Design of POLCA Material Control Systems

Size: px
Start display at page:

Download "Design of POLCA Material Control Systems"

Transcription

1 Design of POLCA Material Control Systems Jan Riezebos To cite this version: Jan Riezebos. Design of POLCA Material Control Systems. International Journal of Production Research, Taylor Francis, 0, (0), pp.-. <0.00/00000>. <hal-00> HAL Id: hal-00 Submitted on Dec 0 HAL is a multi-disciplinary open access archive for the deposit and dissemination of scientific research documents, whether they are published or not. The documents may come from teaching and research institutions in France or abroad, or from public or private research centers. L archive ouverte pluridisciplinaire HAL, est destinée au dépôt et à la diffusion de documents scientifiques de niveau recherche, publiés ou non, émanant des établissements d enseignement et de recherche français ou étrangers, des laboratoires publics ou privés.

2 International Journal of Production Research Design of POLCA Material Control Systems Journal: International Journal of Production Research Manuscript ID: TPRS-0-IJPR-0.R Manuscript Type: Original Manuscript Date Submitted by the Author: -Aug-0 Complete List of Authors: Riezebos, Jan; University of Groningen, Faculty of Economics and Business Keywords: MAKE TO ORDER PRODUCTION, MATERIAL FLOW, MANUFACTURING CONTROL SYSTEMS, PULL SYSTEMS, CELLULAR MANUFACTURE, DESIGN OF PRODUCTION SYSTEMS, ENGINEER TO ORDER Keywords (user): MAKE TO ORDER PRODUCTION, MATERIAL FLOW

3 Page of International Journal of Production Research 0 Abstract Design of POLCA Material Control Systems Jan Riezebos Department of Operations, Faculty of Economics and Business University of Groningen, P.O. Box 00, 00 AV Groningen, The Netherlands Tel.: + ; Fax: + ; j.riezebos@rug.nl POLCA is a material control system designed for Make-To-Order or Engineer-To-Order companies. These firms have to cope with a high variety of customized products, and strong pressure to provide short throughput times. POLCA constrains the amount of work in progress on the shop floor in order to achieve a short average shop floor throughput time. Earlier work has shown that the POLCA system has the capability to reduce both the average shop floor throughput time and the average total throughput time, but it is only effective if the POLCA system has appropriately been designed. The design of the POLCA system is therefore being investigated and discussed in this paper. We give an extensive literature review and give attention to the authorization mechanisms of POLCA, the design of control loops, the route-specific capacity signals (POLCA cards), and specific facilities needed to use the POLCA system in practice. Finally, we report on the design of a POLCA system in practice, the first complete implementation of POLCA in The Netherlands, and present the quick scan that was used in the design of the POLCA system for this SME. Keywords: POLCA, MTO, Pull, Material control system. Introduction Firms that offer customized products cannot produce these items in advance. They often face huge problems with throughput time control, as demand for capacity fluctuates over time. Some of these Make-To-Order (MTO) firms will be able to use large lead times for these products, but most need to excel in throughput time management and control in order to survive. Material control is an important part of the chain of tools used in realizing short throughput times. It regulates the flow of goods on the shop floor. This includes the authorization to start a job, release of new material to the shop floor, setting priorities for jobs that are waiting to be processed, and initiating the start of succeeding activities, such as transport, quality control, et cetera. Pull systems are a special type of material control systems. They aim to control throughput times by constraining the release of jobs to the shop floor. Well known pull systems such as KANBAN are designed for Make-To-Stock (MTS) situations, as they use small intermediate stocks. In these pull systems, cards or containers (bins) are directly related to a specific product type. E.g., an empty bin should be filled with exactly the same product type as before. For MTO companies, such a direct relation between signal and product type is not useful. MTO companies face a much higher product variety, which would lead to a very large number of different bins or intermediate stocks. Next, the repetition of identical jobs is not that frequent, which would lead to low cycle times of a bin once it has been filled. The combination of both effects would result in large work-in-process inventories (WIP). Page of

4 International Journal of Production Research Page of 0 Some pull systems seem to be applicable in MTO companies (Stevenson et al., 0). POLCA is one of them. It has been introduced in Suri () in his book on Quick Response Manufacturing, and is based on principles that can also be found in the KANBAN system (Sugimori et al., ) and the CONWIP system (Spearman et al., ). However, POLCA aims to improve these systems in order to make the principles better applicable in MTO situations as well. Literature has given attention to the design of pull systems such as POLCA, but mainly in MTS companies. Design issues resulting from comparison studies of pull systems in MTO situations are not well addressed in literature. Fernandes et al. (0) did compare the performance of POLCA, MRP and Generic POLCA (GPOLCA), but for an MTS system. Germs and Riezebos (0) compared POLCA with CONWIP and m-conwip in an MTO system. Krishnamurthy et al. (0) compared several push and pull systems, but did not give explicit attention to design issues of these systems. The only paper that gives a more elaborate overview of design issues is the recent paper of Vandaele et al. (0), who discuss the design of a load-based POLCA system for an MTO case study. However, they focus on rather specific planning-level design issues for this case and develop a computerized version of POLCA. We aim to provide a more general overview of design issues in a POLCA system and give attention to the tools that have been developed and can be applied in POLCA implementations in MTO companies. This results in a proposal for a quick scan that can be applied to design a POLCA system. The structure of the paper is as follows. Section provides a literature review. Based on this review, Section will identify the main design issues of a POLCA system and proposes tools that are needed for supporting these decisions. Section discusses the effectiveness of POLCA in MTO systems, based on a case study at the first firm in the Netherlands that has implemented POLCA. Finally, Section concludes. Page of. Literature review on characteristics of the POLCA system POLCA is an acronym for Paired-cell Overlapping Loops of Cards with Authorization (Suri, ). It is a material control system that regulates the authorization of order progress on the shop floor in a cellular manufacturing system. POLCA controls the flow of work between cells. The main problem of planning in such cellular systems is related to insufficient synchronization of the processes between these cells, resulting in waiting times between the completion of a job in one cell and its start in the next cell (Riezebos, 0). At the same time, another cell might face a lack of work to be done, which we denote as unbalance. POLCA not only aims to increase the speed of job transfer between cells, but also to reduce these unbalances in the system. In order to achieve this, it uses overlapping control loops that cover subsequent segments of the job routing. POLCA uses a visual signal (cards) to authorize the progress of an order. These visual signals are often denoted as Polca s (in order to avoid ambiguity of terms, we use italics if we refer to the visual signals and capitals if we refer to the system). POLCA not only operates at the shop floor itself, but does also decide on the release of orders to the shop floor. It can affect the timing of release through the regular authorization mechanism (Polca s) as well as through an additional authorization mechanism, so called release lists. The decisions when and what to release to the shop floor have both a high impact on shop floor throughput time and delivery performance (Land and Gaalman, ; Germs and Riezebos, 0). If jobs are released too early, they often wait a long time on the shop floor before being completed. This enables the shop floor employees to allow low-priority orders to be produced before high-priority orders. This behavior will lead to a higher standard deviation of lateness, with possibly negative effects on due date performance. By limiting the amount of work on the shop floor and regulating the inflow of work, POLCA aims to achieve short and stable throughput times.

5 Page of International Journal of Production Research 0 Most information on the POLCA material control system stems from the book of Suri () and papers that have been published by Suri in QRM conference proceedings on POLCA (e.g. Suri 0, Suri and Krishnamurthy, 0). Other important sources of information are the proceedings of the tri-annual Group Technology / Cellular Manufacturing world conferences (Hernández and Süer 00; Sormaz and Süer, 0; Riezebos and Slomp, 0). Journal and conference papers on POLCA or variants of the POLCA system are e.g. Krishnamurthy et al. (00), Tien et al. (0), Krishnamurthy et al. (0), Suri (0), Fernandes et al. (0), Vandaele et al. (0), Germs and Riezebos (0). Other papers give attention to POLCA in a comparison of various suitable approaches for production planning, e.g. Zhou et al. (00), Lödding et al. (0), Ryan and Choobineh (0), Krishnamurthy et al. (0), Stevenson et al. (0). We know from discussions with researchers that several case studies have been performed, but the number of published case studies is very small. Finally, many websites of research centers, consultancy agents, and MTO firms that apply POLCA nowadays provide descriptions of POLCA. Table provides an overview of the above listed sources on POLCA research, The first column categorizes the type of contribution that is made. It appears that most contributions describe or analyze the POLCA system from a theoretical perspective instead of an empirical perspective. Two types of theoretical perspectives for analyzing the POLCA system have been used. Some contributions extend the initial description of Suri () on POLCA, using theory from the related fields that have been listed above. For example, Vandaele et al. (0) use a queuing theoretic perspective on determining the required cell throughput times given the (expected) demand during the next three months. Based on this internal lead-time setting method, they determine the number of Polca s in the system. Other contributions compare several material control systems and try to assess the area of applicability or the effectiveness of POLCA amongst other available material control systems. The main conclusion from these studies is that POLCA has to be considered as a promising approach for MTO-firms, due to its ability to control the material flows in shop configurations that tend more towards the job shop type with many different routings between the cells or work stations. For this type of configuration, known pull systems such as CONWIP and Generic KANBAN are not well equipped (Krishnamurthy et al., 0; Fernandes et al., 0), while at the same time use of detailed scheduling techniques may not be appropriate due to its complexity and reliance on the accuracy of the information systems (Stevenson, 0). There is clearly a lack of literature on well-elaborated case studies that describe and analyze POLCA system implementation. In the proceedings of the QRM workshops, several successful implementations of POLCA are discussed, but to our knowledge these implementations have not been company wide, but limited to some segments of the production system. Vandaele et al. (0) describe a case of a Belgium firm for which they designed a POLCA system. This case is very instructive, but no details are provided on the actual implementation. Hence, there is still a lack of insight in the implementation problems and barriers that are encountered in design and implementation. Note that the same problem holds for research on CONWIP. Framinan et al. (0:0) reports on CONWIP application studies and lists papers that have analyzed the applicability of CONWIP, but only of them did actually report on a real application! Research on POLCA brings together various fields of interest. First of all, research on throughput time control and the relation with higher level planning systems. Next, research on cellular manufacturing and, more specifically, planning problems in cellular manufacturing. Finally, research on shop floor improvement. Table does also categorize the point of view from which the various contributions to POLCA system design originate. We denote the first perspective as PPC (production planning and control), the second as CM (Cellular manufacturing) and the third as Improve (at the shop floor). The table shows that most contributions are provided from the perspective of PPC design. Hence, there is stronger focus Page of

6

7 Page of International Journal of Production Research 0 Literature is not uniform on the way this route-specific control should be implemented in POLCA. Two main issues have to be addressed:. Design of the visual signal. Design of the control loops The visual signal (Polca) should provide information to the shop floor employees on routespecific characteristics of the order to which it is or should be attached. Suri () suggested to provide the following information: (a) Originating cell (From); (b) Destination cell (To); (c) Card identifiers (Company name, serial number of card, et cetera). The signal is provided through a card similar to a Kanban, where at the left side the information on the from-cell and at the right side the to-cell is listed (Suri, :). Pieffers and Riezebos (0) have suggested to increase the visual contents of these cards by using color-coding to identify the cells. If every cell has a unique color, each card consists of two colors: one for the from-cell and one for the to-cell. Employees of a cell can easily identify the direction of the card-flow. If their color is listed in the to-column, the card should be returned to the originating cell after completing the operations in the current cell. If their color is listed in the from-column, the card should remain attached to the order and be send to the to-cell after completing the operations in the current cell. Vandaele et al. (0) list several different types of cards / visual signals that are available for providing this type of information. They choose to use an electronic signal, mainly because of the shop floor layout in their case study. Electronic signals are shown on screens at the work stations and the operator can attach and detach these signals to orders in his system. The main advantage of electronic signals is that there is no information delay caused by the transportation of the visual signal if it is detached from an order. Other advantages are the avoidance of card damage and loss, mistakes when attaching or detaching cards, search time in order to localize cards, and easiness of changing the number of cards in the system by the shop floor manager or planner. The main disadvantage is the loss of connection between the flow of material and information, which might lead to less confidence in the system by the employees. Insights from lean manufacturing indicate that the strength of that connection often determines the success of a control policy. Another important element in this discussion seems to be the possibility for employees to interpret the visual signal. This might be rather trivial, but nevertheless it is often overseen when designing systems for shop floor management. For example, color-coding does not work for color-blind people. The percentage of men that cannot distinguish red from green is for blank men %. Women suffer less from red-green color vision problems (< 0.%) (Hunt, ). Written information is only accessible if employees understand the icons or letters used. As the number of analphabetic people in industry is still rather high, especially in some countries, a mixture of information types seems to be more appropriate when designing a visual signal. The same holds true for people that are digibetic (i.e. cannot easily use a computer to interpret, attach or detach signals). Finally, the way information is interpreted depends on the place where the information is provided on the visual signal. If information on the from-cell is provided at the left hand side of a card and on the to-cell at the right hand side of the card, people that are used to read from right to left might become confused. <<INSERT Figure ABOUT HERE>> Page of

8 International Journal of Production Research Page of 0 The second issue that has to be addressed is the design of the control loops. POLCA uses overlapping loops. <<INSERT Figure provides a scheme for the operation of a POLCA system with such loops. The system shows three cells, A, B and C. Each cell has an internal queue where jobs that are allowed to start processing wait until capacity is available. The average cell throughput time is with index i indicating the cell. Jobs that have to visit these µ i cells arrive with an arrival rate (= demand rate) λ. However, the POLCA system introduces an assembly waiting time before a job can enter a cell. First a suitable Polca needs to be attached to the job in order to signal the authorization to start processing in the next cell. What Polca should be attached depends on the routing of the job. The job in <<INSERT Figure needs to be processed subsequently in cells A, B, C and D. The first Polca that should be attached is therefore the Polca that circulates between the first two cells in this routing A and B. If no such Polca is available in the queue Polca AB, the job will wait in queue Q AB. As soon as an item is available in both these queues, the Polca will be attached to the job and continue to the internal queue of cell A. After completing processing in cell A, both the job and the attached Polca AB will move to cell B. But before they are allowed to enter the internal queue of cell B, first an additional Polca has to be attached. That Polca circulates in a new control loop between cell B and the next cell in the routing of this job. In the example this is cell C, so a Polca BC need to be attached. The job with Polca AB still attached therefore enters queue Q BC if no such Polca is available in queue Polca BC. Only if an item is available in that queue can the job proceed with now two Polca s attached: one Polca AB and a Polca BC. After completing the operation in cell B, the Polca AB is detached and returned to its originating cell A. The job proceeds to cell C, where the story of waiting on a suitable Polca before it can enter the cell starts over again. The rationale of this procedure is that a job will only be allowed to ask for capacity in a cell upstream (e.g. cell A) if it is expected that the required downstream cell (Cell B) will be able to continue processing afterwards. If cell B would face a breakdown, no Polca AB s will be returned to cell A and no authorization is given to start new jobs that need to be processed on B after completing cell A. If cell B is a bottleneck, probably a lot of Polca AB s are waiting in Q BC, as the internal queue of a bottleneck cell will often be lengthy. Hence, no new jobs will be released that have B in their routing until another job on B has finished and the Polca AB detached and returned to its originating station. As cell A cannot proceed with the jobs that have to visit B afterwards, but have not already a Polca attached, it will stay idle and in accordance to the lean manufacturing paradigm- help the next stage in solving their problem. Alternatively, it might select another job that have a different cell than cell B as immediate follower in their routing. Orders selected will therefore for the moment bypass cell B, which has important benefits for shortening average throughput times. We denote this control behavior workload balancing. Note that <<INSERT Figure does not indicate the number of Polca s that circulate in a single control loop. However, it is obvious that if this number is zero, no jobs will ever be authorized to start production. Similar, if this number approximates infinity, the probability that a job will have to wait because there is no Polca available approximates zero. Suri (:) provides a simple formula based on Little s law (Little, ). Little s law states that the average throughput rate of a system equals the quotient of the average number of elements in the system and the average time an element is in the system. The formula that Suri provides uses Polca s as elements in the system. Following the notation that we introduced, the number of Polca AB s is denoted as n AB with: ( ) n = L + L g λ () AB A B Page of

9 Page of International Journal of Production Research 0 where λequals the throughput rate of jobs that have to visit cells A and B subsequently, and L i = is the average (job) lead time in cell i. If n µ AB is a fractional number, it should be i rounded up to the next integer value n AB. Formula () is not a correct application of Little s law. The main problem is that the elements of the left hand side (Polca AB s) are not identical to the elements at the right hand side (jobs). This problem mainly affects the first term of the right hand side, the estimate of the average time an element is in the system. Polca s circulate in the system, so they should be returned to the originating cell before they can start a new cycle. So instead of using the average lead time of jobs, we should use an estimate of the average cycle time of a Polca. This average cycle time will also include the waiting time of a Polca AB in the queues Polca AB W, and the average time that is needed to transport the card in the ( WPolca AB ) and Q BC ( ) Q BC system ( T AB between cells A and B and TBA back from cell B to cell A). As a Polca will only start a new cycle if it is attached to a single job, and if we assume that only one Polca AB will be attached to a job that has to visit cells A and B subsequently, the throughput rate parameter of Polca AB s equals the throughput rate of these jobs. Hence, we propose to use: ( ) n = L + L + W + W + T + T g λ () AB A B Polca AB Q BC AB BA Note that formula () is only valid if there is no limitation on the release date of jobs to the various cells. Suri (:) does describe the possibility to control the earliest release dates of jobs in the various cells in order to provide the planner increased control. How this information is presented to the cells will be discussed in the next subsection, but here we would like to stress the consequence it has for the determination of the required number of Polca s. The increased flexibility of the planner comes at a cost in terms of longer average throughput times of jobs, as it introduces additional waiting times in <<INSERT Figure. Hence in case of authorization signals that specify the earliest release dates of a job in a cell, <<INSERT Figure transfers to << INSERT Figure and formula () transfers to formula (). << INSERT Figure ABOUT HERE>> ( ) n = L + L + W + W + W + T + T g λ () AB A B PolcaAB QB QBC AB BA The only change compared to formula () is the inclusion of the term W Q B between the brackets, i.e. the average waiting time of the job with a Polca AB attached on its earliest release date in cell B. Note that we do not need to include the time a job waits in cell A, as in that case the Polca AB will not have been attached to the job. In practice, we often see that the latter five terms between brackets are replaced by a term α L + L, with safety allowance α > 0, which leads to the expressions: ( ) A B ( ) ( ) n = L + L g + α g λ () AB A B W + W + W + T + T α = L + L PolcaAB QB QBC AB BA A B However, we should note that there is no reason to assume that the ratio between the upper and lower side of this quotient is always similar for different combinations of cells. Hence we prefer to estimate the components of formula (). () Page of

10 International Journal of Production Research Page of 0 Suri (:) also introduced the notion of a quantum, i.e. the maximum amount of material that should accompany a single card. Jobs that exceed this limit need more than one Polca in order to be authorized to start processing in a cell. Vandaele et al. (0) propose a load-based POLCA system that does not use cards, but electronic signals based on the actual workload released in a loop. This avoids the type of rounding effects that occur when using quantum cards. However, using quantum cards is still much better than using a limit on the number of jobs in a loop, as can be concluded from workload control theory (e.g. Bergamaschi et al., ; Land and Gaalman, ). In MTO job shop configurations, the correlation between work content and throughput time is much stronger than the correlation between number of orders and throughput time. Still there may be valid reasons to not use a quantum. For example, easiness of use and transparency of the system might lead to the use of a POLCA system with no quantum at all. Germs and Riezebos (0) show that the POLCA system can have effective work load balancing capability even in this situation. From this discussion we see that the POLCA system enables control of work order progress based on information of routings between cells in a loop and a measure of WIP that already has been released in that loop. The design of a POLCA loop does have to give attention to the cells that are included in a single loop, as this affects the information content on routings in the POLCA system. Moreover, it should give attention to the number of Polca s that will circulate in that loop and the work load associated with a single Polca. When discussing the case study results, we will further explore this issue. Note that these design issues are similar for CONWIP systems. In CONWIP, a card also signals the release opportunity of a new order. As long as total processing times of orders at operations are similar, there is no need to convert orders to workload in hours. The basic CONWIP system (Hopp and Spearman, 0:) is therefore as indifferent as POLCA with respect to the decision how much of each item will be in the WIP inventory. Variants of the CONWIP system that allow for the introduction of quantums have been developed as well (see e.g., Hopp and Spearman, 0:0-0; Framinan et al., 0). The important difference between POLCA and CONWIP is in the way routing-variety is being handled and the loops overlap. CONWIP designs longer non-overlapping loops for every different routing that can be encountered. If loops become too long, segmented or tandem CONWIP loops can be used (see e.g., Bonvik et al., ; Gaury, 00). POLCA uses very short loops between two cells and includes the cell details on the visual signal. By chaining the various POLCA loops, each possible job routing can be controlled. The POLCA loops overlap, as one job generally has two cards attached when being processed. This results in improved signaling capability of capacity problems in subsequent parts of the routing (Suri, ). Concluding, a POLCA system uses both visual signals and control loops to implement an effective routing mechanism that enables a firm to reduce average shop floor throughput time.. Release The second category of tools and methods in the POLCA system supports the release of jobs to the shop floor. Although the authorization mechanism of the cards receives generally most attention in a POLCA system, the release list provides an equally important authorization mechanism. However, this mechanism is an instrument of the planner, i.e. it allows the planner to directly influence the release of jobs to the shop floor and the progress of jobs that already have been released to the shop floor. In the POLCA system, this is accomplished by enabling a planner to specify an earliest release date of a job in each cell. Therefore, the influence of the planner is not complete, but only partial. He or she cannot affect the actual starting moment of a job, as this is regulated by the Polca s and the shop floor employees. Page of

11 Page of International Journal of Production Research 0 << INSERT Table ABOUT HERE>> Other pull systems, such as CONWIP and KANBAN, do not have such an authorization mechanism at all (Framinan et al., 0). They only have a release list in order to prioritize the release of jobs to the shop floor. Hopp and Spearman (0:0) conclude that a simple sequencing mechanism to support CONWIP in case of a highly complex job shop is not useful. They suggest using instead a type of capacitated material requirements planning. POLCA uses cell-specific release lists. It lists all jobs that according to their routing will have to visit the cell and specifies an earliest release date of this order in this cell. An example is presented in << INSERT Table. All jobs that are authorized to be released according to the specified earliest release date are listed above the red line, the others below. Note that some of the jobs above the red line cannot be started because the material has not yet been received from an earlier cell in its routing or from the warehouse. In order to determine the earliest release dates of a job in a cell, the planner might apply backward calculation from the due date of the job. For each cell that is included in the routing and each stock point between two cells both the average throughput time and the standard deviation of throughput time can be calculated. By summing the average throughput time of the remaining part of the routing and including a buffer time to compensate for the variation, the planner can estimate the earliest release time in a cell. The problems that are faced when applying this procedure in practice are due to the unavailability of reliable data. Most firms do have an ERP system with information on the setup times of machines and (estimated) processing times of jobs at these machines. However, this information is not sufficient to determine the main component of cell throughput time, i.e., the waiting times within the cell. The reasons for these waiting times are unavailability of materials and/or capacity at the moment the job arrives. The probability of waiting on capacity increases if the utilization of the machine has to be higher. ERP systems normally neglect the sensitivity of throughput times for changes in utilization levels. They simply use standard lead times and use large buffer times to accommodate for variation and errors. The POLCA system copes with this problem in two different ways. First, it takes into account that the utilization of cell might fluctuate over time. POLCA determines the expected cell throughput times based on the expected work load that a cell has to process within a certain time fence. Next, it determines the buffer time at cell level instead of at operation level. In that way buffer times are smaller. Although POLCA proposes some improvements on standard ERP procedures with respect to lead time offsetting, Lambrecht et al. () have described how to apply a capacity based lead time offsetting procedure. Vandaele et al (0) use this ARP (Advanced Resource Planning) module to determine expected cell throughput times, buffer times, and the number of Polca s that have to circulate in a loop between two cells. The use of an additional authorization mechanism, such as cell-specific release lists, will increase the shop floor throughput time of some jobs. It is unclear how this affects the average shop floor throughput time. The main reasons for introducing this mechanism are therefore focusing on achieving other performance indicators. For example, a planner might aim to prohibit cannibalization of components inventory, which might occur if cells start too early with orders that have enough time before they are due. The same holds true for using scarce capacity. In both cases, the planner may prefer some jobs to wait in order to prioritize the progress of other jobs. This might improve due-date related performance measures (e.g., tardiness or lateness), but it does not need to have a positive influence on average shop floor throughput time. Page of

12 International Journal of Production Research Page 0 of 0. Facilities One of the essential elements of pull systems that contribute to their success is the strong connection of the production planning & control system and the actual situation at the shop floor. The system quickly reacts if circumstances at the shop floor change, i.e. if a cell completes processing of a job or a machine breaks down. However, in some situations extraordinary circumstances occur that cannot easily be handled through the pull system. We denote such circumstances as calamities. A card-based system should include some measures that enable the users of the system to continue with the necessary operations in these circumstances without counterproductive behavior of the PPC system... Safety cards POLCA introduces safety cards in order to enable the system to cope with unforeseen events. An effect of these unforeseen events might be the decision to stop further processing of a job that is already at the shop floor. Reasons for this decision can be unavailability of components needed for this product (strikes), lack of solvability of the customer, et cetera. If the decision is made to (temporarily) stop progress of a job that already has some Polca s attached, these Polca s may be detached and send back to their originating cells, but this complicates the process of authorizing a future restart of the job. POLCA introduces safety cards in such cases. These cards look similar to the original Polca s, but they clearly identify the fact that they are special cards for emergency situations. The planner releases such a card whenever he/she thinks that the number of cards in a loop that still circulate is too low due to these unforeseen events. A safety card best replaces the original Polca that was attached to the problematic job. In that case, the regular Polca starts circulating again, while the safety card accompanies the problematic job. Whenever the progress of that job will be allowed, the safety card provides the required authorization to complete the job. However, instead of returning the safety card to its originating cell, the card is send back to the planner. A POLCA system with such safety cards can only function if the occurrence of safety cards is limited. We expect that the number of safety Polca s should be less than 0% of the regular number of Polca s. The planner will generally not only release a safety card, but also start an investigation of the reason for the event to occur. This will provide useful information that might enable the system to respond differently in future... Convergent routings Another type of facility is needed in case of complex routings. We distinguish two types of complex routings: convergent and divergent routings. In practice, combinations of both occur as well. First, we give attention to the way a POLCA system copes with convergent routings. Convergent routings occur in case of assembly. Various components and parts are required in the assembly stage and continue afterwards in a single product routing, but these components might need to have different routings in the preceding stages. An illustration is provided in <<INSERT Figure. Cell A is an assembly cell. It uses non-standard components from both M and M. After completing the assembly, the product flows to P for further processing. How does the POLCA system ensure that the assembly cell receives the required components from the preceding cells? And how will they signal the completion of a job to these preceding cells? <<INSERT Figure ABOUT HERE>> This problem would not be difficult in case the components were standard and could be made to stock. However, we investigate the case of Make-To-Order companies, where Page 0 of

13 Page of International Journal of Production Research 0 components can be product specific. Both components have to be in A in order to continue processing in A. This can be formalized in the POLCA system by requiring that input cards from both cells (i.e., a Polca MA and a Polca MA ) have to be attached to the order as well as a Polca AP in order to start processing this job in cell A, assuming that the current date is not before the earliest starting date in cell A. In case of convergent structures, a job will therefore be accompanied by more than two Polca s. After completing the job in cell A, the two input cards return to cells M and M respectively, while the job together with Polca AP continues to cell P. As the POLCA system uses cards as capacity signals instead of product-specific demand signals, the information flow of the cards does not signal what items should be made. In case of assembly, it is necessary to co-ordinate what items to produce in the parallel cells (e.g., M and M) in order to avoid the situation that one cell produces parts for job X and the next cell selects parts for job Y. This type of co-ordination cannot be done through the card system and should therefore be accomplished through the job release system of POLCA, i.e. the release list per cell and, if necessary, additional information or priority mechanisms. Hence, a release list per cell is a prerequisite in case of convergent structures... Divergent routings The question now arises whether or not additional measures are required in case of divergent routings. Such routings occur frequently in practice, e.g., in case of different packaging cells. <<INSERT Figure provides an example. <<INSERT Figure ABOUT HERE>> For cell A and A it is important to receive a relatively constant flow of work over time. High peak loads and lumpy periods are rather costly, especially in case of inflexible capacity. If the utilization of these cells is high, a fluctuating flow rate of work to the cell causes long throughput times, as the average waiting time between cell M and A or A will be longer than necessary. POLCA is designed to avoid this problem through its card system. Germs and Riezebos (0) have shown that POLCA effectively balances workload between cells if the number of cards is determined appropriately and in this way reduces the average throughput times of jobs. This workload balancing capability is mainly apparent in these divergent structures. However, in order to be able to select jobs in cell M for succeeding cells that have returned a card, cell M needs to receive a mixture of jobs from its preceding cell Z. It is there where a problem might occur if the regular POLCA system is being used. Cell Z is autonomous in its choice of jobs, as long as a Polca ZM is available and the release lists authorizes to proceed with this job. This allows cell Z to subsequently select jobs that all have to visit cell A afterwards. This mix of jobs that flows to cell M will cause negative effects on the total throughput time, as it will lead to an increase in the average waiting time of jobs between cell M and A. Divergent structures therefore may be extended with a mechanism that avoids such a mix. From the literature on mixed model lines (e.g. Becker and Scholl, 0) and level schedules in lean systems (Aigbedo, 00), methods and tools are available that can be used here as well. Basically, it comes down to applying a look-ahead priority rule at cell Z. See e.g. Van der Zee (0) for further details. This completes our discussion of the specific facilities needed to use the POLCA system in practice. CONWIP system design has given attention to similar issues, such as card deficits and the use of CONWIP in assembly lines (Hopp and Spearman, 0). However, in case of MTO production, additional measures are required. The POLCA system has addressed several of these issues. They enable a strong connection of the production planning & control system Page of

14 International Journal of Production Research Page of 0 and the actual situation at the shop floor of the make-to-order firm, which is very important for an effective pull system.. Quick scan for POLCA system design This section will describe the approach we propose to perform a quick scan in an organization that is interested in applying POLCA. First we will describe the scanning tool. The next subsection will describe a case study where this tool has been applied in order to investigate the applicability of POLCA in that organization and implement POLCA. Note that the scanning tool investigates applicability, but does not indicate whether POLCA is the most appropriate planning mechanism for the firm. Applicability studies focus on the required conditions for a specific planning concept (see e.g., Henrich et al., 0 for a Workload Control applicability study). Comparison studies (e.g., Stevenson, 0) give attention to the appropriateness of a planning concept compared to some alternatives.. Scanning tool The POLCA scanning tool is designed to investigate through a quick scan whether POLCA is a suitable system for a firm and whether the firm is ready for implementing POLCA. The tool can be considered as a practical guideline for checking the basic conditions for applying POLCA as well as identifying the company specific factors that have to be addressed when implementing POLCA. An extended version is online available (in Dutch: Riezebos, 0). <<INSERT Figure ABOUT HERE>> The scan consists of five stages (see <<INSERT Figure ) that need to be performed in the specified sequence. The first stage focuses on the objectives of POLCA and identifies whether POLCA may add to solving the problems of the firm. This requires an analysis of the causes of these problems. We have encountered several situations in firms where the causes of the planning problems were related to delivery or quality problems of suppliers. Applying a card-based material control system such as POLCA will not solve these problems. The POLCA scan will identify the necessity to address these problems first before other design choices are being made. If the analysis reveals that POLCA may add to solving some specific problems, a performance gap analysis is made and objectives for the POLCA implementation are being set. Targets for dependability, inventory levels and throughput times are required, as these targets affect the design of the POLCA system. They also help to communicate the usefulness of a POLCA system and assess the effectiveness of POLCA in stage of the POLCA scan. In order to gather data in this stage, we suggest to interview executives as well as material planners, team leaders, and employees. Our experience has learned that the various viewpoints provide new insights on the causes of the performance problems and the contribution of a material control system. The second stage identifies the cellular system. POLCA controls the flow between cells, but not the flow within a cell. It is therefore required to identify a suitable cellular structure of the production system. This structure need not always be identical to the current structure of the firm. In earlier work (Riezebos, 0) we discussed the design of cells from a planning point of view. It may be helpful to decompose a large department into several cells that are involved in separate loops. As the POLCA system controls the WIP in these loops, the flow of work to these cells can be controlled more effectively compared to the situation of one large department. This is especially important in case of bottlenecks or workstations that require Page of

15 Page of International Journal of Production Research 0 special conditions or handling equipment. Element of this analysis is therefore an inventarisation of the machines, stock locations, and other layout characteristics. The stage is completed with a proposal of a cellular structure of the production system, taking into account both the planning problems that POLCA should address (listed in stage ) and the characteristics of the production system of stage. This proposal is not a detailed design, but detailed enough to determine the product routings between the cells (stage ). The third stage encompasses the input of the planning system. As POLCA uses lead time offsetting in order to determine the earliest release date at the shop floor, it depends on the information on cell throughput times in the planning system. The actual throughput times are highly affected by capacity utilization, variation in processing times, batch sizes / job work content, capacity control measures, et cetera. However, the information on cell lead times in the ERP system of the firm might not reflect the actual situation at all. Hence, stage three gives attention to the utilization levels, cell throughput time estimates, and the work content of jobs. It proposes necessary improvements in data accuracy and capacity control before implementing POLCA, and whether or not additional instruments are needed for release management, such as the release lists for cells in the POLCA system, or a simple priority mechanism. The fourth stage designs the POLCA network in terms of control loops of the cards that will flow in the system. It identifies the product types that should be controlled using POLCA and produces a from-to table of the inter-cellular traffic that these product types will generate. Based on this analysis, the actual loops are set. This is an iterative process that requires involvement of many stakeholders. It is important to check whether the loops will provide the required control and solve the planning problems that POLCA should address (stage ). Especially in case of convergent and divergent routing structures (see section.), this decision requires careful attention. Finally, stage five considers the product mix variety and available production flexibility. It determines the number of cards that will circulate in the POLCA loops and the need to introduce safety cards. We recommend using formula of section. for setting the number of cards. Next, it assesses the effectiveness of the proposed POLCA system and recommends modifications of the various parts of the POLCA system. For example, it may be necessary to introduce additional information on the release lists because of some convergent routings. Finally, it investigates whether the objectives that were set in stage are realistic and can be achieved with this design of the POLCA system. For example, the expected lead time of the various routings can be estimated and compared to the initial performance targets.. Case study on the applicability of POLCA To our knowledge, the first implementation of a fully operational POLCA system in the Netherlands occurred in 0 (Bosch Hinges, Doetinchem, The Netherlands). Until then, several case studies had been performed in firms that were interested in applying the POLCA system. These firms have experimented with (elements of) the POLCA system, but did not yet implement it. The firm that has implemented POLCA is a small to medium sized enterprise that produces custom-made hinges (see <<INSERT Figure ) for industrial applications, i.e. in the business-to-business market. <<INSERT Figure ABOUT HERE>> Their customers are e.g., ship builders, furniture producers, train and machine builders. They need these hinges at the assembly line in their processes for their custom-made products. Batch sizes range from 0 to 00, with an average of 0. The size of the hinges ranges from Page of

16 International Journal of Production Research Page of 0 smaller than a centimeter to more than meter. The total number of orders per year is 00 with an average repetition rate of. orders per year for similar products. The first stage of the scan revealed that the main objectives of implementing POLCA were to improve the dependability (many orders were delivered two weeks over due) and reduce WIP and throughput time. Their lead times were - weeks, which needed to be reduced with more than % whenever the dependability had increased. The ultimate lead time target is weeks. It appeared that the most important causes for the high throughput times and the bad due date performance were due to the large work in progress, lack of information when deciding on the acceptance and release of jobs, and the functional organization of the shop floor. It was decided that these issues could be addressed using a POLCA system. The second stage investigated the possibility to apply a cellular structure. Until then, a pure functional structure had been applied, where machines were allocated without a clear plan and employees arrived at the start of their shift and asked the planner to assign them a job. It was up to the planner to select jobs that both could be produced (i.e., availability of materials, machine, tools and capabilities of employee matched) and needed to be produced (priority). The cellular structure that was proposed in stage assigned employees to cells. The tools and machines in the cells were color-coded. Each cell received an input-area, where products that need to be processed in that cell could be located and the accompanying order information could be left. In the new situation, buffers of inventory could only occur at these locations. A training program for the employees was developed to enable them to perform as many operations in the cell as possible. The third stage focused on the ERP system, cell throughput times, and order information. The firm did have estimates of process and set-up times (the latter ranging from minutes to one hour for a single order), but the information on expected throughput times of jobs in a cell could not be obtained from the ERP system. It was decided to buy some additional presses and milling machines in order to reduce the utilization rate and/or avoid too much intercellular traffic. This would change cell throughput times as well. Finally it was decided that the planner should make a realistic estimate of the cell throughput times, based on his experience. With respect to work content, it was decided to divide the large orders into several jobs in order to reduce the average work content of a job. This was preferred instead of adding complexity to the POLCA system by introducing a quantum (maximum of work content) per card. The fourth stage identified the product routings of the jobs. Each job needs to visit - operations, including external operations such as heating, special cleaning, et cetera. The average number of operations required is. The use of cells has decreased the number of steps in the routing, but only slightly. Hence, each order information card uses color-coded routing information, showing the sequence of cells that need to be visited through colored stickers. The planner prepares these accompanying slides before the job is released to the shop floor. See <<INSERT Figure. It is interesting to note that between two cells flows can exist in both directions, i.e. a flow from the red cell to the black cell and a flow back from the black cell to the red cell. The cards that were designed for this POLCA system have both the color of the two cells as well as their names on it (see upper side of <<INSERT Figure ), which makes identification of the correct card easy. There are different control loops in this system with six cells, so on average each cell has relations with four other cells. The black cell is an externally located supplier and functions as a cell in the POLCA system. <<INSERT Figure ABOUT HERE>> <<INSERT Figure ABOUT HERE>> Page of

17 Page of International Journal of Production Research 0 Finally, stage identified the number of cards that should circulate in these control loops. As there was no information on the cell throughput times and waiting times between the cells, formula () of section. could not be applied, and therefore formula () was used, using the estimates of the planner. This firm did not encounter serious problems with convergent or divergent routing structures, so no special modifications of the POLCA system were needed. Due to the absence of convergent routing structures, special release lists per cell were not required. A simple priority system was used instead. The information slides of all orders awaiting a Polca in this cell are put in sequence of arrival in a file box (see lower part of <<INSERT Figure ). The planner is authorized to re-sequence this list for planning reasons, and the employee is authorized to select a job that is not first in the list if he/she does not have the skills to complete the job. However, he should maintain the sequence as much as possible. The firm has implemented both the cellular structure and the circulating Polca s in October 0. At the moment of writing, the firm is very enthusiastic about the change and performance improvements realized. Dependability issues have been solved and throughput times are much shorter. Lead times have been reduced with more than 0%, and the firm now even offers lead times of to weeks for special products to their customers. An important benefit is that productivity per employee has increased, due to the cellular organization and the focus on craftsmanship in that area. The material planner has a better view of the progress of orders in the system. There are less peaks and troughs, and the reaction speed in case of machine breakdowns is much better. Employee satisfaction has increased as well. The team concept and the improved control of workload in the system helps them to focus on their area. The skills training and increased autonomy works out well. However, system design is still not finalized and it is too early to conclude that all objectives have been achieved. One of the things that has changed and works out very well is the change in behavior of the employees when starting their shift. They now know their responsibilities and tasks are less dependent on the decisions and authority of the planner, as they understand the basic mechanism of the POLCA system: only start working at a job when a signal is available that the next cell in the routing of this job has capacity available.. Conclusions and discussion The design of a POLCA system involves important decisions with respect to routing, release, and special facilities that may be needed in order to let the system function appropriately. This paper has shown that literature gives mainly attention to the effect of routing decisions, i.e. the number of POLCA loops and the number of cards that should circulate in a loop. For the latter decision, some alternative formula s are presented. The design of both the release system and special facilities receive much less attention in literature. However, cell-specific release lists provide an important tool for planners to command on the progress of jobs that already have been released to the shop floor. Other pull systems, such as KANBAN and CONWIP, do not provide such an authorization mechanism. Special facilities may be needed in case of assembly operations (convergent routing structures), divergent routing structures with work load balancing opportunities, or special circumstances (material shortages, breakdowns, et cetera). We propose to use a quick scan for POLCA system design that addresses the above mentioned issues. The scan consists of five stages. First, a gap analysis is performed that investigates whether the objectives of the firm match with the capabilities of a POLCA system. Next, POLCA cells, lead times and loops are identified. Finally, the effectiveness of applying POLCA in this situation is assessed. There are still very few fully operational POLCA implementations described in literature. Since October 0, a POLCA system is implemented in The Netherlands. We describe the POLCA system design in the case according to the five stages of the quick scan. The POLCA Page of

18 International Journal of Production Research Page of 0 system is able to control the complex processes with high routing, product mix, and processing time variety in this SME. Throughput times were reduced with more than 0%. Other benefits in terms of increased employee satisfaction, increased dependability, and improved control were substantial as well. Concluding, companies in the Make-To-Order segment may benefit from applying a material control system that is suitable to manage the complex product flows in these firms. The design of a POLCA system can be supported using the quick scan approach that we propose and that has been applied in the case study of the first firm in The Netherlands that has implemented POLCA. The literature review has shown that there is still a lack of case study descriptions. Future work should elaborate on these issues. Insights from these case studies should help to improve both the quick scan and enrich the description of relevant factors for designing routing, release and special facilities in POLCA systems. Acknowledgements We would like to thank Jacob Pieffers MSc Technology Management at the University of Groningen, and now associated with TCPM consultancy Hengelo, The Netherlands, who applied the POLCA scan at the case study described in this paper. Moreover, we would like to thank Godfried Kaanen, managing director of the firm Bosch Hinges, Doetinchem, The Netherlands, for his enthusiasm and for providing us the information for the case study. References Aigbedo, H., 00, Some structural properties for the just-in-time level schedule problem, Production Planning & Control, (), -. Becker, C., Scholl, A., 0, A survey on problems and methods in generalized assembly line balancing, European Journal of Operational Research, (), -. Bergamaschi, D., Cigolini, R., Perona, M., Portioli, A.,, Order review and release strategies in a job shop environment: a review and a classification, International Journal of Production Research, (), -. Bonvik A.M., Couch C.E., Gershwin S.B.,, A comparison of production-line control mechanisms, International Journal of Production Research, (), -0 Chang, T.M., Yih, Y.,, Generic kanban systems for dynamic environments, International Journal of Production Research, (), 0. Fernandes, N.O., Carmo-Silva, S. do, 0. Generic POLCA A production and materials flow control mechanism for quick response manufacturing. International Journal of Production Economics, 0(),. Framinan, J.M., González, P.L., Ruiz-Usano, R., 0, The CONWIP production control system: review and research issues, Production Planning and Control, (), -. Gaury, E.G.A., 00, Pull control systems: Classification and selection, PhD thesis, Tilburg University, The Netherlands. Germs, R., Riezebos, J., 0, Workload balancing capability of pull systems in MTO production, Preprints th working seminar on production economics, Innsbruck, Austria. Henrich, P., Land, M.J., Gaalman, G.J.C.., 0, Exploring applicability of the workload control concept, International Journal of Production Economics, 0, -.Hernández, W., Süer, G.A., (eds), 00, Proceedings Group Technology / Cellular manufacturing world symposium year 00, March - 00, San Juan, Puerto Rico. Hopp, W.J., Spearman, M.L., 0, Factory Physics, Foundations of Manufacturing Management, th ed., Irwin/McGraw-Hill, Burr Ridge, IL. Hunt, R.W.G.,, Measuring Colour, Ellis Horwood Ltd, Chichester. Page of

19 Page of International Journal of Production Research 0 Krishnamurthy, A., Suri, R., Vernon, M. K., 00, A New Approach for Analyzing Queueing Models of Material Control Strategies in Manufacturing Systems, Proc. th Int'l. Workshop on Queueing Networks with Finite Capacity (QNETs00), West Yorkshire, U.K., July 00. Krishnamurthy, A., Suri, R., Vernon, M.K., 0, Re-Examining the Performance of MRP and Kanban Material Control Strategies for Multi-Product Flexible Manufacturing Systems, The International Journal of Flexible Manufacturing Systems,, 0, 0. Krishnamurthy, A., Claudio, D., 0, Pull systems with advance demand information, -, in: Kuhl, M.E., Steiger, N.M., Armstrong, F.B., Joines, J.A., (eds), Proc. Winter Simulation conference, Piscataway, NJ: Institute of Electrical and Electronics Engineers. Lambrecht, M.R., Ivens, L.I., Vandaele, N.J.,, ACLIPS: A capacity and lead time integrated procedure for scheduling, Management Science, (). Land, M.J., Gaalman, G.J.C.,. The performance of workload control concepts in job shops: improving the release method, International Journal of Production Economics, -, -. Little, J.D.C.,, A proof for the queuing formula: L = λ W, Operations Research,, -. Lödding, H., Yu, K.W., Wiendahl, H.P., 0, Decentralized WIP-oriented manufacturing control (DEWIP), Production Planning and Control, (), -. Pieffers, J., Riezebos, J., 0. POLCA as innovative material control system (in Dutch), Technical Report University of Groningen, The Netherlands. ( Riezebos, J., 0, Design of a Period Batch Control planning system for cellular manufacturing, University of Groningen, The Netherlands. Riezebos, J., 0, Polca simulation of a unidirectional flow system, in: Riezebos, J., Slomp, J., (eds), 0, Proceedings of the Third International Conference on Group Technology / Cellular Manufacturing, University of Groningen, The Netherlands, July 0. Riezebos, J., 0, Polca scanningtool (in Dutch), Technical Report University of Groningen, The Netherlands. ( Riezebos, J., Slomp, J., (eds), 0, Proceedings of the Third International Conference on Group Technology / Cellular Manufacturing, University of Groningen, The Netherlands, July 0. Ryan, C.M., Choobineh, F., 0, Total WIP and WIP mix for a CONWIP controlled job shop, IIE Transactions, (),. Sormaz, D.N., Süer, G.A., (eds), 0, Proceedings Group Technology / Cellular manufacturing world symposium year 0, July - 0, Columbus, Ohio, USA. Spearman, M.L., Woodruff, D.L., Hopp, W.J.,. CONWIP: A pull alternative to kanban. International Journal of Production Research, (),. Stevenson, M., Hendry, L.C., Kingsman, B.G., 0. A review of production planning and control: the applicability of key concepts to the make-to-order industry. International Journal of Production Research, (), -. Sugimori, Y., Kusunoki, K., Cho, F., Uchikawa, S.,. Toyota production system and kanban system: Materialization of just-in-time and respect-for-human system. International Journal of Production Research, (),. Suri, R.,, Quick Response Manufacturing: A Companywide Approach to Reducing Leadtimes, Portland, OR: Productivity Press. Suri, R., 0, QRM and POLCA: A winning combination for manufacturing enterprises in the st Century, Technical Report Center for Quick Response Manufacturing, ( University of Wisconsin-Madison, USA. Page of

20 International Journal of Production Research Page of 0 Suri, R., Krishnamurthy, A., 0, How to plan and implement POLCA: a material control system for high-variety or custom-engineered products, Technical Report Center for Quick Response Manufacturing, ( University of Wisconsin-Madison, USA. Suri, R., 0, A lean strategy for job shops, Gear Technology, Nov-Dec 0. Tien, J.M., Krishnamurthy, A., Yasar, A., 0, Towards real-time customized management of supply and demand chains, Journal of Systems Science and Systems Engineering, (), pp. -. Vandaele, N., Claerhout, D., 0, A structural approach to control cellularized job shops, in: Riezebos, J., Slomp, J., (eds), 0, Proceedings of the Third International Conference on Group Technology / Cellular Manufacturing, University of Groningen, The Netherlands, July 0. Vandaele, N., Van Niewenhuyse, I., Claerhout, D., Cremmery, R., 0, Load-based POLCA: an integrated material control system for multiproduct, multimachine job shops, Manufacturing & Service Operations Management, 0(), -. Van der Zee, D.J., 0, Dynamic scheduling of batch servers with compatible product families, International Journal of Production Research, (), 0-. Zhou, X., Luh, P.B., 00, The performance of a new material control and replenishment system: a simulation and comparative study, in: R. Suri (Ed.) Proceedings of the Quick Response Manufacturing 00 Conference, 0-. Page of

21 Page of International Journal of Production Research 0 Source Theory Contribution Point of view Methods and Tools Suri Krishnamurthy et al. 00 Zhou & Luh 00 Riezebos 0 Lödding et al. 0 Ryan & Choobineh 0 Suri 0 Suri & Krishnamurthy 0 Krishnamurthy et al. 0 Tien et al. 0 Krishnamurthy & Claudio 0 Stevenson et al. 0 Suri 0 Fernandes & do Carmo-Silva 0 Riezebos 0 Vandaele & Claerhout 0 Germs & Riezebos 0 Vandaele et al. 0 Table Case Classification of POLCA literature Compare PPC CM Improve Routing Release Facilities Page of 0

22 International Journal of Production Research Page of 0 λ Q AB Q A BC Polca µ AB A Polca BC Figure POLCA control loops B Q CD µ B Polca CD C µ C Page of 0

23 Page of International Journal of Production Research 0 λ Q A Q AB Q A B Q BC Polca µ AB A Q Q B C CD Polca µ BC B C µ C Polca CD Figure Earliest release dates causing additional waiting time before jobs enter a cell Page of 0

24 International Journal of Production Research Page of 0 Release list Cell A (released on --0 (dd-m-yyyy)) Order Material Earliest start Route in cell A (proc. time) Next Required number check date Cell Polca's CL00 not ok --0 M ( 0) M ( ) M ( 0) B A / B CL00 ok --0 M ( ) M ( ) M ( ) B A / B CK00 ok --0 M ( 0) M ( ) C A / C ST ok --0 M (0) M (0) B A / B CK00 not ok --0 M ( ) M ( ) M ( 0) C A / C CL0 ok --0 M ( ) M ( ) M ( ) B A / B HY ok --0 M (00) M () M ( 0) B A / B ST ok --0 M (0) M () M () B A / B Table POLCA release list Page of 0

25 Page of International Journal of Production Research 0 Release lists M M Figure Convergent structure requiring multiple POLCA loops A P Page of 0

26 International Journal of Production Research Page of 0 A Z M A Figure Divergent structure Page of 0

27 Page of International Journal of Production Research 0 POLCA objectives Observe causes of problems that POLCA has to solve Analyse performance gaps and identify objectives for POLCA POLCA cells Observe resource and layout characteristics Identify POLCA cells POLCA lead times Observe process flow and capacity characteristics Identify required improvements POLCA loops Observe process routings between cells Identify the loops between cells POLCA effectiveness Observe product mix variety and production flexibility Assess the effectiveness of POLCA Figure Stages in POLCA scan Page of 0

28 International Journal of Production Research Page of 0 Figure Examples of custom-made hinges Page of 0

29 Page of International Journal of Production Research 0 Figure Example of order information slide Page of 0

30 International Journal of Production Research Page of 0 Figure Polca's awaiting new orders (above) and orders awaiting Polca s (below) Page 0 of 0

Workload Balancing Capability of Pull Systems in MTO Production

Workload Balancing Capability of Pull Systems in MTO Production Workload Balancing Capability of Pull Systems in MTO Production Remco Germs, Jan Riezebos To cite this version: Remco Germs, Jan Riezebos. Workload Balancing Capability of Pull Systems in MTO Production.

More information

Paired-cell Overlapping Loops of Cards with Authorization Simulation In Job shop Environment

Paired-cell Overlapping Loops of Cards with Authorization Simulation In Job shop Environment International Journal of Mechanical & Mechatronics Engineering IJMME-IJENS Vol:15 No:03 68 Paired-cell Overlapping Loops of Cards with Authorization Simulation In Job shop Environment Chong Kuan Eng, How

More information

Placement of effective work-in-progress limits in route-specific unit-based pull systems

Placement of effective work-in-progress limits in route-specific unit-based pull systems This article was downloaded by: [University of Groningen] On: 13 August 2012, At: 02:02 Publisher: Taylor & Francis Informa Ltd Registered in England and Wales Registered Number: 1072954 Registered office:

More information

A COMPARATIVE STUDY OF POLCA AND GENERIC CONWIP PRODUCTION CONTROL SYSTEMS IN ERRATIC DEMAND CONDITIONS. Ozgur Kabadurmus

A COMPARATIVE STUDY OF POLCA AND GENERIC CONWIP PRODUCTION CONTROL SYSTEMS IN ERRATIC DEMAND CONDITIONS. Ozgur Kabadurmus A COMPARATIVE STUDY OF POLCA AND GENERIC CONWIP PRODUCTION CONTROL SYSTEMS IN ERRATIC DEMAND CONDITIONS Ozgur Kabadurmus Department of Industrial and Systems Engineering, Auburn University Abstract The

More information

Optimal Work-In-Process control for a closed multistage production system with machine preference

Optimal Work-In-Process control for a closed multistage production system with machine preference Optimal Work-In-Process control for a closed multistage production system with machine preference Bacem Samet, Florent Couffin, arc Zolghadri, aher Barkalla, ohamed To cite this version: Bacem Samet, Florent

More information

Performance evaluation of centralized maintenance workshop by using Queuing Networks

Performance evaluation of centralized maintenance workshop by using Queuing Networks Performance evaluation of centralized maintenance workshop by using Queuing Networks Zineb Simeu-Abazi, Maria Di Mascolo, Eric Gascard To cite this version: Zineb Simeu-Abazi, Maria Di Mascolo, Eric Gascard.

More information

Guidelines for the Selection of FIFO Lanes and Supermarkets for Kanban-Based Pull Systems When to Use a FIFO and When to Use a Supermarket

Guidelines for the Selection of FIFO Lanes and Supermarkets for Kanban-Based Pull Systems When to Use a FIFO and When to Use a Supermarket Guidelines for the Selection of Lanes and Supermarkets for Kanban-Based Pull Systems When to Use a and When to Use a Supermarket Christoph Roser, Masaru Nakano To cite this version: Christoph Roser, Masaru

More information

Flow and Pull Systems

Flow and Pull Systems Online Student Guide Flow and Pull Systems OpusWorks 2016, All Rights Reserved 1 Table of Contents LEARNING OBJECTIVES... 4 INTRODUCTION... 4 BENEFITS OF FLOW AND PULL... 5 CLEARING ROADBLOCKS... 5 APPROACH

More information

Performance Analysis of Reverse Supply Chain Systems by Using Simulation

Performance Analysis of Reverse Supply Chain Systems by Using Simulation Performance Analysis of Reverse Supply Chain Systems by Using Simulation Shigeki Umeda To cite this version: Shigeki Umeda. Performance Analysis of Reverse Supply Chain Systems by Using Simulation. Vittal

More information

PRODUCTION PLANNING PROBLEMS IN CELLULAR MANUFACTURE

PRODUCTION PLANNING PROBLEMS IN CELLULAR MANUFACTURE PRODUCTION PLANNING PROBLEMS IN CELLULAR MANUFACTURE J. Riezebos Assistant professor Production systems design, University of Groningen, P.O.Box 800, 9700 AV Groningen, The Netherlands, email J.Riezebos@Bdk.Rug.NL,

More information

On the dynamic technician routing and scheduling problem

On the dynamic technician routing and scheduling problem On the dynamic technician routing and scheduling problem Victor Pillac, Christelle Gueret, Andrés Medaglia To cite this version: Victor Pillac, Christelle Gueret, Andrés Medaglia. On the dynamic technician

More information

Designing and Implementing a Framework for Process-Oriented Logistics-Costs Measurement in an Automotive-Supplier Group

Designing and Implementing a Framework for Process-Oriented Logistics-Costs Measurement in an Automotive-Supplier Group Designing and Implementing a Framework for Process-Oriented Logistics-Costs Measurement in an Automotive-Supplier Group Gregor Von Cieminski, Michael Karrer, Malte Zur To cite this version: Gregor Von

More information

Organizational Capability in Production Scheduling

Organizational Capability in Production Scheduling Organizational Capability in Production Scheduling Emrah Arica, Sven Buer, Jan Strandhagen To cite this version: Emrah Arica, Sven Buer, Jan Strandhagen. Organizational Capability in Production Scheduling.

More information

Flexibility in the Formation and Operational Planning of Dynamic Manufacturing Networks

Flexibility in the Formation and Operational Planning of Dynamic Manufacturing Networks Flexibility in the Formation and Operational Planning of Dynamic Manufacturing Networks Senay Sadic, Jorge Sousa, José Crispim To cite this version: Senay Sadic, Jorge Sousa, José Crispim. Flexibility

More information

Estimating traffic flows and environmental effects of urban commercial supply in global city logistics decision support

Estimating traffic flows and environmental effects of urban commercial supply in global city logistics decision support Estimating traffic flows and environmental effects of urban commercial supply in global city logistics decision support Jesus Gonzalez-Feliu, Frédéric Henriot, Jean-Louis Routhier To cite this version:

More information

Card-Based Delivery Date Promising in Pure Flow Shops with Order Release Control

Card-Based Delivery Date Promising in Pure Flow Shops with Order Release Control Card-Based Delivery Date Promising in Pure Flow Shops with Order Release Control Matthias Thürer (corresponding author) and Mark Stevenson Name: Institution: Address: E-mail: Name: Institution: Address:

More information

Card-Based Delivery Date Promising in High-Variety Manufacturing with Order Release Control

Card-Based Delivery Date Promising in High-Variety Manufacturing with Order Release Control Card-Based Delivery Date Promising in High-Variety Manufacturing with Order Release Control Formatted: Centered Matthias Thürer, Martin Land, Mark Stevenson, and Lawrence Fredendall Name: Institution:

More information

Dennis Bricker Dept of Mechanical & Industrial Engineering The University of Iowa. JIT --Intro 02/11/03 page 1 of 28

Dennis Bricker Dept of Mechanical & Industrial Engineering The University of Iowa. JIT --Intro 02/11/03 page 1 of 28 Dennis Bricker Dept of Mechanical & Industrial Engineering The University of Iowa JIT --Intro 02/11/03 page 1 of 28 Pull/Push Systems Pull system: System for moving work where a workstation pulls output

More information

One-of-a-Kind Production (OKP) Planning and Control: An Empirical Framework for the Special Purpose Machines Industry

One-of-a-Kind Production (OKP) Planning and Control: An Empirical Framework for the Special Purpose Machines Industry One-of-a-Kind Production (OKP) Planning and Control: An Empirical Framework for the Special Purpose Machines Industry Federico Adrodegari, Andrea Bacchetti, Alessandro Sicco, Fabiana Pirola, Roberto Pinto

More information

Collusion through price ceilings? In search of a focal-point effect

Collusion through price ceilings? In search of a focal-point effect Collusion through price ceilings? In search of a focal-point effect Dirk Engelmann, Wieland Müllerz To cite this version: Dirk Engelmann, Wieland Müllerz. Collusion through price ceilings? In search of

More information

Location of distribution centers in a multi-period collaborative distribution network

Location of distribution centers in a multi-period collaborative distribution network Location of distribution centers in a multi-period collaborative distribution network Xin Tang, Fabien Lehuédé, Olivier Péton To cite this version: Xin Tang, Fabien Lehuédé, Olivier Péton. Location of

More information

How Resilient Is Your Organisation? An Introduction to the Resilience Analysis Grid (RAG)

How Resilient Is Your Organisation? An Introduction to the Resilience Analysis Grid (RAG) How Resilient Is Your Organisation? An Introduction to the Resilience Analysis Grid (RAG) Erik Hollnagel To cite this version: Erik Hollnagel. How Resilient Is Your Organisation? An Introduction to the

More information

5.3 Supply Management within the MES

5.3 Supply Management within the MES Technical 6x9 / Manufacturing Execution Sytems (MES): Design, Planning, and Deployment / Meyer / 0-07-162383-3 / Chapter 5 Core Function Production Flow-Oriented Planning 85 Customer data (e.g., customer

More information

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation Atanu Mukherjee, President, Dastur Business and Technology Consulting,

More information

Facility Layout Planning of Central Kitchen in Food Service Industry: Application to the Real-Scale Problem

Facility Layout Planning of Central Kitchen in Food Service Industry: Application to the Real-Scale Problem Facility Layout Planning of Central Kitchen in Food Service Industry: Application to the Real-Scale Problem Nobutada Fujii, Toshiya Kaihara, Minami Uemura, Tomomi Nonaka, Takeshi Shimmura To cite this

More information

Optimal Storage Assignment for an Automated Warehouse System with Mixed Loading

Optimal Storage Assignment for an Automated Warehouse System with Mixed Loading Optimal Storage Assignment for an Automated Warehouse System with Mixed Loading Aya Ishigai, Hironori Hibino To cite this version: Aya Ishigai, Hironori Hibino. Optimal Storage Assignment for an Automated

More information

Integration of Supplier and Customer s Production Processes

Integration of Supplier and Customer s Production Processes Integration of Supplier and Customer s Production Processes Marek Eisler, Remigiusz Horbal To cite this version: Marek Eisler, Remigiusz Horbal. Integration of Supplier and Customer s Production Processes.

More information

Composite Simulation as Example of Industry Experience

Composite Simulation as Example of Industry Experience Composite Simulation as Example of Industry Experience Joachim Bauer To cite this version: Joachim Bauer. Composite Simulation as Example of Industry Experience. George L. Kovács; Detlef Kochan. 6th Programming

More information

Just-In-Time (JIT) Manufacturing. Overview

Just-In-Time (JIT) Manufacturing. Overview Just-In-Time (JIT) Manufacturing Overview The Just-in-Time (JIT) Manufacturing Philosophy Prerequisites for JIT Manufacturing Elements of JIT Manufacturing Benefits of JIT Manufacturing Success and JIT

More information

DIFFICULTIES IN GRAIN REFINING ALUMINUM LITHIUM ALLOYS USING COMMERCIAL Al-Ti AND Al-Ti-Bor MASTER ALLOYS

DIFFICULTIES IN GRAIN REFINING ALUMINUM LITHIUM ALLOYS USING COMMERCIAL Al-Ti AND Al-Ti-Bor MASTER ALLOYS DIFFICULTIES IN GRAIN REFINING ALUMINUM LITHIUM ALLOYS USING COMMERCIAL Al-Ti AND Al-Ti-Bor MASTER ALLOYS L. Labarre, R. James, J. Witters, R. O Malley, M. Emptage To cite this version: L. Labarre, R.

More information

Decomposing Packaged Services Towards Configurable Smart Manufacturing Systems

Decomposing Packaged Services Towards Configurable Smart Manufacturing Systems Decomposing Packaged Services Towards Configurable Smart Manufacturing Systems Taehun Kim, Seunghwan Bang, Kiwook Jung, Hyunbo Cho To cite this version: Taehun Kim, Seunghwan Bang, Kiwook Jung, Hyunbo

More information

CUWIP: A modified CONWIP approach to controlling WIP

CUWIP: A modified CONWIP approach to controlling WIP CUWIP: A modified CONWIP approach to controlling WIP Jules Comeau, professor at Université de Moncton, NB Uday Venkatadri, professor at Dalhousie University, Halifax, N.S. Cahier électronique de la Faculté

More information

WORKLOAD CONTROL AND ORDER RELEASE IN COMBINED MTO-MTS PRODUCTION

WORKLOAD CONTROL AND ORDER RELEASE IN COMBINED MTO-MTS PRODUCTION WORKLOAD CONTROL AND ORDER RELEASE IN COMBINED MTO-MTS PRODUCTION N.O. Fernandes 1, M. Gomes 1, S. Carmo-Silva 2 1 Polytechnic Institute of Castelo Branco, School of Technology Castelo Branco, Av. do Empresário

More information

Energy savings potential using the thermal inertia of a low temperature storage

Energy savings potential using the thermal inertia of a low temperature storage Energy savings potential using the thermal inertia of a low temperature storage D. Leducq, M. Pirano, G. Alvarez To cite this version: D. Leducq, M. Pirano, G. Alvarez. Energy savings potential using the

More information

Managing Systems Engineering Processes: a Multi- Standard Approach

Managing Systems Engineering Processes: a Multi- Standard Approach Managing Systems Engineering Processes: a Multi- Standard Approach Rui Xue, Claude Baron, Philippe Esteban, Hamid Demmou To cite this version: Rui Xue, Claude Baron, Philippe Esteban, Hamid Demmou. Managing

More information

Value-Based Design for Gamifying Daily Activities

Value-Based Design for Gamifying Daily Activities Value-Based Design for Gamifying Daily Activities Mizuki Sakamoto, Tatsuo Nakajima, Todorka Alexandrova To cite this version: Mizuki Sakamoto, Tatsuo Nakajima, Todorka Alexandrova. Value-Based Design for

More information

Sociotechnical Evaluation of Alternative and Innovative Shop Floor Control Systems

Sociotechnical Evaluation of Alternative and Innovative Shop Floor Control Systems Universal Journal of Management 5(3): 139-148, 2017 DOI: 10.13189/ujm.2017.050305 http://www.hrpub.org Sociotechnical Evaluation of Alternative and Innovative Shop Floor Control Systems J. Slomp Faculty

More information

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A. M. Uhrmacher, eds.

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A. M. Uhrmacher, eds. Proceedings of the 2012 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A. M. Uhrmacher, eds. A SIMULATION-BASED LEAN PRODUCTION APPROACH AT A LOW-VOLUME PARTS MANUFACTURER

More information

Inventory Management : Forecast Based Approach vs. Standard Approach

Inventory Management : Forecast Based Approach vs. Standard Approach Inventory Management : Forecast Based Approach vs. Standard Approach Y. Dallery, Z. Babai To cite this version: Y. Dallery, Z. Babai. Inventory Management : Forecast Based Approach vs. Standard Approach.

More information

Operational Considerations for Mass Customisation

Operational Considerations for Mass Customisation Operational Considerations for Mass Customisation 1 Andrew Lyons 1, Dong Li 1, Jorge Hernandez 1, Lucy Everington 1 e Business & Supply Chain Management Research Centre Technology & Innovation. Management

More information

Requirements for a Value Stream Mapping in Make-To-Order Environments

Requirements for a Value Stream Mapping in Make-To-Order Environments Requirements for a Value Stream Mapping in Make-To-Order Environments Christoph Koch, Hermann Lödding To cite this version: Christoph Koch, Hermann Lödding. Requirements for a Value Stream Mapping in Make-To-Order

More information

REAL-TIME ADAPTIVE CONTROL OF MULTI-PRODUCT MULTI-SERVER BULK SERVICE PROCESSES. Durk-Jouke van der Zee

REAL-TIME ADAPTIVE CONTROL OF MULTI-PRODUCT MULTI-SERVER BULK SERVICE PROCESSES. Durk-Jouke van der Zee Proceedings of the 2001 Winter Simulation Conference B. A. Peters, J. S. Smith, D. J. Medeiros, and M. W. Rohrer, eds. REAL-TIME ADAPTIVE CONTROL OF MULTI-PRODUCT MULTI-SERVER BULK SERVICE PROCESSES Durk-Jouke

More information

Modelling the trade off between period lenght and stages in a period batch control system Riezebos, Jan

Modelling the trade off between period lenght and stages in a period batch control system Riezebos, Jan University of Groningen Modelling the trade off between period lenght and stages in a period batch control system Riezebos, Jan IMPORTANT NOTE: You are advised to consult the publisher's version (publisher's

More information

Manufacturing Resource Planning

Manufacturing Resource Planning Outline Manufacturing Resource Planning MRP The Strategic Importance of Short- Term Scheduling Scheduling Issues Forward and Backward Scheduling Scheduling Criteria Outline Continued Scheduling Process-Focused

More information

A Concept for Project Manufacturing Planning and Control for Engineer-to-Order Companies

A Concept for Project Manufacturing Planning and Control for Engineer-to-Order Companies A Concept for Project Manufacturing Planning and Control for Engineer-to-Order Companies Pavan Kumar Sriram, Erlend Alfnes, and Emrah Arica Norwegian University of Science and Technology, Trondheim, Norway

More information

Monitoring of Collaborative Assembly Operations: An OEE Based Approach

Monitoring of Collaborative Assembly Operations: An OEE Based Approach Monitoring of Collaborative Assembly Operations: An OEE Based Approach Sauli Kivikunnas, Esa-Matti Sarjanoja, Jukka Koskinen, Tapio Heikkilä To cite this version: Sauli Kivikunnas, Esa-Matti Sarjanoja,

More information

PLUS VALUE STREAM MAPPING

PLUS VALUE STREAM MAPPING LEAN PRINCIPLES PLUS VALUE STREAM MAPPING Lean Principles for the Job Shop (v. Aug 06) 1 Lean Principles for the Job Shop (v. Aug 06) 2 Lean Principles for the Job Shop (v. Aug 06) 3 Lean Principles for

More information

Exploring Different Faces of Mass Customization in Manufacturing

Exploring Different Faces of Mass Customization in Manufacturing Exploring Different Faces of Mass Customization in Manufacturing Golboo Pourabdollahian, Marco Taisch, Gamze Tepe To cite this version: Golboo Pourabdollahian, Marco Taisch, Gamze Tepe. Exploring Different

More information

Occupational accidents in Belgian industry in restructuring contexts

Occupational accidents in Belgian industry in restructuring contexts Occupational accidents in Belgian industry in restructuring contexts Cédric Lomba To cite this version: Cédric Lomba. Occupational accidents in Belgian industry in restructuring contexts. What precariousness

More information

Impact of cutting fluids on surface topography and integrity in flat grinding

Impact of cutting fluids on surface topography and integrity in flat grinding Impact of cutting fluids on surface topography and integrity in flat grinding Ferdinando Salvatore, Hedi Hamdi To cite this version: Ferdinando Salvatore, Hedi Hamdi. Impact of cutting fluids on surface

More information

Heat line formation during roll-casting of aluminium alloys at thin gauges

Heat line formation during roll-casting of aluminium alloys at thin gauges Heat line formation during roll-casting of aluminium alloys at thin gauges M. Yun, J. Hunt, D. Edmonds To cite this version: M. Yun, J. Hunt, D. Edmonds. Heat line formation during roll-casting of aluminium

More information

Can combining web and mobile communication channels reveal concealed customer value?

Can combining web and mobile communication channels reveal concealed customer value? Can combining web and mobile communication channels reveal concealed customer value? Grégoire Bothorel, Régine Vanheems, Anne Guérin To cite this version: Grégoire Bothorel, Régine Vanheems, Anne Guérin.

More information

Finite Element Model of Gear Induction Hardening

Finite Element Model of Gear Induction Hardening Finite Element Model of Gear Induction Hardening J Hodek, M Zemko, P Shykula To cite this version: J Hodek, M Zemko, P Shykula. Finite Element Model of Gear Induction Hardening. 8th International Conference

More information

Conceptual Design of an Intelligent Welding Cell Using SysML and Holonic Paradigm

Conceptual Design of an Intelligent Welding Cell Using SysML and Holonic Paradigm Conceptual Design of an Intelligent Welding Cell Using SysML and Holonic Paradigm Abdelmonaam Abid, Maher Barkallah, Moncef Hammadi, Jean-Yves Choley, Jamel Louati, Alain Riviere, Mohamed Haddar To cite

More information

A Malthusian model for all seasons?

A Malthusian model for all seasons? A Malthusian model for all seasons? Paul Sharp, Jacob L. Weisdorf To cite this version: Paul Sharp, Jacob L. Weisdorf. A Malthusian model for all seasons?. PSE Working Papers n2008-03. 2008.

More information

The microstructure evolution of Fe-Si alloys solidified in a high static magnetic field

The microstructure evolution of Fe-Si alloys solidified in a high static magnetic field The microstructure evolution of Fe-Si alloys solidified in a high static magnetic field Chunmei Liu, Yunbo Zhong, Tianxiang Zheng, Weili Ren, Zuosheng Lei, Zhongming Ren To cite this version: Chunmei Liu,

More information

Exploring the Impact of ICT in CPFR: A Case Study of an APS System in a Norwegian Pharmacy Supply Chain

Exploring the Impact of ICT in CPFR: A Case Study of an APS System in a Norwegian Pharmacy Supply Chain Exploring the Impact of ICT in CPFR: A Case Study of an APS System in a Norwegian Pharmacy Supply Chain Maria Thomassen, Heidi Dreyer, Patrik Jonsson To cite this version: Maria Thomassen, Heidi Dreyer,

More information

Simulation for Sustainable Manufacturing System Considering Productivity and Energy Consumption

Simulation for Sustainable Manufacturing System Considering Productivity and Energy Consumption Simulation for Sustainable Manufacturing System Considering Productivity and Energy Consumption Hironori Hibino, Toru Sakuma, Makoto Yamaguchi To cite this version: Hironori Hibino, Toru Sakuma, Makoto

More information

Conception of a new engineering curriculum in smart buildings

Conception of a new engineering curriculum in smart buildings Conception of a new engineering curriculum in smart buildings Anne-Marie Jolly, Christophe Léger, Guy Lamarque To cite this version: Anne-Marie Jolly, Christophe Léger, Guy Lamarque. Conception of a new

More information

"Value Stream Mapping How does Reliability play a role in making Lean Manufacturing a Success " Presented by Larry Akre May 17, 2007

Value Stream Mapping How does Reliability play a role in making Lean Manufacturing a Success  Presented by Larry Akre May 17, 2007 "Value Stream Mapping How does Reliability play a role in making Lean Manufacturing a Success " Presented by Larry Akre May 17, 2007 LAKRE 2007 1 Lean Manufacturing What is Lean Manufacturing? A philosophy

More information

PERFORMANCE ANALYSES OF CONWIP CONTROLLED PRODUCTION SYSTEM USING SIMULATION

PERFORMANCE ANALYSES OF CONWIP CONTROLLED PRODUCTION SYSTEM USING SIMULATION PERFORMANCE ANALYSES OF CONWIP CONTROLLED PRODUCTION SYSTEM USING SIMULATION ROTARU Ana University of Pitesti, Faculty of Mechanics and Technology, Department of Management and Technology e-mail: ana_c_rotaru@yahoo.com

More information

Dynamic price competition in air transport market, An analysis on long-haul routes

Dynamic price competition in air transport market, An analysis on long-haul routes Dynamic price competition in air transport market, An analysis on long-haul routes Chantal Roucolle, Catherine Müller, Miguel Urdanoz To cite this version: Chantal Roucolle, Catherine Müller, Miguel Urdanoz.

More information

UNIT II PRODUCTION PLANNING AND CONTROL AND COMPUTERISED PROCESS PLANNING

UNIT II PRODUCTION PLANNING AND CONTROL AND COMPUTERISED PROCESS PLANNING UNIT II PRODUCTION PLANNING AND CONTROL AND COMPUTERISED PROCESS PLANNING 2 Process Planning Product design for each product has been developed in the design department. To convert the product design into

More information

Anne Peretz. To cite this version: HAL Id: halshs https://halshs.archives-ouvertes.fr/halshs

Anne Peretz. To cite this version: HAL Id: halshs https://halshs.archives-ouvertes.fr/halshs Development of a co-operative information system for the follow-up of evolution of users s situation (Children, youngs and adults mentally handicapped). Anne Peretz To cite this version: Anne Peretz. Development

More information

The Application of Lean Production Control Methods within a Process-Type Industry: The Case of Hydro Automotive Structures

The Application of Lean Production Control Methods within a Process-Type Industry: The Case of Hydro Automotive Structures The Application of Lean Production Control Methods within a Process-Type Industry: The Case of Hydro Automotive Structures Daryl Powell 1, Erlend Alfnes 1, and Marco Semini 2 1 Department of Production

More information

Infor CloudSuite Industrial Whatever It Takes - Advanced Planning & Scheduling for Today s Manufacturer

Infor CloudSuite Industrial Whatever It Takes - Advanced Planning & Scheduling for Today s Manufacturer Infor CloudSuite Industrial Whatever It Takes - Advanced Planning & Scheduling for Today s Manufacturer May 2017 CloudSuite Industrial Where Did APS Come From? APS grew out of the convergence of two movements.

More information

Lean and Agile Systems. Rajiv Gupta FORE School of Management October 2013 Session 6

Lean and Agile Systems. Rajiv Gupta FORE School of Management October 2013 Session 6 Lean and Agile Systems Rajiv Gupta FORE School of Management October 2013 Session 6 Module 1 Recap of Session 5 Module 2 Pull Production Rules of Kanban Module 3 Small Batch Production Level Production

More information

9. What are the activities within the scope of production planning? 1. Aggregate production planning

9. What are the activities within the scope of production planning? 1. Aggregate production planning UNIT-II PRODUCTION PLANNING AND CONTROL AND COMPUTERISED PROCESS PLANNING 1. Define Process Planning Process planning involves determining the sequence of processing and assembly steps that must be accomplished

More information

THE INTERPRETATION OF ELECTRON DIFFRACTION PATTERNS FROM Ni-Al MARTENSITE

THE INTERPRETATION OF ELECTRON DIFFRACTION PATTERNS FROM Ni-Al MARTENSITE THE INTERPRETATION OF ELECTRON DIFFRACTION PATTERNS FROM Ni-Al MARTENSITE M. Chandrasekaran, L. Delaey To cite this version: M. Chandrasekaran, L. Delaey. THE INTERPRETATION OF ELECTRON DIFFRACTION PAT-

More information

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras Lecture - 24 Sequencing and Scheduling - Assumptions, Objectives and Shop

More information

Comparison of lead concentration in surface soil by induced coupled plasma/optical emission spectrometry and X-ray fluorescence

Comparison of lead concentration in surface soil by induced coupled plasma/optical emission spectrometry and X-ray fluorescence Comparison of lead concentration in surface soil by induced coupled plasma/optical emission spectrometry and X-ray fluorescence Roseline Bonnard, Olivier Bour To cite this version: Roseline Bonnard, Olivier

More information

Towards a Modeling Framework for Service-Oriented Digital Ecosystems

Towards a Modeling Framework for Service-Oriented Digital Ecosystems Towards a Modeling Framework for Service-Oriented Digital Ecosystems Rubén Darío Franco, Angel Ortiz, Pedro Gómez-Gasquet, Rosa Navarro Varela To cite this version: Rubén Darío Franco, Angel Ortiz, Pedro

More information

JOB SEQUENCING & WIP LEVEL DETERMINATION IN A CYCLIC CONWIP FLOWSHOP WITH BLOCKING

JOB SEQUENCING & WIP LEVEL DETERMINATION IN A CYCLIC CONWIP FLOWSHOP WITH BLOCKING International Journal of Mechanical Engineering and Technology (IJMET) Volume 8, Issue 9, September 2017, pp. 274 280, Article ID: IJMET_08_09_029 Available online at http://www.iaeme.com/ijmet/issues.asp?jtype=ijmet&vtype=8&itype=9

More information

JOB SEQUENCING & WIP LEVEL DETERMINATION IN A CYCLIC CONWIP FLOWSHOP WITH BLOCKING

JOB SEQUENCING & WIP LEVEL DETERMINATION IN A CYCLIC CONWIP FLOWSHOP WITH BLOCKING International Journal of Mechanical Engineering and Technology (IJMET) Volume 8, Issue 9, September 2017, pp. 274 280, Article ID: IJMET_08_09_029 Available online at http://www.iaeme.com/ijmet/issues.asp?jtype=ijmet&vtype=8&itype=9

More information

Allocating work in process in a multiple-product CONWIP system with lost sales

Allocating work in process in a multiple-product CONWIP system with lost sales Allocating work in process in a multiple-product CONWIP system with lost sales S. M. Ryan* and J. Vorasayan Department of Industrial & Manufacturing Systems Engineering Iowa State University *Corresponding

More information

Prediction of the energy efficiency of an Ar-H2-O2 plasma torch with Ansys Fluent

Prediction of the energy efficiency of an Ar-H2-O2 plasma torch with Ansys Fluent Prediction of the energy efficiency of an Ar-H2-O2 plasma torch with Ansys Fluent M Vadon, Y Delannoy, G Chichignoud To cite this version: M Vadon, Y Delannoy, G Chichignoud. Prediction of the energy efficiency

More information

RE-EXAMINING THE PERFORMANCE OF MRP AND KANBAN MATERIAL CONTROL STRATEGIES FOR MULTI-PRODUCT FLEXIBLE MANUFACTURING SYSTEMS

RE-EXAMINING THE PERFORMANCE OF MRP AND KANBAN MATERIAL CONTROL STRATEGIES FOR MULTI-PRODUCT FLEXIBLE MANUFACTURING SYSTEMS RE-EXAMINING THE PERFORMANCE OF MRP AND KANBAN MATERIAL CONTROL STRATEGIES FOR MULTI-PRODUCT FLEXIBLE MANUFACTURING SYSTEMS Ananth Krishnamurthy Department of Decision Sciences and Engineering Systems,

More information

Cover-Time Planning, An alternative to Material Requirements Planning; with customer order production abilities and restricted Work-In-Process *

Cover-Time Planning, An alternative to Material Requirements Planning; with customer order production abilities and restricted Work-In-Process * International Conference on Industrial Engineering and Systems Management IESM 2007 May 30 - June 2, 2007 BEIJING - CHINA Cover-Time Planning, An alternative to Material Requirements Planning; with customer

More information

A framework to improve performance measurement in engineering projects

A framework to improve performance measurement in engineering projects A framework to improve performance measurement in engineering projects Li Zheng, Claude Baron, Philippe Esteban, Rui ue, Qiang Zhang To cite this version: Li Zheng, Claude Baron, Philippe Esteban, Rui

More information

IMPROVING THE SCHEDULING ALGORITHM OF LIMIS PLANNER

IMPROVING THE SCHEDULING ALGORITHM OF LIMIS PLANNER IMPROVING THE SCHEDULING ALGORITHM OF LIMIS PLANNER MASTER THESIS INDUSTRIAL ENGINEERING AND MANAGEMENT Student: First Supervisor : Second Supervisor: Roel Kikkert s0141178 Industrial Engineering and Management

More information

Smarter Round Robin Scheduling Algorithm for Cloud Computing and Big Data

Smarter Round Robin Scheduling Algorithm for Cloud Computing and Big Data Smarter Round Robin Scheduling Algorithm for Cloud Computing and Big Data Hicham Gibet Tani, Chaker El Amrani To cite this version: Hicham Gibet Tani, Chaker El Amrani. Smarter Round Robin Scheduling Algorithm

More information

Progress of China Agricultural Information Technology Research and Applications Based on Registered Agricultural Software Packages

Progress of China Agricultural Information Technology Research and Applications Based on Registered Agricultural Software Packages Progress of China Agricultural Information Technology Research and Applications Based on Registered Agricultural Software Packages Kaimeng Sun To cite this version: Kaimeng Sun. Progress of China Agricultural

More information

Interaction between mechanosorptive and viscoelastic response of wood at high humidity level

Interaction between mechanosorptive and viscoelastic response of wood at high humidity level Interaction between mechanosorptive and viscoelastic response of wood at high humidity level Cédric Montero, Joseph Gril, Bruno Clair To cite this version: Cédric Montero, Joseph Gril, Bruno Clair. Interaction

More information

Finished goods available to meet Takt time when variations in customer demand exist.

Finished goods available to meet Takt time when variations in customer demand exist. Delaware Valley Industrial Resource Center 2905 Southampton Road Philadelphia, PA 19154 Tel: (215) 464-8550 Fax: (215) 464-8570 www.dvirc.org Term Batch-and-Queue Processing Buffer Stock Catchball Cell

More information

International Journal of Industrial Engineering Computations

International Journal of Industrial Engineering Computations International Journal of Industrial Engineering Computations 10 (2019) 149 160 Contents lists available at GrowingScience International Journal of Industrial Engineering Computations homepage: www.growingscience.com/ijiec

More information

High Purity Chromium Metal Oxygen Distribution (Determined by XPS and EPMA)

High Purity Chromium Metal Oxygen Distribution (Determined by XPS and EPMA) High Purity Chromium Metal Oxygen Distribution (Determined by XPS and EPMA) K. Suzuki, H. Tomioka To cite this version: K. Suzuki, H. Tomioka. High Purity Chromium Metal Oxygen Distribution (Determined

More information

An update on acoustics designs for HVAC (Engineering)

An update on acoustics designs for HVAC (Engineering) An update on acoustics designs for HVAC (Engineering) Ken Marriott To cite this version: Ken Marriott. An update on acoustics designs for HVAC (Engineering). Société Française d Acoustique. Acoustics 2012,

More information

Chapter 17. Synchronizing and Balancing Processes. Level the master production schedule. Production. Time

Chapter 17. Synchronizing and Balancing Processes. Level the master production schedule. Production. Time Chapter 17 Synchronizing and Balancing Processes 1 Goal Achieve uniform flow Level the master production schedule Production Time Avg. Reduce the size of batches produced for final assembly Production

More information

Numerical investigation of tradeoffs in production-inventory control policies with advance demand information

Numerical investigation of tradeoffs in production-inventory control policies with advance demand information Numerical investigation of tradeoffs in production-inventory control policies with advance demand information George Liberopoulos and telios oukoumialos University of Thessaly, Department of Mechanical

More information

Agricultural biodiversity, knowledge systems and policy decisions

Agricultural biodiversity, knowledge systems and policy decisions Agricultural biodiversity, knowledge systems and policy decisions D Clavel, F Flipo, Florence Pinton To cite this version: D Clavel, F Flipo, Florence Pinton. Agricultural biodiversity, knowledge systems

More information

New approach of envelope dynamic analysis for milling process

New approach of envelope dynamic analysis for milling process New approach of envelope dynamic analysis for milling process Claudiu-Florinel Bisu, Miron Zapciu, Alain Gérard, V. Vijelea, Marin Anica To cite this version: Claudiu-Florinel Bisu, Miron Zapciu, Alain

More information

Computerized simulation of thermal behaviour during forging sequences

Computerized simulation of thermal behaviour during forging sequences Computerized simulation of thermal behaviour during forging sequences S. Hollard, J.-L. Noyes To cite this version: S. Hollard, J.-L. Noyes. Computerized simulation of thermal behaviour during forging

More information

Distribution Grid Planning Enhancement Using Profiling Estimation Technic

Distribution Grid Planning Enhancement Using Profiling Estimation Technic Distribution Grid Planning Enhancement Using Profiling Estimation Technic Siyamak Sarabi, Arnaud Davigny, Vincent Courtecuisse, Léo Coutard, Benoit Robyns To cite this version: Siyamak Sarabi, Arnaud Davigny,

More information

Production Release Control: Paced, WIP-Based or Demand-Driven? Revisiting the Push/Pull and Make-to-Order/Make-to-Stock Distinctions

Production Release Control: Paced, WIP-Based or Demand-Driven? Revisiting the Push/Pull and Make-to-Order/Make-to-Stock Distinctions Production Release Control: Paced, WIP-Based or Demand-Driven? Revisiting the Push/Pull and Make-to-Order/Make-to-Stock Distinctions George Liberopoulos Department of Mechanical Engineering University

More information

Balanced Scorecard leading indicators to monitor performance variability in OHS management systems.

Balanced Scorecard leading indicators to monitor performance variability in OHS management systems. New Balanced Scorecard leading indicators to monitor performance variability in OHS management systems Frédéric Juglaret, Jean-Marc Rallo, Raoul Textoris, Franck Guarnieri, Emmanuel Garbolino To cite this

More information

Selecting the components of composites

Selecting the components of composites Selecting the components of composites M. Ashby To cite this version: M. Ashby. Selecting the components of composites. Journal de Physique IV Colloque, 1993, 03 (C7), pp.c7-1595-c7-1600. .

More information

Drum- and -Disc-Engine with Shape Memory Wires

Drum- and -Disc-Engine with Shape Memory Wires Drum- and -Disc-Engine with Shape Memory Wires F.-U. Glasauer, I. Müller To cite this version: F.-U. Glasauer, I. Müller. Drum- and -Disc-Engine with Shape Memory Wires. Journal de Physique IV Colloque,

More information

A simple gas-liquid mass transfer jet system,

A simple gas-liquid mass transfer jet system, A simple gas-liquid mass transfer jet system, Roger Botton, Dominique Cosserat, Souhila Poncin, Gabriel Wild To cite this version: Roger Botton, Dominique Cosserat, Souhila Poncin, Gabriel Wild. A simple

More information

A Performance Measurement System to Manage CEN Operations, Evolution and Innovation

A Performance Measurement System to Manage CEN Operations, Evolution and Innovation A Performance Measurement System to Manage CEN Operations, Evolution and Innovation Raul Rodriguez-Rodriguez, Juan-Jose Alfaro-Saiz, María-José Verdecho To cite this version: Raul Rodriguez-Rodriguez,

More information

Simultaneous Perspective-Based Mixed-Model Assembly Line Balancing Problem

Simultaneous Perspective-Based Mixed-Model Assembly Line Balancing Problem Tamkang Journal of Science and Engineering, Vol. 13, No. 3, pp. 327 336 (2010) 327 Simultaneous Perspective-Based Mixed-Model Assembly Line Balancing Problem Horng-Jinh Chang 1 and Tung-Meng Chang 1,2

More information