STUDENT GUIDE. CON 170 Fundamentals of Cost & Price Analysis. Unit 5, Lesson 1 Cost Analysis Process, Players, and Business Systems

Size: px
Start display at page:

Download "STUDENT GUIDE. CON 170 Fundamentals of Cost & Price Analysis. Unit 5, Lesson 1 Cost Analysis Process, Players, and Business Systems"

Transcription

1 STUDENT GUIDE CON 170 Fundamentals of Cost & Price Analysis Unit 5, Lesson 1 Cost Analysis Process, Players, and Business Systems January 2017 CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 1

2 STUDENT PREPARATION Required Student Preparation Read FAR subpart 15.4, DFARS subpart Scan CPRG Vol 3, Chapters 1-4 Planned Academic Time Required: 90 minutes Student performance will be informally evaluated during class discussions, and formally evaluated on Exam 2 CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 2

3 Lesson Presentation We begin this lesson with a brief discussion to review the definition of cost analysis. As defined at FAR (c)(1), Cost analysis is the review and evaluation of any of the separate cost elements and profit or fee in an offeror s or contractor s proposal, as needed to determine a fair and reasonable price or to determine cost realism, and the application of judgment to determine how well the proposed costs represent what the cost of the contract should be, assuming reasonable economy and efficiency. As also introduced in Unit 4 Lesson 1, price analysis generally involves evaluation of the total price; while cost analysis generally involves evaluation of all or some of the individual cost elements that comprise the total price. CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 3

4 The FAR also says that Cost analysis shall be used to evaluate the reasonableness of individual cost elements when certified cost or pricing data are required (FAR (a)(3)), and may be used to evaluate data other than certified cost or pricing data to determine cost reasonableness or cost realism when a fair and reasonable price cannot be determined through price analysis alone. (FAR (a)(4)). It is important to realize that cost analysis can be used to analyze proposals for ANY type of contract. Beware of a common misunderstanding that cost analysis can only be done on cost reimbursement contracts. Per TINA, cost analysis is required whenever certified cost or pricing data are required regardless of contract type. Remember, contract type is not a TINA exception. Cost analysis can be used any time the contracting officer believes it is necessary to determine a price to be fair and reasonable. CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 4

5 However, it is equally important to realize that if the Contracting Officer needs to conduct cost analysis without obtaining certified cost or pricing data (i.e. a TINA exception applies) there are some limitations and considerations for obtaining data other than certified cost or pricing data when it is needed to establish a fair and reasonable price. Per FAR (a)(2)-(3), the Contracting Officer shall obtain data from Government or other secondary sources first (relying first on Government data, then secondary sources), and then as a last resort obtain data necessary to establish a fair and reasonable price from the offeror, but not any more data than is necessary. CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 5

6 The slide below presents a summary of the cost analysis techniques and procedures stated in FAR (c)(2). Two more listed techniques, review for completeness and analysis of make-or-buy reviews, aren t addressed in this lesson. When reviewing contractors costs in proposals, audits, or requests for payment, contracting officers must also understand the definition of what constitutes an allowable cost. From Unit 1 Lesson 4, remember the five characteristics which make a cost allowable, as stated in FAR Reasonableness ( ) -- Nature or need for the cost & generally recognized as necessary by a prudent person -- No presumption that a cost actually incurred is a reasonable cost - Allocability ( ) -- Incurred specifically, distributed proportionally, or necessary to overall business -- Direct (FAR ) or indirect (FAR ) not both. - Accounting Principles -- Generally Accepted Accounting Principles (GAAP) all contractors/contracts -- Cost Accounting Standards (CAS) if applicable - Terms of the Contract -- Mutually agreed-to if contractor accepts contracting officer s solicitation clauses - Limitations set forth in subpart : Allowable, unallowable, allowable with restrictions CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 6

7 It will be unlikely that you can perform cost analysis on your own. Cost analysis requires an evaluation of individual cost elements and an understanding of cost allowability. In addition, cost analysis requires an understanding of direct and indirect costs, an ability to evaluate indirect rates, and an awareness of how contractors estimate future costs. All of these aspects must be integrated with an understanding of what we are buying. In short, cost analysis, perhaps to an even greater extent than price analysis, is a team sport. Based on this review, we will now explore the process of cost analysis, and the roles and responsibilities of the key players in accomplishing cost analysis. The Process and Key Players in Cost Analysis As mentioned above, contracting officers must seek support from other Government acquisition team members. When your supervisor hands you the assignment to contract for a requirement where cost analysis will be required, what will you do? The next slide and narrative describe the cost analysis process in 8 steps, as outlined in FAR (c)). CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 7

8 CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 8

9 The Process of Cost Analysis Step 1 Know what you are buying: Like price analysis, cost analysis begins by understanding the requirement. This requires market research, engagement with the customer, and engagement with contractors. As early as possible, figure out and make a determination about whether or not the requirement is commercial, and whether certified cost and pricing data will be required. If it is required, cost analysis shall be accomplished. If certified cost and pricing data is not required, cost analysis may still be accomplished in areas where there are gaps in historical data. Finally, early in the acquisition, the contracting officer must embrace a leadership role in identifying risk areas, determining commerciality, writing the solicitation, and establishing what data will be needed from the contractor in order to perform cost analysis, and determine the price to be fair and reasonable. Step 2 Get a good proposal: The contracting officer s goal is to receive a proposal that is complete on the first submittal. This is only possible if Step 1 concluded with a well-written requirement and solicitation. In addition, when certified cost or pricing data are required, the solicitation must require contractors to submit their proposals in accordance with the proposal adequacy checklist (DFARS , Proposal Adequacy Checklist, prescribed in DFARS (5). This checklist may still be used as a guide when certified data are not required. DCAA (one of the agencies we will explore later in this lesson) will use this guide before auditing a proposal, and may reject a proposal that does not comply. This will require additional time delays for the contractor to resubmit. You should expect contractors to submit adequate proposals on the first submittal, and generally not accept an inadequate proposal from the contractor. Step 3 Map and Model the proposal: The process of mapping the proposal means reading it, studying it, and understanding how the technical elements align with the cost elements. This typically requires several rounds of meetings between the Government s contracting and technical team members. Then, the contracting officer leads efforts to model the proposal, whereby the contracting officer (or buyer) creates a spreadsheet workbook to mirror the contractor s proposed cost element calculations. This model becomes a foundational tool during negotiations to quickly calculate cost adjustments. Step 4 Cost analysis with technical analysis: This is the point in the process where you are actively leading Government team members in order to conduct a technical analysis and a cost analysis of the proposal. Yes, technical analysis is a separate Proposal Analysis Technique per FAR (e); however, cost analysis is almost ALWAYS conducted in conjunction with a technical analysis. Thus, in this step, the contracting officer must embrace a leadership role to ensure the following are accomplished: Technical analysis by technical specialists, including within DCMA. Analysis of direct and indirect costs by the contracting officer, DCMA, and DCAA Analysis of the amounts and mixes of material and labor Analysis of field pricing support (DCMA) or audit (DCAA) (per FAR (c)) CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 9

10 - DCMA. Field pricing support may also include technical evaluation. Should complement, not replace the technical evaluation by your local Government team members. - DCAA. Will conduct a formal audit only when above certain dollar thresholds, as described in the next section of this lesson. Below thresholds may not be a priority. When asking for an audit, the more focused or tailored the request, the better odds the audit will be timely, focused. - If contractor s proposal and data is so deficient a review or audit cannot be accomplished, contracting officer engages with contractor immediately (FAR (d)) - Analysis of gaps/weaknesses in proposed costs; fact-finding - Request additional information when lacking adequate data (including cost or pricing data) to determine a fair and reasonable price. - Evaluation of the contractor s commercial item determination - Evaluation of subcontracts (FAR ) - Establishing profit/fee objective (FAR ) Throughout this process, the contracting officer must embrace a leadership role in assigning tasks, setting deadlines, and ensuring the team s evaluations are sound. These analyses serve as the contracting officer s basis for determining fair and reasonable. Step 5 Document the analysis and establish a fair and reasonable range: At this point, you will conclude evaluations, document conclusions, and establish your negotiation objectives. The contracting officer leads the team to integrate the technical analyses with cost analysis to establish minimum and maximum negotiation objectives within a fair and reasonable range. While the contracting officer is responsible pursuant to FAR 1.6 to determine prices to be fair and reasonable, cost analysis requires analysis and contributions by all members of the acquisition team. Step 6 Obtain approval to enter negotiations: Obtain management review and approval to enter negotiations. Remember, this is not just a contracting officer s job. You might need to bring technical experts in to defend their positions. Contracting officers or the technical evaluation team leader or project/program manager should have a role in presenting this information in order to obtain approval to proceed. Step 7 - Negotiate: Focus on the most significant areas. Conduct a sensitivity analysis to ensure team focuses on the most important elements a small change in overhead rate bases can drive big changes in the overhead rate. How will you know which are most important? Watch how much the price objective changes with/without each key element. This is also not only a job for the contracting professionals. Successful negotiations often involve several members of the acquisition team. Step 8 - Award: If certified cost or pricing data is required, as of the date the price is agreed to, the contractor conducts a final review to ensure all their cost and pricing data is accurate, current and complete (This will be covered in Lesson 7). Finally, write and obtain approval for your post negotiation price memorandum and obtain signatures on the award document. CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 10

11 Finally, as you journey through the process described, keep in mind some of the following tips: - The purpose of cost and price analysis is to enable the contracting officer and an offeror to agree on a fair and reasonable price. A fair and reasonable price does not require agreement on every element of cost, nor that the agreed price be within the contracting officer s initial negotiation position. - Consider advisory recommendations, reports of contributing specialists, status of contractor s purchasing system, and provide rationale when not adopting specialists recommendations. - Negotiation objectives should be based on the results of the contracting officer s analysis of the offeror s proposal, taking into consideration all pertinent information including field pricing assistance, audit reports and technical analysis, fact-finding results, independent Government cost estimates and price histories. However, the contracting officer is still responsible to exercise judgment to reach a fair and reasonable price, and document rationale on the most significant elements. The Key Players in Cost Analysis Contracting Officer. As we learned earlier, the purpose of cost analysis is to analyze costs so that the contracting officer can determine a fair and reasonable price. Because this determination is the responsibility of the contracting officer (FAR ), the contracting officer must initiate action and lead the Government team through the cost analysis process. Thus, the contracting officer typically seeks the support of technical specialists, the Defense Contract Management Agency (DCMA), and the Defense Contract Audit Agency (DCAA), to accomplish cost analysis, and determine the objectives for a fair and reasonable price. CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 11

12 Technical Specialists. Per FAR (c), and (e)). Because a technical analysis is generally a critical aspect of determining a price to be fair and reasonable, the contracting officer should request personnel having specialized knowledge, skills, experience, or capability in engineering, science, or management perform a technical analysis of the proposed types and quantities of materials, labor, processes, special tooling, equipment or real property, the reasonableness of scrap and spoilage, and other associated factors set forth in the proposal(s) in order to determine the need for and reasonableness of the proposed resources, assuming reasonable economy and efficiency. At a minimum, per FAR (e)(2), the technical analysis should examine the types and quantities of material proposed and the need for the types and quantities of labor hours and the labor mix. Any other data that may be pertinent to an assessment of the offeror s ability to accomplish the technical requirements or to the cost or price analysis of the service or product being proposed should also be included in the analysis. The contracting officer s role in orchestrating technical analysis and cost analysis requires leadership. Many other team members outside of contracting may perceive market research, technical evaluation, and cost analysis to be exclusively a a contracting function. The above FAR references recognize the contracting officer s leadership role, and the need for the contracting officer to request support from team members with the appropriate background and training to accomplish all aspects of cost analysis. The contracting officer must embrace a leadership role to focus the team members to accomplish their analyses, for the determination of fair and reasonable price is still vested with the contracting officer. DCAA. In addition to recruiting technical specialists within the buying agency, the contracting officer may also be required to request support from team members outside their agency. In conducting cost analysis, consider the range of cost analysis support functions DCAA is capable of delivering. The DCAA is known as the audit agency for the DoD. Its authority was established by the Government Accountability Office, pursuant to Generally Accepted Government Audit Standards (GAGAS), commonly known as the Yellow Book, available at The DCAA auditor supports contracting officers and other Government acquisition team members by analyzing a contractor s financial and accounting records, reviewing the financial and accounting aspects of the contractor s cost control systems, and analyzing proposed and historical, actual costs. This support can be critical to contracting officers during cost analysis, as the Government teams are attempting to verify historical costs, and validate proposed costs. CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 12

13 A common support function for DCAA is to provide Government acquisition teams with a preaward audit of a contract proposal. The objectives of these audits are outlined in DCAA s Pre- Award Checklist, in DFARS According to FAR , DCAA is normally the CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 13

14 responsible Government audit agency. However, there may be instances where DCAA must decline requests for service. In such cases, Government teams may be required to tailor their request, or engage with DCMA or other support activity. The DCAA contract audit dollar thresholds are stated in DFARS PGI (c). At the time of this text s issue, a contracting officer should submit audit requests to DCAA for contract actions over $10 million for a fixed price contract, and over $100 million for a cost reimbursement type contract. Otherwise, the contracting officer should seek field pricing support from DCMA. When DCAA provides an audit of a contractor s proposal, they provide an audit report with a range of opinions to help the contracting officer determine if the proposal is a reasonable basis for negotiation. Per the Defense Contract Audit Agency Audit Manual (known as the DCAM, the range of auditor s opinions include the following (DCAM, Ch 9, Section 9-211): - Unqualified auditor believes data submitted by contractor is an acceptable basis for negotiation - Qualified auditor believes data includes questioned, unsupported costs, which may impact basis for negotiation - Adverse data includes significant inadequacies or non-compliances, or contractor has denied access to auditor - Disclaimer no opinion expressed due to an insufficient audit Although an auditor s opinions are advisory, contracting officers should evaluate each comment and document how each comment was dispositioned. Generally, contracting officers discuss the opinions with the auditor to ensure the Government evaluation team understands the auditor s perspectives, and to assess the impact on the proposal evaluation. When significant disagreements arise, contracting officers must abide by the procedures in the DFARS PGI (a) and (b) to pursue resolution. CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 14

15 DCMA. The last key player in supporting cost analysis discussed in this lesson is DCMA. Check out Attachments 1 & 2 to this lesson for a look at 2 DCMA informational brochures the first one provides some insight into DCMA capabilities in terms of cost and pricing analysis and support and the second one provides information and details regarding the DCMA Commercial Item Centers of expertise. In addition, DCMA offers a wide variety of additional contract administration and support services, as outlined in FAR A summary of these services can support the contracting officer through the cost analysis process. CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 15

16 In accomplishing cost analysis, a contracting officer should contact the cognizant DCMA office to obtain specific information regarding a contractor s direct and indirect rates, and to ensure compliance with Forward Pricing Rate Agreements (FPRA) if available (per FAR , and ). In addition, contracting officers engage with DCMA to verify the contractor s compliance with Cost Accounting Standards (when applicable), and to verify the contractor is performing appropriately on a host of other contract administration functions listed in FAR CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 16

17 A specific area in which contracting officers rely on DCMA is in determining the acceptability of each contractor s Contractor Business Systems. The Contractor Business Systems are defined by law (P.L , Section 893), and prescribed for DoD contracts in DFARS subpart , and DCMA is responsible for routinely monitoring these systems, determining if the systems are approved or disapproved, and engaging with a contractor to ensure deficiencies are corrected. An overview of each business system is provided below: CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 17

18 Accounting System. Per FAR (a)(12), the cognizant Contract Administration Office (CAO) within DCMA is responsible to determine the adequacy of a contractor s accounting system. An accounting system includes the contractor s system to gather, record, classify, analyze, summarize, interpret, and present accurate and timely financial data. The DFARS defines accounting system, and describes the parameters of an acceptable accounting system. This clause, and therefore an acceptable accounting system is required when contracting with a cost reimbursement, incentive type, time & materials or labor hour contract; or a contract with progress payments. Earned Value Management System (EVMS). Per FAR subpart 34.2, and DFARS (2), an EVMS is required to track cost, schedule and performance status for systems and other major contract actions. The DFARS defines earned value management system, and describes the parameters of an acceptable earned value management system. This clause, and therefore an acceptable EVM system is required when contracting for a requirement that meets the circumstances described at DFARS (2). Estimating System. Per DFARS (d), the cognizant Administrative Contracting Officer within DCMA is responsible to determine the adequacy of a contractor s estimating system. DFARS defines estimating system, and describes the parameters of an acceptable estimating system. An estimating system is the contractor s policies, procedures and practices for budgeting and planning controls, and generating estimates of costs included in proposals. As prescribed in DFARS (2), an estimating system is required when contractors must submit certified cost and pricing data. Material Management and Accounting System (MMAS). Per DFARS (a)(2), the cognizant Administrative Contracting Officer within DCMA is responsible to determine the CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 18

19 adequacy of a contractor s MMAS. A material management and accounting system (MMAS) is the contractor's system for planning, controlling, and accounting for the acquisition, use, issuing, and disposition of material. The DFARS defines MMAS and describes the parameters of an acceptable system. The DFARS prescribes when MMAS is required, which is generally for noncommercial contracts above the simplified acquisition threshold that are either cost reimbursement or fixed price with progress payments based on actual costs. Property Management System. Per DFARS , the cognizant ACO within DCMA, in consultation with the property administrator is responsible to determine the adequacy of a contractor s property management system. The clause at DFARS defines property management system as the contractor s system or systems for managing and controlling Government property, prescribes when to include the clause in a contract, and states the parameters of an acceptable property management system. Purchasing System. Per DFARS , the cognizant Administrative Contracting Officer within DCMA is responsible to determine the adequacy of a contractor s purchasing system, including contractor s rationale for commercial item determination, and processes for avoiding use of counterfeit parts. The DFARS defines and describes parameters of an acceptable purchasing system. A purchasing system is the contractor s system for purchasing, subcontracting, selecting vendors, analyzing quoted prices, placing and administering of orders, and expediting delivery of materials. The purpose of this lesson is not to become an expert in each of these systems, but to recognize the following: - DCMA is the authority for monitoring, reviewing, and determining these systems to be acceptable. - Consequences on the contractor for having a disapproved system(s) could include withheld payments, no new contract awards, and lower performance ratings. - With respect to cost analysis, the procuring contracting officer should remember to contact DCMA before awarding contract actions to verify these systems are in an approved status. - In situations where a procuring contracting officer is unable to obtain appropriate or verifiable data from the contractor, he can request DCMA review a related business system to ensure the contractor is adequately managing data with respect to accounting, estimating, project management, and property. CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 19

20 Exercise: Understanding Contractor Business Systems Learning Objective Describe the requirements for compliance of contractor's business systems. Introduction This exercise will require the student to explore the descriptions and requirements of the contractor business systems as described in their respective clauses and introduced in this lesson. Assessment This activity is not scored or graded. Student Instructions: Explore the respective DFARS business system clauses to complete this matching exercise. You will have approximately 20 minutes to associate the contractor business system with one element from its system criteria list. Ensure you cite your references. A. Accounting System (DFARS ) B. Earned Value Management System (EVMS) (DFARS ) C. Estimating System (DFARS ) D. Material Management and Accounting System (MMAS) (DFARS ) E. Property Management System (DFARS ) F. Purchasing System (DFARS ) Establish and maintain adequate levels of record accuracy, and include reconciliation of recorded inventory quantities to physical inventory by part number on a periodic basis. A 95 percent accuracy level is desirable. A timekeeping system that identifies employees labor by intermediate or final cost objectives. Provide procedures that ensure subcontract prices are reasonable based on a documented review and analysis provided with the prime proposal, when practicable. Management procedures that provide for generation of timely, reliable, and verifiable information for the Contract Performance Report (CPR) and the Integrated Master Schedule (IMS) required by the CPR and IMS data items of this contract. Evaluate price, quality, delivery, technical capabilities, and financial capabilities of competing vendors to ensure fair and reasonable prices The Contractor s system shall be in accordance with paragraph (f) of the contract clause at Federal Acquisition Regulation CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 20

21 LESSON SUMMARY TLO: 5.1 Summarize the cost analysis process, including the purpose, key players, and necessity for compliant contractor business systems ELO(s): Describe the process of cost analysis Summarize the roles of key players in the cost analysis process, including the contracting officer, technical specialist, DCMA, and DCAA Summarize the responsibilities of key players in the cost analysis process, including the contracting officer, technical specialist, DCMA, and DCAA Describe the different contractor's business systems Describe the requirements for compliance of contractor's business systems CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 21

22 DCMA Cost & Pricing Brochure Attachment 1 (Page 1 of 2) CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 22

23 DCMA Cost & Pricing Brochure Attachment 1 (Page 2 of 2) CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 23

24 DCMA Commercial Item Centers of Expertise Brochure Attachment 2 (Page 1 of 2) CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 24

25 DCMA Commercial Item Centers of Expertise Brochure Attachment 2 (Page 2 of 2) CON170, Unit 5 Lesson 1 Cost Analysis Process and Players - Page 25

Understanding the DCAA Audit Process and How to Prepare for Success

Understanding the DCAA Audit Process and How to Prepare for Success Understanding the DCAA Audit Process and How to Prepare for Success Breakout Session #: C11 Presented by: Beverly Arviso, CPA, Fellow, CPCM, CFCM Date: July 22, 2013 Time: 4:00-5:15 DCAA s Mission Compliance

More information

A cost analysis is required for any negotiated (non competitive) contract procurement on behalf of any University program, if:

A cost analysis is required for any negotiated (non competitive) contract procurement on behalf of any University program, if: SECTION 7: ACQUISITION PROCEDURES SUBJECT: COST ANALYSIS PROCEDURE 7.4.2 POLICY: A cost analysis is required for any negotiated (non competitive) contract procurement on behalf of any University program,

More information

Forward Pricing Proposal- Labor Categories. Next Slide

Forward Pricing Proposal- Labor Categories. Next Slide Forward Pricing Proposal- Labor Categories Table of Contents Risk Assessment Research and Planning Initial Discussion with Contractor s Representative and Request for Information Preliminary Analytical

More information

Make or Buy Decisions in a Proposal Audit. Next Slide

Make or Buy Decisions in a Proposal Audit. Next Slide Make or Buy Decisions in a Proposal Audit Table of Contents Risk Assessment Research and Planning Risk Assessment Initial Review of Proposal Risk Assessment Coordination with the PCO and ACO Preliminary

More information

Contractor Business Systems Earned Value Management, Material Management and Accounting, and Property Management

Contractor Business Systems Earned Value Management, Material Management and Accounting, and Property Management McKenna Government Contracts, continuing excellence in Dentons Contractor Business Systems Earned Value Management, Material Management and Accounting, and Property Management Michael McGuinn, Dentons

More information

Contractor Estimating Systems: System Adequacy Standards and Key Compliance Issues

Contractor Estimating Systems: System Adequacy Standards and Key Compliance Issues McKenna Government Contracts, continuing excellence in Dentons Contractor Estimating Systems: System Adequacy Standards and Key Compliance Issues Joe Martinez, Esq. Dentons US LLP Michael Steen, CPA Redstone

More information

Section M: Evaluation Factors for Award HQ R LRDR Section M: Evaluation Factors for Award For HQ R-0002

Section M: Evaluation Factors for Award HQ R LRDR Section M: Evaluation Factors for Award For HQ R-0002 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 LRDR Section M: Evaluation Factors for Award For 1 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 Table of

More information

DCMA INSTRUCTION 2501 CONTRACT MAINTENANCE

DCMA INSTRUCTION 2501 CONTRACT MAINTENANCE DCMA INSTRUCTION 2501 CONTRACT MAINTENANCE Office of Primary Responsibility: Contract Maintenance Capability Effective: August 14, 2017 Releasability: Cleared for public release New Issuance Incorporates:

More information

How to Prepare a DCAA Compliant Cost or Price Proposal. Bag Lunch Webinar November 17, 2016

How to Prepare a DCAA Compliant Cost or Price Proposal. Bag Lunch Webinar November 17, 2016 How to Prepare a DCAA Compliant Cost or Price Proposal Bag Lunch Webinar November 17, 2016 Presenter: Paul H. Calabrese Rubino & Company, CPAs & Consultants Senior Manager Tel: 301 214 4137 pcalabrese@rubino.com

More information

Repetitive Bidding of Duplicative Material Costs. Next Slide

Repetitive Bidding of Duplicative Material Costs. Next Slide Repetitive Bidding of Duplicative Material Costs Table of Contents Risk Assessment Research and Planning Risk Assessment Initial Review of Subcontract Proposal Preliminary Analytical Procedures Entrance

More information

PHASE 4 - Post-Award. Type of Feedback Type of Contract Feedback Category Feedback

PHASE 4 - Post-Award. Type of Feedback Type of Contract Feedback Category Feedback PHASE 4 - Post-Award Type of Feedback Type of Feedback Category Feedback Commodity (Competitive) Use of the Bid Evaluation Model (BEM), when validated, is a best practice approach to evaluating competitive,

More information

Defective Pricing- Material Pricing Deficiencies. Next Slide

Defective Pricing- Material Pricing Deficiencies. Next Slide Defective Pricing- Material Pricing Deficiencies Table of Contents Risk Assessment Research and Planning Risk Assessment - Initial Data Obtained from Contractor Risk Assessment Overrun or Underrun Analysis

More information

Material Transfers and Material Management and Accounting System (MMAS) Next Slide

Material Transfers and Material Management and Accounting System (MMAS) Next Slide Material Transfers and Material Management and Accounting System (MMAS) Table of Contents Risk Assessment Research and Planning Preliminary Analytical Procedures Entrance Conference Audit Team Brainstorming

More information

Cost and Pricing Overview

Cost and Pricing Overview DEFENSE LOGISTICS AGENCY AMERICA S COMBAT LOGISTICS SUPPORT AGENCY Cost and Pricing Overview WARFIGHTER FIRST PEOPLE & CULTURE STRATEGIC ENGAGEMENT FINANCIAL STEWARDSHIP PROCESS EXCELLENCE 1 Agenda Better

More information

Best Practices in Dealing with the DCAA

Best Practices in Dealing with the DCAA Best Practices in Dealing with the DCAA Bag Lunch Webinar December 7, 2016 1 Presenter: Paul H. Calabrese Rubino & Company, CPAs & Consultants Senior Manager Tel: 301-214-4137 pcalabrese@rubino.com www.linkedin.com/pub/paul-calabrese/20/293/645/

More information

PHASE 2 - Pre-Final Proposal Revision

PHASE 2 - Pre-Final Proposal Revision Type of Feedback Type of Feedback Category Feedback, multipleaward IDIQ PHASE 2 - Pre-Final Proposal Revision ing Officer (CO) prepared a worksheet/checklist that included every requirement to be evaluated

More information

Master Document Master Document. Version 4.28, dated December 2017 B-1 Planning Considerations

Master Document Master Document. Version 4.28, dated December 2017 B-1 Planning Considerations Activity Code 17100 B-1 Planning Considerations Termination, Total Cost Basis Type of Service - Attestation Examination Engagement Audit Specific Independence Determination Members of the audit team and

More information

REFERENCES Overview Quality Assurance Engineering Program...5

REFERENCES Overview Quality Assurance Engineering Program...5 TABLE OF CONTENTS REFERENCES... 4 CHAPTER 1 QAE GUIDANCE OVERVIEW 1.1. Overview... 5 1.2. Quality Assurance Engineering Program...5 CHAPTER 2 QAE MANAGEMENT STRUCTURE 2.1. Heads of DCMA QA-HQ and Operations...6

More information

Request for Proposal For: 2018 American Bar Association Temporary Services

Request for Proposal For: 2018 American Bar Association Temporary Services Table of Contents Bid Timetable [2] 1.0 General Bid Information [3] 2.0 Proposal Requirements [5] 3.0 Criteria for Selection [7] 4.0 Specifications and Work Statement [7] Appendix A: Bidder Response Sheet

More information

TCAQ UNCLASSIFIED. Together, we deliver.

TCAQ UNCLASSIFIED. Together, we deliver. 1 United States Transportation Command (USTRANSCOM) Acquisition Tips Presented by: Suzanne Mudd-Yarber 2 Overview Where to Access Information about USTRANSCOM Business Opportunities Tips on Proposal Preparation

More information

Version 1.0. The Contract Management Standard Final Edition. Version 1.0

Version 1.0. The Contract Management Standard Final Edition. Version 1.0 The Management Standard Final Edition 1 Purpose of the Management Standard The purpose of the Management Standard is to describe the nature of contract management in terms of the contract management processes

More information

Audit of Executive Compensation

Audit of Executive Compensation 5-803.1 Audit of Executive Compensation a. The contractor's executive compensation system should be evaluated separately, even if the contractor does not have a separate pay structure for executives. FAR

More information

Recent Changes in Definitions and Determinations of Commerciality: How They Can Affect Your Products and Services Sold to the Federal Government

Recent Changes in Definitions and Determinations of Commerciality: How They Can Affect Your Products and Services Sold to the Federal Government Recent Changes in Definitions and Determinations of Commerciality: How They Can Affect Your Products and Services Sold to the Federal Government Presented by Darrell Hineman, CPA, CFE, Director Donald

More information

IMMEDIATE POLICY CHANGE

IMMEDIATE POLICY CHANGE DEPARTMENT OF DEFENSE Defense Contract Management Agency IMMEDIATE POLICY CHANGE Contract Audit Follow Up Contracts Directorate DCMA-INST 126 (IPC-1) OPR: DCMA-AQ February 11, 2016 1. POLICY. This Immediate

More information

The New Era of Transparent Internal Audit: What You Should Know

The New Era of Transparent Internal Audit: What You Should Know The New Era of Transparent Internal Audit: What You Should Know May 17, 2012 Presented by: Bryan Moser, CPA, CFF, ABV, CFE, Director, Grant Thornton LLP Bob Wagman, Counsel, Government Contracts Group,

More information

Uncompensated Overtime. Next Slide

Uncompensated Overtime. Next Slide Uncompensated Overtime Table of Contents Risk Assessment Research and Planning Risk Assessment Labor System Entrance Conference Preliminary Analytical Procedures Audit Team Brainstorming for Fraud Risk

More information

Guidance Note: Corporate Governance - Audit Committee. March Ce document est aussi disponible en français.

Guidance Note: Corporate Governance - Audit Committee. March Ce document est aussi disponible en français. Guidance Note: Corporate Governance - Audit Committee March 2015 Ce document est aussi disponible en français. Applicability The Guidance Note: Corporate Governance Audit Committee (the Guidance Note )

More information

Improper Billing of Costs on Progress Payments 1

Improper Billing of Costs on Progress Payments 1 Improper Billing of Costs on Progress Payments 1 1 Progress payments are not interim vouchers or invoices that the government pays based on the allowable costs incurred and charged to the contract. Instead,

More information

1.0 BASIS OF ESTIMATE (BOE) HOW TO

1.0 BASIS OF ESTIMATE (BOE) HOW TO 1.0 BASIS OF ESTIMATE (BOE) HOW TO 1.1 Definition A Basis of Estimate (BOE) is a document that identifies the logic, data, methodology and calculations used to estimate the resources required to perform

More information

International Subawards

International Subawards International Subawards Alternatives to Cost Reimbursable Subrecipient Agreements Presentation for the Federal Demonstration Partnership International Subawards Subcommittee 11 January 2008 David Brady,

More information

SECTION 6.2: CONTRACT MANAGER

SECTION 6.2: CONTRACT MANAGER : Section 287.057(15), Florida Statutes, requires the department, for each contractual service contract, to designate an employee to be responsible for enforcing the performance of the contract terms and

More information

Contract Pricing Reference Guides Volume 1

Contract Pricing Reference Guides Volume 1 Contract Pricing Reference Guides Volume 1 February 21, 2012 I.0 Chapter Introduction Contract Pricing Environment. An important part of your job as a contract specialist is to conduct the price analyses

More information

Master Document Audit Program. Activity Code Compliance Audit CAS 407 Version 5.19, dated December 2017 B-1 Planning Considerations

Master Document Audit Program. Activity Code Compliance Audit CAS 407 Version 5.19, dated December 2017 B-1 Planning Considerations Activity Code 19407 Compliance Audit CAS 407 B-1 Planning Considerations Type of Service - Attestation Examination Engagement Audit Specific Independence Determination Members of the audit team and internal

More information

Mid-America Intergovernmental Audit Forum. Selecting an External Auditor. Guide for Making a Sound Decision

Mid-America Intergovernmental Audit Forum. Selecting an External Auditor. Guide for Making a Sound Decision Mid-America Intergovernmental Audit Forum Selecting an External Auditor Guide for Making a Sound Decision May 2007 Foreword The benefits of having a high-quality audit of a government's financial statements

More information

Internal Controls Required for Systems Involved in Procurement to Payment Processes

Internal Controls Required for Systems Involved in Procurement to Payment Processes Internal Controls Required for Systems Involved in Procurement to Payment Processes Definition: Procure to Pay encompasses all business functions necessary to obtain goods and services through contracting.

More information

Eralis Job and DCAA Compliance. January 2017

Eralis Job and DCAA Compliance. January 2017 Eralis Job and DCAA Compliance January 2017 2017 Eralis Software Inc. All rights reserved. No parts of this work may be reproduced in any form or by any means graphic, electronic, or mechanical, including

More information

Pricing to Win and Deliver June 19, 2012

Pricing to Win and Deliver June 19, 2012 Network for Enabling Small Business Teaming (NEST) Workshop 2 WINNING THE OPPORTUNITY Pricing to Win and Deliver Susan Pernia, MBA/PMP Consultant, Foundation for Enterprise Development spernia@fed.org

More information

Integrated Baseline Review (IBR) Guide

Integrated Baseline Review (IBR) Guide National Defense Industrial Association Program Management Systems Committee Integrated Baseline Review (IBR) Guide Revision 1 September 1, 2010 National Defense Industrial Association (NDIA) 2111 Wilson

More information

SEC ESTABLISHMENT OF PANEL ON CONTRACTING INTEGRITY.

SEC ESTABLISHMENT OF PANEL ON CONTRACTING INTEGRITY. SEC. 813. ESTABLISHMENT OF PANEL ON CONTRACTING INTEGRITY. (a) Establishment- (1) IN GENERAL- The Secretary of Defense shall establish a panel to be known as the `Panel on Contracting Integrity'. (2) COMPOSITION-

More information

Master Document Master Document. Version 8.13, dated December 2017 B-1 Planning Considerations

Master Document Master Document. Version 8.13, dated December 2017 B-1 Planning Considerations Activity Code 11015 Version 8.13, dated December 2017 B-1 Planning Considerations Testing of Paid Vouchers Type of Service - Attestation Examination Engagement Audit Specific Independence Determination

More information

Definitions Definitions used in this document are taken from TNI SOP 7-100, and may be found there.

Definitions Definitions used in this document are taken from TNI SOP 7-100, and may be found there. Request for Proposal (RFP) Evaluating Non-Governmental Accreditation Bodies BACKGROUND The NELAC Institute (TNI) is a 501(c)(3) non-profit organization whose mission is to foster the generation of environmental

More information

Timekeeping for Government Contractors Mike Mardesich & Brad Tress March 28, 2017

Timekeeping for Government Contractors Mike Mardesich & Brad Tress March 28, 2017 Timekeeping for Government Contractors Mike Mardesich & Brad Tress March 28, 2017 The Fundamentals of Government Contracting Webinar Series 1 Your Presenters Mike Mardesich Dixon Hughes Goodman LLP 703.970.0508

More information

DEFENSE ACQUISITION REVIEW JOURNAL

DEFENSE ACQUISITION REVIEW JOURNAL DEFENSE ACQUISITION REVIEW JOURNAL 92 Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per response, including

More information

This policy will outline the requirements for competitive bids on goods and services purchased by the College.

This policy will outline the requirements for competitive bids on goods and services purchased by the College. Policy Name: Procurement Sole Source/Competitive Bid Policy Updated/Reviewed: August 10, 2017 Effective Date: November 15, 2010 Office with Primary Responsibility: Procurement Services Offices with Secondary

More information

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO. Request for Proposals (RFP) Information Technology Independent Verification and Validation ADDENDUM NO. 2 Questions and Answers RFP Amendments September 2015 Contained herein are the responses to the questions

More information

GMIG Courses and Course Descriptions

GMIG Courses and Course Descriptions FCN 190 FAR Fundamentals.... 2 Basic Simplified Acquisition Procedures.. 2 CON 100 Shaping Smart Business Arrangements... 2 CON 121 Contract Planning... 2 CON 124 Contract Execution. 3 CON 127 Contract

More information

DAU Hot Topics Forum on: Using commercial items to increase innovation, increase competition and lower costs

DAU Hot Topics Forum on: Using commercial items to increase innovation, increase competition and lower costs DAU Hot Topics Forum on: Using commercial items to increase innovation, increase competition and lower costs John Tenaglia Deputy Director, DPAP/CPIC 19 July 17 1 Briefing Overview Status of Current Guidance

More information

Case Report from Audit Firm Inspection Results

Case Report from Audit Firm Inspection Results Case Report from Audit Firm Inspection Results July 2014 Certified Public Accountants and Auditing Oversight Board Table of Contents Expectations for Audit Firms... 1 Important Points for Users of this

More information

Delivering End-to-End Supply Chain Excellence

Delivering End-to-End Supply Chain Excellence Delivering End-to-End Supply Chain Excellence -The DCMA Perspective- Ms. Marie A. Greening Director, Operations and Aeronautical Systems Divisions 19 March 2009 DCMA Mission We provide Contract Administration

More information

How to Perform Effective Price Analyses on Subcontractors. Jeffery A. White, C.P.M J.A. White & Associates, Inc.

How to Perform Effective Price Analyses on Subcontractors. Jeffery A. White, C.P.M J.A. White & Associates, Inc. How to Perform Effective Price Analyses on Subcontractors Jeffery A. White, C.P.M J.A. White & Associates, Inc. Pricing Wisdom A cynic is a man who knows the price of everything and the value of nothing.

More information

What You Don t Know About Procuring Commercial Items Could Hurt You (or Your Suppliers)! BY DORIS HOLLINGSWORTH GRAY

What You Don t Know About Procuring Commercial Items Could Hurt You (or Your Suppliers)! BY DORIS HOLLINGSWORTH GRAY What You Don t Know About Procuring Commercial Items Could Hurt You (or Your Suppliers)! BY DORIS HOLLINGSWORTH GRAY 52 Contract Management April 2008 Knowing precisely what characterizes products or services

More information

DEPARTMENT OF DEFENSE Defense Contract Management Agency INSTRUCTION. Product Acceptance and Release - QA

DEPARTMENT OF DEFENSE Defense Contract Management Agency INSTRUCTION. Product Acceptance and Release - QA DEPARTMENT OF DEFENSE Defense Contract Management Agency INSTRUCTION Product Acceptance and Release - QA Quality Assurance Directorate DCMA-INST 314 OPR: DCMA-QA Validated Current with Administrative Changes,

More information

GROUND RULES AND PRICING INSTRUCTIONS:

GROUND RULES AND PRICING INSTRUCTIONS: GROUND RULES AND PRICING INSTRUCTIONS: F-22 REPLENISHMENT SPARES PRICING CY2013 CY2017 REQUIREMENTS CONTRACT (MRC) WITH VARIABLE QUANTITIES I. GENERAL INSTRUCTIONS: The objective of this Spares Requirements

More information

Pre-Audit Collaboration and Cooperation

Pre-Audit Collaboration and Cooperation 16 Contract Management January 2011 Contract Management January 2011 17 C ontractor audits are an inevitable way of life for most organizations providing goods or services to the U.S. federal government,

More information

SOURCE SELECTION PLAN. {Insert if Phase I or Phase II} {Insert Project Name} {Insert Project Acronym} SOLICITATION XXXXXX-xx-R-xxxx

SOURCE SELECTION PLAN. {Insert if Phase I or Phase II} {Insert Project Name} {Insert Project Acronym} SOLICITATION XXXXXX-xx-R-xxxx SOURCE SELECTION PLAN {Insert if Phase I or Phase II} {Insert Project Name} {Insert Project Acronym} SOLICITATION XXXXXX-xx-R-xxxx {INSERT MONTH & YEAR} COORDINATION: Contracting Officer Date IPT Leader

More information

SRI LANKA AUDITING STANDARD 300 PLANNING AN AUDIT OF FINANCIAL STATEMENTS CONTENTS

SRI LANKA AUDITING STANDARD 300 PLANNING AN AUDIT OF FINANCIAL STATEMENTS CONTENTS SRI LANKA AUDITING STANDARD 300 PLANNING AN AUDIT OF FINANCIAL STATEMENTS (Effective for audits of financial statements for periods beginning on or after 01 January 2014) * CONTENTS Paragraph Introduction

More information

REQUEST FOR PROPOSAL. HRIS Human Resources Information Software Fort Morgan, Colorado

REQUEST FOR PROPOSAL. HRIS Human Resources Information Software Fort Morgan, Colorado REQUEST FOR PROPOSAL HRIS Human Resources Information Software Fort Morgan, Colorado October 7, 2014 Michael Boyer Director, Human Resources and Risk Management CITY OF FORT MORGAN P.O. BOX 100 FORT MORGAN,

More information

DEPARTMENT OF DEFENSE Defense Contract Management Agency INSTRUCTION. Government Purchase Cards

DEPARTMENT OF DEFENSE Defense Contract Management Agency INSTRUCTION. Government Purchase Cards DEPARTMENT OF DEFENSE Defense Contract Management Agency INSTRUCTION Government Purchase Cards Contracts Directorate DCMA-INST 117 CPR: DCMA-AQ Validated current, March 10, 2014 1. PURPOSE. This Instruction:

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of the ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

CORPORATE GOVERNANCE POLICY

CORPORATE GOVERNANCE POLICY CORPORATE GOVERNANCE POLICY I - PRINCIPLES AND VALUES 1 GOVERNANCE PRINCIPLES Saferoad Holding ASA ( Saferoad or the Company ) considers good corporate governance to be a prerequisite for value creation

More information

Counterfeit Mitigation

Counterfeit Mitigation Counterfeit Mitigation Parts Standardization & Management Committee (PSMC) LMI Tysons, A Defense Contract Management Agency (DCMA) Technical Directorate - Engineering 25-27 April 2017 2 Agenda COUNTERFEIT

More information

Bulk Metals Qualified Suppliers List for Distributors (QSLD) Criteria and Provisions

Bulk Metals Qualified Suppliers List for Distributors (QSLD) Criteria and Provisions Bulk Metals Qualified Suppliers List for Distributors (QSLD) Criteria and Provisions PREFACE The DLA Troop Support Construction and Equipment Supply Chain (C & E) has instituted a Qualified Suppliers List

More information

HOWEVER, IT S NOT THAT SIMPLE.

HOWEVER, IT S NOT THAT SIMPLE. 10 Contract Management November 2015 An explanation of why the source selection process takes as long as it does, along with some tips for both government and industry to speed up the process. BY MARGE

More information

Ipswich Public Schools

Ipswich Public Schools Ipswich Public Schools Executive Search Consultant Services for the position of Superintendent of Schools December 2016 I. RFQ Timeline and Decision to Use a Request for Quotes Time Line Superintendent

More information

DEFENSE ACQUISITION UNIVERSITY FE Intermediate Facilities Engineering

DEFENSE ACQUISITION UNIVERSITY FE Intermediate Facilities Engineering 1 Describe the relationship that exists between weapons systems acquisition and facilities requirements. Identify the milestones within the systems acquisition framework that may require the application

More information

IMMEDIATE POLICY CHANGE

IMMEDIATE POLICY CHANGE DEPARTMENT OF DEFENSE Defense Contract Management Agency IMMEDIATE POLICY CHANGE Data Collection and Analysis Component Name DCMA-INST 323 (IPC-1) OPR: DCMA-QA June 26, 2015 Administrative Change, July

More information

DLA Troop Support Pre-Proposal Conference

DLA Troop Support Pre-Proposal Conference DEFENSE LOGISTICS AGENCY AMERICA S COMBAT LOGISTICS SUPPORT AGENCY DLA Troop Support Pre-Proposal Conference OCONUS Central Chicken SPM300-13-R-0014 14 March 2013 1 DLA Troop Support Mission, Vision, and

More information

Vendor Questions and answers- Question 1:

Vendor Questions and answers- Question 1: Vendor Questions and answers- Question 1: Page 7 states cost/price of the proposed items for week of 3/10/2014 Clarify that this means last delivered prices thru 3/7 which determines customer pricing effective

More information

CRISP Azure Migration Consulting Services. All responses due no later than Friday, July 21 st, at 5pm EST

CRISP Azure Migration Consulting Services. All responses due no later than Friday, July 21 st, at 5pm EST Request for Quote CRISP Azure Migration Consulting Services Friday, July 7th, 2017 All responses due no later than Friday, July 21 st, at 5pm EST 1 Request for Quote RFQ TO ALL RESPONDERS CRISP Azure Migration

More information

INSTRUCTION ON METHODOLOGY ON PERFORMING FINANCIAL AUDIT AND REGULARITY AUDIT ( Official Gazette of MN, no. 07/15 from 17 th February 2015)

INSTRUCTION ON METHODOLOGY ON PERFORMING FINANCIAL AUDIT AND REGULARITY AUDIT ( Official Gazette of MN, no. 07/15 from 17 th February 2015) On the basis of Article 38 item 1 point 4 of the Law on the State Audit Institution ( Official Gazette of Republic of Montenegro, no. 28/04, 27/06, 78/06, Official Gazette of Montenegro, no. 17/07, 73/10,

More information

Department of the Navy. Earned Value Management Implementation Guide. Published by THE NAVAL CENTER FOR EARNED VALUE MANAGEMENT

Department of the Navy. Earned Value Management Implementation Guide. Published by THE NAVAL CENTER FOR EARNED VALUE MANAGEMENT Department of the Navy Earned Value Management Implementation Guide Published by THE NAVAL CENTER FOR EARNED VALUE MANAGEMENT FIGURE 1: EVM GUIDANCE ROADMAP 1 1 Please note that links to all cited documents

More information

PHILIPPINE STANDARD ON AUDITING 300 PLANNING AN AUDIT OF FINANCIAL STATEMENTS CONTENTS

PHILIPPINE STANDARD ON AUDITING 300 PLANNING AN AUDIT OF FINANCIAL STATEMENTS CONTENTS PHILIPPINE STANDARD ON AUDITING 300 PLANNING AN AUDIT OF FINANCIAL STATEMENTS (Effective for audits of financial statements for periods beginning on or after December 15, 2009) CONTENTS Paragraph Introduction

More information

Workforce Innovation and Opportunity Act of 2014, Public Law , Sections 107(d)(10)(A), 107(g)(2), and 121(d),

Workforce Innovation and Opportunity Act of 2014, Public Law , Sections 107(d)(10)(A), 107(g)(2), and 121(d), Administrative Policy POLICY NUMBER 097 Title: Program: One-Stop Operator Procurement Workforce Innovation and Opportunity Act (WIOA) Adopted: September 25, 2017 Effective: September 25, 2017 I. PURPOSE

More information

Bending The Cost Curve (BTCC)

Bending The Cost Curve (BTCC) Bending The Cost Curve (BTCC) A Discussion with Northrop Grumman January 2015 Catherine Rice VP Contracts, Pricing & Program Business Operations Northrop Grumman Aerospace Systems Sector Utilizing Joint

More information

Planning an Audit of Financial Statements

Planning an Audit of Financial Statements ISA 300 February 2008 International Standard on Auditing Planning an Audit of Financial Statements INTERNATIONAL STANDARD ON AUDITING 300 Planning an Audit of Financial Statements Explanatory Foreword

More information

INSPECTION SYSTEM REQUIREMENTS

INSPECTION SYSTEM REQUIREMENTS MILITARY SPECIFICATIONS MIL-I-45208A INSPECTION SYSTEM REQUIREMENTS This specification has been approved by the Department of Defense and is mandatory for use by all Agencies. 1. SCOPE 1.1 Scope. This

More information

RFP Restructuring Advisory Committee: Water and Sewer Question and Answer. Question Cut-Off 2/13/17

RFP Restructuring Advisory Committee: Water and Sewer Question and Answer. Question Cut-Off 2/13/17 RFP 2017-0007 Restructuring Advisory Committee: Water and Sewer Question and Answer Question Cut-Off 2/13/17 1. What is the estimated value of the sewer system? Determining an appropriate valuation of

More information

Safety Perception / Cultural Surveys

Safety Perception / Cultural Surveys Safety Perception / Cultural Surveys believes in incorporating safety, health, environmental and system management principles that address total integration, thus ensuring continuous improvement, equal

More information

Charges to sponsored projects are classified as either non-salary or salary.

Charges to sponsored projects are classified as either non-salary or salary. EXPENDITURE APPROVAL AND CONTROL INITIATING CHARGES TO SPONSORED PROJECTS Charges to sponsored projects are classified as either non-salary or salary. Non-salary charges are initiated via: 1. Pcard; 2.

More information

GSA Federal Supply Schedule Contracting: Compliance Program Best Practices

GSA Federal Supply Schedule Contracting: Compliance Program Best Practices GSA Federal Supply Schedule Contracting: Compliance Program Best Practices Breakout Session #: F14 Presented by: David Black, Partner, Holland & Knight Bill Bressette, Principal, Baker Tilly Date: 7/23/2013

More information

Washington Metropolitan Area District Office

Washington Metropolitan Area District Office Presentation by: Anthony Ruiz Assistant District Director/8(a) Business Development for the National Defense Industrial Association 11 th National Small Business Conference September 10, 2014 Part I: The

More information

AFARS APPENDIX AA ARMY SOURCE SELECTION SUPPLEMENT

AFARS APPENDIX AA ARMY SOURCE SELECTION SUPPLEMENT AFARS APPENDIX AA ARMY SOURCE SELECTION SUPPLEMENT 28 November 2017 TABLE OF CONTENTS CHAPTER 1: PURPOSE, ROLES, AND RESPONSIBILITIES... 1 1.1 Purpose... 1 1.2 Applicability and Waivers... 1 1.3 Best Value

More information

PURCHASING POLICY. Code: Policy 5.1. Date of Coming into Force: June Number of Pages: 10. Finance Department

PURCHASING POLICY. Code: Policy 5.1. Date of Coming into Force: June Number of Pages: 10. Finance Department REGISTER OF POLICIES, PROCEDURES AND BY-LAWS PURCHASING POLICY Code: Policy 5.1 Date of Coming into Force: June 2009 Number of Pages: 10 Origin: Finance Department Operator and Storage Site: Finance Department

More information

AICPA STANDARDS FOR PERFORMING AND REPORTING ON PEER REVIEWS. Effective for Peer Reviews Commencing on or After January 1, 2009

AICPA STANDARDS FOR PERFORMING AND REPORTING ON PEER REVIEWS. Effective for Peer Reviews Commencing on or After January 1, 2009 AICPA STANDARDS FOR PERFORMING AND REPORTING ON PEER REVIEWS Effective for Peer Reviews Commencing on or After January 1, 2009 Guidance for Performing and Reporting on Peer Reviews Copyright 2008 by American

More information

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES Section I Application (These procedures do not apply to Design-Build Contracts.)

More information

FOR PLANNING PURPOSES ONLY!

FOR PLANNING PURPOSES ONLY! COMPANY (Bus. Area, Facility or Unit) Unique Identification (UID) And Radio Frequency Identification (RFID) Implementation Approach Dated February 17, 2005 FOR PLANNING PURPOSES ONLY! TABLE OF CONTENTS.

More information

OSD Level Peer Reviews Best Practices, Lessons Learned, and Recommendations (as of December 20, 2013)

OSD Level Peer Reviews Best Practices, Lessons Learned, and Recommendations (as of December 20, 2013) Category Type of Feedback Review Phase Type of Feedback Logistical Services (Competitive) Solicitation contained provision for an award-term. Peer Review Team (PRT) recommended adding language to indicate

More information

The New Procurement Review for School Nutrition Programs

The New Procurement Review for School Nutrition Programs New Jersey Department of Agriculture 1 The New Procurement Review for School Nutrition Programs What New Jersey schools need to know August 2017 WEBINAR LEARNING OBJECTIVES Participants should be able

More information

Strategic Planning Consultant Proposal No. P13/9824 Date: July 17, 2013

Strategic Planning Consultant Proposal No. P13/9824 Date: July 17, 2013 Answers to Vendor Questions - Questions are in black, answers are in red. 1. In reference to Section 7 Agreement Page 15 are we to include a copy of this within our returned proposal or will this be executed

More information

UNIT 36: PRICE ANALYSIS (NEGOTIATED ACQUISITIONS)

UNIT 36: PRICE ANALYSIS (NEGOTIATED ACQUISITIONS) Duty Establish prenegotiation positions on price including: the need to cancel and resolicit for price related reasons; the need for communications; the need for cost information; and the need to negotiate.

More information

REQUEST FOR QUOTES. Period of Performance: March 1, 2017 to June 30, Statement of Work:

REQUEST FOR QUOTES. Period of Performance: March 1, 2017 to June 30, Statement of Work: International Republican Institute 1225 Eye St. NW, Suite 700 REQUEST FOR QUOTES Washington, DC 20005 (202) 408-9450 Procurement Number: GOV2017SC01o Open Date: January 23, 2017 Questions Deadline: January

More information

Effective Date: January, 2007 Last Reviewed Date: September, 2016 Last Revised Date: October, 2016 Next Review Date: April 2018

Effective Date: January, 2007 Last Reviewed Date: September, 2016 Last Revised Date: October, 2016 Next Review Date: April 2018 Section: Finance and Administration Number: 12.20.PP.v7 Subject: Goods and Services Procurement (including consulting services) Policy and Procedure Associated Document Form Number: 12.20.F Effective Date:

More information

PART 6 - INTERNAL CONTROL

PART 6 - INTERNAL CONTROL PART 6 - INTERNAL CONTROL INTRODUCTION The A-102 Common Rule and OMB Circular A-110 (2 CFR part 215) require that non-federal entities receiving Federal awards (i.e., auditee management) establish and

More information

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017 Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program

More information

Kaydon Corporation Small Business Individual Subcontracting Plan

Kaydon Corporation Small Business Individual Subcontracting Plan Kaydon Corporation Small Business Individual Subcontracting Plan 1. IDENTIFICATION DATA: Company Name: Kaydon Corporation-Bearings Division Address: 2860 McCracken St., Muskegon, MI 49441 Date Prepared:

More information

Federal Education Programs Financial Management Practices

Federal Education Programs Financial Management Practices Federal Education Programs Financial Management Practices Legal Structures for Federal Programs Statutes / Legislation Program Statues (NCLB, IDEA, Perkins) General Education Provisions Act (GEPA) Regulations

More information

Internal Audit Report. Facilities Services Contract Management

Internal Audit Report. Facilities Services Contract Management Internal Audit Report Report Number: 2017-01 Report Date: March 10, 2017 Executive Summary Audit Report No.: 2017-01 March 10, 2017 WE AUDITED the Facilities Division s management controls over the management

More information

SRI LANKA AUDITING STANDARD 300 PLANNING AN AUDIT OF FINANCIAL STATEMENTS CONTENTS

SRI LANKA AUDITING STANDARD 300 PLANNING AN AUDIT OF FINANCIAL STATEMENTS CONTENTS SRI LANKA AUDITING STANDARD 300 PLANNING AN AUDIT OF FINANCIAL STATEMENTS (Effective for all the audits carried out on or after ) CONTENTS Paragraph Introduction 1-5 Preliminary Engagement Activities 6-7

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS Title Organizational Review LRFP Number 2100.17.01 Project Manager Alan Sorum Submittal Deadline June 17, 2016 Award Announcement July 15, 2016 Submit Proposals to: or Alan Sorum,

More information

Application for Focus on Energy s Biogas Feasibility Study Grants for Anaerobic Pretreatment and Anaerobic Digester Facilities

Application for Focus on Energy s Biogas Feasibility Study Grants for Anaerobic Pretreatment and Anaerobic Digester Facilities Application for Focus on Energy s Biogas Feasibility Study Grants for Anaerobic Pretreatment and Anaerobic Digester Facilities Focus on Energy, a statewide service, works with eligible Wisconsin residents

More information