR July

More information

AP 515 PURCHASING. Administrative Procedures Manual AP Purchasing

AP 515 PURCHASING. Administrative Procedures Manual AP Purchasing AP 515 PURCHASING BACKGROUND The purchase of goods and services for Saskatoon Public Schools shall be conducted in accordance with the most current version and amendments of The Education Act, of the Province

More information

Manager, Sourcing Supply and Contracts, Grid Projects Approved By:

Manager, Sourcing Supply and Contracts, Grid Projects Approved By: Procurement Policy ISSUE DETAILS Effective Date: 1 Policy Owner: Chief Executive Officer Written By: Manager, Sourcing Supply and Contracts, Grid Projects Approved By: Transpower Board of Directors Minute

More information

CORONA-NORCO UNIFIED SCHOOL DISTRICT. Vendor Registration Packet

CORONA-NORCO UNIFIED SCHOOL DISTRICT. Vendor Registration Packet CORONA-NORCO UNIFIED SCHOOL DISTRICT Vendor Registration Packet Company Name*: DBA**: Street Address*: City*: State*: Zip Code*: Phone*: Email*: Website: DIR Registration No.**: Contractor s License No.**:

More information

Purchase Card Program

Purchase Card Program Purchase Card Program POLICIES AND PROCEDURES South Puget South Community College has established a Purchase Card Program in accordance with the Office of Financial Management and the Department of Enterprise

More information

Procurement Policy. Version: 1.0 Bodies consulted: Date Approved: 25 September 2018 Director of Financial Operations

Procurement Policy. Version: 1.0 Bodies consulted: Date Approved: 25 September 2018 Director of Financial Operations Procurement Policy Version: 1.0 Bodies consulted: EMT Approved by: Board of Directors Date Approved: 25 September 2018 Lead Manager: Director of Financial Operations Responsible Director: Director of Finance

More information

UNIVERSITY OF RICHMOND Financial Policy Manual

UNIVERSITY OF RICHMOND Financial Policy Manual UNIVERSITY OF RICHMOND Financial Policy Manual Policy #: 4403 Policy Title: Procurement Policy Effective: 07/01/2018 Responsible Office: Strategic Sourcing and Payments Revised: 05/11/2018 Approval: David

More information

Name of the equipment or item: Battery Cycler

Name of the equipment or item: Battery Cycler INVITATION FOR TENDER FOR SUPPLY OF EQUIPMENT Sealed tender offers are invited in two separate sealed covers (Technical and Commercial offers) from eligible manufacturers/suppliers or their direct Indian

More information

BURTON AND DALBY PARISH COUNCIL FINANCIAL REGULATIONS

BURTON AND DALBY PARISH COUNCIL FINANCIAL REGULATIONS BURTON AND DALBY PARISH COUNCIL FINANCIAL REGULATIONS BURTON AND DALBY PARISH COUNCIL FINANCIAL REGULATIONS ISSUE No.3 DATED 28.01.10 1 1. GENERAL BURTON AND DALBY PARISH COUNCIL FINANCIAL REGULATIONS

More information

ALLAN HANCOCK JOINT COMMUNITY COLLEGE DISTRICT

ALLAN HANCOCK JOINT COMMUNITY COLLEGE DISTRICT ALLAN HANCOCK JOINT COMMUNITY COLLEGE DISTRICT BUSINESS SERVICES PURCHASING AND CONTRACT GUIDE PURCHASING AND CONTRACT GUIDE BUSINESS SERVICES TABLE OF CONTENTS Purchasing of Supplies. Equipment and Services....1

More information

ULTRASONIC PLASTIC WELDING MACHINE

ULTRASONIC PLASTIC WELDING MACHINE INVITATION FOR TENDER FOR SUPPLY OF EQUIPMENT Sealed tender offers are invited in two separate sealed covers (Technical and Commercial offers) from eligible manufacturers/suppliers or their direct Indian

More information

POLICY ON OFFERS OF GIFTS AND HOSPITALITY RECEIVED. Policy on Offers of Gifts and Hospitality Received 1

POLICY ON OFFERS OF GIFTS AND HOSPITALITY RECEIVED. Policy on Offers of Gifts and Hospitality Received 1 POLICY ON OFFERS OF GIFTS AND HOSPITALITY RECEIVED Policy on Offers of Gifts and Hospitality Received 1 TABLE OF CONTENTS 1 INTRODUCTION... 4 2 GENERAL RULES... 4 3 RULES FOR SPECIFIC GROUPS OF PERSONS...

More information

Invitation to tender. Provision of External Audit Services

Invitation to tender. Provision of External Audit Services Invitation to tender for the Provision of External Audit Services Tender return date: 10.00 am on 2 nd May 2017 Return to: Enquiries to: Address: Clerk to the Corporation Alison Rowland (arowland@sussexcoast.ac.uk)

More information

SECTION 17 CONTRACT PROCEDURE RULES

SECTION 17 CONTRACT PROCEDURE RULES Glossary of terms:- 17.1.1 "Tender" means a sealed bid or proposal to supply or receive goods, materials or services or for the execution of works. 17.1.2 "Contract" means any contract including a Purchase

More information