1 Route to orisation 1. SCOPE This document was previously included in OPSAF orisation Procedures as Attachment 1 Route to orisation Manual. This document has now been issued as an individual document number to allow for separate updates to be carried out without affecting OPSAF The Route to orisation Document provides guidance for Training and orisation of Personnel in the Electrical and Mechanical Safety Rules. This document also lays down the procedures to be followed to ensure that persons have knowledge and experience appropriate to the duties which they will carry out on, or near to, the System. 2. ISSUE RECORD This is a Reference document. The current version is held on the Energy Networks Intranet Document Library. It is your responsibility to ensure you work to the current version. Issue Date Issue No or Amendment Details Dec Jack Neilson 1) Modification of authorisation flow chart to reflect stage 1 to 3 process. 2) 5.1 Inclusion of First Aid requirements. 3) Inclusion of CP-4 orisation Schedule 31. 4) Inclusion of PRT-CM orisation Schedule 32 for Protection, testing and commissioning staff or contractors. Sept Jack Neilson 1) Adjustment in sequence of orisation Schedules 2) Inclusion of AME-SS National Accreditation. 3) Inclusion of Z Special orisation egories 3. ISSUE AUTHORITY or Owner Issue ority Jack Neilson orisation Compliance Manager Jack Neilson orisation Compliance Manager Ewan McMillan Health & Safety Director Date:..20/02/ SP Power Systems Limited Page 1 of 42 MSP 5.1.1

2 Route to orisation 4. REVIEW This is a Reference document which has a 5 year retention period after which a reminder will be issued to review and extend retention or archive. DISTRIBUTION This document is part of the Management Safety Procedures but does not have a maintained distribution list. This document is published to the SPEN Internet. SP Power Systems Limited Page 2 of 42 MSP 5.1.1

3 Route to orisation 5. CONTENTS 1. SCOPE ISSUE RECORD ISSUE AUTHORITY REVIEW... 2 DISTRIBUTION CONTENTS ROUTE TO AUTHORISATION FLOW CHART GENERAL REQUIREMENTS AND PROCEDURES GENERAL PROCEDURE FOR AUTHORISATION AUTHORISATION ROUTE AME National Accreditation Pre Course Experience Post Course Experience Examination PERSONAL LOG OF ACTIVITIES DURING TRAINING FORMAT FOR PERSONAL LOG RECORDING OF RELEVANT ACTIVITIES VERIFICATION OF ENTRIES IN PERSONAL LOG MEETINGS BETWEEN CANDIDATE AND TRAINING MENTOR SUBMISSION OF RECOMMENDATION FOR AUTHORISATION SCHEDULE 1 AME- SS SCHEDULE 2 WI-1 LV TO 400KV SCHEDULE 3 WI-2 LV TO 400KV SCHEDULE 4 WI-3 LV HEDULE 5 OP-1 LV SCHEDULE 6 - OP-1 11KV SCHEDULE 7 - OP-1 33KV SCHEDULE 8 - OP-1 132KV SCHEDULE 9 - OP-1 275/400KV SCHEDULE 10 - OP-2 LV SCHEDULE 11 - OP-2 11 TO 400KV SCHEDULE 12 - OP-3 LV SCHEDULE 14 EN-2 LV TO 400KV SCHEDULE 15 WL-1 LV SCHEDULE 16 - WL-1 11KV SCHEDULE 17 - WL-2 LV SCHEDULE 18 SR-2 ALL VOLTAGES SCHEDULE 19 - SR-3 ALL VOLTAGES SCHEDULE 20 SR-4 ALL VOLTAGES SCHEDULE 21 SB-1 ALL VOLTAGES SCHEDULE 22 - SB-2 ALL VOLATGES SCHEDULE 23 DE-1 11KV TO 400KV SCHEDULE 24 S1 ALL VOLTAGES SCHEDULE 25 SI-3 ALL VOLTAGES SCHEDULE 26 SI-4 ALL VOLTAGES SCHEDULE 27 SI-5 ALL VOLTAGES SP Power Systems Limited Page 3 of 42 MSP 5.1.1

4 Route to orisation 9.32 SCHEDULE 28 CP-1 ALL VOLTAGES SCHEDULE 29 CP-2 ALL VOLTAGES SCHEDULE 30 CP-3 ALL VOLTAGES SCHEDULE 31 CP-4 ALL VOLTAGES SCHEDULE 32 - PRT-CM ALL VOLTAGES SCHEDULE 33 Z SPECIAL CATEGORIES APPENDIX 1 - TRAINING FOR SWITCHING / SAFETY DOCUMENT ISSUE LOG SP Power Systems Limited Page 4 of 42 MSP 5.1.1

5 Route to orisation 6. ROUTE TO AUTHORISATION FLOW CHART SP Power Systems Limited Page 5 of 42 MSP 5.1.1

6 Route to orisation 7. GENERAL REQUIREMENTS AND PROCEDURES Basic Guidelines The appointment of a Person to any Group or egory of authorisation cannot be decided by the length of time for which the Person has been authorised at a different Group or egory, nor can it be decided by the duration of training and/or the number of activities carried out. Suitability for authorisation must be measured by the person's approach, attitude, knowledge of and proper application of Safety Rules, Safety Instructions and Procedures. This knowledge and experience is gained through training and operational practice. At all stages of the authorisation process an appointed employee of Energy Networks, or in the case of contractors an employee appointed in agreement with Energy Networks, (known as the Training Mentor) will judge the suitability of the candidate to progress to the next stage of the authorisation process and complete and sign the relevant paperwork. The candidate's training programme shall be arranged such that as wide a variation of the different types and manufacture of Plant and Apparatus as possible is covered. The work and testing shall also be as varied as possible to give experience in operating procedures. Basic First Aid (P20.1) is a prerequisite for all Energy Networks staff attaining electrical authorisations. Contractors are only required to hold Basic First Aid where they are seeking to attain a Live Work orisation. 8. GENERAL PROCEDURE FOR AUTHORISATION 8.1 orisation Route orisation will follow the route indicated in the relevant schedule of this document for the appropriate authorisation. The route will always consist of the same elements, each of which shall be completed and signed off prior to authorisation. The basic building blocks are: AME National Accreditation With the introduction of the AME National Accreditation, candidates seeking to hold for example non electrical authorisations (WI-2) for work adjacent to Live Apparatus in conjunction with Independent Entry (EN-1) into substations. The candidates will attend the computer bases training and assessment which on successful completion requires the candidates to be practically assessed at a suitable site to confirm their knowledge, experience and overall competence. Where appendix 9s are received successful candidates are issued with an authorisation certificate with AME recorded Pre Course Experience This is the knowledge and experience which the candidate requires in order that he may understand the content of the training course. This knowledge may have been gained by attendance at a formal training course or by practical experience. When a candidate is nominated for training it is the responsibility of the Training Mentor to ensure that the candidate has the correct knowledge and experience prior to attendance at the appropriate formal training course. SP Power Systems Limited Page 6 of 42 MSP 5.1.1

7 Route to orisation Post Course Experience Many training courses can provide the candidate with the appropriate knowledge. In order that the candidate may safely undertake the duties for which he is to be authorised it may be a requirement to gain additional practical experience. This experience, where it is a requirement of the particular schedule in this document, shall be gained by carrying out appropriate work under the Personal Supervision of an appropriately orised Person. There may be a requirement to document the quantity and type of work carried out before progressing to the authorisation examination Examination The examination will consist of a formal interview at which the candidate will provide the examiner with any necessary evidence of his training and answer sufficient questions to satisfy the examiner of his competence. Competence in all aspects of the work to be carried out shall be sufficient to meet the requirements of the Electricity at Work Regulations, Regulation PERSONAL LOG OF ACTIVITIES DURING TRAINING In accordance with section 11.3 of OPSAF (MSP 5.1), a Person while under training for switching or Safety Document issue shall, for the purposes of subsequent assessment, keep a personal log of all System operations and work carried out under training. 9.1 Format for Personal Log The personal log shall be in the model form contained in Appendix 1 of this document. 9.2 Recording of Relevant Activities The Person under training shall record in the log all relevant activities carried out in person. 9.3 Verification of Entries in Personal Log Entries in the personal log shall be verified and signed in the appropriate column by the Person providing Supervision. 9.4 Meetings between Candidate and Training Mentor Throughout the course of the candidate s training, the Training Mentor shall conduct regular meetings with the candidate. These meetings shall be recorded by the Training Mentor and a note of the meeting shall be passed to the candidate for inclusion with the candidate s personal log. SP Power Systems Limited Page 7 of 42 MSP 5.1.1

8 Route to orisation 9.5 Submission of Recommendation for orisation When submitting a recommendation for authorisation, the Recommending Person shall attach the personal log to the recommendation, SCHEDULES OF ROUTE TO AUTHORISATION The schedules contained in this part of the document detail information which the candidate requires in order to fulfil the requirements of the orisation being sought. The schedules are intended to give a minimum requirement only and in some cases the person signing off that part of the process may consider that additional requirements need to be fulfilled. These schedules should not be used as a job specification. The knowledge and training requirements detailed are only those related to electrical safety. The prospective candidate for authorisation will almost certainly require associated knowledge and training in order to fulfil the requirements of the job. The requirements listed in the schedules do not take into consideration Limitations or Exclusions which it may be intended to apply to an authorisation, or which may be applied at the examination stage due to inadequacies in the knowledge or experience of the candidate. If it is intended at the outset of the authorisation process to apply a Limitation or Exclusion to an authorisation then only knowledge in the relevant area needs to be acquired. Example If an employee is to be authorised to SI-3 (Prepare, issue, and cancel Permit for Work and Limited Work Certificate) limited to overhead lines then he needs to fulfil those requirements listed in the schedule that are pertinent to the authorisation. He therefore does not need to have knowledge or experience in issuing Safety Documents on underground cables. The following words are used in the schedules and have specific meanings attached to them in order to indicate the level of knowledge or experience, which the candidate must attain: Appreciation Knowledge Understanding The candidate shall be aware of the types of Safety Documents, Apparatus etc. and be able to outline key points to the Training Mentor. The candidate shall have a good working knowledge of Safety Documents and Apparatus although some gaps are acceptable provided that the candidate knows the basic principles involved. The candidate shall have an in depth knowledge of documents or items of Apparatus etc. and must be able to show the ability to apply the information. The authorisation training requirements being sought will be converted into training course codes by the orisation Compliance Department and passed to Development Support for the appropriate training centre. SP Power Systems Limited Page 8 of 42 MSP 5.1.1

9 Route to orisation 9.6 Schedule 1 AME- SS All AME Familiar with Access, Movement and Egress in environments pertinent to the candidates specific work activity. This may relate to one of the following area:- Substations (current) Cables (potential) Overhead Lines (potential ) Following the successful completion of the electronic course and 25 question assessment and the for initial training an onsite visual assessment and verification of competency by questioning. the candidate will be issued with a AME cover note by the instructor. This will be valid for 30 days pending issue of the Accredited AME card. Where an appendix 9 has been submitted an Electrical orisation Certificate will be issued immediately following the course/assessments. For candidates attaining the AME-SS authorisation for the first time, prior to gaining independent Entry to any substation site the project manager shall review the requirement for any substation access keys and confirm the candidates knowledge, experience and overall competence. SP Power Systems Limited Page 9 of 42 MSP 5.1.1

10 Route to orisation 9.7 Schedule 2 WI-1 LV to 400kV All WI-1 None Where practicable the candidate shall gain post course experience by working as a member of a team under the Personal Supervision of a Suitably orised Person. There may be some instances, particularly with regard to contractors, where this requirement is not practicable types of plant and apparatus used on the system at this voltage and an appreciation of the plant and apparatus used at associated voltages requirements for PPE and the PPE pertinent to the tasks to be executed The candidate shall show that he has sufficient knowledge and experience to meet the requirement of the Electricity at Work Reg 16 in the environment in which he is to work this may include all or some of the following The candidate shall understand the requirements for safety documents The candidate shall show a knowledge of safety distances The candidate shall understand the use of Danger and Caution Notices requirements for and shall recognise earthing equipment demarcation of safe working areas in substations SP Power Systems Limited Page 10 of 42 MSP 5.1.1

11 Route to orisation 9.8 Schedule 3 WI-2 LV to 400kV All WI-2 None Where practicable the candidate shall gain post course experience by working as a member of a team under the Personal Supervision of a Suitably orised Person. There may be some instances, particularly with regard to contractors, where this requirement is not practicable The candidate shall show an appreciation of the types of plant and apparatus used on the system at all voltages requirements for PPE and the PPE pertinent to the tasks to be executed The candidate shall show that he has sufficient knowledge and experience to meet the requirements of the Electricity at Work Regulations, Reg 16 in the environment in which he is to work. This may include all or some of the following The candidate shall understand the requirements for safety documents The candidate shall show a knowledge of safety distances The candidate shall understand the use of Danger and Caution Notices demarcation of safe working areas in substations SP Power Systems Limited Page 11 of 42 MSP 5.1.1

12 Route to orisation 9.9 Schedule 4 WI-3 LV All WI-3 None Where practicable the candidate shall gain post course experience by working as a member of a team under the Personal Supervision of a Suitably orised Person. There may be some instances, particularly with regard to contractors, where this requirement is not practicable The candidate shall show an appreciation of the types of plant and apparatus used on the system at all voltages requirements for PPE and the PPE pertinent to the tasks to be executed The candidate shall show that he has sufficient knowledge and experience to meet the requirements of the Electricity at Work Regulations, Reg 16 in the environment in which he is to work. This may include all or some of the following The candidate shall understand the requirements for safety documents The candidate shall show a knowledge of safety distances The candidate shall understand the use of Danger and Caution Notices demarcation of safe working areas in substations SP Power Systems Limited Page 12 of 42 MSP 5.1.1

13 Route to orisation 9.10 hedule 5 OP-1 LV LV OP-1 Appreciation of the types of LV switchgear on the system and the general hazards associated with LV switching. Appreciation of system Fault Levels Appreciation of switchgear ratings orised to carryout LV switching under supervision. Execute sufficient operations to satisfy mentor of competence The candidate shall understand the procedures to be carried out during switching with particular reference to phasing checks, etc. The candidate shall understand the fuse ratings applicable to the operation of the different types of plant and apparatus on the system. requirements for PPE and the PPE pertinent to the tasks to be executed System Fault Levels Switchgear ratings cable and line ratings protection relay terminology and interrogation requirements for recording of switching operations The candidate shall have knowledge of system control boundaries The candidate shall have knowledge of System Control procedure SP Power Systems Limited Page 13 of 42 MSP 5.1.1

14 Route to orisation 9.11 Schedule 6 - OP-1 11kV 11kV OP-1 Appreciation of the types of 11kV switchgear on the system and the general hazards associated with 11kV switching. Appreciation of system Fault Levels Appreciation of switchgear ratings orised to carryout 11kV switching under supervision. Execute sufficient operations to satisfy mentor of competence types of plant and apparatus used on the system at this voltage requirements for PPE and the PPE pertinent to the tasks to be executed System Fault Levels Switchgear ratings cable and line ratings protection relay terminology and interrogation requirements for recording of switching operations The candidate shall show knowledge of system control boundaries The candidate shall show knowledge of System Control procedure SP Power Systems Limited Page 14 of 42 MSP 5.1.1

15 Route to orisation 9.12 Schedule 7 - OP-1 33kV 33kV OP-1 Appreciation of the types of 33kV switchgear on the system and the general hazards associated with 33kV switching. Appreciation of system Fault Levels Appreciation of switchgear ratings orised to carryout 33kV switching under supervision. Execute sufficient operations to satisfy mentor of competence types of plant and apparatus used on the system at this voltage requirements for PPE and the PPE pertinent to the tasks to be executed System Fault Levels Switchgear ratings cable and line ratings protection relay terminology and interrogation requirements for recording of switching operations The candidate shall show knowledge of system control boundaries The candidate shall show knowledge of System Control procedure SP Power Systems Limited Page 15 of 42 MSP 5.1.1

16 Route to orisation 9.13 Schedule 8 - OP-1 132kV 132kV OP-1 Appreciation of the types of 132kV switchgear on the system and the general hazards associated with 132kV switching. Appreciation of system Fault Levels Appreciation of switchgear ratings orised to carryout 132kV switching under supervision. Execute sufficient operations to satisfy mentor of competence types of plant and apparatus used on the system at this voltage requirements for PPE and the PPE pertinent to the tasks to be executed System Fault Levels Switchgear ratings cable and line ratings protection relay terminology and interrogation requirements for recording of switching operations The candidate shall show knowledge of system control boundaries The candidate shall show knowledge of System Control procedure SP Power Systems Limited Page 16 of 42 MSP 5.1.1

17 Route to orisation 9.14 Schedule 9 - OP-1 275/400kV kV OP-1 Appreciation of the types of 400/275kV switchgear on the system and the general hazards associated with 400/275kV switching. Appreciation of system Fault Levels orised to carryout 400/275kV switching under supervision. Execute sufficient operations to satisfy mentor of competence types of plant and apparatus used on the system at this voltage requirements for PPE and the PPE pertinent to the tasks to be executed System Fault Levels Appreciation of switchgear ratings Switchgear ratings cable and line ratings protection relay terminology and interrogation requirements for recording of switching operations The candidate shall show knowledge of system control boundaries The candidate shall show knowledge of System Control procedure SP Power Systems Limited Page 17 of 42 MSP 5.1.1

18 Route to orisation 9.15 Schedule 10 - OP-2 LV LV OP-2 Appreciation of the types of LV switchgear on the system and the general hazards associated with LV switching, with consideration being given to the limitations being put on the authorisation Appreciation of system Fault Levels Appreciation of switchgear ratings orised to carryout switching under supervision pertinent to the authorisation, including limitations and exclusions, for which training is being provided. Execute sufficient operations to satisfy mentor of competence The candidate shall understand the procedures to be carried out during switching with particular reference to phasing checks, etc The candidate shall understand the fuse rating applicable to the operation of the different types of plant and apparatus on the system requirements for PPE and the PPE pertinent to the tasks to be executed System Fault Levels switchgear ratings cable and line ratings protection relay terminology and interrogation requirements for recording of switching operations The candidate shall show knowledge of system control boundaries The candidate shall show knowledge of system control procedure SP Power Systems Limited Page 18 of 42 MSP 5.1.1

19 Route to orisation 9.16 Schedule 11 - OP-2 11 to 400kV All HV OP-2 Appreciation of the types of switchgear on the system at the appropriate voltage and the general hazards associated with switching of these types of equipment. Appreciation of system Fault Levels Appreciation of switchgear ratings orised to carryout switching under supervision pertinent to the authorisation, including limitations and exclusions, for which training is being provided. Execute sufficient operations to satisfy mentor of competence types of plant and apparatus used on the system at this voltage requirements for PPE and the PPE pertinent to the tasks to be executed System Fault Levels Switchgear ratings cable and line ratings protection relay terminology and interrogation requirements for recording of switching operations Knowledge of system control boundaries Knowledge of System Control procedure SP Power Systems Limited Page 19 of 42 MSP 5.1.1

20 Route to orisation 9.17 Schedule 12 - OP-3 LV LV OP-3 Appreciation of the types of cut-outs likely to be found on the system orised to carry out cut-out fuse insertion and removal under supervision. Execute sufficient operations to satisfy mentor of competence types of plant and apparatus used on the system at this voltage The candidate shall be able to correctly explain the procedures to be carried out during switching with particular reference to phasing and polarity checks, etc. requirements for PPE and the PPE pertinent to the tasks to be executed SP Power Systems Limited Page 20 of 42 MSP 5.1.1

21 Route to orisation Schedule 13 - EN-1 LV to 400kV All EN-1 Experience of substation environments with and without uninsulated busbars. Previous membership of working parties within substations None The candidate shall be able to identify hazards within substation environments and shall exhibit an understanding of basic safety rules with particular reference to safety distances SP Power Systems Limited Page 21 of 42 MSP 5.1.1

22 Route to orisation 9.18 Schedule 14 EN-2 LV to 400kV All EN-2 Experience of substation environments without uninsulated busbars. Previous membership of working parties within substations None The candidate shall be able to identify hazards within substation environments and shall exhibit an understanding of basic safety rules with particular reference to safety distances and responsibilities of persons SP Power Systems Limited Page 22 of 42 MSP 5.1.1

23 Route to orisation 9.19 Schedule 15 WL-1 LV LV WL-1 Experience of carrying out appropriate work with a WI-1 authorisation Working as a member of a team under the Personal Supervision of a Suitably orised Person. Carrying out the duties for which the candidate is to be authorised Carry out sufficient tasks to satisfy the Training Mentor or an approved assessor of his competence types of plant and apparatus used on the system at this voltage and apparatus used at associated voltages risk assessment system to be used to identify whether the work may be carried out live The candidate shall show that he has sufficient knowledge and experience to meet the requirements of the Electricity at Work Regulations, Reg 16 in the environment in which he is to work. This may include all or some of the following The candidate shall understand the requirements for safety documents The candidate shall show a knowledge of safety distances The candidate shall understand the use of Danger and Caution Notices demarcation of safe working areas in substations SP Power Systems Limited Page 23 of 42 MSP 5.1.1

24 Route to orisation 9.20 Schedule 16 - WL-1 11kV 11kV WL-1 Experience of carrying out appropriate work with a WI-1 authorisation Working as a member of a team under the Personal Supervision of a Suitably orised Person. Carrying out the duties for which the candidate is to be authorised Carry out sufficient tasks to satisfy the Training Mentor or an approved assessor of his competence types of plant and apparatus used on the system at this voltage and apparatus used at associated voltages risk assessment system to be used to identify whether the work may be carried out live requirements for PPE and the PPE pertinent to the tasks to be executed The candidate shall show that he has sufficient knowledge and experience to meet the requirements of the Electricity at Work Regulations, Reg 16 in the environment in which he is to work. This may include all or some of the following The candidate shall understand the requirements for safety documents The candidate shall show a knowledge of safety distances The candidate shall understand the use of Danger and Caution Notices Requirements for and the recognition of earthing equipment SP Power Systems Limited Page 24 of 42 MSP 5.1.1

25 Route to orisation 9.21 Schedule 17 - WL-2 LV LV WL-2 None None requirements for PPE and the PPE pertinent to the tasks to be executed types of plant and apparatus used on the system at this voltage and apparatus used at associated voltages risk assessment system to be used to identify whether the work may be carried out live The candidate shall be able to assist in the avoidance of danger The candidate shall be able to render assistance in an emergency SP Power Systems Limited Page 25 of 42 MSP 5.1.1

26 Route to orisation 9.22 Schedule 18 SR-2 All ages All HV SR-2 Appreciation of the Scottish Power Safety Rules. None Appreciation of HASWA types of plant and apparatus used on the system at this voltage Appreciation of the Electricity at Work Regulations Appreciation of the Management of Health and Safety at Work Regulations Appreciation of Plant and Apparatus used on the System at this voltage Appreciation of the requirements for safety documents Appreciation of Energy Networks Risk Assessment requirements for PPE and the PPE pertinent to the tasks to be executed Knowledge of the requirements for the completion of appropriate safety documents The candidate shall show an understanding the requirements for supervision of the working party when in receipt of a safety document. hazard control measures implemented before the issue of a safety document e.g. position of Primary Earths (Note this requirement will vary dependant on any limitations which are to be applied to the authorisation) hazard control measures implemented after the issue of a safety document e.g. position of Drain Earths (Note this requirement will vary dependant on any limitations which are to be applied to the authorisation) SP Power Systems Limited Page 26 of 42 MSP 5.1.1

27 Route to orisation 9.23 Schedule 19 - SR-3 All ages All HV SR-3 Appreciation of the Scottish Power Safety Rules. None Appreciation of HASWA types of plant and apparatus used on the system at this voltage Appreciation of the Electricity at Work Regulations Appreciation of the Management of Health and Safety at Work Regulations Appreciation of Plant and Apparatus used on the System at these voltages Appreciation of the requirements for safety documents Appreciation of Energy Networks Risk Assessment requirements for PPE and the PPE pertinent to the tasks to be executed The candidate shall have a knowledge of the requirements for the completion of appropriate safety documents requirements for supervision of the working party when in receipt of a safety document. hazard control measures implemented before the issue of a safety document e.g. position of Primary Earths (Note this requirement will vary dependant on any limitations which are to be applied to the authorisation) hazard control measures implemented after the issue of a safety document e.g. position of Drain Earths (Note this requirement will vary dependant on any limitations which are to be applied to the authorisation) SP Power Systems Limited Page 27 of 42 MSP 5.1.1

28 Route to orisation 9.24 Schedule 20 SR-4 All ages All. Levels SR-4 Appreciation of the Scottish Power Safety Rules. None Appreciation of HASWA types of plant and apparatus used on the system at this voltage Appreciation of Electricity at Work Regulations Appreciation of Management of Health and Safety at Work Regulations Appreciation of Plant and Apparatus used on the System at this voltage Appreciation of the requirements for safety documents Appreciation of Energy Networks Risk Assessment Appreciation of system control boundaries Appreciation of System Control requirements for PPE and the PPE pertinent to the tasks to be executed The candidate shall have knowledge of the requirements for the completion of appropriate safety documents requirements for supervision of the working party when in receipt of a safety document. hazard control measures implemented before the issue of a safety document (Note this requirement will vary dependant on any limitations which are to be applied to the authorisation) hazard control measures implemented after the issue of a safety document e.g. position of Drain Earths (Note this requirement will vary dependant on any limitations which are to be applied to the authorisation) SP Power Systems Limited Page 28 of 42 MSP 5.1.1

29 Route to orisation 9.25 Schedule 21 SB-1 All ages All SB-1 WI and/or WL authorisation for working in the areas where standby is to be carried out. None requirements for PPE and the PPE pertinent to the tasks to be executed types of plant and apparatus used on the system at all voltages risk assessment system to be used. The candidate shall show that he has sufficient knowledge and experience to meet the requirements of the Electricity at Work Regulations, Reg 16 in the environment in which he is to work. This may include all or some of the following The candidate shall understand the requirements for safety documents The candidate shall show a knowledge of safety distances The candidate shall understand the use of Danger and Caution Notices The candidate shall understand the requirements for and shall recognise earthing equipment demarcation of safe working areas in substations The candidate shall understand the procedures governing the use and movement of long objects and plant etc., including the requirements for field equipment earthing. SP Power Systems Limited Page 29 of 42 MSP 5.1.1

30 Route to orisation 9.26 Schedule 22 - SB-2 All Volatges All SB-2 WI and/or WL authorisation for working in the areas where standby is to be carried out. None requirements for PPE and the PPE pertinent to the tasks to be executed types of plant and apparatus used on the system at all voltages risk assessment system to be used. The candidate shall show that he has sufficient knowledge and experience to meet the requirements of the Electricity at Work Regulations, Reg 16 in the environment in which he is to work. This may include all or some of the following The candidate shall understand the requirements for safety documents The candidate shall show a knowledge of safety distances The candidate shall understand the use of Danger and Caution Notices The candidate shall understand the requirements for and shall recognise earthing equipment demarcation of safe working areas in substations The candidate shall understand the procedures governing the use and movement of long objects and plant etc., including the requirements for field equipment earthing. SP Power Systems Limited Page 30 of 42 MSP 5.1.1

31 Route to orisation 9.27 Schedule 23 DE-1 11kV to 400kV All HV volts DE Appreciation of the requirements for drain earths gained whilst working as a member of a working party orised to receive PFW on overhead lines Working with authorisation DE-PS under to personal supervision of a suitable authorised person. requirements for PPE and the PPE pertinent to the tasks to be executed requirements for application of drain earths and pennants on overhead lines. risk assessment system to be used. SP Power Systems Limited Page 31 of 42 MSP 5.1.1

32 Route to orisation 9.28 Schedule 24 S1 All ages All HV S-1 Knowledge of the Scottish Power Safety Rules. Working with S-1 authorised member of staff. Assisting in all the duties of S-1. (Note the candidate should carry out the following duties but the responsibility for the correct implementation of the Safety Rules remains with the S-1 orised Person) Knowledge of HASWA Preparation of switching schedules to include points of isolation and Primary Earthing as defined in Section C of the Safety Rules types of plant and apparatus used on the system at this voltage Knowledge of Electricity at Work Regulations Preparation of appropriate safety documents requirements for PPE and the PPE pertinent to the tasks to be executed Knowledge of the Management of Health and Safety at Work Regulations Appreciation of Plant and Apparatus used on the System at this voltage Appreciation of the requirements for safety documents Appreciation of Energy Networks Risk Assessment Issue of appropriate safety documents (The candidate must ensure that the recipient understands the content of the document but, since the responsibility for the safety precautions and the issue of the document remain with the supervising S-1 authorised person then, the supervising S-1 orised Person must also be satisfied that the recipient understand the contents of the document etc. If there is any doubt about anything in this part of the job then training shall be suspended and the supervising S-1 orised Person will continue the job himself) requirements for achieving safety from the system prior to the issue of a safety document requirements for the completion of appropriate safety documents Appreciation of system control boundaries Cancellation of appropriate safety documents requirements for issue, receipt, clearance and cancellation of safety documents Appreciation of System Control Receipt and clearance of appropriate safety documents The candidate shall show understanding of the requirements for supervision of the working party when in receipt of a safety document Fulfilling the responsibilities of a substation control person SP Power Systems Limited Page 32 of 42 MSP 5.1.1

33 Route to orisation 9.29 Schedule 25 SI-3 All ages All HV SI-3 Knowledge of the Scottish Power Safety Rules. Working with SI-3 authorised member of staff. Assisting in all the duties of SI-3. (Note the candidate should carry out the following duties but the responsibility for the correct implementation of the Safety Rules remains with the SI-3 orised Person) Knowledge of HASWA Preparation of switching schedules to include points of isolation and Primary Earthing types of plant and apparatus used on the system at this voltage Knowledge of Electricity at Work Regulations Preparation of appropriate safety documents requirements for the completion of appropriate safety documents Knowledge of the Management of Health and Safety at Work Regulations Appreciation of Plant and Apparatus used on the System at this voltage Appreciation of the requirements for safety documents Appreciation of Energy Networks Risk Assessment Issue of appropriate safety documents (The candidate must ensure that the recipient understands the content of the document but, since the responsibility for the safety precautions and the issue of the document remain with the supervising SI-3 authorised person then, the supervising SI-3orised Person must also be satisfied that the recipient understand the contents of the document etc. If there is any doubt about anything in this part of the job then training shall be suspended and the supervising SI-3 orised Person will continue the job himself) requirements for issue, receipt, clearance and cancellation of appropriate safety documents requirements for achieving safety from the system prior to the issue of a safety document Appreciation of system control boundaries Appreciation of System Control Cancellation of appropriate safety documents Fulfilling the responsibilities of a substation control person (where applicable) * Training Mentor to initial and date completion of each stage SP Power Systems Limited Page 33 of 42 MSP 5.1.1

34 Route to orisation 9.30 Schedule 26 SI-4 All ages All HV SI-4 Knowledge of the Scottish Power Safety Rules. Working with SI-4 authorised member of staff. Assisting in all the duties of SI-4. (Note the candidate should carry out the following duties but the responsibility for the correct implementation of the Safety Rules remains with the SI-4 orised Person) Knowledge of HASWA Preparation of appropriate safety documents types of plant and apparatus used on the system at this voltage Knowledge of Electricity at Work Regulations Knowledge of the Management of Health and Safety at Work Regulations Appreciation of Plant and Apparatus used on the System at this voltage Appreciation of the requirements for safety documents Appreciation of Energy Networks Risk Assessment Issue of appropriate safety documents (The candidate must ensure that the recipient understands the content of the document but, since the responsibility for the safety precautions and the issue of the document remain with the supervising SI-4 authorised person then, the supervising SI-4 orised Person must also be satisfied that the recipient understand the contents of the document etc. If there is any doubt about anything in this part of the job then training shall be suspended and the supervising SI-4 orised Person will continue the job himself) Cancellation of Appropriate safety documents requirements for achieving safety from the system prior to the issue of a safety document requirements for the completion of appropriate safety documents requirements for issue, receipt, clearance and cancellation of appropriate safety documents Appreciation of system control boundaries Appreciation of System Control Fulfilling the responsibilities of a substation control person (where applicable) SP Power Systems Limited Page 34 of 42 MSP 5.1.1

35 Route to orisation 9.31 Schedule 27 SI-5 All ages All. Levels SI-5 Appreciation of the Scottish Power Safety Rules. Working with SI-5 authorised member of staff. Assisting in all the duties of SI-5. (Note the candidate should carry out the following duties but the responsibility for the correct implementation of the Safety Rules remains with the SI-5 orised Person) Appreciation of HASWA Preparation of appropriate safety documents types of plant and apparatus used on the system at this voltage Appreciation of Electricity at Work Regulations Appreciation of the Management of Health and Safety at Work Regulations Appreciation of Plant and Apparatus used on the System at this voltage Issue of appropriate safety documents. (The candidate must ensure that the recipient understands the content of the document but, since the responsibility for the safety precautions and the issue of the document remain with the supervising SI-5 authorised person then, the supervising SI-5 orised Person must also be satisfied that the recipient understand the contents of the document etc. If there is any doubt about anything in this part of the job then training shall be suspended and the supervising SI-5 orised Person will continue the job himself) requirements for achieving safety from the system prior to the issue of a safety document requirements for issue, receipt, clearance and cancellation of appropriate safety documents requirements for the completion of appropriate safety documents Appreciation of the requirements for safety documents Appreciation of Energy Networks Risk Assessment Appreciation of system control boundaries Cancellation of appropriate safety documents Fulfilling the responsibilities of a substation control person (where applicable) Appreciation of System Control SP Power Systems Limited Page 35 of 42 MSP 5.1.1

36 Route to orisation 9.32 Schedule 28 CP-1 All ages All HV volts CP-1 Knowledge of the Scottish Power Safety Rules. Working with CP-1 authorised member of staff. Assisting in all the duties of CP-1. (Note the candidate should carry out the following duties but the responsibility for the correct implementation of the Safety Rules remains with the CP-1 orised Person) Knowledge of HASWA Knowledge of the Electricity at Work Regulations Knowledge of the Management of Health and Safety at Work Regulations Knowledge of the The Electricity Safety Quality & Continuity Regulations 2002 Appreciation of Plant and Apparatus used on the System at all voltages Appreciation of the requirements for safety documents Appreciation of Energy Networks Risk Assessment Appreciation of system control boundaries Appreciation of System Control System Fault Levels protection relay terminology and interrogation Switchgear ratings cable and line ratings requirements for recording of switching operations and instructions requirements for the completion of safety documents requirements for issue, receipt, clearance and cancellation of safety documents SP Power Systems Limited Page 36 of 42 MSP 5.1.1

37 Route to orisation 9.33 Schedule 29 CP-2 All ages All HV volts CP-2 Knowledge of the Scottish Power Safety Rules. Working with CP-1 authorised member of staff. Assisting in all the duties of CP-1. (Note the candidate should carry out the following duties but the responsibility for the correct implementation of the Safety Rules remains with the CP-1 orised Person) Knowledge of HASWA Knowledge of the Electricity at Work Regulations Knowledge of the Management of Health and Safety at Work Regulations Knowledge of the The Electricity Safety Quality & Continuity Regulations 2002 Appreciation of Plant and Apparatus used on the System at all voltages Appreciation of the requirements for safety documents Appreciation of Energy Networks Risk Assessment Appreciation of system control boundaries Appreciation of System Control System Fault Levels protection relay terminology and interrogation Switchgear ratings cable and line ratings requirements for recording of switching operations and instructions requirements for the completion of safety documents requirements for issue, receipt, clearance and cancellation of safety documents SP Power Systems Limited Page 37 of 42 MSP 5.1.1

38 Route to orisation 9.34 Schedule 30 CP-3 All ages All HV volts CP-3 Knowledge of the Scottish Power Safety Rules. Working with CP-1 authorised member of staff. Assisting in all the duties of CP-1. (Note the candidate should carry out the following duties but the responsibility for the correct implementation of the Safety Rules remains with the CP-1 orised Person) Knowledge of HASWA Knowledge of the Electricity at Work Regulations Knowledge of the Management of Health and Safety at Work Regulations Knowledge of the The Electricity Safety Quality & Continuity Regulations 2002 Appreciation of Plant and Apparatus used on the System at all voltages Appreciation of the requirements for safety documents Appreciation of Energy Networks Risk Assessment Appreciation of system control boundaries Appreciation of System Control System Fault Levels protection relay terminology and interrogation Switchgear ratings cable and line ratings requirements for recording of switching operations and instructions requirements for the completion of safety documents requirements for issue, receipt, clearance and cancellation of safety documents SP Power Systems Limited Page 38 of 42 MSP 5.1.1

39 Route to orisation 9.35 Schedule 31 CP-4 All ages All HV volts CP-4 Knowledge of the Scottish Power Safety Rules. Working with CP-1 authorised member of staff. Assisting in all the duties of CP-1. (Note the candidate should carry out the following duties but the responsibility for the correct implementation of the Safety Rules remains with the CP-1 orised Person) Knowledge of HASWA Knowledge of the Electricity at Work Regulations Knowledge of the Management of Health and Safety at Work Regulations Knowledge of the The Electricity Safety Quality & Continuity Regulations 2002 Appreciation of Plant and Apparatus used on the System at all voltages Appreciation of the requirements for safety documents Appreciation of Energy Networks Risk Assessment Appreciation of system control boundaries Appreciation of System Control System Fault Levels protection relay terminology and interrogation Switchgear ratings cable and line ratings requirements for recording of switching operations and instructions requirements for the completion of safety documents requirements for issue, receipt, clearance and cancellation of safety documents SP Power Systems Limited Page 39 of 42 MSP 5.1.1

40 Route to orisation 9.36 Schedule 32 - PRT-CM All ages Pre-orisation Experience All HV volts PRT-CM Knowledge of the Scottish Power Safety Rules. Knowledge of HASWA Knowledge of the Electricity at Work Regulations Knowledge of the Management of Health and Safety at Work Regulations Knowledge of the The Electricity Safety Quality & Continuity Regulations 2002 Appreciation of Plant and Apparatus used on the System at all voltages Appreciation of the requirements for safety documents Appreciation of Energy Networks Risk Assessment Comprehensive knowledge and understanding of protection systems, installation and commissioning at the specific voltage level. Following a gap analysis, training issues shall be identified and training established to ensure gaps in knowledge are addressed. System Fault Levels protection relay terminology and interrogation Switchgear ratings cable and line ratings requirements for recording of switching operations and instructions requirements for the completion of safety documents requirements for issue, receipt, clearance and cancellation of safety documents Candidates shall be assessed for competence in the commissioning activities by a SP Nominated Person who shall have sufficient expertise to confirm knowledge and understanding of commissioning abilities. SP Power Systems Limited Page 40 of 42 MSP 5.1.1

41 Route to orisation 9.37 Schedule 33 Z Special egories 132 to 400kV Z-1 Evidence of prior experience of Continuous tension stringing of earthwires under single circuit outage conditionson double circuit 132 to 400kV OHL Z-1PS No prior experience or evidence of Continuous tension stringing of earthwires under single circuit outage conditions on double circuit 132 to 400kV OHL Z-2 Evidence of prior experience of wrap on optical cable installations on earthwires on 132 to 400kV double circuits OHL Z-2PS No prior experience or evidence of wrap on optical cable installations on earthwires on 132 to 400kV double circuits OHL Z-3 Evidence of prior experience of optical earthwire installation on 275 to 400kV double circuits OHL Z-4 Evidence of prior experience of all dielectric self supporting optical installation on 132 to 400kV double circuits OHL Z-5 Work on High age capacitor banks None requirements for PPE and the PPE pertinent to the tasks to be executed types of plant and apparatus used on the system at this voltage and apparatus used at associated voltages risk assessment system to be used to identify whether the work may be carried out live The candidate shall be able to assist in the avoidance of danger The candidate shall be able to render assistance in an emergency SP Power Systems Limited Page 41 of 42 MSP 5.1.1

42 Route to orisation 10. APPENDIX 1 - TRAINING FOR SWITCHING / SAFETY DOCUMENT ISSUE LOG Name : Personnel No. : DATE SITE/WORK IN HAND OPERATIONS CARRIED OUT TYPE OF SWITCHGEAR SUPERVISING PERSON (SIGN AND PRINT) SP Power Systems Limited Page 42 of 42 MSP 5.1.1

OPERATIONAL COMPLIANCE AUDITING

OPERATIONAL COMPLIANCE AUDITING 1. SCOPE This document details the policy and procedure to be applied in auditing Senior Authorised Persons and Authorised Persons to ensure full compliance with the application of the ScottishPower Safety

More information

Method Statement for LIVE TANK OIL SAMPLING (LTOS) of RMU s and OSW s

Method Statement for LIVE TANK OIL SAMPLING (LTOS) of RMU s and OSW s 1. SCOPE This document defines the method to be used when obtaining an insulating oil sample from distribution switchgear whilst the equipment is energised. This is referred to as a LIVE TANK OIL SAMPLE

More information

Field Instruction. Any part of a person (body). Any conducting object, tool or equipment being held or carried.

Field Instruction. Any part of a person (body). Any conducting object, tool or equipment being held or carried. 2.17 Safe Approach Distances Purpose This instruction outlines the safe approach distances (SAD) for authorised Horizon Power Workers, Mobile Plant and Vehicles working near live electrical apparatus.

More information

Corporate. Emergency Standby Generator SOP. Document Control Summary

Corporate. Emergency Standby Generator SOP. Document Control Summary Corporate Emergency Standby Generator SOP Document Control Summary Status: Version: Author/Title: Owner/Title: Approved by: Ratified: Related Trust Strategy and/or Strategic Aims Implementation Date: Review

More information

Process for LV and HV connections activities under SPEN and ICP s DSR s

Process for LV and HV connections activities under SPEN and ICP s DSR s 1. SCOPE This document details SP Energy Networks approach to facilitating connection activities for Independent Connection Providers (ICP s) to carry out LV and HV network connections. Whether under SPEN

More information

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance National Grid UK Electricity Transmission plc NGUK/PM/ETSR/NSI/33/GN Issue 2 National Grid UK Electricity Transmission plc Uncontrolled when printed NATIONAL SAFETY INSTRUCTION and Guidance NSI 33 THE

More information

DISTRIBUTION SWITCHING EXAMPLE ONLY NOT TO BE USED

DISTRIBUTION SWITCHING EXAMPLE ONLY NOT TO BE USED HV OPERATOR TRAINING DISTRIBUTION SWITCHING DS LOG BOOK Enabling the establishment, consistency and portability of agreed industry standards across the Victorian Electricity Supply Industry TRAINEE NAME

More information

Procedure UE PR Access to the United Energy Electricity Network. Document UE PR 0001

Procedure UE PR Access to the United Energy Electricity Network. Document UE PR 0001 Access to the United Energy Electricity Network Document UE PR 0001 Procedure UE PR 0001 This procedure outlines the requirements for access to work on or near the UE electricity network for the performance

More information

Certificate in Electrical Power Engineering - Underground Cables at SCQF Level 5 ( ) Unit Handbook

Certificate in Electrical Power Engineering - Underground Cables at SCQF Level 5 ( ) Unit Handbook Certificate in Electrical Power Engineering - Underground Cables at SCQF Level 5 (2343-52) Unit Handbook www.cityandguilds.com July 2016 Version 1.1 Contents 1 About this document 3 Unit 001 Working safely

More information

TESTING PTE EARTHING

TESTING PTE EARTHING 1 SCOPE This section of the Power Systems Live Working Manual details the procedures to be followed to achieve Safety from the System when carrying out examination, testing and remedial work on PTE (Pole

More information

Company Directive STANDARD TECHNIQUE : OC1A/5. Relating to High Voltage System Control and Switching

Company Directive STANDARD TECHNIQUE : OC1A/5. Relating to High Voltage System Control and Switching Company Directive STANDARD TECHNIQUE : OC1A/5 Relating to High Voltage System Control and Switching Document Summary: This documents describes WPD procedure related to High Voltage System Control and Switching.

More information

TRAINING. Operations & Protection

TRAINING. Operations & Protection Operations & Protection TRAINING Providing high quality electrical power system courses and related specialised training to both Utility and Commercial sectors. " An investment in knowledge pays the best

More information

HSEQ GUIDELINE FOR WORK

HSEQ GUIDELINE FOR WORK HSEQ GUIDELINE FOR WORK IN VICINITY OF ADDC ASSETS Effective Date : 01/09/2013 Procedure #: GL.GN.06 Issue: 01 Revision: 0 Page 2 of 12 Approved by: Managing Director TABLE OF CONTENTS Contents AMENDMENTS

More information

Inspection and Monitoring of Networks Constructed by Independent Connection Providers

Inspection and Monitoring of Networks Constructed by Independent Connection Providers 1. SCOPE This document details SP Energy Networks (SPEN) inspection and escalation regime for contestable works constructed (ICPs) that will be adopted by SPEN. 2. ISSUE RECORD This is a Controlled document.

More information

Level 3 Diploma in Electrical Power Engineering - Underground Cables ( )

Level 3 Diploma in Electrical Power Engineering - Underground Cables ( ) Level 3 Diploma in Electrical Power Engineering - Underground Cables (2339-32) Accreditation number: 500/7324/2 Qualification Units www.cityandguilds.com August 2009 Version V1 0 Level 3 Engineering Technology

More information

Level 2 Diploma in Electrical Power Engineering - Underground Cables ( )

Level 2 Diploma in Electrical Power Engineering - Underground Cables ( ) Level 2 Diploma in Electrical Power Engineering - Underground Cables (2339-22) Accreditation number: 600/1672/3 www.cityandguilds.com August 2009 Version 2.0 (August 2011) Unit Handbook Contents 1 About

More information

ECP SECONDARY SUBSTATION ENERGISATION PROCEDURE

ECP SECONDARY SUBSTATION ENERGISATION PROCEDURE Document Number: ECP 11-0504 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0504 SECONDARY SUBSTATION ENERGISATION PROCEDURE EPN, LPN, SPN This procedure details the energisation procedures

More information

Project Management Rail Safety Worker Competence

Project Management Rail Safety Worker Competence Discipline: HR08-004 Contents Discipline: People, Culture and Development Category: Procedure Project Management Rail Safety Worker Competence HR08-004 Applicability ARTC Network Wide Interstate Network

More information

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance National Grid UK Electricity Transmission plc NATIONAL SAFETY INSTRUCTION and Guidance NSI 6 DEMARCATION IN SUBSTATIONS Copyright National Grid plc 2016, all rights reserved. No part of this publication

More information

HAS/042/001 Code of Practice for Work on Street Lighting and Street Furniture including Installation, Repairs and Maintenance

HAS/042/001 Code of Practice for Work on Street Lighting and Street Furniture including Installation, Repairs and Maintenance Version:- 2.0 Date of Issue:- March 2017 Page 1 of 13 HAS/042/001 Code of Practice for Work on Street Lighting and Street Furniture including Installation, Repairs and Maintenance 1. Purpose The purpose

More information

Specification for the Installation of Low Voltage Internal Mains and Services

Specification for the Installation of Low Voltage Internal Mains and Services 1. SCOPE This specification details the requirements for New Build and Remedial LV internal mains and services work, including the quality of materials, the installation methodology and general procedures

More information

Approved Tasks for the Application of Safe Approach Distance Special

Approved Tasks for the Application of Safe Approach Distance Special In the Victorian Electricity Supply Industry October 2013 Approved Tasks for the Application of Safe Approach Distance Special This guideline has been developed by the Victorian Electricity Supply Industry

More information

ED-EDM-P1/G2 Guidelines for Works in the Vicinity of MV/LV OHL

ED-EDM-P1/G2 Guidelines for Works in the Vicinity of MV/LV OHL Guidelines for Works in the Vicinity of MV/LV OHL Issue : 1 26-04-2018 Public Page 1 of 7 Document Control Department Document Type Document Title ED Guideline Guidelines for Works in Vicinity of MV/LV

More information

High voltage for apparatus under Safe Access Rules and statutory regulations is defined as being greater than 1000V ac or 1500V dc.

High voltage for apparatus under Safe Access Rules and statutory regulations is defined as being greater than 1000V ac or 1500V dc. Clean, Green & Safe Management System SP 24-76 Process Authority: HV Test Engineer Peter New High Voltage Testing Approval: EO Engineering & Projects Ken Lister Version Date: 22/02/2012 Revision: A 1.

More information

SUP 02 Avoiding danger from underground services during ground works Unified procedures for use within NHSScotland

SUP 02 Avoiding danger from underground services during ground works Unified procedures for use within NHSScotland SUP 02 Avoiding danger from underground services during ground works Unified procedures for use within NHSScotland April 2015 Contents Page Acknowledgements... 4 1. Preface... 5 1.1 Introduction... 5 1.3

More information

Protection Officer Training and Perpetual Accreditation QUEENSLAND RAIL OFFICIAL. Approved for public release

Protection Officer Training and Perpetual Accreditation QUEENSLAND RAIL OFFICIAL. Approved for public release Protection Officer Training and Perpetual Accreditation MD-11-309 QUEENSLAND RAIL OFFICIAL Version: 4.0 Updated: 02/03/2015 Policy: Safety Policy Document history Document Information Current Version 4.0

More information

Certificate in Electrical Power Engineering - Overhead Lines at SCQF Level 5 ( )

Certificate in Electrical Power Engineering - Overhead Lines at SCQF Level 5 ( ) Certificate in Electrical Power Engineering - Overhead Lines at SCQF Level 5 (2343-53) Unit handbook www.cityandguilds.com July 2016 Version 1.1 Contents 1 About this document 3 Unit 001 Working safely

More information

Inspection and Testing of new Low Voltage Supplies

Inspection and Testing of new Low Voltage Supplies 1. SCOPE This document details the Company s requirements for inspection and testing of new Low Voltage supplies at the time of first energisation. Whist inspection and testing of all new supplies is undertaken

More information

Electrical Safety Policy

Electrical Safety Policy Electrical Safety Policy This procedural document supersedes: Trust Electrical Safety Policy, September 2008 Did you print this document yourself? The Trust discourages the retention of hard copies of

More information

NZQA registered unit standard version 4 Page 1 of 5. Carry out switching operations on metal clad switchgear

NZQA registered unit standard version 4 Page 1 of 5. Carry out switching operations on metal clad switchgear Page 1 of 5 Title Carry out switching operations on metal clad switchgear Level 4 Credits 3 Purpose People credited with this unit standard are able to: demonstrate knowledge of metal clad switchgear,

More information

NZQA registered unit standard version 4 Page 1 of 5

NZQA registered unit standard version 4 Page 1 of 5 Page 1 of 5 Title Demonstrate the requirements for holding access permits for work on high voltage electrical lines, cables, and equipment Level 3 Credits 4 Purpose People credited with this unit standard

More information

NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY NHMFL LOCKOUT/TAGOUT SAFETY PROCEDURE SP-1

NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY NHMFL LOCKOUT/TAGOUT SAFETY PROCEDURE SP-1 NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY NHMFL LOCKOUT/TAGOUT SAFETY PROCEDURE SP-1 TITLE: SAFETY CLEARANCE PROCEDURE LOCKOUT/TAGOUT HEAD of MAGNET OPERATIONS Bryon Dalton

More information

Supervision Guideline for Apprentice Lineworkers (Distribution)

Supervision Guideline for Apprentice Lineworkers (Distribution) Supervision Guideline for Apprentice Lineworkers (Distribution) This Guideline has been developed by the Victorian Electricity Supply Industry (VESI) Skills and Training Reference Committee to provide

More information

VEHICLE DAMAGE QUANTIFICATION GOVERNANCE BODY OF SOUTH AFRICA. Recognition of Prior Learning Policy

VEHICLE DAMAGE QUANTIFICATION GOVERNANCE BODY OF SOUTH AFRICA. Recognition of Prior Learning Policy VEHICLE DAMAGE QUANTIFICATION GOVERNANCE BODY OF SOUTH AFRICA Recognition of Prior Learning Policy Table of Contents Recognition of Prior Learning Policy... 1 1. Introduction... 4 2. Legal Framework for

More information

Distribution Information Exchange Code

Distribution Information Exchange Code Distribution Information Exchange Code Version 5.1 Approved September 2007 Comments to this document can be forwarded to: The RSA Grid Code Secretariat Attention: Mr. Bernard Magoro Eskom, Transmission

More information

QUALIFICATION HANDBOOK

QUALIFICATION HANDBOOK QUALIFICATION HANDBOOK Level 2 NVQ Diploma in Plastering (Construction) (6573-22/24) March 2018 Version 1.0 Qualification at a glance Subject area Plastering (Construction) City & Guilds number 6573 Age

More information

ECP SECONDARY COMMISSIONING REQUIREMENTS

ECP SECONDARY COMMISSIONING REQUIREMENTS Document Number: ECP 11-0002 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0002 SECONDARY COMMISSIONING REQUIREMENTS EPN, LPN, SPN This standard details the commissioning requirements

More information

QUALIFICATION HANDBOOK

QUALIFICATION HANDBOOK QUALIFICATION HANDBOOK Level 2 NVQ Diploma in Controlling Lifting Operations - Slinger/Signaller (Construction) (6564-02) May 2013 Version 1.0 Qualification at a glance Subject area Controlling Lifting

More information

SSR Competency Assurance Guidance Booklet No.1 (Process and Requirements) Revision 0 October 2014 HSEQ Department, TRANSCO

SSR Competency Assurance Guidance Booklet No.1 (Process and Requirements) Revision 0 October 2014 HSEQ Department, TRANSCO SSR Competency Assurance Guidance Booklet No.1 (Process and Requirements) Revision 0 October 2014 HSEQ Department, TRANSCO Disclaimer: This document is for general guidance and awareness purposes only

More information

Level 2 NVQ Diploma in Formwork ( ) December 2015 Version 4.0

Level 2 NVQ Diploma in Formwork ( ) December 2015 Version 4.0 Level 2 NVQ Diploma in Formwork (6580-02) December 2015 Version 4.0 QUALIFICATION HANDBOOK Qualification at a glance Subject area City & Guilds number 6580 Formwork Age group approved 16-18, 19+ Entry

More information

Qualification manual

Qualification manual Qualification manual Qualification title: EAL Level 2 NVQ Diploma in Composite Engineering Qualification code: 600/8085/1 NVQ qualification manual - Issue 2.0 Contents 1.0 About EAL. 3 1.1 Equal opportunities

More information

AGREEMENT FOR CONNECTION TO [EASTERN /LONDON / SOUTH EASTERN] POWER NETWORKS PLC S DISTRIBUTION SYSTEM

AGREEMENT FOR CONNECTION TO [EASTERN /LONDON / SOUTH EASTERN] POWER NETWORKS PLC S DISTRIBUTION SYSTEM AGREEMENT FOR CONNECTION TO [EASTERN /LONDON / SOUTH EASTERN] POWER NETWORKS PLC S DISTRIBUTION SYSTEM BETWEEN AND (1) [Eastern / London / South Eastern] Power Networks plc Company Number [02366906 / 03929195

More information

MASS MANAGEMENT ACCREDITATION STANDARDS

MASS MANAGEMENT ACCREDITATION STANDARDS Mass Management Accreditation Standards June 2006 Page 1 MASS MANAGEMENT ACCREDITATION STANDARDS Introduction The Mass Management Accreditation Program forms one of the operational modules of the National

More information

Pre-commissioning Requirements for Independent Connection Providers Requiring New Assets to be Connected to the 11/6.6kV Network

Pre-commissioning Requirements for Independent Connection Providers Requiring New Assets to be Connected to the 11/6.6kV Network Electricity Specification 220 Issue 3 December 2016 Pre-commissioning Requirements for Independent Connection Providers Requiring New Assets to be Connected to the 11/6.6kV Network Contents 1 Introduction

More information

STCP 11-1 Issue Outage Planning

STCP 11-1 Issue Outage Planning STCP 11-1 Issue 004 005 Outage Planning STC Procedure Document Authorisation Party Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission Ltd Scottish Hydro-Electric

More information

Contractor s Guide to Applying for Permit to Dig/Excavate

Contractor s Guide to Applying for Permit to Dig/Excavate Contractor s Guide to Applying for Permit to Dig/Excavate Page 1 of 15 Contractor s Guide to Applying for Permit to Dig/Excavate Contents Purpose... 3 Inclusion Group... 3 1. Pre commencement worksite

More information

Permit Manager Training Guide Apply for Permit to Isolate High Voltage

Permit Manager Training Guide Apply for Permit to Isolate High Voltage Permit Manager Training Guide Apply for Permit to Isolate High Voltage Details of revisions Level Details Date Initial 01 Creation of initial document for use 06-01-17 J.O S 02 Revisions from Permit Workshops

More information

Specification for UDC Electrical Testing

Specification for UDC Electrical Testing Ergon Energy Corporation Limited Specification for UDC Electrical Testing RSC10 Abstract: Electrical Testing for Underground Distribution Construction (UDC) Specification RSC10 Ver 5 Contents 1. Purpose

More information

Health and Safety Policy Statement

Health and Safety Policy Statement Statement is committed to a programme of continual improvement in OH&S management and performance to all employees, contractors/subcontractors, visitors and anyone else who may be exposed to the Company

More information

Supervision Guideline for Electrician to Lineworker Apprentices

Supervision Guideline for Electrician to Lineworker Apprentices Supervision Guideline for Electrician to Lineworker Apprentices This Guideline has been developed by the Victorian Electricity Supply Industry (VESI) Skills and Training Reference Committee to provide

More information

ED-EDM-P1 Work in Vicinity of MV and LV Network Service Information Sheet (SIS)

ED-EDM-P1 Work in Vicinity of MV and LV Network Service Information Sheet (SIS) Work in Vicinity of MV and LV Network Service Information Sheet (SIS) Issue : 2 17-05-2018 Public Page 1 of 10 Document Control Department Document Type Document Title ED Procedure Issue Approval Work

More information

These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National

These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National Grid, on or near to its electricity apparatus. National

More information

COMMERCIAL-IN-CONFIDENCE Operational Procedure: High Voltage: Customer Operational Training Requirements

COMMERCIAL-IN-CONFIDENCE Operational Procedure: High Voltage: Customer Operational Training Requirements Operational Procedure: High Voltage: Customer Operational Training Before you begin 1 CHECK that this printed document is the most recent version before you use it The online version of this document is

More information

IMP/001/010 Code of Practice for Standard Arrangements for Customer Connections

IMP/001/010 Code of Practice for Standard Arrangements for Customer Connections Version:- 6.0 Date of Issue:- August 2015 Page 1 of 62 IMP/001/010 Code of Practice for Standard Arrangements for Customer Connections 1 Purpose The purpose of this document is to state Northern Powergrid

More information

Candidate NICET ID No.: NICET ENGINEERING TECHNICIAN CERTIFICATION Experience Application, Part II: Verifier Data. (Please print legibly or type)

Candidate NICET ID No.: NICET ENGINEERING TECHNICIAN CERTIFICATION Experience Application, Part II: Verifier Data. (Please print legibly or type) Candidate: Experience Application, Part II: Verifier Data Candidate NICET ID No.: SM Standard Model (Please print legibly or type) To be completed by the Verifier only Name: Title: Current employer: Daytime

More information

ERECTION OF POLES INTO LIVE HV (11kV and below) AND LV OVERHEAD LINES

ERECTION OF POLES INTO LIVE HV (11kV and below) AND LV OVERHEAD LINES 1. SCOPE This section of the Live Working Manual details the Approved procedures to be employed in erecting a new pole into, or in close proximity to, Live HV (11kV and below) and LV conductors using one

More information

Company 'A' Wind Turbine Safety Rules (3 rd Edition) 2015

Company 'A' Wind Turbine Safety Rules (3 rd Edition) 2015 Company 'A' Wind Turbine Safety Rules (3 rd Edition) 2015 Support Procedure P8 PROCEDURE FOR APPROVAL OF ELECTRONIC SAFETY DOCUMENT SYSTEMS FOREWORD The purpose of this procedure is to enable Company A

More information

1. Policy Xact recognises how the contribution of an applicant s previous experience could contribute to a qualification.

1. Policy Xact recognises how the contribution of an applicant s previous experience could contribute to a qualification. RPL: Recognition of Prior Learning Policy 1. Policy Xact recognises how the contribution of an applicant s previous experience could contribute to a qualification. Applicants will be accredited with Recognition

More information

IMP/001/010 Code of Practice for Standard Arrangements for Customer Connections

IMP/001/010 Code of Practice for Standard Arrangements for Customer Connections Version:- 6.1 Date of Issue:- August 2017 Page 1 of 59 IMP/001/010 Code of Practice for Standard Arrangements for Customer Connections 1 Purpose The purpose of this document is to state Northern Powergrid

More information

UNIT Land-based Engineering: Electrics: Introduction (SCQF level 6)

UNIT Land-based Engineering: Electrics: Introduction (SCQF level 6) National Unit Specification: general information UNIT Land-based Engineering: Electrics: Introduction (SCQF level 6) CODE F91A 12 SUMMARY This Unit may form part of a National Qualification Group Award

More information

Technical Guideline for. Section 8. Inspection and Approval of Construction

Technical Guideline for. Section 8. Inspection and Approval of Construction Technical Guideline for Section 8. Inspection and Approval of Construction Ontario Regulation 22/04 Electrical Distribution Safety January 12, 2005 Technical Guideline Section 8 General Legal Disclaimer

More information

M.B. Power Services (Essex) Ltd

M.B. Power Services (Essex) Ltd M.B. Power Services (Essex) Ltd HEALTH & SAFETY POLICY 1 POLICY STATEMENT The company recognises that under the Health & Safety at Work Act 1974 the Company has a legal duty to ensure so far as is reasonably

More information

BAFE SP203-1 Assessment Check List

BAFE SP203-1 Assessment Check List BAFE SP203-1 Assessment Check List To be Read in conjunction with BAFE SP203-1 Version 5 May 2011 General A minimum of 2 projects, with all relevant documentation and certification are available for review.

More information

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)

More information

NZQA registered unit standard version 3 Page 1 of 5. Install high voltage (HV) electricity network overhead conductors

NZQA registered unit standard version 3 Page 1 of 5. Install high voltage (HV) electricity network overhead conductors Page 1 of 5 Title Install high voltage (HV) electricity network overhead conductors Level 4 Credits 8 Purpose People credited with this unit standard are able to: interpret scope of work for installing

More information

GUIDANCE ON THE APPLICATION OF THE IRSE LICENSING SCHEME. July 2015

GUIDANCE ON THE APPLICATION OF THE IRSE LICENSING SCHEME. July 2015 GUIDANCE ON THE APPLICATION OF THE IRSE LICENSING SCHEME July 2015 Contents 1 About the Licensing Scheme 3 2 What is a Competence Management System? 5 3 What elements of a CMS does the IRSE Licensing

More information

Northern Powergrid Appendix B for ENA Engineering Recommendation G81 Part 4: Design and Planning

Northern Powergrid Appendix B for ENA Engineering Recommendation G81 Part 4: Design and Planning Version:- 2.0 Date of Issue:- Sept 2013 Page 1 of 10 Northern Powergrid Appendix B for ENA Engineering Recommendation G81 Part 4: Design and Planning Framework for design and planning, materials specification,

More information

Wayleave Application for Non-Queensland Rail Service

Wayleave Application for Non-Queensland Rail Service Wayleave Application for Non-Queensland Rail Service This form may only be used for applications lodged in the 2018-19 financial year Form Instructions This form contains important information on how to

More information

Name: Phil Langlois Position: Lead Electrical Engineer, Ontario Operations

Name: Phil Langlois Position: Lead Electrical Engineer, Ontario Operations Page of 8 Training Code (N/A): Document Owner: Name: Phil Langlois Position: Lead Engineer, Ontario Operations Table of Contents.0 PURPOSE... 2 2.0 APPLICATION... 2 2.. EXCEPTIONS... 2 3.0 REFERENCES...

More information

Powerline Technician On-the-Job Training Guide

Powerline Technician On-the-Job Training Guide Powerline Technician On-the-Job Training Guide Powerline Technicians construct and maintain overhead and underground power lines and related equipment. Training Requirements: 6800 hours (4 years) including:

More information

1. Purpose This procedure provides a guideline for developing operating competency training and assessment documentation and training plans.

1. Purpose This procedure provides a guideline for developing operating competency training and assessment documentation and training plans. ACCESS PRACTICE AP 34 Operator Training Competency Guideline Process Authority: Manager Operations Improvement Approval: Chief Operating Officer Version Date:27/08/2013 Revision: A 1. Purpose This procedure

More information

UNIT Inspection and Testing of Electrical Installations (SCQF level 5)

UNIT Inspection and Testing of Electrical Installations (SCQF level 5) National Unit Specification: general information CODE F5FS 11 SUMMARY This Unit is intended for candidates with little or no prior knowledge of inspection and testing of electrical installations but who

More information

Eur Ing Ian Hogarth CEng CIWE CEWE EWIE FWeldI Compliance Verification Engineer for TWI Certification Ltd.

Eur Ing Ian Hogarth CEng CIWE CEWE EWIE FWeldI Compliance Verification Engineer for TWI Certification Ltd. Eur Ing Ian Hogarth CEng CIWE CEWE EWIE FWeldI Compliance Verification Engineer for TWI Certification Ltd. How can I become a Responsible Welding Coordinator (RWC) to comply with ISO 3834 and ISO 14731-1?

More information

Permit to Work Manual

Permit to Work Manual Permit to Work Manual Release Date March 2016 CS-PTW-01 Version 3.1 Originator PTW Committee For further information, contact your supervisor or the site safety department. THIS DOCUMENT IS UNCONTROLLED

More information

Distribution Tradesperson (Jobsplus Permit No. 706/2017)

Distribution Tradesperson (Jobsplus Permit No. 706/2017) CAREER OPPORTUNITIES Enemalta plc is the leading energy service provider in the Maltese Islands, entrusted with the generation and distribution of electricity and the development of the national electricity

More information

Quality Assurance Manual

Quality Assurance Manual Quality Assurance Manual Current Electrical is committed to leading the market in satisfying customer needs by providing versatile and innovative electrical and control solutions We take pride in the ability

More information

Level 3 Diploma in Electrical Power Engineering - CT/VT Metering ( )

Level 3 Diploma in Electrical Power Engineering - CT/VT Metering ( ) Level 3 Diploma in Electrical Power Engineering - CT/VT Metering (2339-34) Accreditation number: 500/7210/9 Qualification Units www.cityandguilds.com August 2009 Version V1 Contents About this document

More information

Training. Commercial Engineering Services. High Voltage Engineering Specialists A unique combination of experience and expertise

Training. Commercial Engineering Services. High Voltage Engineering Specialists A unique combination of experience and expertise What will you learn today? Training Commercial Engineering Services High Voltage Engineering Specialists A unique combination of experience and expertise Training Contents 02 01 Our Academy 03 02 Why Choose

More information

Specifications. Level 1 Essential Energy Works for the Warialda Truck Wash

Specifications. Level 1 Essential Energy Works for the Warialda Truck Wash Specifications Request for Quotation (RFQ) RFQ Title RFQ Number Level 1 Essential Energy Works for the Warialda Truck Wash GWY_1819_Q03 Issue Date 21st December 2018 This document contains the specification

More information

QUALIFICATION HANDBOOK

QUALIFICATION HANDBOOK QUALIFICATION HANDBOOK Level 3 NVQ Diploma in Plastering (Construction) (6573-07/08) April 2018 Version 1.1 Qualification at a glance Subject area City & Guilds number 6573 Age group approved 16-18; 19+

More information

INFORMATION PROVIDED TO ASSIST THE TENDERER FOR THE SUPPLY OF:

INFORMATION PROVIDED TO ASSIST THE TENDERER FOR THE SUPPLY OF: Page 1 of 7 Authorised by: A.B. Network Services Manager Proposed Review Date: Dec. 11 Issue Date: Dec. 06 No of this copy: INFORMATION PROVIDED TO ASSIST THE TENDERER FOR THE SUPPLY OF: ITEM: TERMINATIONS

More information

QP 02 Audit and Certification Procedure

QP 02 Audit and Certification Procedure 1. AUDIT PROGRAMME [9.1.1] The audit programme shall be conducted in stages within a 3-year certification cycle as follows; Initial audit: Two stage process Surveillance audit: Conducted in the first and

More information

Hazardous. Scheme. the power behind your business

Hazardous. Scheme. the power behind your business Hazardous Areas Scheme YOUR GUIDE TO REGISTRATION the power behind your business GUIDE TO REGISTRATION REQUIREMENTS Electrical work in potentially explosive atmospheres (hazardous areas) is not included

More information

Transmission System Security and Planning Standards

Transmission System Security and Planning Standards ver. 1.4 page 1 from 13 Transmission System Security and Planning Standards April 2014 ver. 1.4 page 2 from 13 TABLE OF CONTENTS 1 Introduction... 4 2 Definitions... 4 2.1 Transmission System... 4 2.2

More information

Level 3 Diploma in Warehousing and Storage ( )

Level 3 Diploma in Warehousing and Storage ( ) Level 3 Diploma in Warehousing and Storage (06-07) Candidate logbook 600/3766/0 www.cityandguilds.com January 202 Version.0 About City & Guilds City & Guilds is the UK s leading provider of vocational

More information

Transmission Substation Field Instructions

Transmission Substation Field Instructions 4.3 Substation Clearances Purpose This instruction describes the Safe Approach Distance from live electrical apparatus when working in an electrical substation. It supports the requirements detailed in

More information

ELECTRICAL EQUIPMENT IN HAZARDOUS AREAS (EEHA) VERIFICATION DOSSIER STANDARD

ELECTRICAL EQUIPMENT IN HAZARDOUS AREAS (EEHA) VERIFICATION DOSSIER STANDARD Planning and Capability Group Mechanical and Electrical Services ELECTRICAL EQUIPMENT IN HAZARDOUS AREAS (EEHA) Document No.: VERSION 7 REVISION 1 AUGUST 2014 FOREWORD Electrical Equipment in Hazardous

More information

On successful completion of the Unit candidates will be able to carry out a simple earthing exercise on a simulated electrical installation.

On successful completion of the Unit candidates will be able to carry out a simple earthing exercise on a simulated electrical installation. National Unit Specification: general information CODE F5HE 11 SUMMARY This Unit is designed for candidates with little or no prior knowledge of earthing systems for electrical installations but who wish

More information

ELECTRICAL APPLICATIONS AND DESIGN SI MODULE CODE N CREDITS 15 LEVEL 7

ELECTRICAL APPLICATIONS AND DESIGN SI MODULE CODE N CREDITS 15 LEVEL 7 MODULE DESCRIPTOR TITLE ELECTRICAL APPLICATIONS AND DESIGN SI MODULE CODE 55-7665-00N CREDITS 15 LEVEL 7 JACS CODE H600 SUBJECT GROUP Automation and Operations Engineering DEPARTMENT Engineering and Mathematics

More information

DOMESTIC ELECTRICAL INSTALLATION PERIODIC INSPECTION REPORT (FOR A SINGLE DWELLING) B ADDRESS AND DETAILS OF THE INSTALLATION Address: SPECIMEN

DOMESTIC ELECTRICAL INSTALLATION PERIODIC INSPECTION REPORT (FOR A SINGLE DWELLING) B ADDRESS AND DETAILS OF THE INSTALLATION Address: SPECIMEN A DETAILS OF THE CLIENT Client / Address: C PURPOSE OF THE REPORT Purpose for which this report is required: E PARTICULARS OF THE CONTRACTOR Trading Title: Address: DOMESTIC ELECTRICAL INSTALLATION PERIODIC

More information

SITE SAFETY RULES - SILVERSTONE CLASSIC 2018

SITE SAFETY RULES - SILVERSTONE CLASSIC 2018 SITE SAFETY RULES - SILVERSTONE CLASSIC 2018 The following is an outline of the Safe Working Requirements for all Companies, staff and any other persons for this event. Please note that the terms Company

More information

SIGNALS RAIL SAFETY WORKER COMPETENCE

SIGNALS RAIL SAFETY WORKER COMPETENCE Engineering Standard Signals L1-CHE-MAN-003 SIGNALS RAIL SAFETY WORKER Version: 3 Issued: February 2018 Owner: Engineering Approved By: Phil Ellingworth Chief Engineer PRINTOUT MAY NOT BE UP-TO-DATE; REFER

More information

Electrical Engineering

Electrical Engineering Electrical Engineering Unit - EE08 Equipment Inspection and Condition Monitoring This training specification has been developed from the utilities engineering technician standard. This training specification

More information

Ergon Energy Corporation Limited. Specification for UDC Design RSD01. Specification RSD01 Ver 7. Ergon Energy Corporation Limited ABN

Ergon Energy Corporation Limited. Specification for UDC Design RSD01. Specification RSD01 Ver 7. Ergon Energy Corporation Limited ABN Ergon Energy Corporation Limited Specification for UDC Design RSD01 Specification RSD01 Ver 7 Contents 1. PURPOSE AND SCOPE... 1 2. REFERENCES... 1 2.1 ERGON ENERGY CONTROLLED DOCUMENTS... 1 3. DEFINITIONS,

More information

Apply for Permit to Dig/Excavate

Apply for Permit to Dig/Excavate Apply for Permit to Dig/Excavate Title: Apply for Permit to Dig/Excavate (Guide) Date Published: 23/03/2018 Page 1 Apply for Permit to Dig/Excavate 1 Introduction 3 1.1 Purpose 3 1.2 Inclusion Group 3

More information

University of Portsmouth Safe System of Work Policy

University of Portsmouth Safe System of Work Policy University of Portsmouth Safe System of Work Policy Document title University of Portsmouth Safe System of Work Policy Document author and department Jonathan Latter Health & Safety Compliance Manager

More information

Level 2 NVQ Certificate in Erection of Precast Concrete (Construction)

Level 2 NVQ Certificate in Erection of Precast Concrete (Construction) Level 2 NVQ Certificate in Erection of Precast Concrete (Construction) Qualification Specification ProQual 2016 Contents Introduction 3 Qualification profile 3 Qualification Structure 4 Pathway 1 Flooring

More information

Engineering Recommendation G81 - Part 4: Design and Planning

Engineering Recommendation G81 - Part 4: Design and Planning PRODUCED BY THE ENGINEERING DIRECTORATE OF THE ENERGY NETWORKS ASSOCIATION Engineering Recommendation G81 - Part 4: Design and Planning Issue 2 Amendment 1 January 2008 Framework for design and planning

More information

Demonstrate the requirements for holding permits on high voltage electrical equipment

Demonstrate the requirements for holding permits on high voltage electrical equipment Page 1 of 6 Demonstrate the requirements for holding permits on high voltage electrical equipment Level 3 Credits 2 Purpose People credited with this unit standard are able to: describe the requirements

More information