1 PRINCE2 VS PMBOK FRIEND OR FOE A presentation to: PMI Vancouver Island Chapter May 21, 2009 Presented by: Julie Grabb PMP Prince2 Practitioner Prince2 Authorized Trainer WOULDN T IT BE NICE: Let the Project Manager Manage. Specific definition of what the Executives & other key stakeholders are responsible for. No weekly team status meetings. No monthly steering committee meetings. Give me some wiggle room in the plan. Periodic review of the continued viability of the project. A detailed definition of how to document and build QUALITY into my project plan. A list of document templates and definitions of what should be in them & where the information comes from. Page 2 Advantage Learning Ltd 2008 Page 1
2 BASICS PRINCE2 is generic: Developed by OGC in UK Applicable to any type of project / scalable International situation: In 59 countries In Canada: since 2007 over 300 certifications Page 3 WHAT IS PRINCE2? PRINCE2 = PRojects IN Controlled Environments Is a structured method for effective project management. ref: Managing Successful Projects with Prince2 Key Principles: Regular review of progress against the Business Case. Management by Exception. Controlled start, middle & end. Manage one stage at a time. Page 4 Advantage Learning Ltd 2008 Page 2
3 WHY PRINCE2 WHEN THERE IS PMBOK? Section 1.1 (ref: PMBOK 4 th Edition) This standard is a guide rather than a methodology. One can use different methodologies and tools to implement the framework. the PMBOK Guide is neither a textbook, nor a step-by-step, or how to type of reference PMI Today, Feb 2006 Section Project Management Office (ref: PMBOK 4 th Edition) Some of the key features of a PMO may include Identifying & developing project management methodology, best practices & standards. Page 5 BUSINESS CASE PMBOK Acknowledges the existence of a business case as input to developing the project charter. Initiation starts after the business case has been accepted. Section In the early stages of the project life cycle, periodic review of the business case by the sponsoring organization also helps to confirm that the project is still required. Prince2 Starts with a project mandate and creates the outline business case as part of the project brief. Business case approved by the Project Board as part of the P.I.D. in Approving the Project. Business Case is a key project control document at the end of each stage. Page 6 Advantage Learning Ltd 2008 Page 3
4 PHASES/STAGES PMBOK : Section 2.1 Project life cycle overview The project life cycle is a collection of generally sequential project phases A life cycle can be documented with a methodology. Section Project Phases Are a collection of logically related project activities usually culminating in the completion of a major deliverable. End of a Phase formally closed with a review of the deliverable. obtaining authorization to close the current phase and initiate the subsequent one. if the project risk is deemed to be too great a phase can be closed with the decision to not initiate any other phases. Page 7 PHASES/STAGES PRINCE2: Section Project life cycle (technical stages) Technical stages can coincide with the management stages of P2 Section 16.6 Project Stages Are partitions of the project with management decision points. Contains specific products to be produced. End of a Stage Managing Stage Boundaries process. Identifies WHAT you need to do and produce. Specifically reviews risks & issues. Specifically reviews & updates the business case & viability. Plans the next Stage. Page 8 Advantage Learning Ltd 2008 Page 4
5 PMBOK SAYS: VS PRINCE2 DOES: Tolerances (specified range of acceptable results) and control limits (thresholds, which can indicate whether the process is out of control. ref: PMBOK 4 th Edition Section 8.3 Perform Quality Control the permissible deviation above and below a plan s estimate of time & cost without escalating the deviation to the next level of management. Separate tolerance figures should be given for time and cost. There may also be tolerance levels for quality, scope, benefit and risk. Tolerance is applied at project, stage and team levels. ref: Managing Successful Projects with Prince2 - Glossary Page 9 PMBOK SAYS: VS PRINCE2 DOES: Project Org Charts part of HR plan A graphic display of project team members and their reporting relationships Sponsor / customer / user defined Roles & Responsibilities nothing specifically defined Project Board specifically defined roles and responsibilities includes business, User & Supplier interests ref: Managing Successful Projects with Prince2 - Glossary Page 10 Advantage Learning Ltd 2008 Page 5
6 PMBOK SAYS: VS PRINCE2 DOES: Acceptance Criteria Those criteria, including performance requirements and essential conditions, which must be met before project deliverables are accepted. ref: PMBOK 4 th Edition Glossary Quality Metrics/Criteria A definition in measurable terms of the characteristics required of the final product(s) for it/them to be acceptable to the customers and staff who will be affected. ref: Managing Successful Projects with Prince2 Acceptance Criteria Product Description Quality Criteria Page 11 PRINCE2 ENHANCES QUALITY Description of the Project Quality Plan. Definition of what to include in: Customer quality expectations Acceptance criteria Definition of info to include in each product description: Quality criteria Quality method Quality skills/responsibilities Inclusion of quality definitions at all plan levels and in the authorization of work packages to a team manager. So that all can be included in the plans at the appropriate level. Page 12 Advantage Learning Ltd 2008 Page 6
7 SCOPE & CONTEXT OF PRINCE2 Expectations Programmes Tools Techniques People Configuration Management Mission Project Business PRINCE2 Strategy Operations Benefits Crown Copyright 2005 Reproduced under licence from OGC Page 13 8 PROCESSES Directing a Project Starting up a Project Initiating a Project Controlling a Stage Managing Stage Boundaries Closing a Project Managing Product Delivery Planning Crown Copyright 2005 Reproduced under licence from OGC Page 14 Advantage Learning Ltd 2008 Page 7
8 8 COMPONENTS Change Control Business Case Configuration Management Organization Quality in a Project Environment Processes Plans Management of Risk Controls Crown Copyright 2005 Reproduced under licence from OGC Page 15 3 TECHNIQUES Product Based Planning Quality Review Technique Change Control Technique Crown Copyright 2005 Reproduced under licence from OGC Page 16 Advantage Learning Ltd 2008 Page 8
9 CERTIFICATION OPTIONS PRINCE2 Foundation Certificate: 3 days training Delivers PRINCE2 knowledge, terminology 1 hour, multiple choice exam 100% pass rate PRINCE2 Registered Practitioner: 2 additional days training (usually a 5 day, combined, class) Delivers PRINCE2 application, scalability 3 hour, Objective Testing paper 94% pass rate Page 17 QUESTIONS + NEXT STEPS? Advantage Learning Ltd 2008 Page 9
Guten Tag. (good day)
Guten Tag (good day) 4.5 Perform Integrated Change Control How a person may percieve change: paideiagroup.com 4.5 Perform Integrated Change Control Consider what change is: Crossing unknown territory Departing
More informationPMP PMBOK 5 th Edition Course Agenda
PMP PMBOK 5 th Edition Course Agenda 1. Introduction to PMP Course Certification What are PMI and PMP Application Requirements for the PMP Exam Guidelines to Fill Up the PMP Application About the PMP Exam
More informationPRINCE2 FOUNDATION INSTRUCTOR LED TRAINING
FACT SHEET PRINCE2 FOUNDATION INSTRUCTOR LED TRAINING LEARN PRINCE2 AND GAIN FIRST CLASS PROJECT MANAGEMENT SKILLS GreyCampus provides PRINCE2 Foundation Instructor Led Training that helps professionals
More informationPM tutor. The Business Case, SOW and The Project Charter. Presented by Dipo Tepede, PMP, SSBB, MBA. Empowering Excellence
PM tutor Empowering Excellence The Business Case, SOW and The Project Charter Presented by Dipo Tepede, PMP, SSBB, MBA This presentation is copyright 2009 by POeT Solvers Limited. All rights reserved.
More informationPRINCE2 and the National and International Standards
PRINCE2 and the National and International Standards Robert Buttrick, Project Workout Limited White Paper December 2012 2 PRINCE2 and the National and International Standards Contents 1 Introduction 3
More information7.11b: Quality in Project Management: A Comparison of PRINCE2 Against PMBOK
by Peter Whitelaw, Rational Management Pty Ltd, Melbourne Introduction This comparison takes each part of the PMBOK and provides comments on what match there is with elements of the PRINCE2 method. It's
More informationComparing PMBoK and PRINCE2 in 2013
Abstract Comparing PMBoK and PRINCE2 in 2013 G J Rankins CPPD MApplSc MBA This paper reports on a detailed comparison of the latest versions of the PMBoK (5th edition) [1] and PRINCE2 (5th edition) [2].
More informationPMI Scheduling Professional (PMI-SP)
PMI Scheduling Professional (PMI-SP) E X A M I N AT I O N CO N T E N T O U T L I N E Project Management Institute PMI Scheduling Professional (PMI-SP) Exam Content Outline Published by: Project Management
More informationAgenda. PMBOK Guide Third Edition. PMI Standards Background. PMI Life Cycle Plan for Standards. Presented by Kevin Chui, PMP. How Did We Get Here?
Agenda PMBOK Guide Third Edition Presented by Kevin Chui, PMP Vice President, PMI Hong Kong Chapter Background PMBOK Guide 2004 Update Project Structural Changes to the Standard Process Group Changes Knowledge
More informationThe Pen Project A fully documented sample PRINCE2 project
by Management Plaza The Pen Project A fully documented sample PRINCE2 project ISBN: 9789082114706 By: Frank Turley, Nader K. Rad Date: 24/9/2013 Version: 01.15 Free Edition Check for Updates: www.mgmtplaza.com/latestversion
More informationCourse outline Introduction to project management The project management process groups Project initiation
Course outline Introduction to project management The project management process groups Project initiation Total Quality Project Management 2 Many organizations today have a new or renewed interest in
More informationProject Management Standards Applied to Complex Clinical Trials. Disclaimer
Project Management Standards Applied to Complex Clinical Trials Alexander Gissler, PMP ProjectPharm Ltd., Owner & Director 1 Disclaimer The views and opinions expressed in the following PowerPoint slides
More informationProject Management Professional (PMP)
Project Management Professional (PMP) E X A M I N AT I O N CO N T E N T O U T L I N E Project Management Institute Project Management Professional (PMP) Examination Content Outline June 2015 Published
More informationNote: See the text itself for full citations.
Note: See the text itself for full citations. Describe the importance of creating plans to guide project execution, and list several planning processes and outputs for project integration and scope management
More informationGUIDE TO THE CHANGES IN PMP simpl learn i
GUIDE TO THE CHANGES IN PMP- 2015 simpl learn i Table of contents Introduction the purpose of this manual 1 New Tasks: Initiating 3 New Tasks: Planning 4 New Tasks: Executing 6 New Tasks: Monitoring and
More informationIntroduction and Key Concepts Study Group Session 1
Introduction and Key Concepts Study Group Session 1 PD hours/cdu: CH71563-01-2018 (3 hours each session) 2015, International Institute of Business Analysis (IIBA ). Permission is granted to IIBA Chapters
More informationPRINCE2 - Project Initiation Documentation
Created/updated 05/11/17 PRINCE2 - Project Initiation Documentation Downloaded from stakeholdermap.com. Visit Prince2 Templates for more Prince2 downloads. Get a Mind Map Project Initiation Documentation
More informationPRINCE2 and the IPMA Competence Baseline (ICB 3) Michael Young, Reinhard Wagner. AXELOS.com
PRINCE2 and the IPMA Competence Baseline (ICB 3) Michael Young, Reinhard Wagner AXELOS.com White Paper May 2015 Contents Introduction 3 Relationship between ICB3 and PRINCE2 6 Comparison of ICB3 and PRINCE2
More informationProject Management for Non-Profits What s in it for you? Benefits of Improved Project Management (PM) Skills, Techniques and Processes.
Project Management for Non-Profits What s in it for you? Benefits of Improved Project Management (PM) Skills, Techniques and Processes Nov 2014 1 Overview What is a project? Impact on organizational results
More informationProject Stakeholder Management
Jambo (Swahili) Project Management Process Groups Project 4. Integration Management Initiating Planning Executing 5. Scope Monitoring & Controlling Closing Knowledge Areas 6. Time 7. Cost 8. Quality 9.
More informationFrequently Asked Questions (FAQs) Standards Updates
Revised: 1 August 2017 The PMBOK Guide Sixth Edition and the Agile Practice Guide bundle Q. When will the PMBOK Guide Sixth Edition and the Agile Practice Guide be published? A. Both publications will
More informationFor Portfolio, Programme, Project, Risk and Service Management. APMP for PRINCE2 Practitioners Graham Williams, Principle Consultant, GSW Consulting
For Portfolio, Programme, Project, Risk and Service Management for Practitioners Graham Williams, Principle Consultant, GSW Consulting White Paper January 2010 2 for Practioners 2009 Introduction The main
More informationThe Standard for Program Management
The Standard for Program Management What is it and How can it help me? Colleen McGraw, PMP 15 March 2007 Agenda Introduction Contents and Context Section 1 The Program management Framework Section 2 The
More informationPM tutor. Identify Stakeholders. Presented by Dipo Tepede, PMP, SSBB, MBA. Empowering Excellence. Powered by POeT Solvers Limited
PM tutor Empowering Excellence Identify Stakeholders Presented by Dipo Tepede, PMP, SSBB, MBA This presentation is copyright 2009 by POeT Solvers Limited. All rights reserved. This presentation is protected
More informationOverview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition
Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Topics for Discussion PMI Foundational Standards Harmonization of PMI s Foundational Standards Top 10 changes
More informationMESA unconference: ROI & Justification for Manufacturing IT Solutions
MESA unconference: ROI & Justification for Manufacturing IT Solutions (Original presentation available on MESA site library) Co-Hosts Darren Riley Solution Consultant Apriso Chair, MESA ROI WG Scott Daugherty
More informationPRINCE Update. Changes to the manual. AXELOS.com. April 2017 PUBLIC
PRINCE2 2017 Update s to the manual AXELOS.com April 2017 2 PRINCE2 2017 Update Contents 1 Introduction 3 2 Summary of changes 4 PRINCE2 2017 Update 3 1 Introduction This document provides a list of the
More informationIMPROVING PROJECT MANAGEMENT; ENABLING SUCCESS
IMPROVING PROJECT MANAGEMENT; ENABLING SUCCESS Praxis is a free, community driven framework which can help you and your organization realize the intended benefits of projects, programs and portfolios.
More informationPROJECT COMMUNICATIONS
PROJECT COMMUNICATIONS A No-Surprises Approach for PMI-Metrolina PDD September 15, 2012 Frank A. Clemente, PMP www.totalsystemseducation.com PROJECT COMMUNICATIONS A No-Surprises Approach The Importance
More informationIDENTIFY STAKEHOLDERS BEST PRACTICES 1. Identify Stakeholders Best Practices. Bill Carswell
IDENTIFY STAKEHOLDERS BEST PRACTICES 1 Identify Stakeholders Best Practices Bill Carswell IDENTIFY STAKEHOLDERS BEST PRACTICES 2 Abstract Identifying stakeholders is an enabling activity, leading to development
More informationPMBOK Guide Sixth Edition Updates and Agile Alignment By Tony Johnson July 2017
PMBOK Guide Sixth Edition Updates and Agile Alignment By Tony Johnson July 2017 Trademarks and Copyrights Materials in this presentation are based on the text, A Guide to the Project Management Body of
More informationPMP in the Real World. Scott Bailey, MBA, PMP, SSGB
PMP in the Real World Scott Bailey, MBA, PMP, SSGB PMP in the Real World Webinar purpose To understand the relevance of the PMI PMP certification and its influence on the success or failure of projects
More informationExam Questions PRINCE2-Foundation
Exam Questions PRINCE2-Foundation PRINCE2 Foundation exam https://www.2passeasy.com/dumps/prince2-founda tion/ 1. - (Topic 1) Which two roles are linked by the Managing Product Delivery process? A. Corporate
More informationPRINCE2-Foundation Exam Questions Demo PRINCE2-Exams. Exam Questions PRINCE2-Foundation
PRINCE2-Exams Exam Questions PRINCE2-Foundation PRINCE2 Foundation exam Version:Demo 1. - (Topic 1) Which two roles are linked by the Managing Product Delivery process? A. Corporate or programme management
More informationQuality Management Evaluation & Audit Policy
Title Quality Management Evaluation & Audit policy Document ID Director Mark Reynolds Status Final Owner Neil McCrirrick Version 1.1 Author Mark Reynolds Version Date 07/11/2011 Quality Management Evaluation
More informationContent Break-up & Methodology for awarding Contact Hours / PDUs
N.I.T.E - Project Management Professional (PMP) Exam Prep Course Content Break-up & Methodology for awarding Contact Hours / PDUs This course is based on Project Management Book of Knowledge PMBOK Guide
More informationPRINCE 2009 Edition Quick Reference Card
PRINCE 2009 Edition Quick Reference Card Defined Roles and Responsibilities Learn from Experience Continued Business Justification Progress Plans Business Case Manage by Stages Change Preproject stage
More informationFROM PRINCE TO 2009
FROM PRINCE2 2005 TO 2009 REFERENCE MANUALS The 2009 Refresh has brought about two new reference manuals: 1. Managing Successful Projects with PRINCE2 is written for those who manage or assist in the management
More informationPMINJ Chapter 02 May Symposium Strategic Portfolio Management
PMINJ Chapter 02 May Symposium 2016 Strategic Portfolio Management Dr. Ed Chapel, Senior Vice President www.njedge.net Te Wu, CEO of PMO Advisory www.pmoadvisory.com Strategic Portfolio Management LINKING
More informationScope Definition and Management DJT
Scope Definition and Management DJT01 0407 Copyright ESI International April 2007 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any
More informationSystematic Project Management
Systematic Project Management Karlos A. Artto at HUT S-72.124 Product Development of Telecommunication Systems Lecture on March 16, 2001 Systematic Project Management CONTENTS 1 What are the capabilities
More informationProject Communications Management
Project Communications Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. 2013 PMstudy.com.
More informationPMI - Minnesota August 14, Oh no - PMO. Presented by: Michael Vinje - PMP.
PMI - Minnesota August 14, 2007 Oh no - PMO Presented by: Michael Vinje - PMP 1 mvinje@trissential.com 2005 All Rights Reserved. Agenda Presentation Objective PMO Background & Survey What The Experts Said
More informationIntroduction and Key Concepts Study Group Session 1
Introduction and Key Concepts Study Group Session 1 PDU: CH71563-04-2017 (3 hours) 2015, International Institute of Business Analysis (IIBA ). Permission is granted to IIBA Chapters to use and modify this
More informationTRAINING AND CONSULTING
GBMC has a Global Footprint with offices in Asia, Europe, EMEA, and North America enabling us to serve customers Worldwide www.bmc-global.com TRAINING AND CONSULTING C ATA LO G U E 2017 GBMC Training Programs
More informationPROJECT SCOPE MANAGEMENT PLAN TEMPLATE
PROJECT SCOPE MANAGEMENT PLAN TEMPLATE This template guides you through each stage of preparing an effective scope management plan that ensures success. With this plan you clearly state the exact work
More informationManaging Successful Bids with PRINCE2 2009
Managing Successful Bids with PRINCE2 2009 A road-map for successful business development David Warley. Bid to Win Ltd 1 After this workshop you will have: Knowledge Be able to apply PRINCE2 principles
More informationPROJECT RESPONSIBILITY ASSIGNMENT MATRIX (RAM) TEMPLATE
PROJECT RESPONSIBILITY ASSIGNMENT MATRIX (RAM) TEMPLATE This template enables you to define and record the different roles and their associated responsibilities as they relate to your project. It performs
More informationUnderstanding Agile from a PMP s Perspective! Exploding the myth that Agile is not in the PMBOK
Understanding Agile from a PMP s Perspective! 1 Agile experts claim their best practices are outside the PMBOK Guide but that has no basis in fact! Fact As early as PMBOK Guide 2000 Edition, it identified
More informationNote: appendix may include further responsibilities or experience necessary for the particular role.
Job title Job family Project Manager Project Management Proposed band D Job purpose To collaborate with a business or product owner to deliver a project, or many projects; deliver expected outcomes and
More informationProject Management Professional (PMP) Boot Camp
Project Management Professional (PMP) Boot Camp According to the Project Management Institute, the world's leading association for the project management profession: "PMP Certification is the profession's
More informationProject Management Documentation Templates
Project Management Documentation Templates Free Download PROJECT MANAGEMENT DOCUMENTATION TEMPLATES PROJECT MANAGEMENT - OFFICIAL SITE Sat, 16 Dec 2017 01:34:00 GMT free project management templates. download
More informationNEW! The Project Manager & The Business Analyst. by Barbara A. Carkenord, CBAP, PMP, PMI-ACP
NEW! The Project Manager & The Business Analyst by Barbara A. Carkenord, CBAP, PMP, PMI-ACP A White Paper from RMC Project Management, Inc. www.rmcproject.com 10953 Bren Road East, Minnetonka, Minnesota
More informationPortfolio Management Professional (PfMP)
Portfolio Management Professional (PfMP) E X A M I N AT I O N CO N T E N T O U T L I N E Project Management Institute Portfolio Management Professional (PfMP) Examination Content Outline Published by:
More informationErrata 1 st Printing. Errata 2 nd Printing
Errata 1 st Printing NOTE: The following errata only pertain to the first printing of the PMBOK Guide Fifth Edition. In order to verify the print run of your book (or PDF), refer to the bottom of the copyright
More informationEngaging the Business to Ensure Project Success. Cindy Stonesifer, MBA, PMP
Engaging the Business to Ensure Project Success Cindy Stonesifer, MBA, PMP Objectives and Agenda Objectives. At the end of this session you will: Be aware of stakeholder classification models you can use
More informationRisk Management and Regulatory Examination/Compliance Seminar October 27, Eric Young CCO-Americas and CCO-IHC
Risk Management and Regulatory Examination/Compliance Seminar October 27, 2015 Eric Young CCO-Americas and CCO-IHC I. Volcker Rule: Overview of the Compliance Program 2 The Volcker Compliance Program:
More informationCopyright protected. Use is for Single Users only via a VHP Approved License. For information and printed versions please see
Business Analysis - Based on BABOK Guide Version 2 A Pocket Guide Other publications by Van Haren Publishing Van Haren Publishing (VHP) specializes in titles on Best Practices, methods and standards within
More informationUnit 11: Stakeholder Management (PMBOK Guide, Chapter 13)
(PMBOK Guide, Chapter 13) Stakeholder management identifies people, groups, and organizations that could impact or be impacted by the project. The topic has increased in importance with each new edition
More informationMANAGING EPM SOLUTION (Microsoft Project Server) AND THE DYNAMICS OF PMO ORGANIZATION
MANAGING EPM SOLUTION (Microsoft Project Server) AND THE DYNAMICS OF PMO ORGANIZATION Ground Rules Mobiles Silent Please! Raise your hand for Questions One conversation at a time Respect opinions of others
More informationTEMPLATES FOR MANAGING TRAINING PROJECTS
TEMPLATES FOR MANAGING TRAINING PROJECTS Willis H. Thomas, PhD, PMP TEMPLATES FOR MANAGING TRAINING PROJECTS Willis H. Thomas, PhD, PMP 2015 ASTD DBA Association for Talent Development (ATD) All rights
More informationHow a project approach will build change management capability across your organization
capability across your How a project approach will build change management capability across your Prosci Webinar How a project approach will build change management Enterprise Change Management Organizational
More informationPMO SIG March 2016 Meeting Summary
PMO SIG March 2016 Meeting Summary Introductions SIG attendees introduced themselves, with brief summary of PM experience and background. Presentation: Project Administration Presenter: Ed Mahler Reference
More informationAS/NZS ISO and AS/NZS ISO Management systems for records. Presented by Judith Ellis
AS/NZS ISO 30300 and AS/NZS ISO 30301 Management systems for records Presented by Judith Ellis Framework for Good Recordkeeping Records are evidence of business Records system characteristics Records characteristics
More informationTenStep Project Management Process Summary
TenStep Project Management Process Summary Project management refers to the definition and planning, and then the subsequent management, control, and conclusion of a project. It is important to recognize
More informationManaging Successful Programmes (MSP) Practitioner Pre-Course Work
Managing Successful Programmes (MSP) Practitioner Pre-Course Work Version 4.2 MSP is a registered trademark of the Cabinet Office The Swirl Logo is a trademark of the Cabinet Office PBPMSPP Pre-Reading
More informationCONFIGURATION MANAGEMENT PLAN TEMPLATE
CONFIGURATION MANAGEMENT PLAN TEMPLATE This template helps you to create a Configuration Management (CM) Plan that allows a formal structure to describe how configuration management will be managed to
More informationExam Duration: 2 hours and 30 minutes
The PRINCE2 Practitioner Examination Sample paper TR Question Booklet Multiple Choice Exam Duration: 2 hours and 30 minutes Instructions 1. You should attempt all 75 questions. Each question is worth one
More informationProject Scope Management
Assalam-o-alaikum Project Management Process Groups Project Integration Management Knowledge Areas Initiating Planning Executing Scope Time Cost Quality Human Resources Communications Monitoring & Controlling
More informationSharePoint Governance at BMO. How we took action to curb the sprawl of sites
SharePoint Governance at BMO How we took action to curb the sprawl of sites Who is Jed? Director, Business Technology Strategy & KM for Legal Corporate Compliance Group Ex-Consultant Long time member of
More informationPRINCE2 Foundation Revision Notes. Introduction
PRINCE2 Foundation Revision Notes Introduction These revision notes are not designed to be your only revision, they are however designed to provide the key points in each area that the exam questions normally
More informationHerzlich Willkommen zum. Vortrag. PMBOK Guide 6 th Edition (2017) Änderungen zur 5. Edition (2013) Michael Forstenhäusler PS Consulting International
Chapter 2 Herzlich Willkommen zum Vortrag PMBOK Guide 6 th Edition (2017) Änderungen zur 5. Edition (2013) PS PS Consulting International Horber Horber Straße Straße 142 142 D-72221 D-72221 Haiterbach
More informationTailoring PRINCE2 to the project environment
1. The adoption of PRINCE 2 across an organisation is known as: A. Adapting B. Embedding C. Tailoring D. Reporting 2. Tailoring PRINCE 2 appropriately is: A. Implementing a portion of the method as the
More informationInitiation Group Process. Planning Group Process
Initiation Group Process Develop Project Charter Project statement of work Expert judgment Project charter Business case Contract (if third party project) EEF: government/industry standards, organizational
More informationCertified Associate in Project Management (CAPM)
Certified Associate in Project Management (CAPM) E X A M I N AT I O N CO N T E N T O U T L I N E Project Management Institute PMI Certified Associate in Project Management (CAPM) Exam Content Outline October
More informationS O Seminar Objective
Introduction to Project Management Welcome! Presenter: Bob Hull CalACT Conference September 202 S O Seminar Objective To provide an overview of project management processes and provide some skills, tools
More informationTestkings PMP 705q. PMI PMP. Project Management Professional v5
Testkings PMP 705q Number: PMP Passing Score: 800 Time Limit: 120 min File Version: 14.5 PMI PMP Project Management Professional v5 This is my first share of braindumps questions. Very helpful study center
More informationProject Cost Management
PMBOK Overview A Guide to the Body of Knowledge (PMBOK), created by the Institute (PMI), is the sum of knowledge within the profession of project management. The complete Body of Knowledge includes proven
More informationProject Management Playbook
Playbook Free PDF ebook Download: Playbook Download or Read Online ebook project management playbook in PDF Format From The Best User Guide Database project management today and is key to effective implementation
More informationManaging Successful Projects with PRINCE2
Managing Successful Projects with PRINCE2 Details of changes to the Reference Manual for the revised edition published 2002 1. Introduction The PRINCE2 Reference Manual has been revised. The objective
More informationPRINCE2 - Project Brief
Created/updated 05/11/17 PRINCE2 - Project Brief Downloaded from stakeholdermap.com. Visit Prince2 Templates for more Prince2 downloads. Get a Mind Map Project Brief template Project
More informationstakeholdermap.com Project Management, project planning, templates and advice <PROJECT NAME> RESOURCE PLAN VERSION <1.
Project Management, project planning, templates and advice RESOURCE PLAN VERSION TABLE OF CONTENTS ... 1 Resource Plan... 1 Version ... 1 ...
More informationPMI Risk Management Professional (PMI RMP ) Exam Preparation Student Courseware Book
PMI Risk Management Professional (PMI RMP ) Exam Preparation Student Courseware Book The PM Instructors EXAM DOMAINS COVERED INCLUDE: Risk Communication Risk Analysis Risk Response Planning Risk Governance
More informationITIL Intermediate: Service Offerings and Agreements. Lesson Plan. Included in Course (x2)
ITIL Intermediate: Service Offerings and Agreements Lesson Plan Delivery: e-learning Mock Exam: Included in Course (x2) Certificate: Examination (included) Duration: 30 hours, self-paced Accredited By:
More informationProject Management Professional (PMP) Exam Prep Course 00 PMP Application & Exam
Project Management Professional (PMP) Exam Prep Course 00 PMP Application & Exam Slide 1 Application & Exam Types of Questions PM Basics Ten Knowledge Areas Professional Responsibility Practice Exams Slide
More informationProject Management Framework
Project Management Framework Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note Please
More informationStage 1 Scoping (concept formation)
Stage 1 Scoping (concept formation) A quick assessment of the technical merits of the project and its market prospects Forming a team Define key attributes of product Technical feasibility Market prospects
More informationSix year training partnership with Off Peak Training brings continual improvement for non-profit organization
Six year training partnership with Off Peak Training brings continual improvement for non-profit organization Introduction: Project management is a critical part of every organization s success. Certified
More informationProgram Management Professional (PgMP)
Program Management Professional (PgMP) E X A M I N AT I O N CO N T E N T O U T L I N E Project Management Institute Program Management Professional (PgMP ) Examination Content Outline April 2011 Published
More informationPMP MOCK EXAMS BASED ON PMBOK 5TH EDITION
PMP MOCK EXAMS http://www.tutorialspoint.com/pmp-exams/pmp_mock_exams_set2.htm Copyright tutorialspoint.com BASED ON PMBOK 5TH EDITION Here are 200 objective type sample questions and their answers are
More informationPAYIQ METHODOLOGY RELEASE INTRODUCTION TO PROJECT MANAGEMENT GUIDE. iq Payments Oy
PAYIQ METHODOLOGY RELEASE 1.0.0.0 INTRODUCTION TO PROJECT MANAGEMENT GUIDE D O C U M E N T A T I O N L I C E N S E This documentation, as well as the software described in it, is furnished under license
More informationProcess Safety Management and Functional Safety Management. Spot the difference
Process Safety Management and Functional Safety Management. Spot the difference A few key points for those Directors and Managers responsible for overseeing safety trips by The 61508 Association SAFETY
More informationMSP : The Basics. Kenn Dolan, Consultant, FPMS. AXELOS.com. APMG International 2010
Kenn Dolan, Consultant, FPMS AXELOS.com White Paper May 2010 Contents Background/history 3 Why would an organization use MSP? 3 Who uses MSP? 3 What are the benefits of using MSP? 3 An overview of the
More informationPMI-PBA IN ACTION. Saturday PDU Program PMI Metrolina Chapter. Gary Schmitz, PMP, PMI-PBA.
PMI-PBA IN ACTION Saturday PDU Program PMI Metrolina Chapter Gary Schmitz, PMP, PMI-PBA www.totalsystemseduca5on.com 2016 Total Systems Educa5on, LTD. Business Analysis WHAT IS BUSINESS ANALYSIS? The application
More informationTOOL 8.1. HR Transformation Milestones Checklist. The RBL Group 3521 N. University Ave, Ste. 100 Provo, UT
HR TOOL 8.1 HR Transformation Milestones Checklist The RBL Group 3521 N. University Ave, Ste. 100 Provo, UT 84604 801.373.4238 www.hrtransformation.com TOOL 8.1 HR Transformation Milestones Checklist In
More informationWhat Every Manager Needs to Know About Project Management in 2018
What Every Manager Needs to Know About Project Management in 2018 Introduction Course Agenda Why is the PMBOK Guide-6th edition so different from previous versions? What Are Some Tools I Can Use Today
More informationBonus Program April 15, 2010 Click to edit Master subtitle style
Bonus Program April 15, 2010 Click to edit Master subtitle style CMI Project Management Study Group CMI Energy Advantage HRSGs Supplied with Quality, Reliability, and Experience CMI Group Worldwide Success
More informationProject Management Principles
Project Management Principles Project Management Skills Team FME www.free-management-ebooks.com ISBN 978-1-62620-958-9 Copyright Notice www.free-management-ebooks.com 2013. All Rights Reserved ISBN 978-1-62620-958-9
More informationProject Initiation Document
Project Initiation Document Joint School Computing Service Project Manager: Alinda Tyler Creation date: 01/10/2014 Revision date: 15/10/2014 Version Number: 1.1 Document Status: LIVE Based on Prince2 Methodology
More informationRecruitment Pack Project Officer Battersea Dogs & Cats Home
Recruitment Pack Project Officer Battersea Dogs & Cats Home Dear Applicant, Thank you for requesting further information for our Project Officer vacancy (Ref BDCH851). Please find enclosed the below information
More information