1 PMP Study Group Human Resource Management
2 Project Human Resource Management Definition Project Human Resource Management includes the processes that organize, manage and lead the project team. The project team is comprised of the people with assigned roles and responsibilities for completing the project. PMBoK Guide, 4 th Edition, p
3 Human Resource Management Processes 9.1 Develop Human Resource Plan 9.2 Acquire Project Team 9.3 Develop Project Team 9.4 Manage Project Team 3
4 Develop Human Resource Plan Process Knowledge Area Project Management Process Groups Initiating Planning Executing Monitoring & Controlling Closing 5. Project Human Resource Management 9.1 Develop Human Resource Plan 9.2 Acquire Project Team 9.3 Develop Project Team 9.4 Manage Project Team 4
5 9.1 Develop Human Resource Plan Project Human Resource Management Definition: The process of identifying and documenting project roles, responsibilities and required skills, reporting relationships, and creating a staffing management plan. PMBoK Guide, 4 th Edition, Glossary PMBoK Guide, 4 th Edition, p
6 9.1 Develop Human Resource Plan - Notes Human resource planning is used to determine and identify human resources with the necessary skills required for project success. The human resource plan documents project roles and responsibilities, project organization charts and the staffing management plan including the timetable for staff acquisition and release. The human resource plan may also include identification of training needs, team building strategies, plans for recognition and rewards programs, compliance considerations, safety issues, and the impact of the staffing management plan on the organization 6
7 9.1.1 Develop Human Resource Plan Inputs Activity Resource Requirements Human Resources planning uses activity resource requirements to determine the human resource needs for the project Enterprise Environmental Factors Organizational culture and structure Existing human resources Personnel administration policies Market conditions and unique challenges Organizational Process Assets Organizational standard processes and policies and standardized role descriptions Templates for organizational charts and position descriptions Historical information that has worked in previous projects 7
8 9.1.2 Develop Human Resource Plan Tools and Techniques Document team members roles & responsibilities Organizational Charts/Job Descriptions Some common types: Hierarchal type, ie: Organizational Breakdown Structure (OBS) Matrix Based, ie: Responsibility Assignment Matrix (RAM) Text Oriented format Formal and informal interaction with others within the organization, industry or professional environment Networking A constructive way to understand political and interpersonal factors that may impact the effectiveness of various staffing management options. Activities can include informal conversations, meetings, trade shows Organizational Theory Provides information on the way in which people, teams and organizational units behave. Effective use of this information can shorten the amount of time, cost and effort needed for human resource planning. 8
9 Organization Chart Examples Project Human Resource Management Example of a Responsibility Assignment Matrix (RAM): The RACI Chart Responsible Accountable Consult Inform 9
10 9.1.3 Human Resource Plan Definition The human resource plan, a part of the project management plan, provides guidance on how human resources should be defined, staffed, managed, controlled and eventually released. PMBoK Guide, 4 th Edition, p
11 9.1.1 Develop Human Resource Plan Outputs The human resource plan should include: Roles & Responsibilities Role - Describes the portion of the project for which the person is accountable. Be sure everyone is familiar with their authority, duties and boundaries Human Resource Plan Responsibility The work a team member is expected to perform to complete the project s activities. Authority The right to apply project resources, make decisions and sign approvals Team members operate best when their authority matches their individual responsibilities. Competency The skill and capacity required to complete project activities. When project team members do not have the required skills, performance can be jeopardized. 11
12 9.1.1 Develop Human Resource Plan Outputs (cont d) The human resource plan should include: Project Organizational Charts A graphic display of project team members and their reporting relationships Human Resource Plan (cont d) formal, informal, highly detailed, or broad Staffing Management Plan Part of the human resource plan Describes how and when human resource requirements will be met. formal, informal, highly detailed, or broad 12
13 9.1.1 Staffing Management Plan Items to Consider Staff Acquisition Resource Calendars Staff Release Plan Training Needs Recognition & Rewards Compliance Safety Can the company HR Dept help? Will resources be working remote or centrally located? Can you contract consultants to perform the work? Describes necessary timeframes for project team members Determining the method and timing of releasing team members Helps control costs by specifying release criteria upfront Helps mitigate human resource risks that may occur during or at the end of the project If training is needed, a training plan can be developed as part of this project Include ways to help team members obtain certifications that may benefit the project Criteria for rewards and a plan for their use Create a plan with established times for distribution of rewards Strategies for complying with applicable regulations and human resource policies Protect team members from safety hazards Also may appear in Risk Register 13
14 9.1.3 Develop Human Resource Plan Resource Histogram Example PMBoK Guide,4 th Edition, p
15 9.1 Develop Human Resource Plan Miscellaneous Terms Roles & Responsibilities Project Sponsor/Initiator One who provides financial resources for the project. Can be the Customer or Senior Management. Team A group of people who will complete work on the project. Stakeholders Functional Manager Anyone who is involved in the project, or whose interests may be positively or negatively affected by execution or completion of the project. The individual who manages and owns the resources in a specific dept. The amount of involvement depends on the structure of the organization. Project Manager Responsible for managing the project to meet the projects objectives. 15
16 9.1 Develop Human Resource Plan Miscellaneous Terms (cont d) Resource Histogram Resource Calendar Represents in graphical format the hours and duration team members are needed throughout the project. Shows where there is a spike in the need for resources. Project Manager can arrange to minimize the peaks and valleys of resource usage (a.k.a. resource leveling). A calendar of working days and non-working days. Defines resource availability periods Resource Leveling The schedule analysis of resources so that there is limited over/under allocation of resource at a given time throughout the project timeline. How is the team going to be motivated? Recognition & Rewards This is an alien concept to most Project Managers. Motivate each team member individually based on their own needs. Thank You, rewards for performance, desired training, flexible work environment. 16
17 9.1 Develop Human Resource Plan Data Flow Diagram PMBoK Guide, 4 th Edition, p
18 Acquire Project Team Process Project Human Resource Management Knowledge Area Project Management Process Groups Initiating Planning Executing Monitoring & Controlling Closing 5. Project Human Resource Management 9.1 Develop Human Resource Plan 9.2 Acquire Project Team 9.3 Develop Project Team 9.4 Manage Project Team 18
19 9.2 Acquire Project Team Definition Project Human Resource Management Definition: The process of confirming human resource availability and obtaining the team necessary to complete project assignments. PMBoK Guide, 4 th Edition, Glossary PMBoK Guide, 4 th Edition, p
20 9.2 Acquire Project Team - Notes Project Human Resource Management The project management team may or may not have direct control over team member selection for various reasons depending on the organizational structure Failure to acquire necessary resources may affect overall project success. 20
21 9.2.1 Acquire Project Team Inputs Project Human Resource Management Project Management Plan Contains information that provides guidance on how human resources should be indentified, staffed, managed, controlled and eventually released Enterprise Environmental Factors Project team members come together from all available sources both internal and external. Assignments are based on many factors: Staff availability Staff location Staff Competency Outsourcing Organizational Process Assets One or more organizations involved in the project may have guidelines/policies/procedures governing staff assignments, ie: Personnel administrative policies, processes, procedures 21
22 9.2.2 Acquire Project Team Tools and Techniques Team members may be known in advance Pre-Assignment Team members may be promised as part of the project proposal. Certain staff assignments can be part of the Project Charter Negotiation Project Manager needs to negotiate with the functional managers and/or other project teams for the best team members in the timeframe set forth by the project Acquisition Organization may lack internal resources to complete the project. Resources can be acquired from outside sources, subcontractors or consultants may be hired. Teams not located within the same geographic area Virtual Teams The availability of electronic communication such as , audio conferencing, web-based meetings and video conferencing make these teams possible. 22
23 9.2.3 Acquire Project Team Outputs Project Human Resource Management Project Staff Assignments Appropriate staff has been assigned. Create documentation of staff assignments, such as a team directory, memos to team members, project organizational charts Resource Calendars Accurately document the time period team members are available to work on the project. Create a reliable schedule and understand possible conflicts and plan conflict resolution Project Management Plan Updates Elements of the plan may need updating depending on the outcome of staffing requirements and availability. 23
24 9.2 Acquire Project Team Data Flow Diagram 24
25 Develop Project Team Process Project Human Resource Management Knowledge Area Project Management Process Groups Initiating Planning Executing Monitoring & Controlling Closing 5. Project Human Resource Management 9.1 Develop Human Resource Plan 9.2 Acquire Project Team 9.3 Develop Project Team 9.4 Manage Project Team 25
26 9.3 Develop Project Team Definition Project Human Resource Management Definition: The process of improving the competencies, team interaction, and the overall team environment to enhance project performance. PMBoK Guide, 4 th Edition, Glossary PMBoK Guide, 4 th Edition, p
27 9.3 Develop Project Team - Notes Project Human Resource Management Project managers need to acquire skills to identify, build, maintain, motivate, lead, and inspire project teams to achieve high team performance to help meet project objectives. Teamwork is a critical factor for project success. Create an environment that facilitates teamwork. 27
28 9.3.1 Develop Project Team Inputs Project Human Resource Management Project Staff Assignments List of the project team members that identify the people who are on the project team Project Management Plan Human Resource Plan Identifies training strategies and plans for developing the project team. Rewards, feedback, additional training, and disciplinary actions can be added to the plan as a result of on-going performance assessments Resource Calendars Identify when project team members can participate in development activities. 28
29 9.3.2 Develop Project Team Tools and Techniques Interpersonal Skills Training a.k.a. Soft Skills Important to team development. Understand the team, anticipate the team s actions, acknowledge their concerns and follow-up on team issues. Enhance the competencies of team members: Formal or informal. Classroom, on-line, computer-based, on the job training from other team members. Skills can be developed as part of the project Team-Building Activities Help individual team members work together effectively. Formal or informal. Do not forget to include remote team members. Build trust and establish good working relationships. Team should be encouraged to work collaboratively to resolve team issues. Need management support and team member buy-in. Talk about rewards & recognitions program. Provide good team leadership. Never ending process as project changes occur. 29
30 Five Stages of Team Development Bruce Tuckman Forming Storming Norming Performing Adjourning Team meets and learns about the project. Learn roles & responsibilities. Begin to address project work, technical decisions, and management approach. Environment can become destructive if members are not open to ideas. Team members begin to work together and trust each other. Adjust work habits and behaviors. Team starts to perform as well organized unit. Works through issues effectively. Team completes the work and move on from the project. 30
31 9.3.2 Develop Project Team Tools and Techniques (cont d) Ground Rules Co-location Establish clear expectations for acceptable behavior. Early commitment to project guidelines decreases misunderstandings and increases productivity. Allow team members to discover values that are important to one another. All team members share responsibility for enforcement. All or most active members in the same physical location. Temporary during strategic times in the project or permanent. Enhance communication and sense of community Recognition and Rewards Ways in which to reward team members are developed during the Develop Human Resource Plan process. Recognize and reward desirable behavior ONLY. Rewards will only be effective if it satisfies a need which is valued by that individual. Formal or informal. Based on continuing project performance assessments. People are motivated if they feel they are valued in the organization. Recognition should be given during the life cycle of the project rather than waiting until the project is completed. 31
32 9.3.3 Develop Project Team Outputs During the project lifecycle the project management team makes formal or informal assessments of the project team s effectiveness. Development strategies and activities are expected to increase the teams performance which leads to a more successful project overall Team Performance Assessments Team performance assessment criteria should be determined and incorporated in the Develop Project Team inputs. Most important in contract-related or collective bargaining projects. Must use agreed upon assessment objectives. May identify additional need for training, coaching, mentoring or changes to increase the teams overall performance. Performance assessments must be well documented and forwarded to the appropriate parties Enterprise Environmental Factors Updates Employee training records Employee skills assessments General personnel records 32
33 9.3 Develop Human Resource Plan Miscellaneous Terms General management skills are important to team development: Soft Skills Empathy Identification with and understanding of another's situation, feelings, and motives Influence Power to sway or affect based on prestige, wealth, ability, or position Creativity Characterized by originality and expressiveness; imaginative Group Facilitation A formal meeting controlled by an outside person War Room A co-location where the project team can meet during important times of the project or for the entire project. A Place where project team can enhance communications and form a sense of community Only desirable behavior should be rewarded, ie Recognition & Rewards Willingness to work overtime Turning in reports on-time Rewards should be meaningful to the person given 33
34 Manage Project Team Process Project Human Resource Management Knowledge Area Project Management Process Groups Initiating Planning Executing Monitoring & Controlling Closing 5. Project Human Resource Management 9.1 Develop Human Resource Plan 9.2 Acquire Project Team 9.3 Develop Project Team 9.4 Manage Project Team 34
35 9.4 Manage Project Team Definition Project Human Resource Management Definition: The process of tracking team member performance, providing feedback, resolving issues, and managing changes to optimize performance. PMBoK Guide, 4 th Edition, Glossary PMBoK Guide, 4 th Edition, p
36 9.4 Manage Project Team - Notes Project Human Resource Management Managing the project team requires a variety of management skills to create high performance teams. Project Managers should provide challenging assignments to team members and provide recognition for high performance. 36
37 9.4.1 Manage Project Team Inputs Project Human Resource Management Project Staff Assignments Provides documentation which includes the list of project team members Project Management Plan Team Performance Assessments Contains the Human Resource Plan to include: Roles & Responsibilities Project Organization The staffing management plan Formal or informal assessments of the team s performance. 37
38 9.4.1 Manage Project Team Inputs (cont d) Provide documentation about the current project status compared to project forecasts Performance Reports Areas that help with project team management include results from: Schedule control Cost Control Quality control Scope verification The information from performance reports help to determine future resource requirements, recognition & rewards, and staffing management plan updates Organizational Process Assets Process assets that can influence the Manage Project Team process include: Certificates of appreciation Newsletters Websites Bonus structures Corporate apparel Other perquisites (perks) 38
39 9.4.2 Manage Project Team Tools and Techniques Observation & Conversation Stay in touch with the work attitudes of the project team members. Project management team monitors progress of deliverables, accomplishments that are a source of pride for team members Project Performance Appraisals Conduct performance appraisals during the course of the project. Objectives can include: Clarification of roles & responsibilities Constructive feedback to team Discovery of unknown or unresolved issues Development of individual training plans Establishing goals for future Formal or informal Results in greater productivity and positive working relationships. Conflicts are inevitable Conflict Management Sources of conflicts include: Resource Scheduling Priorities Personal work styles 39
40 9.4.2 Manage Project Team Tools and Techniques (cont d) Conflict Management (cont d) Reduce amount of conflict by: Ground rules Solid project management practices Communication planning Role definition Address conflict early and in private Use direct approach and formal procedures if needed Recognize characteristics of conflict Team issue Resolved by openness Focus on issues not personalities Focus on present not past Depends on Project Manager s ability to resolve conflict Importance, impact, & intensity of conflict Time pressure for resolution Position taken by players Motivation to resolve conflict short term or long term 40
41 9.4.2 Manage Project Team Tools and Techniques (cont d) Conflict Management (cont d) General techniques for resolving conflict Withdrawal (Avoidance) Postponing a decision on a problem. Not the best choice for resolution, nothing is resolved. Smoothing Stressing agreement rather than difference of opinion Compromising find solutions with a degree of satisfaction to both parties. Neither party gets what they want completely. Forcing Pushing one viewpoint over another Collaborating Incorporate multiple viewpoints Confronting (Problem Solving) Solving the real problem to make it go away. Win-Win. Problem Solving: Define the cause of the problem, not just the symptom Analyze the problem (root cause) Identify possible solutions Implement a decision Review the decision to see if it solves the problem 41
42 9.4.2 Manage Project Team Tools and Techniques (cont d) Issues arise in the course of managing the project team Issue Log Issues during project should be documented Can block team from achieving their goals Combination of technical, human, and conceptual Interpersonal Skills Using the appropriate skills aid the Project Manager in capitalizing on the strengths of all team members. Interpersonal skills most often used are: Leadership Influencing Effective Decision Making 42
43 Interpersonal Skills Project Human Resource Management Leadership Influencing Effective Decision Making Important in all phases of the project for high performance. In a matrix environment team members often do not report directly to the Project manager. Key influencing skills: Ability to be persuasive Effective listening Consideration of all perspectives Information gathering Reach agreements while maintaining mutual trust The ability to negotiate and influence the organization and project management team. Guidelines include: Focus on goals Follow a decision making process Study the environmental factors Develop personal qualities of team members Stimulate team creativity Manage opportunity and risk 43
44 Powers of the Project Manager Project Human Resource Management The project manager needs to constantly convince people to cooperate and/or perform. Types of Project Management power: Formal (Legitimate) Reward Penalty (Coercive) Expert Referent Based on your position Reward top performers by assigning them to projects they are interested in next time Ability to penalize team members as needed to get what you need for the project to perform Being the subject matter expert PM using someone of authority above them. BEST: Expert & Reward WORST: Penalty 44
45 Leadership Styles Directing Telling others what to do just because Facilitating Coordinating with the input of others. Coaching Instructing others (mentoring). Supporting Providing assistance. Autocratic Deciding without input in a vacuum Consultative Consultative- Autocratic Consensus Bottom-up approach uses influence to get results. Listens to team members, but reserves decision making authority for themselves. Group decision making based on agreement 45
46 Leadership Styles (cont d) Delegating PM gives the team sufficient authority to complete the work Bureaucratic Following process or procedures exactly Charismatic Democratic or Participative Laissez-faire Analytical Driver Energize and encourage team to perform Encourage team to participate in decision making process Not directly involved in the work of the team but manages or consults as necessary Make technical decisions for project based on their own knowledge of subject Constantly giving directions, competitive attitude drives team to win Influencing Teamwork style, team decision making 46
47 9.4.3 Manage Project Team Outputs Project Human Resource Management Enterprise Environmental Factors Updates Changes as a result of the manage project team process Input to organizational performance appraisals Personnel skills updates Organizational process assets updates Changes as a result of the manage project team process Historical information and lessons learned documentation Templates Organizational standard processes Change requests Staffing changes are often unavoidable and are caused by uncontrollable events. Staffing changes can disrupt the project management plan by causing the schedule to be extended or budget to be exceeded Moving people to different assignments People leaving (voluntary or termination) Outsourcing of some of the work not previously intended Try to develop preventive actions to reduce risk. 47
48 9.4.3 Manage Project Team Outputs (cont d) Project management plan updates Staffing management plan may be updated as a result of approved changes during the manage project team process. 48
49 Theories to Know Expectancy Theory Arbitration Perquisites (aka: Perks) Fringe Benefits Employees who believe their efforts will lead to effective performance and who expect to be rewarded for their accomplishments remain productive as rewards meet their expectations. The hearing a resolution of a dispute performed by a neutral party. The giving of special rewards to some employees, such as assigned parking spaces, corner offices and executive dining. The standard benefits formally given to all employees such as educational benefits, insurance and profit sharing. Motivational Theory (What do people want?) Understand what motivates people in order to reward them. 49
50 McGregor s Theory of X and Y Project Human Resource Management All workers fit into one of two groups, X or Y Theory X ( Authoritarian management style) The average person dislikes work and will avoid it he/she can. Therefore, most people must be forced with the threat of punishment to work towards organizational objectives. The average person prefers to be directed; to avoid responsibility; is relatively un-ambitious, and wants security above all else. 50
51 McGregor s Theory of X and Y Project Human Resource Management All workers fit into one of two groups, X or Y Theory Y ( Participative management style) Effort in work is as natural as work and play. People will apply self-control and self-direction in the pursuit of organizational objectives, without external control or the threat of punishment. Commitment to objectives is a function of rewards associated with their achievement. People usually accept and often seek responsibility. The capacity to use a high degree of imagination, ingenuity and creativity in solving organizational problems is widely, not narrowly, distributed in the population. In industry the intellectual potential of the average person is only partly utilized. 51
52 Maslow s Hierarchy of Needs Project Human Resource Management People do not work for security or money. People work to contribute and to use their skills. Self Actualization. One cannot ascend to the next level until the levels below are fulfilled. 52
53 Herzberg s Theory Hygiene Factors and Motivating Agents Hygiene Factors Poor hygiene factors may destroy motivation, but improving them may not improve motivation Working conditions Salary Personal Life Relationships at work Security Status Motivating Agents Responsibility Self actualization Professional growth Recognition 53
54 9.4 Manage Project Team Data Flow Diagram PMBoK Guide, 4 th Edition, p
55 Terms and Common Acronyms Project Human Resource Management Organizational Breakdown Structure (OBS) A hierarchically organized chart of the project organization arranged to relate to the work packages of the performing organizational units Responsibility Assignment Matrix (RAM) Resource Breakdown Structure (RBS) A structure that relates the project s Organizational Breakdown Structure to the Work Breakdown Structure to help ensure that each component of the projects scope is assigned to a responsible person or owner A hierarchical structure of resources by resource category and resource type. Helps in resource leveling and scheduling. Work Breakdown Structure (WBS) Co-location 360-degree feedback Project deliverables broken down into smaller more manageable components An organizational placement strategy where the project team members are physically located close to one another in order to improve communication, working relationships and project productivity Feedback regarding performance is given from superiors, peers and subordinates. from all sides 55
56 56
57 Good Luck!!
Project Human Resource and Communication Management. Prof. Dr. Daning Hu Department of Informatics University of Zurich
Project Human Resource and Communication Management Prof. Dr. Daning Hu Department of Informatics University of Zurich Now you tell me.. n What are the things a Project Manager needs to do regarding Human
More informationProject Human Resource Management
Project Human Resource Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note
More informationSWEN 256 Software Process & Project Management
SWEN 256 Software Process & Project Management What are your responsibilities as a team member? As a Project Manager? How does Team Development relate to the Project Triangle? Scope Cost Schedule What
More informationCOURSE CATALOG. vadoinc.net
COURSE CATALOG 2018 vadoinc.net Welcome Welcome to the Vado 2018 Course Catalog. Vado provides any organization or learner numerous opportunities to build the skills needed to lead and manage others, as
More informationNEW HORIZONS ONLINE LIVE. Certified Associate of Project Management (CAPM ) PMBOK Guide, 5th Edition DAY 3
NEW HORIZONS ONLINE LIVE Certified Associate of Project Management (CAPM ) PMBOK Guide, 5th Edition DAY 3 Plan Quality Management 1. Project mgt. 2. Stakeholder register 3. Risk register 4. Requirements
More informationProject Planning & Management. Lecture 9 Project Human Resource Management
Lecture 9 Project Human Resource Management What is Project Human Resource Management? Making the most effective use of the people involved with a project. Processes include: Human resource planning: Identifying
More informationThe 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th
The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th www.pmlead.net PMI, PMP, CAPM and PMBOK Guide are trademarks of the Project Management Institute, Inc. PMI has not endorsed and did not
More informationInitiation Group Process. Planning Group Process
Initiation Group Process Develop Project Charter Project statement of work Expert judgment Project charter Business case Contract (if third party project) EEF: government/industry standards, organizational
More information2. What does the Human Resource Plan describe? 3. List three items included in the Staffing Management Plan.
CSC 310 Program Management California State University Dominguez Hills Spring 2017 Instructor: Howard Rosenthal Assignment 3c Chapter 3 What Are The Project Management Process Groups Answer Sheet 1. Who
More informationProject Management. Objectives 3/17/2015. David Borrill, MT, MBA, PMP
Project Management David Borrill, MT, MBA, PMP Objectives Nobody falls asleep or walks out. Presentation of some of the main points in the management of projects in the healthcare environment. Everybody
More informationPMP MOCK EXAMS BASED ON PMBOK 5TH EDITION
PMP MOCK EXAMS http://www.tutorialspoint.com/pmp-exams/pmp_mock_exams_set2.htm Copyright tutorialspoint.com BASED ON PMBOK 5TH EDITION Here are 200 objective type sample questions and their answers are
More informationCERTIFICATIONS IN HUMAN RESOURCES. SPHRi TM Senior Professional in Human Resources - International TM SPHRi. Exam Content Outline
CERTIFICATIONS IN HUMAN RESOURCES SPHRi TM Senior Professional in Human Resources - International TM 2018 SPHRi Exam Content Outline SPHRi Exam Content Outline At-a-Glance: SPHRi Exam Weighting by Functional
More informationPerformance Leader Navigator Individual Feedback Report For: Chris Anderson
For: Chris Anderson Finding your way in today's world of work Copyright ã 2007, 2008 Wilson Learning Worldwide Inc. This report includes ratings from: Self 1 Manager 1 Direct Report 5 Peer 3 Customer 4
More informationMotivation and Empowerment
Chapter 8 Motivation and Empowerment 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. 1 Your Leadership
More informationManager, Supervisor & CEMA Skill Set Model County of Santa Clara
Leads Innovation Leadership Styles Manages Change Models Integrity, Trust & Transparency Strategic Thinking and Planning Manager, Supervisor & CEMA Skill Set Model County of Santa Clara Conflict Management
More informationProject Management Professional (PMP) Boot Camp
Project Management Professional (PMP) Boot Camp According to the Project Management Institute, the world's leading association for the project management profession: "PMP Certification is the profession's
More informationMANAGEMENT COMPETENCY FRAMEWORK TEMPLATE
MANAGEMENT COMPETENCY FRAMEWORK TEMPLATE This template enables you to determine two things with regard to the twelve common competencies used in organization s management competency framework. Firstly,
More informationHow to Engage Employees. A Guide for Employees, Supervisors, Managers, & Executives
How to Engage Employees A Guide for Employees, Supervisors, Managers, & Executives 1 Introduction Employee Engagement is a good in and of itself. What is Employee Engagement? Employee engagement is the
More informationIntegration Mgmt / Initiating Process Group 4.1 Develop Project Charter
1 Mgmt / Initiating Process Group 4.1 Develop Project Charter Project statement of work Business Case Contract Enterprise environmental factors Project charter Expert judgement 26/02/2013 18:22:56 1 2
More informationBusiness Studies - Management Notes. Business Studies Study Notes
Business Studies - Management Notes Business Studies Study Notes The Nature of Management: Definition of Management: The process of working with and through other people to achieve business goals in a
More informationBasic Concepts of Supervisory Skills for Transportation Officials
Puerto Rico Transportation Technology Transfer Center Department of Civil Engineering and Surveying University of Puerto Rico at Mayagüez PO Box 9000 * Mayagüez, PR 00681 Tel. 787-834- 6385 * Fax: 787-265-
More informationUnit 11: Stakeholder Management (PMBOK Guide, Chapter 13)
(PMBOK Guide, Chapter 13) Stakeholder management identifies people, groups, and organizations that could impact or be impacted by the project. The topic has increased in importance with each new edition
More information4.1 Organizational Charts and Designs 4.2 Centralized and Decentralized Organization 4.3 Span of Control
4. Organizing 4.1 Organizational Charts and Designs 4.2 Centralized and Decentralized Organization 4.3 Span of Control 4.4 Authority and Unity of Command 4.5 Incentives and Motivation Tools 4.6 Maslow
More informationICMA PRACTICES FOR EFFECTIVE LOCAL GOVERNMENT LEADERSHIP Approved by the ICMA Executive Board June 2017; effective November 2017
Reorganization The Credentialing Advisory Board proposed, and the Leadership Advisory and Executive Boards agreed, that the ICMA Practices should be organized as a narrative rather than a list. The following
More informationLeadership Communications Workshop. Future Leaders Day HNZ Conference 2013
Leadership Communications Workshop Future Leaders Day HNZ Conference 2013 Defining Leadership Leading Different Personalities 4 Leadership Styles Avoiding Leadership Traps What Impacts Motivation? Managing
More informationJob Description: Operations Manager September 2017
Job Description: Operations Manager September 2017 Title: Operations Manager Reporting to: Executive Director Purpose As a senior member of the Management Team, the Operations Manager is responsible for
More informationThe Agile PMP Teaching an Old Dog New Tricks
The Agile PMP Teaching an Old Dog New Tricks Why are we here today? What is Project Management? When will the project be done? How much will it cost? Do we all agree on what done looks like? What are the
More informationCh.10 Organization for Logistics.
Part 1 : System Management. Ch.10 Organization for Logistics. Edited by Dr. Seung Hyun Lee (Ph.D., CPL) IEMS Research Center, E-mail : lkangsan@iems.co.kr Organization for Logistics. [Blanchard, pp405-430]
More informationJustice Administration Police, Courts, and Corrections Management
Justice Administration Police, Courts, and Corrections Management EIGHTH EDITION CHAPTER 2 Organization and Administration: Principles and Practices Defining Organizations Like supervision and management,
More informationChapter Ten. Motivating Employees. McGraw-Hill/Irwin. Copyright 2010 by the McGraw-Hill Companies, Inc. All rights reserved.
Chapter Ten Motivating Employees McGraw-Hill/Irwin Copyright 2010 by the McGraw-Hill Companies, Inc. All rights reserved. INTRINSIC REWARDS The Value of Motivation Intrinsic Rewards -- Personal satisfaction
More informationINTERPERSONAL SKILLS FOR
INTERPERSONAL SKILLS FOR PROJECT MANAGERS Dr Anthony Yeong DBA MBA PMP PRINCE2 Practitioner July 2011 AGENDA Why Interpersonal Skills? Leadership Team building Motivation Communication Influencing Decision
More informationMotivating Employees to a Winning Performance
Motivating Employees to a Winning Performance Lynne Vu Principal Human Capital Consultant The Executive s Roadmap to Best-in-Class HR Strategy 2015 2016 TriNet TriNet Group, Group, Inc. All Inc. rights
More informationJust like QUALITY Good Project Management Practices start with an Internal Kick-Off Meeting. It is the Project Managers job to communicate:
Just like QUALITY Good Project Management Practices start with an Internal Kick-Off Meeting It is the Project Managers job to communicate: What is the team trying to accomplish? How the team is going to
More informationWhat skills and abilities does it really take to succeed as a Senior Human Resource Professional today?
SCROLL DOWN What skills and abilities does it really take to succeed as a Senior Human Resource Professional today? Executive Summary Report of a Survey of Senior HR Generalists Prepared by: DISCOVERY
More informationTestkings PMP 705q. PMI PMP. Project Management Professional v5
Testkings PMP 705q Number: PMP Passing Score: 800 Time Limit: 120 min File Version: 14.5 PMI PMP Project Management Professional v5 This is my first share of braindumps questions. Very helpful study center
More information7.11b: Quality in Project Management: A Comparison of PRINCE2 Against PMBOK
by Peter Whitelaw, Rational Management Pty Ltd, Melbourne Introduction This comparison takes each part of the PMBOK and provides comments on what match there is with elements of the PRINCE2 method. It's
More informationPMP Preparation Q & A Part-I Questions 1-220
1. A Project Manager is most likely to have the strongest influence in an organization that is: A. Balanced Matrix B. Functional C. Projectized D. Strong Matrix 2. Project Management processes are: A.
More informationBy: Jenna Smith, Kay White, Ismael Lozano, Stas Yarovikov, Allen Liu, Forrest Six
Chapter 14: Manageme nt, Motivation, and Leadership By: Jenna Smith, Kay White, Ismael Lozano, Stas Yarovikov, Allen Liu, Forrest Six Chapter Introduction 14-1: Discuss the role of management and its importance
More informationBuilding and Leading Teams BUILDING EFFECTIVE TEAMS COMPETENCY MAP. SLP Level 1 workshop competencies mapped to SLP2 Leadership Advantage tracks
Building and Leading Teams Work/Life Balance Career Development Problem Solving and Decision Making Setting and Priorities Leader as Motivator WORK/LIFE BALANCE BUILDING EFFECTIVE TEAMS SELFKNOWLEDGE Upward
More informationSVP/Chief Information Officer Executive President and CEO Exempt
JOB TITLE: DEPARTMENT: REPORTS TO: FLSA STATUS: SALARY GRADE: SVP/Chief Information Officer Executive President and CEO Exempt SUMMARY: The Senior Vice President/Chief Information Officer is responsible
More informationChapter 7. Management, Leadership, and the Internal Organization
Chapter 7 Management, Leadership, and the Internal Organization Learning Objectives 1 Define management and the three types of skills necessary for managerial success. 5 Contrast the types of business
More informationPMP Sample Questions Click here for PMP Questions. Question No : 1 Which of the following is an output of Define Scope?
PMP Sample Questions www.techfaq360.com Click here for 1600+ PMP Questions Question No : 1 Which of the following is an output of Define Scope? A. Accepted deliverables B. Change Requests C. Project document
More informationKNOWLEDGE ACQUISITION (KA)
COMPANY A B C D E Average ABSORTIVE CAPACITY (Section A) KNOWLEDGE ACQUISITION (KA) Organization values employees opinions and Attitudes 1 We survey employees regularly to assess their attitudes toward
More informationFundamentals of Project Management Bill Coda
Fundamentals of Project Management Bill Coda The P in PM is as much about People Management as it is about Project Management. Agenda Introduction and Overview Objectives Project Management Frameworks
More informationPMI-001 Questions & Answers
PMI-001 Questions & Answers Number: PMI-001 Passing Score: 700 Time Limit: 137 min File Version: 21.2 http://www.gratisexam.com/ PMI-001 Questions & Answers Exam Name: Project Management Professional v5
More informationWorking in Groups 6 th edition
Working in Groups 6 th edition Isa N. Engleberg Prince George s Community College Dianna R. Wynn Nash Community College This multimedia product and its contents are protected under copyright law. The following
More informationUnit 8: Communications Management (PMBOK Guide, Chapter 10)
Unit 8: Communications Management (PMBOK Guide, Chapter 10) The questions on this topic are very straightforward and you can rely on common sense for many of the questions. The PMI Director of Certification
More informationLeadership is a key enabler of change. THE THEORY AND PRACTICE OF CHANGE MANAGEMENT, 3 rd Edition, John Hayes, Palgrave
Leadership is a key enabler of change. THE THEORY AND PRACTICE OF CHANGE MANAGEMENT, 3 rd Edition, John Hayes, Palgrave 2010 1 There is marked difference in the orientation between management and leadership.
More informationMeet & Confer: Run & Hide, or Get Prepared?
Meet & Confer: Run & Hide, or Get Prepared? Presented by: Elizabeth M. Provencio Denton, Navarro, Rocha & Bernal, P. C. elizabeth.provencio@rampage-sa.com 2517 North Main, San Antonio, Texas 78212 (210)227-3243
More informationCentral Kitchen Manager
Central Kitchen Manager Reports To: Director of Food Service Bargaining Unit: Food Service Managers Salary Schedule: Schedule A EEO Class: Level 9 FLSA Status: Hourly Revised Date: April 2011 POSITION
More informationProject Management Context Outline
Project Management Context Outline Project Phases and the Project Life Cycle Product Life Cycles Project Stakeholders Understanding Organizational Influences Suggested Skills for a Project Manager 1 Project
More informationProject Manager Regional Projects Manager Department Division/Region Community Location
1. IDENTIFICATION Position No. Job Title Supervisor s Fin. Code Position 14-01693 Project Manager Regional Projects Manager 14-03406 14740-01-02-210- 1406000-01 Department Division/Region Community Location
More informationManagement, Motivation, and Leadership: Bringing Business to Life
14 14-1 14-2 14-3 14-4 14-5 14-6 Management, Motivation, and Leadership: Bringing Business to Life Discuss the role of management and its importance to organizational success Explain key theories and current
More information2018 SPHR. Exam Content Outline CERTIFICATIONS IN HUMAN RESOURCES. SPHR Senior Professional in Human Resources
CERTIFICATIONS IN HUMAN RESOURCES SPHR Senior Professional in Human Resources 2018 SPHR Exam Content Outline NOTE: The 2018 revisions to the SPHR exam content outline go into effect for all SPHR exams
More informationTechnology Deployment and Operations Technician
LIT Job Description Job Family: Job Title: Department Name: Level: Deployment and Operations Technology Deployment and Operations Technician Learning and Information Technology (LIT) ITB Revised: May 20,
More informationBusiness Services Training
Business Services Training Unit of Competency BSBWOR502B Ensure team effectiveness Unit Descriptor This unit describes the performance outcomes, skills and knowledge required to facilitate all aspects
More informationPMP Sample Questions. 1. In face-to-face interactions, how is most information conveyed?
PMP Sample Questions 1. In face-to-face interactions, how is most information conveyed? A. By the tone of voice B. By the words spoken C. By body language D. By the location. 2. A report is a reflective
More informationUC Core Competency Model
UC Core Competency Model Developed and Endorsed by: UC Learning and Development Consortium Chief Human Resources Officers Date: May 2011 University of California Staff Employees Core Competencies Communication
More informationDo Happy Employees Lead to Happy Customers?: Revisiting the Employee-Customer Relationship
Do Happy Employees Lead to Happy Customers?: Revisiting the Employee-Customer Relationship AMA Web Cast October, 2008 Rick Garlick, Director of Consulting and Strategic Implementation, Maritz Research
More informationPOLYTECHNIC OF NAMIBIA
POLYTECHNIC OF NAMIBIA CENTRE FOR OPEN AND LIFELONG LEARNING OFFICE MANAGEMENT & TECHNOLOGY ADMINISTRATIVE MANAGEMENT B (ADM720S) FEEDBACK LETTER NO. 1 FOR SECOND SEMESTER 2015 COMPILED BY: DDJ FREDERICKS
More informationFOURTH EDITION. BUSINESS REVIEW BOOKS Management. Patrick J. Montana. Bruce H. Charnov BARRON'S
BUSINESS REVIEW BOOKS Management FOURTH EDITION Patrick J. Montana Professor of Management Fordham University Schools of Business Bruce H. Charnov Associate Professor of Management Frank G. Zarb School
More informationChapter 16 Motivation
Chapter 16 Motivation TRUE/FALSE. 1) The definition of motivation has three key elements: energy, direction, and persistence. 8) According to the goal-setting theory, a generalized goal of "do your best"
More informationHow do teams contribute to organizations?
Teams and Teamwork How do teams contribute to organizations? Team A small group of people with complementary skills, who work together to achieve a shared purpose and hold themselves mutually accountable
More informationCAMPUS ADVANTAGE INC. Job Description. JOB TITLE: Corporate Intern
CAMPUS ADVANTAGE INC. Job Description JOB TITLE: Corporate Intern Reports To: Director of Employee Engagement & Training Prepared by: ADP TotalSource January 30, 2016 SUMMARY This position is primarily
More informationCertificate IV in Project Management Student Assessment Guide
Overview The assessment for the Certificate IV in Project Management comprises Team Assignment Development of a detailed Project Management Plan for chosen case study - 30% for blended classes Individual
More informationROCKY MOUNTAIN PERFORMANCE EXCELLENCE POSITION DESCRIPTION FOR THE EXECUTIVE/MANAGING DIRECTOR
ROCKY MOUNTAIN PERFORMANCE EXCELLENCE POSITION DESCRIPTION FOR THE EXECUTIVE/MANAGING DIRECTOR ABOUT THE ORGANIZATION: Rocky Mountain Performance Excellence (RMPEx) is a Colorado nonprofit corporation
More informationCOMMUNITY ACTION PLANNING COUNCIL
COMMUNITY ACTION PLANNING COUNCIL INSTRUCTIONS FOR PREPARING AND CONDUCTING EMPLOYEE PERFORMANCE EVALUATIONS It is the policy of Community Action to conduct a formal performance evaluation with all parttime
More informationPMI Risk Management Professional (PMI RMP ) Exam Preparation Student Courseware Book
PMI Risk Management Professional (PMI RMP ) Exam Preparation Student Courseware Book The PM Instructors EXAM DOMAINS COVERED INCLUDE: Risk Communication Risk Analysis Risk Response Planning Risk Governance
More informationLesson-21. Leadership-- Some More Leadership Theories. This lesson is an insight into the following topics related to leadership:
Lesson-21 Leadership-- Some More Leadership Theories Learning Objectives This lesson is an insight into the following topics related to leadership: Some more leadership theories Leadership styles Leadership
More informationProject Communications Management
Project Communications Management Unit 10 Project Communication Management Includes the processes required to insure timely and appropriate generation, collection, distribution, storage, retrieval, and
More informationCONFLICT MANAGEMENT. Goal conflict is situation in which desired end states or preferred outcomes appear to be incompatible.
CONFLICT MANAGEMENT Introduction To Conflict: Conflict is difficult to define, because it occurs in many different settings. The essence of conflict seems to be disagreement, contradiction, or incompatibility.
More informationDeterminants of Performance
MOTIVATION 1 Determinants of Performance Person: Ability Motivation Accurate Role Perceptions Situation: Environmental (Constraints and Facilitators) Performance 2 Fundamentals of Motivation Motivation
More informationL e a d e r s h i p S t y l e S u r v e y
L e a d e r s h i p S t y l e S u r v e y This questionnaire contains statements about leadership style beliefs. Next to each statement, circle the number that represents how strongly you feel about the
More informationHandling Difficult Project Situations. A Critical Skill for Every PM
Handling Difficult Project Situations A Critical Skill for Every PM Mark Waldof Consulting LLC 2015 This seminar provided by Mark Waldof Consulting LLC owner@manageprojectsbetter.com The latest version
More informationFlexibility on what is delivered High
Flexibility on what is delivered level 1: Stakeholders are very comfortable with the fact that limited flexibility on budget and time may be necessary in order to deliver the full scope on quality, and
More informationDescription of Module Food Technology Food Business Management
Subject Name Paper Name Paper No. 14 Module Name/Title Module Id Description of Module Food Technology Food Business Management Organizational Leadership FT/FBM/09 Objectives To know about difference between
More informationVersion 1.0. The Contract Management Standard Final Edition. Version 1.0
The Management Standard Final Edition 1 Purpose of the Management Standard The purpose of the Management Standard is to describe the nature of contract management in terms of the contract management processes
More informationWales Millennium Centre Behavioral Competencies Framework 1
Wales Millennium Centre Behavioural Competencies Framework Be Reflective Ensuring we understand who our customers are Taking time to listen to customers Proactively engaging with customers to find out
More informationProviding Pathways to Housing House 1262 Sutton Way, Grass Valley, California (530) hhshelter.org
Hospitality Providing Pathways to Housing House 1262 Sutton Way, Grass Valley, California 95945 (530) 271-7144 hhshelter.org POSITION DESCRIPTION Position: Thrift Store Manager Status: Exempt/Full-time,
More informationH U M A N R E S O U R C E S M A N A G E R
DESCRIPTION OF WORK: H U M A N R E S O U R C E S M A N A G E R Employees in this banded class provide leadership and supervision to professional/technical staff in the delivery of a contemporary human
More informationProfessional Development Studies
492 Professional Development Studies Professional Development Studies Today s worker is faced not only with ever-increasing technological challenges, but also with the need for applied instruction in a
More informationPART B UNIT 5 MOTIVATION AND BEHAVIOR. N.Venkatesh, MITE
PART B UNIT 5 MOTIVATION AND BEHAVIOR Hawthorne studies Elton Mayo conducted the famous experiment at Howthorne plant of western electric company between 1924 and 1932 The study revealed the influence
More informationSelf-Assessment for the CoSN Certified Education Technology Leader (CETL ) Certification Exam
Self-Assessment for the CoSN Certified Education Technology Leader (CETL ) Certification Exam COSN s Self-Assessment will help you determine your readiness for the CETL certification exam. It can also
More informationMGM RESORTS INTERNATIONAL LEADERSHIP COMPETENCIES
MGM RESORTS INTERNATIONAL LEADERSHIP COMPETENCIES Mission, Vision, Core Values and People Philosophy Our Mission MGM Resorts International is the leader in entertainment and hospitality - a diverse collection
More informationHafan Cymru Job Description
Job title Grade / Salary Scale Location Contract hours Working Pattern Responsible to Responsible for (staff / finance / Service Users /Customers Job Purpose Competency and Level required Project Manager
More informationProject Management Professional (The Project Professional MBA)
HR CERTIFICATION INSTITUTE ISO 9001:2015 Certified :2010 Certified An Intensive 10 - Day Seminar On Project Management Professional DUBAI 10-21 December 2017 EuroMaTech is proud to be associated with the
More informationCompetency Dictionary
HARVARD UNIVERSITY Competency Dictionary ver. FY14 Welcome to the Harvard University Competency Dictionary. Here you will find a list of competencies that Harvard values in their employees. Please click
More informationWORKPLACE SKILLS (WPS)
WORKPLACE SKILLS (WPS) A Singapore Workforce Skills Qualifications Programme While there are always job-specific skills that employers are looking for, most will also wish their employees to have essential
More informationCareer Compass Navigating Your Own Path to Success
Career Compass Navigating Your Own Path to Success your great day at work uuquestion 1: Your Engagement. Select the spot where you believe you are on the X above. Is this where you typically are? If not,
More informationChapter 9 Attracting and Retaining the Best Employees
Chapter 9 Attracting and Retaining the Best Employees 1 Describe the major components of human resources management. 2 Identify the steps in human resources planning. 3 Describe cultural diversity and
More informationBrown s Leadership Certification Program Learn. Lead. Succeed. Module Titles and Descriptions
Brown s Leadership Certification Program Learn. Lead. Succeed. Module Titles and Descriptions Core Modules An Orientation to Leadership at Brown University: This orientation will ensure new leaders get
More informationworking with partnerships
A practical guide to: working with partnerships Practical step-by-step building blocks for establishing an effective partnership in the not-for-profit sector N 2 (squared) Consulting with Nottingham Council
More informationManagement. Part IV: Leading Ch. 13. Leadership
Management Part IV: Leading Ch. 13. Leadership Dan C. Lungescu, PhD, assistant professor 2015-2016 Course outline Management Part I: Introduction Part II: Planning Part III: Organizing Part IV: Leading
More informationQualification Specification 601/3688/1 icq Level 3 Diploma in Management (RQF)
Qualification Specification 601/3688/1 icq Level 3 Diploma in Management (RQF) Qualification Details Title : icq Level 3 Diploma in Management (RQF) Awarding Organisation : ican Qualifications Limited
More informationSection 1: Background and Objective of this Policy. Section 2: Primary Aim for Mizuho s HR Management
Section 1: Background and Objective of this Policy Article 1 - Background and objective of this Policy 1) This Policy stipulates guiding principles for Mizuho s HR management under the HR Vision (refer
More informationPrepared for: Joe Sample 2/2/15
Leadership Potential Inventory Report Prepared for: Joe Sample 2/2/ Introduction Your Leadership Potential Inventory Report collects feedback about your behavior and performance from you and your supervisor.
More informationManaging a Payroll Department
Managing a Payroll Department Charlotte N. Hodges, CPP August 23, 2014 Topics Basic Management Theory Management Skills Management Issues Management Styles Research Needs Policies and Procedures Basic
More informationChapter 7 Management and leadership
Chapter 7 Management and leadership Leadership and management Definitions of leadership Leadership means giving a lead to others. A leader gives guidance and direction, and other ( followers ) follow the
More informationProject Manager: Superman or Entrepreneur?
Project Manager: Superman or Entrepreneur? Nina Alimpić, PMP nina@saga.rs Dragana Milojević, PMP dragana.milojevic@pmi-yu.org Belgrade, November 18, 2009 What is Project Management? What is not Project
More informationIT PROJECT ANALYST/MANAGER
IT PROJECT ANALYST/MANAGER I. DESCRIPTION OF WORK Positions in this banded class are responsible for project management work involving planning and coordination of information technology projects. To ensure
More information