An Automated System for Prioritizing Highway Improvement Locations and Analyzing Project Alternatives

Size: px
Start display at page:

Download "An Automated System for Prioritizing Highway Improvement Locations and Analyzing Project Alternatives"

Transcription

1 An Automated System for Prioritizing Highway Improvement Locations and Analyzing Project Alternatives Albert Gan, Ph.D. Professor Florida International University Priyanka Alluri, Ph.D., P.E.* Assistant Professor Florida International University Md Asif Raihan, M.S. Graduate Research Assistant Florida International University Kaiyu Liu, Ph.D. Senior Research Associate Florida International University Dibakar Saha, Ph.D. Research Associate Florida International University Rax Jung, Ph.D., P.E. Project Development Engineer Florida s Turnpike Enterprise rax.jung@dot.state.fl.us *Corresponding Author Department of Civil and Environmental Engineering Florida International University 0 West Flagler Street, EC Miami, FL Phone: (0) -; palluri@fiu.edu Total words:,0 words + figures 0 =,0 words Revised Paper Submitted for: Publication and Presentation The th Annual Meeting of the Transportation Research Board November 0

2 Gan et al. 0 0 ABSTRACT The Florida Department of Transportation (FDOT) District One first deployed a web-based system in 00, called the Congestion Management Process (CMP), to screen and prioritize highway locations on its Strategic Intermodal System (SIS) for low-cost, near-term improvements. The system prioritizes highway locations on the SIS within the District based on a simple scoring method with seven performance measures, i.e., crash ratio, fatal crash, volumeto-capacity (v/c) ratio, Average Annual Daily Traffic (AADT), truck volume, truck percent, and delay. Since its development and following the adoption of the Highway Safety Manual (HSM) by FDOT, there was a desire to apply safety performance measures that are consistent with the HSM methodology. There was also a desire to explore and implement a more advanced project prioritization method for better location screening and prioritization. The District further desires to add mapping capabilities to improve data visualization. This paper describes the District s effort to incorporate these improvements in the CMP system. The CMP system has the capability to automatically calculate performance measures including two safety-related measures based on the HSM methodology, and prioritize highway locations using the Analytic Network Process (ANP), an advanced multi-criteria decision-making technique. The system can also create thematic maps of performance measures and other input variables on Google Maps for data visualization. The system also has the capability to evaluate potential projects and record project level information. While the system was developed for FDOT District One, it can serve as prototype and be customized for prioritizing highway locations in other states. Keywords: Highway improvement location prioritization, performance measures, Analytic Network Process (ANP), data visualization, information system.

3 Gan et al INTRODUCTION The Florida Department of Transportation (FDOT) District One represents counties in Southwestern Florida, constituting,0 centerline miles of state highway network. The District deployed a web-based system in 00, called the Congestion Management Process (CMP), to help its transportation planners screen and prioritize highway locations on its Strategic Intermodal System (SIS) for low-cost, near-term improvements (). The SIS is composed of specially designated facilities considered to be of statewide and regional significance for aviation, highway, intermodal rail, seaport, space and transit systems, and accommodations for bicycles and pedestrians. The CMP system prioritizes highway locations on the SIS within the District based on seven performance measures, i.e., crash ratio, fatal crash, volume-to-capacity (v/c) ratio, Average Annual Daily Traffic (AADT), truck volume, truck percent, and delay. The system further implements a simple scoring method for highway location prioritization. In this method, each of the seven performance measures is pre-assigned a maximum score, depending on their relative importance. For each highway location, a score is then assigned to each measure based on the corresponding site-specific condition. The scores from all seven measures of a location are then totaled to obtain the overall score which is then used in the final ranking of locations. Although the main function of the CMP is to screen highway segments that have significant safety and mobility issues, it also includes functions to record project-specific information such as site characteristics and costs associated with specific improvements at potential improvement locations. Accordingly, the CMP is a two-tier process: () screening for highway segment locations with potential for improvement; and () prioritizing project improvement alternatives. Tier one is an automated process where a long-list of candidate locations is generated based on the seven performance measures. Tier two is mainly a manual process where the long-list is reviewed to identify the short-list of potential candidate projects. In this tier, the short-list locations are further analyzed for specific improvements and include non-transportation performance goals and project-specific details such as benefit and cost estimates, potential funding sources, type of improvement (i.e., localized vs. systemic), etc. Since the development of the CMP system in 00 and following the adoption of the Highway Safety Manual (HSM) by FDOT (), there was a desire to replace the two safetyrelated performance measures, namely, crash ratio and fatal crash, with safety measures that are consistent with the methodology used in the HSM. There was also a desire to explore and implement a more advanced project prioritization method for better location screening. The District further desires to add mapping capabilities to the system to take advantage of the increasingly available web mapping tools. Accordingly, this paper describes the District s effort in accomplishing these objectives in the system, namely: () replacing existing safety measures to be consistent with the HSM methodology; () implementing an advanced project prioritization method; and () incorporating mapping capabilities to visualize project locations, performance measures, and system output. PERFORMANCE MEASURES As aforementioned, FDOT District One uses seven measures for implementation in the CMP ():

4 Gan et al Crash ratio: The ratio of the annual crash rate for each highway segment to the corresponding year s District One average system-wide crash rate for that type of highway segment.. Fatal crash: The average number of fatal crashes per year over the past three years divided by the length of the highway segment.. Volume-to-capacity ratio: The ratio of the two-way peak-hour traffic volume and the capacity.. Average Annual Daily Traffic (AADT) per lane: The AADT normalized by the number of travel lanes.. Truck volume per lane: The truck volume normalized by the number of travel lanes.. Truck percent: Percentage of trucks in the traffic stream.. Delay: Three general levels of the delay condition are defined: a) Fails if the existing Level of Service (LOS) is F, b) Exceeds Standard if the existing LOS exceeds its corresponding LOS standard, and c) At or Below Standard if the existing LOS is at or below its corresponding LOS standard. It was recognized that a main issue with the two existing safety performance measures was that they do not account for the regression-to-the-mean (RTM) effect. This bias may cause locations with high crashes that were due merely to random fluctuations in crash numbers to be erroneously selected for safety improvements, thus, reducing the cost-effectiveness of safety programs. In other words, when locations are identified for safety improvements based on high crash frequencies and crash rates, they will often experience fewer crashes after the safety improvement even if the improvement is not effective. Therefore, because of the RTM bias, safety countermeasures often appear to be more effective than they really are. It was recommended that the two existing safety-related performance measures, i.e., fatal crash and crash ratio, be replaced with number of excess fatalities and number of excess injuries. The number of excess fatalities is the expected number of excess fatalities for the final year of the analysis period for the location. Similarly, the number of excess injuries is the expected number of excess injuries for the final year of the analysis period for the location. These two measures give the prediction of the number of excess fatalities and injuries at the person level given the location s existing traffic volume and roadway geometric characteristics. Any location with excess fatalities (or injuries) greater than zero would be experiencing more fatalities (or injuries) than expected, and larger values of excess fatalities (or injuries) indicate greater potential for safety improvement. On the other hand, negative excess number of fatalities (or injuries) suggests that the location experiences fewer fatalities (or injuries) than expected. PRIORITIZATION METHOD Transportation agencies have been prioritizing highway locations using a variation of simple scoring and ranking methods (-). The general approach in this method is that each of the selected performance measures is first assigned a maximum score. The actual score of each measure is then determined based on site-specific characteristics. Finally, for each project location, scores from all the performance measures are summed up to obtain the overall score which is then used in project prioritization.

5 Gan et al One major limitation with the simple scoring method is that it does not consider the impacts on the final ranking and thus the decisions due to the presence of correlation among the performance measures used. Furthermore, some of the performance measures could also be qualitative, requiring subjective judgment. The simple scoring method cannot efficiently address these issues, and thus agencies have become more interested in advanced prioritization methods that are transparent, effective, accountable, and defendable (0, ). In decision making involving multiple criteria, the Analytic Hierarchy Process (AHP) has been widely used for its ability to organize quantitative and qualitative criteria in a systematic manner, and provide a structured yet relatively simple solution to decision making problem (). Developed by Professor Thomas L. Saaty in 0, the method stresses the importance of the intuitive judgments of a decision maker as well as the consistency of the comparison of criteria (alternatives) in the decision-making process (). However, as AHP structures the problem hierarchically, it does not consider the impacts of interdependencies that exist among the criteria. For example, it was quite clear from this set of performance measures used in CMP that AADT and v/c ratio are interdependent, so are truck volume and truck percentage. Further, delay and v/c (thus AADT) are also interdependent as delay is a function of v/c. In fact, it can be concluded that most if not all the performance measures are interdependent to an extent and would benefit from a method that can take account of the impacts of such interdependencies. This led to the consideration of the Analytic Network Process (ANP), developed also by Professor Saaty, which is a generalized methodology of AHP. Unlike AHP, ANP not only has the capability of breaking down a decision problem into a logical order, but can also account for the interdependencies among the criteria, the alternatives, and the overall goal in a decision network (). The ANP is composed primarily of the following steps (, ): Model construction and problem structuring Pairwise comparison matrices and priority vectors Supermatrix, weighted supermatrix, and limit matrix formations Ranking of alternatives ANP Model Structure The goal of this application is to prioritize highway locations on the FDOT District One s SIS network based on several performance measures. Figure illustrates the hierarchical structure for this scenario. As can be observed from the figure, Level 0 is the analysis goal, i.e., to prioritize the highway improvement locations. Level is the multi-criteria that consist of seven performance measures. Finally, Level consists of the alternative choices, i.e., the highway locations. The lines between the three levels indicate the relationship between goal, performance measures, and the alternatives (i.e., highway locations). As can be observed from Figure, the problem can be disintegrated into three levels (similar to hierarchical structure): goal to rank the alternatives, performance measures to achieve the goal, and alternatives (i.e., the highway locations that need to be prioritized). The ANP addresses the interdependency of the criteria (i.e., performance measures) by including an inner

6 Gan et al. dependence loop in the network structure. Figure depicts the potential network structure for this scenario. FIGURE Hierarchical structure of highway improvement location selection. 0 0 FIGURE ANP network model structure. In this figure, each arrow and loop has specific impacts on the interrelation of different levels, and on the next steps. W represents the impact of goal on each of the criterion and W represents the impact of criteria on each of the alternatives. The interdependency within the criteria (i.e., performance measures) is represented by W. The direction of arrows is dependent on the rationale of this problem structure. For the stated scenario, the goal of prioritizing highway locations can be achieved through the criteria, i.e., the criteria are impacting the goal; and these criteria determine the ranking of the alternatives. On the other hand, the criteria can be interdependent in nature. Pairwise Comparisons and Priority Vectors Once the ANP model structure is established, the next step is to determine the relative importance of each performance measure and each alternative (i.e., highway segment) with respect to each performance measure. It is achieved via pairwise comparisons that aim to compare the relative importance of two performance measures (or, alternatives) at a time. This

7 Gan et al approach theorizes that an analyst can better assess the relative importance of a set of performance measures when given only two measures to compare at a time, than when given all measures at once. The pairwise comparisons are performed on a pre-defined relative scale of -, which translates to comparing how much preference one measure gets over the other. These pairwise comparisons might not always be completely logical. For example, if Measure A is more important than Measure B, and Measure B is more important than Measure C, the selections would be inconsistent if Measure C is considered to be more important than Measure A, which is not logical. However, such conflicts will arise naturally, especially when several performance measures are involved. Professor Saaty () developed the consistency ratio to help gauge the degree of consistency in a set of pairwise comparisons made. A 0% consistency ratio indicates that the pairwise comparisons are perfectly consistent. This is not acceptable as inconsistency itself is important, for without it new knowledge that changes preference order cannot be admitted. In general, a consistency ratio of around 0% is considered acceptable. This is because the priority of consistency to obtain a coherent explanation of a set of facts must differ by an order of magnitude from the priority of inconsistency which is an error in the measurement of consistency (). Thus, on a scale from 0-, inconsistency should not exceed 0.0 by very much (). Otherwise, the pairwise comparisons should be revised to improve their consistency. Once the pairwise comparisons are performed, and the consistency of the comparisons are found to be acceptable, the next steps in the ANP model are to generate pairwise comparison matrices and priority vectors. Level corresponds to one n n comparison matrix for the pairwise comparison between n performance measures with respect to the goal. Similarly, since the y locations are connected to each of the n performance measures, n number of y y comparison matrices are created to evaluate the y locations. The pairwise comparison matrices are then used to generate priority vectors, which are the normalized Eigen vectors of the comparison matrices. Priority vectors are generated for all the y highway locations and the performance measures at sub-cluster level with respect to the n performance measures. Supermatrix, Weighted Supermatrix, and Limit Matrix Formations A supermatrix is a comparatively large square matrix where the cluster priority vectors are entered in appropriate columns to obtain global priorities with interdependent influence (). The general supermatrix framework takes the following form: Goal Criteria Alternatives Goal Criteria W W 0 Alternatives 0 W I Note that each of the elements in this supermatrix represents a submatrix. Zero (0) elements correspond to those elements which do not have any influence. Since each alternative depends only on itself, identity matrix (I) submatrix is used in the supermatrix framework in row: Alternatives and column: Alternatives.

8 Gan et al Once the supermatrix is generated, the next step is to derive the limit priorities of influence from the supermatrix. To obtain such priorities, the supermatrix needs to be transformed to a matrix each of whose column sums to unity, known as column stochasticity (). The resulting stochastic matrix is known as weighted supermatrix. The rationale behind this transformation is to convert the elements local cluster priorities to global priorities. The limit supermatrix is next obtained by raising the weighted supermatrix to exponential powers k+, where k is an arbitrary number. It provides the long-term relative influences of the elements on each other through convergence on the importance weights. Ranking of Alternatives The final priorities of all elements are obtained by normalizing each cluster of the limit matrix. Note that detailed calculations are not included here for brevity. Readers are referred to Raihan et al. () which presents the detailed calculations in each step of the ANP process. CMP SYSTEM This section presents the design and functionalities of the web-based CMP system. The system automates the two-tier process of screening for highway segments and analyzing potential improvements at specific project locations. Specifically, the system implements the following key functions: Upload various traffic-related data and crash records. Calculate performance measures from uploaded data. Determine the importance of each performance measure based on pairwise comparisons. Prioritize highway segments by applying the ANP method with multiple performance measures. Create thematic maps of performance measures and other input variables on Google Maps for data visualization. Evaluate potential projects and record project level information. Manage user accounts and assign account privileges. User Types The CMP system supports the following four user types: User: This user type can view projects and project information sheets, and print or export information. Project Manager: This user type can upload and process data, view projects, export project list, build scenarios, apply prioritization method, make project selections, enter project information for selected projects, and generate project information sheets. Decision Maker: This user type can make final decision on project selections, in addition to all that can be done by a Project Manager. Administrator: This user type can manage user accounts and scenarios, in addition to all that can be done by a Decision Maker.

9 Gan et al. Main Screen After logging into the system, the user is presented with the main screen shown in Figure. The left panel includes a dropdown list for the user to select an analysis year, plus a list of menu items to provide access to various CMP functions. Access privilege to specific menu items is provided based on the specific roles of each user type. The right panel of the main screen includes a Google Maps application that displays the map area covered by District One. This map is used mainly to display highway locations and system inputs and outputs. 0 0 FIGURE CMP main screen. Data Preparation The first step in applying the CMP system is to upload all required input data into the system. CMP provides tools for authorized users to upload and process the required data. The data preparation process in CMP includes the following two major steps: uploading input data and calculating performance measure values. Step : Upload Input Data This step allows the user to upload all the required input data into the system database. The input data for CMP include all those that are needed to derive the seven performance measures used in project prioritization, in addition to the SIS road network covered by the District. The data are divided into three data files for crashes, segments, and RCI (Roadway Inventory Characteristics)

10 Gan et al. 0 variables, and are uploaded for each analysis year when their respective data become available. The file upload history, including the data year, the data category, the file name, the upload date, and the user who uploaded the file, are listed on the screen for reference (see Figure ) FIGURE Window for uploading data. Step : Calculate Performance Measures After all the required data files are successfully uploaded, they can be used in this step to calculate the performance measure data used in the project prioritization process. Specifically, the calculations performed in this step include: Calculating the truck volume from truck percent. Standardizing the volume data (i.e., vehicular volume and truck volume) from the total volume for all lanes to volume per lane. Calculating the excess injuries and excess fatalities consistent with the HSM method. Calculating the volume-to-capacity ratios. Determining the delay condition based on existing level of service (LOS) with respect to the design LOS. Figure shows the window for calculating performance measures. It includes a table that lists the data uploaded for each data year. Only one data set can exist in the system for each year. However, data can be uploaded multiple times to update existing data in the system. When all the required data sets have been successfully uploaded, as indicated by the Ready status indicator (otherwise, the status will indicate Missing ), a Calculate link will appear to allow the user to start calculating the performance measure data. After the calculation is completed, the table will list the date and time the calculation was initiated, in addition to the name of the user who ran the calculation, and the status of the calculation. The calculated performance measure data will also be available for export to Excel. In the case when the performance measure data have been

11 Gan et al. calculated based on previously uploaded data files, the Calculate link will be replaced with Recalculate to signal the existence of performance measure data in the system for the same year. Thus, the recalculation, if performed, will replace the existing data FIGURE Window for calculating performance measures. Location Prioritization and Project Analysis After the performance measure data are successfully calculated, they are ready to be applied to prioritize highway segments and analyze projects. The process in the CMP system includes three steps: building scenarios, prioritizing project locations, and managing selected projects. Step : Build Scenarios The Build Scenarios step allows the user to build scenarios that weigh the importance of different performance measures. As shown in Figure, the user can start building scenarios based on pairwise comparisons of performance measures. For a new scenario, the system starts by assuming that all performance measures are equally important. The user can then go through each pair of measures to assess and indicate their relative importance. This is done by marking on the scale between each pair of measure. For example, if the user feels very strongly that Excess Fatalities is more important than Delay, he/she would mark the radio button highlighted in a red box in Figure. To help the user gauge the degree of consistency in a set of pairwise comparisons made, CMP calculates a so-called consistency ratio as a quick measure of the level of consistency. This ratio, expressed in percent, is calculated and displayed with each user selection of the preference level. A 0% consistency ratio indicates that the pairwise comparisons are perfectly consistent. The literature suggests that a consistency ratio of around 0% can be considered to be acceptable. Otherwise, the pairwise comparisons shoud be revised to improve their consistency. When the consistency ratio is calculated, the system also calculates the relative weight for each performance measure based on the result from the pairwise comparisons. The relative weights, which sum up to 00%, are shown at the bottom of the window. These weights can be saved as a scenario and are available for use in the second step of the project analysis process to prioritize the projects.

12 Gan et al. Only the transportation planner(s) who are knowledgeable of the performance measures would weigh the measures. The weighting/pairwise comparisons either could be performed by one person, or could be a team effort. Note that several scenarios with different weighting factors could be created and saved. This approach gives the users (i.e., the planners) an opportunity to compare the results from different scenarios. Only the user with the Decision Maker or Administrator privileges can make the final decisions on project selection. 0 FIGURE Window for performing pairwise comparisons and building weight scenarios. Step : Prioritize Project Locations This step allows the user to calculate scores using the ANP method and the weight scenario built in the previous step. The scores are then used to gauge a highway segment s overall need for improvements. Figure shows the main screen for performing this function. It allows the user to

13 Gan et al. select the analysis year and then select to calculate the scores for each highway segment. As soon as the scores are calculated, the list of the highway segments with their calculated scores is listed. The user can then select the highway segments from the list for further analysis in the third and final step of the process. The user can also export the list to an Excel file and display specific highway segments on Google Maps on a pop-up window. Figure shows an example. FIGURE Project prioritization window. 0 FIGURE Map display when multiple highway segments are selected. Step : Manage Selected Projects The final step of the analysis process is to analyze the highway segments selected in the previous step to further shortlist the project selections, document the selection decisions, and populate the

14 Gan et al. selected project location (i.e., the Go projects) with detailed project-level information. Figure shows that the project locations assigned a decision status of Go or No Go based on the review by the project manager and/or decision makers. Figure 0 shows a partial screen for a Go project location which allows the user to specify the general project information. In addition, the section also allows the user to enter information on the proposed improvement, the project, and other additional comments. 0 FIGURE Manage Selected Projects window. FIGURE 0 Project information data entry for a Go project location.

15 Gan et al. 0 0 After project data are entered, the user can generate a one-page pre-formatted report that includes all the project information. The user may also export the report to an available file format (i.e., Excel, PDF, or Word). Data Visualization The CMP system includes a Google Maps application to plot thematic maps of both the input variables and the performance measures. Once an analysis year is selected, the map view will display the state roads layer for the selected analysis year, along with a search box and four dropdown lists. As shown in Figure, a standard -digit roadway ID could be entered to find a specific highway segment. The four dropdown lists combine to provide the user the ability to create different thematic maps. Thematic maps can be created by selecting a variable to plot from the first dropdown list. The remaining three dropdown lists provide the following plotting options: Number of intervals: select from a range of to 0 intervals. Line width: select from a range of level to level. The default is level. Line color: select either fixed colors or one of four color ramps. Figure shows a thematic map of the Level of Service (LOS). As can be seen in the figure, the legend for the thematic map is displayed on the left panel, where additional map layers for the district, counties, and state roads could also be displayed. FIGURE A sample thematic map for level of service (LOS).

16 Gan et al System Transferability Although the CMP system is primarily developed for FDOT District One, it can be customized to prioritize locations in other agencies. Specifically, the customization efforts will include: modifying the input data file structure depending on the agency s data, updating the performance measures to be considered, and including the GIS layer for the agency route network for data visualization. Future Enhancements A future enhancement to this system would be to provide flexibility in the performance measures being considered for prioritizing locations. Currently, the seven performance measures included in the system are fixed, and cannot be easily changed by the user. However, agencies might want to use performance measures that are different from these seven. The enhanced system would allow the user to consider a different set of performance measures. CONCLUSIONS Most transportation agencies have been using the simple scoring method to prioritize highway project locations. This simple method which assigns a fixed weight to each performance measure does not account for correlation between performance measures. Given that it is not likely that a single performance measure will be able to address all the goals and objectives of an agency, nor is it likely that multiple performance measures will be independent from each other, it becomes clear that transportation agencies would benefit from a method that can take account of the impacts of interdependencies of performance measures. This paper presented a web-based system that fully implemented an advanced method of project prioritization known as the Analytic Network Process (ANP). It is the first known application of ANP in prioritizing transportation projects. The method is specially designed to account for the impact from the interdependencies of performance measures. The system also calculates safety performance measures based on the empirical Bayes (EB) methodology. The EB methodology is recommended by the Highway Safety Manual (HSM) to specifically account for the regression-to-the-mean (RTM) bias, which could cause locations to be erroneously selected for safety improvements. The system can also create thematic maps of performance measures and other input variables on Google Maps for data visualization. The system further provides functions for evaluating potential projects and record project level information. The FDOT District One is currently considering adopting this system. While the system was developed for FDOT District One, it can serve as prototype and be customized for prioritizing highway locations in other states. ACKNOWLEDGEMENTS This research was funded by the Florida Department of Transportation (FDOT) Research Center.

17 Gan et al REFERENCES. Florida Department of Transportation (FDOT). Development of a Congestion Management Process for the Florida Intrastate Highway System/Strategic Intermodal System in District One. FDOT District One, 00.. FDOT. Highway Safety Manual Implementation Plan Timeline, June 0. Implementation-Timeline_0-.pdf Accessed May, 0.. Delaware Department of Transportation. DelDOT Project Prioritization Criteria. 0/DelDOT_project_prioritization_criteria.pdf Accessed May, 0.. Missouri Department of Transportation. Criteria for Project Prioritization. iaforprioritizationofprojects.pdf. Accessed May, 0.. North Carolina Department of Transportation. Prioritization.0 Highway Scoring Criteria: Summary Report, March 0. Accessed June, 0.. Ohio Department of Transportation. Transportation Review Advisory Council: Policy & Procedures, July 0. %0and%0Procedures%0Revisions_...pdf. Accessed April, 0.. Metropolitan Planning Council. States Approaches to Transportation Project Prioritization: Linking Policy, Planning and Programming. Accessed July, 0.. Miller, J. S., R. E. Turochy, and J. H. Lambert. Considerations in the Development of Procedures for Prioritizing Transportation Improvement Projects in Virginia, March Accessed May, 0.. Dowling Associates, Inc. WSDOT Mobility Project Prioritization Process: Benefit/Cost Software User s Guide, May Accessed July, Gan, A., A. Raihan, P. Alluri, K. Liu, and D. Saha. Updating and Improving Methodology for Prioritizing Highway Project Locations on the Strategic Intermodal System (SIS). Final Research Report, Florida Department of Transportation, Tallahassee, FL, 0.. Raihan, A., P. Alluri, A. Gan, and R. Jung. Application of the Analytic Network Process (ANP) in Prioritizing Highway Improvement Locations. In Proceedings of the th Annual Meeting of the Transportation Research Board, Washington, DC, 0.. Skibniewski, M. J., and L. Chao. Evaluation of Advanced Construction Technology with AHP Method. In Journal of Construction Engineering and Management, Vol., No.,, pp. -.. Saaty, T. L. The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation. McGraw-Hill. New York, 0.. Saaty, T. L. Decision Making with Dependence and Feedback: The Analytic Network Process. RWS Publications. Pittsburgh,.

18 Gan et al. 0. Chung, S. H., A. H. L. Lee, and W. L. Pearn. Analytic Network Process (ANP) Approach for Product Mix Planning in Semiconductor Fabricator. In International Journal of Production Economics, Vol., 00, pp. -.. Yüksel, İ., and Dağdeviren, M. Using the Analytic Network Process (ANP) in A SWOT Analysis A Case Study for a Textile Firm. In Journal of Information Sciences, Vol., No., 00, pp. -.. Saaty, R. W. The Analytic Hierarchy Process - What It is and How It is Used. In Journal of Mathematical Modelling, Vol., No.,, pp. -.. Saaty, T. L., and L. G. Vargas. Decision Making with the Analytic Network Process Economic, Political, Social and Technological Applications with Benefits, Opportunities, Costs and Risks. Springer, Pittsburgh, 00.

NATMEC June 30, 2014 Anita Vandervalk, PE, PMP

NATMEC June 30, 2014 Anita Vandervalk, PE, PMP NATMEC June 30, 2014 Anita Vandervalk, PE, PMP Agenda 1. Florida s MPM Program 2. Research Efforts and Progress 3. Source Book 4. Transitioning to Real Time Data 5. Next Steps Importance of Mobility Providing

More information

Evaluating Design Alternatives using Crash Prediction Methods from the Highway Safety Manual

Evaluating Design Alternatives using Crash Prediction Methods from the Highway Safety Manual Evaluating Design Alternatives using Crash Prediction Methods from the Highway Safety Manual Andrew Ooms November 2012 Outline Safety Overview Current practices Safety Fundamentals Introduction the Highway

More information

A RANKING AND PRIORITIZING METHOD FOR BRIDGE MANAGEMENT

A RANKING AND PRIORITIZING METHOD FOR BRIDGE MANAGEMENT A RANKING AND PRIORITIZING METHOD FOR BRIDGE MANAGEMENT Saleh Abu Dabous and Sabah Alkass Department of Building, Civil and Environmental Engineering, Concordia University, Rm: EV-6139 1455 de Maisonneuve,

More information

RELATIONSHIP BETWEEN TRAFFIC FLOW AND SAFETY OF FREEWAYS IN CHINA: A CASE STUDY OF JINGJINTANG FREEWAY

RELATIONSHIP BETWEEN TRAFFIC FLOW AND SAFETY OF FREEWAYS IN CHINA: A CASE STUDY OF JINGJINTANG FREEWAY RELATIONSHIP BETWEEN TRAFFIC FLOW AND SAFETY OF FREEWAYS IN CHINA: A CASE STUDY OF JINGJINTANG FREEWAY Liande ZHONG, PhD Associate professor, Certified Safety Engineer, Research Institute of Highway, Ministry

More information

Volume to Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning. Hiron Fernando, BSCE. A Thesis CIVIL ENGINEERING

Volume to Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning. Hiron Fernando, BSCE. A Thesis CIVIL ENGINEERING Volume to Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning by Hiron Fernando, BSCE A Thesis In CIVIL ENGINEERING Submitted to the Graduate Faculty of Texas Tech

More information

Status of Highway Safety Manual Implementation. October 2015

Status of Highway Safety Manual Implementation. October 2015 Status of Highway Safety Manual Implementation October 2015 Agenda NCHRP Project 17-50 Overview Project Objective Panel members and support states Project Deliverables to Date Status of HSM Implementation

More information

Proposal for using AHP method to evaluate the quality of services provided by outsourced companies

Proposal for using AHP method to evaluate the quality of services provided by outsourced companies Available online at www.sciencedirect.com ScienceDirect Procedia Computer Science 55 (2015 ) 715 724 Information Technology and Quantitative Management (ITQM 2015) Proposal for using AHP method to evaluate

More information

The Analysis of Supplier Selection Method With Interdependent Criteria

The Analysis of Supplier Selection Method With Interdependent Criteria The Analysis of Supplier Selection Method With Interdependent Criteria Imam Djati Widodo Department of Industrial Engineering Islamic University of Indonesia, Yogyakarta, Indonesia Tel: (+62) 8122755363,

More information

HORIZON 2030: Plan Projects November 2005

HORIZON 2030: Plan Projects November 2005 Horizon PROJECTS 2030 Projects 10-1 10-2 The Horizon 2030 Project Information section is comprised of individual project information in alphabetical order by project name. The information provided for

More information

CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES PREPARED FOR: CITY OF JACKSONVILLE

CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES PREPARED FOR: CITY OF JACKSONVILLE CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES 3.20.2017 PREPARED FOR: CITY OF JACKSONVILLE 55 Railroad Row White River Junction, VT 05001 802.295.4999

More information

Origin-Destination Trips and Skims Matrices

Origin-Destination Trips and Skims Matrices Origin-Destination Trips and Skims Matrices presented by César A. Segovia, AICP Senior Transportation Planner AECOM September 17, 2015 Today s Webinar Content Matrix Estimation Data sources Florida Application

More information

System for Transit Performance Analysis Using the National Transit Database

System for Transit Performance Analysis Using the National Transit Database System for Transit Performance Analysis Using the National Transit Database Albert Gan, Feng Gui, and Li Tang Florida International University Abstract The National Transit Database (NTD) includes comprehensive

More information

DETERMINING THE WEIGHTS OF MARKETING MIX COMPONENTS USING ANALYTIC NETWORK PROCESS

DETERMINING THE WEIGHTS OF MARKETING MIX COMPONENTS USING ANALYTIC NETWORK PROCESS DETERMINING THE WEIGHTS OF MARKETING MIX COMPONENTS USING ANALYTIC NETWORK PROCESS Şenay Sadıç Industrial Engineering Department Istanbul Technical University Istanbul, TURKEY E-mail: sadic@itu.edu.tr

More information

Procedures for Prioritizing Noise Barrier

Procedures for Prioritizing Noise Barrier TRANSPORIAT/ON RESEARCH RECORD 1444 165 Procedures for Prioritizing Noise Barrier Locations on Freeways RAHIM F. BENEKOHAL, WEIXIONG ZHAO, AND MICHAEL H. LEE The ranking of potential noise barrier locations

More information

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement 2 Purpose and Need 2.1 Study Area Interstate 81 (I-81) is relied upon for local and regional travel and interstate travel in the eastern United States. It extends 855 miles from Tennessee to New York at

More information

Section 5: Performance-Based Planning

Section 5: Performance-Based Planning Section 5: Performance-Based Planning Mapping the Future: The Southwestern PA Plan establishes a performance-based foundation for regional transportation investment decisions consistent with MAP-21 1 guidance.

More information

The New Highway Capacity Manual 6 th Edition It s Not Your Father s HCM

The New Highway Capacity Manual 6 th Edition It s Not Your Father s HCM The New Highway Capacity Manual 6 th Edition It s Not Your Father s HCM Tom Creasey, PE, PhD Principal, Stantec Consulting Services Inc. Chair, TRB Highway Capacity and Quality of Service Committee Presented

More information

An Introduction to the. Safety Manual

An Introduction to the. Safety Manual An Introduction to the Highway Safety Manual An Introduction to the HIGHWAY SAFETY MANUAL Table of Contents Section 1: HSM Overview... 1 What is the Highway Safety Manual?... 1 How is the HSM Applied?...

More information

APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS

APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS Page 1 of 15 ST-01: I-95 ITS DEPLOYMENT (DE STATE LINE TO AIRPORT) PROJECT DESCRIPTION AND SCOPE: Project will address gaps in ITS device coverage on I-95 from

More information

Technology Selection for Product Innovation Using Analytic Network Process (ANP) A Case Study

Technology Selection for Product Innovation Using Analytic Network Process (ANP) A Case Study Technology Selection for Product Innovation Using Analytic Network Process (ANP) A Case Study G. Thangamani, Member, IACSIT Abstract In today s competitive world, the strength of competitiveness of any

More information

Increasing Performance through Extremely Cool Prioritization and Project Selection

Increasing Performance through Extremely Cool Prioritization and Project Selection Increasing Performance through Extremely Cool Prioritization and Project Selection June 26, 2017 Presented by: Tamara Haas, PE Director, Asset Management & Planning New Mexico DOT Mara Campbell, CQM Chief

More information

ANALYTIC HIERARCHY PROCESS IN SELECTING BEST GROUNDWATER POND

ANALYTIC HIERARCHY PROCESS IN SELECTING BEST GROUNDWATER POND 31 st International Geological Congress, Rio de Janeiro, Brazil, 6-17 August 2000 ANALYTIC HIERARCHY PROCESS IN SELECTING BEST GROUNDWATER POND JANDRIC, Z., SRDJEVIC, B. Institute for Water Management,

More information

Project Evaluation Criteria

Project Evaluation Criteria Project Evaluation Criteria Goals and Objectives were developed to guide Envision 35 Long Range Transportation Plan (LRTP) Update. These guiding principles were based on the requirements included in the

More information

Comparing Roundabout Capacity Analysis Methods, or How the Selection of Analysis Method Can Affect the Design

Comparing Roundabout Capacity Analysis Methods, or How the Selection of Analysis Method Can Affect the Design Comparing Roundabout Capacity Analysis Methods, or How the Selection of Analysis Method Can Affect the Design ABSTRACT Several analysis methods have been proposed to analyze the vehicular capacity of roundabouts.

More information

Use of AHP Method in Efficiency Analysis of Existing Water Treatment Plants

Use of AHP Method in Efficiency Analysis of Existing Water Treatment Plants International Journal of Engineering Research and Development ISSN: 78-067X, Volume 1, Issue 7 (June 01), PP.4-51 Use of AHP Method in Efficiency Analysis of Existing Treatment Plants Madhu M. Tomar 1,

More information

VENDOR RATING AND SELECTION IN MANUFACTURING INDUSTRY

VENDOR RATING AND SELECTION IN MANUFACTURING INDUSTRY International Journal of Decision Making in Supply Chain and Logistics (IJDMSCL) Volume 2, No. 1, January-June 2011, pp. 15-23, International Science Press (India), ISSN: 2229-7332 VENDOR RATING AND SELECTION

More information

An ANP Approach to Assess the Sustainability of Tourist Strategies for the Coastal NP of Venezuela

An ANP Approach to Assess the Sustainability of Tourist Strategies for the Coastal NP of Venezuela 5 th International Vilnius Conference EURO Mini Conference Knowledge-Based Technologies and OR Methodologies for Strategic Decisions of Sustainable Development (KORSD-2009) September 30 October 3, 2009,

More information

Congestion Management Process 2013 Update

Congestion Management Process 2013 Update OVERVIEW OF THE DALLAS-FORT WORTH CONGESTION MANAGEMENT PROCESS Traffic Congestion In The Dallas-Fort Worth Region With the Dallas-Fort Worth (DFW) urban area as its center, the North Central Texas region

More information

USING TRAVEL TIME RELIABILITY DATA TO DEVELOP CONGESTION MANAGEMENT STRATEGIES IN THE TRANSPORTATION PLANNING PROCESS.

USING TRAVEL TIME RELIABILITY DATA TO DEVELOP CONGESTION MANAGEMENT STRATEGIES IN THE TRANSPORTATION PLANNING PROCESS. USING TRAVEL TIME RELIABILITY DATA TO DEVELOP CONGESTION MANAGEMENT STRATEGIES IN THE TRANSPORTATION PLANNING PROCESS by Shuangshuo Wang B.S. Engineering, Tongji University, 2014 Submitted to the Graduate

More information

ERP Reference models and module implementation

ERP Reference models and module implementation ERP Reference models and module implementation Based on Supporting the module sequencing decision in the ERP implementation process An application of the ANP method, Petri Hallikainen, Hannu Kivijärvi

More information

A Decision Support System for Performance Evaluation

A Decision Support System for Performance Evaluation A Decision Support System for Performance Evaluation Ramadan AbdelHamid ZeinEldin Associate Professor Operations Research Department Institute of Statistical Studies and Research Cairo University ABSTRACT

More information

AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA

AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA Introduction: North Jersey Transportation Planning Authority NJTPA Congestion Management Process Study Goals Analysis

More information

Risk Management User Guide

Risk Management User Guide Risk Management User Guide Version 17 December 2017 Contents About This Guide... 5 Risk Overview... 5 Creating Projects for Risk Management... 5 Project Templates Overview... 5 Add a Project Template...

More information

Estimating Annual Average Daily Traffic (AADT) for Local Roads for Highway Safety Analysis

Estimating Annual Average Daily Traffic (AADT) for Local Roads for Highway Safety Analysis 0 0 0 Estimating Annual Average Daily Traffic (AADT) for Local Roads for Highway Safety Analysis by Tao Wang, Ph.D. Research Associate Lehman Center for Transportation Research Florida International University

More information

The Multi criterion Decision-Making (MCDM) are gaining importance as potential tools

The Multi criterion Decision-Making (MCDM) are gaining importance as potential tools 5 MCDM Methods 5.1 INTRODUCTION The Multi criterion Decision-Making (MCDM) are gaining importance as potential tools for analyzing complex real problems due to their inherent ability to judge different

More information

VISUM State-of-the-Art Travel Demand Modeling VISUM

VISUM State-of-the-Art Travel Demand Modeling VISUM State-of-the-Art Travel Demand Modeling VISUM What is VISUM? VISUM is a comprehensive, flexible software system for transportation planning, travel demand modeling and network data management. VISUM is

More information

DEVELOPMENT OF AHP BASED MODELS AND DSS FOR STRATEGIC PLANNING OF LOCAL SUSTAINABLE DEVELOPMENT

DEVELOPMENT OF AHP BASED MODELS AND DSS FOR STRATEGIC PLANNING OF LOCAL SUSTAINABLE DEVELOPMENT DEVELOPMENT OF AHP BASED MODELS AND DSS FOR STRATEGIC PLANNING OF LOCAL SUSTAINABLE DEVELOPMENT Zaneta Servini *, PhD candidate, University St. Kliment Ohridski, Bitola, Macedonia, E-mail: hzaneta@yahoo.com

More information

Determining and ranking essential criteria of Construction Project Selection in Telecommunication of North Khorasan-Iran

Determining and ranking essential criteria of Construction Project Selection in Telecommunication of North Khorasan-Iran Determining and ranking essential criteria of Construction Project Selection in Telecommunication of North Khorasan-Iran Majid Mojahed, Rosnah bt Mohd Yusuff, Mohammad Reyhani Abstract Economy project

More information

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance APPENDICES Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance D.1 Functional classification identifies the role a highway or street plays in the transportation

More information

Computer-Aided Maintenance Management

Computer-Aided Maintenance Management 52 TRANSPORTATION RESEARCH RECORD 1276 Computer-Aided Maintenance Management JOHN P. ZANIEWSKI AND MICHAEL J. WILES A maintenance management system (MMS) allows managers to organize and control maintenance

More information

INSIDE THIS ISSUE. mctrans.ce.ufl.edu VOLUME 64 \\ OCTOBER Streets Heat Map Freeways Animation HSM Supplement

INSIDE THIS ISSUE. mctrans.ce.ufl.edu VOLUME 64 \\ OCTOBER Streets Heat Map Freeways Animation HSM Supplement mctrans.ce.ufl.edu INSIDE THIS ISSUE McTrans Center University of Florida Civil & Coastal Engineering PO Box 116585 Gainesville, FL 32611-6585 Streets Heat Map Freeways Animation HSM Supplement Phone:

More information

Route 670 Connector Road

Route 670 Connector Road SMART SCALE Application Route 670 Connector Road Status: Scored ID: F2-0000001167-R02 General Point of Contact Information Point of Contact Name Bart Point of Contact Phone (434) 985-1486 Point of Contact

More information

A Study of Textile & Clothing Supply Chain in Pakistan

A Study of Textile & Clothing Supply Chain in Pakistan 2 nd International Conference on Engineering Optimization September 6-9, 2010, Lisbon, Portugal A Study of Textile & Clothing Supply Chain in Pakistan Deedar Hussain 1, Manuel Figueiredo 2, Anabela Tereso

More information

SELECTING A PROFOUND TECHNICAL SERVICE PROVIDER TO PERFORM A TECHNICAL FIELD DEVELOPMENT STUDY FROM GIVEN MULTIPLE CRITERIA

SELECTING A PROFOUND TECHNICAL SERVICE PROVIDER TO PERFORM A TECHNICAL FIELD DEVELOPMENT STUDY FROM GIVEN MULTIPLE CRITERIA SELECTING A PROFOUND TECHNICAL SERVICE PROVIDER TO PERFORM A TECHNICAL FIELD DEVELOPMENT STUDY FROM GIVEN MULTIPLE CRITERIA Slamet Riyadi, Lokman Effendi and Rafikul Islam Department of Business Administration,

More information

FINAL REPORT CONSIDERATIONS IN THE DEVELOPMENT OF PROCEDURES FOR PRIORITIZING TRANSPORTATION IMPROVEMENT PROJECTS IN VIRGINIA

FINAL REPORT CONSIDERATIONS IN THE DEVELOPMENT OF PROCEDURES FOR PRIORITIZING TRANSPORTATION IMPROVEMENT PROJECTS IN VIRGINIA FINAL REPORT CONSIDERATIONS IN THE DEVELOPMENT OF PROCEDURES FOR PRIORITIZING TRANSPORTATION IMPROVEMENT PROJECTS IN VIRGINIA John S. Miller, Ph.D., P.E. Senior Research Scientist Rod E. Turochy, Ph.D.,

More information

WebShipCost - Quantifying Risk in Intermodal Transportation

WebShipCost - Quantifying Risk in Intermodal Transportation WebShipCost - Quantifying Risk in Intermodal Transportation Zhe Li, Heather Nachtmann, and Manuel D. Rossetti Department of Industrial Engineering University of Arkansas Fayetteville, AR 72701, USA Abstract

More information

Cartersville-Bartow County Metropolitan Planning Organization. Long-Range Regional Transportation Plan Project Evaluation Process

Cartersville-Bartow County Metropolitan Planning Organization. Long-Range Regional Transportation Plan Project Evaluation Process Cartersville-Bartow County Metropolitan Planning Organization Long-Range Regional Transportation Plan Project Evaluation Process Joint Policy Committee & Transportation Coordinating Committee Meeting September

More information

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014 2040 Transportation Policy Plan Conversion to Performance Based Planning Basis 25 th Annual CTS Transportation Research Conference May 21, 2014 1 About the plan Long-range transportation plan for the Twin

More information

MONITORING IMPLEMENTATION AND PERFORMANCE

MONITORING IMPLEMENTATION AND PERFORMANCE 12 MONITORING IMPLEMENTATION AND PERFORMANCE The FAST Act continues the legislation authorized under MAP-21, which created a data-driven, performance-based multimodal program to address the many challenges

More information

Analytic Hierarchy Process (AHP) in Ranking Non-Parametric Stochastic Rainfall and Streamflow Models

Analytic Hierarchy Process (AHP) in Ranking Non-Parametric Stochastic Rainfall and Streamflow Models Analytic Hierarchy Process (AHP) in Ranking Non-Parametric Stochastic Rainfall and Streamflow Models Masengo Ilunga Department of Civil & Chemical Engineering, University of South Africa, Pretoria, South

More information

Supplier Selection Using Analytic Hierarchy Process: An Application From Turkey

Supplier Selection Using Analytic Hierarchy Process: An Application From Turkey , July 6-8, 2011, London, U.K. Supplier Selection Using Analytic Hierarchy Process: An Application From Turkey Betül Özkan, Hüseyin Başlıgil, Nergis Şahin Abstract Decision making is one of the most activities

More information

I-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings. Tier II June 11 th & 13 th, 2012

I-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings. Tier II June 11 th & 13 th, 2012 I-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings Tier II June 11 th & 13 th, 2012 Agenda Introduction & Background Study Area Purpose & Need Project Status Tier Methodology & Tier I Evaluation

More information

ESTABLISHING RELATIVE WEIGHTS FOR CONTRACTOR PREQUALIFICATION CRITERIA IN A PRE-QUALIFICATION EVALUATION MODEL

ESTABLISHING RELATIVE WEIGHTS FOR CONTRACTOR PREQUALIFICATION CRITERIA IN A PRE-QUALIFICATION EVALUATION MODEL ESTABLISHING RELATIVE WEIGHTS FOR CONTRACTOR PREQUALIFICATION CRITERIA IN A PRE-QUALIFICATION EVALUATION MODEL N. El-Sawalhi 1*, D. Eaton 2, and R. Rustom 3 1, 2 Research Institute for the Built and Human

More information

Florida Freight Supplychain Intermodal Model

Florida Freight Supplychain Intermodal Model Florida Freight Supplychain Intermodal Model Innovations in Travel Modeling 2014 April 29, 2014 Introduction Support freight plan development Office of Freight Logistics and Passenger Operations Evaluate

More information

Truck GPS Data for Freight Planning

Truck GPS Data for Freight Planning Truck GPS Data for Freight Planning presented to Florida Model Task Force, Orlando presented by Frank Tabatabaee Abdul Pinjari Jeff Short (ATRI) Florida DOT University of South Florida (USF) American Transportation

More information

Analytic Hierarchy Process, Basic Introduction

Analytic Hierarchy Process, Basic Introduction Analytic Hierarchy Process, Basic Introduction **Draft 2009-08-12** This tutorial uses a common situation to illustrate how to handle a multilevel decision question using a method called the AHP (Analytic

More information

Florida International University; University of Central Florida. Mohammed Hadi, Ph.D., PE (Dr. Haitham Al-Deek from UCF is Co-PI)

Florida International University; University of Central Florida. Mohammed Hadi, Ph.D., PE (Dr. Haitham Al-Deek from UCF is Co-PI) Project Information Form Project Title University Principal Investigator PI Contact Information Performance Measurements of Transportation Systems based on Fine- Grained Data Collected by AVI and AVL Systems

More information

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule

More information

A Semi-Structured Process for ERP Systems Evaluation: Applying Analytic Network Process

A Semi-Structured Process for ERP Systems Evaluation: Applying Analytic Network Process A Semi-Structured Process for ERP Systems Evaluation: Applying Analytic Network Process Huan-Jyh Shyur shyur@mail.im.tku.edu.tw Department of Information Management Tamkang University Abstract This paper

More information

HB2 Implementation Policy Guide

HB2 Implementation Policy Guide report HB2 Implementation Policy Guide prepared for Commonwealth Transportation Board date August 1, 2015 Table of Contents 1.0 Introduction... 1 1.1 HB2 Legislation Requirements... 1 1.2 Roles and Responsibilities...

More information

Work Zone Safety Performance Measures for Virginia

Work Zone Safety Performance Measures for Virginia Work Zone Safety Performance Measures for Virginia http://www.virginiadot.org/vtrc/main/online_reports/pdf/16-r1.pdf YOUNG-JUN KWEON, Ph.D., P.E. Senior Research Scientist Virginia Transportation Research

More information

An Automated Transit Stop Data Collection System

An Automated Transit Stop Data Collection System ABSTRACT An Automated Transit Stop Data Collection System Albert Gan, Ike Ubaka, and Fabian Cevallos A transit stop inventory is needed for various transit planning, operational, and maintenance applications.

More information

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives. 4 Goals & Objectives INTRODUCTION The 2015-2040 MTP preserves and promotes the quality of life and economic prosperity of the MAB by providing a transportation system consistent with the regional goals.

More information

Traffic Safety Measures Using Multiple Streams Real Time Data

Traffic Safety Measures Using Multiple Streams Real Time Data CAIT-UTC-055 Traffic Safety Measures Using Multiple Streams Real Time Data FINAL REPORT January 2017 Submitted by: Mohsen Jafari Professor of Industrial and Systems Engineering Center for Advanced Infrastructure

More information

Exclusive Facilities for Trucks in Florida: An Investigation of the Potential for Reserved Truck Lanes and Truckways on the State Highway System

Exclusive Facilities for Trucks in Florida: An Investigation of the Potential for Reserved Truck Lanes and Truckways on the State Highway System Exclusive Facilities for Trucks in Florida: An Investigation of the Potential for Reserved Truck Lanes and Truckways on the State Highway System Stephen L. Reich, Janet L. Davis, Anthony J. Ferraro, and

More information

1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\

1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\ 1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\ Executive Summary 3UHSDUHGýIRUã 3UHSDUHGýE\ã.DQVDVý'HSDUWPHQWýRI 7UDQVSRUWDWLRQ,QýDVVRFLDWLRQýZLWKã (DUWKý7HFKý,QFï EXECUTIVE SUMMARY Introduction This Northwest

More information

A Planning Phase Decision Tool for Accelerated Bridge Construction

A Planning Phase Decision Tool for Accelerated Bridge Construction A Planning Phase Decision Tool for Accelerated Bridge Construction Pool Funded Study, TPF 5(221) Project Mgr Lead - Benjamin Tang, P.E. ODOT PI - Toni Doolen, Ph.D, PI, OSU Presentation Outline Pool funded

More information

Since the Vision 2000 effort under taken in 1995, ODOT has operated under a Mission,

Since the Vision 2000 effort under taken in 1995, ODOT has operated under a Mission, , and ODOT s Updated, and Since the Vision 2000 effort under taken in 1995, ODOT has operated under a, Vision, and. These were updated in 2000 and are updated again here by Senior Leadership to reflect

More information

REGIONAL SOLICITATION ROADWAY APPLICATIONS: POTENTIAL CHANGES. TAB September 20, 2017

REGIONAL SOLICITATION ROADWAY APPLICATIONS: POTENTIAL CHANGES. TAB September 20, 2017 REGIONAL SOLICITATION ROADWAY APPLICATIONS: POTENTIAL CHANGES TAB September 20, 2017 2 2016 Application Categories Bridge Incorporate Highway Truck Corridor Study Tiers instead of Freight Project Elements

More information

Group Decision Support System for Multicriterion Analysis A Case Study in India

Group Decision Support System for Multicriterion Analysis A Case Study in India Group Decision Support System for Multicriterion Analysis A Case Study in India K. Srinivasa Raju Department of Civil Engineering, S.E.S.College of Engineering, Kopargaon 423 603, Maharashtra, India D.Nagesh

More information

Presentation to DATA on VTrans 2040 / HB2. October 21, 2015

Presentation to DATA on VTrans 2040 / HB2. October 21, 2015 Presentation to DATA on VTrans 2040 / HB2 October 21, 2015 Life Cycle of a Candidate Project How it s planned. How it s scored. How it s funded. 2 How it s planned. VTrans2040 VTRANS 2040 serves two functions,

More information

A Stochastic AHP Method for Bid Evaluation Plans of Military Systems In-Service Support Contracts

A Stochastic AHP Method for Bid Evaluation Plans of Military Systems In-Service Support Contracts A Stochastic AHP Method for Bid Evaluation Plans of Military Systems In-Service Support Contracts Ahmed Ghanmi Defence Research and Development Canada Centre for Operational Research and Analysis Ottawa,

More information

Tool for Operations Benefit/Cost (TOPS- BC) for Florida DOT Applications

Tool for Operations Benefit/Cost (TOPS- BC) for Florida DOT Applications Task Work Order 20, Sub Task 4 Tool for Operations Benefit/Cost (TOPS- BC) for Florida DOT Applications TOPS-BC Florida Guidebook prepared for Florida Department of Transportation prepared by Cambridge

More information

Concept of Operations prepared for Minnesota Department of Transportation (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment

Concept of Operations prepared for Minnesota Department of Transportation (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment Concept of Operations prepared for Minnesota Department of (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment December 22, 2014 Table of Contents 1. Introduction and Concept Overview...1

More information

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges I. ABSTRACT Keith A. Riniker, PE, PTOE This paper presents the Folded Interchange design and compares

More information

Performance Based Practical Design (PBPD)

Performance Based Practical Design (PBPD) Performance Based Practical Design (PBPD) 2016 ODOT D08 LPA Day John R. Kasich, Ohio Governor Jerry Wray, ODOT Director PBPD PBPD Presenter Katherine DeStefano, P. E. District 08 Design Engineer ODOT D08

More information

Criteria For Selection of Software Development Environment For Construction Robotic Systems

Criteria For Selection of Software Development Environment For Construction Robotic Systems Criteria For Selection of Software Development Environment For Construction Robotic Systems Khaled Zied and Derek Seward Engineering department, Lancaster University, Lancaster, LA1 4YR, UK k.zied@lancaster.ac.uk

More information

OPEN DATA & PROJECT TRACKER. Michael Chamberlain TPP, Data Management

OPEN DATA & PROJECT TRACKER. Michael Chamberlain TPP, Data Management OPEN DATA & PROJECT TRACKER Michael Chamberlain TPP, Data Management October 11, 017 Table of contents 1 People 3 Attributes 4 3 Locations 5 4 Systems 6 5 Reports 7-8 6 Applications 8-13 7 Closing 14 Data

More information

TRANSPORTATION ASSET MANAGEMENT GAP ANALYSIS TOOL

TRANSPORTATION ASSET MANAGEMENT GAP ANALYSIS TOOL Project No. 08-90 COPY NO. 1 TRANSPORTATION ASSET MANAGEMENT GAP ANALYSIS TOOL USER S GUIDE Prepared For: National Cooperative Highway Research Program Transportation Research Board of The National Academies

More information

TRAFFIC ANALYSES TO SUPPORT NEPA STUDIES

TRAFFIC ANALYSES TO SUPPORT NEPA STUDIES VIRGINIA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION NEPA PROGRAM LOCATION STUDIES TRAFFIC ANALYSES TO SUPPORT NEPA STUDIES CONSULTANT RESOURCE GUIDANCE DOCUMENT Issued on: November 18, 2016 Last

More information

SHRP Project C11: Reliability Analysis Tool: User s Guide

SHRP Project C11: Reliability Analysis Tool: User s Guide SHRP Project C11: Reliability Analysis Tool: User s Guide This document represents Section 2.2 of the full report: SHRP2 Project C11 Final Report: Development of Tools for Assessing Wider Economic Benefits

More information

THAT Council adopt the Congestion Management Strategy as outlined in this report

THAT Council adopt the Congestion Management Strategy as outlined in this report RR3 ADMINISTRATIVE REPORT Report Date: May 2, 2017 Contact: Winston Chou Contact No.: 604.873.7913 RTS No.: 011564 VanRIMS No.: 08200020 Meeting Date: May 16, 2017 TO: FROM: SUBJECT: Vancouver City Council

More information

HCM 6th Edition Planning and Preliminary Engineering Applications Guide (PPEAG) to the HCM Bringing Back-of-the-Envelope Back.

HCM 6th Edition Planning and Preliminary Engineering Applications Guide (PPEAG) to the HCM Bringing Back-of-the-Envelope Back. HCM 6th Edition Planning and Preliminary Engineering Applications Guide (PPEAG) to the HCM Bringing Back-of-the-Envelope Back April, 2017 Potential Use of the HCM in Planning The HCM is commonly used to

More information

INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING RESEARCH AND DEVELOPMENT (IJIERD)

INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING RESEARCH AND DEVELOPMENT (IJIERD) INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING RESEARCH AND DEVELOPMENT (IJIERD) International Journal of Industrial Engineering Research and Development (IJIERD), ISSN 0976 ISSN 0976 6979 (Print) ISSN

More information

Problem Screening Guideline January, 2016

Problem Screening Guideline January, 2016 Problem Screening Guideline January, 2016 Check the Capital Project Delivery website to ensure this is the current version Table of Contents Purpose... 1 Introduction... 1 The following are the major work

More information

Engagement Portal. Employee Engagement User Guide Press Ganey Associates, Inc.

Engagement Portal. Employee Engagement User Guide Press Ganey Associates, Inc. Engagement Portal Employee Engagement User Guide 2015 Press Ganey Associates, Inc. Contents Logging In... 3 Summary Dashboard... 4 Results For... 5 Filters... 6 Summary Page Engagement Tile... 7 Summary

More information

IT portfolio management template User guide

IT portfolio management template User guide IBM Rational Focal Point IT portfolio management template User guide IBM Software Group IBM Rational Focal Point IT Portfolio Management Template User Guide 2011 IBM Corporation Copyright IBM Corporation

More information

Technical Methods Part 2

Technical Methods Part 2 Technical Methods Part 2 Performance Measurement in Transportation Planning Leading for results means that performance must be planned, not just reported Learning Objectives Describe a sample technical

More information

BMS2 Release Notes. Detailed BMS2 Release Notes. Release Version 5.13 (AMS Release 50)

BMS2 Release Notes. Detailed BMS2 Release Notes. Release Version 5.13 (AMS Release 50) BMS2 Release Notes Detailed BMS2 Release Notes Release Version 5.13 (AMS Release 50) 1. Added BMS ID to the email notification detail pop-up in BMS2. 2. Bug requiring a user to delete the DOT AAR number

More information

Twin Cities Regional Truck Corridors Study. MnDOT Metro Freight Studies Roundup

Twin Cities Regional Truck Corridors Study. MnDOT Metro Freight Studies Roundup Twin Cities Regional Truck Corridors Study MnDOT Metro Freight Studies Roundup February 3, 2017 Study Background Transportation Policy Plan Goal: The regional transportation system supports the economic

More information

Ian Kidner, GISP GIS Systems Administrator Office of Technical Services

Ian Kidner, GISP GIS Systems Administrator Office of Technical Services / Ian Kidner, GISP GIS Systems Administrator Office of Technical Services Ian.kidner@dot.ohio.gov 614-752-5743 TIMS Vision Provide Easy & Reliable Access to Information Data Consistency Enables Decision

More information

Use of TMC Data for Performance Measurement and Improving Operations. National Rural ITS Conference August 25, 2014 Ming Shiun Lee URS Corporation

Use of TMC Data for Performance Measurement and Improving Operations. National Rural ITS Conference August 25, 2014 Ming Shiun Lee URS Corporation Use of TMC Data for Performance Measurement and Improving Operations National Rural ITS Conference August 25, 2014 Ming Shiun Lee URS Corporation 1 Presentation Outline Motivations Performance Measures

More information

IMPLEMENTING TOLL PLAZA ANALYSIS INTO FREEPLAN

IMPLEMENTING TOLL PLAZA ANALYSIS INTO FREEPLAN IMPLEMENTING TOLL PLAZA ANALYSIS INTO FREEPLAN By ROBIN PHILIP OSBORNE A THESIS PRESENTED TO THE GRADUATE SCHOOL OF THE UNIVERSITY OF FLORIDA IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF

More information

MULTI CRITERIA EVALUATION

MULTI CRITERIA EVALUATION MULTI CRITERIA EVALUATION OVERVIEW Decision making on alternatives for risk reduction planning starts with an intelligence phase for recognition of the decision problems and identifying the objectives.

More information

Florida Transportation Systems Management and Operations. Strategic Plan

Florida Transportation Systems Management and Operations. Strategic Plan Florida Transportation Systems Management and Operations Final: Version 2 December 13, 2013 Prepared for: Florida Department of Transportation Intelligent Transportation Systems Program 605 Suwannee Street,

More information

Standard Performance Attributes for Transportation Projects

Standard Performance Attributes for Transportation Projects Standard s for Transportation Projects Mainline Operations Local Operations Maintainability Construction Impacts Environmental Impacts Project Schedule An assessment of traffic operations and safety on

More information

siemens.com/mobility Traffic simulation with PTV Vissim Leading-edge software fully integrated in the Sitraffic landscape

siemens.com/mobility Traffic simulation with PTV Vissim Leading-edge software fully integrated in the Sitraffic landscape siemens.com/mobility Traffic simulation with PTV Vissim Leading-edge software fully integrated in the Sitraffic landscape For urban or interurban traffic, rail transport or private travel: To all kinds

More information

TDMS A Traffic Data Repository for Government and Business Use

TDMS A Traffic Data Repository for Government and Business Use TDMS A Traffic Data Repository for Government and Business Use Prepared for: Arizona Association of County Engineers Prescott, Arizona February 13, 2014 Presented by: Mark Catchpole ADOT Multimodal Planning

More information

Multi-Criteria Analysis of Advanced Planning System Implementation

Multi-Criteria Analysis of Advanced Planning System Implementation Multi-Criteria Analysis of Advanced Planning System Implementation Claudemir L. Tramarico, Valério A. P. Salomon and Fernando A. S. Marins São Paulo State University (UNESP) Engineering School, Campus

More information

As government agencies and businesses become

As government agencies and businesses become RESEARCH FEATURE A Formal Process for Evaluating COTS Software s A software product evaluation process grounded in mathematics and decision theory can effectively determine product quality and suitability

More information