1 Page 1 of 6 Issue: 2 1. Intent The Salvation Army Australia Eastern Territory (TSA-AUE) is committed to the provision of a safe, healthy and injury free environment for all persons in the mission / ministry and operations under TSA-AUE control. TSA-AUE recognises the need to provide a structured approach to change in order to identify, assess, and control all risk exposures that could be associated with new or changed processes, plant & equipment and/ or materials with the potential to adversely affect the health and safety of our people and others involved in business or operations. 2. Purpose To ensure all hazards associated with new or changed processes, plant & equipment and / or materials with the potential to adversely affect the health and safety of our people and others impacted by our business are identified and the risks eliminated or effectively controlled prior to the introduction of that change. To provide direction, guidance and assistance to Officers / management who will be accountable for establishing the Change Management Process for any activity (within their area of responsibility) that will result in a change that has the potential to adversely affect the health and safety of our people either directly or indirectly. 3. Definitions Change: Change Initiator: Department: Hazard: Officer: Risk: The introduction, purchase or trial of a new item of plant, hazardous chemical, process or material a modification made whether temporary or permanent, to an existing unit of plant, or process from its current design or state. Normal repairs or other activities to restore same functionality are NOT considered as change. The person responsible for introducing the proposed change. An entity within TSA-AUE organization with specific responsibilities to carry out the various functions and activities of, although ultimate control remains under TSA-AUE leadership. A source or a situation with a potential for harm in terms of human injury or ill-health, damage to property, damage to the environment, or a combination of these. A person who is specifically commissioned for ministry within TSA. This ministry ranges from evangelical to pastoral duties as well as community service and administrative responsibilities. (In relation to any potential injury or harm) The likelihood and consequence of that injury or harm occurring.

2 Page 2 of 6 Issue: 2 4. Methodology To effectively manage the health, safety and welfare risks associated with introducing new or changed processes, plant & equipment and/ or materials into our business we must: Identify if the new or changed processes, plant & equipment, hazardous chemical and/ or materials will introduce new hazards or risks or exacerbate any existing hazards or risks in accordance with our hazard management processes. Identify the need for and scope of the project management process including necessary appointments. Ensure the change management process is conducted in line with our consultation and engagement processes. This procedure should be read in conjunction with our Change Management Flow Chart F13-02, Purchasing, Hire or Leasing Procedure P17-01, Hazard Management Procedure P4-01, Hazard Identification Procedure P4-02, Risk Assessment & Control Procedure P4-03, Safe Plant & Equipment Management Procedure P29-01, Hazardous Chemicals and Dangerous Goods Management Procedure P24-01, Manual Handling Policy OHS-025 and Contractor Management Procedure P14-01 by further defining mandatory requirements, as well as establishing a risk based approach. The application of the change management process shall be undertaken using the Change Management Form F Procedure Information Exchange The Change Initiator or Project Manager shall seek information from designers, manufacturers, importers or suppliers in relation to calculations, data, analysis, risk assessments, etc. to identify all potential hazards and risks associated with the use, handling, storage, construction, installation, maintenance, decommissioning, dismantling and disposal arrangements associated with the proposed change and to ensure where reasonably practicable that the recommendations / controls as detailed can be complied with at the workplace. Consultation In consultation with the WHS Committee / consultative forum or relevant workers and / or their representatives the Change Initiator or Project Manager shall provide the key information obtained from the designers, manufacturers, importers or suppliers on the proposed change and seek feedback in relation to any foreseeable new hazards or any increased risks of existing hazards that are likely to result from the use, handling, storage, construction, installation, maintenance, decommissioning, dismantling and disposal arrangements arising from the proposed change. This will include consideration of:- Identification & assessment of legislative requirements Plant & equipment management processes Chemical management processes

3 Page 3 of 6 Issue: 2 Process compatibility Goods compatibility Risk management / training / emergency response requirements Where necessary or upon the request of the WHS Committee / consultative forum or relevant workers and / or their representatives, the Change Initiator or Project Manager shall seek advice, expertise and information from appropriately qualified and / or competent persons to aid in the understanding of the impacts of the proposed change in relation to the introduction of new hazards or increased risks from existing hazards. Where it is deemed unlikely that the proposed change will introduce new hazards or increase the risks associated with existing hazards the change shall be communicated to relevant workers via the provision of information, instruction and / or training and subsequently introduced. Where the consultation indicates the likely introduction of new hazards or increased risks from existing hazards the change management process shall be followed. The Change Initiator or Project Manager shall reconsider the proposed changed / Project Management Plan and where necessary make any amendments in order to prevent the introduction of new hazards or minimise the risk impact on existing hazards. Where the change involves the purchase of new plant, equipment, chemicals, goods or materials compliance with the Purchasing, Hire or Leasing Procedure P17-01 shall occur in addition to the requirements of this procedure. All meetings involving consultation during the change management process shall be documented. Project Management The Change Initiator shall determine the requirement to appoint a Project Manager to be responsible for the management of the change activity. This will be determined upon the scale of the change and the anticipated impact that the change has on TSA-AUE operations. Where Project Managers are appointed, the Project Manager shall determine the requirement for a Project Management Plan to be established based upon the nature, extent and complexity of the change being considered. Identification & assessment of legislative requirements The Change Initiator / Project Manager shall identify all applicable relevant legislation, regulations, regulated standards, approved codes of practice and guidance material associated with the proposed change. Permits, Licences, Registration Requirements The Change Initiator / Project Manager shall identify any relevant registration, permit and licencing requirements. Arrangements shall be made for all registration applications to be prepared in accordance with regulator requirements.

4 Page 4 of 6 Issue: 2 Permit and licensing requirements shall be identified via the Training Needs Analysis process and relevant worker s training plans shall be amended and training provided to enable worker competency. Management System Requirements The Change Initiator / Project Manager shall identify and update all management system requirements to ensure the ongoing support and management of the change once introduced into the operation. Registers, inspection systems, etc. shall be identified and amended as required to accommodate the change. Potential process and compatibility issues will be identified, considered and where necessary addressed to ensure the proposed change does not impact negatively on site activities. Risk Assessment The Change Initiator or Project Manager shall undertake comprehensive hazard identification, risk assessment and control activities in consultation with relevant workers and / or their representatives in accordance with the requirements contained within the Hazard Management Procedure P4-01, Hazard Identification Procedure P4-02, Risk Assessment & Control Procedure P4-03, Safe Plant & Equipment Management Procedure P29-01, Hazardous Chemicals and Dangerous Goods Management Procedure P24-01 and / or Manual Handling Policy OHS-025. Record Retention All calculations, data, analysis, risk assessments, etc. obtained from designers, manufacturers, importers or suppliers shall be held on file by the Change Initiator / Project Manager for the life of the change. Change Management Forms and risk assessments shall be held on file by the Change Initiator / Project Manager for the life of the change or 7 years (whichever is the longer). Control Reviews It is important that risk controls are regularly reviewed and monitored to ensure they have been implemented correctly and continue to be effective. Further controls shall be identified and implemented where this is not achieved. It is also important to ensure that controls implemented do not result in any new hazards. Risk assessments and their control measures shall be reviewed every five (5) years. Notwithstanding the above, risk assessments and control measures shall be reviewed if any of the following occurs:- There is evidence that the control measure does not control the risks identified or are not understood or being implemented There are further proposed changes to the workplace or work environment, a system of work, work practice, process or procedure that may create new or different risks. A new or relevant hazard is identified

5 Page 5 of 6 Issue: 2 New legislation is introduced or current legislation is revised that has implication on the controls implemented. As a result of consultation occurring between relevant workers and / or their representatives At the request of a Health and Safety Representative As a result of an incident where the investigation indicates that the controls may be insufficient. Additional information is obtained from the designer, manufacturer, importer or supplier that changes the manner in which identified hazards and risks should be controlled or identifies / indicates new or potential hazards present. As a result of an incident where the investigation indicates that the control may be insufficient. 6. Monitoring and Review Compliance with this procedure shall be reviewed and its effectiveness evaluated across TSA- AUE, in accordance with the WHS Planning, Monitoring and Review and Auditing Procedures. Key aspects of this flow chart s implementation shall be monitored via:- Change management forms Project Plans Risk assessments Management meeting minutes shall record the outcomes of any discussions relating to monitoring and review activities. 7. Auditable Records Auditable Record Responsibility Location Consultation minutes Communication minutes Project management plans Change management forms Plant risk assessments Hazardous manual handling task risk assessments Hazardous chemical risk assessments Hazard Register Plant and Equipment Register Chemical register

6 Page 6 of 6 Issue: 2 SDS s Training Needs Analyses Training records Licences, accreditations, permits Inspections, testing, calibration, monitoring reports Plant registrations Management meeting minutes & schedules WHS Committee / consultative forum minutes 4. Internal References TSA-AUE WHS Hazard Management Policy WHS 004 TSA-AUE WHS Hazard Management Procedure WHSP4-01 TSA-AUE WHS Hazard Identification Procedure WHSP4-02 TSA-AUE WHS Risk Assessment & Control Procedure WHSP4-03 TSA-AUE WHS Contractor Management Procedure WHSP14-01 TSA-AUE Change Management form F13-01 TSA-AUE WHS Purchasing, Hire or Leasing Procedure WHSP17-01 TSA-AUE WHS Pre Purchase checklist F17-01 TSA-AUE WHS Hazardous Chemicals and Dangerous Goods Management Procedure WHSP24-01 TSA-AUE WHS Safe Plant & Equipment Management Procedure WHSP29-01 TSA-AUE WHS Manual Handling Policy WHS 025

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) 4.1 General Requirements 4.2 OHS policy Has the organisation an established and maintained

More information

Performance Standards for Self-insurers

Performance Standards for Self-insurers A.1.3.1 adequacy check Applicant: name Date: date Person responsible for content: name Evaluator: name Performance Standards for Self-insurers This adequacy check relates specifically to the and/or Injury

More information

WORK HEALTH AND SAFETY AUDIT STANDARD

WORK HEALTH AND SAFETY AUDIT STANDARD WORK HEALTH AND SAFETY AUDIT STANDARD FORESTRY INDUSTRY South Australia, Victoria and Tasmania Safety Standards 2017 2017 Content I. Introduction... 2 II. Audit Criteria and Indicators... 3 1 PLANNING...

More information

Health and Safety Management Standards

Health and Safety Management Standards Management Standards Curtin University Sept 2011 PAGE LEFT INTENTIONALLY BLANK Management Standards Page 2 of 15 CONTENTS 1. Introduction... 4 1.1 Hierarchy of Documents... 4 2. Management System Model...

More information

See revision section. Resources, Roles, Responsibility, Accountability, and Authority. Section in OHSAS 18001:2007

See revision section. Resources, Roles, Responsibility, Accountability, and Authority. Section in OHSAS 18001:2007 1. PURPOSE The purpose of this document is to identify occupational health and safety roles and responsibilities at each function and level within the City of Dallas in accordance with the requirements

More information

CONTENTS MANAGEMENT STANDARDS ANGLO OCCUPATIONAL HEALTH WAY MANAGEMENT SYSTEM STANDARDS INTRODUCTION 1 3 LEGAL AND OTHER REQUIREMENTS 10

CONTENTS MANAGEMENT STANDARDS ANGLO OCCUPATIONAL HEALTH WAY MANAGEMENT SYSTEM STANDARDS INTRODUCTION 1 3 LEGAL AND OTHER REQUIREMENTS 10 Version 1 July 2007 CONTENTS INTRODUCTION 1 3 LEGAL AND OTHER REQUIREMENTS 10 OCCUPATIONAL HEALTH IN ANGLO AMERICAN OUR VISION OUR PRINCIPLES OUR POLICY 2 THE ANGLO OCCUPATIONAL HEALTH FRAMEWORK 3 CORPORATE

More information

National self-insurer OHS management system audit tool. Version 3

National self-insurer OHS management system audit tool. Version 3 National self-insurer OHS management system audit tool Version 3 Release Date: 4 August 2014 Next Review Date: 2016 Approval Status: Prepared by: Approved by Heads of Workers Compensation Authorities WorkCover

More information

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock 1/16 Management of Rolling Stock Revision Date Comments 1 January 2011 Procedure developed to support SMS and legislative requirements. 2 February 2012 Reviewed with RISSB Standards and change of titles

More information

CONTRACTOR WHS HAZARD STANDARD TRAFFIC MANAGEMENT EXTERNAL USE ONLY

CONTRACTOR WHS HAZARD STANDARD TRAFFIC MANAGEMENT EXTERNAL USE ONLY CONTRACTOR WHS HAZARD STANDARD TRAFFIC MANAGEMENT EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition

More information

WHS Management Plans

WHS Management Plans WHS Management Plans Disclaimer This Guide provides general information about the obligations of persons conducting a business or undertaking and/or persons in control of premises and workers under the

More information

Policy Work Health and Safety (WHS) RCPA Introduction WHS legislation

Policy Work Health and Safety (WHS) RCPA Introduction WHS legislation Policy Subject: Work Health and Safety (WHS) Approval Date: July 2011, December 2014 Review Date: July 2018 Review By: Board of Directors Number: 1/2011 The Royal College of Pathologists of Australasia

More information

Work Health and Safety

Work Health and Safety Policy Health and Safety Endorsed: 23 August 2016 Brief description The GPC Health and Safety Policy and its supporting standards and procedures provide a framework to protect the health and safety of

More information

The anglo american Safety way. Safety Management System Standards

The anglo american Safety way. Safety Management System Standards The anglo american Safety way Safety Management System Standards 2 The Anglo American Safety Way CONTENTS Introduction 04 Anglo American Safety Framework 05 Safety in anglo american 06 Monitoring and review

More information

Verify Category A Audit Content

Verify Category A Audit Content Verify Category A Audit Content V10.0 Achilles Group Limited, 2014. All rights reserved. Objective The objective of this document is to provide suppliers who have registered for a Verify Category A (V10.0)

More information

Evaluation of Occupational Health & Safety Management System

Evaluation of Occupational Health & Safety Management System Section 1 Legal Obligation Employers have a duty of care to provide a safe workplace and systems of work, to consult with workers, to identify and manage workplace hazards and to keep them informed about

More information

WHS Manual Insert Business Name & Logo

WHS Manual Insert Business Name & Logo WHS Manual Insert Business Name & Logo Version5 Work Health & Safety Manual INDEX OVERVIEW 4 1. WORK HEALTH AND SAFETY POLICY 5 2. PLANNING, REVIEW AND EVALUATION 9 3. HAZARD IDENTIFICATIO, ASSESSMENT

More information

Designer and CDM Co-ordinator Guidance

Designer and CDM Co-ordinator Guidance Designer and CDM Co-ordinator Guidance Five or more employees 1 CONTENTS INTRODUCTION...4 Further reading / additional resources...4 QUESTION 1: POLICY AND ORGANISATION...5 Guidance...5 What you need to

More information

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY 1. Introduction 1.1 SCOPE & PURPOSE This policy (which includes this document and the work health and safety standards, policies, procedures and safety control

More information

MANUAL HANDLING PROCEDURE

MANUAL HANDLING PROCEDURE Document uncontrolled when printed Procedure ID no 0480/05 MANUAL HANDLING PROCEDURE This procedure is applicable to: All Department of Education and Children's Services employees. DOCUMENT CONTROL Managed

More information

HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd

HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd Company Trading Address 242 Fort Austin Avenue Crownhill Plymouth PL6 5NZ Tel: 01752 657227 Fax: 01752 657227 Email: enquiries@jmc-sw.com

More information

PERFORMANCE STANDARDS FOR SELF-INSURED EMPLOYERS

PERFORMANCE STANDARDS FOR SELF-INSURED EMPLOYERS ANNEXURE A: Performance standards for self-insured employers WorkCoverSA PERFORMANCE STANDARDS FOR SELF-INSURED EMPLOYERS WorkCover Corporation of South Australia, 2014 Page 74 of 104 Contents PERFORMANCE

More information

Bowmer. & Kirkland. Kirkland. & Accommodation. Health & Safety Policy.

Bowmer. & Kirkland. Kirkland. & Accommodation. Health & Safety Policy. Bowmer Kirkland & Kirkland & Accommodation Health & Safety Policy December 2013 www.bandk.co.uk Index Policy Statement Page 3 Interaction of Health and Safety Responsibilities Page 5 Organisation Page

More information

219 Make sure your own actions reduce risks to health and safety

219 Make sure your own actions reduce risks to health and safety 219 Make sure your own actions reduce risks to health and safety QCF Reference Number R/501/0874 Level: 2 Credit Value: 5 Learning outcomes The learner will: 1. Identify the hazards and evaluate the risks

More information

CATEGORY Policy SUBJECT Work Health & Safety ISSUED BY Human Resources APPROVAL DATE 05/08/2015

CATEGORY Policy SUBJECT Work Health & Safety ISSUED BY Human Resources APPROVAL DATE 05/08/2015 POLICY NUMBER P15/2 VERSION 1.0 CATEGORY Policy SUBJECT Work Health & Safety ISSUED BY Human Resources APPROVAL DATE 05/08/2015 AUTHORISED BY Trust ISSUED DATE 10/08/2015 DISTRIBUTION External REVIEW DATE

More information

Centre for Rail Skills. National Occupational Standards. for the. Maintenance and Repair of. Traction and Rolling Stock

Centre for Rail Skills. National Occupational Standards. for the. Maintenance and Repair of. Traction and Rolling Stock Centre for Rail Skills National Occupational Standards for the Maintenance and Repair of Traction and Rolling Stock March 2003 Introduction This document sets out the work done on the revised CFRS National

More information

HEALTH AND SAFETY STRATEGY

HEALTH AND SAFETY STRATEGY HEALTH AND SAFETY STRATEGY 2016-2019 Version: 1.0 Ratified by: Integrated Governance Committee Date ratified: 30 September 2015 Title of originator/author: Title of responsible committee/group: Head of

More information

1. Quality Policy: Complete Metrology Sourcing. 2. Company History:

1. Quality Policy: Complete Metrology Sourcing. 2. Company History: Quality Fact Sheet 2018 1. Quality Policy: Avon-Dynamic Calibration provides its customers with a calibration and inspection service, which is both genuine and reliable, assuring them of the highest level

More information

EDUCATION SUPPORT OFFICER Cardijn College Position Information Document

EDUCATION SUPPORT OFFICER Cardijn College Position Information Document EDUCATION SUPPORT OFFICER Cardijn College Position Information Document Name: Position Title: Maintenance Officer Employment: Permanent Replacement Temporary x Commencement date: / / 2016 Full Time/Part-time

More information

Corporate Health and Safety Policy July 2012

Corporate Health and Safety Policy July 2012 Corporate Health and Safety Policy July 2012 Contents Page General Statement of Health and Safety Policy and Intent 2 1. ORGANISATION 3 1.1 Elected Members 3 1.2 Cabinet Members 3 1.3 Governing Bodies

More information

HEALTH & SAFETY POLICY TABLE OF CONTENTS RESPONSIBILITIES

HEALTH & SAFETY POLICY TABLE OF CONTENTS RESPONSIBILITIES TABLE OF CONTENTS INTRODUCTION Page 1 STATEMENT OF INTENT Page 2 Employer's Responsibilities Management Regulations Page 3 Employee's Responsibilities Page 4 Information for Employees Joint Consultation

More information

Work Health and Safety Management Systems and Auditing Guidelines

Work Health and Safety Management Systems and Auditing Guidelines Work Health and Safety Management Systems and Auditing Guidelines 5th edition, September 2013 (Updated May 2014) Work Health and Safety Management Systems and Auditing Guidelines These Guidelines are a

More information

Contractors for which this position is responsible:

Contractors for which this position is responsible: POSITION DESCRIPTION 1. POSITION DETAILS Position Title: Division: Unit: Management Level: Facilities Coordinator City Operations Venue Management Supervisor/Team Leader 2. ORGANISATIONAL RELATIONSHIPS

More information

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 CS ENERGY PROCEDURE FOR GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 Responsible Officer: Manager Environment Approved: Executive General Manager Asset Strategy DOCUMENT HISTORY Date

More information

Occupational Health and Safety Management Manual v2.2

Occupational Health and Safety Management Manual v2.2 Occupational Health and Safety Management Manual v2.2 Written: February 2013 Author: David Seymour, Director of Operations Co Author: Mathew Sprake, Operations Manager Approved: Board of Directors 1. Introduction

More information

Responsible Sourcing Policy

Responsible Sourcing Policy June 2015 Document Owner Group Procurement Version 5.1 Date of Issue 08 June 2015 Creation Date: June 2015 Page 2 of 13 1 Purpose, Scope & Priorities 1.1 Purpose The purpose of this document is to describe

More information

CHAS Assessment Standards

CHAS Assessment Standards CHAS Assessment Standards Section 1 - All Prosecutions or Enforcement Notices The Supplier has provided details of any enforcement notices or prosecutions served on them in the last three years by the

More information

5.43 NOSA CMB

5.43 NOSA CMB FRESH STANDARD CONTRACTOR OCUPATIONAL HEALTH & SAFETY Approval: 5.43 NOSA CMB 150 5.43 New OHSAS 18001:2007 4.3.2; 4.4.2; 4.4.6 Supersede Std. 5.43 rev 01 Revision No. 02 Effective Date 18 August 2014

More information

CDM-C Guidance. Five or more employees. Health and Safety 1. CMD-C Guidance Notes V

CDM-C Guidance. Five or more employees. Health and Safety 1. CMD-C Guidance Notes V CDM-C Guidance Five or more employees Health and Safety 1 CONTENTS INTRODUCTION...4 Further reading / additional resources...4 QUESTION 1: POLICY AND ORGANISATION...5 Guidance...5 What you need to provide...6

More information

Work Health and Safety Consultation, Cooperation and Coordination

Work Health and Safety Consultation, Cooperation and Coordination Work Health and Safety Consultation, Cooperation and Coordination Code of Practice December 2012 CP135 Workplace Standards Department of Justice This code of practice has been approved by the Tasmanian

More information

Occupational Health and Safety Management System. OHSAS 18001:2007 OH&S Manual

Occupational Health and Safety Management System. OHSAS 18001:2007 OH&S Manual Occupational Health and Safety Management System OHSAS 18001:2007 OH&S Manual Type Your Company Name, Address, City, State, Zip Here This generic manual is to be used as a template in developing your Manual

More information

CODE HEALTH AND SAFETY COMMITTEE. Student Safety: A Guide for Supervisory Officers, Principals and Vice-Principals

CODE HEALTH AND SAFETY COMMITTEE. Student Safety: A Guide for Supervisory Officers, Principals and Vice-Principals CODE HEALTH AND SAFETY COMMITTEE Student Safety: A Guide for Supervisory Officers, Principals and Vice-Principals June 2013 About this guide Developed by a team of educators and health and safety professionals

More information

National Harmonisation of WHS Legislation

National Harmonisation of WHS Legislation National Harmonisation of WHS Legislation Considerations for Schools Update No. 2 Roles and Structure July, 2011 Michael Shorter, CAHRI, CPMSIA, RSP (Aust) Grad. Dip. Occ. Health Prac. This update contains

More information

Community & Client Services. Health & Regulatory Services

Community & Client Services. Health & Regulatory Services Position Title: Team Leader Environmental Health Level: Salaried 6 Department: Program: Position Numbers: Community & Client Services Health & Regulatory Services HRS011 Position Objective Contribute to

More information

Designer and CDM Co-ordinator Guidance

Designer and CDM Co-ordinator Guidance Designer and CDM Co-ordinator Guidance Fewer than five employees Health and Safety 1 CONTENTS INTRODUCTION...5 Further reading / additional resources...5 Note to suppliers...6 QUESTION 1: POLICY AND ORGANISATION...8

More information

THE COMPLETE GUIDE TO ISO14001

THE COMPLETE GUIDE TO ISO14001 THE COMPLETE GUIDE TO ISO14001 1. Introduction... 3 Plan Do Check Act... 5 2. Requirements... 7 Environmental Policy... 7 Environmental Aspects... 7 Legal and Other Requirements... 8 Objectives & Targets...

More information

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities DS447 Date: 20 February 2015 IAEA SAFETY STANDARDS for protecting people and the environment STATUS: SPESS STEP 12 For submission to CSS Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle

More information

Licensee Design Authority Capability

Licensee Design Authority Capability Title of document ONR GUIDE Licensee Design Authority Capability Document Type: Unique Document ID and Revision No: Nuclear Safety Technical Assessment Guide NS-TAST-GD-079 Revision 3 Date Issued: April

More information

UEENEEE101A Apply Occupational Health and Safety regulations, codes and practices in the workplace

UEENEEE101A Apply Occupational Health and Safety regulations, codes and practices in the workplace UEENEEE101A Apply Occupational Health and Safety regulations, codes and practices in the workplace Release: 1 UEENEEE101A Apply Occupational Health and Safety regulations, codes and practices in the workplace

More information

Guideline Asset Management

Guideline Asset Management Guideline Asset Management Title of the document National Rail Safety Regulator Page1of28 Document reference number: A389849 Version No. Approved by Publication date 1.0 Chief Executive November 2014 1.1

More information

Electrical Safety Management Plan (ESMP)

Electrical Safety Management Plan (ESMP) Electrical Safety Management Plan (ESMP) CONTENTS 1 INTRODUCTION 4 1.1 Purpose 4 1.2 Background 4 2 OBJECTIVES OF THE ESMP 2.1 Electrical Safety Policy 2.2 Electrical Safety Goals 2.3 Objectives 5 5 5

More information

City Infrastructure and Traffic Operations. Titles of Positions which report to the Principal Engineer are:

City Infrastructure and Traffic Operations. Titles of Positions which report to the Principal Engineer are: POSITION DESCRIPTION 1. POSITION DETAILS Position Title: Division: Unit: Management Level: Principal Engineer, Electrical and Furniture Assets City Operations City Infrastructure and Traffic Operations

More information

Quality Manual DRAFT. Quality Management Plan Version A1 Date: <22/01/11> Page 1 of 17

Quality Manual DRAFT. Quality Management Plan Version A1 Date: <22/01/11> Page 1 of 17 Quality Manual DRAFT Page 1 of 17 Document Acceptance and Release Notice This is Revision A1 of the East Coast Designer Builders Quality Manual. The Manual is a managed document. For identification of

More information

Protocol for Consultation with Trade Union Safety representatives.

Protocol for Consultation with Trade Union Safety representatives. Protocol for Consultation with Trade Union Safety representatives. Introduction The purpose of this protocol is to outline the arrangements within the School for consulting and cooperating with Trade Union

More information

Qualification of Suppliers of Safety Critical Engineering Products and Services

Qualification of Suppliers of Safety Critical Engineering Products and Services Qualification of Suppliers of Safety Critical Engineering Products and Services Signatures removed from electronic version Submitted by George Clayton Nominated Responsible Manager Approved by Colin Boocock

More information

Release: 1. CPPDSM4015B Minimise agency and consumer risk

Release: 1. CPPDSM4015B Minimise agency and consumer risk Release: 1 CPPDSM4015B Minimise agency and consumer risk CPPDSM4015B Minimise agency and consumer risk Modification History Not Applicable Unit Descriptor Unit descriptor This unit of competency specifies

More information

WORK IN THE VICINITY OF POWER POLES AND OVERHEAD LINES

WORK IN THE VICINITY OF POWER POLES AND OVERHEAD LINES CONTRACTOR WHS HAZARD STANDARD WORK IN THE VICINITY OF POWER POLES AND OVERHEAD LINES EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES

More information

BROOKHAVEN NATIONAL LABORATORY SBMS Interim Procedure

BROOKHAVEN NATIONAL LABORATORY SBMS Interim Procedure BROOKHAVEN NATIONAL LABORATORY SBMS Interim Procedure Interim Procedure Number: 2004-18001-005 Revision: 12 on 1-26-07 Title: 18001 Audit Checklist Point of Contact: Pat Williams Management System: Occupational

More information

Position Description

Position Description Position Description Wesley Training Programs Manager Wesley Vocational Institute Agreement Signed Programs Manager Signed Operations Manager, Wesley Training Name Name 1 Date Date This position description

More information

PABIAC STRATEGIC OBJECTIVE 2: SAFETY MANAGEMENT SYSTEMS. A self assessment tool for SMEs.

PABIAC STRATEGIC OBJECTIVE 2: SAFETY MANAGEMENT SYSTEMS. A self assessment tool for SMEs. PABIAC STRATEGIC OBJECTIVE 2: SAFETY MANAGEMENT SYSTEMS. A self assessment tool for SMEs. Over the period April 2008 to March 2011 all employers should demonstrate a continuously improving health and safety

More information

Electricity in underground mines and tunnels

Electricity in underground mines and tunnels INTERPRETIVE GUIDELINES Electricity in underground mines and tunnels The relationship between the Health and Safety in Employment (Mining Operations and Quarrying Operations) Regulations 2013 and the Electricity

More information

THE MANAGEMENT OF WORK HEALTH AND SAFETY IN THE COMMONWEALTH JURISDICTION. Establishing a work health and safety management system

THE MANAGEMENT OF WORK HEALTH AND SAFETY IN THE COMMONWEALTH JURISDICTION. Establishing a work health and safety management system THE MANAGEMENT OF WORK HEALTH AND SAFETY IN THE COMMONWEALTH JURISDICTION Establishing a work health and safety management system DISCLAIMER This guide provides a basic and general overview of subject

More information

SECTION 1 - INTRODUCTION 2 PURPOSE 2 SCOPE 2 DEFINITIONS 2 LEGISLATIVE CONTEXT 4 RESPONSIBILITIES 4

SECTION 1 - INTRODUCTION 2 PURPOSE 2 SCOPE 2 DEFINITIONS 2 LEGISLATIVE CONTEXT 4 RESPONSIBILITIES 4 OH&S Procedure Name: Manual Handling Procedure Approved by: Director Human Resources Last reviewed: December 2013 SECTION 1 - INTRODUCTION 2 PURPOSE 2 SCOPE 2 DEFINITIONS 2 LEGISLATIVE CONTEXT 4 RESPONSIBILITIES

More information

VOLUNTEER SERVICE COORDINATOR. Central Victorian Volunteer Service. EFT 0.6 (3 days per week)

VOLUNTEER SERVICE COORDINATOR. Central Victorian Volunteer Service. EFT 0.6 (3 days per week) POSITION DESCRIPTION TITLE VOLUNTEER SERVICE COORDINATOR Health and wellbeing for all through: Compassion Integrity Flexibility Respect Commitment PROGRAM/TEAM EFT TYPE/PERIOD OF EMPLOYMENT CLASSIFICATION

More information

Business Continuity Policy

Business Continuity Policy Business Continuity Policy To ensure the effective availability of essential products and services, BCQ has raised this Business Continuity Policy in support of a comprehensive program for business continuity,

More information

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) EHS Regulatory Instrument Code of Practice EHS RI - CoP 53.0 EHS Management During Construction Work Version 2.0 February 2012 ACKNOWLEDGEMENTS With gratitude

More information

BEHAVIOUR ON SAFE SITES

BEHAVIOUR ON SAFE SITES Page: 1 of 8 P932 (a) Introduction: Black & Veatch has set a target of achieving ZERO incidents and injuries across all of its business operations. At B&V, we believe that zero incidents and injuries are

More information

Position Title Customer & Service Delivery Manager, Metropolitan

Position Title Customer & Service Delivery Manager, Metropolitan Position Title Customer & Service Delivery Manager, Metropolitan Position Purpose This role is one of five functional roles that form the leadership team directly reporting into the General Manager Customer

More information

Click on the relevant state and open the OHS authority website.

Click on the relevant state and open the OHS authority website. Copyright 2011 - OnGuard Safety Training Pty Ltd 1 of 7 Introduction Overview OHS Acts National Codes Codes of Practice Duty of Care Overview Occupational health and safety (OHS) legislation varies in

More information

POSITION DESCRIPTION. JOB TITLE: Director, Corporate Services STATUS: Permanent. LOCATION: Sydney HOURS: 35 hours per week

POSITION DESCRIPTION. JOB TITLE: Director, Corporate Services STATUS: Permanent. LOCATION: Sydney HOURS: 35 hours per week POSITION DESCRIPTION Cancer Council Australia is the nation s leading non-government cancer control organisation. Cancer Council develops and promotes independent, evidence-based policy and information

More information

Managing Health & Safety

Managing Health & Safety Managing Health & Safety This section of the resource pack explains the principles behind OHS management. It explains what hazard and risk management means and then provides guidance on how to put hazard

More information

Health, Safety and Environmental Management Systems Audit Report

Health, Safety and Environmental Management Systems Audit Report Health, Safety and Environmental Management Systems Audit Report SMART Group of Companies Jaunuary 2016 Page 1 of 18 1.0 Executive Summary A review of SMART Technical Services workplace health and safety

More information

JOB DESCRIPTION SECOND IN CHARGE OF SCIENCE Science Teacher SECOND IN CHARGE OF SCIENCE

JOB DESCRIPTION SECOND IN CHARGE OF SCIENCE Science Teacher SECOND IN CHARGE OF SCIENCE Broomfield School Job title Type of post Salary scale Line Manager JOB DESCRIPTION SECOND IN CHARGE OF SCIENCE Science Teacher SECOND IN CHARGE OF SCIENCE Permanent Main Scale/UPS + TLR 2b Head of Science

More information

UCLH Asbestos Management Plan. July 2017

UCLH Asbestos Management Plan. July 2017 UCLH Asbestos Management Plan July 2017 Out of Hours and Emergency contacts: Larne Fuller Tel: 0345 5040 303 Mob: 07881 108 17 Joe Beesley Tel: 0345 5040 303 Mob: 07710 306 326 E-mail: uclh@ lucionservices.com

More information

Lone Working Policy Reference DP113

Lone Working Policy Reference DP113 Responsible Person: Business Director Committee: Pupil, Parent & Community Last Review: November 2017 Next Review: November 2020 The Governing Board of Hazel Grove High School recognises its obligations

More information

Occupational Health and Safety Program Manual Chapter 14 Monitoring and Measurement. Table of Contents

Occupational Health and Safety Program Manual Chapter 14 Monitoring and Measurement. Table of Contents Table of Contents 14.1 Introduction... 2 14.2 Measurement of Performance Related to OHS Objectives and Targets... 2 14.2.1 Process Indicators... 2 14.2.2 Outcome Indicators... 3 14.3 Measurement of OHS

More information

Child Protection Compliance

Child Protection Compliance Compliance PURPOSE OF THE POLICY The purpose of this policy is to provide written processes to ensure that complies with legislation applying in Queensland about the care and protection of children. In

More information

Health, Safety and Welfare Policy

Health, Safety and Welfare Policy Health, Safety and Welfare Policy Contents Introduction Our objectives Health and Safety Policy Statement Health and safety organogram Responsibilities for health, safety and welfare 2 3 4 5 6 13 Arrangements

More information

NUCLEAR SAFETY REQUIREMENTS BSR

NUCLEAR SAFETY REQUIREMENTS BSR NUCLEAR SAFETY REQUIREMENTS BSR-1.8.2-2015 APPROVED BY Order No. 22.3-99 of The Head of State Nuclear Power Safety Inspectorate, of 7 October 2011 (as amended by Order No. 22.3-57 of the Head of State

More information

Occupational Health and Safety. Improvement Standard

Occupational Health and Safety. Improvement Standard Premier s Department New South Wales Occupational Health and Safety Improvement Standard A tool for measuring OHS performance within NSW Government Agencies OHS IMPROVEMENT STANDARD NSW GOVERNMENT - REVIEW

More information

NHSLA Risk Management Standards for NHS Trusts Providing Community Services 2011/12

NHSLA Risk Management Standards for NHS Trusts Providing Community Services 2011/12 NHSLA Risk Management Standards for NHS Trusts Providing Community Services 2011/12 Milton Keynes Primary Care Trust Provider of Community and Mental Health Services Level 1 May 2011 Contents Page 1: Executive

More information

Level 3 Award, Certificate and Diploma in Workbased Agriculture ( ) August 2015 Version 2.3 (September 2014)

Level 3 Award, Certificate and Diploma in Workbased Agriculture ( ) August 2015 Version 2.3 (September 2014) QUALIFICATION HANDBOOK Level 3 Award, Certificate and Diploma in Workbased Agriculture (0066-81-82-83) August 2015 Version 2.3 (September 2014) Qualification at a glance Subject area Agriculture City &

More information

AGILE WORKPLACE SAFETY GUIDELINES

AGILE WORKPLACE SAFETY GUIDELINES UOW SAFE@WORK AGILE WORKPLACE SAFETY GUIDELINES HRD-WHS-GUI-648.1 Agile Workplace Safety Guidelines Page 1 of 6 Contents Agile Workplace Guidelines 1 Introduction...3 2 Purpose...3 3 Scope...3 4 Responsibilities...3

More information

BSB41415 Certificate IV in Work Health and Safety. Safety Culture and Compliance. V1.0 Produced 25 November 2015

BSB41415 Certificate IV in Work Health and Safety. Safety Culture and Compliance. V1.0 Produced 25 November 2015 BSB41415 Certificate IV in Work Health and Safety Safety Culture and Compliance V1.0 Produced 25 November 2015 Copyright 2016 Compliant Learning Resources. All rights reserved. No part of this publication

More information

Before you begin. Topic 1: Provide WHS information to the work team 1. Learning checkpoint 1: Provide WHS information to the work team 15

Before you begin. Topic 1: Provide WHS information to the work team 1. Learning checkpoint 1: Provide WHS information to the work team 15 Contents Before you begin vii Topic 1: Provide WHS information to the work team 1 1A Explain WHS legislation and codes of practice to the work team 2 1B Provide accessible organisational WHS information

More information

ISO 22000:2005 Standard INTERNATIONAL STANDARDS REGISTRATIONS

ISO 22000:2005 Standard INTERNATIONAL STANDARDS REGISTRATIONS ISO 22000:2005 Standard Food Safety Management System INTERNATIONAL STANDARDS REGISTRATIONS 3.1 FOOD SAFETY concept that food will not cause harm to the consumer when it is prepared and/or eaten according

More information

The Horse Rangers Association Health & Safety Policy

The Horse Rangers Association Health & Safety Policy The Horse Rangers Association Health & Safety Policy General Statement of Intent The company believes that excellence in the management of health and safety is an essential element within its overall business

More information

University of Birmingham

University of Birmingham University of Birmingham Health and Safety Policy Manager responsible for review: Facilities Manager Date of last review and update: April 2015 Approved by: H&S committee 2015 Next scheduled review date:

More information

City Infrastructure and Traffic Operations. Titles of Positions which report to Public Domain Team Leader are:

City Infrastructure and Traffic Operations. Titles of Positions which report to Public Domain Team Leader are: POSITION DESCRIPTION 1. POSITION DETAILS Position Title: Division: Unit: Management Level: Team Leader Public Domain City Operations City Infrastructure and Traffic Operations Supervisor/Team Leader 2.

More information

Contractor Selection & Management Guideline Rev01. Revision 00. April 2011

Contractor Selection & Management Guideline Rev01. Revision 00. April 2011 Contractor Selection and Management Guideline Revision 00 April 2011 Document Details and Issue Record Rev No. Details Date Author 00 Draft 10/04/2011 CJMD Checked Text Calcs Approved Document Reference:

More information

Return to Work Policy and Procedure

Return to Work Policy and Procedure Return to Work Policy and Procedure Category: Number: Responsibility: Approval: Amendments: Human Resources HU1 Director of Human Resources January 2016, Administration Every 5 years or as circumstances

More information

Overview of Good Food Laboratory Practices

Overview of Good Food Laboratory Practices Overview of Good Food Laboratory Practices Dr. Anne Bridges Technical Director, AACC International International Workshop & Training Program On Good Food Laboratory Practices Jointly Organized By Food

More information

ACCIDENT PREVENTION POLICY, SAFETY AND PROTECTION OF HEALTH AND ENVIRONMENT DOCUMENT OF ESSECO SRL

ACCIDENT PREVENTION POLICY, SAFETY AND PROTECTION OF HEALTH AND ENVIRONMENT DOCUMENT OF ESSECO SRL ACCIDENT PREVENTION POLICY, SAFETY AND PROTECTION OF HEALTH AND ENVIRONMENT DOCUMENT OF ESSECO SRL (In compliance with Art. 2 of Ministry Decree of August 09, 2000) Page 1 of 6 1. INTRODUCTION The ESSECO

More information

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Highways Maintenance (Construction)

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Highways Maintenance (Construction) Civil Engineering Services Highways Maintenance (Construction) Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification structure 4 Centre requirements

More information

Contractor Safety Management Procedure

Contractor Safety Management Procedure Contractor Safety Management Procedure Name: Approved by: Contractor Safety Management Procedure University Secretary Last reviewed: 9 February 2012 SECTION 1 - INTRODUCTION 2 PURPOSE 2 SCOPE 2 DEFINITIONS

More information

CS ENERGY PROCEDURE FOR A JOB SAFETY AND ENVIRONMENTAL ANALYSIS CS-OHS-11

CS ENERGY PROCEDURE FOR A JOB SAFETY AND ENVIRONMENTAL ANALYSIS CS-OHS-11 CS-OHS-11 (Amd 09/11) CS ENERGY PROCEDURE FOR A JOB SAFETY AND ENVIRONMENTAL ANALYSIS CS-OHS-11 Responsible Officer: Group Manager Health and Safety Approved: EGM Corporate CONTENTS 1 Purpose... 3 2 Context...

More information

POSITION DESCRIPTION

POSITION DESCRIPTION POSITION DESCRIPTION POSITION TITLE: TENURE: LOCATION: REPORTING MANAGER: LEADERSHIP PROVIDED TO: NATIONAL HSE COORDINATOR Full Time Mile End National HSE Manager 1. POSITION SUMMARY The National Health

More information

15. Building management

15. Building management 15. Building management Summary Buildings provide for safety, economic and social well-being, and lifeline services. Building management in an emergency requires having coordinated readiness, response,

More information

An Industry Code of Conduct Maritime Autonomous Systems (Surface) MAS(S)

An Industry Code of Conduct Maritime Autonomous Systems (Surface) MAS(S) BEING A RESPONSIBLE INDUSTRY An Industry Code of Conduct Maritime Autonomous Systems (Surface) MAS(S) The ISSUE 1 Maritime 01/03/2016 Autonomous Systems Surface, MAS(S) Industry Code of Conduct Foreword

More information

Dangerous Substances Handling, Use and Storage Policy

Dangerous Substances Handling, Use and Storage Policy Relevant UTAS Ordinance, Rule and/or GLP No. Relevant State/Federal Govt. Legislation Commencement Date December, 2009 Governance Level Principle No. 6 Occupational Health & Safety Workplace Health and

More information

Risk Assessment Policy

Risk Assessment Policy Risk Assessment Policy 1. Introduction Risk assessment is a pivotal concept in health and safety risk management. However, it is often seen as a bureaucratic or a complex process. Neither is true. Risk

More information