Background Information on Inter-American Development Bank Environmental and Social Safeguards Policies and Procedures 3 June 2011

Size: px
Start display at page:

Download "Background Information on Inter-American Development Bank Environmental and Social Safeguards Policies and Procedures 3 June 2011"

Transcription

1 1 OPERATIONAL PRINCIPLES:0F Environmental Assessment A. ENVIRONMENTAL ASSESSMENT OP-703 Environment and Safeguards Compliance Policy; Guidelines; Safeguard Screening Form World Bank Policies & Procedures on Environmental Assessment OP 4.01 Environmental Assessment, BP 4.01 Environmental Assessment, OP 4.01 Annexes A, B, C Overarching Objective: To help ensure the environmental and social soundness and sustainability of investment projects and to support integration of environmental and social aspects of projects into the decision making process. SCREENING Directive B.3 1. Use a screening process for each proposed project, as early as possible, to: (a) determine the appropriate extent and type of environmental assessment (EA) so that appropriate studies are undertaken proportional to potential risks; All Bank-financed operations will be screened and classified according to their potential environmental impacts. Screening will be carried out early in the preparation process. The screening process will consider potential negative environmental impacts whether direct, indirect, regional or cumulative in nature, including environmentally related social and cultural impacts, of the operation and of its associated facilities if relevant. Bank operations will be classified according to their potential impacts so that the appropriate environmental assessment or due diligence requirements are selected for the operation. Directive B.5 Guidelines Requirements: As part of the overall preparation and design process of Bank operations, the Bank requires that Category A and B operations be subject to Environmental Assessments (EA), according to the nature and significance of the potential impacts of the operation. OP, 8: The Bank undertakes environmental screening of each proposed project to determine the appropriate extent and type of EA. The Bank classifies the proposed project into one of four categories, depending on the type, location, sensitivity, and scale of the project and the nature and magnitude of its potential environmental impacts. (OP, 8) Categories: A, B, C, or FI (see definitions below). OP, 7: Depending on the project, a range of instruments can be used to satisfy the Bank s EA requirement: environmental impact assessment (EIA), regional or sectoral EA, environmental audit, hazard or risk assessment, and environmental management plan (EMP). EA applies one or more of these instruments, or elements of them, as appropriate. 1 These Operational Principles are excerpted directly from Table A1 in OP 4.00, Piloting the Use of Borrower Systems to Address Environmental and Social Safeguard Issues in Bank-Supported Projects (Source: These Operational Principles are being used in this context to provide an overview of and a framework for analyzing the World Bank s safeguards relevant for REDD+. 1

2 1 OPERATIONAL PRINCIPLES:0F Environmental Assessment World Bank Policies & Procedures on Environmental Assessment DIRECT/INDIRECT IMPACTS (b) assess direct, and, as relevant, indirect, cumulative, and associated impacts. Directive B.3 The screening process will consider potential negative environmental impacts whether direct, indirect, regional or cumulative in nature, including environmentally related social and cultural impacts, of the operation and of its associated facilities if relevant. Directive B.5 Guidelines A. The Environmental Impact Assessment: Standards The EIA report is required to comply with the requirements of this policy, and will be reviewed by the project team. The requirements of the EIA process, as presented here and complemented in Annex II, provide guidance to fulfill such requirements. Annex II o A.1 Scoping: This preliminary assessment by the borrower is used during the early stage of project identification. It requires understanding the proposed project and all its components by referring to technical and other pre-feasibility or feasibility documents, undertaking field surveillance in the area of influence of the project and holding discussions with agencies and organizations linked to the project. o A.8 Preparation of the EIA Report: Section 4 - Environmental and Associated Social Conditions: This section includes descriptions of the area of influence (direct and indirect) or study area (which are ideally determined at initial scoping) and the relevant physical, biological and socioeconomic conditions. The information/data presented must be relevant to decision-making 2 regarding project location, design, operation, and mitigation measures for adverse impacts.1f OP, 2: EA evaluates a project s potential environmental risks and impacts in its area of influence. OP Annex A.5: Project area of influence: The area likely to be affected by the project, including all its ancillary aspects, such as power transmission corridors, pipelines, canals, tunnels, relocation and access roads, borrow and disposal areas, and construction camps, as well as unplanned developments induced by the project (e.g., spontaneous settlement, logging, or shifting agriculture along access roads). The area of influence may include, for example, (a) the watershed within which the project is located; (b) any affected estuary and coastal zone; (c) off-site areas required for resettlement or compensatory tracts; (d) the airshed (e.g., where airborne pollution such as smoke or dust may enter or leave the area of influence; (e) migratory routes of humans, wildlife, or fish, particularly where they relate to public health, economic activities, or environmental conservation; and (f) areas used for livelihood activities (hunting, fishing, grazing, gathering, agriculture, etc.) or religious or ceremonial purposes of a customary nature. OP ft. nt. 1: This policy applies to all components of the project, regardless of the source of financing. OP Annex A.6: Regional EA pays particular attention to potential cumulative impacts of multiple activities. OP Annex A.8; Sectoral EA pays particular attention to potential cumulative impacts of multiple activities. 2 IDB relies on international good practice for criteria to determine the ADI and AII in each project during the scoping phase. These are consistent with the examples and guidance included in the WB OP Annex. 2

3 1 OPERATIONAL PRINCIPLES:0F Environmental Assessment World Bank Policies & Procedures on Environmental Assessment SECTORAL/ REGIONAL 1.c. Use sectoral or regional environmental assessment when appropriate. Directive B.3 Any operation that is likely to cause significant negative environmental and associated social impacts, or have profound implications affecting natural resources, will be classified as Category A. These operations will require an environmental assessment (EA), normally an Environmental Impact Assessment (EIA) for investment operations, or other environmental assessments such as a Strategic Environmental Assessment (SEA) for programs and other financial operations that involve plans and policies. Directive B.5 The Bank will require compliance with specified standards for Strategic Environmental Assessments (SEAs) as defined in this Policy and detailed in the Guidelines. OP, 7: When the project is likely to have sectoral or regional impacts, sectoral or regional EA is required. OP, 9: Sectoral: If the Bank is not satisfied that adequate capacity exists for carrying out EA, all Category A subprojects and, as appropriate, Category B subprojects including any EA reports are subject to prior review and approval by the Bank. OP Annex A.6: Regional EA pays particular attention to potential cumulative impacts of multiple activities. OP Annex A.8; Sectoral EA pays particular attention to potential cumulative impacts of multiple activities. The SEA has the following objectives: (i) assure that the main environmental risks and opportunities of policies, plans or programs have been properly identified; (ii) engage early on governments and potentially affected parties in the identification and analysis of strategic issues, actions, and development alternatives; (iii) define and agree on a sequence of actions to address systematically and strategically environmental issues and priority actions, summarized in an SEA action plan for adequate monitoring and follow up; and (iv) assure that adequate environmental information is available and collected for the decision-making process. The SEA process should be triggered early in the decision-making process and prior to the implementation of the policies, plans or programs. Recommendations from the SEA process 3 should be incorporated into an operation s activities.2f Directive B.5 Guidelines Procedures and Implementation: B. The Strategic Environmental Assessment In the context of the Bank s operations, the SEA is often the appropriate tool for the following types of operations: (i) policybased lending operations (e.g., structural or sectoral adjustment); (ii) sector-wide loans, such as the tourism sector programs; and (iii) regional plans and programs, such as infrastructure development. 3 Specific aspects also covered by SESA guidelines. 3

4 1 OPERATIONAL PRINCIPLES:0F Environmental Assessment World Bank Policies & Procedures on Environmental Assessment IMPACTS 2. Assess potential impacts of the proposed project on physical, biological, socioeconomic and physical cultural resources, including transboundary and global concerns, and potential impacts on human health and safety. Directive B.5 The Bank will require compliance with specified standards for Environmental Impact Assessments (EIAs) and environmental analyses, as defined in this Policy and detailed in the Guidelines. The operation s executing agency or borrower is required to submit all EA products to the Bank for review. The operation s approval by the Bank will consider the quality of the EA process and documentation, among other factors. Directive B.8 The environmental assessment process will identify and address, early in the project cycle, Transboundary issues associated with the operation. The environmental assessment process for operations with potentially significant transboundary environmental and associated social impacts, such as operations affecting another country s use of waterways, watersheds, coastal marine resources, biological corridors, regional air sheds and aquifers, will address the following issues: (i) notification to the affected country or countries of the critical transboundary impacts; (ii) implementation of an appropriate framework for consultation of affected parties; and (iii) appropriate environmental mitigation and/or monitoring measures, to the Bank s satisfaction. OP, 3: EA takes into account the natural environment (air, water, and land); human health and safety; social aspects (involuntary resettlement, indigenous peoples, and physical cultural resources); and transboundary and global environmental aspects. EA considers natural and social aspects in an integrated way. TIMING OP, 3: EA is initiated as early as possible in project processing. BP, 7: EA is an integral part of project preparation. Directive B.5 Guidelines Procedures and Implementation: Requirements: As part of the overall preparation and design process of Bank operations, the Bank requires that Category A and B operations be subject to Environmental Assessments (EA), according to the nature and significance of the potential impacts of the operation. The Environmental Impact Assessment: The EIA is undertaken to identify potential significant environmental and social impacts,. The EIA considers the entire project cycle, from the design stage to construction, operation and decommissioning, if applicable. Annex II The EA Process and EIA Report: For the purpose of this Policy, the EIA report includes information on the following topics, as appropriate, in relation to specific projects: baseline environmental and social 4

5 1 OPERATIONAL PRINCIPLES:0F Environmental Assessment LEGAL FRAMEWORK 3. Assess the adequacy of the applicable legal and conditions; requirements under host country laws and regulations; applicable international treaties and agreements; sustainable use of natural resources; protection of human health, cultural properties, endangered species and sensitive ecosystems; use of hazardous substances; major hazards; occupational health and safety; socioeconomic impacts; land acquisition and land use; involuntary resettlement; impacts on indigenous peoples and communities; cumulative impacts of existing projects and proposed project; consultation of affected parties in the design, review and implementation of the project; consideration of environmentally and socially preferable alternatives; efficient production, delivery and use of energy; pollution prevention and waste minimization; and pollution controls (liquid effluents and air emissions) and waste management. A.8 Preparation of the EIA Report: Section 5 - Environmental Impacts: A prediction of the changes in the environment resulting from project construction and operation is to be considered, and an assessment of the effect on the surrounding physical, biological, and human systems, should be presented. Directive B.3 Guidelines Procedures and Implementation: The Safeguard Screening Form (SSF): For all applicable Bank operations, the project team will complete, when necessary in collaboration with an environmental and/or social specialist, the Safeguard Screening Form in order to identify potential environmental and environmentally related socio-cultural impacts and risks of the operation. The Safeguard Screening Form includes a checklist of environmental and social issues to assist the project team in classifying the operation.3f 4 Directive B.2 Guidelines See element 3, Legal Framework below. Directive B.2 The Bank will also require the borrower for that operation to ensure that it is designed and carried out in World Bank Policies & Procedures on Environmental Assessment OP, 3: EA also takes into account the variations in project and country conditions; the findings of country environmental studies; national environmental action plans; the country's 4 The checklist included in the Safeguard Screening Form (toolkit) requires consideration of impacts on physical, biological, socio-economic and cultural resources, including trans-boundary and global concerns (compliance with MEAs, identification of significant greenhouse gas emissions) and potential impacts on human health and safety, in accordance with the directives of all IDB safeguard policies, including the Environment and Safeguards Compliance Policy itself, as well as the Operational Policy on Indigenous Peoples, the Policy on Involuntary Resettlement, the Disaster Risk Management Policy and the Information Access Policy. 5

6 1 OPERATIONAL PRINCIPLES:0F Environmental Assessment institutional framework, including applicable international environmental agreements, and confirm that they provide that the cooperating government does not finance project activities that would contravene such international obligations. compliance with environmental laws and regulations of the country where the operation is being implemented, including national obligations established under ratified Multilateral Environmental Agreements (MEAs). Directive B.2 Guidelines During screening (see Directive B.3), the project team will determine whether the operation potentially triggers relevant ratified MEAs, and if so, verify as part of the Bank s analysis/due diligence that necessary measures are in place for the proposed Bank operation to comply with the specific applicable ratified national MEA obligations of the respective country. In the context of implementing Policy Directive B.5 (environmental assessment requirements), the project team will review that the Terms of Reference (TOR) for the environmental assessment or the Bank s analysis or due diligence for the operation include a review of the operation s compliance with the applicable MEAs. World Bank Policies & Procedures on Environmental Assessment overall policy framework, national legislation, and institutional capabilities related to the environment and social aspects; and obligations of the country, pertaining to project activities, under relevant international environmental treaties and agreements. The Bank does not finance project activities that would contravene such country obligations, as identified during the EA. ALTERNATIVES 4. Provide for assessment of feasible investment, technical, and siting alternatives, including the "no action" alternative, potential impacts, feasibility of mitigating these impacts, their capital and recurrent costs, their suitability under local conditions, and their institutional, training and monitoring requirements associated with them. Directive B.5 The EIA process includes, as a minimum: examination of alternatives including a no project scenario. The EIA should be supported by economic analysis of project alternatives and, as applicable, by economic cost-benefit assessments of the project s environmental impacts and/or the associated protection measures.4f 5 The SEA has the following objectives: (ii) engage early on governments and potentially affected parties in the identification and analysis of strategic issues, actions, and development alternatives. Directive B.5 Guidelines Annex II: The EA Process and EIA Report: For the purpose of this Policy, the EIA report includes information on the following topics, as appropriate, in relation to specific projects: consideration of environmentally OP, 8.a: EA for a Category A project examines the project's potential negative and positive environmental impacts, compares them with those of feasible alternatives (including the "without project" situation), and recommends any measures needed to prevent, minimize, mitigate, or compensate for adverse impacts and improve environmental performance. OP Annex B.2.f: Systematically compares feasible alternatives to the proposed project site, technology, design, and operation-- including the "without project" situation--in terms of their potential environmental impacts; the feasibility of mitigating these impacts; their capital and recurrent costs; their suitability under local conditions; and their institutional, training, and monitoring requirements. For each of the alternatives, quantifies the environmental impacts to the extent possible, and attaches economic values where feasible. States the basis for selecting the particular project design proposed and justifies 5 Directive B.9 also includes specific alternative analysis requirements with respect to impacts on natural and critical habitats. 6

7 1 OPERATIONAL PRINCIPLES:0F Environmental Assessment World Bank Policies & Procedures on Environmental Assessment and socially preferable alternatives;. o A.1 Scoping: 2: The TORs include information pertinent for potential parties who may conduct the EA.This would include: a brief history of the project, including alternatives considered. o A.3 Examination of Alternatives: Alternatives analysis in EIA is designed to bring environmental and social considerations into the upstream stages of development planning project identification and earlier as well as the later stages of site selection, design and implementation. Inclusion of social and environmental considerations at an early stage can reveal alternative options and cost-effective ways of achieving the same project objectives at lower environmental or social cost (measured either by the severity of the impacts or the costs of measures to mitigate them). Incorporating analysis of alternative design into the consultation mode also provides affected communities and other interest groups input into the decisions regarding location, size and technology of the proposed project. o A.5 Impact Mitigation: Normally, potential impacts are identified early during the initiation and scoping stages of EIA for a project, and measures to avoid or minimize impacts are incorporated into the alternatives being considered. In this respect, some of the most important measures to protect the environment or local communities become integral to the project design. o A.6 Economic Analysis: The Bank mandates performing economic analysis to assess the overall economic viability of projects. Category A operations should include an economic analysis, to the extent applicable and practicable, of alternative measures to avoid or mitigate adverse environmental impacts and risks. The economic analysis is undertaken to further evaluate the alternatives identified in the EIA and to incorporate environmental economic information into the final evaluation of the proposed project. The consideration of project alternatives may reveal, for example, approaches with slightly higher direct investment cost but much lower ongoing environmental remediation costs A.8 Preparation of an EIA Report Section 6 - Analysis of Alternatives: This section provides a description of relevant possible alternatives to the project/project design (including the no action alternative). These may include alternative location, site layout, technologies, design options, and management systems. The reasons why the various alternatives considered were rejected should be documented. To the extent applicable and feasible, an economic analysis may be used to provide further recommended emission levels and approaches to pollution prevention and abatement. 7

8 1 OPERATIONAL PRINCIPLES:0F Environmental Assessment understanding of these options. World Bank Policies & Procedures on Environmental Assessment IDB considers these points covered by the standard content of the economic and institutional analysis of each alternative and an aspect to be addressed at the technical specification rather than policy level.idb analysis covers all aspects of economic analysis, management systems and institutional capabilities. See also MEs 3 and 6. PPAH 5. Where applicable to the type of project being supported, normally apply the Pollution Prevention and Abatement Handbook (PPAH). Justify deviations when alternatives to measures set forth in the PPAH are selected. Directive B.11 Bank-financed operations will include as appropriate, measures to prevent, reduce or eliminate pollution emanating from their activities. The Bank will require clients to follow source-specific emission and discharge standards recognized by multilateral development banks. Taking into account local conditions and national legislation and regulations, the environmental assessment report or environmental and social management report will justify the standards selected for the particular operation, consistent with this Directive. Directive B.11 Guidelines Emission and Discharge Standards: For numerical standards the Bank requires borrowers to follow source-specific emission and discharge standards recognized by multilateral development banks, such as the Pollution Prevention and Abatement Handbook (PPAH) (section III), The environmental assessment for the operation may recommend alternative emission levels to those recognized by multilateral development banks and/or alternative approaches to pollution prevention and abatement for the project. In such case, the environmental assessment or the Bank s ESMR, if applicable, must provide a description of what standards and/or approaches are chosen for the particular operation, project or site. The first order of reference is the PPAH, and if the pollutant is not covered by the PPAH or if the PPAH is not appropriate for a particular case, other standards recognized by MDBs should be used. OP, 6: The Pollution Prevention and Abatement Handbook describes pollution prevention and abatement measures and emission levels that are normally acceptable to the Bank. However, taking into account borrower country legislation and local conditions, the EA may recommend alternative emission levels and approaches to pollution prevention and abatement for the project. The EA report must provide full and detailed justification for the levels and approaches chosen for the particular project or site. 8

9 1 OPERATIONAL PRINCIPLES:0F Environmental Assessment World Bank Policies & Procedures on Environmental Assessment PREVENTION/MITIGATION 6. Prevent and, where not possible to prevent, at least minimize, or compensate for adverse project impacts and enhance positive impacts through environmental management and planning that includes the proposed mitigation measures, monitoring, institutional capacity development and training measures, an implementation schedule, and cost estimates. B. Safeguarding the Environment: Managing Environmental Impacts and Risks: The Bank applies safeguards throughout the project cycle to ensure the environmental sustainability of all Bank-financed operations. In line with sustainable development practices, the Bank takes a general precautionary approach5f6 to environmental impacts. The Bank favors avoiding negative environmental impacts; when impacts are unavoidable, Bank-financed operations require mitigation measures; and for impacts that cannot be fully mitigated, compensation or offsets should be implemented. The Bank will work with borrowers to manage environmental risks effectively and to help develop environmental management capacity, as agreed. Where, in the opinion of the Bank, the environmental risks are deemed to be too great, the Bank would support the proposed investment only once the plan for mitigation of the risks is agreed. Directive B.4 In addition to risks posed by environmental impacts, the Bank will identify and manage other risk factors that may affect the environmental sustainability of its operations. These risk factors may include elements such as the governance capacity of executing agencies/borrower and of third parties Depending on the nature and the severity of the risks, the Bank will engage with the executing agency/borrower and relevant i third parties to develop appropriate measures for managing such risks.16f Directive B.5 o The operation s executing agency or borrower is required to submit all EA products to the Bank for review. The operation s approval by the Bank will consider the quality of the EA process and documentation, among other factors. o An EIA report must be prepared with its ESMP. o For operations requiring an environmental assessment but not subject to an EIA or an SEA, an environmental analysis should be performed including an evaluation of the potential OP, 2: The Bank favors preventive measures over mitigatory or compensatory measures, whenever feasible. OP, 5: The Bank advises the borrower on the Bank s EA requirements. The Bank reviews the findings and recommendations of the EA to determine whether they provide an adequate basis for processing the project for Bank financing. OP, 13: When the borrower has inadequate legal or technical capacity to carry out key EA-related functions (such as review of EA, environmental monitoring, inspections, or management of mitigatory measures) for a proposed project, the project includes components to strengthen that capacity. OP, 2: EA includes the process of mitigating and managing adverse environmental impacts throughout project implementation. OP, 19: During project implementation, the borrower reports on (a) compliance with measures agreed with the Bank on the basis of the findings and results of the EA, including implementation of any EMP, as set out in the project documents; (b) the status of mitigatory measures; and (c) the findings of monitoring programs. The Bank bases supervision of the project's environmental aspects on the findings and recommendations of the EA, including measures set out in the legal agreements, any EMP, and other project documents. OP Annex C: The EMP identifies monitoring objectives and specifies types of monitoring, with linkages to the impacts assessed in the EA report and the mitigation measured described in the EMP. 6 OP-703: Definitions: Precautionary approach means that where there are threats of serious or irreversible environmental damage, lack of full scientific certainty should not be used as a reason for postponing measures to prevent environmental degradation. 9

10 1 OPERATIONAL PRINCIPLES:0F Environmental Assessment environmental, social, health and safety impacts and risks associated with the operation, and an indication of the measures foreseen to control these risks and impacts. o The ESMP must include: a presentation of the key direct and indirect impacts and risks of the proposed operation; the design of the proposed social/environmental measures to avoid, minimize, compensate and/or mitigate the key direct and indirect impacts and risks; the institutional responsibilities to implement these measures, including, where necessary, institutional development, capacity building and training; the schedule and budget allocated for the implementation and management of such measures; the consultation or participation program agreed for the operation; and the framework for the monitoring of social and environmental impacts and risks throughout the execution of the operation, including clearly defined indicators, monitoring schedules, responsibilities and costs. The ESMP should be ready for, and reviewed during, the analysis/due diligence mission. o See also content under IMPACTS (element 2) above. Directive B.5 Guidelines Environmental and Social Management Plan: ESMPs describe the institutional arrangements, where necessary, and capacity building needed to carry out required mitigation and enhancement measures and put appropriate monitoring programs in place. ESMPs will complement and take into account, as appropriate, information generated in the Institutional Capacity Assessment System (ICAS) that is being increasingly used for project preparations. The draft ESMP is reviewed by the project team and should be agreed upon prior to Bank approval of the operation, and the key provisions of ESMPs are incorporated into the relevant project agreements between the Bank and the borrower. Prior to project approval, the ESMP presented by the team should have all of the necessary requirements and provisions to ensure an appropriate treatment of environmental issues during project execution. Specific mechanisms for corrective action based on feedback from inspection and monitoring programs should be included in the ESMP. World Bank Policies & Procedures on Environmental Assessment 10

11 1 OPERATIONAL PRINCIPLES:0F Environmental Assessment World Bank Policies & Procedures on Environmental Assessment Directive B.7 The Bank will monitor the executing agency/borrower s compliance with all safeguard requirements stipulated in the loan agreement and project operating or credit regulations. Safeguard requirements, such as those in an ESMP must be incorporated into the project contract documents, its operating or credit regulations, or the project bidding documents, as appropriate, setting out as necessary milestones, timeframes and corresponding budgetary allocations to implement and monitor the plan during the course of the project. Safeguard indicators, as appropriate, should be clearly defined in the logical/results framework, followed up in project monitoring reports and reviewed in mid-term reviews and project completion reports.whenever ex-post evaluations are conducted, these will evaluate the sustainability outcomes of an operation. Directive B.7 Guidelines ESMP Requirements: Whenever mitigation measures are required for an operation, the contract, operation regulations and/ or sector letter will include safeguards provisions that define the commitments agreed upon by the Bank and the borrower that serve as binding obligations during execution. Country Office/PRI Project Team: The teams should verify that safeguards included in the loan contract, operating regulations or sector letters are implemented. Supervision may involve different tasks, such as visiting project sites, meeting with the borrower and its representatives, and reviewing environmental monitoring reports. Noncompliance: Where environmental or associated social noncompliance issues arise during project implementation, the project team in charge of supervision will work with the borrower and/or executing agency on an action plan consistent with this Policy, to resolve them. 11

12 1 OPERATIONAL PRINCIPLES:0F Environmental Assessment World Bank Policies & Procedures on Environmental Assessment PARTICIPATION 7. Involve stakeholders, including project-affected groups and local nongovernmental organizations, as early as possible, in the preparation process and ensure that their views and concerns are made known to decision Makers and taken into account Continue consultations throughout project implementation as necessary to address EArelated issues that affect them. Directive B.6 As part of the environmental assessment process, Category A and B operations will require consultations with affected parties6f7 8 and consideration of their views. Consultations with other interested7f parties may also be undertaken in order to consider a broader range of expertise and perspectives. Category A operations will be consulted at least twice during project preparation, during the scoping phase of the environmental assessment or due diligence processes, and during the review of the assessment reports. For Category B operations, affected parties must be consulted at least once, preferably during the preparation or review of the ESMP, as agreed with the borrower. For consultation purposes, appropriate information will be provided in location(s), format(s) and language(s) to allow for affected parties to be meaningfully consulted, to form an opinion and to comment on the proposed course of action. EIAs and/or other relevant environmental analyses will be made available to the public consistent with the Bank s Disclosure of Information Policy (OP-102). During execution, affected parties should be kept informed of those project-related environmental and associated social mitigation measures affecting them, as defined in the ESMP. OP, 14: For all Category A and B projects during the EA process, the borrower consults project-affected groups and local non-governmental organizations (NGOs) about the project s environmental aspects and take their views into account. The borrower initiates such consultations as early as possible. For Category A projects, the borrower consults these groups at least twice: (a) shortly after environmental screening and before the terms of reference for the EA are finalized; and (b) once a draft EA report is prepared. In addition, the borrower consults with such groups throughout project implementation as necessary to address EA-related issues that affect them. Directive B. 6 Guidelines Consultation Process: The consultation process depends on the nature of the operation being considered for financing. For Category A projects, consultations can be preceded by a stakeholder analysis, an exercise consisting of mapping the social landscape associated with the project that identifies affected and interested parties, their inter-relations and interests regarding the project. The Bank also encourages meeting with experts and representatives of institutions and civil society organizations specializing in a given field or issue, to receive feedback and advice. In the case of consultations related to the preparation of resettlement plans, the borrower should follow the Operational Policy on Involuntary Resettlement (OP ). 8F 7 Affected parties are individuals, group of individuals or communities who may be directly impacted by a Bank-financed operation. Such impacts may be positive or negative. Affected parties may designate representatives as part of the consultation process. Note: This generally includes local NGOs and CBOs and other CS organizations that represent or are designated to represent affected parties. 8 Interested parties are individuals or groups who have expressed support or concern regarding a proposed or existing bank-financed operation. Note: these are understood to be individuals or groups who are not directly or indirectly affected. 9 A number of specific consultation requirements apply under OP-710 (Involuntary Resettlement) and OP-765 (Indigenous Peoples) and their respective guidelines. 12

13 1 OPERATIONAL PRINCIPLES:0F Environmental Assessment World Bank Policies & Procedures on Environmental Assessment Timing of Category A Consultations: The first consultation should preferably occur during the scoping phase of the EA process for the operation. The second consultation should preferably occur when the impact assessment is being reviewed, in order to inform, gather comments, and adjust the assessment and the corresponding environmental and social management plan. Category A operations may benefit from more than two consultations, at the discretion of the borrower, if warranted by the nature, geographical extension of the operation, or other pertinent factors. After Bank Approval: For Category A and B operations, the borrower should continue an applicable degree of information disclosure and consultation, on the basis of the agreed Environment and Social Management Plan (ESMP). Directive B.5 The ESMP must include: the consultation or participation program agreed for the operation; Directive B.5 Guidelines Environmental and Social Management Plan: ESMPs outline responsibilities for public consultation and disclosure, and describe mechanisms for feedback and remedial action. They also indicate the estimated costs of these activities. Public consultations may improve the design of mitigation and monitoring measures, and should be considered in the finalization of ESMPs. Affected parties also may be asked to play a role in monitoring the ESMP. Directive A.1 Guidelines Programming CEAs. CEAs should be programmed and carried out well in advance of country strategy development to support the initial phases of policy dialogues with governments and to allow relevant consultations with interested parties, which may include representatives of the private sector, NGOs, and donor community. Practice Notes: According to Directive B.6, IDB consultation practices and general terms of reference for consultation allow for, and encourage, broad based participation. Consultation with directly and indirectly affected 13

14 1 OPERATIONAL PRINCIPLES:0F Environmental Assessment parties in contrast, is required. IDB also relies on the scoping and EA processes to identify the most relevant stakeholders and to develop, in consultation with them, a consultation or participation program as part of the ESMP. IDB will apply these practices to FCPF operations. As highlighted above IDB policies and guidelines require meaningful consultation and due consideration to the views of affected peoples. Additional specific requirements apply to indigenous peoples (See IP Policy, p.10) 9F10 and in case of involuntary resettlement (See Involuntary Resettlement Guidelines, p. 42). As for continuity of consultation during project execution, the ESMP is expected to include feedback and remedial mechanisms. World Bank Policies & Procedures on Environmental Assessment INDEP. EXPERTS 8. Use independent expertise in the preparation of EA where appropriate. Use independent advisory panels during preparation and implementation of projects that are highly risky or contentious or that involve serious and multi-dimensional environmental and/or social concerns. Directive B.5 Guidelines Annex II: The EA Process and EIA Report: The EA process is under the responsibility of the borrower, as defined in Directive B.5. The EA process is a tool that requires both technical and management skills to collect, evaluate and present relevant environmental and social information for use in project planning and decision-making. The EIA report must indicate to decision-makers, the public and affected parties that its review process was carried out according to good professional practices. Practice Note: According to local laws, integrity guidelines and general good practice, IDB applies expertise requirements and follows accepted practices with respect to conflict of interest with respect to consultants engaged for EA preparation. OP, 4: For Category A projects, the borrower retains independent EA experts not affiliated with the project to carry out the EA. For Category A projects that are highly risky or contentious or that involve serious and multidimensional environmental concerns, the borrower should normally also engage an advisory panel of independent, internationally recognized environmental specialists to advise on all aspects of the project relevant to the EA. OP, ft. nt. 7: However, the borrower ensures that when individuals or entities are engaged to carry out EA activities, any conflict of interest is avoided. For example, when an independent EA is required, it is not carried out by the 10 Once the decision to proceed with the processing of a project with potential adverse impacts has been made, the Bank will provide guidance and verify compliance by the project proponent with the following: (ii) the implementation of socio-culturally appropriate and duly documented consultation and good faith negotiation processes with the affected indigenous peoples in relation to project design, analyses of alternatives, preparation, due diligence, and execution; 14

15 1 OPERATIONAL PRINCIPLES:0F Environmental Assessment According to its current practices, IDB will use independent expertise in the preparation of EA for FCPF operations where appropriate. Advisory panels Directive B.3 Category A operations are considered high safeguard risk. For some high safeguard risk operations that, in the Bank s opinion raise complex and sensitive environmental, social, or health and safety concerns, the borrower should normally establish an advisory panel of experts to provide guidance for the design and/or execution of the operation on issues relevant to the EA process, including health and safety. World Bank Policies & Procedures on Environmental Assessment consultants hired to prepare the engineering design. INTEGRATION OF EA 9. Provide measures to link the environmental assessment process and findings with studies of economic, financial, institutional, social and technical analyses of a proposed project. Directive B.5 Guidelines Annex II: The EA Process and EIA Report o A.3 Examination of Alternatives: Alternatives analysis in EIA is designed to bring environmental and social considerations into the upstream stages of development planning project identification and earlier as well as the later stages of site selection, design and implementation. Inclusion of social and environmental considerations at an early stage can reveal alternative options and cost-effective ways of achieving the same project objectives at lower environmental or social cost (measured either by the severity of the impacts or the costs of measures to mitigate them). Incorporating analysis of alternative design into the consultation mode also provides affected communities and other interest groups input into the decisions regarding location, size and technology of the proposed project. o A.5 Impact Mitigation: Normally, potential impacts are identified early during the initiation and scoping stages of EIA for a project, and measures to avoid or minimize impacts are incorporated into the alternatives being considered. In this respect, some of the most important measures to OP, 2: [EA] is integrated closely with the economic, financial, institutional, social, and technical analyses of a proposed project. OP, ft. nt. 7: EA is closely integrated with the project s economic, financial, institutional, social, and technical analyses to ensure that (a) environmental considerations are given adequate weight in project selection, siting, and design decisions, and (b) EA does not delay project processing. 15

16 1 OPERATIONAL PRINCIPLES:0F Environmental Assessment protect the environment or local communities become integral to the project design. ESG Guidance Note No. 2: Environmental and Social Screening and Classification: Selecting Appropriate Instruments, p. 12 The EIA should be supported by economic analysis of project alternatives and, as applicable, by economic cost-benefit assessments of the project's environmental impacts and/or the associated protection measures. Also, due consideration should be given to: analyzing compliance with relevant legal requirements; direct, indirect, regional or cumulative impacts, acquiring and using adequate baseline data as necessary; impact mitigation and management plans; the incorporation of EIA findings into project design; and, measures for adequate follow up, monitoring and supervision during implementation. Bank procedures require the preparation of an environmental and social strategy early in the project cycle so that environmental and social issues can be identified at that stage and integrated in project design, analysis, and execution plans and budgets as appropriate. World Bank Policies & Procedures on Environmental Assessment SUBPROJECTS 10. Provide for application of the material elements in this Table to subprojects under investment and financial intermediary activities. Directive B.13 For policy-based loans, the Bank will analyze during the design phase whether specific country policies and/or institutional changes supported by the operation will have significant and direct effects on the country s environment and natural resources. The appropriate sequence of actions and conditions to ensure environmental sustainability will be reflected in the corresponding action plan, as required. For financial intermediation operations (FIs), including global credit loans, the Bank will assess the executing agency s capacity for environmental management. The financial intermediaries will demonstrate that appropriate environmental procedures are in place so that final recipients of IDB financing are required to adopt and implement sound and adequate environmental measures. The borrower and the Bank will agree on implementing an appropriate and feasible Environmental Management System (EMS) tailored to the particular needs of the operation. Environmental review of a representative sample of projects should be performed periodically. Directive B.13 Guidelines B. For Financial Intermediary Operations and Global Credit Loans: The Bank s environmental OP, 9: For sector investment loans (SILs), during the preparation of each proposed subproject, the project coordinating entity or implementing institution carries out appropriate EA according to country requirements and the requirements of this policy. OP, 10: For a financial intermediary (FI) operation, the Bank requires that each FI screen proposed subprojects and ensure that sub-borrowers carry out appropriate EA for each subproject. Before approving a subproject, the FI verifies (through its own staff, outside experts, or existing environmental institutions) that the subproject meets the environmental requirements of appropriate national and local authorities and is consistent with this OP and other applicable environmental policies of the Bank. OP, 11: In appraising a proposed FI operation, the Bank reviews the adequacy of country environmental requirements relevant to the project and the proposed EA arrangements for 16

17 1 OPERATIONAL PRINCIPLES:0F Environmental Assessment DISCLOSURE 11. Disclose draft EA in a timely manner, before appraisal formally begins, in requirements need to be tailored to properly reflect this diversity of risk [of FI operations], ranging from simple requirements and procedures to more sophisticated environmental management systems. As part of the screening process and at the level of the project concept document, the project team should state the potential level of environmental impacts and risks associated with the FI operation and the proposed actions for the Bank s environmental and social strategy (i.e., environmental analysis/due diligence). This analysis should reflect the FI operation, the relevant FI environmental policies and procedures, and the FI or other relevant institutional capacity. o For FI operations with no or minimal risk, the Bank basically requires that the operation comply with applicable local environmental legislation and FI standard in-country practices related to environmental aspects... o For FI operations with moderate risk, the Bank should normally require that the FI implements a procedure regarding environmental risk management, and such procedure be commensurate to the impacts and risks of the activities financed. This procedure should consider compliance with local applicable environmental legislation and institutional capacity. o For FI operations with significant risk, the Bank should normally require that the FI develop and implement an environmental management system (EMS) that is commensurate with the FI risks and impact. The objective of an EMS is to properly identify, assess, mitigate and monitor the potential environmental impacts and risks associated with projects financed with IDB funds through the FI. An EMS should include a policy and requirements, process, resources, and review and reporting. Relevant obligations should be included in FI project documents and agreements. The Bank will monitor environmental aspects of FI operations as part of the Bank s loan supervision and evaluation, and in a manner consistent with the level of environmental risk. IDB requires FIs to apply EA requirements to moderate and high impact/risk subprojects though an ESMS and requires Borrowers in the multiple work programs to do so through operating regulations. The ESMS or regulations often require IDB review high risk activities (category A type projects), or exclude them from eligibility for financing. Directive B.6 For consultation purposes, appropriate information will be provided in location(s), format(s) and language(s) to allow for affected parties to be meaningfully consulted, to form an opinion and to comment World Bank Policies & Procedures on Environmental Assessment subprojects, including the mechanisms and responsibilities for environmental screening and review of EA results. For FI operations expected to have Category A subprojects, prior to the Bank's appraisal each identified participating FI provides to the Bank a written assessment of the institutional mechanisms (including, as necessary, identification of measures to strengthen capacity) for its subproject EA work. If the Bank is not satisfied that adequate capacity exists for carrying out EA, all Category A subprojects and, as appropriate, Category B subprojects--including EA reports--are subject to prior review and approval by the Bank. OP, ft. nt 17: The requirements for FI operations are derived from the EA process and are consistent with the provisions of para. 6 of this OP. The EA process takes into account the type of finance being considered, the nature and scale of anticipated subprojects, and the environmental requirements of the jurisdiction in which subprojects will be located. OP, 15: For meaningful consultations between the borrower and project-affected groups and local NGOs on all Category A and B projects proposed for IBRD or IDA financing, the borrower provides relevant material in a timely manner prior to consultation and in a form and language that are understandable 17

Table A1 - Environmental and Social Safeguard Policies Policy Objectives and Operational Principles

Table A1 - Environmental and Social Safeguard Policies Policy Objectives and Operational Principles Operational Manual - Table A1 - Environmental and Social Safeguard Policies Policy and Staff Connections- World Bank Intranet WB External Site WBG Directory Help Site Map Feedback Home News & Events Countries

More information

Performance Requirements

Performance Requirements Environmental and Social Policy 15 Performance Requirements PR 1: Environmental and Social Appraisal and Management Introduction 1. The EBRD considers it important that all companies receiving EBRD financing

More information

Environmental and Social Policy

Environmental and Social Policy Environmental and Social Policy Contents Foreword 2 Purpose 2 Commitments 2 Environmental and Social Assessment 3 Operations financed directly 4 Operations financed through Financial Intermediaries 4 Environmental

More information

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives: ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP 1. Objectives The aim of the study is to achieve the following objectives: Review of existing EIA and RAP reports on sections of the line which are not

More information

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify) PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION Interested Organization Name: Project Location: Projected amount of required project funding ($ /USD): TOTAL: Project Sector or Similar:

More information

EBRD Performance Requirement 1

EBRD Performance Requirement 1 EBRD Performance Requirement 1 Assessment and Management of Environmental and Social Impacts and Issues Introduction 1. This Performance Requirement (PR) establishes the importance of integrated assessment

More information

Multilateral Investment Guarantee Agency. Performance Standards on Environmental and Social Sustainability

Multilateral Investment Guarantee Agency. Performance Standards on Environmental and Social Sustainability Multilateral Investment Guarantee Agency Performance Standards on Environmental and Social Sustainability Performance Standard on Environmental and Social Sustainability TABLE OF CONTENTS Overview i Performance

More information

Environmental and Social Impact Assessment and Strategic Environmental and Social Assessment at the World Bank

Environmental and Social Impact Assessment and Strategic Environmental and Social Assessment at the World Bank Environmental and Social Impact Assessment and Strategic Environmental and Social Assessment at the World Bank Agi Kiss Regional Safeguards Advisor, Europe and Central Asia Region The World Bank Economic

More information

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction 9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE 9.1.1 Introduction This chapter is the provisional Environmental Management Plan (EMP) for the Jubilee Phase 1 Development project. The elements of

More information

CAO terms of reference for an Audit of IFC. About the CAO

CAO terms of reference for an Audit of IFC. About the CAO TERMS OF REFERENCE CAO terms of reference for an Audit of IFC CAO Compliance March 12, 2009 Wilmar Group Indonesia Case of Forest Peoples Programme About the CAO The CAO (Office of the Compliance Advisor/Ombudsman)

More information

TIER II STANDARD FOR TECHNICAL COOPERATION ADMINISTRATORS INTRODUCTION

TIER II STANDARD FOR TECHNICAL COOPERATION ADMINISTRATORS INTRODUCTION Job Classification Manual Page 1 of 49 TIER II STANDARD FOR TECHNICAL COOPERATION ADMINISTRATORS INTRODUCTION 1. This grade level standard illustrates the application of the ICSC Master Standard (Tier

More information

DRAFT FOR PUBLIC COMMENT Guidance Note for ESS10 Stakeholder Engagement and Information Disclosure

DRAFT FOR PUBLIC COMMENT Guidance Note for ESS10 Stakeholder Engagement and Information Disclosure The Guidance Notes provide guidance for the Borrower on the application of the Environmental and Social Standards (ESSs), which form part of the World Bank s 2016 Environmental and Social Framework. The

More information

Guidance Note: Corporate Governance - Audit Committee. March Ce document est aussi disponible en français.

Guidance Note: Corporate Governance - Audit Committee. March Ce document est aussi disponible en français. Guidance Note: Corporate Governance - Audit Committee March 2015 Ce document est aussi disponible en français. Applicability The Guidance Note: Corporate Governance Audit Committee (the Guidance Note )

More information

Guidance Note: Corporate Governance - Audit Committee. January Ce document est aussi disponible en français.

Guidance Note: Corporate Governance - Audit Committee. January Ce document est aussi disponible en français. Guidance Note: Corporate Governance - Audit Committee January 2018 Ce document est aussi disponible en français. Applicability The Guidance Note: Corporate Governance Audit Committee (the Guidance Note

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 05-Mar-2014

More information

JAPAN BANK FOR INTERNATIONAL COOPERATION GUIDELINES FOR CONFIRMATION OF ENVIRONMENTAL AND SOCIAL CONSIDERATIONS

JAPAN BANK FOR INTERNATIONAL COOPERATION GUIDELINES FOR CONFIRMATION OF ENVIRONMENTAL AND SOCIAL CONSIDERATIONS JAPAN BANK FOR INTERNATIONAL COOPERATION GUIDELINES FOR CONFIRMATION OF ENVIRONMENTAL AND SOCIAL CONSIDERATIONS APRIL 2002 JAPAN BANK FOR INTERNATIONAL COOPERATION Preface Japan Bank for International

More information

Principles for environmental and social responsibility

Principles for environmental and social responsibility issued by: Principles for environmental and social responsibility Sustainable development is dependent on a balance between economic considerations, social responsibility and environmental protection.

More information

REQUEST FOR PROJECT/PROGRAMME FUNDING FROM THE ADAPTATION FUND

REQUEST FOR PROJECT/PROGRAMME FUNDING FROM THE ADAPTATION FUND REQUEST FOR PROJECT/PROGRAMME FUNDING FROM THE ADAPTATION FUND The annexed form should be completed and transmitted to the Adaptation Fund Board Secretariat by email or fax. Please type in the responses

More information

DRAFT GUIDELINE ON PUBLIC PARTICIPATION IN MYANMAR S EIA PROCESSES CONSULTATION DRAFT

DRAFT GUIDELINE ON PUBLIC PARTICIPATION IN MYANMAR S EIA PROCESSES CONSULTATION DRAFT DRAFT GUIDELINE ON PUBLIC PARTICIPATION IN MYANMAR S EIA PROCESSES CONSULTATION DRAFT 5 April 2017 This Draft Guideline is made possible by the generous support of the American people through the United

More information

CAO terms of reference for an Audit of IFC. About the CAO

CAO terms of reference for an Audit of IFC. About the CAO TERMS OF REFERENCE CAO Compliance December 03, 2008 Wilmar Group Indonesia Case of Forest Peoples Programme About the CAO The CAO (Office of the Compliance Advisor/Ombudsman) is an independent office that

More information

PHILIPPINES: SOCIAL INCLUSION AND ALTERNATIVE LIVELIHOOD FOR THE INFORMAL WASTE SECTOR

PHILIPPINES: SOCIAL INCLUSION AND ALTERNATIVE LIVELIHOOD FOR THE INFORMAL WASTE SECTOR Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PHILIPPINES: SOCIAL INCLUSION AND ALTERNATIVE LIVELIHOOD FOR THE INFORMAL WASTE SECTOR

More information

Liberia Development Forestry Sector Management Project

Liberia Development Forestry Sector Management Project Questions & Answers Q1: What has been the World Bank s role in the Liberia forestry sector and what has been the impact of the Liberia Development Forestry Sector Management Project? Since 2004, the Bank

More information

FOREST INVESTMENT PROGRAM DESIGN DOCUMENT. (Prepared by the Forest Investment Program Working Group)

FOREST INVESTMENT PROGRAM DESIGN DOCUMENT. (Prepared by the Forest Investment Program Working Group) CIF/DMFIP.2/2 February 24, 2009 Second Design Meeting on the Forest Investment Program Washington, D.C. March 5-6, 2009 FOREST INVESTMENT PROGRAM DESIGN DOCUMENT (Prepared by the Forest Investment Program

More information

CEF. Cumulative Effects Framework. Interim Policy. for the Natural Resource Sector. October Cumulative Effects Framework

CEF. Cumulative Effects Framework. Interim Policy. for the Natural Resource Sector. October Cumulative Effects Framework CEF Cumulative Effects Framework Cumulative Effects Framework Interim Policy for the Natural Resource Sector October 2016 Policy Approval The Cumulative Effects Framework Interim Policy is approved for

More information

THE ENERGY DEVELOPMENT CYCLE

THE ENERGY DEVELOPMENT CYCLE THE ENERGY DEVELOPMENT CYCLE PRE-PROJECT EXPLORATION APPRAISAL & DEVELOPMENT OPERATION CLOSURE USE Risks & Opportunities Across the Development Cycle Activities prior to the start of the individual project

More information

JAPAN BANK FOR INTERNATIONAL COOPERATION GUIDELINES FOR CONFIRMATION OF ENVIRONMENTAL AND SOCIAL CONSIDERATIONS

JAPAN BANK FOR INTERNATIONAL COOPERATION GUIDELINES FOR CONFIRMATION OF ENVIRONMENTAL AND SOCIAL CONSIDERATIONS JAPAN BANK FOR INTERNATIONAL COOPERATION GUIDELINES FOR CONFIRMATION OF ENVIRONMENTAL AND SOCIAL CONSIDERATIONS January 2015 JAPAN BANK FOR INTERNATIONAL COOPERATION 1 Preface Japan Bank for International

More information

Peru, Guarantee Facility Project

Peru, Guarantee Facility Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Peru, Guarantee Facility Project Environmental and Social Management Framework (ESMF)

More information

AMDAL Procedure. Flowchart of Indonesian Environmental Clearance 1

AMDAL Procedure. Flowchart of Indonesian Environmental Clearance 1 AMDAL Procedure (This is only indicative and for reference purposes. This is not exhaustive and therefore, the Consultants are requested to familiarize themselves with all the laws, rules, regulations,

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 23-Mar-2015 Report No.: ISDSC 12226 Date ISDS Approved/Disclosed: 06-Apr-2015 Public Disclosure Authorized

More information

EBA/CP/2016/ December Consultation Paper. Draft Guidelines on supervision of significant branches

EBA/CP/2016/ December Consultation Paper. Draft Guidelines on supervision of significant branches EBA/CP/2016/24 20 December 2016 Consultation Paper Draft Guidelines on supervision of significant branches Contents 1. Responding to this consultation 3 2. Executive Summary 4 3. Background and rationale

More information

ab0cd ENVIRONMENTAL AND SOCIAL PROCEDURES

ab0cd ENVIRONMENTAL AND SOCIAL PROCEDURES ab0cd ENVIRONMENTAL AND SOCIAL PROCEDURES APRIL 2010 TABLE OF CONTENTS ABBREVIATIONS... 2 1. INTRODUCTION... 3 2. ENVIRONMENTAL AND SOCIAL PROCEDURES... 4 2.1 Overview... 4 3. APPRAISAL OF DIRECT OPERATIONS...

More information

Case of MIGA s Guarantee Linked to the Engineering and Feasibility Phase of Developing the PT Weda Bay Nickel Project. Summary

Case of MIGA s Guarantee Linked to the Engineering and Feasibility Phase of Developing the PT Weda Bay Nickel Project. Summary APPRAISAL REPORT CAO Appraisal for Audit of MIGA CAO Compliance October 3, 2011 PT Weda Bay Nickel Indonesia Case of MIGA s Guarantee Linked to the Engineering and Feasibility Phase of Developing the PT

More information

REDD+ Safeguards and Safeguard Information Systems

REDD+ Safeguards and Safeguard Information Systems REDD+ Safeguards and Safeguard Information Systems Expected Learning Outcomes This module will provide an overview of REDD+ safeguards and safeguard information systems. In particular, we will discuss:

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 PROJECT PREPARATORY TECHNICAL ASSISTANCE A. Justification 1. A project preparatory technical assistance (PPTA) is required to prepare all documents for the sector project framework and core

More information

PT Sarana Multi Infrastruktur Environmental and Social Management Framework

PT Sarana Multi Infrastruktur Environmental and Social Management Framework PT Sarana Multi Infrastruktur Environmental and Social Management Framework 03 February 2017 Supported by TA 8484 INO: Sustainable Infrastructure Assistance Program - Technical Assistance Cluster Management

More information

REGISTERED CANDIDATE AUDITOR (RCA) TECHNICAL COMPETENCE REQUIREMENTS

REGISTERED CANDIDATE AUDITOR (RCA) TECHNICAL COMPETENCE REQUIREMENTS REGISTERED CANDIDATE AUDITOR (RCA) TECHNICAL COMPETENCE REQUIREMENTS 1. Context After completion of the recognised training contract, a period of specialisation is required, appropriate to the level required

More information

Environmental Impact Assessment (EIA) for Oil & Gas and Power Projects

Environmental Impact Assessment (EIA) for Oil & Gas and Power Projects Environmental Impact Assessment (EIA) for Oil & Gas and Power Projects Insert then choose Picture select your picture. Right click your picture and Send to back. August 6-8 th, 2014 Craig A. Reid Partner,

More information

UNEP Principles 1. Integration of Tourism into Overall Policy for Sustainable Development

UNEP Principles 1. Integration of Tourism into Overall Policy for Sustainable Development UNEP Principles The principles cover: 1. Integration of Tourism into Overall Policy for Sustainable Development 2. Development of Sustainable Tourism 3. Management of Tourism 4. Conditions for Success

More information

Global Infrastructure Facility

Global Infrastructure Facility Global Infrastructure Facility ------------------------------------------------------------------------------------------------------------------- Partnership Framework As Adopted by the Governing Council

More information

1 October. Public Information

1 October. Public Information ANZ S LAND ACQUISITION POSITION STATEMENT 1 October 2016 Public Information CONTENTS ANZ s land acquisition position statement 3 ANZ s commitment to sustainable development 3 Our human rights standards

More information

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d)

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d) Checklist:. 10.Ports and Harbors (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders (3) Examination of Alternatives (1) Air Quality (2) Water

More information

CGMA Competency Framework

CGMA Competency Framework CGMA Competency Framework Technical skills CGMA Competency Framework 1 Technical skills : This requires a basic understanding of the business structures, operations and financial performance, and includes

More information

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 1 Ministry of Environmental Conservation and Forestry (MOECAF) Environmental

More information

CHAPTER 7 STAKEHOLDER ENGAGEMENT

CHAPTER 7 STAKEHOLDER ENGAGEMENT CHAPTER 7 STAKEHOLDER ENGAGEMENT TABLE OF CONTENTS 7 STAKEHOLDER ENGAGEMENT PROCESS... 7-1 7.1 INTRODUCTION... 7-1 7.2 STAKEHOLDERS IDENTIFIED... 7-2 7.3 STAKEHOLDER ENGAGEMENT PROCESS... 7-4 7.3.1 Stakeholder

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/28/2009 INTEGRATED SAFEGUARDS DATASHEET

More information

CARIBBEAN DEVELOPMENT BANK EVALUATION POLICY

CARIBBEAN DEVELOPMENT BANK EVALUATION POLICY CARIBBEAN DEVELOPMENT BANK EVALUATION POLICY December 2011 TABLE OF CONTENTS A. Policy Objective, Commitments and Guiding Principles 1 B. CDB s Evaluation System 3 Self-evaluation 4 Independent evaluation

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 14-Apr-2014

More information

NATIONAL ENVIRONMENTAL MANAGEMENT AUTHORITY (NEMA)

NATIONAL ENVIRONMENTAL MANAGEMENT AUTHORITY (NEMA) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL ENVIRONMENTAL MANAGEMENT AUTHORITY (NEMA) TERMS OF REFERENCE (TOR) FOR STRATEGIC

More information

Achieve. Performance objectives

Achieve. Performance objectives Achieve Performance objectives Performance objectives are benchmarks of effective performance that describe the types of work activities students and affiliates will be involved in as trainee accountants.

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 07/27/2011 1. Basic Project Data Original

More information

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e) Checklist: 3. Hydropower Stations, Dams and Reservoirs (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders Main Check s Have EIA reports been

More information

Alien species that threaten ecosystems, habitats or species I. STATUS AND TRENDS

Alien species that threaten ecosystems, habitats or species I. STATUS AND TRENDS Page 249 VI/23. Alien species that threaten ecosystems, habitats or species The Conference of the Parties I. STATUS AND TRENDS 1. Notes the report on the status, impacts and trends of alien species that

More information

CONDUCTING E&S DUE DILIGENCE ALIGNED WITH IFC PERFORMANCE STANDARDS A FOCUS ON FINANCIAL INTERMEDIARIES

CONDUCTING E&S DUE DILIGENCE ALIGNED WITH IFC PERFORMANCE STANDARDS A FOCUS ON FINANCIAL INTERMEDIARIES CONDUCTING E&S DUE DILIGENCE ALIGNED WITH IFC PERFORMANCE STANDARDS A FOCUS ON FINANCIAL INTERMEDIARIES EMIOLA ABASS June 13, 2017 COURSE OBJECTIVE This course has been designed to provide guidance to

More information

CENTRAL BANK OF CYPRUS

CENTRAL BANK OF CYPRUS GUIDELINES TO BANKS ON THE APPROVAL PROCESS OF THE INTERNAL RATINGS BASED (IRB) AND THE ADVANCED MEASUREMENT (AMA) APPROACHES FOR THE CALCULATION OF CAPITAL REQUIREMENTS APRIL 2007 TABLE OF CONTENTS 1.

More information

Environmental Scientist Series Specification (Established July 22, 1981)

Environmental Scientist Series Specification (Established July 22, 1981) California State Personnel Board Specification Environmental Scientist Series Specification (Established July 22, 1981) Scope This series specification describes three Environmental Scientist and three

More information

INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY. Environmental and Social Management System for ADB Line of Credit

INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY. Environmental and Social Management System for ADB Line of Credit INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY Environmental and Social Management System for ADB Line of Credit CONTENTS I. INTRODUCTION 1 II. ENVIRONMENTAL AND SOCIAL MANAGEMENT POLICY AND APPLICABLE REQUIREMENTS

More information

INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY. Environmental and Social Management System for ADB Line of Credit

INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY. Environmental and Social Management System for ADB Line of Credit Clean Energy Finance Investment Program (RRP IND 46268) INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY Environmental and Social Management System for ADB Line of Credit CONTENTS I. INTRODUCTION 1 II. ENVIRONMENTAL

More information

SUMMARY 2013 EDITION

SUMMARY 2013 EDITION SUMMARY 2013 EDITION RSAT Joint Initiative on Rapid Basin-wide Hydropower Sustainability Assessment Tool PART 1: OVERVIEW OF THE RSAT The RSAT is designed as an integrative tool to assess hydropower development

More information

Environmental and Social Management System Arrangement. Sri Lanka: Small and Medium-Sized Enterprises Line of Credit Project

Environmental and Social Management System Arrangement. Sri Lanka: Small and Medium-Sized Enterprises Line of Credit Project Environmental and Social Management System Arrangement October 2017 Sri Lanka: Small and Medium-Sized Enterprises Line of Credit Project Prepared by Bank of Ceylon for the Asian Development Bank. The environmental

More information

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary Date: December 4, 2015 Location (City, Country): Tashkent, Uzbekistan Audience (Government, Implementing

More information

Fisheries and Oceans Canada Species at Risk Act. Directive on the Identification of Critical Habitat for Aquatic Species at Risk

Fisheries and Oceans Canada Species at Risk Act. Directive on the Identification of Critical Habitat for Aquatic Species at Risk Fisheries and Oceans Canada Species at Risk Act Directive on the Identification of Critical Habitat for Aquatic Species at Risk January 2015 Species at Risk Program Programme d espèces en péril To be read

More information

CHARTER OF THE BOARD OF DIRECTORS

CHARTER OF THE BOARD OF DIRECTORS SUN LIFE FINANCIAL INC. CHARTER OF THE BOARD OF DIRECTORS This Charter sets out: 1. The duties and responsibilities of the Board of Directors (the Board ); 2. The position description for Directors; 3.

More information

Determining Whether a Proposal is Subject to the National Environmental Policy Act (NEPA) Section 102 Updated March

Determining Whether a Proposal is Subject to the National Environmental Policy Act (NEPA) Section 102 Updated March Determining Whether a Proposal is Subject to the National Environmental Policy Act (NEPA) Section 102 Updated March 2005 1 This paper presents some key thresholds to consider when determining whether a

More information

EBRD Performance Requirement 10

EBRD Performance Requirement 10 EBRD Performance Requirement 10 Information Disclosure and Stakeholder Engagement Introduction 1. This Performance Requirement (PR) recognises the importance of an open and transparent engagement between

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 2001L0018 EN 21.03.2008 003.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B DIRECTIVE 2001/18/EC OF THE EUROPEAN PARLIAMENT

More information

Analysis of the final version of Cameroon s R-PP

Analysis of the final version of Cameroon s R-PP Analysis of the final version of Cameroon s R-PP CAMEROON presented its Readiness Preparation Proposal (R-PP) for assessment by the FCPF Participants Committee (PC) at its 13 th meeting held in October

More information

RESOLUTION MEPC.67(37) adopted on 15 September 1995 GUIDELINES ON INCORPORATION OF THE PRECAUTIONARY APPROACH IN THE CONTEXT OF SPECIFIC IMO

RESOLUTION MEPC.67(37) adopted on 15 September 1995 GUIDELINES ON INCORPORATION OF THE PRECAUTIONARY APPROACH IN THE CONTEXT OF SPECIFIC IMO MEPC 37/22/Add.l THE MARINE ENVIRONMENT PROTECTION COMMITTEE RECALLING Article 38(c) of the Convention on the International Maritime Organisation concerning the functions of the Marine Environment Protection

More information

International Finance Corporation Activities Related to Indigenous Peoples Issues

International Finance Corporation Activities Related to Indigenous Peoples Issues International Finance Corporation Activities Related to Indigenous Peoples Issues January 2014 IFC ACTIVITIES RELATED TO INDIGENOUS PEOPLES ISSUES EXECUTIVE SUMMARY 1. The International Finance Corporation

More information

Guidelines for Preparing an Alternatives Analysis

Guidelines for Preparing an Alternatives Analysis Policy Number: Policy No. 2017-01 Title: Guidelines for Preparing an Alternatives Analysis Effective Date: September 7, 2017 Authority: Policy: Public Law 91-575, 84 Stat. 1509 et seq., Sections 3.1, 3.4(2),

More information

A Firm s System of Quality Control

A Firm s System of Quality Control A Firm s System of Quality Control 2759 QC Section 10 A Firm s System of Quality Control (Supersedes SQCS No. 7.) Source: SQCS No. 8; SAS No. 122; SAS No. 128. Effective date: Applicable to a CPA firm's

More information

Implementing the Mitigation Hierarchy

Implementing the Mitigation Hierarchy Implementing the Mitigation Hierarchy Presented by National Biodiversity and Business Network IUCN De Beers Group of Companies 10 August 2016 Objectives for the day Provide an overview of the overall framework

More information

Annex 1: Project Tropicalia Sustainable Tourism, Dominican Republic

Annex 1: Project Tropicalia Sustainable Tourism, Dominican Republic Annex 1: Project Tropicalia Sustainable Tourism, Dominican Republic and Social Action Plan (ESAP) Item PS 1: Assessment and Management of and Social Risks and Impacts 1.1 and Social Management System (ESMS)

More information

Technical Guidance Document for Strategic Environmental Assessment (SEA)

Technical Guidance Document for Strategic Environmental Assessment (SEA) Technical Guidance Document for Strategic Environmental Assessment (SEA) EAD-EQ-PCE-TG-03 Signature on Original Environment Quality Sector * Corporate Management Representative Secretary General Originated

More information

Performance Standard 6 V2

Performance Standard 6 V2 Introduction 1. Performance Standard 6 recognizes that protecting and conserving biodiversity, maintaining ecosystem services, and sustainably managing living natural resources are fundamental to sustainable

More information

7 May 2014 GCF/B.07/ May 2014 Songdo, Republic of Korea Agenda item 6. Meeting of the Board

7 May 2014 GCF/B.07/ May 2014 Songdo, Republic of Korea Agenda item 6. Meeting of the Board Guiding Framework and Procedures for Accrediting National, Regional and International Implementing Entities and Intermediaries, Including the Fund s Fiduciary Principles and Standards and Environmental

More information

Integrated Safeguards Data Sheet (Initial)

Integrated Safeguards Data Sheet (Initial) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Initial) Report No: AC124 Section I - Basic Information

More information

EA Frameworks Case Study

EA Frameworks Case Study EA Frameworks Case Study Tajikistan Community Agriculture & Watershed Management The World Bank Europe & Central Asia Region Biskek,Tblisi March/April 2008 Project Safeguard Policy Process Integrated Safeguards

More information

Guiding Principles and Recommendations for Responsible Business Operations in and around Key Biodiversity Areas (KBAs)

Guiding Principles and Recommendations for Responsible Business Operations in and around Key Biodiversity Areas (KBAs) Guiding Principles and Recommendations for Responsible Business Operations in and around Key Biodiversity Areas (KBAs) A collaborative project of the KBA Partnership coordinated by IUCN Draft 2 for public

More information

Recognizing that pollution of the Caspian Sea by oil and by oil pollution incidents of the sea threatens the marine environment,

Recognizing that pollution of the Caspian Sea by oil and by oil pollution incidents of the sea threatens the marine environment, PROTOCOL CONCERNING REGIONAL PREPAREDNESS, RESPONSE AND CO-OPERATION IN COMBATING OIL POLLUTION INCIDENTS TO THE FRAMEWORK CONVENTION ON THE PROTECTION OF THE MARINE ENVIRONMENT OF THE CASPIAN SEA Preamble

More information

SESA Terms of Reference FOREST CARBON PARTNERSHIP FACILITY (FCPF) INDONESIA: STRATEGIC ENVIRONMENTAL AND SOCIAL ASSESSMENT (SESA) 1

SESA Terms of Reference FOREST CARBON PARTNERSHIP FACILITY (FCPF) INDONESIA: STRATEGIC ENVIRONMENTAL AND SOCIAL ASSESSMENT (SESA) 1 SESA Terms of Reference Updated Draft subject to final consultation FOREST CARBON PARTNERSHIP FACILITY (FCPF) INDONESIA: STRATEGIC ENVIRONMENTAL AND SOCIAL ASSESSMENT (SESA) 1 May 25, 2011 These TORs are

More information

Deliverable 2: Procedural guidelines as a recommendation to the national competent authorities

Deliverable 2: Procedural guidelines as a recommendation to the national competent authorities Deliverable 2: Procedural guidelines as a recommendation to the national competent authorities Content Introduction... 2 Procedural Guidelines... 2 1. Scope of recommended procedural guidelines... 3 2.

More information

GRI Greenhouse Gas (GHG) Emissions Working Group

GRI Greenhouse Gas (GHG) Emissions Working Group GRI TERMS OF REFERENCE These (hereafter ToR ) outline the G4 Working Group ( WG ) workstream on Greenhouse Gas (GHG) Emissions. GRI will select WG members to participate in the development of the next

More information

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK (ESMF)

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK (ESMF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity LAO PDR

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

Chapter 1 Overview of the Environmental Management Plan and Volume 1

Chapter 1 Overview of the Environmental Management Plan and Volume 1 Chapter 1 Overview of the Environmental Management Plan and Volume 1 1.0 EXPLANATORY NOTES Hereafter in this Environmental Management Plan (EMP), the following terms apply: Chad Export Project: Represents

More information

INTERNATIONAL STANDARD ON AUDITING 260 COMMUNICATION WITH THOSE CHARGED WITH GOVERNANCE CONTENTS

INTERNATIONAL STANDARD ON AUDITING 260 COMMUNICATION WITH THOSE CHARGED WITH GOVERNANCE CONTENTS Introduction INTERNATIONAL STANDARD ON AUDITING 260 COMMUNICATION WITH THOSE CHARGED WITH GOVERNANCE (Effective for audits of financial statements for periods beginning on or after December 15, 2009) +

More information

Self Assessment Workbook

Self Assessment Workbook Self Assessment Workbook Corporate Governance Audit Committee January 2018 Ce document est aussi disponible en français. Applicability The Self Assessment Workbook: Corporate Governance Audit Committee

More information

Developing a Feedback and Grievance Redress Mechanism (FGRM) for the Fiji National REDD+ Programme TERMS OF REFERENCE

Developing a Feedback and Grievance Redress Mechanism (FGRM) for the Fiji National REDD+ Programme TERMS OF REFERENCE FIJI REDD+ Readiness Program supported by FCPF/World Bank Developing a Feedback and Grievance Redress Mechanism (FGRM) for the Fiji National REDD+ Programme TERMS OF REFERENCE 1. INTRODUCTION Fiji has

More information

Periodic Comprehensive Review of the External Auditor

Periodic Comprehensive Review of the External Auditor Periodic Comprehensive Review of the External Auditor TOOL FOR AUDIT COMMITTEES January 2014 ENHANCING AUDIT QUALITY AUDIT COMMITTEES iii Table of Contents Introduction 1 1. Determine the scope, timing

More information

CGIAR System Management Board Audit and Risk Committee Terms of Reference

CGIAR System Management Board Audit and Risk Committee Terms of Reference Approved (Decision SMB/M4/DP4): 17 December 2016 CGIAR System Management Board Audit and Risk Committee Terms of Reference A. Purpose 1. The purpose of the Audit and Risk Committee ( ARC ) of the System

More information

GRI Second G4 Public Comment Period

GRI Second G4 Public Comment Period GRI Second G4 Public Comment Period OVERVIEW INTRODUCTION GRI is issuing, for public comment, an exposure draft of the next generation of its reporting Guidelines (G4). The document will be available for

More information

Internal Audit Policy and Procedures Internal Audit Charter

Internal Audit Policy and Procedures Internal Audit Charter Mission Statement Internal Audit Policy and Procedures Internal Audit Charter The mission of the Internal Audit Department is to provide independent and objective reviews and assessments of the business

More information

Appendix 1: Scoping Techniques

Appendix 1: Scoping Techniques Appendix 1: Scoping Techniques 1 Scoping Techniques Checklist technique Checklist technique is used for identifying the project impacts. Such lists usually cover all possible impacts of the project. In

More information

St. Petersburg Declaration

St. Petersburg Declaration DRAFT 20 October 2005 Elements of St. Petersburg Declaration We, the representatives of the Governments from Europe and North Asia, countries from other continents and the European Commission, participating

More information

Register of Contaminated Land Consent Conditions

Register of Contaminated Land Consent Conditions Regional Contaminated Land Capacity Building Program Register of Contaminated Land Consent Conditions AUGUST 2017 Regional Contaminated Land Capacity Building Program This publication was produced by the

More information

Basel Committee on Banking Supervision. Consultative Document. External audits of banks. Issued for comment by 21 June 2013

Basel Committee on Banking Supervision. Consultative Document. External audits of banks. Issued for comment by 21 June 2013 Basel Committee on Banking Supervision Consultative Document External audits of banks Issued for comment by 21 June 2013 March 2013 This publication is available on the BIS website (www.bis.org). Bank

More information

GHANA NATIONAL PETROLEUM CORPORATION (GNPC) NATURAL GAS TRANSPORTATION AND PROCESSING PROJECT (NGTPP) RESETTLEMENT POLICY FRAMEWORK (RPF)

GHANA NATIONAL PETROLEUM CORPORATION (GNPC) NATURAL GAS TRANSPORTATION AND PROCESSING PROJECT (NGTPP) RESETTLEMENT POLICY FRAMEWORK (RPF) GHANA NATIONAL PETROLEUM CORPORATION (GNPC) NATURAL GAS TRANSPORTATION AND PROCESSING PROJECT (NGTPP) RESETTLEMENT POLICY FRAMEWORK (RPF) TERMS OF REFERENCE 1.0 Introduction and Background The Government

More information

available in multiple formats Environmental Self-Assessment Handbook for Rail Infrastructure Projects

available in multiple formats Environmental Self-Assessment Handbook for Rail Infrastructure Projects available in multiple formats Environmental Self-Assessment Handbook for Rail Infrastructure Projects This document and other Canadian Transportation Agency publications are available on our Web site at

More information

Exam Duration: 2 hours and 30 minutes

Exam Duration: 2 hours and 30 minutes The PRINCE2 Practitioner Examination Sample paper TR Question Booklet Multiple Choice Exam Duration: 2 hours and 30 minutes Instructions 1. You should attempt all 75 questions. Each question is worth one

More information

Workstream IV: Monitoring and Evaluation Background note: Overview of evaluation mechanisms in selected funds

Workstream IV: Monitoring and Evaluation Background note: Overview of evaluation mechanisms in selected funds Workstream IV: Monitoring and Evaluation Background note: Overview of evaluation mechanisms in selected funds I. Introduction 1. Decision 1/CP.16 requires that the Transitional Committee shall develop

More information