1 Measuring Performance in Business Enabling Environment Projects IFC Monitoring and Evaluation Team* Cairo, Egypt November 29- December 1, 2005 * Geeta Batra Mark Bardini Benjamin Reno Weber

2 I. Introduction As the scope of IFC s Technical Assistance (TA) work has broadened, projects to improve the Business Enabling Environment (BEE) in our target countries have become an increasing part of IFC s portfolio. This work has enormous potential impact, both in terms of the stability of IFC s investment portfolio and on the productivity of businesses at large within IFC s target countries. However, measuring the impact of this work presents unique challenges. There has been a great deal of discussion about what exactly is BEE? For the purposes of our work, we define BEE as projects designed to improve institutional legal and regulatory conditions under which businesses operate, including changes to government policies, laws, regulatory frameworks and administrative practices by public sector entities. The range of issues encompassed in this definition is wide and includes several stakeholders both within and outside of the World Bank Group. To date, the IFC has worked in a number of key business enabling environment areas essential for long-term development of the private sector. For example, in the financial markets, IFC has worked to improve the regulation of banks and capital markets, reformed bankruptcy procedures, introduced leasing, factoring, and microfinance, improved corporate governance procedures, and privatization laws. Within the tax system, IFC has worked to streamline administrative systems and introduce business-friendly legislation. IFC has worked to improve contract enforcement and introduce alternative dispute resolution into the judicial system. To improve the market for businesses generally, IFC has helped countries to reform their trade policies, their customs administration, their registration and licensing procedures, their inspection regime, and procurement policy. Working directly with local, regional, and national governments, IFC has helped them to improve their transparency, accountability, and overall effectiveness. IFC is committed to strengthening the design and implementation of its Technical assistance in client countries. To accomplish that goal, IFC is in the process of implementing a comprehensive monitoring and evaluation system, and draw on these results to inform management.. An important step would be to track and monitor relevant, meaningful, cost-effective performance indicators to measure the outputs, outcomes, and impact of TA projects. This paper summarizes IFC s recent efforts in measuring the performance of BEE projects, identifies some of the the challenges going forward, and discusses IFC s approach in addressing some of these challenges.

3 II. Measuring Performance in Projects with BEE Components The main challenge in measuring the impact of BEE programs is that these projects or projects with BEE components, by their nature affect a wide pool of end-recipients, many if not most of whom will not know what organizations were involved or in many cases be able to identify precisely how the project impacted their business. This makes it difficult to determine impact without broad surveys and/or detailed economic indicators not easily available in may of IFC s host countries. Even if this is possible, the costs of obtaining that information, particularly in developing countries where data is difficult to obtain, would be a challenge. Keeping the above constraint in mind, IFC has adopted the program logic model to define the objectives and measure the performance of its BEE programs. This approach is consistent with the logical framework method applied by several donor and international agencies. A. The Framework :Developing the Logic Model Figure 1 below shows the logical framework model in general. This logical framework lays out all of the envisioned activities/outputs, intended outcomes, and targeted impacts and gives examples of each. Figure 1: Program Logic Model Outputs Outcomes Impacts Products of Program Activities: Advisory Services to Gov t Public Awareness Campaign Laws Drafted Changes in knowledge, behavior and performance of beneficiaries: Gov t entity reporting increased skills SMEs reporting improved knowledge Legislation adopted Benefits accruing to target population: Improved services to SMEs SMEs utilizing available services Fewer barriers for businesses

4 Figure 2 shows the Program Logic Model for IFC s BEE projects. Figure 2: BEE Program Logic Model Outputs Outcomes Impacts Outside boundaries of accountability B. Developing and Collecting Information Based upon these logical frameworks, indicators are developed for each stage of the project. These indicators should be relevant, universal, reliable, and relatively easy to collect. They should be applicable to the program being monitored, but general enough to offer benchmarking with similar projects in other parts of the world. They should also utilize a methodology that will yield consistent results, and the cost of collecting the information should be economical.

5 Some of the output and outcome indicators that will be collected as core indicators for BEE projects are shown in tables 1 and 2. These lists are by no means exhaustive and all encompassing, and the list would be expanded based on specific project objectives. The intention of this exercise is to be able to aggregate across different projects and compare across geographic regions. Table 1: Output Indicators of BEE Projects Activity Indicator Data Source Assessments Number of reports Program Records Advisory Services Number of advisory service hours provided Program Records by IFC and third-parties under contract to IFC (by target group) Number of laws/regulations drafted or Program Records contributed to the drafting Number of unique organizations to which Program Records advisory services were provided (by target group) Training Number of training courses provided Program Records Number of training participants (by target Program Records group) Number of participant-training hours Program Records provided (by target group) Number of unique organizations that sent Program Records individuals for training (by target group) Public Awareness Campaign Number of press releases distributed by the Program Records facility Number of TV/radio spots aired Program Records Number of unique visitors to Web site Program Records Number of public information events held Program Records Table 2: Outcome Indicators of BEE Projects Construct Indicator Data Source Population Outcomes Changes in the law and regulations related to business enabling environment Changes in relevant administrative procedures Transaction cost for specific procedures Days required to complete specific procedures Yes/No (based on standard checklist) Yes/No (based on standard checklist) Total cost (excluding unofficial payments) born by company to complete specific procedures, including fees to government and third-parties (e.g., attorneys) Time (calendar days) Program records Program records Doing Business SME survey Doing Business SME survey SMEs that completed procedures in the last 12 months SMEs that completed procedures in the last 12 months

6 Corruption Policy advocacy by business associations Sustainable business associations Value of unofficial payments to Doing Business public officials SME survey SMEs that completed procedures in the last 12 months Yes/No (based on standard Business Participating business checklist) Association associations Number of dues-paying members Percentage of BA total costs covered by fees paid by businesses survey Business Association survey Business Association survey Participating business associations Participating business associations. III. Other Experimental Approaches to Evaluation of BEE Projects IFC is piloting randomized control designs in a few countries such as Peru and Honduras For example, IFC LAC Facility and Lima Municipality have joined forces to simplify the business licensing process in Lima Municipality. Since September 2004 a joint-team of IFC staff and municipality officers has worked together to streamline the process of obtaining a municipal business license. As of 2004, new businesses were required to make a minimum of eleven trips to the registration office, to undergo on average of four inspections, and to deal with several different agencies within the Municipal office. The minimum time to complete this process was 35 days, the average time about three to four months. Under the new licensing process, businesses only need one inspection, the minimum time for completion is two days, and applicants deal with a single person within the Municipality. A pure randomized design would be ideal, but practical considerations forced us to modify the process. The main advantage of a randomized evaluation is to rule out selection bias. A randomized experiment of the registration process requires randomly assigning firms to either treatment (new process) or control group (old process). But the Municipality was legally prohibited from operating both processes simultaneously. For that reason, we implemented a modified approach, an experimental approach looking at results before and after the implementation. The main concern with this methodology is that the results could suffer from selection bias due to seasonal variation or time-specific shocks in the businesses applying for a license and due to differential self-selection before and after the switching date. In order to address these issues, firms are sampled as closely as possible to the switching deadline for the new process. This sampling strategy ensures that there is little change in the pool of applicants. 1 Second, the evaluation includes an additional control group of firms that finish the licensing process three months prior to the switching date. This control group 1 The Municipality plans to start advertising the modifications in registration procedures in November Assuming there is little publicity about the new licensing process before November, the project team does not expect a significant change in the type of businesses that apply for a license.

7 will be used to assess any seasonal or time-specific variation and to detect any changes in the registration process prior to the official switching date. 2 We are currently implementing this and will have results within the next 4 months. IV. Challenges Going Forward We have clearly made substantial progress in our monitoring and evaluation efforts. But we can always do more. Some of the challenges we face going forward are: (a) Data collection in developing countries data are not always easily available and can be very expensive (b) Aggregating performance indicators across the diverse projects and regional facilities to be able to provide a consolidated picture of our BEE work (c ) Implementing more experimental designs to be able to address the issue of attribution 2 The Municipality started to implement minor changes to the registration process as early as March We will compare the result from the two control groups with the results from the initial diagnostic report to ensure that none of these changes had a significant impact on the registration process.

IFC Core Indicators for Technical Assistance Projects

IFC Core Indicators for Technical Assistance Projects IFC Core Indicators for Technical Assistance Projects Mark Bardini SME Department IFC BEE Conference Cairo, Egypt December 1, 2005 Background & Criteria for Standard Indicators Core indicators for Technical

More information

Guide to Core Output and Outcome Indicators for IFC Technical Assistance Programs

Guide to Core Output and Outcome Indicators for IFC Technical Assistance Programs Guide to Core Output and Outcome Indicators for IFC Technical Assistance s Revised January 26, 2006 Table of contents I. Introduction...3 Purpose...3 Basic concepts...3 Outline...5 II. Core Indicators...6

More information

ANNEX 3: Bibliography

ANNEX 3: Bibliography ANNEX 3: Bibliography There are a wide range of resources available on monitoring and evaluation and evaluation work specifically related to the business enabling environment. This field of work is ever

More information

Doing Business in Afghanistan 2017

Doing Business in Afghanistan 2017 Doing Business in Afghanistan 2017 COMPARING BUSINESS REGULATION FOR DOMESTIC FIRMS IN 5 AFGHAN PROVINCES AND 189 OTHER ECONOMIES Tommaso Rooms Global Indicators Group Development Economics Kabul - May

More information

Doing Business in Lebanon: Improving Competition and Streamlining Administrative Barriers Presented by Marwan Mikhael April 19, 2007

Doing Business in Lebanon: Improving Competition and Streamlining Administrative Barriers Presented by Marwan Mikhael April 19, 2007 Doing Business in Lebanon: Improving Competition and Streamlining Administrative Barriers Presented by Marwan Mikhael April 19, 2007 Objectives of Economic Policy The main objective of any economic policy

More information

E-Government : Current Trends and Approaches

E-Government : Current Trends and Approaches E-Government : Current Trends and Approaches December 20, 2007 Bernie Mazer, Infrastructure and Engineering Information and Communication Technology What is E-Government? E-Government is the transformation

More information

Terms of Reference (TOR)

Terms of Reference (TOR) CONFÉRENCE DES NATIONS UNIES SUR LE COMMERCE ET LE DÉVELOPPEMENT UNITED NATIONS CONFERENCE ON TRADE AND DEVELOPMENT Terms of Reference (TOR) External Evaluation of Development Account Project 1415 AX Support

More information

AZERBAIJAN ECONOMIC REFORMS REVIEW

AZERBAIJAN ECONOMIC REFORMS REVIEW April 2017 AZERBAIJAN ECONOMIC REFORMS REVIEW Editor-in-chief : Dr. Vusal Musayev PhD in Economics London University THE STRATEGIC ROADMAP FOR THE PRODUCTION OF CONSUMER GOODS IN AZERBAIJAN AT THE LEVEL

More information

Good practices in business regulation

Good practices in business regulation Doing Business 16 What is changing in Doing Business? Good practices in business regulation have evolved since the Doing Business indicators were first developed in 3. Some changes have come, for example,

More information

Systematic Property Registration: Risks and Remedies A T O O L K I T. Public Disclosure Authorized. Public Disclosure Authorized

Systematic Property Registration: Risks and Remedies A T O O L K I T. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized A T O O L K I T Systematic Property Registration: Risks and Remedies This document identifies

More information

SNAPSHOTS OF THE BEST PROGRAMME

SNAPSHOTS OF THE BEST PROGRAMME SNAPSHOTS OF THE BEST PROGRAMME Rationale for the BEST Programme Faster economic growth is an essential precondition for a sustainable reduction in poverty. A more enabling environment for business is

More information

EU Directive: disclosure of non-financial information and diversity information

EU Directive: disclosure of non-financial information and diversity information EU Directive: disclosure of non-financial information and diversity information EU Directive on disclosure of non-financial information and diversity information From reporting year 2017, the legal requirements

More information

Distribution: Restricted EB 99/68/R November 1999 Original: English Agenda Item 9(c) English

Distribution: Restricted EB 99/68/R November 1999 Original: English Agenda Item 9(c) English Distribution: Restricted EB 99/68/R.32 10 November 1999 Original: English Agenda Item 9(c) English IFAD Executive Board Sixty-Eighth Session Rome, 8-9 December 1999 REPORT AND RECOMMENDATION OF THE PRESIDENT

More information

Executive Summary. xiii

Executive Summary. xiii Executive Summary Growth is good for the poor, but the impact of growth on poverty reduction depends on both the pace and the pattern of growth. A pattern of growth that enhances the ability of poor women

More information

COMMISSION STAFF WORKING PAPER

COMMISSION STAFF WORKING PAPER EN EN EN EUROPEAN COMMISSION Brussels, 22 January 2010 COMMISSION STAFF WORKING PAPER INTERPRETATIVE NOTE ON DIRECTIVE 2009/72/EC CONCERNING COMMON RULES FOR THE INTERNAL MARKET IN ELECTRICITY AND DIRECTIVE

More information

Contracting Out Government Functions and Services: Lessons from Post-Conflict and Fragile Situations. Wendy B. Abramson Washington, DC, 21 June 2011

Contracting Out Government Functions and Services: Lessons from Post-Conflict and Fragile Situations. Wendy B. Abramson Washington, DC, 21 June 2011 Contracting Out Government Functions and Services: Lessons from Post-Conflict and Fragile Situations Wendy B. Abramson Washington, DC, 21 June 2011 13:25 14:00: Background on the Handbook Objectives of

More information

PUBLIC-PRIVATE PARTNERSHIP

PUBLIC-PRIVATE PARTNERSHIP PUBLIC-PRIVATE PARTNERSHIP Law firm Sajic GP Banja Luka Bulevar vojvode Zivojina Misica 49B, Banja Luka Bosnia and Herzegovina Tel: +387 51 227 620 Fax: +387 51 227 623 e-mail: info@afsajic.com www.advokatskafirmasajic.com

More information

Moving Forward with E-Procurement

Moving Forward with E-Procurement Moving Forward with E-Procurement Short presentation of Automated Information System STATE REGISTER OF PUBLIC PROCUREMENT OF MOLDOVA (AIS SRPP) Technical Concept of Sistemului Informațional Automatizat

More information

Procurement Policy Review Feedback Summary

Procurement Policy Review Feedback Summary The World Bank Procurement Policy Review Feedback Summary Date: July 26, 2012 Venue: Ottawa, Canada Total Number of Participants: 17 Overview and General Reactions A meeting with Canadian Government Officials

More information

Benchmarking Public Procurement 2015

Benchmarking Public Procurement 2015 Benchmarking Public Procurement 2015 Benchmarking Public Procurement is a World Bank Group initiative launched in 2013 Initial demand for the project came from the G20 Anti- Corruption Working Group in

More information

Enabling Environment for Civil Society in CDD Projects

Enabling Environment for Civil Society in CDD Projects Strengthening Operational Skills in Community Driven Development April 15-19, 2002 Washington, D.C. Enabling Environment for Civil Society in CDD Projects Jeff Thindwa Civil Society Specialist Social Development

More information

Moldova s Priority Reform Action Roadmap Key measures until 31 July 2016

Moldova s Priority Reform Action Roadmap Key measures until 31 July 2016 Moldova s Priority Reform Action Roadmap Key measures until 31 July 2016 The present Roadmap provides a comprehensive list of measures, stakeholders engagement and calendar to address the challenges highlighted

More information

Jordan in the Doing Business Report The Way Forward November 2016

Jordan in the Doing Business Report The Way Forward November 2016 Jordan in the Doing Business Report The Way Forward November 2016 This study is the property of the Jordan Strategy Forum (JSF). For further information please contact the research department at: info@jsf.org

More information

Staff Guidelines for Conducting Impact Assessment

Staff Guidelines for Conducting Impact Assessment Staff Guidelines for Conducting Impact Assessment Executive Summary: Much of the impact of the T-G PEC is not captured and documented in a systematic way. This Guideline is intended for Project, Sector

More information

The Value and Benefits of Supreme Audit Institutions as enablers of Good Governance and Development

The Value and Benefits of Supreme Audit Institutions as enablers of Good Governance and Development The Value and Benefits of Supreme Audit Institutions as enablers of Good Governance and Development Einar J. Gørrissen and Archana P. Shirsat Importance of SAIs Fostering trust in governments and good

More information

USAID Business Enabling Project in Serbia JOB DESCRIPTION AND STATEMENT OF WORK

USAID Business Enabling Project in Serbia JOB DESCRIPTION AND STATEMENT OF WORK USAID Business Enabling Project in Serbia JOB DESCRIPTION AND STATEMENT OF WORK Position: Monitoring and Evaluation Specialist Employer: Cardno Emerging Markets USA Ltd., Washington DC, Belgrade Representative

More information

PUBLIC MANAGEMENT SYSTEMS: AN OVERVIEW

PUBLIC MANAGEMENT SYSTEMS: AN OVERVIEW PUBLIC MANAGEMENT SYSTEMS: AN OVERVIEW Public management systems are the core systems that enable a government to function and to provide services to its citizens. Just as in the private sector, they ensure

More information

CDM. Name of submitter: Klaus Oppermann. Affiliated organization of the submitter (if any): The World Bank

CDM. Name of submitter: Klaus Oppermann. Affiliated organization of the submitter (if any): The World Bank Name of submitter: Klaus Oppermann Affiliated organization of the submitter (if any): The World Bank Contact email of submitter: koppermann@worldbank.org Date: 23 Jan 2013 Increasing regional distribution

More information

Global Infrastructure Facility

Global Infrastructure Facility Global Infrastructure Facility ------------------------------------------------------------------------------------------------------------------- Partnership Framework As Adopted by the Governing Council

More information

Principal Barriers/ Constraints to Successful Public-Private Partnerships

Principal Barriers/ Constraints to Successful Public-Private Partnerships High-level Expert Group Meeting on Infrastructure Public-Private Partnerships for Sustainable Development 11-13 November 2012 Tehran, Islamic Republic of Iran Principal Barriers/ Constraints to Successful

More information

Transformational Change Guidance

Transformational Change Guidance UNEP DTU Partnership, World Resources Institute Transformational Change Guidance Guidance for assessing the transformational impacts of policies and actions May 2018 What is the guidance and why should

More information

AMO s Quick Guide for Responding to the Provincial Review of the Ontario Municipal Board

AMO s Quick Guide for Responding to the Provincial Review of the Ontario Municipal Board AMO s Quick Guide for Responding to the Provincial Review of the Ontario Municipal Board In October 2016, the Ministries of Municipal Affairs and the Attorney General released a Public Consultation document

More information

CANADIAN AVIATION REGULATION ADVISORY COUNCIL (CARAC) NOTICE OF PROPOSED AMENDMENT (NPA): RESPONSIBLE AERODROME DEVELOPMENT

CANADIAN AVIATION REGULATION ADVISORY COUNCIL (CARAC) NOTICE OF PROPOSED AMENDMENT (NPA): RESPONSIBLE AERODROME DEVELOPMENT EXECUTIVE SUMMARY CARAC ACTIVITY REPORTING NOTICE #2013-014 In order to provide aerodrome development proponents and affected stakeholders with greater certainty with respect to aerodrome development and

More information

Provincial Offences Act Modernization. August 16, 2016

Provincial Offences Act Modernization. August 16, 2016 Provincial Offences Act Modernization August 16, 2016 Overview 1. Provincial Offences Act (POA) Background 2. The POA Partnership 3. Current Challenges 4. Recent Reforms 5. Current Projects 2 Provincial

More information

Controlling for Error, Fraud and Corruption (EFC)

Controlling for Error, Fraud and Corruption (EFC) Controlling for Error, Fraud and Corruption (EFC) Bangkok Meeting, World Bank March 2-4, 2010 Christian van Stolk Content 1. Introduction 2. A framework for combating EFC 3. Tools and instruments used

More information

NEIGHBOURHOOD PHARMACY ASSOCIATION OF CANADA SUBMISSION IN RESPONSE TO HEALTH SECTOR PAYMENT TRANSPARENCY ACT DRAFT REGULATIONS

NEIGHBOURHOOD PHARMACY ASSOCIATION OF CANADA SUBMISSION IN RESPONSE TO HEALTH SECTOR PAYMENT TRANSPARENCY ACT DRAFT REGULATIONS NEIGHBOURHOOD PHARMACY ASSOCIATION OF CANADA SUBMISSION IN RESPONSE TO HEALTH SECTOR PAYMENT TRANSPARENCY ACT DRAFT REGULATIONS The Neighbourhood Pharmacy Association of Canada (Neighbourhood Pharmacies)

More information

SIGMA Public Procurement Training Manual. Update Module A

SIGMA Public Procurement Training Manual. Update Module A SIGMA Public Procurement Training Manual Update 2015 Module A 2 Rue André Pascal 75775 Paris Cedex 16 France mailto:sigmaweb@oecd.org Tel: +33 (0) 1 45 24 82 00 Fax: +33 (0) 1 45 24 13 05 www.sigmaweb.org

More information

Entreprenant Status in Benin 1 June 2015

Entreprenant Status in Benin 1 June 2015 Integrating Qualitative Methods into Investment Climate Impact Evaluations: Entreprenant Status in Benin 1 June 2015 Alejandra Mendoza Alcántara World Bank Group Victor Pouliquen World Bank Group Mixed-method

More information

An Agenda for Cash. Part of CaLP s 100 days of cash initiative May Background and introduction

An Agenda for Cash. Part of CaLP s 100 days of cash initiative May Background and introduction An Agenda for Cash Part of CaLP s 100 days of cash initiative May 2016 The Agenda for Cash provides a snapshot of what more than 40 organisations believe needs to change in relation to cash transfer programming

More information

EY Training Internal audit in practice: audit report writing skills

EY Training Internal audit in practice: audit report writing skills EY Training Internal audit in practice: audit report writing skills 3 5 September 2018 Contents About the course 04 Agenda 06 Registration form 07 About the course Introduction Internal auditing is an

More information

The Second Meeting of the OECD DAC Task Force on Procurement

The Second Meeting of the OECD DAC Task Force on Procurement The Second Meeting of the OECD DAC Task Force on Procurement May 4-6 2011- Cusco, Peru Summary of meeting by the UN Procurement Capacity Development Centre Task Force on Procurement representatives including,

More information

Internal Audit Vice Presidency (IADVP) FY11 First Quarter Activity Report

Internal Audit Vice Presidency (IADVP) FY11 First Quarter Activity Report Public Disclosure Authorized Public Disclosure Authorized Internal Audit Vice Presidency (IADVP) FY11 First Quarter Activity Report Public Disclosure Authorized July to September 2010 Public Disclosure

More information

World Bank Group on Food Safety

World Bank Group on Food Safety World Bank Group on Food Safety Integrated WBG offering through various instruments Regulatory & Enforcement Align and harmonize standards with international best practices; Enhance regulator capacity

More information

NASCIO 2010 Recognition Award Nomination. Title: Electronic Commerce Task Force Study and Enterprise Implementation

NASCIO 2010 Recognition Award Nomination. Title: Electronic Commerce Task Force Study and Enterprise Implementation NASCIO 2010 Recognition Award Nomination Title: Electronic Commerce Task Force Study and Enterprise Implementation Category: Cross-Boundary Collaboration and Partnerships State: North Carolina Prepared

More information

Metadata Sustainable Development Goals: SDG indicator

Metadata Sustainable Development Goals: SDG indicator Metadata Sustainable Development Goals: SDG indicator 12.1.1 Goals and Targets addressed Goal: SDG 12 Ensure Sustainable Consumption and Production Patterns Target 12.1: 12.1 Implement the 10-year framework

More information

Improving job creation potential through Skills and SME Development. Raffaele Boldracchi May 7, Cairo

Improving job creation potential through Skills and SME Development. Raffaele Boldracchi May 7, Cairo Improving job creation potential through Skills and SME Development Raffaele Boldracchi May 7, 2012 - Cairo Topics for discussions IFC initiatives taken in the context of the Deauville Partnership The

More information

Case study: Improving the business environment through (mobile) technology-enabled governmental service centres

Case study: Improving the business environment through (mobile) technology-enabled governmental service centres Case study: Improving the business environment through (mobile) technology-enabled governmental service centres There was no water piping and our staff had to carry water to the shops. We received a letter

More information

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN PARLIAMENT

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN PARLIAMENT COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 9.11.2004 COM(2004) 745 final REPORT FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN PARLIAMENT ON INCENTIVES FOR EMAS REGISTERED ORGANISATIONS {SEC(2004)1375}

More information

Final0501. Contents of Report

Final0501. Contents of Report Gover nance Assistance of JICA -Toward indigenous development of democratic institutions, administrative functions and legal institutions in the developing world- Background and Purpose of Study Since

More information

Metadata Sustainable Development Goals: SDG indicator

Metadata Sustainable Development Goals: SDG indicator Metadata Sustainable Development Goals: SDG indicator 12.1.1 Goals and Targets addressed Goal: SDG 12 Ensure Sustainable Consumption and Production Patterns Target 12.1: 12.1 Implement the 10-year framework

More information

Global Trends and Developments in SOE Corporate Governance

Global Trends and Developments in SOE Corporate Governance Global Trends and Developments in SOE Corporate Governance Workshop on Corporate Governance for SOEs in Turkey Sunita Kikeri World Bank June 10, 2014 Outline Legal and regulatory framework State ownership

More information

Vehicle Certification Fee Review Consultation Document

Vehicle Certification Fee Review Consultation Document Vehicle Certification Fee Review Consultation Document December 2013 Prepared by The Access and Use Group Page 1 of 13 Contents 1. INTRODUCTION AND OVERVIEW...3 2. PRINCIPLES AND APPROACH...4 3. CURRENT

More information

USAID Experience in Business Registration Systems

USAID Experience in Business Registration Systems 2010/SOM1/EC/WKSP/014 Session 4 USAID Experience in Business Registration Systems Submitted by: United States Workshop on Reducing Start-up and Establishment Time of Businesses Hiroshima, Japan 1-2 March

More information

REPORT ON THE PRINCIPLE OF ACCOUNTABILITY IN THE CONTEXT OF THE REALIZATION OF THE HUMAN RIGHTS TO WATER AND SANITATION United Nations Special

REPORT ON THE PRINCIPLE OF ACCOUNTABILITY IN THE CONTEXT OF THE REALIZATION OF THE HUMAN RIGHTS TO WATER AND SANITATION United Nations Special REPORT ON THE PRINCIPLE OF ACCOUNTABILITY IN THE CONTEXT OF THE REALIZATION OF THE HUMAN RIGHTS TO WATER AND SANITATION United Nations Special Rapporteur on the Human Rights to Safe Drinking Water and

More information

SELL-SIDE INVESTMENT BANKING INVESTMENT BANKING VALUATION ADVISORY FORENSIC ACCOUNTING

SELL-SIDE INVESTMENT BANKING INVESTMENT BANKING VALUATION ADVISORY FORENSIC ACCOUNTING SELL-SIDE INVESTMENT BANKING INVESTMENT BANKING VALUATION ADVISORY FORENSIC ACCOUNTING AL LIED Connected or related by similitude, resemblance, or friendship. 3 Helping you maximize the return on your

More information

One Watershed, One Plan Operating Procedures

One Watershed, One Plan Operating Procedures One Watershed, One Plan Operating Procedures From the Board of Water and Soil Resources, State of Minnesota Version: 2.00 Effective Date: 03/28/2018 Approval: Board Decision #18-14 Policy Statement These

More information

PRIVACY STATEMENT Date: 25 May 2018

PRIVACY STATEMENT Date: 25 May 2018 PRIVACY STATEMENT Date: 25 May 2018 1 Introcution MULTI BELGIUM MANAGEMENT BVBA ( Multi ) process your personal data if you access our website and applications, if we provide products or services to you

More information

THE POSITION AGENCY DESCRIPTION CITY OF OAKLAND EMPLOYMENT OPPORTUNITY DEPUTY CITY ATTORNEY V OFFICE OF THE CITY ATTORNEY

THE POSITION AGENCY DESCRIPTION CITY OF OAKLAND EMPLOYMENT OPPORTUNITY DEPUTY CITY ATTORNEY V OFFICE OF THE CITY ATTORNEY CITY OF OAKLAND EMPLOYMENT OPPORTUNITY DEPUTY CITY ATTORNEY V OFFICE OF THE CITY ATTORNEY Salary Range: $150,441.12 to $184,697.88 (salary based upon experience) Benefits: Health, dental, vision, retirement

More information

Request for Quotation (RFQ) for Blanket Purchase Agreement (BPA)

Request for Quotation (RFQ) for Blanket Purchase Agreement (BPA) Counterpart International Afghanistan Afghan Civic Engagement Program (ACEP) Request for Quotation (RFQ) for Blanket Purchase Agreement (BPA) RFQ Number: CPI-ACEP-BPA-17-09 Issuance Date: October 29, 2017

More information

Request for Quotation (RFQ) for Blanket Purchase Agreement (BPA)

Request for Quotation (RFQ) for Blanket Purchase Agreement (BPA) Counterpart International Afghanistan Afghan Civic Engagement Program (ACEP) Request for Quotation (RFQ) for Blanket Purchase Agreement (BPA) RFQ Number: CPI-ACEP-BPA-17-06 Issuance Date: August 7, 2017

More information

Frédéric Lapeyre Head, Informal Economy Unit Employment Policy Department International Labour Organization

Frédéric Lapeyre Head, Informal Economy Unit Employment Policy Department International Labour Organization Recommendation No. 204 on the Transition from the informal to the formal economy: A new powerful tool for facilitating the formalization of economic units and employment and promoting an inclusive development

More information

Annex 2. DAC-code Sector Government administration

Annex 2. DAC-code Sector Government administration Annex 2 ACTION FICHE FOR EGYPT 1. IDENTIFICATION Title Support to political development and good governance Total cost EC Contribution : EUR 3 000 000 Aid method / Management mode Project approach / Decentralised

More information

Governance and reporting. How can boards navigate their way through a changing regulatory landscape?

Governance and reporting. How can boards navigate their way through a changing regulatory landscape? Governance and reporting How can boards navigate their way through a changing regulatory landscape? Governance and reporting How can boards navigate their way through a changing regulatory landscape? Boards

More information

TERMS OF REFERENCE FEASIBILITY STUDY ON THE DEVELOPMENT OF A CENTRALISED POINT OF DATA SUBMISSION FOR THE BANKING SECTOR

TERMS OF REFERENCE FEASIBILITY STUDY ON THE DEVELOPMENT OF A CENTRALISED POINT OF DATA SUBMISSION FOR THE BANKING SECTOR TERMS OF REFERENCE FEASIBILITY STUDY ON THE DEVELOPMENT OF A CENTRALISED POINT OF DATA SUBMISSION FOR THE BANKING SECTOR 1.0 INTRODUCTION 1.1 Background Since the rollout of Credit Information Sharing

More information

Framework for Analysis and Reform of the Business and Investment Climate

Framework for Analysis and Reform of the Business and Investment Climate Framework for Analysis and Reform of the Business and Investment Climate Definition Concept - Result Chain Data - Tools Dr. Sonja Kurz Economist Economic Development and Employment 26 July 2005 Content

More information

PRIVACY STATEMENT Date: 25 May 2018

PRIVACY STATEMENT Date: 25 May 2018 PRIVACY STATEMENT Date: 25 May 2018 1 Introcution MULTI ITALY S.R.L. ( Multi ) process your personal data if you access our website and applications, if we provide products or services to you or the organization

More information

RC4311. Future Directions for the Canada Customs and Revenue Agency Small and Medium Enterprises

RC4311. Future Directions for the Canada Customs and Revenue Agency Small and Medium Enterprises RC4311 Future Directions for the Canada Customs and Revenue Agency Small and Medium Enterprises The mission of the Canada Customs and Revenue Agency (CCRA) is to promote compliance with tax, trade, and

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 2012R1024 EN 17.06.2014 002.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B REGULATION (EU) No 1024/2012 OF THE EUROPEAN

More information

Transparent Public Procurement Rating. Georgia. Public Procurement Legislation Assessment

Transparent Public Procurement Rating. Georgia. Public Procurement Legislation Assessment Transparent Public Procurement Rating Georgia Public Procurement Legislation Assessment The Assessment of the Public Procurement Legislation of Georgia was prepared by the Institute for Development of

More information

International Open Call for Consultancy Services. Expert on justice and judicial training. Reference Number 031/017

International Open Call for Consultancy Services. Expert on justice and judicial training. Reference Number 031/017 International Open Call for Consultancy Services Expert on justice and judicial training Reference Number 031/017 TERMS OF REFERENCE: Title: RCC Department: Number of Consultants: Support to the Implementation

More information

Initiative to Reduce CDM Barriers

Initiative to Reduce CDM Barriers Initiative to Reduce CDM Barriers Regional CDM/DNA Workshop Havana, Cuba, 22-24 th March 2011 Nitin ARORA, Programme Officer UNFCCC secretariat, Sustainable Development Mechanism Projects Status Annual

More information

Request for Quotation (RFQ) for Blanket Purchase Agreement (BPA)

Request for Quotation (RFQ) for Blanket Purchase Agreement (BPA) Counterpart International Afghanistan Afghan Civic Engagement Program (ACEP) Request for Quotation (RFQ) for Blanket Purchase Agreement (BPA) RFQ Number: CPI-ACEP-BPA-18-12 Issuance Date: October 14, 2018

More information

National Action Plan of Government of Mongolia on Open Government Partnership

National Action Plan of Government of Mongolia on Open Government Partnership National Action Plan of Government of Mongolia on Open Government Partnership 1. Introduction The Government of Mongolia set forth its objective to join the Open Government Partnership accepting and committing

More information

THE ZAMBIA MINING INVESTMENT AND GOVERNANCE REVIEW (MInGov)

THE ZAMBIA MINING INVESTMENT AND GOVERNANCE REVIEW (MInGov) THE ZAMBIA MINING INVESTMENT AND GOVERNANCE REVIEW (MInGov) November 7, 2016 Lusaka, Zambia Martin Lokanc The Mining Investment and Governance Review Funded by: Implemented by the World Bank with support

More information

PURCHASING AND PROCUREMENT OVERVIEW

PURCHASING AND PROCUREMENT OVERVIEW Purchasing and Procurement Overview AASBO Certificate Program September 2018 David Smith Executive Director david@aasbo.com 256 585 1511 PURCHASING AND PROCUREMENT OVERVIEW Contract Procurement Law Understanding

More information

Public Private Partnership PPP & The Egyptian Experience

Public Private Partnership PPP & The Egyptian Experience Public Private Partnership PPP & The Egyptian Experience Bassel Shoirah Project Manager / Utilities Sector - Egypt Good Governance for Development In Arab Countries initiatives of the OECD July 8, 2009

More information

Dynamic efficiency gains achieved by the end of 2012

Dynamic efficiency gains achieved by the end of 2012 United Nations FCCC/SBI/2013/INF.5 Distr.: General 24 April 2013 English only Subsidiary Body for Implementation Thirty-eighth session Bonn, 3 14 June 2013 Item 18(c) of the provisional agenda Administrative,

More information

Ellucian Advance TM Suite Make Deeper Insights. Yield Deeper Relationships.

Ellucian Advance TM Suite Make Deeper Insights. Yield Deeper Relationships. Ellucian Advance TM Suite Make Deeper Insights. Yield Deeper Relationships. GET CLOSER TO YOUR INSTITUTION S MOST IMPORTANT ASSETS WITH SOLUTIONS AND SERVICES FROM ELLUCIAN As learners, your future alumni

More information

Ministry of Sustainable Development and Tourism. Montenegro

Ministry of Sustainable Development and Tourism. Montenegro Ministry of Sustainable Development and Tourism Montenegro The basic principle of Spatial Plan of Montenegro is sustainable development which implies the consideration of environmental protection, economic

More information

Questions and Answers Questions et réponses

Questions and Answers Questions et réponses Questions and Answers Questions et réponses Ministry of Municipal Affairs and Housing MinistPre des Affaires municipales et du Logement July 28, 2003 COMING INTO FORCE OF BILL 124 : QUESTIONS AND ANSWERS

More information

CORPORATE RESPONSIBILITY ELEVEN GROUP COMMITMENTS

CORPORATE RESPONSIBILITY ELEVEN GROUP COMMITMENTS CORPORATE RESPONSIBILITY ELEVEN GROUP COMMITMENTS S U M M A R Y A RESPONSIBLE INDUSTRIAL FIRM 2 A RESPONSIBLE EMPLOYER 8 A RESPONSIBLE PARTNER 14 EDF, the world s largest electricity company and leader

More information

Executive Summary 19

Executive Summary 19 Executive Summary P lanning for municipal waste management in Cumberland County has occurred in some fashion for nearly 40 years. While many of the previous plans were exercises in theory, current efforts

More information

Request for Comment on Establishment of an Academic Historical Trade Data Product

Request for Comment on Establishment of an Academic Historical Trade Data Product Regulatory Notice MSRB Regulatory Notice 2015-10 0 2015-10 Publication Date July 16, 2015 Stakeholders Municipal Securities Dealers, Municipal Advisors, Issuers, Investors, General Public Notice Type Request

More information

Guatemala City Council: Technological Innovation for Better Citizen Experience Supported by SAP ERP

Guatemala City Council: Technological Innovation for Better Citizen Experience Supported by SAP ERP Picture Credit Guatemala City Council, Guatemala City, Guatemala. Used with permission. SAP Business Transformation Study Public Sector Guatemala City Council Guatemala City Council: Technological Innovation

More information

(For information on related federal laws see LMC Information Memo Cell Towers, Small Cell Technologies, and Distributed Antenna Systems )

(For information on related federal laws see LMC Information Memo Cell Towers, Small Cell Technologies, and Distributed Antenna Systems ) 2017 Telecommunications Right-of-Way User Amendments Permitting Process for Small Wireless Facilities Publication Date: August 1, 2017 Revised November 29, 2017 (For information on related federal laws

More information

Privacy Policy. To invest significant resources in order to respect your rights in connection with Personal Data about you:

Privacy Policy. To invest significant resources in order to respect your rights in connection with Personal Data about you: Privacy Policy Last updated: May 17, 2018 This is the privacy policy (the Policy ) of the website www.experitest.com (the "Website") operated by Experitest Ltd., of 10 HaGavish St, 4250708 Poleg, Israel

More information

Paper 8: IATI Governing Board paper on Long-term Institutional Arrangements

Paper 8: IATI Governing Board paper on Long-term Institutional Arrangements Members Assembly Meeting 03-05 October 2017 IFAD HQ, Via Paolo di Dono, 44, 00142 Roma RM, Italy Paper 8: IATI Governing Board paper on Long-term Institutional Arrangements 1. INTRODUCTION The current

More information

Case Report:Deficiencies in Audit Quality Control (English version)

Case Report:Deficiencies in Audit Quality Control (English version) Case Report:Deficiencies in Audit Quality Control (English version) July 2010 Certified Public Accountants and Auditing Oversight Board Introduction Since its establishment in April 2004, the Certified

More information

PROJECT PREPARATION GRANT (PPG) PROJECT TYPE: Medium-sized Project

PROJECT PREPARATION GRANT (PPG) PROJECT TYPE: Medium-sized Project PROJECT PREPARATION GRANT (PPG) PROJECT TYPE: Medium-sized Project TYPE OF TRUST FUND: GEF Trust Fund Submission date: 06/12/2012 GEF PROJECT ID: 4998 GEF AGENCY PROJECT ID: 5084 COUNTRY(IES): Uruguay

More information

InfoShop. Integrated Safeguards Data Sheet (Initial) Date ISDS Prepared/Updated: 10/21/2002. Section I - Basic Information

InfoShop. Integrated Safeguards Data Sheet (Initial) Date ISDS Prepared/Updated: 10/21/2002. Section I - Basic Information Public Disclosure Authorized THE WORLD BANK GROUP InfoShop Integrated Safeguards Data Sheet (Initial) 25030 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date Prepared/Updated:

More information

PART ONE: GENERAL PRINCIPLES

PART ONE: GENERAL PRINCIPLES PART ONE: GENERAL PRINCIPLES 25 26 Chapter 2: Towards a new Planning Code for Wales INTRODUCTION 2.1 This Chapter summarises briefly the need for reform in this area of the law and, against that background,

More information

Check against delivery

Check against delivery Check against delivery Presentation of Report to United Nations Human Rights Council Professor John G. Ruggie Special Representative of the Secretary-General for Business and Human Rights Geneva, 30 May

More information

Navigating the complexities of VAT and customs in the life sciences industry

Navigating the complexities of VAT and customs in the life sciences industry Life Sciences Tax Spotlight Series Navigating the complexities of VAT and customs in the life sciences industry Some of the most complex supply chain models can be found in the life sciences sector. Drugs

More information

Annex I Revised strategic framework of the Joint Inspection Unit for

Annex I Revised strategic framework of the Joint Inspection Unit for Annex I Revised strategic framework of the Joint Inspection Unit for 2010-2019 Introduction 1. The Joint Inspection Unit presented to Member States its long-term strategic framework for 2010-2019 in its

More information

Terms of Reference. Projects Outputs Evaluation

Terms of Reference. Projects Outputs Evaluation Terms of Reference Projects Outputs Evaluation Strengthening Participatory and Accountable Governance and Protection of Human Rights. Empowering Civil Society in A. BACKGROUND UNDP s corporate policy is

More information

EMAS, a premium environmental management tools for organisations Benefits for public authorities

EMAS, a premium environmental management tools for organisations Benefits for public authorities EMAS, a premium environmental management tools for organisations Benefits for public authorities Content 1 2 3 4 5 6 7 8 4 What is EMAS? How can Member States benefit from EMAS? What is the added value

More information

Customs Reforms in the Philippines

Customs Reforms in the Philippines Customs Reforms in the Philippines June 12, 2006 Bertram I. Spector Management Systems International 600 Water Street, NW, Washington, DC 20024 Bureau of Customs in the Philippines Collects 20% of government

More information

Results-Based Management and Accountability Framework for the Capital Leasing Pilot Project under the Canada Small Business Financing Act (CSBFA)

Results-Based Management and Accountability Framework for the Capital Leasing Pilot Project under the Canada Small Business Financing Act (CSBFA) Results-Based Management and Accountability Framework for the Capital Leasing Pilot Project under the Canada Small Business Financing Act (CSBFA) Prepared by Industry Canada and Performance Management

More information

Annex 1 - APEC OECD Framework on Competition Assessment

Annex 1 - APEC OECD Framework on Competition Assessment 2017/SOM3/025anx1 Agenda Item: 4 Annex 1 - APEC OECD Framework on Competition Assessment Purpose: Information Submitted by: EC Chair Third Senior Officials Meeting Ho Chi Minh City, Viet Nam 29-30 August

More information

Working Party No. 1 on Macroeconomic and Structural Policy Analysis

Working Party No. 1 on Macroeconomic and Structural Policy Analysis For Official Use English - Or. English For Official Use ECO/CPE/WP1(2012)28 Organisation de Coopération et de Développement Économiques Organisation for Economic Co-operation and Development English -

More information