1 Conformity Assessment Dan Cheetham Welding and NDE 4/12/16
2 Welding & NDE requirements Welding What is required for compliance with AMSE Code? -Welding Procedures and welder/welding operators qualified in accordance with Section IX. -Documented evidence of welder continuity (welding in the process at least every 6 months)
3 Welding & NDE requirements NDE -What documents are required? -Review of procedures and Written Practice. -Common problems found
4 WPS- -What must be addressed on a WPS? -Must include all required essential, supplementary essential (when required), and non-essential variables. (QW-200.1(b)) -The WPS may include additional requirements as determined by the manufacturer. Welder must weld within the variables established on the WPS.
5 -What if they cannot weld within the ranges established? -What if they do not weld within the ranges established?
6 PQR- -PQR is the record of variables recorded during he welding of the test coupon and the test results. (QW-200.2(a)) -The PQR is certified accurate by the manufacturer. It is intended to be the organization s verification that the information is true record of the variables used during the welding of the test coupon.
7 -What must be addressed on a PQR? (QW-200.2(b)) -What must be done if it is found to lack required variables? QW-200.2(c) says that changes to a PQR is not permitted except As permitted in QW-200.2(c)
8 WPQ/WOPQ- -The WPQ/WOPQ (WPQ) is a record of variables used in the performance qualification of a welder. -The WPQ shall include the essential variables used, the ranges qualified, the type of test and test results. (QW-301.4)
9 -The WPQ is certified accurate by the manufacturer. It is intended to be the organization s verification that the information is true record of the variables used during the welding of the test coupon.
10 Welder continuity- -Objective evidence of welding. Must indicate the welder welded at least every six months in each process. (QW-322.1) -What if there is a gap of more than 6 months (QW-322.2)
11 Examination of welds- -Tack weld examination. What is required? If a tack weld is to be included in the final weld, it must be examined for defects and found defective, must be removed. The examination must be after the tack weld is properly prepared by grinding or other suitable means. This is a Code required examination, so there must be objective evidence the exam was completed and found satisfactory. (PW-31.1, UW-31(c))
12 -Examination of all parts prior to joining to make certain they have been properly fitted for welding and the surfaces to be joined have been cleaned and the alignment tolerances are maintained. Commonly known as a fit-up examination. Requires objective evidence the exam was completed and found satisfactory. (UG-90(b)(12))
13 -Final examination of welds is required to determine weld sizes are as prescribed by the Code or the drawing. Requires objective evidence the exam was completed and found satisfactory. Must determine that all welds have been identified by the welder or that a record was kept to determine who welded each joint (as allowed by the Code Section and the Quality Control System).
14 What is expected to occur during a Joint Review (JR) -The Team will review welding documents (WPS, PQR, WPQ and continuity). -Section IX will be used as the basis to determine compliance. -A welding demonstration is required. Including fit-up examination, verification that the proper WPS is being used by the welder, acceptance of completed weld by QC.
15 -Common deficiencies identified at a JR. -Tack welds not being properly examined or documented. -Fit-up examination not being documented. -PQR not addressing all required essential variables. -WPS not addressing all required variables. -WPQ not addressing all required variables or the proper ranges. -Continuity records lacking objective evidence.
16 Questions about welding?
17 NDE requirements NDE -What documents are required to be available for review at the JR? -Written Practice, either the manufacturer s or subcontractor s. Sometimes both are required. -Written procedures -Personnel qualification and examination records, including current eye exams.
18 NDE requirements -The JR Team will review the: -Written Practice will be based on SNT-TC-1A or CP-189 as appropriate. (PW-50.1, UW-54(a)) -Review of the procedures will be based on Section V. -Review of personnel qualification and examination records will be based on the employer s Written Practice or for PT & MT for Section I and Section VIII Div. 1, the appropriate appendix.
19 NDE requirements -Common deficiencies identified at a Joint Review. -WP does not specify the Certifying Authority, does not require maintenance of all required records, does not specify timeframe for Technical Performance Evaluation. (SNT-TC-1A) -Written procedures do not include all elements required by Section V. -NDE reports do not include all information required Section V.
20 Welding & NDE requirements NDE Questions???
21 Welding & NDE requirements Other Questions???
Conformity Assessment. Dan Cheetham BPV Topics of Interest 2016 Certification 360
Conformity Assessment Dan Cheetham BPV Topics of Interest 2016 Certification 360 BPV Requirements Boiler and Pressure Vessel Requirements (Quality Control Programs, Materials, Examination & Inspection,
More informationConformity Assessment. Dan Cheetham BPV Requirements 4/12/16
Conformity Assessment Dan Cheetham BPV Requirements 4/12/16 BPV Requirements Boiler and Pressure Vessel Requirements (Quality Control Programs, Materials, Examination & Inspection, etc.) Quality Control
More informationM. F. Sullivan. 9/27/2016 Dr. Sandor Somogyi
The Code is a large document and it is sometimes very difficult to understand. Even for many of us who work with it every day. In my opinion there is no one person who could be termed as a Code Expert.
More informationAmerican Welding Society Nashville Section. Welding Procedure Development
American Welding Society Nashville Section Welding Procedure Development AWS & ASME Welding Procedures Welding Procedure Specification (WPS) Written document that provides direction to the welder for making
More informationJOHN WOOD UNCONTROLLED COPY: THE JOHN WOOD COMPANY PO BOX HIGHLAND AVENUE OAKS, PENNSYLVANIA 19456
JOHN WOOD QUALITY CONTROL SYSTEM MANUAL FOR PRESSURE VESSELS CONSTRUCTED TO ASME BOILER & PRESSURE VESSEL CODE SECTION VIII, DIVISION 1 AND REPAIRS AND ALTERATIONS TO METALLIC PRESSURE RETAINING ITEMS
More informationWelding Performance Qualification Test Administrators GUIDE FOR APPLICANTS
BRITISH COLUMBIA SAFETY AUTHORITY Welding Performance Qualification Test Administrators GUIDE FOR APPLICANTS Prepared by: Ed Hurd P.Eng. Provincial Safety Manager, Boilers Date: March 2, 2012 Controlled
More informationREFERENCE SYLLABUS. for WELDING EXAMINER & WELDING EXAMINER IN TRAINING CERTIFICATES OF COMPETENCY EXAMINATIONS
WELDING EXAMINER & CERTIFICATES OF COMPETENCY S AB-94 Edition 1, Revision 6, 2016-05-01 This syllabus is being phased out and will be discontinued on April 30, 2018. GENERAL INFORMATION INTRODUCTION: This
More informationWashington Association of Building Officials. Standard 1702 Steel Fabricator Registration Program
Washington Association of Building Officials Standard 1702 Steel Fabricator Registration Program July 2010 1 Steel Fabricator Registration Program Scope: This registration program was developed to assist
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-05 14 00.13 (May 2015) -------------------------------- Preparing Activity: NASA Superseding UFGS-05 14 00.13 (November 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationBODY OF KNOWLEDGE API-570 AUTHORIZED PIPING INSPECTOR CERTIFICATION EXAMINATION
BODY OF KNOWLEDGE API-570 AUTHORIZED PIPING INSPECTOR CERTIFICATION EXAMINATION 2018 (Replaces February 2017) API Authorized Piping Inspectors must have a broad knowledge base relating to maintenance,
More information"Welder Certification"
"Welder Certification" The purpose of this presentation is to introduce you to the various aspects of welder certification. This is not intended to cover all of the requirements for certification but only
More informationES&H Manual Welding and Brazing Supplement
1 Purpose and Scope This supplement provides the requirements for welding and brazing operations performed at Jefferson Lab by employees, users, and temporary contract labor under Jefferson Lab direction
More informationQC Inspection and Qualification Procedure- TX-EDU-VT-1-07, Revision # by Richard J DePue, Supersedes IW-VT-1 Visual Inspection Procedure
1.0 Scope: QC Inspection and Qualification Procedure- TX-EDU-VT-1-07, Revision #6 03-04-2016 by Richard J DePue, Supersedes IW-VT-1 Visual Inspection Procedure The purpose of this procedure is to define
More informationPresented by: Gary Scribner Manager of Technical Services. Shanghai April The National Board of Boiler and Pressure Vessel Inspectors
Presented by: Gary Scribner Manager of Technical Services Shanghai April 2016 1. Provides administrative and technical rules, and guidelines to follow for repairing or altering a pressure retaining item.
More informationMEC-QW-E-2005 Senior QA/QC Inspector / Test Package Coordinator PERSONAL DATA LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS
104126-MEC-QW-E-2005 Senior QA/QC Inspector / Test Package Coordinator Has 10 years experience in the field of inspection and quality assurance / control related to chemical, petrochemical, power plants
More informationThe Impact Testing Enigma A Review of ASME Section VIII, Division 1, Subsection C, Part UCS, Impact Testing Requirements
the pressure equipment safety authority The Impact Testing Enigma A Review of ASME Section VIII, Division 1, Subsection C, Part UCS, Impact Testing Requirements AB-511 Edition 2, Revision 1 Issued 2017-05-03
More informationManufacture of welded products - Welding workshop
CLASS PROGRAMME Approval of manufacturers DNVGL-CP-0352 Edition April 2016 Manufacture of welded products - Welding workshop The electronic pdf version of this document, available free of charge from http://www.dnvgl.com,
More informationASME CODE CHANGES 2015 EDITION
ASME CODE CHANGES 2015 EDITION SECTION I 2015 Edition published July 1, 2015, mandatory January 1, 2016. No more addenda. Publish every 2 years. Table A-360 : All ASME standards reference current year
More informationGLOBAL INTERNATIONAL SERVICES MATERIAL INSPECTION CONTROL
GLOBAL INTERNATIONAL SERVICES MATERIAL INSPECTION CONTROL 1 GIS MIC at a glance Created in 2008, GIS MIC is a company specialized in technical assistance services, inspection, NDT, quality and metallurgical
More informationGuide for AWS Visual Weld Inspection
Guide for Visual Weld Overview & Contents Scope This guide is intended to assist Owner/Operators, Contractors, Authority Having Jurisdiction (AHJ) personnel, Inspectors, Manufacturers and Contractors/Fabricators
More informationAWS D1.1 Structural Welding Code: You Specify It- Do You Know What It Really Says?
AWS D1.1 Structural Welding Code: You Specify It- Do You Know What It Really Says? Wesley J. Oliphant, PE, AWS-CWI, F.SEI, F.ASCE ReliaPOLE Inspection Services Company, LLC 1 All welding shall be done
More informationPressure Equipment Repair and Alteration Requirements
the pressure equipment safety authority Pressure Equipment Repair and Alteration Requirements AB-513 Edition 3, Revision 0 - Issued 2018-01-30 Table of Contents FOREWORD... iii 1.0 INTRODUCTION... 1 2.0
More informationNR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26
Company Name/Certificate Number: Page 1 of 26 a. Organization a.1. Has the Organizational Structure of the program identified the levels of management responsible for the Quality System Program, including
More informationJuly 2017 SC 3 Attachments
Table of Contents Attachment Page 1 July 2017 SC 3 Attachments SC 3 Roster July 2017.pdf 2 IN16-0401 Disapproved 3-27-17 3 IN16-0401 Letter Ballot Comments 3-27-17 5 17-135 Petersen 5-2-17 6 17-141 Chaine
More information#.# Section Modified and Revision Description Date Author 1.0 Initial release 7/13/2011 Celine McCulloch
Approved by: Awet Tesfagiorgis Supplier Quality Engineer Ravi Bhatla Supplier Quality Engineer Ashley Weatherington QMS Quality Leader Document Revision Chart The following chart lists the revisions made
More informationa. Are the foundry s employees trained and familiar with portions of the system applicable to their position?
NAV 29 FOUNDRY OPERATIONS 1. Does the foundry have a documented quality system? a. Are the foundry s employees trained and familiar with portions of the system applicable to their position? b. What recognized
More informationStandard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High Temperature Service 1
Designation: A 234/A 234M 02 Used in USDOE-NE Standards An American National Standard Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High Temperature
More informationINSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1
TAKING PRESSURE VESSELS FROM CRADLE TO GRAVE SEMINAR INSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1 Manish Waghare ABSG Consulting Inc., Singapore January 28, 2011 May 29, 2011 1 Presentation
More informationStandard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Low-Temperature Service 1
Designation: A 420/A 420M 07 Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Low-Temperature Service This standard is issued under the fixed designation A 420/A 420M;
More informationACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR STRUCTURAL STEEL AC172. April 2017 (Effective June 1, 2017) PREFACE
ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR STRUCTURAL STEEL April 2017 (Effective June 1, 2017) PREFACE The attached accreditation criteria have been issued to provide all interested
More informationPresented by: Gary Scribner Manager of Technical Services. August The National Board of Boiler and Pressure Vessel Inspectors
Presented by: Gary Scribner Manager of Technical Services August 2016 2 3 PART 3, SECTION 1 REPAIRS AND ALTERATIONS GENERAL AND ADMINISTRATIVE REQUIREMENTS Additional administrative rules can be found
More information2016 Pipeline Safety Trust Conference
API RP 1177 Pipeline Construction QMS New RP Highlights 2016 Pipeline Safety Trust Conference October 21, 2016 New Orleans, LA Agenda History & Stakeholders Scope Outline Examples PDCA Path Forward Document
More informationAPI 653 Training Course
API 653 Training Course The API 653 Classes consist of "Pre-Course Home Study" materials and "5 days of Classroom" instructor lead training. Registration for the API 653 Training Course should be received
More informationMETHOD STATEMENT FOR PIPE WELDING WORKS
METHOD STATEMENT FOR PIPE WELDING WORKS Introduction This Method statement describes in detail the welding process for pipe work and the welder s qualification test procedures. This includes addressing
More informationGE Oil & Gas Quality Management System Pressure Control Supplier Quality Requirements - Outsourced Manufacturing Services SQ-08 Rev: 2.
Document Revision Chart The following chart lists the revisions made to this document tracked by version. Use this to describe the changes and additions each time this document is re-published. The description
More informationPART UF REQUIREMENTS FOR PRESSURE VESSELS FABRICATED BY FORGINGS
p 1 of 6 UF-1 UF-12 PART UF REQUIREMENTS FOR PRESSURE VESSELS FABRICATED BY FORGING the test temperature be higher than 20 F ( 29 C). Certification is required. An ultrasonic examination shall be made
More informationGuideline of the European Committee for Welding of Railway Vehicles - ECWRV ( ) - PART 2 Technical Interpretation of EN 15085
Guideline of the European Committee for Welding of Railway Vehicles - ECWRV (2016-09-07) - PART 2 Technical Interpretation of EN 15085 Contents 1 Introduction... 2 2 Interpretation of EN 15085-1... 2 3
More informationASME B31.3 Process Piping
ASME B31.3 Process Piping Charles Becht IV, PhD, PE Don Frikken, PE Instructors BECHT ENGINEERING COMPANY, INC. Fabrication and Installation - 1 Piping Development Process 1. Establish applicable system
More informationPPQ Requirements training pack for suppliers
PPQ Requirements training pack for suppliers 1 Purpose This appendix serves to define the concept of PPQ elements used within the PPQ process, and replace for Montreal a portion of Section B of EBQR. The
More informationANSI/AWS D An American National Standard. Structural Welding Code Sheet Steel
ANSI/AWS D1.3-98 An American National Standard Structural Welding Code Sheet Steel Key Words Sheet steel, allowable stresses, details of welded joints, workmanship qualification, visual acceptance criteria,
More informationFacilities Planning and Construction (FP&C)
Appendix 8.4a Facilities Planning and Construction (FP&C) UAA FP&C Quality Assessment Checklist (A) Project: PM: Project ID: Updated:
More informationSOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX E: FACTORY PRODUCTION CONTROL INFORMATIVE BASED ON ISO 9001 STANDARD COVERING THE PRODUCTION LINE
SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX E: FACTORY PRODUCTION CONTROL INFORMATIVE BASED ON ISO 9001 STANDARD COVERING THE PRODUCTION LINE 1. General This annex specifies the requirements for the Factory
More informationWELDING PROCEDURE SPECIFICATION NO
NATIONAL CERTIFIED PIPE WELDING BUREAU WELDING PROCEDURE SPECIFICATION NO. 45-32-1 FOR GAS TUNGSTEN ARC WELDING (GTAW) AND SHIELDED METAL ARC WELDING (SMAW) OF NICKEL ALLOY 20 (UNS N08020) PIPE, VALVES,
More informationCQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015
CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 SCOPE This document establishes the minimum quality program requirements for a contractor providing equipment, material,
More informationStandard Specification for Wrought Austenitic Stainless Steel Piping Fittings 1
Designation: A 403/A 403M 06 Standard Specification for Wrought Austenitic Stainless Steel Piping Fittings 1 This standard is issued under the fixed designation A 403/A 403M; the number immediately following
More informationINS QA Programme Requirements
Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued
More informationQualification scheme for welders of hull structural steels
(Sept 2016) Qualification scheme for welders of hull structural steels 1. Scope 1.1 This document gives requirements for a qualification scheme for welders intended to be engaged in the fusion welding
More informationWELDING ENGINEERING FABRICATION
WELDING ENGINEERING FABRICATION Safety Our safety department is structured for optimal safety performance, communication and coverage. Safety is our top priority Our management team has over 280 years
More informationAn UNSAT here would require a STOP WORK and an investigation into what has been delivered to NNS will be required.
Supplier Name: Supplier No: Audit Date: This Process checklist is divided into four (4) sections. Questions marked with an asterisk () are considered key areas, and should be the minimum areas audited.
More informationQM-001(Rev. 1) 1.0 INTRODUCTION. 1.1 Scope
SECTION 1 Page 1/1 1.0 INTRODUCTION 1.1 Scope The purpose of the Quality Manual is to provide a documented quality management system for BOLTEX mfg. The manual includes the organization structure, responsibilities,
More informationMEC-QW-E-2010 Senior Welding & Inspection Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS
103295-MEC-QW-E-2010 Senior Welding & Inspection Engineer Holds a B. Sc. in Metallurgy & Materials Engineering and has more than 7 years of extensive experience in welding management, inspection & NDT
More informationPART UIG THE ASME CODE FOR IMPREGNATED GRAPHITE PRESSURE VESSELS
PART UIG THE ASME CODE FOR IMPREGNATED GRAPHITE PRESSURE VESSELS Presented by: Ed Soltow Engineering and Design Manager SGL Carbon Technic LLC Member ASME Standards Committee on Pressure Vessels (BPV VIII)
More informationInspection and Test Plan for Gas Turbine
and Test Plan for Gas Turbine No. and Test Plan Reference Document Acceptance Criteria Verifying Document Activity By Remark Manuf. TPI Client 1 Pre Meeting Spec. Spec. MOM H H H Before Manufacturing 2
More informationQW-482 WELDING PROCEDURE SPECIFICATION (WPS)
QW-482 WELDING PROCEDURE SPECIFICATION (WPS) Company Name: J.T. Thorpe & Son, Inc. By: J. Jacob Dupree, P.E., Q.C. Manager Welding Procedure Specification No.: JTT-22-STUD Revision No. 0 Date: 4/15/2009
More informationMaterials and Qualification Procedures for Ships
Materials and Qualification Procedures for Ships Approval of a Foundry for the Manufacture of Steel Castings Revision 3, January 2015 Lloyd s Register Group Limited, its subsidiaries and affiliates and
More informationAccreditation of Hot Tap Organizations
Accreditation of Hot Tap Organizations TSSA Guide for Survey Teams Technical Standards & Safety Authority Boiler & Pressure Vessels Safety Division 3300 Bloor Street West 14 th Floor, Centre Tower, Etobicoke,
More informationNorth Atlantic ENGINEERING STANDARD SPECIFICATION 1/7 REV. QUALITY SLAG BOWL WELDING AND QUALITY REQUIREMENTS. Approved by.
1/7 Rev Description Revision by Approved by Issue Date YYYY/MM/DD 1 Update from Job 497-01 KLR 015/04/01 Updated 1.0 and 4.3 PB 016/03/09 KLR 015/04/01 PB 016/03/09 015/04/01 016/03/09 Sud = Sudbury, Ontario,
More informationQuality Control and Quality Assurance for Installation of Steel Deck
s American National standards institute/ steel deck institute QA/QC - 2011 Standard for Quality Control and Quality Assurance for Installation of Steel Deck copyright 2012 steel deck institute 1. General
More informationCanadian Welding Bureau Comparative Review AWS D1.1 vs CSA W47.1 & CSA W59
Comparative Review Canadian Bureau Comparative Review The Similarities and Differences This document summarizes the similarities and key difference in the requirements between welding standards published
More informationWELD PROCEDURE DATA. Carrier Pipe Thickness (WT): 6.4 mm < WT = 31.8 mm (Design and CSA Z662 Cl )
WELD PROCEDURE DATA WPS: WEI-30-1 Rev. 0 Application: Branch and Lap (Sleeve) Connections on non-flowing, gas lines which are either pressured or non-pressured. Supporting PQR: WEI-30-1-1 (Branch) Qualification
More informationDIVISION: METALS SECTION: STRUCTURAL STEEL FRAMING REPORT HOLDER: CAST CONNEX CORPORATION
0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 3031 Reissued 12/2017 This report is subject to renewal 12/2019. DIVISION: 05 00
More informationSQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018
SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018 1.0 SCOPE This document establishes the quality program requirements for an organization providing engineering
More informationIADC GLOBAL SUPPLY CHAIN COMMITTEE
IADC GLOBAL SUPPLY CHAIN COMMITTEE Manufacturing Record Book Guidance (GU-IADC-SC-004) Effective date 1-January-2017 Copyrighted 2016, IADC Unlimited license is hereby granted for reproduction of this
More informationInspection and Welding Repairs of Pressure Vessels
Inspection and Welding Repairs of Pressure Vessels BY S. V. GUPTE B.E., D.M.E. ASNT LEVEL III - RT,MT,PT,VT PRESSURE VESSEL INSPECTOR (API 510), (CCOE) PAINT AND COATING INSPECTOR (NACE INDIA) LEAD AUDITOR
More informationwelder certification welder performance qualification
Chapter 29 Welder Certification OBJECTIVES After completing this chapter, the student should be able : Explain welder qualification and certification. Outline the steps required certify a welder. Make
More informationAssociation of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017
Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program
More informationPage 1 / 11. Version 0 June 2014
Page 1 / 11 CORRESPONDENCE MATRIX NQSA NSQ-100 version 0 NUCLEAR SAFETY AND QUALITY MANAGEMENT SYSTEM REQUIREMENTS Model for quality management in design & development, manufacturing, erection, commissioning
More informationLeveraging ISO s Quality Management System to Achieve 24/7 Inspection Readiness. Randy Querry Accreditation Manager Clinical
Leveraging ISO 15189 s Quality Management System to Achieve 24/7 Inspection Readiness Randy Querry Accreditation Manager Clinical Goals Provide brief background on A2LA Differentiate between CLIA and ISO
More informationAustralian Standard. Qualification of welders for fusion welding of steels AS AS
AS 2980 2004 AS 2980 2004 Australian Standard Qualification of welders for fusion welding of steels This Australian Standard was prepared by Committee WD-003, Welding of Structures. It was approved on
More informationPROJECT KCIL-FORMALDEHYDE DESCRIPTION GENERAL ENGINEERING SPECIFICATION PRESSURE VESSELS DOCUMENT NO MQ-UGS-0001
A company of ThyssenKrupp Technologies Uhde India PROJECT KCIL-FORMALDEHYDE UAN 66-6481-700 3. REFERENCE UHDE STANDARDS DESCRIPTION GENERAL ENGINEERING SPECIFICATION PRESSURE VESSELS DOCUMENT NO. 6481-MQ-UGS-0001
More informationService Suppliers Engaged in Condition Monitoring of Machinery Onboard Ships and Mobile Offshore Units
pproval of rvc upplrsno. 2.9 STANDARD FOR CERTIFICATION Approval Programmes Approval of Service Suppliers No. 416 Service Suppliers Engaged in Condition Monitoring of Machinery Onboard Ships and Mobile
More information1. Poor attitude toward any of the other students, instructors, or judges. 2. Failure to use personal protective equipment (PPE).
Welding Contest Rules and Score Sheet 2016 4G Rules: 1. Be Safe & Have Fun 2. Can tack in any position but groove welding must be in accordance with your WPS. 3. Can use wire brush, chipping hammer, and
More informationELECTRONIC REPAIR STATION MANUAL
UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: http://www.aero-weld.com/forms.htm AEROWELD, INC 433 Breesport San Antonio, Texas 78216 ELECTRONIC REPAIR STATION MANUAL Including: QUALITY
More informationNAVIGATING ASME SECTION VIII (DIV.1): MANAGING YOUR PRESSURE VESSELS - PART 1 FEATURING:
January/February 2014 Volume 20, Issue 1 Since 1995, Inspectioneering Journal has provided the oil & gas and chemical industries with information to help optimally manage equipment risk and reliability,
More informationAircraft Manufacturing Organisations Certification
Civil Aviation Rules Part 148, Amendment 4 Docket 8/CAR/1 Contents Rule objective... 3 Extent of consultation... 3 Summary of submissions... 3 Examination of submissions... 4 Insertion of Amendments...
More informationPRESSURE VESSEL INSPECTION AUTHORITIES SABS 0227: 2000
PRESSURE VESSEL INSPETION AUTHORITIES SABS 0227: 2000 F 41-04 Organisation s SAS No/s. Inspection authority Inspection authority Representative Assessor This report covers the following: Document Review
More informationCORPORATE QUALITY MANUAL
Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of the ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance
More informationAnchor chain cables and accessories
CLASS PROGRAMME Approval of manufacturers DNVGL-CP-0254 Edition May 2016 The content of this service document is the subject of intellectual property rights reserved by ("DNV GL"). The user accepts that
More informationWelding Inspection Technology. rican Welding Society
Welding Inspection Technology rican Welding Society G gp NOLOGY FOURTH EDITION 2000 Published By American Welding Society Education Department American Welding Society able of Contents Module Title Page
More informationWELDING INSPECTION TECHNOLOGY
WELDING INSPECTION TECHNOLOGY FIFTH EDITION 2008 Published by American Welding Society Education Department Education Services WELDING INSPECTION TECHNOLOGY DISCLAIMER The American Welding Society, Inc.
More informationPipeline Systems PIP PLSC0013 Non-Destructive Examination of ASME B31.4 and B31.8 Metallic Pipelines
February 2017 Pipeline Systems PIP PLSC0013 Non-Destructive Examination of ASME B31.4 and B31.8 Metallic Pipelines PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process
More informationCast Steel Propellers W27. (May 2000) (Rev.1 May 2004)
(May 2000) (Rev.1 May 2004) Cast Steel Propellers 1. Scope 1.1 These unified requirements are applicable to the manufacture of cast steel propellers, blades and bosses. 1.2 Where the use of alternative
More informationQualification scheme for welders of aluminium alloys
(March 2009) Qualification scheme for welders of aluminium alloys 1. Scope 1.1 This document provides guidance for a qualification scheme for welders intended to be engaged in welding of aluminium alloys
More informationINSPECTION OF FIELD WELDING
INSPECTION OF FIELD WELDING Objective Types of Projects Involving Welding Common Welding Terms & Symbols Welder Qualifications Common Welding Requirements Welding Inspection Types of Projects Involving
More informationAWS QC1:2007. Standard for AWS Certification of Welding Inspectors
Standard for AWS Certification of Welding Inspectors Standard for AWS Certification of Welding Inspectors Supersedes AWS QC1:2006 Prepared by the American Welding Society (AWS) Subcommittee on Certified
More informationWELDING SPECIFICATION FOR THE WATER INDUSTRY
WTIA Technical Note No. 25 WELDING SPECIFICATION FOR THE WATER INDUSTRY The WTIA National Diffusion Networks Project is supported by Federal and State Governments and Australian industry PAGE DELIBERATELY
More informationGeneral Document or OQE Comments SAT UNSAT
4 Quality Management System 4.2.2 Quality Manual (A) Has a Quality Manual been developed that includes the scope of the QMS, the documented procedures established for Section 2 #1 the QMS, and a description
More informationSECTION QUALITY REQUIREMENTS
SECTION 014000 - PART 1 - GENERAL 1.1 SUMMARY A. Defines SRP requirements for Contractor Quality Control and Owner Quality Assurance. As an Electric and Water Utility, SRP has many critical facilities.
More informationAPI-582. a practical approach for industrial welding practices. All rights reserved to thepetrostreet team
Recommended Welding Guidelines API-582 a practical approach for industrial welding practices By The PetroStreet Team CONTENTS Key Sections: Θ Section 6 WELDING CONSUMABLES Θ Section 7 SHIELDING AND PURGING
More information2
Quality Control Manual 2008 1 2 Table of Contents Introduction... 5 Major Factors in Quality Control... 6 General Requirements... 7 Plant Quality Control Procedures... 7 Steps to integrating a full quality
More informationGeneral Information and Common Procedures
November 2007 IPC-7711B/7721B General Information and Common Procedures 1 General 1.1 Scope This document covers procedures for repairing and reworking printed board assemblies. It is an aggregate of information
More informationGeneral Atomics Electromagnetic Systems Group
General Atomics Electromagnetic Systems Group GA-EMS Supplier Quality Guide 13 April 2017 GA-EMS Supplier Quality Contacts: Daniel Mueller Supplier Quality Manager Daniel.Mueller@ga.com 858-964-7078 Loni
More informationEASA Part 21 Compliance Matrix
Weston Aerospace CE8 Issue 2 EASA Part 21 Compliance Matrix Approved By: Peter Rush, Quality Director Date: 31 March 2011 This document is maintained on digital media. The current issue is located on the
More informationBOOK OF SPECIFICATIONS
American Welding Society CERTIFICATION www.aws.org CERTIFIED WELDING INSPECTOR (CWI) PART B PRACTICAL EXAMINATION BOOK OF SPECIFICATIONS JANUARY 1, 2016 January 1, 2016 This page is intentionally blank.
More informationASME As a Help to Export! Our Topic today: Nuclear Quality Assurance ASME NQA 1
ASME As a Help to Export! Our Topic today: Nuclear Quality Assurance ASME NQA 1 Karte: Wikipedia CIS GmbH Experts in ASME Code Consulting CIS GmbH Consulting Inspection Services 3 rd Party Inspection Training
More informationNOTICE REGARDING CODE CASES OF THE ASME B31 CODE FOR PRESSURE PIPING
NOTICE REGARDING CODE CASES OF THE ASME B31 CODE FOR PRESSURE PIPING All B31 Code Cases in effect as of September 21, 2007 will remain available for use unless annulled by the B31 Standards Committee.
More informationSpecification for Steel Line Pipe for Bundle Casing and Riser Casing
Specification for Steel Line Pipe for Bundle Casing and Riser Casing Specification for Line Pipe for Bundle Casing and Riser Casing 1 of 20 TABLE OF CONTENTS 1SCOPE... 3 2.DEFINITIONS... 3 3.REFERENCE
More information