1 University of Portsmouth Safe System of Work Policy

2 Document title University of Portsmouth Safe System of Work Policy Document author and department Jonathan Latter Health & Safety Compliance Manager Approving body Jeremy Philpot Estates Operational Director Host Manager and department Jeremy Philpot Estates Operation Director Date of approval March 2014 Review date Edition no ID code March EITHER For public access online (internet)? Tick as appropriate OR For staff access only (intranet)? Tick as appropriate No N No N For public access on request copy to be mailed Password protected Tick as appropriate Tick as appropriate Yes No Yes No N Y External queries relating to the document to be referred in the first instance to the University Secretary: telephone or university.secretary@port.ac.uk.

3 Contents Page 1.0 Introduction Safe System of Work Initial Assessment Permit to Work Authorisation to Issue PTW by Estates Competent Persons Authority to Proceed Job Completed Appendices: Appendix A Competency Card Scheme Appendix B SSOW Flow Chart Appendix C Competent Person Matrix 3

4 1. Introduction 1.1 The University of Portsmouth (UoP) Estates Department is committed to operating a fully competent workforce on all of its premises. All management & supervisory staff employed by UoP or employed by our supply chain contractors directly by the Estates Department or indirectly by a Department or Faculty must be able to demonstrate competence in appropriate management, supervisory or technical skills and health & safety matters and follow the safe system of work. 1.2 This policy applies to all staff employed by the University of Portsmouth (UoP) and contractors who carry out work on UoP premises. The scope of this policy covers planned work and does not encompass emergency situations. 1.3 It is the responsibility of all UoP Heads of Department to ensure that any employee or contractor not under the direct control of the Estates Department follows these procedures where required. 2. Safe System of Work 2.1 A safe system of work is defined as the integration of personnel, articles and substances in a laid out and considered method of working which takes proper account of risks to employees, students and others who may be affected, such as visitors and contractors, and provides a formal framework to ensure that all of the steps necessary for safe working have been anticipated and implemented. 2.2 As part of the Safe System of Work process, the Project Manager / Host Manager will need to review the work that is to be undertaken and ascertain if a Permit to Work (PTW) is required before Authority to Proceed (ATP) is granted. A PTW is a formal document which has predefined criteria, prepared in advance and gives written permission for work to be carried out in a potentially hazardous environment, on dangerous equipment or which may be hazardous to staff, students, visitors and members of the public. Permits themselves do not make a job free from risks, they rely upon effective control and co-ordination in order that hazards are identified and risks are suitably managed. PTW s are issued in addition to the Risk Assessment and Method Statement (RAMS) process and should not be issued in place of RAMS as this will devalue the importance of the system. 3. Initial Assessment 3.1 Work order issued When a work request is submitted a works order is raised on the Estates Computer Aid Facilities Management (CAFM) system. Work orders are prioritised with a 1 to 4 rating depending on the nature of the work order requested, priority 1 being the highest As work orders are raised they are assigned to a relevant Estates Department manager or supervisor depending on the nature of the job. This manager or supervisor is then considered to be the Project Manager for that work order. 4

5 3.1.3 The Project Manager selects whether the work should be carried out by the Estates Reactive Maintenance Team (RMT) operative or a contractor There will be occasions where technical managers from other UoP departments or Faculties need to be consulted in the planning and execution of a project in order to provide essential information about equipment and processes within their department which may be harmful or sensitive. They will be the Host Manager and must be consulted prior to workers entering the department. 3.2 Is the contractor authorised? Before a contractor can be used for any type of work they must be on the Estates Department authorisation system. This involves ensuring they have satisfactorily completed the Contractors Health, Safety and Environmental Questionnaire and been issued (and signed to comply with) the University Health, Safety and Environmental Guidelines for Contractors. This includes ensuring that the contractor has the correct insurances, policies and procedures, competencies, etc. which would have previously been checked by the Estates Health & Safety Compliance Manager For construction and maintenance work, operatives are to have a compliant card as defined within Appendix A. 3.3 Is Estates Reactive Maintenance Team (RMT) competent for the work order? Where the work order has been assigned to the RMT, the respective supervisor for that trade must ensure that the RMT operative has: sufficient knowledge of the work orders to be undertaken and the risks involved the experience and ability to carry out their duties in relation to the work order, to recognise their limitations and take appropriate action to prevent harm to those carrying out work or those affected by the work Where necessary this information can be obtained from University training records found on the Estates Department Training Matrix All operatives are to have a compliant card as defined within Appendix A. 3.4 Is the work controlled by a pre-existing RAMS? Pre-existing RAMS can be found in the Estates part of the University K drive (to be transferred to the EDM system in due course). When using a pre-existing RAMS care should be taken that any unknown hazards have been identified. If there are new hazards, the RAMS are to be reviewed Where a pre-existing RAMS is not available or does not sufficiently cover the scope of the works, a suitable and sufficient RAMS shall be prepared. Once these have been reviewed and signed off by the Project Manager they will need to be saved to the CAFM system under the specific work order. 5

6 3.4.3 No authority to proceed shall be granted until the Project Manager is satisfied that the RAMS are suitable and sufficient and any PTW requirements are sufficiently planned and prepared. 3.5 Is a Permit to Work (PTW) required? For some work there may be potentially hazardous activities or situations that carry a higher risk than normal. In order to limit or reduce the risks associated with these hazardous activities a PTW system is in place and the Project Manager will ascertain whether a PTW is required for each job. PTW will only be issued by a designated Competent Person (CP) For major projects where a contractor has full control of a site or works area and University staff, students, visitors and the public have no access to the area, the Project Manager may authorise the contractor to issue their own PTW under their own safe systems of work. This must be agreed prior to the start of the project and the contractors competence to do so established. 3.6 Additional information for PTW When a contractor or a member of the RMT requires a PTW they should provide the relevant CP (via the Project Manager) with a suitable and sufficient assessment of the risks inherent with the work and a method statement for the works to be undertaken. This information should, whenever possible, be submitted at least 48hrs before the start of the work and will allow the CP sufficient time to assess the work in detail For work involving periodic maintenance, service contractors method statements shall be provided for specific work orders at the beginning of the contract and if necessary PTW issued as and when required. Permits will not be issued without prior notice unless for emergency callouts. 3.7 Faculty / Department hazards Areas controlled by Faculties or Departments often contain unusual hazards that can vary on a day by day basis. In addition there are often special critical processes going on that can affect how work is carried out To control these potentially hazardous situations a special type of PTW exists that must be used before any work in these areas can be carried out. This PTW requires assistance from Host Managers in the Faculty / Department so any special hazards can be accounted for. This permit will also require sign off from the Host Manager before being authorised. 4. Permit to Work 4.1 PTW may be required for the following activities and detailed separate procedures are produced for each to clarify the decision making process: High and low voltage systems 6

7 Heating / Ventilation (pressure) systems Access to Faculty / Department controlled areas (incl. LEV s) Working at height / Roofs Hot Work Asbestos 4.2 There may be circumstances where additional PTW are required i.e. confined space entry, but the Project Manager / Host Manager will ensure this is arranged and carried out by a competent specialist contractor. 4.3 Correct operation of the PTW system will ensure: The work being undertaken is clearly defined and closely controlled All potential hazards are identified and appropriate safety precautions are applied. Everyone associated with the work being undertaken is aware of the safety measures required The period of time during which the work may take place is clearly specified The area affected is returned to a safe condition on completion. 4.4 The PTW consists of: Details of the work to be done States the control measures to be implemented Names of persons authorised to issue and receive the permit Date, time and validity period of the permit Confirmation of issue and closure of the permit 4.5 This policy documents the process the Project Manager / Host Manager will have to follow to ensure relevant competencies of workers and safe systems of work are implemented to ensure projects are completed efficiently and safely. The flow chart at Appendix B summarises this process and is cross referenced with the sections in this policy. 4.6 Issuing a PTW Permits should be requested via the Project Manager. They will be stored in Estates Help Desk location in a secure area where only the CP s have access to the permit books. These permits must be allocated with the work order number to which they are to be used Before a PTW is issued the CP should visit the location where the work is to be carried out with the person receiving the permit or the member of staff undertaking the work. If the work is routine or recurring and where the CP is fully conversant with any plant, procedure or hazard involved, a visit may not be required Hazardous work must not commence until a PTW has been issued by the CP and accepted by the contractor or UoP employee. 7

8 4.6.4 A permit is not transferable and must only be issued for one specific work order. Where more than one CP is involved in any single job, activities must be coordinated to ensure the appropriate number of permits are issued and the activities of one contractor / UoP employee does not prejudice the safety of another A separate permit should be issued for each work order and cross referenced with any others via the work order number. The CP will retain the top copy (white) The Contractor / UoP employee shall retain the under copy (green). This PTW must be on display at all times while carrying out the work Inability to show a valid permit will result in the work being stopped immediately Should the Contractor / UoP employee discover during the work that either additional work outside the scope of the permit is required, or that work described in the permit will take longer than the time period stated in the permit, then they must contact the CP immediately to discuss possible extension of the permit or issuing a new PTW which covers the new circumstances Whenever possible, work that requires a PTW should be carried out only during normal working hours. However, there will be occasions when this is not possible and the CP must ensure that he is available to monitor contractor or staff compliance throughout the duration of the permit irrespective of when it takes place. 4.7 Person Receiving the PTW The person receiving the permit for the work to be performed must be: Competent in the nature of the work being performed In attendance at the location of the work as described on the permit Responsible for ensuring the work is carried out safely and in accordance with their own employers procedures and safe systems of work 5. Authorisation to Issue PTW by Estates Competent Persons 5.1 The Estates Operations Director (EOD) is responsible for ensuring that systems are in place for PTW and that they meet the legal and organisational requirements. 5.2 The Compliance Engineer shall assess and recommend to the EOD to appoint Competent Persons (CP) to issue PTW as defined in this procedure and recognised to Industry standards. The EOD will formally appoint a CP in writing to issue permits. This will be reviewed on a three yearly basis. 5.3 Those roles which can issue PTW for the respective activities are defined in Appendix C. 5.4 The EOD expects those persons designated as competent to have had valid certificated trade training (where this is deemed necessary) and: Health and safety appreciation relevant to the permit to be issued 8

9 Experience of the type of work to be carried out Knowledge of the PTW procedures. 6. Authority to Proceed (ATP) 6.1 Estates Project Manager - ATP / job issued When the Project Manager is satisfied that all aspects of competency and safe systems of work are in place, ATP will be granted. 6.2 Arrival of Contractor Contractors must sign in at the Estates Department Help Desk and a contractor s ID will be issued. This will enable the contractor to access the relevant parts of the University to complete the work order. The contractor must report to the Estates Department Help Desk to sign in even when the work to be completed is at one of the University s remote sites The contractor, upon first arrival, must undergo an Estates University health, safety and environmental induction unless this has been previously recorded as being completed by that particular operative in the last two years. The only exception to this is where the Project Manager agrees that the contractor may sign in their staff and sub-contractors and carry out inductions themselves (self contained sites only). 6.3 Starting Work In all cases, checks must be made at the premises being worked on that it is safe to start work. This will involve checking in with building reception and / or Host Managers to ensure the work activity won t adversely affect any activities or processes going on in the building i.e. critical laboratory experiments, sensitive dental or medical work / consultation. If PTW is required, work cannot begin until all specified controls are in place and the permit has been issued and signed by all relevant parties. 6.4 Monitoring the Work As far as is reasonably practicable, the Project Manager will monitor the work to ensure it is being carried in line with RAMS. Where a PTW has been issued, the CP shall monitor the work at regular intervals to ensure the operatives are adhering to the conditions of the permit. 6.5 Completed Work When the work has been completed the Project Manager / Host Manager will inspect the site to ensure: The works have ceased and are satisfactorily completed All tools and equipment have been removed The work area has been left in a satisfactory and safe condition 9

10 6.5.2 Where a PTW has been issued, the CP will close the permit when they are satisfied these conditions have been met and it will be returned to the Estates Help Desk. An electronic copy will be made of the permit and attached to the CAFM system for that work order number file for audit and reference. The hard copies are to be destroyed by the competent person but the green copy may be kept by the contractor for their own records if required. 7. Job Completed 7.1 RMT job completion Where the work has been carried out by RMT the CAFM system is to be updated with details of what was done, how long it took and any materials used. 7.2 Contractor job completion Where the work has been carried out by a contractor they must notify the Project Manager when the work has been completed and then book out at the Estates Help Desk. There is a requirement that contractors book out in person at the Estates Help Desk even where the work has been carried out at one of the University s remote sites. The Project Manager updates the CAFM system. 7.3 Project Manager closes work order The works order is updated and closed off on the CAFM system, approving the work that has been done. 10

11 Appendix A Competency Card Scheme The Competency Card system provides the mechanism for verifying competence and as such, all members of our workforce who are carrying out construction and / or maintenance work orders as defined by The Construction, Design & Management Regulations All site staff that have a construction specific skill are required to hold a relevant competence card. Those who do not have a construction specific skill are required to hold a Site Operatives card. All Estates site staff including supply chain contractors should fall in to one of the following categories and all personnel should progress to reach category A: Category A - Category B - Category C - Category D - Hold the appropriate competence card for their job role. Hold a competence card, or recognised equivalent not specified for role, this includes individuals holding a trainee or experienced worker card are registered for an NVQ or undertaking professional competence assessment. Have passed the relevant H&S Test and applied for their specified competence card and be able to provide written proof. NB: Persons in Category C will only be deemed compliant for 12 weeks from H&S test date. Have booked the relevant H&S test but not yet passed. Verification of competence is required and authority to work will only be valid for a maximum of three weeks and not renewable. Every employee and member of our supply chain is required to support the UoP Estates Department policy towards a fully competent workforce. Our staff and supply chain are responsible to ensure that the card details are kept up to date on the CAFM system by forwarding the details to the Estates Helpdesk. For information about booking a test or obtaining a card please go to or for general advice and guidance contact the Estates H&S Compliance Manager. 11

12 List of Compliant Card Schemes (including CSCS Affiliates) CSCS - Construction Workers CCDO - Demolition Op s CSR - the Northern Irish equivalent of CSCS SKILL card - Heating, Ventilating, Air Conditioning and Refrigeration personnel SNIJIB - Scottish and Irish Plumbers CISRS - Scaffolders JIB-ECS - Electricians JIB-PMES - English and Welsh Plumbers EUSR - Utility Industries ECITB-ACE - Engineering Construction Workers ECITB-BES - Gas, Electric, Water, Oil, Refrigerants, and steam workers NRSWA - New Road and Street Works Gas Safe register - Gas Workers EMTA - Engineering & Marine Training Authority FASET - Erecting safety nets on site. IRATA - Industrial rope access IPAF - Users of all forms of powered access equipment CPCS - Plant Ops LANTRA - Traffic Management MPQC - Mobile Plant Operations CCNSG Safety Passport - Energy and Process Sectors PASMA Prefabricated Access Suppliers & Manufacturers Association The Above list will be kept under review. 12

13 3.1 Work Order is raised Appendix B RMT Select appropriate RMT or Contractor Contractor No 3.3 Is RMT employee competent for the task? 3.2 Is contractor authorised (H&S Questionnaire completed, UOP HS&E Guidelines issued, operatives inducted? No Yes 3.4 Estates Project Manager to ensure RAMS are produced to control hazards 3.5 Are there significant hazards that require a PTW?. Yes No 6.1 Authority to proceed is granted RMT 3.6 Appropriate Competent Person to prepare PTW (This may be done by the contractor where agreed by the Project Manager) Contractor 6.2 Contractor operative arrives on site to book in (Operative must be given HS&E induction on first visit) 6.3 Work commences Project Manager to ensure PTW (where required) is authorised and issued by Competent Person. 6.4 Project Manager / Competent Person monitors progress to ensure operatives are working to RAMS (PTW can be extended if agreed with Competent Person) RMT 6.5 Work completed (PTW, where issued is closed. Copy held in CAFM) Contractor 7.1 RMT operative updates work management system 7.2 Contractor informs Estates Responsible Person and books out 7.3 Project Manager closes work order 13

14 Appendix C Competent Person Matrix The following Matrix displays who is authorised as Competent to issue the following Permits: Type of Permit LV Electrical Installations Heating & Ventilation Systems Faculty / Department Controlled Areas (incl. LEV s) Working at Height / Roofs Hot Work Asbestos Building Ops Manager Mech Ops Manager Electrical Ops Manager M&E Project Manager Assistant Project Manager Carpenter Supervisor Plumbing Supervisor Mech Supervisor Electrical Supervisor

BHC-P-03.1 Training, Competence and Induction

BHC-P-03.1 Training, Competence and Induction BHC-P-03.1 Training, Competence and Induction Contents 1.0 Purpose 2.0 Scope 3.0 Definitions 4.0 Main requirements 5.0 Guidance documents and references 6.0 Appendices Revision register Date Version Description

More information

HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd

HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd Company Trading Address 242 Fort Austin Avenue Crownhill Plymouth PL6 5NZ Tel: 01752 657227 Fax: 01752 657227 Email: enquiries@jmc-sw.com

More information

CHAS Assessment Standards

CHAS Assessment Standards CHAS Assessment Standards Section 1 - All Prosecutions or Enforcement Notices The Supplier has provided details of any enforcement notices or prosecutions served on them in the last three years by the

More information

Honorary Contracts Procedure

Honorary Contracts Procedure Honorary Contracts Procedure Version: 3.0 Bodies consulted: Approved by: Joint Staff Consultative Committee & WMT Executive Management Team Date Approved: 03 October 2017 Lead Manager: Responsible Director:

More information

HEALTH & SAFETY ASSESSMENT SCHEME CONTRACTOR & PRINCIPAL CONTRACTOR APPRAISAL QUESTIONNAIRE

HEALTH & SAFETY ASSESSMENT SCHEME CONTRACTOR & PRINCIPAL CONTRACTOR APPRAISAL QUESTIONNAIRE HEALTH & SAFETY ASSESSMENT SCHEME CONTRACTOR & PRINCIPAL CONTRACTOR APPRAISAL QUESTIONNAIRE The purpose of the health and safety questionnaire is to provide Clients with assurances that all companies on

More information

WHS Management Plans

WHS Management Plans WHS Management Plans Disclaimer This Guide provides general information about the obligations of persons conducting a business or undertaking and/or persons in control of premises and workers under the

More information

CONTRACTORS ON SITE POLICY

CONTRACTORS ON SITE POLICY THE BURTON BOROUGH SCHOOL A Specialist Arts College CONTRACTORS ON SITE POLICY Policy Reviewer Sarah McElduff Date of Review September 2013 Date Presented to Governors 14 October 2013 Date of next Review

More information

Designer and CDM Co-ordinator Guidance

Designer and CDM Co-ordinator Guidance Designer and CDM Co-ordinator Guidance Fewer than five employees Health and Safety 1 CONTENTS INTRODUCTION...5 Further reading / additional resources...5 Note to suppliers...6 QUESTION 1: POLICY AND ORGANISATION...8

More information

CDM-C Guidance. Five or more employees. Health and Safety 1. CMD-C Guidance Notes V

CDM-C Guidance. Five or more employees. Health and Safety 1. CMD-C Guidance Notes V CDM-C Guidance Five or more employees Health and Safety 1 CONTENTS INTRODUCTION...4 Further reading / additional resources...4 QUESTION 1: POLICY AND ORGANISATION...5 Guidance...5 What you need to provide...6

More information

Occupational Health and Safety Management Manual v2.2

Occupational Health and Safety Management Manual v2.2 Occupational Health and Safety Management Manual v2.2 Written: February 2013 Author: David Seymour, Director of Operations Co Author: Mathew Sprake, Operations Manager Approved: Board of Directors 1. Introduction

More information

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 CS ENERGY PROCEDURE FOR GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 Responsible Officer: Manager Environment Approved: Executive General Manager Asset Strategy DOCUMENT HISTORY Date

More information

Safe System of Work Policy

Safe System of Work Policy Reviews and Revisions Safe System of Work Policy Action Date Reason Reviewer Safe System of Work Policy 1 1. Introduction Campus Services manage and deliver a wide range of activities, accommodation, catering,

More information

Annex H: Effective worker engagement for health and safety

Annex H: Effective worker engagement for health and safety The Construction (Design and Management) Regulations 2007: Industry Guidance Annex H: Effective worker engagement for health and safety Introduction Worker engagement is the participation by workers in

More information

Mini Tender PART B External Wall Insulation, Mechanical and Electrical Installation

Mini Tender PART B External Wall Insulation, Mechanical and Electrical Installation Mini Tender PART B External Wall Insulation, Mechanical and Electrical Installation Mini Tender Questionnaire for Subcontractors Section B involves a questionnaire oriented around the provision of key

More information

Designer and CDM Co-ordinator Guidance

Designer and CDM Co-ordinator Guidance Designer and CDM Co-ordinator Guidance Five or more employees 1 CONTENTS INTRODUCTION...4 Further reading / additional resources...4 QUESTION 1: POLICY AND ORGANISATION...5 Guidance...5 What you need to

More information

Occupational Health and Safety. Improvement Standard

Occupational Health and Safety. Improvement Standard Premier s Department New South Wales Occupational Health and Safety Improvement Standard A tool for measuring OHS performance within NSW Government Agencies OHS IMPROVEMENT STANDARD NSW GOVERNMENT - REVIEW

More information

Health & Safety Arrangements for Companies Who Employ Less than 5 Employees

Health & Safety Arrangements for Companies Who Employ Less than 5 Employees Health & Safety Arrangements for Companies Who Employ Less than 5 Employees Guidance Note 41 Jul 16 1 han 5 Employees Introduction If you are a company with under 5 employees and do not have a suitable

More information

Permit to Work Manual

Permit to Work Manual Permit to Work Manual Release Date March 2016 CS-PTW-01 Version 3.1 Originator PTW Committee For further information, contact your supervisor or the site safety department. THIS DOCUMENT IS UNCONTROLLED

More information

A-one+ Supply Chain Standards

A-one+ Supply Chain Standards A-one+ Supply Chain Standards A-one+ Page 1 of 12 Introduction We at A-one+ are committed to achieving an incident and accident free environment through our health and safety strategy. We demand Supply

More information

Asbestos Management Plan

Asbestos Management Plan Health and Safety Services Asbestos Management Plan Policy, Organisation and Arrangements Sean Callaghan Issue number 2 April 2013 Contents Contents 1.1. Introduction... 4 1.2. Policy Statement... 4 2

More information

Page1. Asbestos (Health & Safety) Policy. Issue Date 07/03/2017 Issue 1 Document No: 010 Uncontrolled when copied

Page1. Asbestos (Health & Safety) Policy. Issue Date 07/03/2017 Issue 1 Document No: 010 Uncontrolled when copied Page1 Asbestos (Health & Safety) Policy Page2 1.0 Introduction 1.1 Purpose 1.1.1 To comply with our obligations to control the exposure to Asbestos (and Asbestos Containing Materials (ACMs)) to staff,

More information

JK 1. RIBA stages JK START OF MAIN CONTRACT WORKS 1. DEFINITION 2. PURPOSE 3. PROCEDURE 3.1 PROJECT MANAGEMENT TEAM ROLE

JK 1. RIBA stages JK START OF MAIN CONTRACT WORKS 1. DEFINITION 2. PURPOSE 3. PROCEDURE 3.1 PROJECT MANAGEMENT TEAM ROLE THE UNIVERSITY of EDINBURGH Estates & Buildings ESTATE DEVELOPMENT ISSUE/REVISION JK 1 LAST MODIFIED 12 October 2011 DATE PRINTED RIBA stages JK JK 1 START OF MAIN CONTRACT WORKS 1. DEFINITION The Main

More information

Guidance Note: CSCS Cards

Guidance Note: CSCS Cards Guidance Note: CSCS Cards Most major contractors and homebuilders require their workforce to hold a valid CSCS card as a demonstration of their commitment to safe and efficient working. To attain a CSCS

More information

Construction (Design and Management) Safety Guidance Document

Construction (Design and Management) Safety Guidance Document Construction (Design and Management) Safety Guidance Document Lead Directorate and Service: Corporate Resources - Human Resources, Safety Services Effective Date: April 2011 Contact Officer/Number Garry

More information

THIS IS THE HEALTH AND SAFETY POLICY STATEMENT OF GLASGOW KELVIN COLLEGE

THIS IS THE HEALTH AND SAFETY POLICY STATEMENT OF GLASGOW KELVIN COLLEGE THIS IS THE HEALTH AND SAFETY POLICY STATEMENT OF GLASGOW KELVIN COLLEGE Document Control Information Reviewed by the Strategic Management Team: April 2017 of Next Review: April 2018 Approved by the Board

More information

Work Health and Safety Management Systems and Auditing Guidelines

Work Health and Safety Management Systems and Auditing Guidelines Work Health and Safety Management Systems and Auditing Guidelines 5th edition, September 2013 (Updated May 2014) Work Health and Safety Management Systems and Auditing Guidelines These Guidelines are a

More information

Managing Contractors (Scotland)

Managing Contractors (Scotland) Managing Contractors (Scotland) University Health and Safety Policy Author: Health & Safety Services 1 Managing Contractors Procedures (Scotland) to support University Health and Safety Policy CONTENT

More information

qmbff1zj.zdg.docx Manage Work in Confined Spaces

qmbff1zj.zdg.docx Manage Work in Confined Spaces Overview This national occupational standard focuses on planning, organising and managing work safely in including legislative roles and responsibilities, health and safety considerations and equipment

More information

HSSE TRAINING PLAN (Aim and Objectives)

HSSE TRAINING PLAN (Aim and Objectives) Page 1 OF 6 Al-Yamama Engineering Company HSSE TRAINING PLAN (Aim and Objectives) 1 Page 2 OF 6 Purpose To ensure All AL-YAMAMA s staff, safety representatives, members of the working environment committee

More information

Work Experience Placement Vetting Policy

Work Experience Placement Vetting Policy Work Experience Placement Vetting Policy Prepared by: Director of Health and Safety Policy Approved by: Shadow Board Minute No: 24 13.05.2013 Impact Assessed 22 May 2013 AOS Aim 6 Implemented: August 2103

More information

WHS Manual Insert Business Name & Logo

WHS Manual Insert Business Name & Logo WHS Manual Insert Business Name & Logo Version5 Work Health & Safety Manual INDEX OVERVIEW 4 1. WORK HEALTH AND SAFETY POLICY 5 2. PLANNING, REVIEW AND EVALUATION 9 3. HAZARD IDENTIFICATIO, ASSESSMENT

More information

Directorate of Estates & Facilities Contractor s Rules and Regulations Notification and Acknowledgement

Directorate of Estates & Facilities Contractor s Rules and Regulations Notification and Acknowledgement Directorate of Estates & Facilities Contractor s Rules and Regulations Notification and Acknowledgement 1. NOTIFICATION Within the Directorate of Estates and Facilities at King s College London our aim

More information

Health & Safety Policy Estate Services

Health & Safety Policy Estate Services Health & Safety Policy Estate Services Reference Number: NHSCT/09/193 Responsible Directorate: Planning, Performance Management and Support Services Replaces (if appropriate): Legacy Causeway Estates Health

More information

Annex CC To Facilities Management Department. Routine Audit and Monitoring of Health and Safety management functions.

Annex CC To Facilities Management Department. Routine Audit and Monitoring of Health and Safety management functions. Annex CC To Facilities Management Department Routine Audit and Monitoring of Health and Safety management functions. The responsibilities and monitoring approaches contained within this guide are to be

More information

UCLH Asbestos Management Plan. July 2017

UCLH Asbestos Management Plan. July 2017 UCLH Asbestos Management Plan July 2017 Out of Hours and Emergency contacts: Larne Fuller Tel: 0345 5040 303 Mob: 07881 108 17 Joe Beesley Tel: 0345 5040 303 Mob: 07710 306 326 E-mail: uclh@ lucionservices.com

More information

ESS Health & Safety Arrangements Management of Contractors (Including Consultants)

ESS Health & Safety Arrangements Management of Contractors (Including Consultants) ESS Health & Safety Arrangements Management of Contractors (Including Consultants) Distribution: This document must be brought to the attention of all ESS Managers and Employees responsible for engaging

More information

HEALTH AND SAFETY STRATEGY

HEALTH AND SAFETY STRATEGY HEALTH AND SAFETY STRATEGY 2016-2019 Version: 1.0 Ratified by: Integrated Governance Committee Date ratified: 30 September 2015 Title of originator/author: Title of responsible committee/group: Head of

More information

Guidance on Independent Assessment. Rail Industry Guidance Note. Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY

Guidance on Independent Assessment. Rail Industry Guidance Note. Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2014 Rail Safety and Standards Board Limited GE/GN8645 Issue One: June 2014 Rail Industry Guidance Note Issue record Issue

More information

Lone Working Procedure

Lone Working Procedure Lone Working Procedure Procedure Revision : 2 Prepared by : S.Woolcott, Director Health, Safety & Wellbeing Ratified by (Group and Date): Health and Safety & Wellbeing Committee 15 th September 2010 University

More information

Level 2 NVQ in Heating and Ventilating Ductwork Installation (6088)

Level 2 NVQ in Heating and Ventilating Ductwork Installation (6088) Level 2 NVQ in Heating and Ventilating Ductwork Installation (6088) National occupational standards and Assessment requirements www.city-and-guilds.co.uk Version 1 August 2003 Publications and enquiries

More information

Health and Safety Management Standards

Health and Safety Management Standards Management Standards Curtin University Sept 2011 PAGE LEFT INTENTIONALLY BLANK Management Standards Page 2 of 15 CONTENTS 1. Introduction... 4 1.1 Hierarchy of Documents... 4 2. Management System Model...

More information

Campbell Arnott s Contractor Management

Campbell Arnott s Contractor Management Campbell Arnott s Contractor Management Registration process The Campbell Arnott s Contractor Management process is completed in two parts: online company registration and online employee registration

More information

Hazardous. Scheme. the power behind your business

Hazardous. Scheme. the power behind your business Hazardous Areas Scheme YOUR GUIDE TO REGISTRATION the power behind your business GUIDE TO REGISTRATION REQUIREMENTS Electrical work in potentially explosive atmospheres (hazardous areas) is not included

More information

LONE WORKER POLICY. Version: 3.0. Joint Policy Assurance Group. Date ratified: April Name of responsible committee/individual: Audit Committee

LONE WORKER POLICY. Version: 3.0. Joint Policy Assurance Group. Date ratified: April Name of responsible committee/individual: Audit Committee LONE WORKER POLICY Version: 3.0 Ratified by: Joint Policy Assurance Group Date ratified: April 2018 Name of Director Sponsor: Name of originator/author: Name of responsible committee/individual: Chief

More information

The safe management and control of Temporary Works

The safe management and control of Temporary Works The safe management and control of Temporary Works What are TW s? The HSE describe Temporary Works (TW s) as; an engineered solution that may include any structure, provision for access, item or technique

More information

UNIVERSITY OF ROEHAMPTON LONE WORKING POLICY

UNIVERSITY OF ROEHAMPTON LONE WORKING POLICY UNIVERSITY OF ROEHAMPTON LONE WORKING POLICY Originated by Health & Safety Manager: February 2010 Impact Assessment: 5 May 2010 Recommended by Senate: 26 May 2010 Approved by Council: 28 June 2010 11 March

More information

Bowmer. & Kirkland. Kirkland. & Accommodation. Health & Safety Policy.

Bowmer. & Kirkland. Kirkland. & Accommodation. Health & Safety Policy. Bowmer Kirkland & Kirkland & Accommodation Health & Safety Policy December 2013 www.bandk.co.uk Index Policy Statement Page 3 Interaction of Health and Safety Responsibilities Page 5 Organisation Page

More information

Health and Safety Training University Policy, Organisation and Arrangements

Health and Safety Training University Policy, Organisation and Arrangements Health and Safety Training University Policy, Organisation and Arrangements Issued with the approval of the Health and Safety Committee Revised: April 2013 Health and Safety Training Introduction 1 Policy

More information

CDM FAQ Sheet

CDM FAQ Sheet CDM 2015 - FAQ Sheet 1. The change to the regulations means Domestic works are now included. What if you are doing DIY in your own house? Do the regulations apply to this? If the home owner is doing the

More information

Reviewed: DD Month Guidance to Roof Access on University Premises

Reviewed: DD Month Guidance to Roof Access on University Premises Safety Office Reviewed: 13 October 2015 Reviewed: DD Month Guidance to Roof Access on University Premises Scope of Guidance This guidance aims to set out the University s procedures for roof access and

More information

Evaluation of Occupational Health & Safety Management System

Evaluation of Occupational Health & Safety Management System Section 1 Legal Obligation Employers have a duty of care to provide a safe workplace and systems of work, to consult with workers, to identify and manage workplace hazards and to keep them informed about

More information

Permits and authorisations

Permits and authorisations Procedure Index Section Title 1 Introduction. 2 Purpose 3 Definition 4 Primary authorisations 5 Secondary authorisations 6 Specific permits and authorisations Appendix 1 Primary Authorisation Quick Reference

More information

ABOUT US. We operate on a nationwide basis and have built up an impressive portfolio of clients in the public and private sectors.

ABOUT US. We operate on a nationwide basis and have built up an impressive portfolio of clients in the public and private sectors. ASBESTOS MANAGEMENT ABOUT US Clifford Devlin has been providing specialist services to manage asbestos for over 25 years. The company is licensed by the Health & Safety Executive (HSE) to remove and dispose

More information

Transport Sector Portfolio

Transport Sector Portfolio Transport Sector Portfolio Rehabilitation of 4.476 Kms of Asphalt Road in Shindand District, Herat Province, Afghanistan. United Nations Office for Project Services ( UNOPS ) -and- Name of Contractor Site

More information

Site Safety Plus. Site Management Safety Training Scheme (SMSTS) Course appendix G

Site Safety Plus. Site Management Safety Training Scheme (SMSTS) Course appendix G Site Safety Plus Site Management Safety Training Scheme (SMSTS) Course appendix G 1. Introduction 2. Aims and objectives 3. Entry requirements 4. Assessment 5. Delegate numbers 6. Course duration and attendance

More information

Asbestos Policy and Management Plan

Asbestos Policy and Management Plan Asbestos Policy and Management Plan 2017-22 1. Policy Statement The University of Chichester recognises the responsibilities and duties under the Health and Safety at Work Act 1974, to provide as healthy

More information

Lead Employer Flexible Working Policy. Trust Policy

Lead Employer Flexible Working Policy. Trust Policy Lead Employer Flexible Working Policy Type of Document Code: Policy Sponsor Lead Executive Recommended by: Trust Policy Deputy Director of Human Resources Director of Human Resources Date Recommended:

More information

CS ENERGY PROCEDURE FOR A JOB SAFETY AND ENVIRONMENTAL ANALYSIS CS-OHS-11

CS ENERGY PROCEDURE FOR A JOB SAFETY AND ENVIRONMENTAL ANALYSIS CS-OHS-11 CS-OHS-11 (Amd 09/11) CS ENERGY PROCEDURE FOR A JOB SAFETY AND ENVIRONMENTAL ANALYSIS CS-OHS-11 Responsible Officer: Group Manager Health and Safety Approved: EGM Corporate CONTENTS 1 Purpose... 3 2 Context...

More information

ICL Asbestos Management Plan 2017

ICL Asbestos Management Plan 2017 This document provides formal Policy, Procedures and Guidance. Compliance ensures the College is a healthy and safe environment for all. The AMP is relevant to all who work, study or visit Imperial College

More information

DIT HEALTH AND SAFETY OFFICE

DIT HEALTH AND SAFETY OFFICE DIT HEALTH AND SAFETY OFFICE POLICY TITLE: Policy on Health and Safety Training for Staff REVISION NO.: 4 NUMBER OF PAGES: 14 DATE OF ISSUE: Adopted by DIT Health & Safety Committee 22 nd November 2011

More information

East Cheshire NHS Trust Lift Policy

East Cheshire NHS Trust Lift Policy East Cheshire NHS Trust Lift Policy Estates Officer Lifts Policy V1 Policy Title: Executive Summary: Lift Policy This document describes the systems and processes required for the maintenance and safe

More information

Foreword 3. Terminology 5

Foreword 3. Terminology 5 CONTENTS Foreword 3 Terminology 5 Section 1 Introduction 7 What Legislation Applies 7 The Division Of Responsibility 8 Building Regulations Compliance In General 9 Risk Assessment and The Workplace Fire

More information

Attendance Management Policy

Attendance Management Policy Attendance Management Policy Co-ordinator: Reviewer: Approver: Director of HR Grampian Area Partnership Forum Grampian Area Partnership Forum Date Approved by GAPF: 1 January 2008 Refresh 10 August 2017

More information

Annex G to Loughborough University Facilities Management Health and Safety Procedure

Annex G to Loughborough University Facilities Management Health and Safety Procedure Annex G to Loughborough University Facilities Management Health and Safety Procedure Working with Contractors Including the Construction (Design and Management Regulations) 2015 General 1. The Construction

More information

LANTRA. Highways Sector Scheme 12D SKILLS. TRAINING CENTRE

LANTRA. Highways Sector Scheme 12D SKILLS.  TRAINING CENTRE LANTRA Highways Sector Scheme 12D 020 8619 0939 www.skillstrainingcentre.co.uk SKILLS TRAINING CENTRE 020 12D Sector Scheme for Installing, Maintaining and Removing Temporary Traffic Management on Rural

More information

Railway Interface Planning Scheme Rules (RIPS Rules)

Railway Interface Planning Scheme Rules (RIPS Rules) Contents 1. Purpose.. 1 2. Scope... 2 3. Scheme Rules.... 3 4. Roles and Responsibilities... 4 5. Management System Requirements... 7 6. Investigating Breaches of the Railway Interface Planning Scheme

More information

Risk Assessment Policy

Risk Assessment Policy Risk Assessment Policy 1. Introduction Risk assessment is a pivotal concept in health and safety risk management. However, it is often seen as a bureaucratic or a complex process. Neither is true. Risk

More information

CURRICULUM DEVELOPMENT ADVISORY

CURRICULUM DEVELOPMENT ADVISORY CURRICULUM DEVELOPMENT ADVISORY WORK-AT-HEIGHT COURSE FOR ASSESSORS Version 1.1 1 September 2014 Workplace Safety and Health Council, Ministry of Manpower (MOM), Singapore All rights reserved. This document

More information

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN Revision Date Nature of Revision Prepared by Approved by 1 July 2014 Approved Plan Jon Fahie This, the University

More information

HEALTH & SAFETY POLICY

HEALTH & SAFETY POLICY Deeds not words - Be the best you can be HEALTH & SAFETY POLICY Updated: Spring 2018 Approved by Governors Resource Management Committee: 13 February 2018 NEXT REVIEW 2020 WHITLEY ACADEMY HEALTH AND SAFETY

More information

JOB DESCRIPTION FACILITIES MANAGER

JOB DESCRIPTION FACILITIES MANAGER JOB DESCRIPTION FACILITIES MANAGER Job Title: Facilities Manager Band: Band 7 Directorate: Estates & Facilities Reports To: Head of Estates & Facilities Accountable To: Director of Estates & Facilities

More information

Curo Group HEALTH & SAFETY POLICY: CONSTRUCTION SAFETY MANAGEMENT & CDM PROCEDURE

Curo Group HEALTH & SAFETY POLICY: CONSTRUCTION SAFETY MANAGEMENT & CDM PROCEDURE Curo Group HEALTH & SAFETY POLICY: CONSTRUCTION SAFETY MANAGEMENT & CDM PROCEDURE Introduction Curo Group have a statutory duty to ensure that construction projects and works are managed effectively in

More information

Health, Safety and Welfare Policy

Health, Safety and Welfare Policy Health, Safety and Welfare Policy Contents Introduction Our objectives Health and Safety Policy Statement Health and safety organogram Responsibilities for health, safety and welfare 2 3 4 5 6 13 Arrangements

More information

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Construction Operations (Construction)

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Construction Operations (Construction) Civil Engineering Services Construction Operations (Construction) Qualification Specification ProQual 2014 Contents Page Introduction 3 The Qualifications and Credit Framework (QCF) 3 Qualification profile

More information

CONTINENTAL FERRY PORT SITE INDUCTION

CONTINENTAL FERRY PORT SITE INDUCTION CONTINENTAL FERRY PORT SITE INDUCTION Port activities As landlord of the Commercial Port, the Port Authority must be informed of all works conducted on these premises The Authority is committed to the

More information

HFM Asset Management Contractor Induction Queens Riverside Apartments

HFM Asset Management Contractor Induction Queens Riverside Apartments HFM Asset Management Contractor Induction Queens Riverside Apartments Contents Purpose About HFM Asset Management HFM Asset Management s Responsibilities Contractors Responsibilities Commencing Work Working

More information

Contractor Selection & Management Guideline Rev01. Revision 00. April 2011

Contractor Selection & Management Guideline Rev01. Revision 00. April 2011 Contractor Selection and Management Guideline Revision 00 April 2011 Document Details and Issue Record Rev No. Details Date Author 00 Draft 10/04/2011 CJMD Checked Text Calcs Approved Document Reference:

More information

H&S007 Level 2 and 3 Risk Health and Safety Contractor Approval Request

H&S007 Level 2 and 3 Risk Health and Safety Contractor Approval Request Private Bag 9023 Whangarei 0148 New Zealand T: 09 430 4200 0800 WDC INFO 0800 932 463 F: 09 438 7632 W: www.wdc.govt.nz E: mailroom@wdc.govt.nz H&S007 Level 2 and 3 Risk Health and Safety Contractor Approval

More information

HAS/042/001 Code of Practice for Work on Street Lighting and Street Furniture including Installation, Repairs and Maintenance

HAS/042/001 Code of Practice for Work on Street Lighting and Street Furniture including Installation, Repairs and Maintenance Version:- 2.0 Date of Issue:- March 2017 Page 1 of 13 HAS/042/001 Code of Practice for Work on Street Lighting and Street Furniture including Installation, Repairs and Maintenance 1. Purpose The purpose

More information

HSE statement on radiation protection advisers

HSE statement on radiation protection advisers HSE statement on radiation protection advisers The requirements of this Statement came into effect on 31 March 2007 Purpose Introduction Criteria of core competence Assessing bodies Suitable RPA's Annex

More information

INFORMATION GOVERNANCE POLICY

INFORMATION GOVERNANCE POLICY INFORMATION GOVERNANCE POLICY Page 1 of 13 INFORMATION GOVERNANCE POLICY EXECUTIVE SUMMARY Key Messages Principles of Information Governance Openness Confidentiality and Legal Compliance Information Security

More information

HEALTH & SAFETY POLICY TABLE OF CONTENTS RESPONSIBILITIES

HEALTH & SAFETY POLICY TABLE OF CONTENTS RESPONSIBILITIES TABLE OF CONTENTS INTRODUCTION Page 1 STATEMENT OF INTENT Page 2 Employer's Responsibilities Management Regulations Page 3 Employee's Responsibilities Page 4 Information for Employees Joint Consultation

More information

Building Regulations and fire safety: procedural guidance

Building Regulations and fire safety: procedural guidance Building Regulations and fire safety: procedural guidance Contents Foreword...2 Terminology...4 Section 1 - Introduction...5 What Legislation Applies...5 Building Regulations...5 Fire Precautions Act 1971...5

More information

Level 3 NVQ Diploma in Controlling Lifting Operations Supervising Lifts (Construction)

Level 3 NVQ Diploma in Controlling Lifting Operations Supervising Lifts (Construction) Level 3 NVQ Diploma in Controlling Lifting Operations Supervising Lifts (Construction) Qualification Specification ProQual 2017 1 Contents Page Introduction 3 Qualification profile 3 Qualification structure

More information

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Construction Operations (Construction)

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Construction Operations (Construction) Civil Engineering Services Construction Operations (Construction) Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 4 Qualification structure 5 Centre requirements

More information

Themed Audits Safe Recruitment

Themed Audits Safe Recruitment Internal Audit Report Themed Audits Safe Recruitment 2016/17 Issued to: Simon Newland Assistant Director (Education Provision and Access) Marcus Cooper - Senior Education Manager Copied to Report Status:

More information

Dangerous Substances Handling, Use and Storage Policy

Dangerous Substances Handling, Use and Storage Policy Relevant UTAS Ordinance, Rule and/or GLP No. Relevant State/Federal Govt. Legislation Commencement Date December, 2009 Governance Level Principle No. 6 Occupational Health & Safety Workplace Health and

More information

Lone Working Policy Reference DP113

Lone Working Policy Reference DP113 Responsible Person: Business Director Committee: Pupil, Parent & Community Last Review: November 2017 Next Review: November 2020 The Governing Board of Hazel Grove High School recognises its obligations

More information

219 Make sure your own actions reduce risks to health and safety

219 Make sure your own actions reduce risks to health and safety 219 Make sure your own actions reduce risks to health and safety QCF Reference Number R/501/0874 Level: 2 Credit Value: 5 Learning outcomes The learner will: 1. Identify the hazards and evaluate the risks

More information

King s Oak Primary School

King s Oak Primary School King s Oak Primary School Safer Recruitment and Selection Policy Introduction King s Oak Primary School is committed to safeguarding and promoting the welfare of children and young people and requires

More information

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) CS-OHS-11

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) CS-OHS-11 CS ENERGY PROCEDURE FOR JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) CS-OHS-11 Responsible Officer: HSSE Management Systems Specialist Responsible Executive: Group Manager Health Safety Security and Environment

More information

Authorising Engineer (Ventilation) AE(V): Competency Requirements DRAFT

Authorising Engineer (Ventilation) AE(V): Competency Requirements DRAFT Authorising Engineer (Ventilation) AE(V): Competency Requirements DRAFT 1. Introduction Why have competency standards for AEs? In short to give confidence to clients and organisations planning to employ

More information

Health and Safety Manual

Health and Safety Manual Health and Safety Manual CS-OHS-M-01 Version 2 Effective date: 30 November 2012 Next review date: 01 November 2014 Health and Safety Manual CS-OHS-M-01 FOREWORD The foundation of CS Energy s success as

More information

21311 PROCEDURE - HEALTH AND SAFETY - RISK ASSESSMENT. 2. Risk Assessments/Health and Safety Considerations

21311 PROCEDURE - HEALTH AND SAFETY - RISK ASSESSMENT. 2. Risk Assessments/Health and Safety Considerations Version 13 Last updated 16/03/2017 Review date 16/03/2018 Equality Impact Assessment Low Owning department Health and Safety / Risk 1. About this Procedure 1.1. This procedure explains the Force Procedure

More information

Interviewer Quality Control Scheme

Interviewer Quality Control Scheme Interviewer Quality Control Scheme Minimum service standards for market research data collection Final Pre-Approved Version 9 th May 2013 Issued by the IQCS Council of Management IQCS 2013 CONTENTS 1 General

More information

Managing Fixed Term Contracts Policy & Procedure. All employees HR, NEL CSU. Policy Screened Yes N/A

Managing Fixed Term Contracts Policy & Procedure. All employees HR, NEL CSU. Policy Screened Yes N/A 1 SUMMARY Managing Fixed Term Contracts Policy & Procedure 2 RESPONSIBLE PERSON: Jennie Williams, Executive Nurse and Director of Quality & Integrated Governance 3 ACCOUNTABLE DIRECTOR: 4 APPLIES TO: 5

More information

HAUC England Advice Note No. 2014/02. Code of Practice for Inspections: Defects Not Causing Danger Inspections ENGLAND

HAUC England Advice Note No. 2014/02. Code of Practice for Inspections: Defects Not Causing Danger Inspections ENGLAND HAUC England Advice Note No. 2014/02 Code of Practice for Inspections: Defects Not Causing Danger Inspections ENGLAND Version: VI Control Document No.: 1 Document Owner: Roger Culpin and Mark Ostheimer

More information

East Riding of Yorkshire Council Corporate Health and Safety Policy

East Riding of Yorkshire Council Corporate Health and Safety Policy East Riding of Yorkshire Council Corporate Health and Safety Policy Lead Directorate and Service: Corporate Resources - Human Resources, Safety Services Effective Date: June 2016 Date Due for Review: June

More information

CISRS CONSTRUCTION INDUSTRY SCAFFOLDERS RECORD SCHEME CAP 609 GENERAL INFORMATION BOOKLET

CISRS CONSTRUCTION INDUSTRY SCAFFOLDERS RECORD SCHEME CAP 609 GENERAL INFORMATION BOOKLET CISRS CONSTRUCTION INDUSTRY SCAFFOLDERS RECORD SCHEME CAP 609 GENERAL INFORMATION BOOKLET Published by: Construction Industry Scaffolder s Record Scheme (CISRS) First published 1978 Copyright CISRS 2016

More information

CHAS Health & Safety Training Requirements July 2017

CHAS Health & Safety Training Requirements July 2017 CHAS Health & Safety Training Requirements July 2017 Page1 Introduction The purpose of this document is to provide some basic information and guidance with respect to the types of training and competence

More information