1 HSE DIRECTIVE 11 SAFE JOB ANALYSIS Directive owner per Bjarte Skulstad Please consult the asset s HSE instructions for potential installation specific requirements SJA

2 1 GENERAL Purpose The purpose of the directive is to ensure that a Safe Job Analysis is used when planning critical work tasks a Safe Job Analysis is carried out in a systematic manner and in accordance with standard practice on the Norwegian continental shelf Domain The directive applies to all BP-operated and contracted installations on the Norwegian continental shelf Onshore facilities or projects where BP Norge have a particular responsibility and which are assessed being part of the petroleum activities. Contractors of contracted installations who have a system that satisfies the requirements in this directive, may use their own system provided this has been clarified upon implementation References Activities regulations 30 OMS Risk 3.1 Risk Assessment and Management Norwegian Oil and Gas Association guideline 090 Common Model for Safe Job Analysis HSE Directive no. 1 - Work Permits Definitions and abbreviations A Work Permit (WP) is a written permission to carry out a defined job at a specific place on an installation in a safe manner and under certain conditions The Department Manager is the manager of a specific department CCR (Central Control Room) HSE function (safety officer) - HSE advisor The Area Authority is head of all activities within a certain area The Area Technician has the operational responsibility for a specific system or area The Offshore Installation Manager (OIM) is the top manager of all activities in the field A Safe Job Analysis (SJA) is a systematic and step-by-step review of all elements of risk carried out prior to a specific task or operatoin so that measures can be taken to remove or control any elements of risk identified during the preparation for or performance of the said task or operation. The person responsible for the SJA is the person responsible for the SJA, e.g. the supervisor, area authority or anyone else given the responsibility for the work to be performed. A CCR Technician is a person in the central control room who controls and coordinates all production and other work on board. 317

3 2 RESPONSIBILITY Offshore Installation Manager (OIM) is responsible for ensuring that a Safe Job Analysis (SJA) is carried out for critical operations as described in the directive ensuring that SJAs are performed in accordance with the directive and guidelines ensuring that all relevant personnel have the knowledge necessary to prepare a SJA, in line with their roles in connection with the performance of SJAs Person responsible for the SJA is responsible for preparing and inviting to the SJA meeting chairing the SJA meeting ensuring that analyses with participants are documented ensuring that all identified measures are implemented ensuring that experiences are summed up on completion of the work Person responsible for performing the work (Supervisor) is responsible for performing the work concerned ensuring that conditions and measures identified in the SJA are satisfied and implemented Person responsible for measures is responsible for carrying out measures identified in the SJA Department Manager is responsible for filing all completed SJAs in his/her department Area Authority is responsible for approving the SJA 3 USE OF SAFE JOBANALYSES Identifying the need for a SJA A Safe Job Analysis (SJA) shall be carried out for a work task when oorisk elements exist or may occur, and these are not sufficiently considered and examined in procedures or work permits oothere is a requirement for this in procedures, directives or work programmes 318

4 The following must be taken into account when considering the need for a SJA : 1. Is the work task described in procedures/routines or does it require deviations from these? 2. Have all the elements of risk been considered and examined through the work permit? 3. Do undesired incidents often occur in this type of work? 4. Is the work risky, complex or does it involve more than one discipline group? 5. Is new equipment or methods not covered by procedures or methods used? 6. Do the personnel performing the job have experience in the work concerned? Responsibility for identifying the need for a SJA Everyone involved in planning, approving and performing work and work permits shall consider whether a SJA is required A new SJA shall be carried out for each job. It may nevertheless be sensible to use lessons learnt from previously performed SJAs When the need for a SJA has been demonstrated, a person responsible for the SJA shall be appointed 4 PERFORMING SJA`S Preparation in preparation for an SJA meeting, the person responsible for the SJA shall collect data, drawings, previous experience and any available risk assessments for the work in question prepare draft breakdown of the work into sub-tasks and showing sequence of the work execution consider preconditions for the work define participants to carry out the SJA (the SJA group) call an SJA meeting the SJA meeting must be carried out as near in time as practically possible to the start-up of the work Participants in the SJA group Everyone actively involved in the preparations for and performance of the job concerned will normally be part of the SJA group, and may include: The person responsible for the SJA The supervisor The area authority The area technician The performing personnel The relevant safety delegate (shall always be invited) 319

5 Personnel with relevant discipline skills for the analysis Personnel affected by the work HSE function Performing a SJA The SJA Form shall be used for implementation. The Guidelines for using and filling in SJA forms can be used. 1. The person responsible for the SJA reviews the job to be done, with preconditions and necessary basis for planning 2. The SJA group shall carry out an inspection of the work site 3. The SJA group breaks down the entire job into sub-tasks, which are described briefly, clearly and action-oriented 4. The SJA group identifies potential hazard elements for personnel, the environment or financial values for each sub-task 5. The SJA group considers the probability of hazard elements, and consequences in the event that hazards arise, on the basis of their experience and best judgement. A risk matrix can be used to facilitate this process 6. The SJA group identifies primarily measures that can prevent hazardous incidents from occurring (probability-reducing measures). The SJA checklist is to be used to quality-assure that potential hazard elements, consequences and measures are assessed 7. The person responsible for the SJA identifies persons responsible for the identified measures, and notes this information on the form 8. The SJA group evaluates remaining risk and conducts a comprehensive evaluation to determine whether the work can be/cannot be implemented Documentation The Safe Job Analysis must be documented in the SJA form which will be signed by the person responsible for the SJA on behalf of the SJA group The SJA checklist and signed List of Participants must be attached to the SJA form Approval The area authority and supervisor review and approve the SJA form The daily information meeting will be informed of, and coordinate the planned SJA job Performing a job All personnel involved will go through the job immediately before starting to work. The job must be performed in accordance with the SJA and the work permit 320

6 Prior to and during the work being performed, the supervisor shall ensure that oothe preconditions for the work are fulfilled ooall planned measures have been taken The work must be stopped forthwith in the event of changes in the preconditions or measures described in the SJA and may not be resumed until a new SJA has been carried out. The supervisor must make sure that any new performing personnel go through the SJA documentation thoroughly before starting to work. This must be documented and signed for on the List of Participants Experience transfer On completion of the work the person responsible for the SJA will prepare a brief summary of the SJA-related lessons learnt from the work. The summary will be registered in the SJA form The department manager will file the SJA form w/appendices and the lessons learnt for his/her department. The SJA must be numbered so as to be easily retrievable 321

7

8 HSE DIRECTIVE 11 SAFE JOB ANALYSIS ATTACHMENTS Attachment 1: SJA - Form Attachment 2: Instructions for Completion and Use Of SJA forms HSE DIRECTIVE 1 - WORK PERMITS Attachment 3: ATTACHMENTS Checklist for SJA Attachment 4: Attachment 1: SJA participant Work listpermit Form Level 1 Attachment 5: Attachment 2: Risk Matrix Work Permit Form Level 2 Attachment 3: Guidelines For Completing And Using Work Permit Form Attachment 4: Fire Guard s Duties Attachment 5: Safety Measures For Working With Hydrocarbon Carrying Systems Attachment 6: Safety Measures For Working With Hazardous Chemicals Attachment 7: Safety Measures For Jet Water Washing Over 250 Bar Attachment 8: Safety Measures For Pressure Testing Attachment 9: Form For Approval Of Hot Work Class A In Classified Areas Attachment 10: Advance Approval Of Hot Work Class A In Classified Areas Attachment 11: Form For Logging Heating Value

9 ATTACHMENT 1: SJA-FORM SJA title: SJA No.: Department/Discipline: Person responsible for SJA: Description of the work: Installation: Tag/line no.: Area/Module/Deck: Requirements/Preconditions: WP/WO no.: Number of attachments: No Basic steps Hazard/cause Potential consequence Measures Person responsible for measures Is the total risk acceptable: (Yes/No)? Approval Date/Signature Checklist for SJA applied tick off Person responsible for SJA (Recom.) Summary of experience after completion of the work: Conclusion/comments: Responsible for execution (Recom.) Area/Operations supervisor (Appro.) Other position (Appro.) 324

10 ATTACHMENT 2: INSTRUCTIONS FOR COMPLETION AND USE OF SJA FORMS Top section to be completed by the person responsible for the SJA in preparation for the SJA meeting. SJA Tittel SJA no. Dept./discipline SJA officer Description of work Installation Area/module/ deck No. equipment/ line Prerequisites WP/WO no. No. of appendices Brief descriptive work title Serial number for the SJA based on the following system: SJA-U where U stands for Ula and is the first analysis in 2004 Name of the performing department/discipline Name of the person responsible for the SJA Brief and precise description of the work Name of the platform on which the work will be carried out Name of the area, module or deck on which the area is to be carried out The number of the equipment or pipeline on which work is to be carried out State any job prerequisites Reference to the work permit/work order number State the number of appendices In addition, the SJA officer should do a preliminary break down of the work into sub-tasks, see the mid-section of the form. Mid section to be completed during the SJA meeting No Subtask Subtask s serial number A brief description of each subtask, step by step Break down the job into logical steps Give a brief and precise description of what needs to be done at each step(not how) Describe the subtasks in normal consecutive order For each step, start with an action word such as Open, Remove, Move Avoid too detailed/extensive descriptions of each step 325

11 Elements of risk/cause Possible consequence Measures Responsible person Signature List all elements of risk and causes of possible undesired incidents that may occur List possible consequences of each risk/cause List measures to be taken for each consequence where this is considered necessary State the person responsible for each of the measures The signature of the person responsible for carrying out the measure Lower section to be completed at the end of the SJA meeting Checklist studied (yes/no) Is the total risk level acceptable (yes/ no) Conclusion/ comments SJA responsible Responsible for the job performance Area/operating authority Other position Lower, right part Experience summary after the job State whether the SJA checklist has been used (yes or no) Indicate the team s conclusion (yes or no) Briefly describe the conclusion of the analysis made SJA responsible s signature on behalf of the SJA team Supervisor/performing technician s approval signature Area authority s approval signature (not in use) To be filled in by SJA responsible after the work is completed Short description of the work according to the SJA and incidents/ situations during the work. 326

12 ATTACHMENT 3: CHEKCLIST FOR SJA No Checklist for SJA No: Safeguarded Yes No Not SJA Title: Applic. A Documentation and experience 1 Is this a familiar work operation for the crew? 2 Is there an adequate procedure/instruction/work package? 3 Is the group aware of experiences/ incidents from similar activities/sja? B Competence 1 Do we have the necessary personnel and skills for the job? 2 Are there other parties that should participate in the SJA meeting? C Communication and coordination 1 Is this a job where several units/crews must be coordinated? 2 Is good communications and suitable means of communication in place? 3 Are there potential conflicts with simultaneous activities (system/area/ installation)? 4 Has it been made clear who is in charge for the work? 5 Has sufficient time been allowed for the planning of the activities? 6 Has the team considered handling of alarm/emergency situations and informed emergency functions about possible measures/actions? D Key physical safety systems 1 Are barriers, to reduce the likelihood of unwanted release/leakage maintained intact (safety valve, pipe, vessel, control system etc.)? 2 Are barriers, to reduce the likelihood of the ignition of a HC leakage maintained intact (detection, overpressure protection, isolation of ignition sources etc.)? 3 Are barriers to isolate leakage sources/lead hydrocarbons to safe location maintained intact (process/emergency shutdown system, blowdown system, x-mastree, drains etc.)? 4 Are barriers to extinguish or limit extent/spread of fire/explosion maintained intact (detection/ alarm, fire pump, extinguishing system/equipment etc.)? 5 Are barriers to provide safe evacuation of personnel maintained intact (emergency power/lightning, alarm/pa, escape-ways, lifeboats etc.)? 6 Are barriers that provide stability to floating installations maintained intact (bulkheads/doors, open tanks, ballast pumps etc.)? E Equipment worked on/involved in the job 1 Is the necessary isolation from energy provided (rotation, pressure, electrical voltage etc.)? 2 May high temperature represent a danger? 3 Is there sufficient machinery protection/shields? F Equipment for the execution of the job 1 Is lifting equipment, special tools, equipment/material for the job available, familiar to the users, checked and found in order? 2 Do the involved personnel have proper and adequate protective equipment? 3 Is there danger of uncontrolled movement/rotation of equipment/tools? G The area 1 Is it necessary to make a worksite inspection to verify access, knowledge about the working area working conditions etc.? 2 Has work at heights/at several levels above each other/falling objects been considered? 3 Has flammable gas/liquid/material in the area been considered? 4 Has possible exposure to noise, vibration, poisonous gas/liquid, smoke, dust, vapour, chemicals, solvents or radioactive substances been considered? H The workplace 1 Is the workplace clean and tidy? 2 Has the need for tags/signs/barriers been considered? 3 Has the need for transportation to/from the workplace been considered? 4 Has the need for additional guards/watches been considered? 5 Has weather, wind, waves, visibility and light been considered? 6 Has access/escape been considered? 7 Has difficult working positions, potential for work related diseases been considered? I Additional local questions Comments Work site inspection shall be done 327

13 ATTACHMENT 4: SJA PARTICIPANT LIST SJA PARTICIPANT LIST SJA TITLE: SJA NO: SJA Meeting Date: Time: Place: Signature when changing personnel etc. SJA-responsible: Name (Block letters) Dep/Discipline Date Signature Name (Block letters) Dep/Discipline Date Signature 328

14 ATTACHMENT 5: RISK MATRIX Assessment of hazards probability and consequence In some cases it may be appropriate for the SJA group to use a risk matrix in the assessment of a hazard, i.e. assessing the probability of an undesirable incident occurring, and its consequences. A risk evaluation of this kind may help clarify the need and priority of measures to reduce the risk or its consequences. The evaluation method is a rough qualitative approach, and highrisk hazards may well be subjected to a more detailed evaluation later on. Using the risk matrix A risk matrix is used to assess/estimate risk by plotting the probability of an undesirable incident along one axis and the degree of consequences along the other axis. This must be done for each subtask, cf. the SJA form. If the combination of probability and consequence (cf. the matrix) reaches Medium or High, measures will be needed. Each company will generally have their own matrix used in risk analysis, but a simplified version such as the one shown below with three levels of probability and three degrees of severity, may be useful when performing SJA. Probability Consequence Low Medium High Low L L M Medium L M H High M H H Degree of consequence/severity High Death, serious injury or illness, significant contamination, significant damage to equipment or materials, significantly delayed production, gas-/oil leak, impairment of all or parts of the facility s safety integrity Medium Day Away From Work Case minor injury, minor pollution, minor damage to equipment/material, minor deferred production, minor gas-/oil leak, weakening parts of the facility s safety integrity (for example, a module) 329

15 Low No personal injury, small/negligible pollution, small/ negligible damage to equipment or materials, insignificant deferred production, negligible gas-/ oil leak, local/negligible deterioration of the facility s safety integrity Probability: High Probably, may happen several times during a year Medium Possible, may happen occasionally, the incident has occurred on the installation Low Not very realistic/likely, but conceivable, the event has occurred in the industry 330