Are you in control of process safety? Basis of safety assurance can provide the answer

Size: px
Start display at page:

Download "Are you in control of process safety? Basis of safety assurance can provide the answer"

Transcription

1 Loss Prevention Bulletin 231 June Safety practice Are you in control of process safety? Basis of safety assurance can provide the answer Phil Eames Eur Ing BSc CEng FIChemE Eames Risk Consulting Summary Effective process safety management requires a thorough understanding of process risks so that the means to prevent and control them can be put in place and maintained. Structured techniques such as hazard identification (HAZID) and hazard and operability study (HAZOP) are used to identify major accident scenarios and how they are prevented or controlled. The description of major accident scenarios and the means to prevent and control them (the layers of protection or barriers) is often termed the basis of safety. The purpose of a process safety management system (PSMS) is to provide a framework of high level procedures (risk control systems), the object of which is to maintain protective equipment and procedures in a healthy state. Therefore many organisations, when they seek to assure themselves that process safety is being managed appropriately, base this assurance on auditing of the PSMS. However, process incidents are almost always caused by failures of multiple risk control systems at a detailed level. The potential interactions between failures in different systems are often not visible at the level of the PSMS, which is normally constructed of distinct generic elements (mechanical integrity, incident investigation, management of change etc.). Auditing of distinct PSM elements may not identify the potential for an incident due to such interactions. Moreover, nowadays PSMS are tending to become more integrated with occupational safety management systems, environmental management systems and quality systems, making their role in the prevention of process incidents potentially less visible at system level. Given that the prime concern in process safety management is to prevent process incidents from occurring, it makes sense to devote some assurance effort directly to the scenarios themselves and to their specific layers of protection. This is the essence of Basis of Safety Assurance. Whereas auditing addresses the component elements of the management system, Basis of Safety Assurance seeks to challenge the effectiveness of the process hazards analysis and of the layers of protection for specific process incident scenarios, thereby providing direct assurance that the preventative and protective measures are in place and working. This is not to suggest that auditing is not a necessary or effective tool but focusing on an organisation s key process incident scenarios can be a very direct and costeffective way to provide assurance that process safety is being managed appropriately, complementing traditional audit-based assurance processes. This paper describes the Basis of Safety Assurance technique and the experience of its use. It explains how the technique can be used to enhance an organisation s process safety management programme. Keywords: Process safety management, basis of safety assurance The limitations of audit-based assurance Traditional process safety assurance or governance systems are based on audits of the process safety management system. However, in many organisations the components of the PSMS form part of a larger safety, health, environmental and possible quality management system, and may not be distinguished from components designed to control personal safety and health risks. This means that focus on process safety may diluted by or obscured by the larger management system. Even if the PSMS is a stand-alone system, or is visible within a larger system, auditing focuses on the system as a whole and not on the control of specific risks. Auditing is often undertaken on an element-by-element basis, which is likely to miss the potential interactions between failures in elements that characterise complex process safety events (as represented by the Swiss Cheese model). Moreover, even within a single element significant audit time is normally spent on understanding how the element is managed and relatively little time is spent on detailed field verification. Field verification aims to confirm that the system is in compliance (for example that trip testing is being carried out to plan), rather than test that the system is effective in protecting against the risk of a specific scenario (for example the trip is indentified as a layer of protection in HAZOP, there is a written test method, the trip test method is an end to end test, faults identified in previous tests have been corrected etc.). safetyassurance.indd 23 30/05/ :31

2 24 Loss Prevention Bulletin 231 June 2013 Layers of protection and process safety vital signs In his book on the management of complex process risks, James Reason 1 wrote of the need for proactive checking of the process or plant (the system as he describes it): In the absence of bad outcomes, the best way perhaps the only way to sustain a state of intelligent and respectful wariness is to gather the right kinds of data. This means creating a safety information system that collects, analyses and disseminates information from incidents and near misses as well as from regular proactive checks on the system s vital signs (my capitals). All of these activities can be said to make up an informed culture, one in which those who manage and operate the system have current knowledge about the human, technical, organisational and environmental factors that determine the safety of the system as a whole. In most important respects, an informed culture is a safety culture. The state of health of layers of protection is very much vital signs for the process in relation to major accident scenarios. If they are specified and designed correctly, maintained and tested, then the process is safe. The proactive checking that layers of protection are in place and healthy provides exactly the current knowledge of the state of the plant and the organisation that Reason holds to be so important. The basis of safety assurance event The testing of the state of health of layers of protection for specific major accident scenarios is the centrepiece of a Basis of Safety Assurance event, a generic agenda for which is shown in Figure 1. The initial part of the event aims to understand the major accident hazards associated with the process by discussion, field visits and review of the process hazards analysis (HAZID and HAZOP documentation). This would typically take one day, during which time an assessment of the quality of the site s process hazards analysis and documentation of the basis of safety is also made. It culminates in the selection of specific scenarios to be subjected to detailed assessment, sometimes termed a drill-down or deep dive. It is useful to select a range of different types of scenario if Phase Day Activity Preparation 0 Arrange for immediate access to key personnel and information during time on site Introduction 1 Introduction to process safety on the site Review of major accident risks Site tour Examination of process hazards analyses Selection of drill-down scenarios Drill-downs 2.N Detailed drill-downs, approximately four per day, includes field visits Feedback N+1 Preparation and delivery of feedback Figure 1: Basis of Safety Assurance Agenda this is possible (fire, toxic release, environmental etc.), so that many different types of safeguard are subject to assessment (pressure relief systems, instrumented protective systems, passive and active fire protection systems, secondary and tertiary containment systems etc.). The main part of the event comprises the scenario assessments. Each scenario assessment typically takes around two hours, depending on the quality of the basis of safety documentation, the knowledge of the team and the speed of data retrieval (how fast plant records can be accessed to verify that maintenance and testing is taking place, for example). Findings from the scenario assessments provide the required assurance that layers of protection are healthy or lead to the generation of recommendations for improvement. Common findings across a number of assessments can provide a useful indication of systemic issues, for example, weaknesses in proof test procedures or compliance with testing regimes. This is the way in which it complements conventional process safety management auditing. The scenario assessment technique Most value can be gained from the scenario assessment technique if it is conducted as a team exercise. Experience has shown that the best results can be obtained by deploying two process safety specialists as assessors; one with more a process safety management systems and operations background and the other with more of an engineering and asset integrity management background (this also helps from a leading and scribing standpoint since the event is recorded in a similar way to a process hazards analysis). In addition to the assessors, the involvement of process engineers, operating managers and maintenance engineers is important in providing the understanding of the scenario and the whereabouts of information to verify that the identified layers of protection are in place and being maintained. Since scenarios are normally selected from the site s process hazards analysis or basis of safety documentation, a scenario assessment normally starts with this documentation. The scenario is described and the relevant records are referenced, shown in the upper part of the recording form in Figure 2. It is important to note that the existing documentation may not fully describe the scenario, since the quality of HAZID and HAZOP documentation is heavily influenced by team composition, knowledge available, leader competence, availability of time and recording policy. Therefore it is important that the assessors work with the team to identify all the relevant safeguards, which are recorded in the left hand column of the template shown in Figure 2. Note that the term safeguard is used rather than layer of protection because the aim is to capture safeguards such as procedures and emergency plans as well as physical independent protection systems that are the focus of formalised Layers of Protection Analysis. Once safeguards have been listed the assessors ask for each safeguard in turn what can we check is in place? This is recorded in the verification column. Examples include procedure number and latest version, alarm test methods, maintenance routines and pressure safety valve test records. Evidence for each verification is then sought and the findings recorded in the findings column of the template. It is safetyassurance.indd 24 30/05/ :31

3 Loss Prevention Bulletin 231 June MAJOR ACCIDENT HAZARD SCENARIO DRILL DOWN DESCRIPTION OF SCENARIO: HAZARDS ANALYSIS REFERENCE: Figure 2: Scenario Assessment Template important that documentary evidence is collected to ensure that the assessment is suitably probing and detailed. Conclusions are then drawn for each safeguard. This may be a simple OK if everything expected is in place, but may be a recommendation for improvement, a corrective action or a recommendation to consider whether a finding may be evidence of a systemic weakness. In viewing the robustness of the safeguards as a whole the team may determine that additional risk reduction is appropriate and make a recommendation to identify additional risk reduction measures (a form of as low as reasonably practicable or ALARP assessment in UK terms). It is important to include a field visit for each scenario. This has two purposes. One is to physically check that safeguards are installed in line with the design intent, for example that relief devices are in place and that passive fire protection and secondary containment are in good condition. Photographs of deficiencies provide high-impact evidence to site management. The second purpose is to talk to operators and maintenance technicians about their understanding of the process and of the major accident hazard that is being assessed. This gives an insight into the quality and experience of staff and the quality of process-specific training that they have received. An example of a completed assessment form is shown in Figure 3. Experiences with the technique There is now a significant body of experience of Basis of Safety Assurance across a number of process industry sectors. Companies have found it useful regardless of sector or degree of process hazard (major hazards facilities are more familiar with the concepts but it is readily applicable to lower level process hazards). Some important advantages of using the scenario assessment drill-down technique are as follows: Drilling down into specific scenarios can identify significant risk exposures and weaknesses at a very detailed level, for example: Trips tested at commissioning only; Absence of detailed test methods and reliance on technicians experience; Trip testing not from sensor to final element (end-toend); Reliance on third parties for proof testing; Demands on trips more frequent than the design basis. Examining multiple scenarios can provide evidence of whether there are systemic weaknesses. The technique is useful to identify weaknesses in process hazards analysis and in keeping process hazards analysis records and basis of safety documentation up to date. The technique is a useful vehicle for providing training materials for specific process hazards. Conclusion Because it focuses on specific risks, Basis of Safety Assurance complements conventional PSM system audit activities. It helps to maintain a focus on major accident hazards and improve the understanding and documentation of them. It aligns with line management responsibilities for specific processes and assets, and it directly exposes risks of major accident hazards, thus providing real time assurance to management. References 1. Reason, J.T (1997), Managing the Risks of Organisational Accidents, Ashgate Publishing, Aldershot, UK. safetyassurance.indd 25 30/05/ :31

4 26 Loss Prevention Bulletin 231 June 2013 Figure 3: Scenario Assessment Example MAJOR ACCIDENT HAZARD SCENARIO DRILL DOWN DESCRIPTION OF SCENARIO: Storage Tank V7706 (150m 3 ) is overfilled during (continuous) run-down and a large volume of solvent is released into the bund from the breather/emergency vent, which is subsequently ignited resulting in a flash fire/pool fire and several fatalities. PHA REFERENCE: No specific scenario was identified for this material as incidents involving acetone were taken as the representative set. The acetone scenario for overfill was estimated to result in two fatalities. Monitoring of level transmitter by operators and dependent alarm function. 1. Calibration and maintenance of level transmitter alarm LIA SOP requiring level monitoring. 1. No regular maintenance is now performed on the level transmitter following the installation of the independent high level switches. Corrective maintenance is performed based on notifications raised by the operators. 2. There is no specific SOP relating to the operation of this solvent storage tank. Consideration implementing routine level transmitter calibration on solvent storage tanks. Independent high level switch with trip of run-down line. 1. Proof testing of high level trip LZA-7706H. 1. The trip is proof tested annually 2. The last proof test of this instrument was carried out on the 27/4/10. The proof test is an end-to-end test to a predefined test method including checklist. 3. No SIL assessment has been conducted. Controls appear to be effective. However, conduct a SIL assessment for this scenario to verify that the proof test interval is adequate to provide the required level of protection. Bund 1. Visual integrity of bund B Integrity testing of bund B The bund appears to be in good repair, with no penetrations. 2. There is currently no ongoing inspection of bunds being carried out. The bunds have been inspected to ensure that they are of sufficient capacity. An initial inspection of their integrity has been carried out visually and some repairs are required. A SOP exists for the inspection of bunds. Ongoing inspection is the responsibility of the Area Engineer. Implement a bund integrity inspection programme and consider implementing bund testing. Flammable gas detectors 1. Location of detectors FGD7706A,B,C. 2. Maintenance and proof testing of detectors FGD7706A,B,C. 1. Three detectors are installed, two of which are in the bund. 2. Maintenance is carried out under contract with CGT. The maintenance frequency is every six months. The contractor uses calibration gases to check the detector calibration and a check of the alarms is performed. Very few problems have been experienced other than some initial commissioning problems related to the positioning of the detectors. safetyassurance.indd 26 30/05/ :31

5 Loss Prevention Bulletin 231 June Control of ignition sources 1. Review hazardous area classification. 2. Examine earth testing programme. 3. Examine Ex inspection programme for any items of equipment in the bund. 4. Field inspection (earthing, lightning etc.). 1. Earth testing is carried out on a quarterly basis. Resistance must be less than 10 ohms. A task list has been developed with photographs to assist the tradesman. 2. A six-weekly visual inspection is also carried out to identify issues with connections etc. 3. Evidence was seen of inspections of Ex equipment within the area. The formal Ex inspection programme is in its infancy and further baseline data is required before a frequency of inspection can be determined. 4. Condition-based monitoring tasks are performed on pumps etc. in the area to prevent ignition sources from mechanical equipment, including visual inspection, vibration monitoring and thermography. 1. A wet test of the area foam-water sprinkler systems is carried out annually (triggered by SAP). Records of these tests were reviewed. Baden carries out maintenance on the system. Inspection of the deluge pipe work is carried out and pipe hangers etc. are replaced as necessary. Monthly checks are carried out to check deluge valve operation and records are kept on cards. These are reviewed by PT Global. PT Global carries out an annual audit of the fire protection system in its entirety. Expected controls are in place. Control of mechanical ignition sources is good practice. Opportunity to further develop the formal Ex inspection programme towards detailed inspection programme. Fire protection system 1. Examine fire protection test regime. Effective control by recognised specialist third party. Summary The layers of protection provided for this scenario are in line with recognised good practice for flammable storage overfill and fire protection. There are opportunities for improvements in terms of: (1) the proactive checking of storage tank level transmitters; (2) SIL assessment for this scenario; (3) bund inspection and test programme. safetyassurance.indd 27 30/05/ :31

Health and Safety Management Standards

Health and Safety Management Standards Management Standards Curtin University Sept 2011 PAGE LEFT INTENTIONALLY BLANK Management Standards Page 2 of 15 CONTENTS 1. Introduction... 4 1.1 Hierarchy of Documents... 4 2. Management System Model...

More information

TECHNICAL PAPER. Selection of HAZOP or PHR for Retrospective Hazard Reviews (RHRs)

TECHNICAL PAPER. Selection of HAZOP or PHR for Retrospective Hazard Reviews (RHRs) TECHNICAL PAPER Selection of HAZOP or PHR for Retrospective Hazard Reviews (RHRs) 2 SELECTION OF HAZOP OR PHR FOR RHRs TECHNICAL PAPER Many companies in the high hazard process industries have a requirement

More information

PROCESS SAFETY MANAGEMENT PROGRAM UNIPAR CARBOCLORO

PROCESS SAFETY MANAGEMENT PROGRAM UNIPAR CARBOCLORO PROCESS SAFETY MANAGEMENT PROGRAM UNIPAR CARBOCLORO Clorosur Technical Seminar & WCC Safety Workshop Flávia Mariano Pinto November 18, 2016 Facility Cubatao, Sao Paulo -Brazil 1,000 metric tons chlorine/day

More information

Session Nine: Functional Safety Gap Analysis and Filling the Gaps

Session Nine: Functional Safety Gap Analysis and Filling the Gaps Session Nine: Functional Safety Gap Analysis and Filling the Gaps Presenter Colin Easton ProSalus Limited Abstract Increasingly regulatory and competent authorities are looking to hazardous Installation

More information

26 PROCESS SAFETY MANAGEMENT

26 PROCESS SAFETY MANAGEMENT 26 PROCESS SAFETY MANAGEMENT QUIZ 1 (20 POINTS) True/False (5 points) 1. SARA Title III required companies to develop emergency preparedness plans; recognition, knowledge, and inventories of hazardous

More information

ENVIRONMENTAL AUDITING GUIDE TD 16/16/E

ENVIRONMENTAL AUDITING GUIDE TD 16/16/E ENVIRONMENTAL AUDITING GUIDE MIDDLE EAST GASES ASSOCIATION (MEGA) European Business Center, Office BC 25 Dubai Investments Park, PO Box: 166 Dubai-UAE Tel: +971-4-8135525 / Fax: +971-4-8135575 / E-mail:

More information

Considering industry costs and benefits for Safety Management, can we do better?

Considering industry costs and benefits for Safety Management, can we do better? Considering industry costs and benefits for Safety Management, can we do better? www.epsc.org Richard Gowland Technical Director EPSC EPSC EPSC is an Industry funded association of approximately 40 chemical

More information

GUIDELINES FOR THE CONDUCT OF OIL, GAS & PETROCHEMICAL RISK ENGINEERING SURVEYS

GUIDELINES FOR THE CONDUCT OF OIL, GAS & PETROCHEMICAL RISK ENGINEERING SURVEYS LLOYD S MARKET ASSOCIATION GUIDELINES FOR THE CONDUCT OF OIL, GAS & PETROCHEMICAL RISK ENGINEERING SURVEYS Developed by: Ron Jarvis Andy Goddard Swiss Re, London Talbot Syndicate, London Contributions

More information

AUDITS & INSPECTIONS!!!

AUDITS & INSPECTIONS!!! Sample Written Program For Your Company For AUDITS & INSPECTIONS Provided By: P.O. Box 2136 Slidell, LA 70458 Phone: 985-781-1444 Fax: 985-718-4957 Email: info@se-safety.com Safety Audits & Inspections

More information

NEBOSH International Technical Certificate in Oil & Gas Operational Safety

NEBOSH International Technical Certificate in Oil & Gas Operational Safety NEBOSH International Technical Certificate in Oil & Gas Operational Safety UNIT IOG Management of International Oil & Gas Safety Operational Safety Sample Trainer Pack RRC Trainer Packs are designed to

More information

Group Health & Safety. Management System

Group Health & Safety. Management System Group Health & Safety Management System 2010 H ealth and Safety is our first priority. It has been our priority for several years and it will continue to be until it becomes clearly embedded in the culture

More information

BROOKHAVEN NATIONAL LABORATORY SBMS Interim Procedure

BROOKHAVEN NATIONAL LABORATORY SBMS Interim Procedure BROOKHAVEN NATIONAL LABORATORY SBMS Interim Procedure Interim Procedure Number: 2004-18001-005 Revision: 12 on 1-26-07 Title: 18001 Audit Checklist Point of Contact: Pat Williams Management System: Occupational

More information

Protective Systems Lifecycle Management and IPL Data Repository A database solution

Protective Systems Lifecycle Management and IPL Data Repository A database solution Lifecycle Management and IPL Data Repository A database solution OSHA Compliance Manager U.S. Patents Pending Nigel James President - Gulf Coast Division njames@manganinc.com 979-299-9893 /1/2012 Agenda

More information

HOW TO OSHA-PROOF YOUR PHAs

HOW TO OSHA-PROOF YOUR PHAs HOW TO OSHA-PROOF YOUR PHAs David A. Walker Dale F. Nawrocki Thomas R. Williams William G. Bridges JBF Associates, Inc. 1000 Technology Park Center Knoxville, Tennessee 37932-3353 (615) 966-5232 The Occupational

More information

Standard Approach to Risk Management for Offshore Operations. R.T. Lokken Chief Offshore Engineer ExxonMobil Upstream Research Company May 12, 2014

Standard Approach to Risk Management for Offshore Operations. R.T. Lokken Chief Offshore Engineer ExxonMobil Upstream Research Company May 12, 2014 Standard Approach to Risk Management for Offshore Operations R.T. Lokken Chief Offshore Engineer ExxonMobil Upstream Research Company May 12, 2014 Offshore Operations Involve Many Operational Risks DRILLING

More information

Process Safety Performance Indicators in Chemical Industry What Makes It a Success Story and What Did We Learn So Far?

Process Safety Performance Indicators in Chemical Industry What Makes It a Success Story and What Did We Learn So Far? 391 A publication of CHEMICAL ENGINEERING TRANSACTIONS VOL. 31, 2013 Guest Editors: Eddy De Rademaeker, Bruno Fabiano, Simberto Senni Buratti Copyright 2013, AIDIC Servizi S.r.l., ISBN 978-88-95608-22-8;

More information

Quality, Health, Safety & Environment Manual

Quality, Health, Safety & Environment Manual Page 1 of 14 DOCUMENT RELEASE AUTHORIZATION Prepared, Reviewed and Issued by: Management Representative: ( ) Approved by: Chairman and Managing Director ( ) Issued as: CONTROLLED COPY / UNCONTROLLED COPY

More information

Occupational Health and Safety. Improvement Standard

Occupational Health and Safety. Improvement Standard Premier s Department New South Wales Occupational Health and Safety Improvement Standard A tool for measuring OHS performance within NSW Government Agencies OHS IMPROVEMENT STANDARD NSW GOVERNMENT - REVIEW

More information

Ammonia Terminals Risk Management Improvements

Ammonia Terminals Risk Management Improvements Ammonia Terminals Risk Management Improvements Through a series of corporate acquisitions, Agrium has assembled a number of anhydrous ammonia distribution terminals. Prior to Agrium s acquisition, the

More information

Electricity in underground mines and tunnels

Electricity in underground mines and tunnels INTERPRETIVE GUIDELINES Electricity in underground mines and tunnels The relationship between the Health and Safety in Employment (Mining Operations and Quarrying Operations) Regulations 2013 and the Electricity

More information

MECHANICAL INTEGRITY

MECHANICAL INTEGRITY MECHANICAL INTEGRITY 1.0 Purpose This element identifies Petsec s Mechanical Integrity (MI) program as required by its Safety and Environmental Management System (SEMS) Program and applies to all Petsec

More information

Opportunities for Improvements in Safety and Health Management Systems for Coal Mines - An Auditor's Perspective

Opportunities for Improvements in Safety and Health Management Systems for Coal Mines - An Auditor's Perspective University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2009 Opportunities for Improvements in Safety and Health Management Systems for Coal

More information

COMPARISON OF PROCESS HAZARD ANALYSIS (PHA) METHODS

COMPARISON OF PROCESS HAZARD ANALYSIS (PHA) METHODS COMPARISON OF PROCESS HAZARD ANALYSIS (PHA) METHODS by Primatech Inc. The hazard and operability (HAZOP) study is the most commonly used process hazard analysis (PHA) method. However, there are many other

More information

The Merlin Principles. The Elements of each Principle

The Merlin Principles. The Elements of each Principle The Merlin Standard INTRODUCTION The development of the Merlin Standard has been progressed as a joint exercise between the Department for Work and Pensions (DWP) and its providers operating in the Welfare

More information

Occupational Health and Safety Management Manual v2.2

Occupational Health and Safety Management Manual v2.2 Occupational Health and Safety Management Manual v2.2 Written: February 2013 Author: David Seymour, Director of Operations Co Author: Mathew Sprake, Operations Manager Approved: Board of Directors 1. Introduction

More information

THE COMPLETE GUIDE TO ISO14001

THE COMPLETE GUIDE TO ISO14001 THE COMPLETE GUIDE TO ISO14001 1. Introduction... 3 Plan Do Check Act... 5 2. Requirements... 7 Environmental Policy... 7 Environmental Aspects... 7 Legal and Other Requirements... 8 Objectives & Targets...

More information

Bowmer. & Kirkland. Kirkland. & Accommodation. Health & Safety Policy.

Bowmer. & Kirkland. Kirkland. & Accommodation. Health & Safety Policy. Bowmer Kirkland & Kirkland & Accommodation Health & Safety Policy December 2013 www.bandk.co.uk Index Policy Statement Page 3 Interaction of Health and Safety Responsibilities Page 5 Organisation Page

More information

LEVERAGING DATA TO DRIVE BSC PERFORMANCE. A Practical Introduction to Asset and Cleaning Operations Management for Building Service Contractors

LEVERAGING DATA TO DRIVE BSC PERFORMANCE. A Practical Introduction to Asset and Cleaning Operations Management for Building Service Contractors LEVERAGING DATA TO DRIVE BSC PERFORMANCE A Practical Introduction to Asset and Cleaning Operations Management for Building Service Contractors ABSTRACT: Increasing competition and rising expectations create

More information

Ivara EXP - Reliability Software

Ivara EXP - Reliability Software IVARA EXP - HELPING COMPANIES OPTIMIZE ASSET RELIABILITY Background the new approach to maintenance Studies originally conducted in the airline industry and subsequently validated across other industries

More information

Life-cycle Management of Safety Instrumented Systems

Life-cycle Management of Safety Instrumented Systems Life-cycle Management of Safety Instrumented Systems Dr. Bernd Schroers Bayer AG, Leverkusen, Germany University of Aachen, Germany University of Kassel, Germany D-51368 Leverkusen, Building 407 Abstract

More information

Description of Gap or Gaps Use additional rows for each Potential Action.

Description of Gap or Gaps Use additional rows for each Potential Action. API P 1173 5.2 5.3 API P 1173 equirement Has Top Management established and documented the goals and objectives for the PSMS? Has Management documented a process for addressing regulatory and legistlative

More information

NATIONAL ENERGY BOARD PIPELINE PERFORMANCE MEASURES REPORTING GUIDANCE

NATIONAL ENERGY BOARD PIPELINE PERFORMANCE MEASURES REPORTING GUIDANCE NATIONAL ENERGY BOARD PIPELINE PERFORMANCE MEASURES REPORTING GUIDANCE Amended November 2014 PIPELINE PERFORMANCE MEASURES - OVERVIEW Introduction The National Energy Board (Board) took action in March

More information

PSM Key Performance Indicators Nexen Energy ULC SEPT. 26, 2017 CCPS CALGARY REGIONAL MEETING

PSM Key Performance Indicators Nexen Energy ULC SEPT. 26, 2017 CCPS CALGARY REGIONAL MEETING PSM Key Performance Indicators Nexen Energy ULC SEPT. 26, 2017 CCPS CALGARY REGIONAL MEETING Agenda 1. Why use KPIs, What to Measure? 2. Two Approaches at Nexen 3. Oil Sands PSM Dashboard 4. Current Status

More information

EVALUATION OF SAFETY CULTURE IN WANO PRE-STARTUP REVIEWS

EVALUATION OF SAFETY CULTURE IN WANO PRE-STARTUP REVIEWS EVALUATION OF SAFETY CULTURE IN WANO PRE-STARTUP REVIEWS Todd Brumfield World Association of Nuclear Operators (WANO) Atlanta, Georgia, USA ABSTRACT: The requirements for performance of pre-startup reviews

More information

Hazardous. Scheme. the power behind your business

Hazardous. Scheme. the power behind your business Hazardous Areas Scheme YOUR GUIDE TO REGISTRATION the power behind your business GUIDE TO REGISTRATION REQUIREMENTS Electrical work in potentially explosive atmospheres (hazardous areas) is not included

More information

Health & Safety. Report 2011/12

Health & Safety. Report 2011/12 Health & Safety Report 2011/12 1 Contents Page 1. Introduction 3 2. Health and safety policy 4 3. Health and safety model 4 4. Performance against 2011/12 objectives 5-8 5. Assurance activities 8 6. Health

More information

The National Heavy Vehicle Accreditation Scheme (NHVAS)

The National Heavy Vehicle Accreditation Scheme (NHVAS) The National Heavy Vehicle Accreditation Scheme (NHVAS) Mass Management Guide April 2009 0 of 21 NHVAS Maintenance Management Guide April 2009 The National Heavy Vehicle Accreditation Scheme (NHVAS) Mass

More information

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) 4.1 General Requirements 4.2 OHS policy Has the organisation an established and maintained

More information

HAZARDOUS AREAS FOR WATER & WASTEWATER FACILITIES

HAZARDOUS AREAS FOR WATER & WASTEWATER FACILITIES HAZARDOUS AREAS FOR WATER & WASTEWATER FACILITIES Paper Presented by : Neil Dennis Author: Neil Dennis, Associate Director, Maunsell Australia 68 th Annual Water Industry Engineers and Operators Conference

More information

CHAPTER 7: PREVENTION PROGRAM (PROGRAM 3)

CHAPTER 7: PREVENTION PROGRAM (PROGRAM 3) CHAPTER 7: PREVENTION PROGRAM (PROGRAM 3) Many of you will need to do little that s new to comply with the Program 3 prevention program, because you already have the PSM program in place. However, if your

More information

Application of CSM on risk assessment at SBB

Application of CSM on risk assessment at SBB ERA-Workshop, 25 June 2013 Application of CSM on risk assessment at SBB Dr Jonathan Shaha Swiss Federal Railways SBB Central Safety Department 25 June 2013 Outline: Implementation of CSM RA at SBB Ú In

More information

Quality Systems Basics

Quality Systems Basics Quality Systems Basics This presentation was developed by Allison Transmission Global Purchasing. All rights reserved. No part of this material may be reproduced in any form, or by any method, for any

More information

ASSET MANAGEMENT SERVICES

ASSET MANAGEMENT SERVICES ASSET MANAGEMENT SERVICES Petrofac Engineering & Production Services 02 ASSET MANAGEMENT SERVICES ASSET MANAGEMENT SERVICES 03 Introducing Petrofac Asset Management Services Petrofac is an international

More information

Introduction and Revision of IEC 61508

Introduction and Revision of IEC 61508 Introduction and Revision of IEC 61508 Ron Bell OBE, BSc, CEng FIET Engineering Safety Consultants Ltd Collingham House 10-12 Gladstone Road Wimbledon London, SW19 1QT UK Abstract Over the past twenty-five

More information

JOB SAFETY ANALYSIS (JSA) PROCEDURE NUMBER: HES-208

JOB SAFETY ANALYSIS (JSA) PROCEDURE NUMBER: HES-208 JOB SAFETY ANALYSIS (JSA) PROCEDURE NUMBER: HES-208 CPL CONTENTS Job Safety Analysis HES-208 Section Title Page 1.0 Purpose 208-3 2.0 Scope 208-3 3.0 Prerequisites 208-3 4.0 Process Overview 208-4 5.0

More information

Traffic Incident During Refinery Turnaround

Traffic Incident During Refinery Turnaround Traffic Incident During Refinery Turnaround Lessons Learned Volume 02 Issue 04 2004 USW Purpose Traffic Incident During Refinery Turnaround To conduct a small group lessons learned activity to share information

More information

Are You Being Honest With Yourself Regarding IPL Integrity?

Are You Being Honest With Yourself Regarding IPL Integrity? Are You Being Honest With Yourself Regarding IPL Integrity? Mr. Andrew C. Madewell, P.E. Cognascents Consulting Group, Inc. 11777-A Katy Freeway, Ste 438 Houston, TX 77079 andrew.madewell@cognascents.com

More information

The Horse Rangers Association Health & Safety Policy

The Horse Rangers Association Health & Safety Policy The Horse Rangers Association Health & Safety Policy General Statement of Intent The company believes that excellence in the management of health and safety is an essential element within its overall business

More information

The Responsible Person AKA Technical Person with Executive Functions

The Responsible Person AKA Technical Person with Executive Functions Peter Roberts Explosive Atmospheres Essential Guidance Series EGS 0035 Edition 1 Supplement for the CompEx Ex 14 training course. The Responsible Person AKA Technical Person with Executive Functions ExVeritas

More information

Materion AMTS Supplier Quality Manual

Materion AMTS Supplier Quality Manual Advanced Materials Technologies and Services Inc. Materion AMTS Supplier Quality Manual Supplier Name: Supplier Address: Suppliers shall review the attached Supplier Quality Manual and acknowledge receipt

More information

AUDITING CONCEPTS. July 2008 Page 1 of 7

AUDITING CONCEPTS. July 2008 Page 1 of 7 AUDITING CONCEPTS 1. BACKGROUND Each of the twenty aspects in SAP Sections B and C has been separated into components that need to be addressed individually. As well as addressing the specific SAP requirement,

More information

Preliminary Hazard Analysis and Risk Assessment for the Wood Centre Development, Southwood Resources - Huon

Preliminary Hazard Analysis and Risk Assessment for the Wood Centre Development, Southwood Resources - Huon Preliminary Hazard Analysis and Risk Assessment for the Wood Centre Development, Southwood Resources - Huon TABLE OF CONTENTS PRELIMINARY HAZARD ANALYSIS AND RISK ASSESSMENT... 4 INTRODUCTION... 4 METHODOLOGY...

More information

Fixed Electrical Testing

Fixed Electrical Testing Fixed Electrical Testing Essential Facts for Business Owners January 2017 Fixed Electrical Testing Employers must comply with the Electricity at Work Regulations 1989, made under the Health and Safety

More information

HSE s AGEING & LIFE EXTENSION KEY PROGRAMME (KP4) Andy Duncan, CEng KP4 Manager. Health and Safety Executive

HSE s AGEING & LIFE EXTENSION KEY PROGRAMME (KP4) Andy Duncan, CEng KP4 Manager. Health and Safety Executive Health and Safety Executive WEDNESDAY 8 TH MAY 2013 12:10 TO 12:25 SCIS AECC HSE s AGEING & LIFE EXTENSION KEY PROGRAMME (KP4) Andy Duncan, CEng KP4 Manager WHAT IS AGEING? AGEING It s about deterioration

More information

IBM Chemical & Petroleum. Enterprise asset management: Why it s even more important in today s oil and gas industry

IBM Chemical & Petroleum. Enterprise asset management: Why it s even more important in today s oil and gas industry IBM Chemical & Petroleum Enterprise asset : Why it s even more important in today s Enterprise asset : Why it s even more important in today s 1 2 3 4 5 6 Introduction Enterprise asset in today s Integrate

More information

Jon Keswick, CFSE aesolutions Inc. 250 Commonwealth Drive, Suite 200 Greenville, SC 29615, USA

Jon Keswick, CFSE aesolutions Inc. 250 Commonwealth Drive, Suite 200 Greenville, SC 29615, USA Managing critical operational Process Safety Performance Indicators (PSPI) Prepared for the 10 th European Chemical Engineering Congress, Nice, France September 2015 Jon Keswick, CFSE aesolutions Inc.

More information

ERM CVS s Approach Performance Based Certification versus Traditional Auditing Approaches

ERM CVS s Approach Performance Based Certification versus Traditional Auditing Approaches ERM CVS s Approach Performance Based Certification versus Traditional Auditing Approaches Overview The traditional approach to management systems implementation and certification is to focus on demonstrating

More information

Qualitative & Quantitative Hazard Analysis

Qualitative & Quantitative Hazard Analysis Qualitative & Quantitative Hazard Analysis Guidelines for Chemical Process Quantitative Risk Analysis, CCPS / AIChE Guidelines for Hazard Evaluation Procedure, CCPS / AIChE Risk Analysis Methodology 1.

More information

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction 9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE 9.1.1 Introduction This chapter is the provisional Environmental Management Plan (EMP) for the Jubilee Phase 1 Development project. The elements of

More information

CASE STUDY. Network Rail keeps services on track with accurate asset information ABB Ability Ellipse + Fieldreach case study

CASE STUDY. Network Rail keeps services on track with accurate asset information ABB Ability Ellipse + Fieldreach case study CASE STUDY Network Rail keeps services on track with accurate asset information ABB Ability Ellipse + Fieldreach case study 2 C A S E S T U DY A B B A B I L I T Y E L L I P S E + F I E L D R E A C H CASE

More information

Audit report 1 Background 1.1 Analysis and assessment of risk - key elements for safe operations

Audit report 1 Background 1.1 Analysis and assessment of risk - key elements for safe operations Audit report Report Title Report following audit of the implementation, follow-up and use of risk assessments in operations and in connection with minor modifications 1 Background 1.1 Analysis and assessment

More information

Health and safety objectives.

Health and safety objectives. 2016-17 Health and safety objectives. Martin Baggs message. My commitment to the health, safety and wellbeing of our people is unwavering. This commitment is reflected across all teams within the business,

More information

Operational Safety Integrity Closing the Safety Loop

Operational Safety Integrity Closing the Safety Loop Operational Safety Integrity Closing the Safety Loop by Sven Grone and Steve J. Elliott Executive summary Process safety management in the process industries has evolved beyond simple functional safety.

More information

APCChE 2012 PSM Seminar Feb 2012 Critical role of leadership in preventing Major Accidents in the Chemical Process Industry

APCChE 2012 PSM Seminar Feb 2012 Critical role of leadership in preventing Major Accidents in the Chemical Process Industry Graeme Ellis, Principal Lead Consultant, ABB Consulting APCChE 2012 PSM Seminar Feb 2012 Critical role of leadership in preventing Major Accidents in the Chemical Process Industry February 6, 2012 Slide

More information

What s On The Horizon: Possible Changes to OSHA s PSM and EPA s RMP Requirements

What s On The Horizon: Possible Changes to OSHA s PSM and EPA s RMP Requirements What s On The Horizon: Possible Changes to OSHA s PSM and EPA s RMP Requirements OCTC Operational Excellence & Sustainability Committee Meeting March 17, 2016 Gary M. Glass (513) 352-6765 Gary.Glass@ThompsonHine.com

More information

DRAFT ROLE DESCRIPTION Riverina Murray Destination Network, Administrative Assistant

DRAFT ROLE DESCRIPTION Riverina Murray Destination Network, Administrative Assistant DRAFT ROLE DESCRIPTION Riverina Murray Destination Network, Administrative Assistant Location: tbc 1. OVERVIEW The Destination Network (DN) Riverina Murray is one of six DNs recently established across

More information

Safety Management System Assessment Guide TP 14326E (05/2005)

Safety Management System Assessment Guide TP 14326E (05/2005) Safety Management System Assessment Guide TP 14326E (05/2005) Transport Canada Civil Aviation Communications Centre Place de Ville Tower C, 5th Floor 330 Sparks Street Ottawa ON K1A 0N8 Telephone: 1 800

More information

Performance audit report. New Zealand Transport Agency: Information and planning for maintaining and renewing the state highway network

Performance audit report. New Zealand Transport Agency: Information and planning for maintaining and renewing the state highway network Performance audit report New Zealand Transport Agency: Information and planning for maintaining and renewing the state highway network Office of the Auditor-General PO Box 3928, Wellington 6140 Telephone:

More information

Health & Safety Induction for Staff, Service Users & Volunteers

Health & Safety Induction for Staff, Service Users & Volunteers Phoenix Community Care Ltd Policy & Procedure Health & Safety Induction for Staff, Service Users & Volunteers Version Written Updated Scheduled Review Date Author 1 2008 2008 2009 Anne Spriggs Approving

More information

Health and Safety Manual

Health and Safety Manual Health and Safety Manual CS-OHS-M-01 Version 2 Effective date: 30 November 2012 Next review date: 01 November 2014 Health and Safety Manual CS-OHS-M-01 FOREWORD The foundation of CS Energy s success as

More information

IEC Is it pain or gain?

IEC Is it pain or gain? IEC 61508 Is it pain or gain? Clive Timms, Director, C&C Technical Support Services Ltd. Introduction IEC 61508 (Ref. 1) provides designers and operators with the first generic internationally accepted

More information

General Guidance for Developing, Documenting, Implementing, Maintaining, and Auditing an SQF Quality System. Quality Code. SQF Quality Code, Edition 8

General Guidance for Developing, Documenting, Implementing, Maintaining, and Auditing an SQF Quality System. Quality Code. SQF Quality Code, Edition 8 General Guidance for Developing, Documenting, Implementing, Maintaining, and Auditing an SQF Quality System Quality Code SQF Quality Code, Edition 8 October 2017 2014 Safe Quality Food Institute 2345 Crystal

More information

See revision section. Resources, Roles, Responsibility, Accountability, and Authority. Section in OHSAS 18001:2007

See revision section. Resources, Roles, Responsibility, Accountability, and Authority. Section in OHSAS 18001:2007 1. PURPOSE The purpose of this document is to identify occupational health and safety roles and responsibilities at each function and level within the City of Dallas in accordance with the requirements

More information

RAS TEK PVT LTD An ISO 9001:2008 certified Company. Health, Safety and Environmental Management System Manual

RAS TEK PVT LTD An ISO 9001:2008 certified Company. Health, Safety and Environmental Management System Manual RAS TEK PVT LTD An ISO 9001:2008 certified Company Health, Safety and Environmental 1/2/2011 No. 0 Health, Safety and Environmental Management System Manual Document No: DD - 01 1/2/2011 Table of Contents

More information

ABB LIMITED. Technical training

ABB LIMITED. Technical training ABB LIMITED Technical training To request our current list of our open courses or for any other training query, please email: contact@gb.abb.com and we will be happy to send a copy out to you. Contents

More information

RTC EDUCATION LTD T/A REGENT COLLEGE REGENT SKILLS TRAINING

RTC EDUCATION LTD T/A REGENT COLLEGE REGENT SKILLS TRAINING Commercial in Confidence RTC EDUCATION LTD T/A REGENT COLLEGE REGENT SKILLS TRAINING TMX Report Template V2 02.04.12 Contents 1. Organisation Information, Introduction and Overview... 1 2. Areas of Particular

More information

FSC36 SAFE FEED/SAFE FOOD GUIDANCE DOCUMENT

FSC36 SAFE FEED/SAFE FOOD GUIDANCE DOCUMENT FSC36 SAFE FEED/SAFE FOOD GUIDANCE DOCUMENT FSC36 Safe Feed/Safe Food (www.safefeedsafefood.org) is a facility certification program for the American Feed Industry Association (www.afia.org) Version 7.0

More information

COAL - HAZOP SYSTEMS ANALYSIS GRINDING AND FIRING

COAL - HAZOP SYSTEMS ANALYSIS GRINDING AND FIRING COAL GRINDING AND FIRING SYSTEMS - HAZOP ANALYSIS JAGRUT UPADHYAY, PEC CONSULTING GROUP LLC, US, OUTLINES AND EXPLAINS THE USE OF THE HAZOP STUDY WITHIN COAL GRINDING AND FIRING SYSTEMS. A Process Hazard

More information

INTEGRATED RISK-MANAGEMENT MATRICES

INTEGRATED RISK-MANAGEMENT MATRICES OPERATIONS & MAINTENANCE INTEGRATED RISK-MANAGEMENT MATRICES By Nathanael Ince, Pinnacle Advanced Reliability Technologies May 1, 2016 An overview of the tools available to reliability professionals for

More information

OCTC Ohio Chemistry Technology Council

OCTC Ohio Chemistry Technology Council OCTC Ohio Chemistry Technology Council Process Safety Management (PSM) Requirements and Keys to Compliance Presented By: Michael Taylor Sr. PSM Consultant/Engineer EN Engineering 17-March-2016 Goal of

More information

The SMS Table. Kent V. Hollinger. December 29, 2006

The SMS Table. Kent V. Hollinger. December 29, 2006 The SMS Table Kent V. Hollinger December 29, 2006 This presentation introduces the concepts contained in a Safety Management System (SMS) by using the analogy of an SMS being a four-legged glass-top table,

More information

Candidate NICET ID No.: NICET ENGINEERING TECHNICIAN CERTIFICATION Experience Application, Part II: Verifier Data. (Please print legibly or type)

Candidate NICET ID No.: NICET ENGINEERING TECHNICIAN CERTIFICATION Experience Application, Part II: Verifier Data. (Please print legibly or type) Candidate: Experience Application, Part II: Verifier Data Candidate NICET ID No.: SM Standard Model (Please print legibly or type) To be completed by the Verifier only Name: Title: Current employer: Daytime

More information

Section 11: Water treatment and related matters

Section 11: Water treatment and related matters SEC TION 11: WATER TREATMENT AND RELATED MATTERS 11 Section 11 Section 11: Water treatment and related matters Summary of Section 11 Describes the importance of quality assurance systems including written

More information

Transporting radioactive material - Guidance on radiation and contamination monitoring requirements, and determining a Transport Index

Transporting radioactive material - Guidance on radiation and contamination monitoring requirements, and determining a Transport Index Transporting radioactive material - Guidance on radiation and contamination monitoring requirements, and determining a Transport Index Who is this guide for? This guide has been prepared primarily to help

More information

The essential guide to the mandatory knowledge, skills and competencies required for personnel designing for or working in hazardous areas

The essential guide to the mandatory knowledge, skills and competencies required for personnel designing for or working in hazardous areas The essential guide to the mandatory knowledge, skills and competencies required for personnel designing for or working in hazardous areas Based on IEC 60079-14 and IEC 60079-17 2 nd Edition, April 2013

More information

HAZOP and What-If Analyses

HAZOP and What-If Analyses 14 HAZOP and What-If Analyses 14.1 INTRODUCTION The hazard and operability (HAZOP) study and the what-if analysis are analytical techniques that have their roots in the petrochemical industry. The HAZOP

More information

REDEFINE YOUR BIOMEDICAL, FACILITIES, & HEALTHCARE TECHNOLOGY MANAGEMENT STRATEGIES

REDEFINE YOUR BIOMEDICAL, FACILITIES, & HEALTHCARE TECHNOLOGY MANAGEMENT STRATEGIES ASSET & MAINTENANCE MANAGEMENT DESIGNED FOR HEALTHCARE REDEFINE YOUR BIOMEDICAL, FACILITIES, & HEALTHCARE TECHNOLOGY MANAGEMENT STRATEGIES Keeping a healthcare system performing optimally means minimizing

More information

Guidance on Independent Assessment. Rail Industry Guidance Note. Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY

Guidance on Independent Assessment. Rail Industry Guidance Note. Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2014 Rail Safety and Standards Board Limited GE/GN8645 Issue One: June 2014 Rail Industry Guidance Note Issue record Issue

More information

GUIDEBOOK CODE OF CONDUCT MANAGEMENT SYSTEMS

GUIDEBOOK CODE OF CONDUCT MANAGEMENT SYSTEMS GUIDEBOOK CODE OF CONDUCT MANAGEMENT SYSTEMS 2005 Levi Strauss & Co. Page 1 of 57 Table of content SECTION I: INTRODUCTION... 3 1. Introduction... 3 2. How to use this Guidebook... 3 SECTION II: THE MANAGEMENT

More information

Risk Communications. Barrier Diagrams and Web-sites. Robin Pitblado, DNV Houston Ravi Tahilramani, DNV Abu Dhabi

Risk Communications. Barrier Diagrams and Web-sites. Robin Pitblado, DNV Houston Ravi Tahilramani, DNV Abu Dhabi Risk Communications Barrier Diagrams and Web-sites Mary Kay O Connor Process Safety Conference College Station TX Oct 27-28, 2009 Robin Pitblado, DNV Houston Ravi Tahilramani, DNV Abu Dhabi Process Safety

More information

Environmental Conditions Laboratories (for commercial use) Group

Environmental Conditions Laboratories (for commercial use) Group GBR No. 20 Environmental Conditions Laboratories (for commercial use) Group ERA regulates the environmental impact of enterprises through two key mechanisms. Smaller scale activities are regulated through

More information

Development of Bracknell Adult Social Care Quality Assurance Framework

Development of Bracknell Adult Social Care Quality Assurance Framework Development of Bracknell Adult Social Care Quality Assurance Framework Outline of Proposals Principles 1. Our working definition for the Quality Assurance Framework (QAF), is a set of principles, structures

More information

STANDARD. Competence management systems DNVGL-ST-0049: DNV GL AS

STANDARD. Competence management systems DNVGL-ST-0049: DNV GL AS STANDARD DNVGL-ST-0049:2014-08 Competence management systems The electronic pdf version of this document found through http://www.dnvgl.com is the officially binding version. The documents are available

More information

Corporate Aviation Safety Management System

Corporate Aviation Safety Management System Corporate Aviation Safety Management System Prelude Dear aviation colleague, This guide was developed to facilitate the implementation of an effective, yet practical, safety management system (SMS). Although

More information

Performance Standards for Self-insurers

Performance Standards for Self-insurers A.1.3.1 adequacy check Applicant: name Date: date Person responsible for content: name Evaluator: name Performance Standards for Self-insurers This adequacy check relates specifically to the and/or Injury

More information

JULY 10, 2013 INTRODUCTION

JULY 10, 2013 INTRODUCTION Guidelines to Establish the Chief Engineer s Responsibility N.J.A.C. 12:90 Boiler, Pressure Vessel and Refrigeration Rules Specifically N.J.A.C. 12:90-3.9 (a) NOTE: PROPER USE OF THIS DOCUMENT WILL ASSURE

More information

Verify Category A Audit Content

Verify Category A Audit Content Verify Category A Audit Content V10.0 Achilles Group Limited, 2014. All rights reserved. Objective The objective of this document is to provide suppliers who have registered for a Verify Category A (V10.0)

More information

New Lloyd s Register Rules for Natural Gas Fuelled Ships

New Lloyd s Register Rules for Natural Gas Fuelled Ships Lloyd s Register s Gas Seminar New Lloyd s Register Rules for Natural Gas Fuelled Ships Edward Fort Global Head of Engineering Systems April 2013 New Rules for Natural Gas Fuelled Ships OVERVIEW Our Complex

More information